UTS Job 23418 Report 24 Soil Inspection Report 08-05-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-05-2019Soil Inspection Report Report No.24 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 70-80° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavators; Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders, and Ingersoll Rand Pro Pac 110 series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Installation of sewer utilities was performed within the central project limits between proposed buildings 1 & 2. SMH 2 and MDC gas traps 1 & 2 were installed on this date. The sub grade was previously prepared for SMH 2 and MDC gas trap 2 using crushed stone and processed gravel structural fills. The structures were set atop the in-place material and partially backfilled. MDC gas trap #1 was relocated closer to proposed building #1. The excavation for this structure was carried down to approximately 2 - 3' below the bottom of the structure through the organic fill and into the marine clay. The over excavation was backfilled to bottom of structure elevation utilizing ¾" crushed stone. The stone was tamped into place utilizing the excavator bucket. Piping for the MDC gas traps is to be completed by the plumber. The utilities were backfilled using imported structural fill generally consisting of F - C gravel and sand, trace silt placing. Approximately 18" thick lifts were placed and graded utilizing the Deere 380 excavator. ¾" crushed stone was used for backfilling where safety concerns are an issue or the areas were inaccessible with compaction equipment. Each lift was compacted employing several passes of coverage utilizing the heavy Wacker plate compactor exhibiting stable/firm conditions. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-05-2019Soil Inspection Report Report No.24 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque UTS Matt Chace UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-05-2019 Report No.24 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment