Loading...
52 WASHINGTON STREET - BUILDING INSPECTION 52 Washington ST. - , No. City of Salem Ward °�.cuurrt.��* APPLICATION FOR PERMIT TO BUILD ADDITION, MAKE ALTERATIONS OR NEW CONSTRUCTION IMPORTANT-Applicant to complete all items in sections:1, Il, Ill, IV,and IX. I. AT(LinATION) 9 r 1 ,- D STRICT LOCATION OF BETWEEN �' '� 4 N R / AND iP�4 X 4 �h p BUILDING (CRO STREET (M LOTEn SUBDIVISION LOT BLOCK SIZE II. TYPE AND COST OF BUILDING -All applicants complete Parts A -D A. TYPE OF IMPROVEMENT D. PROPOSED USE•FOR"DEMOLITION'USE MOST RECENT USE 1 ❑ New building _ Residential Nonresidential 2 ❑ Addition(If residential,enter number of new 12 ❑ One family 18 ❑ Amusement,recreational housing units added,if any,in part D, 13) 19 Chruch,other religious 13 E] Twoor more family-Enter number 3 ❑ Alteration(See 2 above) of units....................................................... 20 ❑ Industrial 21 ❑ Parking garage 4 Repair replacement 14 ❑ Transient hotel,motel,or dormitory- 22 ❑ Service station,repair garage Enter number of units ........................... 5 ❑ Wracking(if multifamily residential,enter number 23 ❑ Hospital,institutional of units in building in Part D,13) 15 ❑ Garage 24 ❑ Office,bank,professional 6 ❑ Moving(relocation) 16 ❑ Carport / 25 ❑ Public utility 7 ❑ Foundation only /!VI/'G�") 26 ❑ School,library,other educational 17 ❑ Other-Specify 27 ❑ Stores,mercantile B.OWNERSHIP ` 28 ❑ Tanks,towers 8 Private(individual,corporation,nonprofit institution,etc.) \ 29 E] Other-Specify 9 ❑ Public(Federal,State,or local government , a C.COST (Omit cents) Nonresidential-Describe in detail proposed use of buildings,e.g.,food processing plant, machine shop,laundry building at hospital,elementary school,secondary school,college, /, parochial school,parking garage for department store,rental office building,office building 10. Cost of improvement ......................................................... $ v�0 at industrial plant If use of existing building is being changed,enter proposed use. To be installed but not included // in the above cost 00 /ns�a/ J�r+,,,,�a•��a� �!O d r ref 4 GG . . Z QLb. Plumbing........................................................................ t'r c. Heating,air conditioning............................................. d. Other(elevator,etc.)................................................... 11. TOTAL COST OF IMPROVEMENT III. SELECTED CHARACTERISTICS OF BUILDING -For new buildings and additions, complete Parts E L;demolition, complete only Parts J& M, all others skip to IV E. PRINCIPAIyTYPE OF FRAME F. PRINCIPAL TYPE OF HEATING FUEL G. TYPE OF AGE DISPOSAL I. TYPE OF MECHANICAL 30 rL�,To�^/a-sonry(wall bearing) 35 r❑� Gas 40 Public or private company Will there be central air Ly1•• L7 ❑ Private(septic tank,etc.) -conditioning? 31 ootl frame 36 Oil q1 32 ❑ Structural steel 37 ❑ Electricity 44 ❑ Yes 45 E'MO 33 ❑ Reinforced concrete 38 ❑ Coal H. TYPE OF V�A7ER SUPPLY Will there by an elevator? 34 ❑ Other-Specify 39 ❑ Other-Specify 42 L^y't�ublic or private company l 46 ❑ Ves 47 ❑ No 43 ❑ Private(well,cistern) J.DIMENSIONS �J M. DEMOLITION OF STRUCTURES: 48. Number of stories .................1+.................................... 49. Total square feet of floor area, Approval all Aoors,based on a tenor Has pp oval from Historical Commission been receiv d dimensions .............................._Z.�..................... for any structure over fifty(50)years? Yes_ No 50. Total land area,sq.h....................................................... Dig Safe Number K.NUMBER OF OFF-STREET PARKING SPACES Pest Control: 51. Enclosed......................//)....,..... ..................................... fpY/ HAVE THE FOLLOWING UTILITIES BEEN DISCONNECTED? sz. Outdoors............................. ......... ............................... Yes No ` L RESIDENTIAL BUILDINGS ONLY Water: 53. Enclosed.. ........................................................................ Electric: Gas: Full .............. Sewer: 54. Number f bathrooms DOCUMENTATION FOR THE ABOVE MUST BE ATTACHED Partial..................................... BEFORE A PERMIT CAN BE ISSUED. IV. COMPLETE THE FOLLOWING: Historic District? Yes_ No (If yes, please enclose documentation from Hist. Com.) Conservation Area? Yes_ No (If yes, please enclose Order of Conditions) Has Fire Prevention approved and stamped plans or applications? Yes_ No Is property located in the S.R.A. district? Yes_ No Comply with Zoning? Yes�o (If no,enclose Board of Appeal decision) Is lot grandfathered? Yes_ No (If yes,submit documentation/if no, submit Board of Appeal decision) If new construction, has the proper Routing Slip been enclosed? Yes_ No Is Architectural Access Board approval required? Yes_ No (If yes,submit documentation) Massachusetts State Contractor License # 04119 0 71! — Salem License # /3 Z 16 Home Improvement Contractor # /0&S,341 Homeowners Exempt form(if applicable) Yes_ No2c�— CONSTRUCTION TO BE COMMENCED WITHIN SIX(6) MONTHS OF ISSUANCE OF BUILDING PERMIT If an extension is necessary,please submit CONSTRUCTION IS TO BE COMPLETED BY: in writing to the Inspector of Buildings. V. IDENTIFICATION - To be completed by all applicants Name Mailing address-Number,street,city,and state ZIP Code Tel.No. Owner or I,—V Y-' C Lessee y. 2. kal F Contractor , Builder's '/ tJC lL MI- r V� CJ Y`cG[ License No. T6L)7f, A Architect or Engineer I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as authorized a e t and we agn to conform to all applicable laws of this jurisdiction. 42 9 ure of ap can Add re ppI,tion DO NOT WRITE BELOW THIS LINE VI. VALIDATION Building �/r 9 j FOR DEPARTMENT USE ONLY Permit number Building Use Group Permit issued 19 9—J Fire Grading Building Permit Fee $ 71_ DO Live Loading Certificate of Occupancy $ Approvy: Occupancy Load ed Drain Tile $ Plan Review Fee $ TITLE NOTES AND Data•(For department use) J PERMIT TO BE MAILED TO: DATE MAILED: Construction to be started by: 3 Z Completed by: Z I VI ZONING PLAN EXAMINERS NOTES DISTRICT USE FRONT YARD SIDE YARD SIDE YARD REAR YARD NOTES SITE OR PLOT PLAN •For Applicant Use � O