CONSTRUCTION CORPORATION
Controlled Construction
Progress Report
January 13, 2009
Re: Site Inspection for Washington at Derby
155 Washington Street
Salem,Massachusetts
Building Permit No. 964-08
As the Architect of record, I conducted a site visit on January 13,2009 for the above referenced Project as
required by the Massachusetts State Building Code 780 CMR Section 116.2.2. I have reviewed the progress and
the quality of the work as it relates to the design intent and to the best of my knowledge the current work is
generally consistent with the construction documents and is in compliance with applicable codes and regulations.
Ron Lamarre
A.,n 2009.01.13 15:03:21 -05'00'
Ron Lamarre
Architect-Registration No. 10002
Observations and comments:
1. National Grid is on-site reviewing&approving the electrical transformer for energizing the building.
2. Sidewalks have been installed. Paving of the parking areas is complete.
3. Stair No. I and 2 are installed with inside guardrails and being used for construction to the fourth floor.
4. Roof top HVAC units are operational and providing heat to the 2"d, 3`a and 4" floors.
5. Temporary enclosures have been installed to hold heat within the building for finishes to begin.
6. Masonry along all elevations is relatively complete,minor detailing is being completed.
7. Exterior wall framing is being completed; first floor area is the only remaining work.
8. Exterior siding and trim is mostly complete on all elevations; a small amount of work and final detailing
is on-going.
9. Window installation is mostly complete on 2"d, 3`a, and 4t'floors; a small amount of detailing remains.
All interior window perimeters have been sealed with low-expanding foam.
10. Insulating of the exterior walls and vapor barrier installation is complete on the 4`h floor; work continues
on the 2"d and 3`d floors.
11. Gypsum wall board work is on-going on the 4"and 3`d floors.
12. Prime paint(walls)and prime/finish paint(ceiling) is on-going on the 4t'floor.
13. Elevator rails have been installed and machine parts have been placed in the machine room.
14. CPVC sprinkler mains and branch piping is nearly complete on 2"a, 3`d, and 4`"floors.
15. HVAC ductwork is nearly complete on 2"d, 3`d, and 4a' floors.
16. Plumbing rough-in work on-going on 2"d, 3`d, and 4'h; tub installations along with water/drain pipe runs.
17. Electrical rough-in is complete on 2"a 3 and 4" floors.
End of Progress Report.
11 CORPORATE. DRIVE, nE.LNIONT. Nil 03720
PHONE (603) 527-9090 FAX (603) 517-9191
ZIW2IHd DNIC[Ilflg
W H IV S d0 AID
pv 3AOiA
. V
mism
OPECHEE ID
CONSI 14UC'I'.[ON COHI'ORA'1'ION
Controlled Construction
Progress Report
December 03, 2008
Re: Site Inspection for Washington at Derby
155 Washington Street
Salem,Massachusetts
Building Permit No. 964-08
As the Architect of record,I conducted a site visit on December 03, 2008 for the above referenced Project as
required by the Massachusetts State Building Code 780 CMR Section 116.2.2. I have reviewed the progress and
the quality of the work as it relates to the design intent and to the best of my knowledge the current work is
generally consistent with the construction documents and is in compliance with applicable codes and regulations.
Ron L
filen 2008.12.0512.05 09:29:38-05'00'
Ron Lamarre
Architect-Registration No. 10002
Observations and comments:
1. Sewer connection work is on-going in Front Street.
2. Water and Gas connections are complete.
3. Stair No. 1 and 2 are installed with inside guardrails and being used for construction to the fourth floor.
4. A small number of roof top units have been turned-on to provide heat on the 3`d and 4"' floors
5. Temporary enclosures have been installed to hold heat within the building for finishes to begin
6. Masonry along all elevations is relatively complete, minor detailing is being completed.
7. Exterior wall framing is being completed; first floor area is the only remaining work.
8. Final detailing is being completed on continuous foam board insulation,Tyvek air barrier, and
waterproofing tape around 1"floor fenestrations and cornice.
9. Exterior siding and trim is on-going on the 2nd, 3rd, and 4"' floors of all elevations; minor detailing being
completed.
10. Garage doors have been installed.
11. Window installation is nearly complete on 2"d, 3`d, and 4" floors.
12. Insulating of the exterior walls has begun, along with the vapor barrier is almost complete on the 3" and
4th floors; gypsum wall board work is on-going. Exterior wall insulation is on-going on the 2"d floor.
13. CPVC sprinkler mains and branch piping is nearly complete on 2"d, 3`d, and 4" floors.
14. HVAC ductwork is nearly complete on 2nd, 3rd, and 4"floors.
15. Plumbing rough-in work on-going on 2"d, 3`d, and 4"; tub installations along with water/drain pipe runs.
16. Electrical rough-in is complete on 2"d,3`d, and 4" floors.
End of Progress Report.
11 C0RV0RATL nitllF. RF,I,N10 N'r. Nil 03210
PHONE (603) 527-9090 FAX (6031 127-9191
WINTER STREET ARUHtTErJ r S
FIELD OBSERVATION Observation Date: June 24,2008
REPORT # 3 Attention: Mike Bemler
Page 1 of 1 Contractor: RCG Builders
Project: 0265.001
Central House
Location: 155.189 Washington Street
Salem,MA
01970
TRADES ON SITE:
THE FOLLOWING WAS NOTED:
Work in Progress: . Framing of floors and walls
Estimated%of . 10%Framing
Progress:
Observations: Decided on location for mailboxes.
• Determined location of sloped floor in corridor.
• RCG has yet to determine Finish Floor Height
Items to Verify: . Placement of townhouse interior stairs.
• Head height for all stairs.
• Finish Floor Height(From RCG)
Action Items: Confirm that drawings contain updated sloped floor and mailbox locations,
Attachments:
4 �
Report by. Kathryn Giardi;Winter Street Architects, Inc Signature
209 Essex Street Suile 300 Salem, Msssachvsetts 0197o 979..7-04.7179
WINTER 'STREET ARCHITECTS
FIELD OBSERVATION Observation Date: May 27,2008
REPORT # 2 Attention: Mike Bernier
Page 1 of 1 Contractor: RGG Builders
Project: 0265.001
Central House
Location: 155-189 Washington Street,
Salem,MA
01970
TRADES ON SITE;
THE FOLLOWING WAS NOTED:
Work in Progress: Demolition
Estimated%of 100%Demolition
Progress:
Observations: Size and locations of Floor joists.
• Location of shear walls.
• Maximum floor load above Edgewater Cafe.
• Existing structure of 3b floor.
• Leveling of floors.
• Discussed acoustic strategy in regards to additional loads and spans with Ken
Woods,PE
Items to Verify: Acoustic treatment of walls and floors not above Edgewater Cafe.
Action Items: . Feasibility of installing an acoustic ceiling in Edgewater Cafe.
• Enclose egress stairs per building inspectors request.
Attachments:
Report by'. ' i l '.Kathryn Giardi;Winter Street Architects, Inc:Signature
C 'lw�m t'tfl; '
209 Essex Street Suite 3.00 Salem, Massac✓ vette 01970 976,74.4.7079
aCITY OF SALEM
PUBLIC PROPERTY
DEPARTMENT
KIMBUIWBY DRISCOIJ.
MAYOR
120 WASHINGTON STRe.BT+ SN.EM,D'(ASSACHUSP_TTS 01970
Tea.:978-745-9595 4 FAX:978-740-9846
July 31, 2008
Mr. Kenneth Woods PE
18 Temple Street
Newburyport, Ma 01950
RE: Central House 155 Washington Street
Dear Mr. Woods
Regarding your letter of July 21 regarding floor framing at the above project, please prepare a
plan illustrating how you plan to reinforce the floor framing and a detail of the floor/ceiling
assembly showing, sheathing, sound attenuation and finished floor.
Sincerely,
Thomas McGrath
Assistant Building Inspector
City of Salem
978-745-9595 x5644
cc: Mike Bemier
18 Temple Street
Newburyport,MA 01950
Phone:978-985-6129 Kenneth • • •
Fax:978-255-3555
July 21, 2008
Tom McGrath
Salem Public Properties/Building Department
120 Washington Street, 3rd Floor
Salem MA 01970
Phone: (978)745-9595 x5841
Re: Central House, 155 Washington Street, Salem, MA
Ref: Structural capacity
Mr. McGrath:
I understand your office would like a letter speaking to the structural floor capacity of the
referenced project- In particular the capacity of the second floor framing.
The capacity of the existing steel framing is approximately 100 PSF. There are areas of
existing wood framing that ultimately load that steel which do not have the capacity of 100
PSF at present. The required live loading for the proposed residential use is 40 PSF. The
proposed dead load for the sound attenuation for the second floor added to the existing dead
load is approximately 40 PSF total.
It is my intention and the intention of the owner / builder to bring the whole second floor
framing up to 80 PSF capacity minimum. This will be achieved by sistering the existing
framing and/or adding supplemental framing between the existing framing.
If you require any additional information please contact his office at your earliest convenience.
Sincerely,
0
Kenneth A. Woods
i
1
r
WINTER STREET ARCHITECTS
June 3, 2008
Tom McGrath—Inspector of Buildings
120 Washington Street
Salem, MA 01970
Re: Central House First Floor Accessibility
Dear Tom:
A survey of the Central House First Floor has shown the following issues and our proposed resolutions:
Edgewater Cafe:
Add handrails to existing interior ramp.
Entrance vestibule is too small, remove.
Entry door is too small, replace with 36"door.
Remove interior entrance ramp and widen the opening at the top of the existing ramp.
Bathroom accessories(soap, paper towel dispenser, mirrors)are not accessible, relocate at
correct height.
Passage to India:
Accessible as is.
Sincerely,
Winter Street Architects, Inc.
Kathryn Giardi
Designer
209 Essex Street Suite 300 Salem, Massachusetts 01970 976.744.7379
18 Temple Street
Nexburyport,MA 01950
Phone:978-985-6129 Kenneth A. Woods RE
Fax:978-255.3555
June 3, 2008
Tom McGrath
Salem Public Properties/Building Department
120 Washington Street, 3"'Floor
Salem MA 01970
Phone: (978)745-9595 x5641
Re: Central House, 155 Washington Street, Salem, MA
Ref: 780 CMR 3408.0 Structural Requirements for Existing Buildings
Gentlemen:
I have visited the referenced site and have conducted a field investigation sufficient to
determine location, size, details and conditions of the existing structural elements. The
following report was prepared following the guidelines of 780 CMR Ch. 34 and Appendix F.
The building's Seismic Hazard Exposure Group is I with a Seismic Performance Category of
C (1612.0). The current Use Groups of the structure are F (Factory and Industrial) and B
(Business)with a worse case Hazard Index of 3. The proposed Use Groups are B and R-2
with a Hazard Index of 2. The net change in Hazard Index is negative one which indicates
that the requirements of 780 CMR 3404 and 780 CMR 3408 control the proposed
construction. The cost of alterations requires the proposed construction to meet the
requirements of Seismic Hazard Category 2(3408.1).
Per 780 CMR 3408.21 have completed a structural analysis of the structural systems affected
by the proposed alterations. The existing structure to remain, the modified structure and the
complete structure as a whole has adequate capacity to support the required loads.
Seismic Hazard Category 2 requires that the earthquake resistance of the existing building
comply with the requirements of 780 CMR 3408,3.5 — specifically: alterations shall not be
made to elements or systems reducing the lateral load resistance of the building. and 780
CMR 3408.6.3 Reduction of Earthquake Hazards. This specifically addresses unbraced
parapets and unbraced masonry walls of which this building has neither.
On the whole there are not many proposed structural alterations required in this adaptive re-
use of the existing building. The architectural design has kept virtually all existing structure in
place-ittle structural modification is required.
Per 780 CMR 3408.5 the capacity of the existing structure is adequate to support the floor
loads and wind loads as required in 780 CMR Chapter 16.
Al
Page 2 of 2
It is our professional opinion that the existing structure and the minor structural modifications
required adequately meet the requirements of 780 CMR. In conclusion, I request this report
suffice for the Chapter 34 structural evaluation requirements of 780 CMR 3408.2 and the
requirements of the building permit submission.
If further information is required please contact his office at your earliest convenience.
Sincerely,
���1N OF MgS,�cy
1��`I� KENNETH G
A.WOODS
c�.e STRUCTURAL m
Na 39886
Kenneth A.Woods
FSS/ONAL ENv
Central House
1-May-08 Unit Sq Ft
Assumptions 1 994
# Units 7 2 962
Gross Square Feet 3 1238
Net Square Feet 6,952 4 920.
Construction $/NSF $ 107.88 5 1354
Building 6 809
7 675
Hall 708
Division Label 7660
Division 1 General Requirements $27,298 4%
Division 2 Site Work/Demo $0 0%
Division 3 Concrete $52,690 7%
Division 4 Masonry $4,700 1%
Divion 5 Metals $1,800 0%
Division 6 Wood and Plastics $197,389 26%
Division 7 Thermal/Moisture Protection $50,208 7%
Division 8 Doors and Windows $57,256 8%
Division 9 Finishes $106,478 14%
Division 10 Construction Specialties $11,735 2%
Division 11 Equipment $22,771 3%
Division 12 Furnishings $49,549 7%
Division 13 Special Construction Systems $1,200 0%
Division 14 Conveying Systems $0 0%
Division 15 Mechanical $120,305 16%
Division 16 Electrical $46,620 6%
Construction Subtotal $749,999
155 Washington $749,999
18 Temple Street
Newburyport,MA 01950 Woods,
• '
Phone:978-985-6129
" Fax:978-255-3555
May 27, 2008
Alex Schnip
Washington at Derby LLC
120 Washington St Ste 202A
Salem, MA 01970-3523
Re: 155 Washington Street, Salem, MA Structural Engineer of record (SER)
Ref: Central House
Alex:
This letter is written to certify that I am the Structural Engineer of Record for the referenced
project. If you need any additional information please contact this office at your earliest
convenience.
•
Sincerely, OfMASWOODS
SA �
`o A UCTuFt
$TR
Na 39885
�O �Q
Kenneth WoodsA99EOI3'T
�FFSsinmM,��
CONSTRUCTION CONTROL AFFIDAVIT
Project Number: 0265.000 Date: May 27, 2008
Project Title: Central House
Project Location: 155-189 Washington Street, Salem, MA 01970
Name of Building: Central House
Scope of Project: Exterior Restoration and Interior Renovation of Building
IN ACCORDANCE WITH SECTION 116.0 OF THE MASSACHUSETTS STATE BUIDING CODE, I
PAUL DURAND, MASS. REGISTRATION NO. 8615 BEING A REGISTERED ARCHITECT HEREBY
CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL
DESIGN PLANS, COMPUTATIONS, AND SPECIFICATIONS CONCERNING:
Entire Project Architectural X Structural Mechanical
Electrical Fire Protection Other(specify)
FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUCH
PLANS, COMPUTATIONS, AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE
MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRACTICES AND
ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT.
I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES
AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO
DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS
APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING
AS SPECIFIED IN SECTION 116.2.2.
1. Review of shop drawings, samples and other submittals of the contractor as required by the construction
contract documents as submitted for building permit, and approval for conformance to the design concept.
2. Review and approval of the quality control procedures for all code required control materials.
3. Special architectural or engineering professional inspection of critical construction components requiring
controlled materials or construction specified in the accepted engineering practice standards listed in
Appendix I.
PURSUANT TO SECTION 116.4, 1 SHALL SUBMIT PERIODICALLY, A PROGRESS REPORT
TOGETHER WITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. UPON C ETION
OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTO + ION
AND READINESS OF THE PROJECT FOR OCCUPANCY. "d✓ 5
a;
Signatu � R
N
DURAMD
8615of
�, F• „nom
SUBSCRIBED AND SWORN TO BEFORE ME THIS DAY OF R 200
--,
My commission Expires:
�Nl Mry Publi
i
REGISTERED ARC JITT( TURA L AND ENG]NEI RING' 4FRVICF S
CONSTRUC rI0N CONTROL AFFIDAVI F
PROJECTINUMBER:
--
PROJECTTITLE: I
LL_
PROJECT LOCATION:
NAME OF BUILDING
SCOPE OF P ROJ ECT: 'OVA 1I
In accordance With Section 116.0 of the Massachusetts State Builifinp Code,1,
Mass. Registration No........�j11�,65
or directly supemsed the preparation ofall design plans,computations and spec ifiCiltions COnCenong;
EXTIREPROJECT I II-I"ECTURAL tI STRUCTURAL
MECHANICAL -FIRE PROTECTION FLECTRICAL
..-,......_6 TI I ER{s pLTi fv)
For the above named project and that,to the bcsL of my knowledge,such plans,conlinlutions and Npccitications nuet the
applicable provisions of the Massachusetts State Building Codc. All acceptable engineering practices and ill applhcubla laws for
the Proposed project.
I furtherceitify that I shall peribialn,the necessary piofc,,ston2kcrNicc,and be prescin on the consiroution site on a rei-ailgr and
periodic basis to determine that the work is procceding,in accordance.with the documents approver)for the building permit and
shall be responsible for the following as spocified in section [16,2
1. Review,for conformance to the design concept, shop drawings,samples kind othertubminilIS which tile submitted be tile
contractor in accordance with themciunencoas offfic unsiruct:_
ion docunienu,
2. Review and approval of the quality conuol procedurcs for all code-rNuired rraterials
3. Be present in intervals appropriate to the ma.,,Q oCconstruction to become,genet lily familiar with the peonies,and quality of
the work and to determine, in general, if the work is being performed in a inannur consistent with the construction docurilonts.
Pursuant to Section 116.4, 1 shall submit periodically,a piogress recon together with pertinent conuncrat,to the Building
Departicent, Upon Con4fletion of the.Work. I shalt submit a final report is to the a,l1SfaL1%ry conpicli(tri-a I readiness or the
proj ect fox occo pane y.
Sign ams..........
o:3
Subscribed and sxvorR.4)nr this day of 106
My 0-nalusslon Ispr
es a
BLIC
�,COIl1DIT�
4
YSpYE AO 1�
CITY OF SALEM
BUILDING PERMIT
aCITY OF SALEM
PUBLIC PROPERTY
DEPARTMENT
KIMBERLEY DRISCOLL
MAYOR
120 WASHING"I'ON$'1'R8E'1 * SALEM,IVL\SSACHUSETTS 01970
TEL:978-745-9595 ♦ FAX:978-740-9846
May 29, 2008
Mr. Michael Bernier
RCG
By email
RE: Plan Review for permit application for Central House
Dear Mike
I have reviewed the drawings submitted for permit on May 22 for the above project and have the following
comments:
1. Section 3.3.3 of MAAB requires that the entire building (including fust floor tenant spaces) be brought up to
full compliance with MAAB regulations. Please submit 1 of the following:
a. Letter from the Architect stating that existing conditions meet MAAB regulations
b. Plan describing alterations necessary for compliance
c. Variance application to MAAB
2. Section 1014.9 of 780 CMR requires that common egress stairs be enclosed in a rated enclosure.
Please submit amended plans.
3. Please submit a Structural Evaluation of the existing building as described in section 3408 of 780CMR
and drawings detailing any reinforcements necessary to carry increased dead loads of second floor and
necessary lateral reinforcement.
4. I have received controlled construction affidavits from the Structural Engineer and Architect
Sincerely,
Thomas McGrath
Assistant Building Inspector
City of Salem
978-745-9595 x5644
` CITY OF SALEM
s PUBLIC PROPERTY
DEPARTMENT
KIMBERLEY DRISCOLL
MAYOR 120 WASHINGTON STREET♦ SALEM,I IASSACHOSBTTS 01970
TFL:978-745-9595 ♦ RAX:978-740-9846
Metro-Swift
METRO - SWIFT SPRINKLER CORP.
58r PULASKI STREET
PEABODY, MA 01960
978-532-2907
Job Name CENTRAL HOUSE LOFT
Remote Area NFPA 13- 4 HEAD DESIGN
Head Info 20x20 SPACING 22 GPM MIN, 10.2 PSI MIN ACTUAL MAX 148 SF
Flows 342 GPM RQD AT TEST INCL 250 GPM HOSE
Pressures 68 PSI ROD AT TEST, 14 PSI SAFETY
Data Fife CENTRAL.wx1
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
METRO - SWIFT SPRINKLER CORP. Page 1
ZENTRAL HOUSE LOFT Date 052208
Hydraulic Desiqn Summary Sheet
Name - CENTRAL HOUSE - LOFT RESIDENTIAL
Remote Area - NFPA 13 - 4 HEAD DESIGN
Head Information - 20x20 SPACING 22 GPM MIN, 10.2 PSI MIN ACTUAL MAX 148 SF
Flow Information - 342 GPM RQD AT TEST INCL 250 GPM HOSE
Pressure Information - 68 PSI RQD AT TEST, 14 PSI SAFETY
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Water Supply Curve (C)
METRO- SWIFT SPRINKLER CORP. Page 2
CENTRAL HOUSE LOFT Date 052208
Demand:
City Water Supply: DemD1 - Elevation 16.025
C1 - Static Pressure 83
C2 - Residual Pressure: 79 D2 - System Flow 91.215
C2 - Residual Flow 1460 D2 - System Pressure 67.786
Hose ( Adj City )
Hose ( Demand ) 250
D3 - System Demand 341.215
Safety Margin 14.942
150
140
130
P 120
R 110
E 100
S 90 C1 C2
S 80
U 70 D2
R 60 D3
E 50
40
30
20
D
10 1
200 400 600 800 1000 1200 1400 1600 1800
FLOW ( N ^ 1.85 )
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Pressure / Flow Summary - STANDARD
METRO -SWIFT SPRINKLER CORP. Page 3
CENTRAL HOUSE LOFT Date 052208
Node Elevation K-Fact Pt Pn Flow Density Area Press
No. Actual Actual Req.
D001 0.0 6.9 10.2 na 22.04 0.1 220 10.2
8 37.0 K=K@ EQ01 11.69 ne 22.04
7 37.0 K=K @ E001 12.51 ne 22.81
6 37.0 K= K@ EQ01 14.24 na 24.33
1 37.0 K=K@ EQ01 11.68 ne 22.04
2 37.0 12.54 na
3 37.0 13.49 na
4 37.0 15.82 na
5 37.0 23.15 na
R3 34.0 37.24 na
R2 22.0 45.72 na
Rt 22.0 50.77 na
CTE 22.0 53.04 na
TOR -2.0 63.55 na
BOR -9.0 66.63 na
UG -9.0 71.64 na
TEST 0.0 67.79 na 250.0
The maximum velocity is '19.18 and it occurs in the pipe between nodes 4 and 5
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Final Calculations - Hazen-Williams
METRO -SWIFT SPRINKLER CORP. Page 4
CENTRAL HOUSE LOFT Date 052208
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. ..C.. or Ftng's Pe Pv .... Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
D001 22.04 1.101 2E 7.65 1.000 10.200 K Factor= 6.90
to 150.0 1T 9.563 17.212 0.0
EQ01 22.04 0.0814 0.0 18.212 1.483 Vel = 7.43
0.0
22.04 11.683 K Factor= 6.45
8 22.04 1.101 IT 9.563 0.870 11.690 K Factor @ node EQOt
to 150.0 0.0 9.562 0.0
2 22.04 0.0815 0.0 10.432 0.850 Vel = 7.43
0.0
22.04 12.540 K Factor= 6.22
7 22.81 1.101 1T 9.563 1.660 12.515 K Factor @ node EQ01
to 150.0 0.0 9.562 0-0
3 22.81 0.0867 0.0 11.222 0.973 Vel = 7.69
0.0
22.81 13.488 K Factor= 6.21
6 24.33 1.101 1E 3.825 12.417 14.236 K Factor @ node EQ01
to 150.0 0.0 3.825 0.0
4 24.33 0.0978 0.0 16.242 1.588 Vel = 8.20
0.0
24.33 15.824 K Factor= 6.12
1 22.04 1.101 1 E 3.825 6.700 11.683 K Factor @ node EQ01
to 150.0 0.0 3.825 0.0
2 22.04 0.0814 0.0 10.525 0.857 Vel = 7.43
2 22.04 1.394 0.0 10.200 12.540
to 150.0 0.0 0.0 0.0
3 44.08 0.0929 0.0 10.200 0.948 Vel= 9.27
3 22.81 1.394 1T 9.523 2.083 13.488
to 150.0 0.0 9.523 0.0
4 66.89 0.2013 0.0 11.606 2.336 Vel = 14.06
4 24.33 1.394 1 E 4.762 15.750 15.824
to 150.0 0.0 4.761 0.0
5 91.22 0.3572 0-0 20.511 7.327 Vel= 19.18
5 0.0 1.598 2E 11.656 46.333 23.151
to 150.0 1T 11.656 23.312 1.299
R3 91.22 0.1837 0.0 69.645 12.793 Vel = 14.59
R3 0.0 1.598 1 E 5.828 12.000 37.243
to '150.0 0.0 5.828 5.197
R2 91.22 0.1837 0.0 17.828 3.275 Vel = 14.59
R2 0.0 1.598 1T 11.656 4.200 45.715
to 150.0 2E 11.656 23.312 0.0
R1 91.22 0.1837 0.0 27.512 5.053 Vel = 14.59
R1 0.0 1.598 1T 11.656 0.700 50.768
to 150.0 0.0 11.656 0.0
CTE 91.22 0.1837 0.0 12.356 2.270 Vel = 14.59
CTE 0.0 6.065 6E 59-951 144.000 53.038
to 100.0 0.0 59.951 10.394
TOR 91.22 0.0006 0.0 203.951 0.120 Vel = 1.01
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Final Calculations - Hazen-Williams
METRO - SWIFT SPRINKLER CORP. Page 5
,CENTRAL HOUSE LOFT Date 052208
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C" or Ftng's Pe Pv Notes **«**«
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
TOR 0.0 6.065 1D 33.544 9.000 63.552
to 100.0 1B 7.137 62.092 3.032
BOR 91.22 0.0006 1T 21.411 71.092 0.042 Vel = 1.01
BOR 0.0 6.065 1E 9.992 6.000 66.626
to 100.0 0.0 9.992 5.000 * Fixed loss= 5
UG 91.22 0.0006 0.0 15.992 0.009 Vel = 1.01
UG 0.0 6.16 1T 43.037 100.000 71.635
to 140.0 1E 20.084 67.425 -3.898
TEST 91.22 0.0003 1G 4.304 167.425 0.049 Vel = 0.98
250.00 Qa= 250.00
341.22 67.786 K Factor= 41.44
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
1
vzz�//
v nff�_A -
Metro-Swift
METRO - SWIFT SPRINKLER CORP.
58r PULASKI STREET
PEABODY, MA 01960
978-532-2907
Job Name CENTRAL HOUSE 2ND
Remote Area NFPA 13 - 4 HEAD DESIGN
Head Info 20x20 SPACING 22 GPM MIN, 10.2 PSI MIN ACTUAL MAX 177 SF
Flows 342 GPM ROD AT TEST (NCL 250 GPM HOSE
Pressures 63 PSI ROD AT TEST, 20 PSI SAFETY
Data File CENTRAL.wx2
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
'METRO - SWIFT SPRINKLER CORP. Page 1
CENTRAL HOUSE 2ND Date 052208
Hydraulic Desian Summary Sheet
Name - CENTRAL HOUSE - 2ND FLR UNIT 5 LIV RM RESIDENTIAL
Remote Area - NFPA 13 - 4 HEAD DESIGN
Head Information - 20x2O SPACING 22 GPM MIDI, 10.2 PSI MIN ACTUAL MAX 177 SF
Flow Information - 342 GPM RQD AT TEST INCL 250 GPM HOSE
Pressure Information - 63 PSI RQD AT TEST, 20 PSI SAFETY
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Water Supply Curve (C)
METRO- SWIFT SPRINKLER CORP. Page 2
CENTRAL HOUSE 2ND Date 052208
City Water Supply: Demand:
C1 - Static Pressure 83 D - Elevation 9.528
C2 - Residual Pressure: 79 D2 - System Flow 91.617
C2 - Residual Flow 1460 D2 - System Pressure 62.061
Hose ( Adj City )
Hose ( Demand ) 250
D3 - System Demand 341.617
Safety Margin 20.666
150
140
130 ---
p 120 --
R 110
E 100 ---
S 90 C1 C2 -- _
S 80
U 70 D2 ---
R 60
E 50 --
40
30 ----
20
10
200 400 600 800 1000 1200 1400 1600 1800
FLOW ( NA1.85 )
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Pressure / Flow Summary - STANDARD
METRO-SWIFT SPRINKLER CORP. Page 3
CENTRAL HOUSE 2ND Date 052208
Node Elevation K-Fact Pt Pn Flow Density Area Press
No. Actual Actual Req.
D101 22.0 6.9 10.2 na 22.04 0.1 220 10.2
0102 22.0 6.9 10.2 ne 22.04 0.1 220 10.2
20 22.0 K=K@ EQ02 13.37 ne 23.57
21 22.0 K=K@ EQ02 13.45 na 23.65
40 22.0 14.06 ne
18 22.0 K=K@ EQ01 11.22 na 22.04
19 22.0 K=K@ EQ02 12.03 na 22.36
37 22.0 13.07 na
38 22.0 14.15 na
39 22.0 15.29 na
F3 22.0 25.8 na
F2 22.0 33.52 na
F1 22.0 42.33 na
R1 22.0 45.02 na
CTE 22.0 47.31 na
TOR -2.0 57.83 na
BOR -9.0 60.9 na
UG -9.0 65.91 na
TEST 0.0 62.06 na 250.0
The maximum velocity is 19.26 and it occurs in the pipe between nodes 39 and F3
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Final Calculations - Hazen-Williams
-METRO -SWIFT SPRINKLER CORP. Page 4
CENTRAL HOUSE 2ND Date 052208
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C" or Ftng's Pe Pv *'***'* Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Ph
D101 22.04 1.101 3E 11.475 1.000 10.200 K Factor=6.90
to 150.0 0.0 11.475 0.0
EQ01 22.04 0.0814 0.0 12.475 1.016 Vel= 7.43
0.0
22.04 11.216 K Factor= 6.58
D102 22.04 1.101 1T 9.563 1.000 10.200 K Factor= 6.90
to 150.0 2E 7.65 17.212 0.0
EQ02 22.04 0.0814 0.0 18.212 1.483 Vel= 7.43
0.0
22.04 11.683 K Factor= 6.45
20 23.57 1.394 0.0 2.790 13.369 K Factor @ node EQ02
to 150.0 0.0 0.0 0.0
21 23.57 0.0290 0.0 2.790 0.081 Vel = 4,95
21 23.65 1.394 1E 4.762 1.160 13.450 K Factor @ node EQ02
to 150.0 0.0 4.761 0.0
40 4722 0.1057 0.0 5.921 0.626 Vel= 9.93
40 0.0 1.394 1T 9.523 2.000 14.075
to 150.0 0.0 9.523 0.0
39 47.22 0.1056 0.0 11.523 1.217 Vel = 9.93
0.0
4722 15.293 K Factor= 12.07
18 22.04 1.101 0.0 10.000 11.216 K Factor @ node EQ01
to 150.0 0.0 0.0 0.0
19 22.04 0.0814 0.0 10.000 0.814 Vel = 7.43
19 22.36 1.394 IE 4.762 6.250 12.030 K Factor @ node EQ02
to 150.0 0.0 4.761 0.0
37 44.4 0.0943 0.0 11.011 1.038 Vel = 9.33
37 0.0 1.394 1T 9.523 2.000 13.068
to 150.0 0.0 9.523 0.0
38 44.4 0.0942 0.0 11.523 i.086 Vel = 9.33
38 0.0 1.394 0.0 12.080 14.154
to 150.0 0.0 0.0 0.0
39 44.4 0.0943 0.0 12.080 1.139 Vel = 9.33
39 47.22 1.394 1T 9.523 19.660 15.293
to 150.0 0.0 9.523 0.0
F3 91.662 0.3601 _ 0.0 29.183 10.510 Vel = 19.26
F3 0.0 1.598 3E 17.484 24.160 25.803
to 150.0 0.0 17.484 0.0
F2 91.62 0.1852 0.0 41.644 7.712 Vel = 14.66
F2 0.0 1.598 1E 5.828 41.750 33.515
to 150.0 0.0 5.828 0.0
F1 91.62 0.1852 0.0 47.578 8.811 Vel = 14.66
F1 0.0 1.598 1T 11.656 2.910 42.326
to 150.0 0.0 11.656 0.0
R1 91.62 0.1852 0.0 14.566 2.697 Vel = 14.66
R1 0.0 1.598 1T 11.656 0.700 45.023
to 150.0 0.0 11.656 0.0
CTE 91.62 0.1852 0.0 12.356 2.288 Vel = 14.66
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Final Calculations - Hazen-Williams
'M'ETR6 - SWIFT SPRINKLER CORP. Page 5
CENTRAL HOUSE 2ND Date 052208
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C" or Ftng's Pe Pv **** ** Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
CTE 0.0 6.065 6E 59.951 144.000 47.311
to 100.0 0.0 59.951 10.394
TOR 91.62 0.0006 0.0 203.951 0.121 Vel= 1.02
TOR 0.0 6.065 1 D 33.544 9.000 57.826
to 100.0 1 B 7.137 62.092 3.032
BOR 91.62 0.0006 1T 21.411 71.092 0.042 Vel = 1.02
BOR 0.0 6.065 1E 9.992 6.000 60.900
to 100.0 0.0 9.992 5.000 ` Fixed loss= 5
UG 91.62 0.0006 0-0 15.992 0-010 Vel= 1.02
UG 0.0 6.16 1T 43.037 100.000 65.910
to 140.0 1 E 20.084 67.425 -3.898
TEST 91.62 0.0003 1 G 4.304 167.425 0.049 Vel = 0.99
250.00 Qa = 250.00
341.62 62.061 K Factor= 43.36
Cnm nirtcr Prnnrome hi Hurlrn4cn Inn gnii90 999 WinAhnm NI N 1 ICA nzna7
�1
1 �
Metro-Swift
METRO - SWIFT SPRINKLER CORP.
58r PULASKI STREET
PEABODY, MA 01960
978-532-2907
Job !Name CENTRAL HOUSE 2ND
Remote Area NFPA 13- 4 HEAD DESIGN
Head Info 20x20 SPACING 22 GPM MIN, 10.2 PSI MIN ACTUAL MAX 177 SF
Flows 341 GPM RQD AT TEST INCL 250 GPM HOSE
Pressures 55 PSI ROD AT TEST, 27 PSI SAFETY
Data File CENTRAL.wx3
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
METRO-SWIFT SPRINKLER CORP. Page 1
CENTRAL HOUSE 2ND Date 052208
Hydraulic Design Summary Sheet
Name - CENTRAL HOUSE - 2ND FLR UNIT 5 MASTER BR RESIDFNTIAL
Remote Area - NFPA 13 - 4 HEAD DESIGN
Head Information - 20x20 SPACING 22 GPM MIN, 10.2 PSI MIN ACTUAL NLA: 177 SF
Flow Information - 341 GPM RQD AT TEST INCL 250 GPM HOSE
Pressure Information - 55 PSI RQD AT TEST, 27 PSI SAFETY"
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Water Supply Curve (C)
METRO- SWIFT SPRINKLER CORP. Page 2
CENTRAL HOUSE 2ND Date 052208
City Water Supply: Demand:
C1 - Static Pressure 83 D1 - Elevation 9.528
C2 - Residual Pressure: 79 D2 - System Flow 90.635
C2 - Residual Flow 1460 D2 - System Pressure 54.870
Hose ( Adj City )
Hose ( Demand ) 250
D3 - System Demand 340.635
Safety Margin 27.859
150
140 --
130
p 120
R 110
E 100
S 90 C1 C2 —
S 80 --
U 70 ----
R 60
E 50
D3
40 —"--
30
20
10 D1
200 400 600 800 1000 1200 1400 1600 1800
FLOW ( NA 1.85 )
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Pressure / Flow Summary - STANDARD
METRO -SWIFT SPRINKLER CORP. Page 3
CENTRAL HOUSE 2ND Date 052208
Node Elevation K-Fact Pt Pn Flow Density Area Press
No. Actual Actual Req
D201 22.0 6.9 10.2 na 2204 0.1 220 102
D202 22.0 6.9 10.2 ne 2204 0.1 220 10.2
17 22.0 K=K@ EQ01 11.5 na 22.31
14 22.0 K=K@ EQ01 11.22 na 22.04
15 22.0 K=K @ EQ02 12.24 na 22.56
41 22.0 12.45 na
16 22.0 K=K @ EQ02 13.55 na 23.73
42 22.0 17.13 ne
43 22.0 21.2 na
44 22.0 25.26 na
F2 22.0 26.6 na
F1 22.0 35.24 ne
R1 22.0 37.88 na
CTE 22.0 40.12 na
TOR -2.0 50.64 na
BOR -9.0 53.71 ne
UG -9.0 58.72 na
TEST 0.0 54.87 ne 250.0
The maximum velocity is 19.05 and it occurs in the pipe between nodes 16 and 42
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Final Calculations - Hazen-Williams
METRO - SWIFT SPRINKLER CORP. Page 4
CENTRAL HOUSE 2ND Date 052208
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C" or Ftng's Pe Pv ***""*" Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
D201 22.04 1.101 3E 11.475 1.000 10.200 K Factor= 6.90
to 150.0 0.0 11.475 0.0
EQ01 22.04 0.0814 0.0 12.475 1.016 Vel= 7.43
0.0
22.04 11.216 K Factor= 6.58
D202 22.04 1.101 1 T 9.563 1.000 10.200 K Factor= 6.90
to 150.0 2E 7.65 17.212 0.0
EQ02 22.04 0.0814 0.0 18.212 1.483 Vel = 7.43
0.0
22.04 11.683 K Factor= 6.45
17 22.31 1.101 1T 9.563 1.870 11.496 K Factor @ node EQ01
to 150.0 0.0 9.562 0.0
41 22.31 0.0833 0.0 11.432 0.952 Vel = 7,52
0.0
22.31 - 12.448 K Factor= 6.32
14 22.04 1.101 1 E 3.825 8.790 11.216 K Factor @ node EQ01
to 150.0 0.0 3.825 0.0
15 22.04 0.0814 0.0 12.615 1.027 Vel = 7.43
15 22.56 1.394 0.0 2.160 12.243 K Factor @ node EQ02
to 150.0 0.0 0.0 0.0
41 44.6 0.0949 0.0 2.160 0.205 Vel = 9.38
41 22.31 1.394 0.0 5.450 12.448
to 150.0 0.0 0.0 0.0
16 66.91 0.2013 0.0 5.450 1.097 Vel = 14.07
16 23.72 1.394 0.0 10.160 13.545 K Factor @ node EQ02
to 150.0 0.0 0.0 0.0
42 90.63 0.3531 0.0 10.160 3.587 Vei= 19.05
42 0.0 1.394 1 E 4.762 6.750 17.132
to 150.0 0.0 4.761 0.0
43 90.63 0.3531 0.0 11.511 4.064 Vel = 19.05
43 0.0 1.394 1 T 9.523 2.000 21.196
to 150.0 0.0 9.523 0.0
44 90.63 0.3530 0.0 11.523 4.068 Vel = 19.05
44 0.0 1.598 1E 5.828 1.540 25.264
to 150.0 0.0 5.828 0.0
F2 90.63 0.1815 0.0 7.368 1-337 Vel = 14-50
F2 0.0 1.598 1E 5.828 41.750 26.601
to 150.0 0.0 5.828 0.0
F1 90.63 0.1815 0.0 47.578 8.637 Vel = 14 50
Ft 0.0 1.598 1T 11.656 2.910 35.238
to 150.0 0.0 11.656 0.0
R1 90.63 0.1815 0.0 14.566 2.644 Val = 14.50
R1 0.0 1.598 1T 11.656 0.700 37.882
to 150.0 0.0 11.656 0.0
CTE 90.63 0.1815 0.0 12.356 2.243 Vel = 14.50
CTE 0.0 6.065 6E 59.951 144.000 40.125
to 100.0 0.0 59.951 10.394
TOR 90.63 0.0006 0.0 203.951 0.119 Vel = 1.01
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Final Calculations - Hazen-Williams
METRO- SWIFT SPRINKLER CORP. Page 5
CENTRAL HOUSE 2ND Date 052208
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C" or Ftng's Pe Pv ****"" Notes
Point Qt Pf1Ft Eqv. Ln. Total Pf Pn
------------- -- - -.-... ----- --- - - ------ -- - -
TOR 0.0 6.065 1D 33.544 9.000 50.638
to 100.0 1B 7.137 62.092 3.032
BOR 90.63 0.0006 1T 21.411 71.092 0-041 Vel = 1.01
BOR 0.0 6.065 1 E 9.992 6.000 53.711
to 100.0 0.0 9.992 5.000 Fixed loss= 5
UG 90.63 0.0006 0.0 15.992 0.009 Vel = 1.01
UG 0.0 6.16 1T 43.037 100.000 58.720
to 140.0 IE 20.084 67.425 -3.898
TEST 90.63 0.0003 1G 4.304 167.425 0.048 Vel = 0.98
250.00 Qa= 250.00
340.63 54.870 K Factor= 45.98
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Metro-Swift
METRO - SWIFT SPRINKLER CORP.
