Loading...
22 WALTER STREET - BUILDING INSPECTION 22 WALTER STREET lip F t CITY OF SALEM9 MASSACHUSETTS f I+ BOARD OF APPEAL CITY OF c 120 WASHINGTON STREET, 3Ro FLOOR CLERK'S OFF E&A SALEM, MASSACHu5ETT4 01970 TELEPHONE: 978-745-9895 FAX: 978-740-9846 ; ?806y JUL-2 ' p,2. DECISION ON THE PETITION OF FRANK& CYNTHIA BECKHUSEN REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 22 WALTER STREET R-2 A hearing on this petition was held on July 19, 2006 with the following Board Members present: Nina Cohen, Chairman, Richard Dionne, Robin Stein, Stephen Pinto and Annie Harris. Notice of the hearing was sent to abutter,and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The petitioner is requesting a Variance from the side yard setback,rear yard setback and lot coverage to construction a two story addition for the property located at 22 Walter Street located in an R-2 zone. The Variances,which have been requested,may be granted upon a finding by this Board that: a. Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structures involve. b. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise,to the petitioners. c. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district of the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing, and after viewing the plane,makes the following findings of fact: 1. The Petitioners Cynthia and Frank Beckhusen seek to build an addition to their home at 22 Walter Street. They submitted scaled drawings singed R. Nelson and dated April 3, 2006. 2. The present structure has two distinct parts. One part along Walter Street consists of a two-story structure, and one part along Southwick St. consists of a one-story structure and open deck. Petitioner's planned addition sites a two and a half story structure on the footprint of the existing one-story section along Southwick St., and an open porch added onto the two-story structure that fronts on Walter Street. ,t 1 DECISION OF THE PETITION OF FRANK& CYNTHIA BECKHUSEN REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 22 WALTER STREET R-2 page two 3. The proposed 30' x 26' addition requires a variance from front and a side setback because it is sited 2 ft from the lot line on Walter St and is directly on the property line on Southwick St. It requires a variance from rear setback requirements to 21 ft. and from lot coverage to allow coverage of 41%in a district where the limit is 35%coverage. 4. Two neighbors spoke in support of the petition. There were longtime North Salem Residents Claire Chalifour and Frances Schrader. On the basis of the above findings of fact,and on,the evidence presented the Board of Appeals finds as follows; 1. Special conditions exist when especially affect the subject property but not he District. 2. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship to the petitioner. 3. Desirable relief can be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. Therefore,the Zoning Board of Appeal voted 5 in favor and 0 in opposition to grant the Variances requested, subject to the following conditions: I. Petitioner shall comply with all city and state stature,ordinance, codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted and approved by the Building Commissioner. 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. A Certificate of Occupancy shall be obtained. 6. Petitioner shall obtain approval from any City Board or Commission having jurisdiction,but not limited to the Planning Board. 7. Exterior finishes of the new construction shall be in harmony with the existing Structure. r i DECISION OF THE PETITION OF FRANK&CYNTHIA BECKHUSEN REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 22 WALTER STREET R-2 Page three 8. Unless this decision expressly provides otherwise, any zoning relief granted does not authorize Petitioner to demolish or deconstruct any structure(s)on the property to an extent greater than 50%of the structure as measured by floor area or replacement cost. If a structure on the property is demolished by any means to an extent of more than 50%of its replacement cost or more than 500/6 of its floor area at the time of destruction, it shall not be reconstructed except in conformity with this Ordinance. 4— 4k"�,t— Variance Granted Nina Cohen, Chairman (scr\\, July 19, 2006 Board of Appeal A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days date of filing of this decision in the office of the City Clerk Pursuant to Massachusetts General Laws Chapter 40A, Section 11,the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk that 20 days have elapsed and no appeal has been filed,or that, if such appeal has been filed,that is has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. Board of Appeal j 6 Southwick Stn.eet Satem, Massachusetts July 6, 1911 Mn. John Powe&A City of Satem Bu.itd.ing Inzpectoa One Satem Gneen Satem, Massachusetts Dean Mn. Powen.s, I am wAit.Lng to voice my objections to the proposed con4thuet.ion of a swimming pool at the nesidenee ob Catheh.ine Beckhu4en, 22 Watteh Stteet, Satem, Mass. My w.i6e and I n.ez ide at 6 Southwick Stheet and out ptopenty abuts the Beckhu4en pxopexty. As you know, att og the bu.itd.ing .Lots .in this ne.ighbonhood ane unden4.ize .Lots and I am 4une that this pool cannot be .in4ta ted without viotat.ing the hequ.ixed cteakance SKom an abutten4 pnopenty kine. I am not only eoneexned about the size o6 thein .Lot but I am atzo concehned about the nuisance and satiety 6actoh4 .involved. Thete .is a deb.inite .Lack o6 patentat bupehv.i4.ion at the.i2 hou4ehotd. The Satem Pot.iee wene catted to this ne.ighbohhood twice last even.ing. to answer eompta.intb 6&om otheh ne.ighbots about the Beckhu4en bam.ity. I am asking you to investigate the size ob the Beckhu4en phope&ty and to deteam.ine whether ot not a swimming pool can be tega ty and 4a6ety eonbtn.ucted on the.ih land. S.incehety, Y. �.� ameb L. Picone f BUILDING DEPT _s�;simrnt .iced R 4usrltrs JUL 20 10 39 AM '17 _ RECEIVED CITY OF SALEM,HASS, .. Ch1e Date J ily 23,19-,17 pamet sirs asr,'-•;eri.ne 3ecl:nusen Ret 212 falter t Add_resst 22 .1alt.cr "U As a result of an inspection this date of the premises, structure, span land area or vehicle owned, occupied or otherwise under your control, the follow'_:-, recoanendations are submitted and shall serve as a notice of violation of fire laws. These recommendations are made in the interest of fire prevention and to correct conditions that are or may become dangerous as a fire hazard or are in violation of law. You are hereby notified to remedy said violations named below within of the above date, sc . . Such furthur action will be ta:en as the law requires, for failure `w to comply with the above requirements within the stipulated time, (Reference: General Taws of Commonwealth of Massachusetts, Chapter 148 Section 30; and the Salem Fire Code Article 1. ) It io :.oq,tested twat :ron tale .ir:!e a;;: Steps o c)rrect a seri-ous fire hazard 1;0 ;! nl and your neiahborhood,at above location. Yonr back yard is in direct violation of F.P.12 :r9 :bile 12 This condition can easy he corrected with a little effort .;n roir part Failure to correct this con-cation will lead to furtlreracti.on as law requires. kCC 51iil,-Un7 Inspector Zaimond T ilan. reau CC Health Dept. Inspector, Sal eta Fire Prevent.`ion Bur eau