UTS Job 23418 Report 28 Soil Inspection Report 08-09-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-09-2019Soil Inspection Report Report No.28 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 70-80° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavators; Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders, and Ingersoll Rand Pro Pac 110 series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Installation of water main utilities was performed at the ENE side of proposed building 2 (see sketch). The excavation was carried down to design elevation utilizing the Deere 380 excavator. The 8" diameter class 52 CLDI piping was installed and bedded in clean imported bedding sand. The sub grade was previously prepared using crushed stone and processed gravel structural fills. All appropriate tees, bends and fittings were used for the installation. Boulders were used as thrust blocks. The approach to the building was prepared by removing existing tannin bark fill from the area and replacing the material with compacted structural fill. This area will eventually become an access drive to the building trash room. The utilities were backfilled using the same material generated during excavation generally consisting of F - C gravel and sand, trace silt placing. 12 - 18" thick lifts were placed and graded. Each lift was compacted employing several passes of coverage utilizing the heavy Wacker plate compactor exhibiting stable/firm conditions. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-09-2019Soil Inspection Report Report No.28 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque UTS Matt Chace UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-09-2019 Report No.28 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment