7 WEBB STREET - BUILDING INSPECTION 7 Webb St.
Commonwealth of Massachusetts iL\
y �
f City of Salem
Nk '� 120 Washington St,3rd Floor Salem,MA 01970(976)745-9595 x5641
Return card to Building Division for Certificate of Occupancy UV
Permit B-14-1682 PERMIT T O BUILD
FEE PAID:: $1$119.00
DATE ISSUED: 10/23/2014
This certifies that NADEAU WILLIAM C NADEAU DONNA J
has permission to erect, alter, or demolish a building 7 WEBB STREET Map/Lot: 410153-0
as follows: Solar Panels INSTALLATION OF ROOF MOUNTED PHOTOVOLTAIC SOLAR PANELS &
SISTERING OF NEW 2'X6' RAFTERS TO REEXISTING RAFTERS
Contractor Name: JOSEPH WYLD-CHIRICO
DBA: ROOF DIAGNOSTICS SOLAR OF MASS, LLC
Contractor License No: CS-093115
10/23/2014
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
HIC#: 170279 'Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
�°N a Commonwealth of Massachusetts
' City of Salem
� 4
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595x5641
.- Return card to Building Division for Certificate of Occupancy
Structure CITY OF SALEM BUILDING PERMIT
PERMIT TO BE POSTED IN THE WINDOW }
Excavation
Footing INSPECTION RECORD
Foundation
Framing
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber
Final
Plumbing/Gas
Rough:Plumbing -
Rough:Gas
Final
Electrical
Ua
Service
Rough
Final
Fire Department
Preliminary
Final
Health Department
Preliminary
Final
L _
I
QTY OF SALEM, MASSACHUSETTS
z - t BUILDING DEPARTMENT
'�"-- 120 WASHINGTON STREET,3RD FLOOR
TEL: 978-745-9595
FAx: 978-740-9846
KI OERLEY DRISCOLL
MAYOR
THOMAS ST.PIERRE
DIRECTOR OF PUBLIC PROPERTIES/BUILDING COMMISSIONER
Notice of Building Code Violations
7 WEBB STREET
May 22, 2012
William Nadeau and Donna Nadeau
7 Webb Street
Salem, Massachusetts 01970
Mr. &Ms. Nadeau
This correspondence shall serve as notification of Building Code violations noted regarding your property
located at 7 Webb Street. The complaints were investigated on Thursday, May 22, 2012, said property
was found to be in violation of Massachusetts State Building Code requirements.
Conditions that have been deemed to be insufficient;
I- Exit Stairways, Section 1020.1 - "an exit shall not be used for any purpose that interferes with its
function as a means of egress"Exit stairways can have no chairs, televisions, boxes, trash etc. or
be used for storage of objects at any time as was the situation and noted at the time of inspection.
2- Interior basement stair is in disrepair and unsafe. This failure to maintain a required means of egress violates
Section 116.1 through 116.3of the eighth edition of the Mass Building Code with Mass amendments. Repair or
replacement of stair is required.
3- Exterior wood and synthetic entry stair at front left of building, deck boards spacing is to wide.
This failure to maintain a required means of egress violates section 116.1 through 116.3of the eighth edition of the
Mass Building Code with Mass amendments. Infill of opening or replacement of deck boards is required.
4- This failure to maintain a required means of egress violates section 116.1 through 116.3of the eighth edition of the
Mass Building Code with Mass amendments. Repair or replacement ofstair is required.
5- Gypsum drywall needs to be installed various locations 3rd floor attic area.
6- Handrails, Section 1012—Stairways handrails are missing and incorrectly secured at 2nd
to third floor levels in Second Floor unit.
CITY OF SALEM, MASSACHUSETTS
BUILDING DEPARTMENT
'�s9T 120 WASHINGTON STREET,3`D FLOOR
TEL: 978-745-9595
KIMBERLEY DRISCOLL FAx: 978-740-9846
MAYOR
THOMAS ST.PIERRE
DIRECTOR OF PUBLIC PROPERTIES/BUILDING COMMISSIONER
7- First Floor Egress Doors—Installation of lever hardware on doors to outside.
8- Remove tires from Basement storage area.
You are hereby ordered to begin to rectify these conditions within 7 days of receipt of this notice; failure to respond to
this notification will be construed as non- compliance, with issuance of Municipal tickets and including the filing of
criminal complaints at District Court.
You have the right to appeal this order to the State Board of Building Regulations at One Ashburton Place,
Boston, Ma.
If you have any questions regarding this letter,please contact the Building Inspectors Office at
(978) 619-5648, extension 5648.
Respectfully,
Michael E. Lutrzykowski
Assistant Building Inspector
Cc: file, Health Department, Fire Prevention, Jason Silva.
Plans must be riled and approved by the Inspector before a permit will be granted.
No. �2 City of Salem Ward__
IS PROPERTY LOCATED IN THE
HISTORIC DISTRICT? Yes No
IF SIDING, HAS ELECTRICAL f"ep� Home Phone # ' 4 )L-)
PERMIT BEEN OBTAINED? Yes _
APPLICATION Bus. Phone # ��� >a ��
SAP2 6&1, 009 FOR
PERMIT TO ROOF, REROOF OR INSTA SIDING
Salem, Mass.,
TO THE INSPECTOR OF BUILDINGS:
The undersigned herebv applies for a permit to builccording to the following specifications:
Owner's name and address _r/'✓/f /-Ll�4 M X/951%z S TX-M
Architect's name
Mechanic's name and address IE�/�NN/L`1�1� /Ll1 c(n 1w(�/LL HA-2c./3r9r?17ygfj,/Pts Skt"AjAjr
Location of building,No. 7. w/u3,ft S1~
What is the purpose of building? _
Material of building? We-4 D Asbestos?
If a dwelling,for how many families^. _�`' ._ LctJ i�/e s
Will the building confon to the requirements of the law?
Estimated cost I "3e,0 096- rs Lic.
Signature of applicant
REMARKS SI D UNDER THE
PENALTY OF PERJURY.
� i �.�uc�y�vr �rtibd
No�� Ward
APPLICATION FOR
PERMIT TO ROOF
REROOF OR INSTALL SIDING
Location/
PERMIT GRANTED
-? - V 7.
APPm --�
uil rig 1 pact r
tj