Loading...
7 WHEATLAND STREET - BUILDING INSPECTION Pedf#ems 74520 40°/a P4 I i is c Ci UJc uao W1TYt C>Rt�4LtSM - CITY OF SALEM, MASSACHUSETTS !(" BUILDING DEPARTMENT 120 WASHINGTON STREET,3x FLOOR TEL. (978) 745-9595 FAX(978)740-9846 KIMBERLEY DRISGOLL MAYOR THOMAS STTIERRE DIRECTOR OF PUBLIC PROPERTY/BUILDING COMMISSIONER May 26, 2015 Edward Valewzuela 9 Wheatland Street Salem Ma. 01970 9 Wheatland Permit Dear Mr. Valewzuela, I am in receipt of a Building permit package for a second egress on your property. While the property was being marketed, I was asked to determine the legal status of the home. I found no building permits or zoning relief for the creation of a second unit. In fact, I shared this information with Salem Fire Prevention. Therefore,I am denying the building permit for this property. If you feel you are aggrieved by this denial, your Appeal is to the Salem Zoning Board of Appeals. If you have any questions,please contact me directly Sincer , Thomas St.Pierre Final Construction Control I}ll (tFt;V SDEPWICES E, i To be submitted at completion of construction by a Registered Design Professional015 OCT 2 1 P 2- 35 r�u for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107.6.4 Project Title: Second Means of Egress Date:7/21/15 Permit No. Property Address: 9 Wheatland St Salem,Ma. Project: Check(x)one or both as applicable:X New construction Existing Construction eA Project description: Second Means of Egress I Robert A. Guay P.E. MA Registration Number: 43126 Expiration date: 6/30/2018 ,am a registered design professional, and hereby certify that I have�7repared or directly supervised the preparation of all design plans, computations and specifications concerning Entire Project X Architectural X Structural Mechanical Fire Protection Electrical Other: for the above named project. I certify that I, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis to determine that the work proceeded in accordance with the requirements of 780 CMR and the design documents prepared by me and approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Enter in the space to the right a"wet"or electronic signature and seal: f• ftU /y r W o- Phone number: 508.989.7911 Email: rguay@res-design.com sem_ i Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen, provide a description. Trial Version 10092012 Iv ICY t of � ' 3 7 1 '82 MR 17 A10 :49 " A� uttr3 rrf ems[ DECISION UN THE PETITION OF WILFRED PETTIPAS CITY :.Ea? CrFtCE SAALEM .N. S'; ;:FOR A SPECIAL PERMIT FOR-7- WHEATLAND STREET A hearing on this Petition was held on March 10, 1982 with the following 'Board Members present:. Douglas Hopper, Chairman; Messrs. Piemonte, Hacker, LaBrecque and Feeherry. Notice of the hearing was sent to abutters and ":others and notices of the hearing.were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The Petitioner has requested the right to construct an addition to the first floor of the existing building at the site. The proposed construction will, however, extend an existing non-conforming structure. The existing structure encroaches in theminimum sideyard at the site; the proposed addition will likewise be built to within 3' 6" of the side line. The provision of the Salem Zoning Ordinance which is applicable to this request for a Special Permit is Section V B 10, which provides as follows: Notwithstanding anything to the contrary appearing in this Ordinance, the Board of Appeal may, in accordance with the procedure and conditions set forth in Section VIII F and IX D, 'grant Special Permits for \: alterations and reconstruction. of nonconforming structures, and for changes, enlargement, extension or expansion of nonconforming lots, land, structures, and uses, provided, however, that such change, extension, enlargement or expansion shall not be substantially more detrimental than the existing nonconforming use to the neighborhood. In more general terms, the Board is, when reviewing Special Permit requests, guided by the rule that a Special Permit request may be granted upon a finding by .the Board that the grant of the Special Permit will promote the public health,,'.safety, convenience and welfare. The Board, after considering the evidence ,at the hearing on this matter, makes the following findings of fact: 1. The proposed addition will improve the appearance of the property in question. 2. The proposed addition will have a negligible impact upon the property of abutters and other neighbors. 3. The proposed addition was unopposed .by anyone. On the basis of the above findings of fact and on the evidence presented at the public hearing, the Board of Appeal finds (i) that the proposed use of the i I property will not be substantially more detrimental than the existing use to the neighborhood, (ii) that the proposed use of the property will promote the public health, safety, convenience, and welfare, and (iii) that the proposed use of the property is in harmony with the Salem Zoning Ordinance. Accordingly, the Board unanimously approves the granting of a Special Permit to the Petitioners. DECISION — March 10, 1982 — WILFRDD PETTIPAS '82 MAR 17 A10 :49 Page 2 CITY CURK':, OFFICE SAC. The Special Permit is therefore granted in accordance with the following terms and conditions: 1) The Petitioner .is authorized to construct a 16' x 24' addition at the rear of the first floor of the existing structure at the site. 2) The addition may encroach into the minimum sideyard to within 3' x 6" of the property side line. 3) Plans shall. be submitted to. the Building Inspector prior to the commence- ment of any work at the site. . I 4) The Petitioner shall comply with all applicable provisions of Mass. Gen. Laws and the State Building Code with respect to smoke detectors and shall submit plans for stamped approval by the Salem ire Marshal.. all - nthony M. Fe berry t - A??°AL rl._:1 `. E v C_ r -... ' TJ n: 17 OF DIE .'.'ASS. . .. - C°i_t'.^.L Lk,:Z6r..: ice. 'Lig, f. .:r'.._ r'-E-i .i 2d 1CaiS A T_4 fi: '-A-E 0: Fi L1ii0 - - .. CF TrnS :"C :.: G C T.._ 'Gii! 'sCT- • - ' •' ; ;i CR 1° S AIS ... .A:; :.ct= `:._ .....E .:... _ uF 1P. 0 ..�aR" OF R4CuRO OR i$ RECu3DED AND ia' ED n= THE 0\ii:ER'S 0::'.itF-�. c 4 Tic E. - .F. . .. - BOARD OF APPEAL A COPY OF THIS DECISION AND PLANS HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK City of Salem, Mass. ELECTRICAL DEPARTMENT 44 Lafayette Street PAUL M. TUTTLE ,CITY ELECTRICIAN DATE . � : . � . % . . . . . . . . . . To: INSPECTOR OF BUILDINGS Salem, Mass. /,/, , �, r, A r i 7/,., Electrical Contractor -------- ----- - ----------------------- ----------- (Signature of Applicant) -------------------------------------------------------------------------------------------------------- /l.� has signified their intention of performing the required electrical work, viz: removing and later replacing all electrical wires, fixtures, receptacles, etc., on outside of building located at: 14, /i. _ _.' T1 - ' � Street . ------ --- i in conjunction with a wall siding installation to be made by: jr-.., , . ___ I '___ ------------------ /____._ ------------ Siding Contractor i % /�.� ----------- ISSUED BY ^.r ✓s ... ...................... --------------------------------------------- This is a requirement, preliminary to the issuance of a permit for the sidewall installation by the Inspector of Buildings. ORIGINAL-SIDEWALL INSTALLER PINK COPY-BLDG.INSP. YELLOW COPY-ELEC. FILE