UTS Job 23418 Report 28 Compressive Strength Report - Concrete 08-06-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-06-2019Compressive Strength Report - Concrete Report No.28 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4" *No. Of Sets:2 89CUBIC YARDS: SET 1 LOCATION:Footing; Building #2, Elevator Pit Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type A463 4.00 x 8.00 12.57 Good 08/06/19 08/13/19 7 32,000 2,550 2 A464 4 x 8 12.57 Good 08/06/19 08/20/19 14 A465 4 x 8 12.57 Good 08/06/19 09/03/19 28 A466 4 x 8 12.57 Good 08/06/19 09/03/19 28 A467 4 x 8 12.57 Good 08/06/19 09/03/19 28 Slump (in.)4 Air Temp. (F.)77 Conc Temp (F)83 Truck No.258 Ticket No.9626 Time 1:50 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Column Line G at 4.5 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type A468 4.00 x 8.00 12.57 Good 08/06/19 08/13/19 7 28,000 2,230 1 A469 4 x 8 12.57 Good 08/06/19 08/20/19 14 A470 4 x 8 12.57 Good 08/06/19 09/03/19 28 A471 4 x 8 12.57 Good 08/06/19 09/03/19 28 A472 4 x 8 12.57 Good 08/06/19 09/03/19 28 Slump (in.)4 Air Temp. (F.)77 Conc Temp (F)82 Truck No.244 Ticket No.9634 Time 2:45 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:*MRWR. Cylinders Received 8-7-19 Inspector Premium Travel Name Time Hours Time M. Chace No REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-06-2019Compressive Strength Report - Concrete Report No.28 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque UTS Matt Chace Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-06-2019Compressive Strength Report - Concrete Report No.28 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan FIELD SUMMARY REPORT Total Pour:Footings; Building #2, Elevator Pit. Stairs & Interior Footing: Column Line G-D.3 at 4-8 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)4-6 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-06-2019 Report No.28 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment