2016-05-11 SRA MinutesSRA
May 11, 2016
Page 1 of 9
City of Salem Massachusetts
Public Meeting Minutes
Board or Committee: Redevelopment Authority, Regular Meeting
Date and Time: Wednesday, May 11, 2016 at 6:05 pm
Meeting Location: 120 Washington Street, Third Floor Conference Room
Members Present: Vice-Chairperson Grace Harrington, Conrad Baldini,
Robert Curran, Matthew Smith, Russell Vickers
Members Absent: None
Others Present: Lynn Duncan, Andrew Shapiro
Recorder: Colleen Anderson
Vice-Chairperson Grace Harrington calls the meeting to order. Roll call was taken.
Urban Renewal Area Projects Under Review
1. 24 New Derby Street (Artists’ Row): Discussion and vote on “Mural Slam” concept.
Deborah Greel, the Salem Public Art Planner, was present to present the “Mural Slam”
concept.
Greel stated that the Salem Arts Festival is scheduled for June 4th-6th. The back of the
buildings along Artists’ Row are blank walls. Mural slams are paintings that last two days.
The walls themselves will not be painted. 4x8 pieces of plywood will be primed, attached to
the walls, and murals will be painted on them. 10 artists have submitted applications so far.
When driving by it is not apparent that this is a place for art and these murals will call
attention to this area. If it becomes popular it can be done every year.
Baldini asked how long the mural will stay in place and noted that the rain will warp the
plywood.
Greel replied at least through October. The mural surface will be treated to help them last,
these boards are smaller so they could bend more, but alternate plywood options are being
considered.
Shapiro stated that public art projects go straight to the SRA and the DRB does not review
them. SRA will approve it as a concept proposal and the Public Art Commission will also
review it.
Greel stated that the PAC has already reviewed and approved the project.
Vickers: Motion to approve the “Mural Slam” concept.
Seconded by: Curran, Passes 5-0.
2. Lappin Park: Discussion and vote on proposed installation of “Free Little Library”
Deborah Greel, the Salem Public Art Planner, was present to present the “Free Little
Library” project.
There is one in town already at the Carlton School. The DRB has approved the library and
in the colors to that would match the Adirondack chairs. The library will make the park
more engaging. It will be registered on-line like the 25,000 other Little Libraries around the
world.
Shapiro stated that the DRB reviewed and recommended approval, but asked that it be
located along the interior diagonal path through the park as shown in one of the pictures in
the proposal.
Baldini: Motion to approve as recommended by the DRB.
Seconded by: Smith. Passes 5-0.
3. 50 St. Peter Street (Bit bar Salem): Discussion and vote on proposed installation of
signage and sidewalk designs
Stephen Hall (co-owner and co-designer of the signs) was present to discuss the proposed signage.
Hall stated that they are located in the Old Salem Jail, in the old A&B Burger space. There are
visibility challenges with that space so they are proposing signage.
Sign 1) A flat sign against the building that faces Bridge Street and uses their logo. The text
is playful but reminiscent of several video games.
Sign 2) A blade sign hanging perpendicular to the building that will be visible to those
coming from the direction of the train station/along Bridge Street.
Sign 3) A small back-lit sign, recommended by the DRB, to the right of the entrance door
when approaching from the walkway.
Sign 4) A vertical blade sign on the St. Peters Street side of the building, but towards the
Bridge Street corner, so they can be found from St. Peters Street. It will not be seen
from the courtyard by the residents. This will also keep people entering the
residential lobby looking for the restaurant, which they have done in the past.
Sign 5) A brass plaque on the existing granite post at the St. Peters Street entrance, to keep
people from walking by the entrance to the site and towards Bridge Street, where
there is no entrance.
Duncan stated that the directional sign is a great idea because it’s the easiest way to access the site
and you can avoid the grade changes that occur towards Bridge Street.
Shapiro noted that Glenn Kennedy of the DRB worked with the applicants to refine the signage size
and placement, and adding the additional sign by the door. Shapiro noted that the applicant is
required to get a ZBA variance because the top of signs 1 & 2 rise above the Second Floor window
sills. Previous signs have been approved without that variance; this was an oversight. The Code
Enforcement Officer suggested the applicant seek the variance and the variance will stay with the
property. Other than that the applicants’ signage package is in compliance.
Hall stated that sign 4 was made smaller than it was originally proposed.
Shapiro recommends that the SRA grant approval is based on the granting of a variance by the ZBA.
