UTS Job 23418 Report 19 Soil Inspection Report 07-29-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-29-2019Soil Inspection Report Report No.19 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 70-80° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavators; Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders, and Ingersoll Rand Pro Pac 110 series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Footing excavation continued for isolated interior footings within the Southwest limits of proposed building #2 (see sketch). The trench was excavated to design elevation utilizing the Deere 450 excavator equipped with a flat cutting edge (flared teeth) to minimize sub grade disturbance. Ground improvements were recently completed in this area by installing GCC deep foundation elements. The area was over excavated a minimum of 6" below design BOF elevation to provide a cushion/base of material between the elements and the footing. All GCC elements were carefully located and exposed during excavation. The sub grade soil in this area is recently placed gravel fill generally consisting of F - C gravel some sand, trace silt. The sub grade was stable, dry and firm. A 6" - 12" thick layer of 2" minus processed gravel was placed at each location. The gravel was moisture conditioned and compacted employing several passes of coverage utilizing the heavy plate compactor generally exhibiting stable/firm conditions. Installation of drainage utilities was performed at the south side of building 1. The trench was carried down to design elevation utilizing the Deere 380 excavator. Piping was installed from previously installed DMH 6 west toward DMH 12. The sub grade was previously prepared using crushed stone and gravel to accommodate the utility. The 15" diameter HDPE piping was installed and bedded ¾ up the pipe in ¾" crushed stone. The remaining bedding/backfill material used is the same material generated during excavation generally consisting of F - C gravel and sand, trace silt placing. 12 - 18" thick lifts were placed and graded. Each lift was compacted employing several passes of coverage Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-29-2019Soil Inspection Report Report No.19 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates utilizing the heavy Wacker plate compactor exhibiting stable/firm conditions. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY: Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque UTS Matt Chace UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-29-2019 Report No.19 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-29-2019 Report No.19 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment