2006-09-27 DRB Agenda
DESIGN REVIEW BOARD
Regular Meeting
Wednesday, September 27, 2006 – 6:00pm
120 Washington Street, Third Floor Conference Room
Roll Call:
Projects Under Review
OTHER PROJECTS
1. 50 Palmer Street – Review of amendments to the approved Final Design Plans.
URBAN RENEWAL AREA PROJECTS
2. 71 Washington Street (Salem Five Bank) – Review of proposed exterior painting.
3. 143 Washington Street/32 Front Street (The Distillery) – Review of proposed
addition of window boxes at the first floor level.
4. 120 Washington Street – Review of plans for minor exterior renovations to the
building facing Barton Square.
5. 50 St. Peter Street (Old Salem Jail) – Review of Final Design Plans for the
redevelopment of the Old Salem Jail. CONTINUED
NORTH RIVER CANAL CORRIDOR PROJECTS
6. 75 North Street (Creations Architectural Woodwork & Salem Kitchen and Bath) –
Continued review of plans for an addition and renovation of property.
7. 401 Bridge Street (Gateway Center) – Review of plans for the construction of a new
building.
Minutes – Approval of the minutes from the July 26, 2006 DRB Meeting, August 3, 2006
Special DRB Meeting, and August 22, 2006 DRB Meeting.
Other Business
Michael Blier Paul Durand
Christos Christoudias David Jaquith
Ernest DeMaio Glenn Kennedy