UTS Job 23418 Report 23 Soil Inspection Report 08-02-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-02-2019Soil Inspection Report Report No.23 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 80-90° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavators; Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders, and Ingersoll Rand Pro Pac 110 series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Footing excavation continued for elevator and stair footings located within the Southern limits of proposed building #2 (see sketch). The trench was excavated to design elevation utilizing the Deere 450 and 80 excavators equipped with a flat cutting edge to minimize sub grade disturbance. Ground improvements were recently completed in this area by installing GCC deep foundation elements. The area was over excavated approximately 8 - 12" below design BOF elevation to provide a cushion/base of material between the elements and the footing. All GCC elements were carefully located and exposed during excavation. The sub grade soil in this area is organic tannin bark. A 12" thick layer of 3/4" crushed stone was placed and graded over the sub grade. A layer of filter fabric was placed between the crushed stone and sub grade material. The crushed stone base was compacted employing several passes of coverage utilizing the heavy plate compactor exhibiting stable/firm conditions. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-02-2019Soil Inspection Report Report No.23 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque UTS Matt Chace UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-02-2019 Report No.23 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment