Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
DRB - REVIEW OF WINDOW PROJECT - SALEM HOUSING AUTHORITY
e� Salem ® Redevelopment Authority Design Review Board Recommendation 292 Essex Street Salem Housing Authority Window Replacement Meeting Date: May 22, 2019 Members Present: Paul Durand, Chair, Glenn Kennedy, Catherine Miller, Helen Sides, J. Michael Sullivan Members Absent: David Jaquith Decision: At a regular meeting of the Design Review Board (DRB), upon a motion duly made and seconded, it was unanimously voted to recommend approval of the Salem Housing Authority's window replacement project at 292 Essex Street as designed and presented. Referenced Plans and Documents 1. Proposal titled 'Zisson Building —Window Replacement', prepared by Environmental Restorations, Inc., 16 Hazel Drive, Hampstead, NH 03841, dated 5/10/19. 2. Staff Comments dated 5/16/19. Findings 1. Consistency with Design Standards and Guidelines: The proposal is consistent with the pertinent design standards and guidelines regarding windows in that the original openings are being preserved with no proposed alterations. Many of the existing windows are not original and will be replaced with new aluminum windows. The fixed- lite transoms will be retained; the flat transoms will be replaced with aluminum and the curved transoms will be retained and repaired in-kind. 2. Visual Improvement of Facade: The windows on the upper two stories are in disrepair. The bay windows that feature Lexan are discolored. This project will greatly improve the visual presentation of this historic structure. 3. Energy Efficiency Improvement: The existing windows are not energy efficient, which impact the functionality of the building and the ability of the Housing Authority to provide safe, efficient housing for its clients. The project will greatly improve energy efficiency, which will positively impact the residents and likely improve systems operations in the building. Signature of the DRB: By the signature below, I certify that this recommendation accurately reflects the actions of the Design Review Board. � • Z3 >9 Paul Durand Date Chair Environmental Restorations, Inc. A professionaf approach to pahity service General Contractors—Deleading—Sandblasting—Asbestos Removal—Mold Remediation—Fire Restoration May 3, 2019 Kate Newhall-Smith Salem Redevelopment Authority 98 Washington Street 2cnd floor Salem, MA. 01970 RE: Zisson Building, 292 Essex Street, Salem, MA. Dear Kate, Please find below a scope of work for the above referenced project. Scope of work: • Removal and replacement of the (57) existing replacement aluminum windows on the 2nd and 3rd floors as noted on the attached drawings o Exterior Asbestos abatement at old window caulking by licensed contractor (ERI) • Remove and replacement of 2 fixed roof skylights • Make intact & Prime existing ornamental metal trim at the bay and bow windows as noted on the attached drawings by licensed RRP contractor (ERI) • Paint existing ornamental metal trim at the bay and bow windows as noted on the attached drawings • Remove & replace curved plexiglass windows at front and side of building to match existing • All work to be done in accordance with plans and specifications designed by Blackstone Block Architects Price: $276,600.00 Respectfully submitted, eA Midentosman res Environmental Restorations, Inc. Environmental Restorations, Inc 16 Hazel Drive, Hampstead NH 03841 Tel: 603-329-6101 Fax: 603-489-5963 Window Replacement - Zisson Building Salem Housing Authority f Salem, MA 01970 SECTION 01 1100 - SUMMARY OF WORK 1.01 GENERAL SCOPE OF WORK A. The work under the Contract consists of: 1. The removal and replacement of the existing aluminum windows on the 2nd and 3rd floors as noted on the drawings. 2. The removal and replacement of 2 fixed roof skylights. 3. Repainting of the existing ornamental metal trim at the bay and bow windows as noted on the drawings. B. In addition, the Work under the Contract includes: 1. Work outside the project site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or destroyed by encroaching upon areas outside of the project site. 3. Providing and restoring, where appropriate, all temporary facilities. 1.02 WORK UNDER SEPARATE CONTRACTS 1. None. 1.03 TIME OF COMPLETION In accordance with the General Conditions, the Work shall start as stated in the Notice to Proceed and shall be complete within 120 consecutive calendar days 1.04 NOTICE TO PROCEED A. Upon the validation of the Owner Contractor Agreement the Owner shall Issue the Notice to Proceed for Construction. B. The Notice to Proceed shall include: 1. The starting date and Construction Completion date for construction. 2. The names of the Owner's contract Officer and Alternate Contract Officer. . I C. The Owner shall send three copies of the Notice to Proceed to the Contractor. 01 1100 - Summary of Work 1 of 3 Window Replacement—Zisson Building Salem Housing Authority Salem,MA 01970 SECTION 09 9100—PAINTING PART 1 —GENERAL 1.01 PROVISIONS INCLUDED A. The general provisions of the Contract including the General Conditions, Supplementary Conditions and relevant portions of Division 01 -General Requirements apply to the work specified under this Section. B. Contractors are directed to Section 01 1100 Summary of Work for the general intent of the Contract Documents. 1.02 DESCRIPTION OF WORK A. Provide all painting required for work such as window trim associated with the replacement windows, (except where specifically excluded), complete,in-place,as shown, specified or necessary for a proper installation. Provide surface preparation,priming and finish coats. B. Paint is used in this Section to mean all types of applied coatings, including undercoaters, sealers, stains,thinners,enamels, varnishes and all other materials specified here or conventionally included under the general term. C. Paint all interior and exterior surfaces as shown, specified or scheduled and,further, including,but not limited to,the following: 1. Clean,scrape and repaint the existing exterior ornamental metal panels and trim at the bow and bay windows as noted on the drawings. 2. Painting of new interior trim at the new replacement aluminum windows as detailed. D. Painting not included: 1. Prefinished items including the new replacement aluminum windows 1.03 RELATED WORK SPECIFIED ELSEWHERE A. The following related work is specified in the Sections noted: 1. Shop coats: In Section providing shop coated items. 1.04 SUBMITTALS A. In accordance with the Division 01 provisions, submit: 1. Manufacturer's Data: For information only,submit manufacturer's specifications, including paint label analysis and application instructions for each material proposed. List each material and cross-reference to the finish system number. 09 9100—Painting Page 1 of 6 Window Replacement—Zisson Building Salem Housing Authority Salem,MA 01970 1.05 JOB CONDITIONS A. Do not apply water-base paints when the temperature of surfaces to be painted and the surrounding air temperatures are below 50 degrees F. unless otherwise permitted by the paint manufacturer's printed instructions. B. Do not apply solvent-thinned paints when the temperature of surfaces to be painted and the surrounding air temperatures are below 45 degrees F.,unless otherwise permitted by the paint manufacturer's printed instructions. C. Do not apply paint in snow,rain,fog,or mist or when the relative humidity exceeds 85%,nor to damp or wet surfaces unless otherwise permitted by the paint manufacturer's printed instructions. Painting may be continued during inclement weather only if the areas and surfaces to be painted are enclosed and heated within the temperature limits specified by the paint manufacturer during application and drying periods. D. The project site has been reviewed for lead based paints by Covino Environmental at both exterior and interior surfaces. Test results were positive with a range from<0.05 mg/cm2 to 1.4 mg/cm2. Based on these results,work crews will need both OSHA and RRP certifications and must comply with OSHA Standard 29 CFR 1926.62-Lead. 1.06 ALTERNATES A.Refer to Section 0123 00-Alternates for details of the alternates which may affect the work of this Section. PART 2-PRODUCTS 2.01 QUALITY OF MATERIALS A. Provide the best quality grade of the various types of coatings as regularly manufactured by approved paint materials manufacturer. Materials not displaying the manufacturer's identification as a standard,best-grade product will not be acceptable. B. Provide undercoat paint produced by the same manufacturer as the finish coats. Use only thinners approved by the paint manufacturer, and use only to recommended limits. C. Provide paint of durable and washable quality. Do not use paint materials which will not withstand normal washing as required to remove pencil marks,ink,ordinary soil,etc.,or which will show discoloration,loss of gloss,staining,or other damage when subject to ordinary wear and maintenance procedures. D. Acceptable Manufacturers: 1. Benjamin Moore 2. Pittsburgh Paint 3. California Paint 4. Amcoat Industries-RhinoShield(ceramic coating) 09 9100—Painting Page 2 of 6 Window Replacement—Zisson Building Salem Housing Authority Salem,MA 01970 2.02 COLORS A. Color selection shall be made by the Architect and summarized in schedules or conveyed through use of color chips. Paint shade names, numbers, or chips may be those of any manufacturer,and shall not be limited to colors in the line of the proposed paint materials manufacturer. Match desired shades in the brand of materials proposed and submit samples as specified above. PART 3-EXECUTION 3.01 INSPECTION A. Examine areas and conditions under which painting work is to be performed. Inspect substrates to receive finishes specified under this Section. B. Do not proceed with application of any finish until conditions which would impair the satisfactory appearance or long-term performance of paint finishes area corrected or formally waived. 3.02 SURFACE PREPARATION A. General: 1. Perform all preparation and cleaning procedures in strict accordance with the paint manufacturer's instructions and as herein specified,for each particular substrate conditions. 2. Remove all hardware,hardware accessories, machined surfaces,plates,lighting fixture,and similar items in place and not to be finish painted, or provide surface- applied protection prior to the surface preparation and painting operations. Following completion of painting of each space or area,reinstall the removed items employing workmen skilled in the trades involved. 3. Clean surfaces to be painted before applying paint or surface treatments. Remove oil and grease with clean cloths and cleaning solvents prior to mechanical cleaning. Provide cleaning solvents of low toxicity and a flash point in excess of 100 degrees F. Program the cleaning and painting so that dust and other contaminants from the cleaning process will not fall in wet,newly painted surfaces. 4. Do not clean surfaces more than one day in advance of priming. S. Metal surfaces with rust must be cleaned with hand tool cleaning to remove loose or flaking rust in accordance with SSPC-SP2. 6. After hand tool cleaning,those areas require solvent cleaning to remove oil,grease, rust, and dust from removing rust in accordance with SSPC SPI. B. Wood: 09 9100—Painting Page 3 of 6 Window Replacement—Zisson Building Salem Housing Authority Salem,MA 01970 1. Clean wood surfaces of all dirt,oil,or other foreign substances with scrapers,mineral spirits, and sandpaper,as required. Sandpaper smooth those finished surfaces exposed to view,and dust off. 2. Scrape and clean small,dry, seasoned knots and apply a thin coat of white shellac or other approved sealer,before application of the priming coat. 3. After priming,fill holes and imperfections in finish surfaces with putty or plastic wood-filler. Sandpaper smooth when dry. 3.03 APPLICATION A. General: 1. Apply paint by brush,roller or spray in accordance with the manufacturer's directions. Use brushes best suited for the type of material being applied. 2. The number of coats and paint film thickness required is the same regardless of the application method. Do not apply succeeding coats until the previous coat has completely dried. Sand between coat applications with fine sandpaper,or rub surfaces with pumice stone where required to produce an even, smooth surface in accordance with the coating manufacturer's directions. 3. Apply additional coats when undercoats, stains,or other conditions show through the final coat of paint,until the paint film is of uniform finish,color and appearance. 4. Finish exterior doors on tops,bottoms,and side edges the same as the exterior faces, unless otherwise indicated. B. Prime Coats: 1. Before application of finish coats,apply a prime coat to material which is required to be painted or finished,and which has not been prime coated by others. 2. Recoat primed and sealed walls and ceilings where there is evidence of suction spots or unsealed areas in first coat,to assure a finish coat with no burn-through or other defects due to insufficient sealing. 3.04 CLEAN UP A. During the progress of the painting work keep work areas clean of debris,discarded materials,oily rags or papers. B. Keep oily rags and other flammable materials in covered metal containers and remove from job site regularly. C. At the conclusion of painting work,clean all paint spatters and drips from adjacent surfaces. Clean paint from glass, hardware and surfaces accidentally painted. Remove all paint cans, tools,papers and masking materials. Leave work areas perfectly clean and free of rubbish produced by the work of this Section. 09 9100—Painting Page 4 of 6 Window Replacement—Zisson Building Salem Housing Authority Salem,MA 01970 3.05 SCHEDULE OF PAINT SYSTEMS A. The following paint systems comprise the major types required for the exterior and interior applications. For each system, special preparation requirements and number of coats is given. Special preparation requirements are in addition to, and not in lieu of,the general preparation requirements specified above in this Section. B. At the end of this Section an Applications Schedule is included to cross-reference the Paint Systems to the actual surfaces in the Project to be painted. EXTERIOR PAINT SYSTEMS 3.06 System E- 1 (Ceramic Coating: Gloss) 1. Special Preparation: a. Ornamental Metal Scrape and sand. Trim: 2. Coatings: a. First Coat: Primed Steel: touch-up shop coat; Galvanized or Non-Ferrous: Vinyl Acrylic Latex or Waterborne Urethane Rhino Rust Bond b. Second Coat: Ceramic Enamel, semi-gloss-Rhino Mastic Epoxy C. Third Coat: Ceramic Enamel, semi-gloss-Rhino Urethrane INTERIOR PAINT SYSTEMS 3.07 System I- 1 (Acrylic Enamel; Semi-gloss) 1. Special Preparation: a. Wood: Acrylic resin primer b. Galvanized Vinyl acrylic latex or steel: Waterborne Urethane C. Primed steel: Touch-up shop coat 2. Coatings: a. First coat Acrylic Enamel, semi-gloss b. Second coat Acrylic Enamel, semi-gloss 09 9100—Painting Page 5 of 6 Window Replacement—Zisson Building Salem Housing Authority Salem, MA 01970 3.08 APPLICATIONS SCHEDULE A. The following schedule identifies the principal surfaces to be painted and the paint systems to be applied to them. B. This schedule is not exhaustive,but is merely indicative. All surfaces except those specifically excluded or obviously not intended to receive paint shall be painted. Where a surface requiring paint is not mentioned below,then the paint system for the most similar substrate shall govern the number of coats and the painter shall confer with the Architect to decide upon the actual paint materials. C. Exterior Surfaces Surface Paint System System No. Ornamental Metal Trim E-1 Ceramic enamel At bay and bow windows Rhino Shield Surfaces Not To Be Painted All prefinished items,including vinyl siding. D. Interior Surfaces Surface Paint System System No. Window trim I-1 Acrylic enamel—semi-gloss Surfaces Not To Be Painted All prefinished items. END OF SECTION 09 9100—Painting Page 6 of 6 Mdd II o,j,�'trr E�Lusd ER— Window; Replacement Ziawn Building Salem, MA 01970 QtIER; Salem Housing Authority 292 Dwx Street Zisson Building Salem, MA 01970 corrrR�li � Environmental Restorations. Inc. i 16 Haan I)riye Hampstead. NH 03841 � Finalcoat, LLC d/b/a Rhino Shield of NE (hereinafter known as Rhino Shield) will use approximately three (3) days to perform the job located at 292 Essex Street (Zisson Building), Salem, MA_ Rhino Shield will paint finish coat on outside casings of galvanized metal of the two (2) large bump-out galvanized windows in front on 292 Essex Street and two (2) large bump-<Xt galvanized metal windows on right side of building on Sewall Street. Rhino Shield will also coat two (2) oval porthole windows on right side of building on Sewall Street. Color to be: Carrington Beige- HC-93 All six (6) windows will be prepped by Environmental Restorations, inc., including remedlatwn of lead and rust. Environmental Restorations, Inc. will supply Rhino Shield with pohce detail,all permits as needed and mechanical lift as we perform our work Rhino Shield will supply Environmental Restorations with the pnmer (Rust Bond),which Environmental Restorations, Inc. will use on the prepping of the six (6) windows to be painted. Rhino Shield will perform the last step of painting the outside of the six (6)windows described herein with Finish Coat Rhino Shield Enamel The wage rate paid to Rhino Shield's subcontractors is S65.96 per hour. No Warranty is given, expressed or implied on work performed. The total cost of Rhino Shield applying the Finish Cost to i the six (6) wmdows described herein is Twenty-One Thousand, Sic Hundred Dollars (S21,600.00). Rhino ShOoM of ME gorhlno d.com SO&S07-I40 90 CorporaM Pam, UrW 14M P*m&ot*. MA 0230 C OFT LA. f T f tl �1 LLJ 4—' t 1 cr) x w •L } F F � ' i { t II L 4 f Rt e 1 � w T - ✓ _ :�r • uo LL TIN S: Tr •,� rr � r / a 0 ': r fI U 1 A c� 0 uo U �0 x j U �0 w LO ai Imo m e 5 O w o g E Ile sn s ry H1.3 CM M N q Al =E A� UH F9C �o M .. � 4 e fi : a E 3S9 S € it $I ofig - -- Q N \ \: 3tj M fill ill ;EESESESE EE1E8 SEES<g R AMS € .o.E w... 3> Caamoammumom``000moo�oauuuamx�FFF:-�� d C (-o O: 1 m cn -P, W N O X X 3 3 3 ° 3 5' ° z m n m n m � 0 3 -a 3 -� v _� v D Z O o aaaarm o m v 2) co Z tll v v v �o C N tU �o cn ° D� � C . Uj �. (n Q 0 D — �- (3D a 0- (3D � Cl) m �.. l m ? L ° ° go o (D 90 o in rn m O (D m v °' x �. g �' in D g N N � f �' w a N C� u, o C� M y w m x a _ � e» � tn � tO69En69 <,vt9e9 �A6S cn C m o r n N O m C) rn w m m rn O 0 0 O W W O �l O O Ul M -P, v Ln N Ocil cn 0 0 0 0 CTi O O O O CTi O < O O CD O CD O O O O CD CD O O CD0 0 0 0 0 0 0 0 0 0 0 0 CDD cn m n C o , � O m O z 0 z O -4 _ cn -D-I O N N D y - v 7 D C O -� w � co 4P m rn .P, — rn (m cn n r D 3 = (� z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m o 0 0 0 0 0 0 0 0 0 0 0 o mN o O w a 3 X m cn (D C4 � z z 0 m = CD co g p CD CO w (n m 0 z 00 o Q° (n ^' v v a m O Cl) D o 0 0 � � m m m v — cn �J > � Un O � O M v m N n O _ r r z n Z 0o CD z 0 N � � o o � m n 0 0 0 ° X r� O m CO m m m z m z ° T 9 m n m m > D D rn m m m co - -- m o r � W O N O O v y - o co v A rn m o r," v o 0 0?'v A Window Replacement - Salem Housing Authority Salem, 2.0 TOP A Provide manufacturer's required top coat with ASTM DB12 Type III steep grave 2.0 FIBER CANT A Provide asphalt impregnated fiberboard cant strips complying with requirements of ASTM- 2.0 SKYLIGHT A Provide copper pipe downspouts to match existing as rebuilt as noted on B Provide thermally insulated aluminum skylights with an integral aluminum with a double acrylic dome equal to the CVA Series skylights as manufactured C Size: 4'-6" x PART 3— 3.01 ACCEPTANCE A. Inspect surfaces to which roofing and flashing are to B. Beginning work on the roofing and flashing shall constitute acceptance of the being satisfactory for the installation of 3.02 PROTECTION OF ADJACENT MATERIALS A. Protect masonry walls, windows, landscaping and other surfaces from asphalt drips by hanging tarps or other effective protection over surfaces near roofing B. Promptly clean and restore any finish surface marred soiled by the work of 07 51 00- Built-up Bituminous Roofing & Page Window Replacement - Salem Housing Authority Salem, 3.03 ROOFING WORK A. Use only kettles with visible working thermometers and observe asphalt temperatures. Remove from the job site any asphalt heated in excess specified maximum B. Follow manufacturer's installation specification approved for this contract exactly type of material and method of 3.04 INSTALLATION A. Install new replacement skylights per manufacturer's recommendations skylights are square and plumb relative to the ridge line END OF 07 51 00- Built-up Bituminous Roofing & Page 4.1 TYPICAL SKYLIGHT ISISTAIL VIRG LIONT /INAPT Ettr •• OOTTRO 1211.--4 ,/,‘, •X111221 112RY•TOR RUM in ak /At CV Z-4,13 ift ESSEX ST 214 02AORD ARRA 2212 2/ X RV 1110PCATa RAL•12 202•100 •211•00, VACANT A0/1111 ARRA An IAD PLOOR ARRA CAN BR MD a • CORTRACIOR STA01/10 AP TOR TOOLS AND IITORA4R OP 2211001 1.02 ak 'At • BLACKSTONE AS•rahall Street Boston AKA 0210K telephone ell fan.. 617 720.1242 www.bleckstonetslock cam 020V12021on• boa / 00120222 Ol GENERAL amp 4 Proect SALEM AUTHORI ZISSON WINDO REPLACEME 292 Emem Estrem Salem, MA 01970 Scsi 41 NOTBO 12141001 04, 2110 041. 01/11/11 11•21001 Ore.., by RIR 0 1/02/1.1.1•2 Orowing Tits / N2: ROOF PLAN I DETAILS A-10 Decorative Diffusers Delivery S -10" = $15 -14" = Rigid Mod 1 1 2 Deliv ZTR 2'- $3 $5 $8 ZTR 4'- $7 $10 $3 s ZTR 6'- $10 $13 $20 S ZTR 12-6 $17 $24 $30 ZTR 24'- 12 units $45 $58 S Descriptio (previous 22522 252 25½x 25h 22546 (254 25 491 30530 (333 33 33 34534 (373 37 37 46546 (494 49 49'/Outside Curb W. Maximum Skylight Clearance W" 26 u/ 26 26 u/ 50 34 u/34 3811/26 38°/a 50 u/ 50 Glazings Code 5/5/5/5/5/ Clear over 0A1A 8231/8306/I336/$3z38 $512/ Bronze 0A4A1 $237/$326/8342/$394/8546/ Clear over 0A1A2 $237/$326/$342/8394/5546/ Custom sizes up to x 150 - call 888-878-3589 for • Micro Mod ZTB Prismati Mod ZTB Triple Mod ZTB Bubble Mod ZTB Brushed Mod ZTB Natural light Mod ZTB Simple way to enhance your fifth wall and ensure that your the decor and feel of 24" reflective - available in Suspension Model Price Delivery ZTZ 203 $23 12-gauge wire and fastener set longer tunnel Acrylic Double Dome Curb- CG (replaces SIZE • 0° - 0:12- I veluxusa. C < =" 3 tlW`waleg e c= m auI e suoiZejolsaN xass 3S 3 Z6Zc JeJuawuonnu3 6ulsnoH •: N�N� ¢ g Q IN3 wales uosslZ Loloo C 4 `- I c Q m `o I m U) m V) 0 d rn Z Q d rn ,O® CI ivw`wales ro ! u���m oul suoge�olsaa N $ S$m Ieluawualnu3 iS xass3 Z6H N�N , ®®■■ m g= 6ulsno c Q = -a la3 lei =s � waleSuoss!Z •• ! i € I I ' i i is I z Q a N� O c O ci cn O U s O ry i i Vw`wales ro d M ®�®® c ; .-ul suoileloysaa ys xass O i a$ s o 1eyuawuonnu3 6u snOH z N�N 0 lil3 14 e� wales uosslZ a _ i it ti ti O� Z Q d I i i i i i i �—IN o ; oul suolle�olsaaluau®®� xass3 Z6Z 0 aad a lewa 1nu3 N 9N i Q g; fiulsnory z a: m 183 wales uoss!Z •� pc - i. f a _ i I LO1 co 04 CL O N -C O d ti Z CL rn r� 0 I ® o s a VW'tuales 'auI suoile�olsab -aieluewuonnu3 3S xa6u snot c N■® $ R!3 wales uosslZ ` azra wx i :I i I A� 1 r LL I r 1 r C � N Cl) N � O > N N O 0 fir " ; o I suoile�oisaa CD e A xass �$m �e�uawuainu3 3S 3 Z6Z BulsnoH ji awaleg uosslZ _ I e M CD OF) Z Q d i i —10 N I I aul suogejolsaa tlW'-ales 3Z 'o IL c— °e= ;S xass3 Z6Z c ON S e o leJuawuainu3 6uisnoH z N e w wa�eS uoss�Z f Naga _z N r z O zz cY rn d rn E- ILL O 0 � w Op r tiff O' 0° J cM a CV J_ O) O U) C� O r \ C O 0 (U O _ i cr, CO N d 2 > Q w ----- �' N x > Q r100 N F_ U 11, 00 o Z Q CO J a N i it J CO � Q U N J E '('to U •L N N >� � Q r-IN r !n L a a CD w C z o r) 14- z H z O z w w v Q r ILLa w �� w rn J � d cor w Q � O LC) rn ZO Z cep r 00 N J Q N E0 Cn N U Q w Lr) (n Z �(j Lrn Q Z) w 1 '9 �;N"1® tlW`waleg d Q� c i '�ul suoile�o{sat! ® 3S x8ss3 Z6Zc G�eluawuonnu3 6ulsnoH z Nri PAR Ri3 waleg uoss!Z . �pN �a4! i I i I I i i I v N N SiM � ,!! m _s _-_s / J! " 22H °p| �� RQ ___ 3 - @5\ � ___mz � | D \ � \- \ k � \� ( � ! , \ � § § iz . � . — f � 2 c Z � 4 ƒ 2 . -LUƒ-ƒ � W Q a- ) g — \\\ / z k \\ \ wk ƒ ¢ 3 •a ® boa s ...I suogeiolsaa vw`wale$ .y r TI S S " Ieauawuainu3 xass3 UZSe 6u!snoryIa3 waleg uoss! e _ f I i I I I —� ' It I' I' i i i I� ':I I n z J Y p - U W r2i < it I � > � 0 l � 0Z C� WZ m wza I, WZQ UQw zzz c~n ¢ = w � � I �I I �I 3: of oil ® _ � oul suopiolsou Vw —ILS §1, w IL M S xOSS3 Z6Z cq IL)Uawuoj!AU3 BuisnOH o Big 183 2. Luales u0s ...... -siz it (Y 0 OLL z 0 E zz L.j N z \ � © I ;` - _j 0 z Z;E o x ui Window Replacement-Zisson Building Salem Housing Authority Salem, MA 01970 SECTION 08 52 00—ALUMINUM REPLACEMENT WINDOWS (Filed Sub- Bid Required) PART 1 - GENERAL 1.01 FILED SUB-BID A. Section 08 52 00-Aluminum Replacement Windows is stipulated as a Filed Sub-Bid under Part D, Item 2 of the Form For General Bid. B. All sub-bids shall be submitted electronically as set forth in the Instructions to Bidders and as required by Section 44F of Chapter 149 of the Massachusetts General Laws, as amended. C. Sub-bids must be filed with the Awarding Authority, before 2 PM, Boston time, on the date stipulated in the Advertisement. D. Specific information relating the sub-bidders is set forth in the Contract Documents, under the heading " Notice to All Bidders, including Sub-Bidders" and the attention of sub-bidders is directed thereto. E. Work to be done under this Section 08 52 00- Aluminum Replacement Windows is shown on the Drawings numbered: A1, A2, A3,A4,A5, A6, A7,A8, A9 and A10. 1.02 PROVISIONS INCLUDED A. The general provisions of the Contract including the General and Supplementary Conditions and applicable portions of Division 1 - General Requirements apply to the work of this Section. 1.03 DESCRIPTION OF WORK A. Provide all aluminum replacement windows complete, in place, as shown, specified here or required for a complete and proper installation. Work includes, but is not necessarily limited to: 1. Aluminum master frames for fixed glazing and operable sash. 2. Aluminum single hung, and project out window units and hardware. 3. All glazing for aluminum frames and windows. 08 52 00- Aluminum Replacement Windows Page 1 Window Replacement-Zisson Building Salem Housing Authority Salem, MA 01970 4. Exterior and interior perimeter caulking at new aluminum replacement windows. 5. New rubberized sill flashing as detailed. 6. All aluminum window trim including structural vertical mullions, snap trim caps, sub-sills, and fasteners in the same color to match the windows. B. Related Work Specified Elsewhere: 1. Demolition of old aluminum windows. 2. Masonry restoration. 1.04 QUALITY ASSURANCE A. Reference Standards: 1. Except as otherwise indicated, the requirements for aluminum windows, and the terminology and standards of performance and fabrication workmanship, are those specified and recommended in ANSI/AAMA 101-85 and the applicable general recommendations published by AAMA, NAAMA and AA. B. Manufacturer: 1. Unless formal approval is granted by the Architect prior to the sub-bid due date which shall be based upon a preselection examination of proposed products, window units shall be by one of the following approved manufacturers: a. Graham GT 2200 , GT 6200, and GT 140011; b. Skyline C. Wausau d. or approved equal. 2. The details shown are based upon standard details of an acceptable manufacturer. Similar details by other manufacturers will be acceptable,provided they comply with the size requirements shown. C. Certification: 1. Provide only aluminum window units which have the AAMA "Quality Certified" label attached. 08 52 00-Aluminum Replacement Windows Page 2 Window Replacement-Zisson Building Salem Housing Authority Salem, MA 01970 2. Wherever manufacturer's standard units comply with requirements and have been tested in accordance with the specified tests,provide certification by the manufacturer of compliance with such tests; otherwise,perform the required tests through a recognized testing laboratory or agency and provide certified test results. D. Field Measurement: Take field measurements at all openings and build windows to conform to actual field conditions. E. Performance Standards: The window assemblies shall conform to the following standards: 1. Fixed Windows: Fixed windows shall meet or exceed the following performance standards: a. AAMA Rating AW-PG65 b. Air Infiltration .12 CFM/ft @ 50 mph C. Water Infiltration 12 psf d. Structural: 97.74 psf e. U-Value: .35 2. Operable Windows: Projecting windows shall meet or exceed the following performance standards: a. AAMA Rating AP-HC70 b. Air Infiltration .06 CFM/ft @ 25 mph C. Water: 12 psf d. Structural: 135 psf e. U-Value .35 3. Samples: a. Submit 2 samples of each required aluminum finish on 12 inch lengths of extrusion shapes as required. b. Submit one complete operable window sample which will show the fabrication techniques and workmanship of component parts, the design of hardware and other exposed auxiliary items for window units, before fabrication of the work. 1.05 SUBMITTALS A. In accordance with submission requirements set forth in Division 1, submit: 08 52 00-Aluminum Replacement Windows Page 3 Window Replacement-Zisson Building Salem Housing Authority Salem, MA 01970 1. Manufacturer's Data: Submit manufacturer's specifications, recommendations and standard details for aluminum window units, including fabrication, finishing, hardware and other components of the work. Include certified test laboratory reports as necessary to show compliance with the requirements. 2. Shop Drawings: Submit shop drawings for the fabrication and installation of aluminum window units and associated components of the work. Include typical unit elevations at 1/2 inch scale, and full size detail sections of every typical composite member. Show anchors, hardware, operators and other components not included in manufacturer's standard data. Include glazing details. Show details of panning system. 1.06 ADDITIONAL MATERIALS A. Provide the following extra materials for the Owner's use in maintaining the windows. Store materials in protective crates where directed by the Architect. B. Schedule of Additional Materials: 1. Sash: Upper and lower units equal to 2% of each size installed (round fractional units up) 2. Hinges: Five sets of hinges for each type of window provided. 3. Hardware: Twenty locks and handles with fasteners. 4. Touchup Paint: One gallon matching specified finish for infill panels and louvers. 1.07 COORDINATION A. As part of the work of this section, the window subcontractor is responsible for coordinating the work of this section with the removal of the existing windows. At no point shall window openings be left open overnight. All new windows shall be installed at locations of removed windows within the same working day. B. The work of this Section will be required to conform to the construction phasing as noted in Article 1.16 of Section 01010—Summary of Work. 08 52 00 -Aluminum Replacement Windows Page 4 Window Replacement-Zisson Building Salem Housing Authority Salem, MA 01970 1.08 STAGING A. It is anticipated that the new windows will be installed from within the building, however; if exterior access is required to install the windows and to complete the exterior perimeter caulking, all lifts, hosting, and/or staging required will be the responsibility of the contractor. B. No permanent or fixed staging will be allowed in the two alleyways. These alleyways are public and free access must be maintained at all times. PART 2 -PRODUCTS 2.01 BASIC MATERIALS AND COMPONENTS A. Aluminum Extrusions: Alloy and temper recommended by manufacturer for strength, corrosion resistance and application of required finish, but not less than 22,000 psi ultimate tensile strength and not less than 0.062" thickness at any location for main frame and panel members. B. Fasteners and Accessories: Aluminum, stainless steel or other metallic or nonmetallic materials guaranteed by the manufacturer to be non-corrosive and compatible with the aluminum members,hardware, anchors, and other components of the units. Provide angles, shims, anchors, stops, fins and other accessories required for complete installation. C. Hardware: Cast, wrought, or drop forged aluminum, non-magnetic stainless steel, or white bronze where exposed. Provide hardware items necessary to properly operate, tightly close and securely lock windows. Do not use aluminum in frictional contact with metal. D. Sealant: Unless otherwise indicated, for sealants required within the fabricated units, provide type guaranteed by unit manufacturer for the joint size and movement to remain permanently elastic, non-shrinking and non-migrating. E. Glass: Provide manufacturer's standard 1 inch units of 2 sheets of 1/a" clear plate glass (ASTM C-1360, Type I, Class 1, Quality q3); permanently and hermetically sealed together at edges with spacers and sealant to provide a dehydrated air space with -60 degree F. dew point. Provide dual seal construction with soft coat low E type glazing. F. Glazing Beads or Stops: Manufacturer's standard glazing beads or stops to suit required glass thickness. Provide continuous vinyl channel type, of color to match aluminum, or extruded aluminum glazing stops with integral vinyl glass seal or vinyl channel type 08 52 00-Aluminum Replacement Windows Page 5 Window Replacement-Zisson Building Salem Housing Authority Salem,MA 01970 glazing bead inserts. Precut beads or stops to full-length pieces as required, for neat fit and tight weatherseal. G. Safety Glazing: As required by the Massachusetts State Building Code, 8d'Edition. 2.02 ALUMINUM OPERABLE WINDOWS A. General: Provide thermal aluminum operable windows meeting heavy commercial grade AAMA Rating AW-PG65. B. Frame: Provide frame of.125"nominal material wall thickness of 6063-T5 or T6 alloy with a depth of between 4". Corners are of screw spline construction and back sealed with small joint seam sealer. Frames are to include extruded sills and stools as detailed. C. Vent Frame: Provide frame with .125" nominal material wall thickness of 6063-T5 or T6 alloy with a depth of 2". Comers are mitered, angle reinforced, crimped, and cold epoxy welded, and back sealed. D. Hardware: Provide the following: 1. Hardware having component parts which are exposed shall be of aluminum, stainless steel or other non-corrosive materials compatible with aluminum. Cadmium or zinc plated steel where used must be in accordance with ASTM Specifications B 766 or B 633. 2. All primary locking devices shall be cast in white bronze cam action locks. Two such locking devices shall be required when vent height exceeds thirty inches. Cam lock handles on projected units shall be "handed"to facilitate operation. The left lock to sweep left, the right lock to sweep right. 3. Projected ventilators shall be balanced on two heavy duty stainless steel hinge assemblies. Hinge shall have the ability to open the window to 90 degrees for easy cleaning. Nylon slides with a suitable set screw shall be provided for precision adjustment. E. Weatherstripping: Provide dual weather stripped Neoprene leaf or bulb gasket types. Weatherstripping shall allow for internal weep system to drain. F. Glazing: All units (except insulated panels as required for insulation) shall be pre-glazed with an exterior continuous uniform silicone bread with an interior snap on aluminum 08 52 00-Aluminum Replacement Windows Page 6 Window Replacement-Zisson Building Salem Housing Authority Salem, MA 01970 bead containing a rigid back bulb gasket installed at the factory with the specified glazing material as follows (use of tapes, vinyls, or any other type of sealant is not allowed): 1. Typical insulated glass shall be constructed to an overall thickness of 1"with two liter of 1/8, 3/16, or 1/4". Typical 1"insulated glass units shall be dual seal. The primary sealant shall be polyisobutylene applied to the edge of the spacer. The secondary sealant shall be silicone. The air spacer shall be continuous metal spacer with formed corners and an in-line connector, containing desiccant. G. Screens: Provide screens on operating vents as indicated on the architectural plans. Screen frames are to be extruded aluminum sections with corners mitered and mechanically attached. Screening fabric shall be 18 x 16 aluminum mesh retained in screen frames with vinyl splines that permit easy replacement. Screen frames shall be secured by aluminum clips fastened with stainless steel screws into window frames. Frames shall be finished to match windows or specify finish. H. Mullions: Provide both vertical and horizontal 3-piece structural mullions, integrated into the master window frame capable of withstanding horizontal loads without deflecting more than 1/1751h of it's span. I. Vent Stops:: At hopper and awning locations on the first floor,provide vent units with an integral stop from preventing outer corner of vent from protruding beyond the edge of the masonry wall. In general, this distance equals 4—6 inch projection from the frame. J. Sub-sill: At all window frames,provide an extruded aluminum sub-sill at the base of the window frame above the existing concrete or brick sill. 2.03 ALUMINUM FIXED FRAMES A. Provide aluminum framed fixed glazing by the same manufacturer as the operable aluminum windows and complying with the relevant portions of the fabrication specifications above. B. Provide mullions, sub-bucks sub-sills and accessory items to mount and join frames. C. Muttins: Provide concealed type aluminum grids within the insulated glazing of hollow aluminum in finish to match window system. 2.04 FINISHES A. Windows: Provide a clear 2 coat Fluorpolymer 70% kynar finish meeting or exceeding AAMA 2605 finish. 08 52 00-Aluminum Replacement Windows Page 7 Window Replacement-Zisson Building Salem Housing Authority Salem, MA 01970 2.05 SEALANTS A. Movement Joints: Provide sealants at interior and exterior joints between new aluminum replacement windows and adjacent materials including masonry and concrete. 1. At all perimeter window joints,provide a low-modulus one-part or two-part polyurethane polymer- based sealant complying to Fed. Spec. TT-S-0O227E Class A, Type II and equal to: a. Tremco "Dymeric"; b. Pecora "Dynatrol 11"; C. Sonneborn "Sonolastic NPII"; d. or approved equal. 2.06 MISCELLANEOUS MATERIALS A. Joint Cleaner: Provide cleaner recommended by the manufacturer of the sealant for the specific joint surface and condition. B. Joint Primer and Sealer: Provide compounds recommended by the manufacturer of the sealant for the specific joint surface and condition. C. Bond Breaker Tyne: Pressure sensitive polyethylene tape. 2.07 JOINT BACKER ROD A. Provide resilient closed cell polyethylene foam joint backer rod manufactured specifically for cold-applied joint sealants. B. Provide rod sized 1/8" to 1/4" larger in diameter than joint for which it is intended to ensure its being under compression. 2.08 MEMBRANE AT WINDOW SILLS A. Provide a high strength rubberized asphalt sheet membrane waterproofing equal to: 1. W.R. Grace "Bituthene"; 08 52 00-Aluminum Replacement Windows Page 8 Window Replacement-Zisson Building Salem Housing Authority Salem, MA 01970 2. Polyguard Products, Inc. "Polyguard 650 membrane"; 3. Pecora "Duramem 700-SM"; 4. or approved equal. B. Follow manufacturer's printed recommendations for materials required, application of membranes and terminating membranes. Provide all materials for a complete installation. Turn flashing up 4 inches at jambs behind window frame. PART 3 -EXECUTION 3.01 INSPECTION A. Examine the substrate and conditions under which the aluminum window units are to be installed and notify the Architect in writing of conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected or formally waived. 3.02 INSTALLATION OF WINDOWS A. Comply with manufacturer's specifications and recommendations for the installation of window units, hardware, operators, and other components of the work. B. Set units plumb, level and true to line, without warp or rack of frames. Anchor securely in place. Separate aluminum and other corrodible metal surfaces from sources of corrosion or electrolytic action at points of contact with other materials. C. Set sill members and other frame members in a bed of compound or with joint fillers or gaskets, to provide weathertight construction. 3.03 ADJUST AND CLEAN A. Adjust operating panels and hardware to provide a tight fit at contact points and at weather stripping for smooth operation and weathertight closure. B. Clean aluminum surfaces promptly after installation of window units. Remove excess glazing and sealant compounds, dirt and other substances. Lubricate hardware and other moving parts. Remove glass labels after acceptance of window work and wash off harmful soil. 08 52 00-Aluminum Replacement Windows Page 9 Window Replacement-Zisson Building Salem Housing Authority Salem,MA 01970 C. Advise Contractor of protective treatment and other precautions required through the remainder of the construction period, to ensure that windows will be without damage or deterioration other than normal weathering at the time of acceptance. 3.04 ACCEPTANCE OF GLASS AND REPLACEMENT A. At conclusion of the work of this Section,present all glass for inspection by the Architect. Architect will inspect glass for conformity with the Contract Documents and recommend to the Owner acceptance of the glazing. After glass has been accepted by the Owner, responsibility for protection of glass and replacement of broken glass shall pass to the General Contractor. Prior to presenting glass for acceptance,remove labels and clean glazing of gross soil, harmful substances and excess sealants. 3.05 FINAL ADJUSTMENT AND OVERALL ACCEPTANCE A. At the conclusion of all construction work, but prior to final inspection of the project for acceptance,return to the site and make all necessary final adjustments, clean tracks, oil moving parts and leave all windows in perfect operating order. 3.06 PREPARATION OF SURFACES FOR SEALANTS AND CAULKING A. Examine all joints to receive sealants or caulking compounds prior to application. Do not commence work in any area where conditions exist which would adversely affect the achievement of weather tight seals until corrective work has been completed or waived. Starting of work in any area shall constitute acceptance of conditions in the area by this Subcontractor, who shall from that time be responsible for the satisfactory results of his work. B. Clean joints and spaces to be sealed and caulked so they are dry and free of dust, loose mortar, and other foreign matter. Wire brush joints in concrete and masonry and air-blow or vacuum clean. C. Clean all surfaces which have been given protective coatings and all those which contain oil or grease with xylol or MEK solvent, with due precautions taken to minimize hazards. D. Prime all surfaces where and as recommended by sealant or caulking compound manufacturers. E. All exterior joints shall be backed with joint backing material to eliminate back bond. Where width of exterior joint is 1/2 in. or less,prepare joint to depth of sealant bead is 08 52 00 -Aluminum Replacement Windows Page 10 Window Replacement-Zisson Building Salem Housing Authority Salem, MA 01970 approximately equal to its width. Where width of exterior joint exceeds 1/2 in.,prepare joint so depth of sealant bead is approximately equal to 1/2 its width or 1/2 in., whichever is greater. Use appropriate joint backing and joint filler material as specified hereinabove. F. Backing of interior caulked joints will not be required except where depth of joint exceeds 3/4 in., in which cases it shall be backed to that depth by use of compressible foam, as above, or non-staining oakum. G. Provide masking tapes or other precautions to prevent migration or spillage of materials onto adjoining surfaces. 3.07 APPLICATION OF SEALANTS AND CAULKING A. Application of caulking compounds and sealants shall be in strict accordance with the manufacturer's printed instructions. B. Apply sealants and caulking compounds before final coat of paint is applied to adjacent surfaces. C. Compound shall generally be applied by means of a hand gun, unless otherwise specified, without smearing of adjacent surfaces, and with sufficient pressure and with proper nozzle size to solidly fill all voids and joints. Where required by manufacturer's instructions, sealant shall be heated to recommended temperature before application. D. Immediately after application, tool all beads to ensure firm, full contact with the inner surfaces of the joint. Strike off excess material with tooling stock or knife Finish all exposed joints to smooth, even, wrinkle-free, slightly concave surface. E. Pour self-leveling compounds in horizontal joints to a level approximately 1/16 inch below adjacent surfaces. 3.08 CLEAN UP AFTER CAULKING AND SEALING A. Remove smears from adjacent surfaces immediately as the work progresses. Exercise particular care to prevent smearing or staining of surrounding surfaces which will be exposed in the finished work. Repair any damage done to the work of other trades. B. At the completion of the work of this Section, remove all packaging and debris from job site. Remove all construction aids and tools and leave work areas neat and clean. 08 52 00-Aluminum Replacement Windows Page 11 Window Replacement-Zisson Building Salem Housing Authority Salem, MA 01970 3.09 CLEAN UP A. Keep work areas clean by daily sweeping and removal of debris resulting from window work. B. At conclusion of job remove from job site all crates,packing material, scrap and other debris. C. Repair or replace work of other trades soiled or damaged by window installation work. END OF SECTION 08 52 00-Aluminum Replacement Windows Page 12 Environmental Restorations, Inc. A professional approach to gualihy service General Contracting•Deleading•Sandblasting•Asbestos Removal•Mold Remediation •Fire&Water Restoration•Duct Cleaning Submittals Salem Housing Authority Window Replacement-Zisson Building 1. GC and window fabricator to field verify window sizes. Owner: Salem Housing Authority 2. Coordinate issue found during .27 Charter Street installtion of sample window. 'Salem, MA 01970 3. Window and panning color to be ,Contact: Debbie Tucker selected by the Salem HA. Architect: Blacksone Block Architect 4. Please verify screen sizes and 7 Marshall Street, Suite 301 mesh type with the Salem HA. ,Boston, MA 02108 (Contact:Barry Bubchinski General Contractor: Environmental Restorations,Inc 25 Spaulding Road,Suite 17-2 Fremont,NH 03044 Contact:Keri Minasalli(603)895-0400 Submittal Number: 085200-01-001 Product: Aluminum Replacement Windows: Multi Manufacturer: Universal Window& Door Architect's Stamp&Sign Off Contractor's Stamp&Sign Off BSBA#08-01 ❑ Approved ❑ Rcviseand Resubmit APPROVED t';OR CONFORMANct' X Approved as Noted ❑ Rejected WITH THE CONTRACT DOCUMENTS ❑ Not Required by the Contract Documents All Dimensions and Quantities Have Bear, Reviewed and Are Accepted by Approval is only for conformance with the design concept ENVIRONMENTAL RESTORATIONS, of the Project and compliance with the information given in the RATIONS,INC. Contract Documents.Contractor is responsible for dimensions All Dimensions and Field Conditions Have Been to be confirmed and correlated at the job tile:for infont:pion or will Be Verified PRIOR to Fabricators that pertains solely to the fabrication process or to techniques of the Items Described Her of construction:and for coordination of the work of all trades. j-/ Herein BLACKSTONE BLOCK ARCHITECTS,INC By BB Date 01/24/2019 25 Spaulding Road,Suite 17-2,Fremont,NH 03044 •Tel (603)895-0400 • Fax (603)895-0445 www.environmentalrestorations.com 1���� Quotation � � UNIVERSAL 3O3 Mechanic St. Marlborough, MA.O1752 .on Window and Door Phone:800.63www. 1 Fax:5windo 00 m www.unlversalwindow.com A full line of products for Commercial,Heavy Commercial,Institutional,Residential,Architectural and Historic Applications Quote#: 11658 Billing Information: Shipping Information: Project: Salem Housing Quote: ERI-#550 Creation ERI-Environmental Restorations Inc. Date:4/20/2018 292 Essex St Carrier: 25 Spaulding Road Suite 17-2 Payment Terms:Customer Fremont NH 03044 Salem MA Number:3367 PO Number: Phone 603895-0400 Phone Fax:: Fax:: 603-895-0445 Order Comments: Line I Qty I Product Description I Dealer Price I Extended 100-1 4 TTT Frame Size: 36" x 65"Notes: T Mark: A ***PRODUCT'*' Series 550 Double Hung Operable 36 x 65 Even Sash Split , **'SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum ffi Mesh ***HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,Top j Balance-Block and Tackle,Bottom Balance-Ultralifts, Ll Include Sash Lock=Yes,Pole Op Sash Lock ***Extrusion Picker*** 550DH Header=Standard Header(400-101),550DH Left Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RLE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 36,65 —Wrapping Surcharges'** Factory Attached Wrapping Wrapping 1 Factory Attached?=Yes,N/A @ Head,N/A @ LJ,N/A @ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Trim804 RJ,Tdm804@ Sill Line I Qty I Product Description i Dealer Price I Extended 100-2 4 TTT Frame Size: 36"x 65" Notes: Mark: A MISC/TRIM 3 Line I Qty I Product Description Dealer Price I Extended Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 1 of 26 200-1 4 TTT Frame Size: 36" x 73"Notes: Mark: Al ***PRODUCT*** Series 550 Double Hung Operable 36 x 73 Even Sash Split ***SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum e Mesh ***HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,Top 5 j Balance-Block and Tackle,Bottom Balance-Ultralifts, L1 Include Sash Lock=Yes,Pole Op Sash Lock ***Extrusion Picker*** 550DH Header=Standard Header(400-101),550DH Left Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RLE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 36,73 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 1 Factory Attached?=Yes,N/A @ Head,N/A @ LJ,N/A @ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Trim804a RJ,Tdm804@ Sill Line City Product Description Dealer Price I Extended 200-2 4 TTT Frame Size: 36"x 73" Notes: Mark: Al MISCITRIM 3 Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 2 of 26 Line Qty I Product Description Dealer Price I Extended 300-1 4 TTT Frame Size: 44"x 64 1/2"Notes: Mark: B ***PRODUCT*** Series 550 Double Hung Operable 44 x 64 1/2 F 1 Even Sash Split ***SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum Mesh a ***HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,Top Balance-Block and Tackle,Bottom Balance-Ultralifts, Include Sash Lock=Yes,Pole Op Sash Lock ***Extrusion Picker*** 550DH Header=Standard Header(400-101),550DH Left M Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RLE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 44,64 1/2 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head, DS113@ LJ,DS113@ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Tdm804 RJ,Tdm804@ Sill Line Qty Product Description Dealer Price I Extended 300-2 4 TTT Frame Size: 44"x 64 1/2" Notes: Mark: B MISC/TRIM 3 Line Qty Product Description Dealer Price I Extended 400-1 2 TTT Frame Size: 38" x 44"Notes: Mark: B1 ***PRODUCT*** Series 550 Double Hung Operable 38 x 44 Even Sash Split ***SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum , Mesh ***HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,Top Balance-Block and Tackle,Bottom Balance-Ultralifts, u Include Sash Lock=Yes,Pole Op Sash Lock ***Extrusion Picker*** 550DH Header=Standard Header(400-101),550DH Left Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RLE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 38,44 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804@ LJ,Tdm804@ RJ,Tdm804@ Sill Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 3 of 26 Line I Qty I Product Description Extended Dealer Price I 400-2 2 TTT Frame Size: 38"x 44" Notes: Mark: B1 MISC/TRIM 3 Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 4 of 26 Line Qty I Product Description Dealer Price I Extended 500-1 2 TTT Frame Size: 56"x 64 3/4"Notes: --, Mark: B2 PRODUCT*** Series 550 Double Hung Operable 56 x 64 3/4 j Even Sash Split ***SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum a Mesh ***HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,Top i I� Balance-Block and Tackle,Bottom Balance-Ultralifts, lJ Include Sash Lock=Yes,Pole Op Sash Lock ***Extrusion Picker** 55ODH Header=Standard Header(400-101),550DH Left Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RILE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 56,64 3/4 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head, DS113@ LJ,DS113@ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Tdm804 RJ,Tdm804@ Sill Line Qty Product Description Dealer Price I Extended 500-2 2 TTT Frame Size: 56"x 64 3/4" Notes: Mark: 132 MISC/TRIM 3 Line Qty I Product Description Dealer Price I Extended Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 5 of 26 600-1 6 TTT Frame Size: 31 1/2" x 65"Notes: Mark: B3 i ***PRODUCT*** Series 550 Double Hung Operable 31 1/2 x 65 Even Sash Split *SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum a Mesh ***HARDWARE*'* Auto Lock+Spring=Yes,Full Length Rail=Yes,Top Balance-Block and Tackle,Bottom Balance-Ultralifts, Include Sash Lock=Yes,Pole Op Sash Lock ***Extrusion Picker*** 550DH Header=Standard Header(400-101),550DH Left r5 Jamb=Standard Jamb(400-103),55ODH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) **'GLASS*** Double IG,RILE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR**' 70%Kynar Finish,Window Color=Not Selected 31 1/2,65 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head, DS113@ LJ,DS113@ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804P LJ,Tdm804 RJ,Tdm804@ Sill Line Qty Product Description Dealer Price I Extended 600-2 6 TTT Frame Size: 31 1/2"x 65" Notes: Mark: B3 MISCITRIM 3 Line Qty Product Description Dealer Price I Extended 700-1 2 TTT Frame Size: 33 1/4" x 63"Notes: Mark: B4 *PRODUCT*** Series 550 Double Hung Operable 33 1/4 x 63 Even Sash Split rY' *SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum Mesh ***HARDWARE*'* Auto Lock+Spring=Yes,Full Length Rail=Yes,Top Balance-Block and Tackle,Bottom Balance-Ultralifts, Include Sash Lock=Yes,Pole Op Sash Lock ***Extrusion Picker** 550DH Header=Standard Header(400-101),550DH Left �3 Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS'** Double IG,RILE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR'*' 70%Kynar Finish,Window Color=Not Selected 33 1/4,63 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head, DS113@ LJ,DS113@ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804@ LJ Trim804@ RJ,Tdm804@ Sill Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 6 of 26 Line I City I Product Description Extended Dealer Price 1 700-2 2 TTT Frame Size: 33 1/4"x 63" Notes: Mark: 134 MISC/TRIM 3 Line City Product Description Extended Dealer Price 1 800-1 1 TTT Frame Size: 42" x 44"Notes: Mark: 135 ***PRODUCT*** Series 550 Double Hung Operable 42 x 44 n Even Sash Split 1�4 ***SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum Mesh **HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,TopJ Balance-Block and Tackle,Bottom Balance-Ultralifts, Include Sash Lock=Yes,Pale Op Sash Lock ***Extrusion Picker— 1 550DH Header=Standard Header(400-101),550DH Left -----, Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RLE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 42,44 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Tdm804 RJ,Tdm804 Sill Line Qty Product Description Dealer Price I Extended 800-2 1 TTT Frame Size: 42"x 44" Notes: Mark: 135 MISC/TRIM 3 Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 7 of 26 Line Qty I Product Description Dealer Price I Extended 900-1 1 TTT Frame Size: 36 1/2" x 44"Notes: Mark: B6 ***PRODUCT— Series 550 Double Hung Operable 36 1/2 x 44 Even Sash Split ***SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum Mesh ***HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,Top Balance-Block and Tackle,Bottom Balance-Ultralifts, Include Sash Lock=Yes,Pole Op Sash Lock ***Extrusion Picker*** 550DH Header=Standard Header(400-101),550DH Left —------------ Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RILE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 36 1/2,44 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804P LJ,Tdm804 RJ,Tdm804@ Sill Line Qty Product Description Dealer Price I Extended 900-2 1 TTT Frame Size: 36 1/2"x 44" Notes: Mark: B6 MISC/TRIM 3 Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 8 of 26 Line Qty I Product Description Dealer Price I Extended 1000-1 1 TTT Frame Size: 67" x 44"Notes: Mark: B7 ***PRODUCT*** Row 1:Series 550 Double Hung Operable 33 1/4 x 44 71 Row 2:Series 550 Double Hung Operable 33 114 x 44 j1 Even Sash Split ***SCREEN*** : Standard Screen,Exterior Applied,Half Window,Aluminum Mesh *HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,Top Balance-Block and Tackle,Bottom Balance-Ultralifts, Include Sash Lock=Yes,Pole Op Sash Lock ---- ***Extrusion Picker*** 550DH Header=Standard Header(400-101),550DH Left Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RILE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected ***MULLS*** Vertical Factory Mull 0.5 thick,44"length 67,44 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Tdm804 RJ,Trim804 Sill Line City Product Description Dealer Price I Extended 1000-2 1 TTT Frame Size: 67"x 44" Notes: Mark: B7 MISC/TRIM 3 Line Qty I Product Description Dealer Price I Extended Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 9 of 26 1100-1 2 TTT Frame Size: 33" x 72"Notes: Mark: B8 ***PRODUCT'*' Series 550 Double Hung Operable 33 x 72 n Even Sash Split ***SCREEN*** j Standard Screen,Exterior Applied,Half Window,Aluminum a -- Mesh ***HARDWARE**' Auto Lock+Spring=Yes,Full Length Rail=Yes,Top Balance-Block and Tackle,Bottom Balance-Ultralifts, Include Sash Lock=Yes,Pole Op Sash Lock ***Extrusion Picker*** 550DH Header=Standard Header(400-101),550DH Left Jamb=Standard Jamb(400-103),55ODH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RLE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ''*COLOR'** 70%Kynar Finish,Window Color=Not Selected 33,72 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head, DS113@ LJ,DS113@ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Tdm804 LJ,Tdm804 RJ,Tdm804@ Sill Line Qty Product Description Extended Dealer Price I 1100-2 2 TTT Frame Size: 33"x 72" Notes: Mark: B8 MISC/TRIM 3 Line Qty Product Description Dealer Price I Extended 1200-1 1 TTT Frame Size: 33 1/4" x 72"Notes: Mark: B9 ***PRODUCT*** Series 550 Double Hung Operable 33 1/4 x 72 (j Even Sash Split 4 ***SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum Mesh ***HARDWARE*** Auto Lock+Spring=*Yes,Full Length Rail=Yes,Top j Balance-Block and Tackle,Bottom Balance-Ultralifts, lJ Include Sash Lock=Yes,Pole Op Sash Lock *Extrusion Picker' 550DH Header=Standard Header(400-101),550DH Left Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RLE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 33 114,72 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head, DS113@ LJ,DS113@ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ Tdm804 RJ Trim804 Sill Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 10 of 26 i, Line Qty I Product Description Dealer Price I Extended 1200-2 1 TTT Frame Size: 33 1/4"x 72" Notes: Mark: B9 MISC/TRIM 3 Line Qry Product Description Dealer Price I Extended 1300-1 1 TTT Frame Size: 40" x 39"Notes: Mark: 610 --- "" ***PRODUCT*** Series 550 Direct Set Fixed 40 x 39 ***HARDWARE*** Include Sash Lock=Yes ***GLASS*** Double IG,RILE Softcoat,1"IG,No Gas,Inside Lite:1/8", Outside Lite:1/8" ***Extrusion Picker** 550FX Header=Standard(400-300),550FX Left Jamb= Standard(400-300),550FX Right Jamb=Standard (400-300),550FX Sill=Standard(400-300) ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 40,39 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head, DS113@ LJ,DS113@ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Tdm804 RJ,Tdm804@ Sill Line Qty Product Description Dealer Price I Extended 1300-2 1 TTT Frame Size: 40"x 39" Notes: Mark: B10 MISC/TRIM 3 Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 11 of 26 Line Qty I Product Description Dealer Price I Extended 1400-1 2 TTT Frame Size: 45 1/2" x 57"Notes:Mark: B11 B11 PRODUCT*** Series 550 Double Hung Operable 45 1/2 x 57 (� Even Sash Split j v ***SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum Mesh — ** HARDWARE— Auto Lock+Spring=Yes,Full Length Rail=Yes,Top r Balance-Block and Tackle,Bottom Balance-Block andJ Tackle,Include Sash Lock=Yes,Pole Op Sash Lock ***Extrusion Picker*** 550DH Header=Standard Header(400-101),550DH Left Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RLE Softcoat,1"IG,No Gas,Inside Lite:1/8", Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 45 1/2,57 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head, DS113@ LJ,DS113@ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Tdm804 RJ,TrinrI Sill Line Qty Product Description Dealer Price I Extended 1400-2 2 TTT Frame Size: 45 1/2"x 57" Notes: Mark: B11 MISC/TRIM 3 Line Qty Product Description Dealer Price I Extended Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 12 of 26 1500-1 2 TTT Frame Size: 451/2" x 57"Notes: Mark: B12 1 — ***PRODUCT— Series 550 Double Hung Operable 45 1/2 x 57 Even Sash Split ***SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum Mesh ***HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,Top Balance-Block and Tackle,Bottom Balance-Block and ij Tackle,Include Sash Lock=Yes,Pole Op Sash Lock ***Extrusion Picker*** i 550DH Header=Standard Header(400-101),550DH Left —K3 Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RLE Softcoat,1"IG,No Gas,Inside Lite:1/8", Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 45 1/2,57 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head, DS113@ LJ,DS113@ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804P LJ,Trim804 RJ,Tdm804@ Sill Line Qty Product Description Dealer Price I Extended 1500-2 2 TTT Frame Size: 45 1/2"x 57" Notes: Mark: B12 MISC/TRIM 3 Line Qty Product Description Dealer Price I Extended 1600-1 4 TTT Frame Size: 28" x 56"Notes: Mark: B13 ***PRODUCT*** Series 550 Double Hung Operable 28 x 56 (� Even Sash Split �} ***SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum x Mesh *HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,Top Balance-Block and Tackle,Bottom Balance-Block and if Tackle,Include Sash Lock=Yes,Pole Op Sash Lock 1 ***Extrusion Picker** 550DH Header=Standard Header(400-101),550DH Left m Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RLE Softcoat,1"IG,No Gas,Inside Lite:1/8", Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 28,56 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head, DS113@ LJ,DS113@ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804@ LJ Tdm804 RJ Tdm804@ Sill Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 13 of 26 Line I Qty I Product Description Extended Dealer Price I 1600-2 4 TTT Frame Size: 28"x 56" N otes: Mark: B13 MISC/TRIM 3 Line Qty Product Description Extended Dealer Price I 1700-1 4 TTT Frame Size: 33 1/2"x 56 1/2"Notes: Mark: B14 ------------ ***PRODUCT*** I� Series 550 Double Hung Operable 33 1/2 x 56 1/2 1 Even Sash Split c j ***SCREEN Standard Screen,Exterior Applied,Half Window,Aluminum Mesh ***HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,Top Balance-Block and Tackle,Bottom Balance-Block and Tackle,Include Sash Lock=Yes,Pole Op Sash Lock I I ***Extrusion Picker*** 550DH Header=Standard Header(400-101),550DH Left - Jamb=Standard Jamb(400-103),550DH Right Jamb= j Standard Jamb(400-103),550DH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RILE Softcoat,1"IG,No Gas,Inside Lite:1/8", Outside Lite:1/8" ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 33 1/2,56 1/2 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head, j DS113@ LJ,DS113@ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Tdm804 RJ,Tdm804@ Sill Line Qty Product Description Dealer Price I Extended 1700-2 4 TTT Frame Size: 33 1/2"x 56 1/2" Notes: Mark: B14 MISC/TRIM 3 Line Qty I Product Description Extended Dealer Price I Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 14 of 26 1800-1 2 TTT Frame Size: 34" x 41"Notes: Mark: B15 ***PRODUCT*** Series 700 Awning Project Out Awning 34 x 41 ***OPERATORS*** J Cam Handles / ***HARDWARE Four Bar Hinge tf ***COLOR*** \ 70%Kynar Finish,Window Color=Not Selected ***SCREEN*** Standard Screen,Exterior Applied,Full Window,Aluminum Mesh ***GLASS*** Double IG,RLE Softcoat,1 1/8"IG,No Gas,Inside Lite: 1/8",Outside Lite:1/8" 34,41 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head, DS113@ LJ,DS113@ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Trim804a RJ,Tdm804@ Sill Line I Qty I Product Description Dealer Price I Extended 1800-2 2 TTT Frame Size: 34"x 41" Notes: Mark: B15 MISC/TRIM 3 Line Qty Product Description Dealer Price I Extended 1900-1 1 TTT Frame Size: 30"x 44" Notes: Mark: B16 ***PRODUCT*** Series 550 Double Hung Operable 30 x 44 n Even Sash Split***SCREEN*** �4 Standard Screen,Exterior Applied,Half Window,Aluminum Mesh s ***HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,Top Balance-Block and Tackle,Bottom Balance-Ultralifts, U Include Sash Lock=Yes,Pole Op Sash Lock ***Extrusion Picker*** 550DH Header=Standard Header(400-101),550DH Left Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),55ODH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RLE Softcoat,1"IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR'** 70%Kynar Finish,Window Color=Not Selected 30,44 ***Wrapping Surcharges*** Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 15 of 26 Factory Attached Wrapping Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Tdm804@ LJ,Tdm804@ RJ,Tdm804@ Sill Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 16 of 26 Line ! Qty ! Product Description ! Dealer Price I Extended] TTT Frame Size: $ Notes: 54.00 Mark: MISC/TRIM 3 1900-2 1 30"x 44" B16 Line ! Qty ! Product Description !Extended Dealer Price 1 2000-1 1 TTT Frame Size: 23" x 44"Notes: Mark: B17 ***PRODUCT --- Series 550 Double Hung Operable 23 x 44 I� Even Sash Split JFJ ***SCREEN*** Standard Screen,Exterior Applied,Half Window,Aluminum Mesh a ***HARDWARE*** Auto Lock+Spring=Yes,Full Length Rail=Yes,Top Balance-Block and Tackle,Bottom Balance-Ultralifts, Include Sash Lock=Yes,Pale Op Sash Lock ***Extrusion Picker*** 550DH Header=Standard Header(400-101),550DH Left J Jamb=Standard Jamb(400-103),550DH Right Jamb= Standard Jamb(400-103),55ODH Sill=Auto Lock(400-125) ***GLASS*** Double IG,RLE Softcoat,V IG,Argon Gas Fill,Inside Lite: 1/8",Outside Lite:1/8" ***COLOR**' 70%Kynar Finish,Window Color=Not Selected 23,44 ***Wrapping Surcharges*** Factory Attached Wrapping ! Wrapping 1 Factory Attached?=Yes,Pan925@ Head, Pan925@ LJ,Pan925@ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Tdm804 RJ,Tdm804@ Sill Line ! City ! Product Description ! Dealer Price I Extended 2000-2 1 TTT Frame Size: 23"x 44" Notes: Mark: B17 MISC/TRIM 3 Line ! Qty ! Product Description ! Dealer Price I Extended Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 17 of 26 2100-1 2 TTT Frame Size: 49" x :Notes: Mark: C ***PRODUCT*** Series 550 Direct Set Fixed 49 x 65 ***HARDWARE*** Include Sash Lock=Yes ***GLASS*** ta Double IG,RILE Softcoat,1"IG,No Gas,Inside Lite:3/16", Outside Lite:3/16" ***Extrusion Picker*** 550FX Header=Standard(400-300),550FX Left Jamb= Standard(400-300),550FX Right Jamb=Standard (400-300),550FX Sill=Standard(400-300) ***COLOR*** , 70%Kynar Finish,Window Color=Not Selected 49,65 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 1 Factory Attached?