Duncan approved of the inclusion of that stipulation to tie the two approvals together.
Baldini: Motion to approve as recommended by the DRB, conditional upon the granting of a
variance by the ZBA.
Seconded by: Vickers, Passes 5-0.
4. 17 Central Street (Residences at Museum Place): Discussion and vote on proposed
replacement of three sets of entry stairs.
Tracey Rubin, James Warren, & Patrick Eddy – Board Members of 17 Central Street were
present to discuss the replacement of the three entry stairs.
Eddy stated that they are looking to upgrade all three sets of stairs that are concrete and
deteriorating. Eddy added that they would like to replace them with granite stairs, to make
them meet code which they currently do not, and to reuse the existing railings and they are
working with the General Contractor to make sure that happens.
Shapiro stated that DRB recommended approval as presented.
Vikers: Motion to approve as recommended by the DRB.
Seconded by: Curran. Passes 5-0.
5. 283R Derby Street (Notch): Discussion and vote on proposed outdoor seating area (café
permit review)
Chris Lohring owner/president of Notch Brewing was present to discuss the proposed
outdoor seating area.
Lohring stated that they have an application for a permitting path at Notch Brewery.
Shapiro stated that the DRB unanimously voted to recommend approval of the outdoor
seating area, but there were some aspects to the plan that Chris will be returning to the DRB
for review and approval on. LED parking lot lighting and goose neck lighting were not
considered by the DRB in their review. The seating, wood fence, bench arrangement, style
of bench, and umbrellas were included in their approval recommendation.
Vickers stated that this application came to them approximately 6 months ago regarding a
sign at the rear of the building.
Lohring replied that that sign has been removed and this is a separate permitting path and he
will be meeting with the ZBA in a week, so he will be returning to the SRA for signage
approval.
Shapiro stated that this approval request is for the patio area only. When Chris returns to the
SRA he should have already been granted approval by the ZBA for signage and lighting.
Baldini: Motion to approve as recommended by the DRB.
Seconded by: Smith. Passes 5-0.
6. 25 Front Street (Lobster Shanty): Discussion and vote on outdoor furniture, lighting, and
fire feature
Diane Wolf, Owner of the Lobster Shanty, was present to discuss the outdoor furniture,
lighting and fire feature.
Wolf stated that this project was previously approved by the DRB and she is seeking SRA
approval. The plan includes Adirondack chairs around the fire feature, black wire tables and
chairs, jelly jar light fixtures, round string lighting across the high poles.
Shapiro stated that DRB & SRA previously recommended approved the plan for outdoor
seating on the deck, and a fence to cover the kitchen and refuse areas.
Baldini: Motion to approve as recommended by the DRB.
Seconded by: Curran. Passes 5-0.
Shapiro stated that a field change was made in the design of the deck to avoid a manhole
towards the corner of the proposed deck. The new version of the plan removes a section of
the deck to keep the manhole clear. Shapiro had the DRB Chair review the plan and he felt
it was an insignificant change that would not require another DRB approval.
Duncan noted that the City Engineer recommended that the manhole not be covered.
Wolf noted that they will use the area but it will always be accessible to the City.
7. 139 Washington Street (Eastern Bank): Discussion and vote on proposed installation of
signage
Shapiro stated that Eastern Bank will be moving to a new location a few doors down from
their existing location and they are requesting two signs. A flat building sign against the
wall above their storefront entrance and a blade sign. The DRB requested one change to the
blade sign that was made.
Vickers: Motion to approve as recommended by the DRB.
Seconded by: Baldini. Passes 5-0.
8. 28 Norman Street (Gold Dust Gallery): Discussion and vote on proposed installation of
signage
Shapiro stated that they are a tattoo shop and are requesting two signs. One sign that says
“tattoo” on a multi-tenant sign above the store. A second graphic decal on their window
storefront. DRB voted to recommend the approval of the proposed signs.
Vickers: Motion to approve as recommended by the DRB.
Seconded by: Curran. Passes 5-0.
9. 9 Church Street (Remix Church): Discussion and vote on proposed installation of signage
Shapiro stated that Remix Church is requesting one vinyl sign attached to the face of the
green awning above their storefront. The “R” on the logo will be raised lettering. Their
existing window signage will be removed if the proposed signage is approved. DRB
recommended approval of the proposed sign.
Baldini: Motion to approve as recommended by the DRB.
Seconded by: Curran. Passes 5-0.
