Loading...
2003-03-26 DRB Agenda Design Review Board March 26, 2003 Roll Call: Paul Durand Chris Green David Jaquith Fred Johnson Don Giard Project list 1. Comcast (133 Washington Street) – Review of proposed signage. 2. City Hall Elevator Project (93 Washington Street) – Final review final of the installation of an elevator at City Hall. 3. Townhouse Square (99 Washington Street) – Final review of proposed façade improvements. 4. Heritage Cooperative Bank (35 St. Peter Street) – Schematic review of proposed site plan and exterior changes. Other business 1. Approval of 2003 meeting schedule.