=Yes,N/A @ Head,N/A @ LJ,N/A @ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804a LJ,Tdm804 RJ,Trim804@ Sill Line Qty Product Description Dealer Price I Extended 2100-2 2 TTT Frame Size: 49"x 65" Notes: Mark: C MISC/TRIM 3 Line Qty Product Description Dealer Price I Extended 2200-1 2 TTT Frame Size: 49"x 73" Notes: Mark: C1 ***PRODUCT*** Series 550 Direct Set Fixed 49 x 73 ***HARDWARE*** Include Sash Lock=Yes ***GLASS`** Double IG,RILE Softcoat,1"IG,No Gas,Inside Lite:3/16", Outside Lite:3/16" ***Extrusion Picker*** 550FX Header=Standard(400-300),550FX Left Jamb= Standard(400-300),550FX Right Jamb=Standard (400-300),550FX Sill=Standard(400-300) n ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 49,73 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 1 Factory Attached?=Yes,N/A @ Head,N/A @ LJ,N/A @ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804@ LJ,Trim804@ RJ,Tdm804@ Sill Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 18 of 26 Line I Qty I Product Description Dealer Price I Extended 2 TTT Frame Size: Notes: Mark: MISC/TRIM 3 2200-2 49"x 73" C1 Line I Qty I Product Description Extended I Dealer Price I 2300-1 2 TTT Frame Size: 51 1/2"x 54 1/2"Notes: Mark: C2 — ***PRODUCT*`* Series 550 Direct Set Fixed 51 1/2 x 54 1/2 ***HARDWARE*** Include Sash Lock=Yes ***GLASS*** Double IG,RLE Softcoat,1"IG,No Gas,Inside Lite:1/8", a Outside Lite:1/8" ***Extrusion Picker** 550FX Header=Standard(400-300),550FX Left Jamb= Standard(400-300),550FX Right Jamb=Standard (400-300),550FX Sill=Standard(400-300) 70%Kynar Finish,Window Color=Not Selected 51 1/2,54 1/2 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 1 Factory Attached?=Yes,N/A @ Head,N/A @ LJ,N/A @ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trirn804P LJ,Trim804 RJ,Trim804 Sill Line I Qty I Product Description Extended I Dealer Price I 2300-2 2 TTT Frame Size: 51 1/2"x 54 1/2" Notes:Mark: MISC/TRIM 3 Line I Qty I Product Description Extended I Dealer Price I Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn P Pages: 19 of 26 2400-1 1 TTT Frame Size: 44"x 39 1/2"Notes: Mark: D ------------------ ***PRODUCT*** Series 550 Direct Set Fixed 44 x 39 1/2 ***HARDWARE*** Include Sash Lock=Yes ***GLASS*** Double IG,RLE Softcoat,Tempered,1"IG,No Gas,Inside x Lite:1/8",Outside Lite:1/8" ***Extrusion Picker*** 550FX Header=Standard(400-300),550FX Left Jamb= Standard(400-300),550FX Right Jamb=Standard (400-300),550FX Sill=Standard(400-300) ***COLOR*** ----- 70%Kynar Finish,Window Color=Not Selected 44,39 1/2 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 1 Factory Attached?=Yes,N/A @ Head,N/A @ LJ,N/A @ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Tdm804 RJ,Tdm804@ Sill Lxe Qty Product Description Eended Dealer Price 1 2400-2 1 TTT Frame Size: 44"x 39 1/2" Notes: Mark: D MISC/TRIM 3 Line I Qty I Product Description Extended I Dealer Price 1 2500-1 2 TTT Frame Size: 85"x 56" Notes: Mark: E ***PRODUCT*** Series 550 Direct Set Fixed 85 x 56 ***HARDWARE*** Include Sash Lock=Yes ***GLASS*** x Double IG,Glass Type=SN68,1"IG,No Gas,Inside Lite: 1/4",Outside Lite:1/4" ***Extrusion Picker*** 550FX Header=Standard(400-300),550FX Left Jamb= az Standard(400-300),550FX Right Jamb=Standard (400-300),550FX Sill=Standard(400-300) ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 85,56 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 1 Factory Attached?=Yes,Pan925@ Head,N/A @ LJ,N/A @ RJ,N/A @ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804@ LJ,Tdm804@ RJ,Tdm804@ Sill Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 20 of 26 Line I Qty I Product Description I Dealer Price I Extended 2 TTT Frame Size: Notes: Mark: MISC/TRIM 3 2500-2 85"x 56" E Line I Qty I Product Description Extended I Dealer Price 1 2600-1 2 TTT Frame Size: 45 13/32" x 21"Notes: Mark: T1 ***PRODUCT*** Series 550 Direct Set Fixed 45 13/32 x 21 ***HARDWARE*** -- Include Sash Lock=Yes ***GLASS Double IG,RLE Softcoat,1"IG,No Gas,Inside Lite:1/8", Outside Lite:1/8" ***Extrusion Picker*** 1 550FX Header=Standard(400-300),550FX Left Jamb -- Standard(400-300),550FX Right Jamb=Standard (400-300),550FX Sill=Standard(400-300) ***COLOR*** 70%Kynar Finish,Window Color=Not Selected ***GRIDS*** Grids,Standard Rectangular,GBG:Grid-105,Exterior: None,Interior:None,Grid Frame Only=No,Grid Color= Window Exterior Color Same,5W2H 45 13132,21 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head,N/A @ LJ,N/A @ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head,N/A @ LJ,N/A @ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Trim804 RJ,Trim804@ Sill Line I Qty I Product Description Extended I Dealer Price 1 2600-2 2 TTT Frame Size: 45 13/32"x 21" Notes:Mark: MISC/TRIM 3 Line I Qty I Product Description Extended I Dealer Price I Quoted by:RobertQuinn Printed by: Robed Quinn Safes Rep:Robert Quinn Pages: 21 of 26 2700-1 4 TTT Frame Size: 28" x 21"Notes: Mark: T2 ***PRODUCT*** Series 550 Direct Set Fixed 28 x 21 ***HARDWARE*** Include Sash Lock=Yes ***GLASS*** Double IG,RLE Softcoat,1"IG,No Gas,Inside Lite:1/8", Outside Lite:1/8" ***Extrusion Picker** 550FX Header=Standard(400-300),550FX Left Jamb= Standard(400-300),550FX Right Jamb=Standard (400-300),550FX Sill=Standard(400-300) — ***COLOR*** 70%Kynar Finish,Window Color=Not Selected ***GRIDS*** Grids,Standard Rectangular,GBG:Grid-105,Exterior: None,Interior:None,Grid Frame Only=No,Grid Color= Window Exterior Color Same,3W1H 28.21 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head,N/A @ LJ,N/A @ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head,N/A @ LJ,N/A @ RJ,N/A @ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Trim804 RJ,Tdm804@ Sill Line Qty Product Description Extended Dealer Price I 2700-2 4 TTT Frame Size: 28"x 21" Notes:Mark: MISC/TRIM 3 Line Qty Product Description Extended � Dealer Price I 2800-1 2 TTT Frame Size: 85"x 21 1/2" Notes: Mark: T3 ***PRODUCT*** Series 550 Direct Set Fixed 85 x 21 1/2 ***HARDWARE*** Include Sash Lock=Yes ) �1 ***GLASS*** Double IG,RLE Softcoat,1"IG,No Gas,Inside Lite:1/8", Outside Lite:1/8" ***Extrusion Picker*** 550FX Header=Standard(400-300),550FX Left Jamb= Standard(400-300),550FX Right Jamb=Standard (400-300),550FX Sill=Standard(400-300) ***COLOR*** 70%Kynar Finish,Window Color=Not Selected 85,21 112 ***Wrapping Surcharges*** Factory Attached Wrapping Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 22 of 26 I Line I Qty I Product Description I Dealer Price I 6dended 2 TTT Frame Size: Notes: Mark: MISC/TRIM 3 Wrapping 2 Factory Attached?=Yes,DS113@ Head,N/A @ LJ,N/A @ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head,N/A @ LJ,N/A @ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804@ LJ,Tdm804@ RJ,Trim804@ Sill 2800-2 85"x 21 1/2" Line I Qty I Product Description Extended I Dealer Price I 2900-1 4 TTT Frame Size: 33 1/2"x 21 1/2"Notes: Mark: T4 ***PRODUCT*** Series 550 Direct Set Fixed 33 1/2 x 21 1/2 T ***HARDWARE*** Include Sash Lock=Yes *GLASS Double IG,RLE Softcoat,1"IG,No Gas,Inside Lite:1/8", ry Outside Lite:1/8" ***Extrusion Picker*** HT I 550FX Header=Standard(400-300),550FX Left Jamb= Standard(400-300),550FX Right Jamb=Standard (400-300),550FX Sill=Standard(400-300) ***COLOR*** 70%Kynar Finish,Window Color=Not Selected ***GRIDS*** Grids,Standard Rectangular,GBG:Grid-105,Exterior: None,Interior:None,Grid Frame Only=No,Grid Color= Window Exterior Color Same,3W2H 33 1/2,21 1/2 —Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head,N/A @ LJ,N/A @ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head,N/A @ LJ,N/A @ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Trim804 RJ,Tdm804 Sill Line I Qty I Product Description Extended I Dealer Price 1 2900-2 4 TTT Frame Size: 33 1/2"x 21 1/2" Notes:Mark: MISC/TRIM 3 Line I Qty I Product Description Extended I Dealer Price I Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 23 of 26 3000-1 2 TTT Frame Size: 51 1/2"x 21 1/2"Notes: Mark: T5 ***PRODUCT*** Series 550 Direct Set Fixed 51 1/2 x 21 1/2 ***HARDWARE*** Include Sash Lock=Yes ***GLASS*** Double IG,RLE Softcoat,1"IG,No Gas,Inside Lite:1/8", 1 Outside Lite:1/8" ***Extrusion Picker*** 550FX Header=Standard(400-300),550FX Left Jamb Standard(400-300),550FX Right Jamb=Standard (400-300),550FX Sill=Standard(400-300) ***COLOR*** 70%Kynar Finish,Window Color=Not Selected ***GRIDS*** Grids,Standard Rectangular,GBG:Grid-105,Exterior: None,Interior:None,Grid Frame Only=No,Grid Color= Window Exterior Color Same,6W2H 51 1/2,21 1/2 ***Wrapping Surcharges*** Factory Attached Wrapping Wrapping 2 Factory Attached?=Yes,DS113@ Head,N/A @ LJ,N/A @ RJ,N/A @ Sill Wrapping 1 Factory Attached?=Yes,Pan925@ Head,N/A @ LJ,N/A @ RJ,Pan977@ Sill Wrapping 3 Factory Attached?=No,Trim804@ Head, Trim804 LJ,Tdm804 RJ,Trim804@ Sill Line Qty Product Description Extended Dealer Price 1 3000-2 2 TTT Frame Size: 51 1/2"x 21 1/2" Notes:Mark: MISC/TRIM 3 Line Qty I Product Description Extended Dealer Price 1 3100-1 40 Notes:Mark: Attic Stock Sash Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 24 of 26 Line Qty I Product Description Dealer Price I Extended Notes: Mark: 3200-1 5 Sets of Hinges Line Qty I Product Description Extended Dealer Price 1 3300-1 20 Notes:Mark: Locks&Handles-Screws Line Qty I Product Description Extended Dealer Price 1 3400-1 1 Notes:Mark: Gallon Paint Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 25 of 26 Line Qty I Product Description Dealer Price I Extended 3500-1 16 Notes:Mark: Mull Cover-119 Ivory K70 119-51/2"2pc Mull Cover Ivory Kynar 70% Length:192 IN Thank you for the opportunity to quote your project. Sub Total: Shipping: MATERIALS ONLY Tax: Installation -Anchors - Flashing -Shop Drawings -Field Measurements NOT INCLUDED UNLESS NOTED ABOVE Total: THIS QUOTED PRICE GOOD FOR 30 DAYS Quoted by:RobertQuinn Printed by: Robert Quinn Sales Rep:Robert Quinn Pages: 26 of 26