10. 168 Essex Street (Village Tavern): Discussion and vote on proposed lighting for outdoor
seating area
Shapiro stated that more work is needed on their proposal. They would like additional
lighting on their patio and want to string up bulb string lights with black poles onto/within
the low brick wall that borders their seating area. The lights would be fixed across from the
poles to the existing awning with another string of lights that connects the poles. The DRB
recommended approval of the project but requested that the SRA stipulate that the applicant
return to the DRB only for review of the plan, connection details, and cap details. The DRB
also believes this project would most likely trigger a building permit.
Vickers asked Shapiro to clarify what “most likely would trigger a building permit” means.
Vickers stated that his is something that should require a building permit because it is both a
structural and safety issue.
Shapiro stated that it probably will but that has not been confirmed with the building
department.
Vickers stated that the attachments are important and if they are not properly done, the brick
will fall out and the poles could fall down.
Shapiro stated that this project will have two layers of review. The DRB and the Building
Department.
Smith asked if the DRB will be looking into how the poles are capped.
Shapiro replied that the DRB didn’t want to hold them up and wanted them to advance to the
SRA to get the lighting concept worked out.
Baldini: Motion to approve as recommended by the DRB subject to approval by the DRB
and with the understanding that there would be a building permit issued.
Seconded by: Smith. Passes 5-0.
New/Old Business
11. 65 Washington Street (former Salem District Court Property):
a. Discussion and vote on amendment of letter of intent between SRA and Diamond
Sinacori, LLC in order to extend due diligence period.
Duncan stated that additional time was needed for getting licenses and DCAMMM
stated they could not issue additional license without an executed extension of the letter
of intent, despite the fact that they are not a party to the letter of intent. To keep the
project moving forward, Harrington already executed a letter authorizing the extension.
A retroactive vote is needed to confirm the approval of that amendment.
Duncan stated that the April 21st date for the ending of the original due diligence period
was calculated based on adding the days for receiving all of the licenses for the due
diligence work. Diamond Sinacori’s attorney didn’t believe an amended letter was
necessary because they were still waiting for additional licenses. Instead of debating the
issue they decided to provide the amended letter.
Shapiro added that this situation was a logistical one and asking Harrington to provide
this letter seemed to be the best option.
b. Discussion and vote to authorize SRA Vice-Chair Grace Harrington to execute amended
letter of intent between SRA and Diamond Sinacori, LLC
Vickers: Motion to approve the amended letter of intent between SRA and Diamond
Sinacori, LLC, to extend the due diligence period until the end of June, and to approve
Grace Harrington to execute the amended letter of intent between SRA and Diamond
Sinacori, LLC.
Seconded by: Baldini. Passes 5-0.
c. Discussion and vote regarding terms for Salem District Court property Land Disposition
Agreement between SRA and Diamond Sinacori, LLC
Duncan stated that there are two outstanding issues.
1. There is an underground oil storage tank that needs to be tested for tightness - the
exact location is unknown at this time. DCAMM is questioning the type of test
that is required, whether oil will be added or removed from the tank, etc. The
test request was submitted the previous week. Duncan spoke with Warren
Madden, DCAMM project manager, earlier in the day and they are waiting for
DCAMM’s license site professional to review what type of test is proposed.
DCAMM is being caution regarding tests that could have environmental
repercussions.
Shapiro added that the letter of intent was pushed because he saw that the two
groups were going back and forth and he suggested the end of June rather than
the end of May they originally requested.
Duncan noted that after they receive the executed license they have to give
DCAMM five days’ notice to do the test and DCAMM must coordinate having
someone present during the testing.
Vickers noted that soil testing and borings will also take time to conduct.
2. There are flooded drain-lines that they believe are from an off-site downstream
manhole collapse. Their engineering firm, Allen & Major Associates, has an
extension of their license for an additional 30 days to perform the due diligence
required for that.
Vickers asked if this flooding was recent or from the Basement flood a year ago.
Duncan replied that the drain-line flooding was recent.
d. Discussion and vote to authorize Chair to execute term sheet for LDA
Duncan stated that the idea of the term sheet is that these are some of the substantive
issues that will be addressed in the LDA, so Diamond Sinacori’s Attorney put this
document together so the SRA could get a head start. The Term Sheet has been revised
with some suggested modifications that the City Solicitor solidified. All parties are fine
with the terms and DCAMM has reviewed it.
Duncan stated that there is no need to execute anything so a vote is not required as part
of the LDA.