58r PULASKI STREET
PEABODY, MA 01960
978-532-2907
Job Name CENTRAL HOUSE 2ND CORRIDOR
Remote Area .10 GPM OVER THE ROOM AREA
Head Info 5 HEADS CALCULATED AT 225 SF
Flows 371 GPM ROD AT TEST INCL 250 GPM HOSE
Pressures 57 PSI ROD AT TEST, 25 PSI SAFETY
Data File CENTRAL.wx4
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
METIRO - SWIFT SPRINKLER CORP. Page 1
CENTRAL HOUSE 2ND CORRIDOR Date 052208
Hydraulic Design Summary Sheet
Name - CENTRAL HOUSE - 2ND FLR CORRIDOR
Remote Area - .10 GPM OVER THE ROOM AREA
Head Information - 5 HEADS CALCULATED AT 225 SF
Flow Information - 371 GPM RQD AT TEST INCL 250 GPM HOSE
Pressure Information - 57 PSI RQD AT TEST, 25 PSI SAFETY
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Water Supply Curve (C)
METRO -SWIFT SPRINKLER CORP. Page 2
CENTRAL HOUSE 2ND CORRIDOR Date 052208
Demand:
City Water Supply: DemD1 - Elevation 9.528
C1 - Static Pressure 83
C2 - Residual Pressure: 79 D2 - System Flow 120.981
C2 - Residual Flow 1460 D2 - System Pressure 57.536
Hose ( Adj City )
Hose ( Demand ) 250
D3 - System Demand 370.981
Safety Margin 25.146
150
140
130
P 120
R 110
E 100
S 90 C1 C2
S 80
U 70
R 60 nq
E 50 D3
40
30
20
10 D1
200 400 600 800 1000 1200 1400 1600 1800
FLOW ( NA 1.85 )
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Pressure / Flow Summary - STANDARD
METRO -SWIFT SPRINKLER CORP. Page 3
CENTRAL HOUSE 2ND CORRIDOR Date 052208
Node Elevation K-Fact Pt Pn Flow Density Area Press
No. Actual Actual Req
D301 22.0 5.6 16.14 na 22.5 0.1 225 7.0
D302 22.0 5.6 16.14 na 22.5 0.1 225 7.0
D303 22.0 5.6 16.14 na 22.5 0.1 225 7.0
D304 22.0 5.6 16.14 na 22.5 0.1 225 7.0
11 22.0 K=K @ EQ03 19.92 na 24.22
52 22.0 20.9 na
13 22.0 K=K @ EQ04 21.38 na 25.09
12 22.0 K=K @ EQ04 24.0 na 26.58
9 22.0 K=K @ EQ01 17.2 na 22.5
10 22.0 K=K @ EQ02 17.84 na 22.6
47 22.0 18.47 na
48 22.0 19.59 na
49 22.0 20.98 na
44 22.0 21.17 na
F2 22.0 21.98 na
50 22.0 22.44 na
51 22.0 25.18 na
F1 22.0 34.3 na
R7 22.0 38.81 na
CTE 22.0 42.64 na
TOR -2.0 53.23 na
BOR -9.0 56.34 na
UG -9.0 61.35 na
TEST 0.0 57.54 na 250.0
The maximum velocity is 19.35 and it occurs in the pipe between nodes 51 and F1
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Final Calculations - Hazen-Williams
' METRO -SWIFT SPRINKLER CORP. Page 4
CENTRAL HOUSE 2ND CORRIDOR Date 052208
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C" or Ftng's Pe Pv **** Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
D301 22.50 1.101 3E 11.475 1.000 16.143 K Factor= 5.60
to 150.0 0.0 11.475 0.0
EQ01 22.5 0.0846 0.0 12.475 1.056 Vel = 7.58
0.0
22.50 17.199 K Factor= 5.43
D302 22.50 1.101 IT 9.563 1.000 16.143 K Factor= 5.60
to 150.0 2E 7.65 17.212 0.0
EQ02 22.5 0.0846 0.0 18.212 1.541 Vel = 7.58
0.0
22.50 17.684 K Factor= 5.35
D303 22.50 1.101 3E 11.475 1.000 16.143 K Factor= 5.60
to 150.0 0.0 11.475 0.0
EQ03 22.5 0.0846 0.0 12.475 1.056 Vel = 7.58
0.0
22.50 17.199 K Factor= 5.43
D304 22.50 1.101 3E 11.475 1.000 16.143 K Factor= 5.60
to 150.0 0.0 11.475 0.0
EQ04 22.5 0.0846 0.0 12.475 1.056 Vel = 7.58
0.0
22.50 17.199 K Factor= 5.43
11 24.22 1.101 1T 9.563 0.540 19.921 K Factor @ node EQ03
to 150.0 0.0 9.562 0.0
52 24.22 0.0969 0.0 10.102 0.979 Vel = 8.16
52 0.0 2.003 1T 12.965 2.250 20.900
to 150.0 0.0 12.965 0.0
49 24.22 0.0053 0.0 15.215 0.080 Vel = 2.47
0.0
24.22 20.980 K Factor= 5.29
13 25.09 1.101 1T 9.563 0.660 21.380 K Factor @ node EQ04
to 150.0 0.0 9.562 0.0
50 25.09 0.1035 0.0 10.222 1.058 Vel = 8.46
0.0
25.09 22.438 K Factor= 5.30
12 26.58 1.101 1T 9.563 0.660 24.001 K Factor @ node EQ04
to 150.0 0.0 9.562 0.0
51 26.58 0.1151 0.0 10.222 1.177 Vel = 8.96
0.0 -
26.58 25.178 K Factor= 5.30
9 22.50 1.101 0.0 7.580 17.199 K Factor @ node EQ01
to 150.0 0.0 0.0 0.0
10 22.5 0.0846 0.0 7.580 0.641 Vel= 7.58
10 22.60 1.394 1 E 4.762 1.750 17.840 K Factor @ node EQ02
to 150.0 0.0 4.761 0.0
47 45.1 0.0971 0.0 6.511 0.632 Vel = 9.48
47 0.0 1.394 IT 9.523 2.000 18.472
to 150.0 0.0 9.523 0.0
48 45.1 0.0970 0.0 11.523 1.118 Vel = 9.48
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
Final Calculations - Hazen-Williams
' 'METRO -SWIFT SPRINKLER CORP. Page 5
CENTRAL HOUSE 2ND CORRIDOR Date 052208
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C" or Ftng's Pe Pv ****** Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
48 0.0 1.598 2E 11.656 16.200 19.590
to 150.0 0.0 11.656 0.0
49 45.1 0.0499 0.0 27.856 1.390 Vel = 7.21
49 24.21 1.598 0.0 1.700 20.980
to 150.0 0.0 0.0 0.0
44 69.31 0.1106 0.0 1.700 0.188 Vel = 11.09
44 0.0 1.598 1E 5.828 1.540 21.168
to 150.0 0.0 5.828 0.0
F2 69.31 0.1106 0.0 7.368 0.815 Vel = 11.09
F2 0.0 1.598 0.0 4.120 21.983
to 150.0 0.0 0.0 0.0
50 69.31 0.1104 0.0 4.120 0.455 Vel = 11.09
50 25.09 1.598 0.0 14.000 22.438
to 150.0 0.0 0.0 0.0
51 94.4 0.1957 0.0 14.000 2.740 Vel = 15.10
51 26.58 '1.598 1E 5.828 23.620 25.178
to 150.0 0.0 5.828 0.0
F1 120.98 0.3097 0.0 29.448 9.121 Vel = 19.35
F1 0.0 1.598 1T 11.656 2.910 34.299
to 150.0 D.0 11.656 0.0
R1 120.98 0.3098 0.0 14.566 4.512 Vel = 19.35
R1 0.0 1.598 1T 11.656 0.700 38.811
to 150.0 0.0 11.656 0.0
CTE 120.98 0.3097 0.0 12.356 3.827 Vel = 19.35
CTE 0.0 6.065 6E 59.951 144.000 42.638
to 100.0 0.0 59.951 10.394
TOR 120.98 0.0010 0.0 203.951 0.202 Vel = 1.34
TOR 0.0 6.065 1D 33.544 9.000 53.234
to 100.0 1 B 7.137 62.092 3.032
BOR 120.98 0.0010 IT 21.411 71.092 0.070 Vol = 1.34
BOR 0.0 6.065 1E 9.992 6.000 56.336
to 100.0 0.0 9.992 5.000 Fixed loss= 5
UG _ 120.98 0.0010 0.0 15.992 0.016 Vel = 1.34
- - - - -- _ -
UG 0.0 6.16 1T 43.037 100.000 61.352
to 140.0 1E 20.084 67.425 -3.898
TEST 120.98 0.0005 1G 4.304 167.425 0.082 Val= 1.30
250.00 Qa = 250.00
370.98 57.536 K Factor= 48.91
Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087
WINTER STREET ARCHITECTS
FIELD OBSERVATION Observation Date: August 5,2008
REPORT # Attention: Mike Banner
Page 1 of 3 Contractor: RCG Builders
Weather: 72,partly cloudy
Project: 0265.001
Central House
Location: 155189 Washington Street
Salem,MA 01970
TRADES ON SITE:
THE FOLLOWING WAS NOTED:
Work in Progress: Removing existing floor in Units 1-3 and 6-7 and installing new floor joists.