Duncan noted that much of the discussion was regarding if the purchase does not move
forward, which of the deposits would get returned and at what point in time. The first
page of the LDA contains the seller and buyer information, as well as the purchase price
and a breakdown of the various deposits. Have a satisfactory title is a big issued and
Diamond Sinacori has done the title work on the property and that is mentioned on page
two. They received a commitment for a lenders and owners policy from Commonwealth
Land Title that they are presently satisfied with. In the case that the SRA could not
provide a satisfactory title all deposits would be returned.
Duncan noted that no warrants are being made as to the condition of the property. The
buyer would pursue all permits and approvals. The buyer would secure all equity
financing. Page three establishes the buyer’s rights.
Vickers asked to discuss, b, 1, item iii, under Buyer’s Rights (iii. Buyer has been unable
to reach commercially reasonable agreements with third parties, including abutters,
required to build or market the Project.) Vickers asked if this was typical and wanted to
make sure the Board was aware that it is an escape clause.
Duncan replied that the City Solicitor had no comments on this item. If there were any
rights or easement that any abutters had on the property, and there may be one abutter
with a right of way. Duncan stated that she has a call into their Attorney Stephen
Anderson and she will get that item clarified.
Duncan acknowledged Councilors Tom Furey and Steve Dibble who were present at the
meeting.
Duncan stated that item two under Buyer’s Rights was regarding the return or retention
of the deposit. If the buyer terminates the agreement because they have been unable to
acquire all the permits and the various Board approvals, the SRA (seller) retains the
$10,000 deposit but remits to the buyer the $50,000 deposit paid at the LDA agreement.
If the buyer terminates the agreement because they have been unable to secure financing
or reach the commercially reasonable agreements, the SRA (seller) will retain both the
$10,000 and $50,000 deposits. However; if there is not a satisfactory title the SRA
(seller) must return both the $10,000 and $50,000 deposits.
Duncan stated that closing will be in a mutually agreed upon location.
Harrington asked who must be present at the closing; the SRA Chair or the City Planner.
Duncan replied both, as well as the City Solicitor.
Vickers stated that this closing will require simultaneous closing between the SRA and
DCAMM and that needs to be organized.
Duncan replied that the SRA did not want to own the court property until the developer
had their permits and financing in hand, so they would not be left with the responsibility
of taking care of that property. The closing will be as close together as possible. The
closing may need to occur at DCAMM.
Vickers stated that Attorney Bill Tinti mentioned that the transfer of the title from
DCAMM to the SRA may need to be recorded prior the SRA selling the property, so
timing may be an issue. The mechanism of the transfers will need to be determined and
stated in the LDA.
Harrington noted that the Chair would need to be present at two different closings.
Duncan reiterated that a vote is not required on this topic but a consensus that the other
terms and conditions are acceptable and clarifications will be needed regarding third-
party rights and the mechanics of the two sales and make sure that is addressed in the
LDA.
Shapiro noted that the Board does not have to execute the term sheet.
e. Discussion and vote regarding extension of date to execute Land Disposition Agreement
Duncan stated that the original letter of intent had a January 15, 2016, which is
concurrent with the first due diligence date that needs to be extended. The new
recommended extension date is July 31, 2016, to make sure there is time to get the due
diligence work done and the LDA is satisfactory.
Duncan stated that she received an e-mail from Diamond Sinacori’s attorney, noting that
they may want to move the LDA forward as quickly as possible. The City Solicitor has
been asked to make time for her review, as well as an internal review.
Vickers asked where the timeline was for the execution of the LDA.
Duncan replied that it is item 2, a, in the original letter of intent.
Baldini: Motion to approve extending the deadline of the LDA to July 31, 2016.
Seconded by: Vickers. Passes 5-0.
12. Discussion and vote on vacant SRA officer position(s)
Duncan stated that Robert Mitnik resigned from his position as Chair.
Vickers: Motion to nominate Grace Harrington as Chair of the SRA.
Seconded by: Baldini. Passes 5-0.
Duncan noted that there is now a vacancy for Vice-Chair.
Harrington: Motion to nominate Matthew Smith as Vice-Chair of the SRA.
Seconded by: Vickers. Passes 5-0.
Minutes
The minutes from the March 9, 2016 regular meeting were reviewed.
Baldini: Motion to approve,
Seconded by: Curran. Passes 5-0
Adjournment
Baldini: Motion to adjourn the meeting.
Seconded by: Curran
Meeting is adjourned at 7:15PM.