• Installing sheathing in rear of building
• Installing new flashing detail at Second Floor windows.
Estimated%of
Progress:
Observations: . Exterior wrapped in Tyvek
• Plumbing piping installed,were able to reuse some existing stacks. Large stack
near Unit#2 was rebuilt.
• Chimney in Unit#5 that was to be removed must remain,is being used to vent
oil burner below.
• Vertical HVAC ducts from 2nd floor ceilings to roof are installed.
• Windows along rear facade in Unit#5 are to be replaced.
• Unit#7 layout to be revised,relocate closet and laundry. Study to be included
in bedroom. New type F window relocated within bedroom.
• Unit#1 kitchen to be larger as a result of the removal and relocation of the
existing corridor wall.
• Unit#7 rear exterior wall of bedroom reframed.
Items to Verify: . Walid,from Acoustonica,to verify correct transition between regular floor
assembly and acoustically treated floor assembly.
• WSA to investigate a drainage bladder for the intersection of the new and
existing buildings.
Action Items: Include in new regular and acoustic floor assembly in drawings.Acoustic:
Existing joists,%'Advantech T&G plywood, 1"RIM,2 layers of W"OSB,2'/a"
Gyperete,'/a'Advantech T&G plywood,'/"Finish floor
• Left entrance stairs to be rebuilt with uniform risers, including 1 more than
existing
Attachments: See attached photos
209 Essex Street suite 300 salern, Massachusetts 0'1.970 978.744,7'379
t,
WINTER STREET ARCH€'I'ECTS
s r i
Report by .I j, Kathryn Giardi;Winter Street Architects, Inc ignature
S t i tr.
f
_ jt j It i
t gg
{ 1_
g y
u '
AREATO BE FLASHED AT FIRST FLOOR ROOF WASHINGTON STREET ELEVATION
r
Y, s�
�J
r
fid.:"
t v T
:9P
ml
SECOND FLOOR WINDOW�FF�RAApMINGAND EXISTING FLOOR JOISTS SECOND FLOOR EXISTING FLOOR JOISTS
m
a
� E
e
THIRD FLOOR NEW AND EXISTING FLOOR JOISTSAND STAIR FRAMING SECOND FLOOR PLUMBING INSTALLED
WINTER STREET A.ERGhi7TEC;.TS
6', 4
=i r Ei1.
i *t
r
i
ay
Fku h L n i
OVERALL SECOND FLOOR CONSTRUCTION EXISTING FLOOR JOISTSAT SECOND FLOOR NEAR
RIG666HT7HANDSTAIR
it
I iii ��Si i
y
-
Y
OVERALL SECOND FLOOR CONSTRUCTION OVERALL SECOND FLOOR CONSTRUCTION
.a
r i
REAR FACADE PREPARED FOR NEW SIDING EXTERIOR WALL OF UNIT#7 REFRAMED AND PREPARED
FOR NEW SIDING
t
18 Temple Street EC
NeuNuryport,MA 01 950
Phone978-985-6129 • • t
Fax:978-255-3555
July 21; 2008
Tom McGrath
Salem Public Properties t Building Department
120 Washington Street, V Floor
Salem MA 01970
Phone: (978) 745-9595 x5641
Re: Central House, 155 Washington Street, Salem, MA
Ref: Structural capacity
Mr. McGrath:
I understand your office would like a letter speaking to the structural floor capacity of the
referenced project- In particular the capacity of the second floor framing.
The capacity of the existing steel framing is approximately 100 PSF. There are areas of
existing wood framing that ultimately load that steel which do not have the capacity of 100
PSF at present. The required live loading for the proposed residential use is 40 PSF. The
proposed dead load for the sound attenuation for the second floor added to the existing dead
load is approximately 40 PSF total.
It is my intention and the intention of the owner 1 builder to bring the whole second floor
framing up to 80 PSF capacity minimum. This will be achieved by sistering the existing
framing and(or adding supplemental framing between the existing framing.
If you require any additional information please contact his office at your earliest convenience.
Sincerely, `V0�4,
r �X �ZN DF AAAS
S'95'y�
KENNETH
A.WOODS
STRUCTURAL
e
No.39885
Kenneth A.Woodsi
A
pTtT�S "tv"q..
r
�rav�t cue -�
C.19 LA4.5
_ G
4-
/f � -.__ .-_i .•� Tib t�4r � � {' y��r,
} r Oce I tt t t . .'! ...
4
t 5-S 3 S- 5
13
f+s 1
u7uJB itnrt��
Thomas McGrath
From: Ken Woods [kenwoods @ comcast.not]
Sent: Tuesday, August 19, 2008 3:50 PM
To: Thomas McGrath
Subject: Emailing: Central House 2nd framing partial.pdf
Attachments: Central House 2nd framing partial.pdf
A ohc
Central House 2nd
framing part...
Tom,
I understand your need for framing drawings on the 155 Washington project.
I include here a sketch I gave the field. I am in the process of catching up on things after being away
on vacation with my family. Michael Bernier has mentioned several times you would like drawings-
my apologies for taking so long.
As I said in a past letter the existing steel is good for 100 PSF total but the wood framing was not.
Several months went by waiting for a sound proofing detail such that we could determine what the
new dead loads were going to be so we could design the framing accordingly. That information has
only been available for 3 or 4 weeks - two of which I was away.
I will create a cleaner version of the sketch in CAD but substantively the information will be the same
as the sketch. FYI the soundproofing detail weighs —40 PSF. Residential LIVE laod is 40 PSF so the
whole system will be capable of no less than 80 PSF total.
Sincerely,
Ken Woods
The message is ready to be sent with the following file or link attachments:
Central House 2nd framing partial.pdf