Loading...
0 VINNIN VILLAGE - PHASE 4 - BUILDING INSPECTION VINNIN VILLAGE . PHASE # 4 i I m of ' tt%Irm, Malisor4usME tlublic Praperig i9epartment iguilaing Department (One t3alem Qbreen 508-735-9595 F—V. 300 Leo E. Tremblay Director of Public Property Inspector of Building Zoning Enforcement Officer Requests all following information be forwarded to the City of Salem Building Department . ## . Request a review for accessibility from parking area to Nursing Home , from required twenty-five ( 25 ) parking spaces per Planning Board decision of 1994 . ( copy enclosed) #2 . According to the zoning interpretation provided by the owner , the 11 . 2 acre of land have been zoned for 139 residential units as of right , plus a recapture of 39 units of additional unused density from prior permitted and constructed phases , for a total of 178 units (Variance required for additional 39 units per Board of Appeals ) . #3 . Required Board of Appeals relief on minimum lot area per dwelling unit of 3500 square feet for buildings B , C,D . 414 . Required Board of Appeals relief on maximum height of building 3 1/2 stories on building A & B . #5 . All soil engineering reports to be submitted to Building Department . a6 . Architectural firm to submit Code Analysis as follows : a . Use group classification. b . Construction classification. c . Fire resistance rating of structural elements . d . Rating in hours for type of construction . e. Occupancy load . f . Means of egress . g. Exit signs & lights . h. Fire grading. i . Fire suppression system. j . Fire protection signaling system. k. Automatic fire detector system. 1 . Height & area computations . m. Unlimited area of buildings . #7 . All construction shall conform to Massachusetts State Building Code .780 CMR Fifth Addition. #8 . Make all necessary permit application with Building Department . /9 . Construction control form per section 127 of the Massachusetts Building Code 780 CMR. CITY OF SALEM, MASSACHUSETTS PLANNING DEPARTMENT WILLIAM E LUSTER ,5� `� •� ONE SALEM GREEN City Planner r f1<, _'! 01970 (508) 745-9595, EXT. 311 FAX (508) 744-5918 May 23 , 1994 Mr . Leo Trembley Building Inspector City of Salem One Salem Green Salem, MA 01970 RE: GROSVENOR HOUSE NURSING HOME Dear Mr . Trembley: ^= c� This letter is to inform you that the Planning Board_:voted on May 19 , 1994 to approve the issuance of a Certificate of Occupancy to the Grosvenor House Nursing Home with- the following c6hdit3:0ns : : 1 . The five ( 5 ) million dollar bond remain in place until the completion of the project ; 2 . Twenty-five ( 25 ) off-site parking spaces be constructed in accordance with the Planning Board approval; 3 . Sloped granite curbing be installed completely around the island on Loring Hills Avenue; 4 . Loring Hills Avenue be completely resurfaced to the City of Salem Engineering Department ' s satisfaction; and 5 . All of the work be completed by June 20 , 1994 . If you have any questions regarding this approval, please do not hesitate to contact me or Debbie Hurlburt in the Planning Department . Sincerely, t1A William E. Luster City Planner cc: Eric Green EX\PB\CGF07LRG.AV Gifu of '�;ttlPm, c assarllusdt5 Plmming *ark OCT Ohne �UIJCM (bran v DECISION Site Plan Review Special Permit Vinnin Associates Realty Trust c/o L. James Zieff 33 Bedford Street, Saite 12;114 Lexington, MA 02173 Re: Grosvenor House Nursing Home - 7 Loring Hills Avenue On Thursday, July 26, 1990, the Salem Planning Board held a public hearing under Section VII-R Site Plan Review Special Permit of the City of Salem Zoning Ordinance for the proposed construction of a 123 bed nursing home to'be located at 7 Loring Hills Avenue. At the public hearing, counsel for the Petitioner introduced evidence in connection with all of the requirements under the Site Plan Review Ordinance including: matters relating to utilities, building mass, traffic, environmental concerns, landscaping, staffing, and other site considerations. There were statements and testimony which indicated that there has not been any nursing home construction in Salem within the last forty to fifty years. In addition, representatives of various social agencies and the Council on Aging testified or submitted statements in support of the project. Petitions with signatures of interested parties were also submitted in support. Opponents of the project expressed several concerns including, but not solely limited to, traffic circulation, noise, change of the residential character of the neighborhood, and adequacy of utilities and parking. The area in question is zoned Residential - 3, which allows multi-family residential purposes. In an R-3 zone a nursing home is a use permitted by Special Permit. The Planning Board was aware that on March 28, 1990, the Zoning Board of Appeal had granted a Special Permit for a nursing home. Following testimony of proponents and opponents, the public portion of the hearing was closed and opponents were invited to designate a representative to meet with the City Planner to air their further concerns. Over.the next several weeks, the City Planner reviewed all of the information and testimony submitted and reviewed the project for the purpose of preparing a recommendation for the Planning Board. The Board, after review of all evidence and careful discussion of all matters with the City Planner, considered the application and at its meeting of September 27, 1990, voted by a vote of 6 in favor, 1 abstention, to approve the requested Site P1an.Review Special Permit as being in compliance with all requirements set forth in said Site Plan Review Ordinance, subject to the following conditions: 1. Conformance With Plan Work shall conform to plan entitled "Grosvenor House Nursing Home - Site Plan", dated June 19, 1990. 2. Utilities Utility installation shall be reviewed and approved by the City Engineer or other appropriate City department head prior to the issuance of a building permit. 3. Board of Health Board of Health conditions stated in a letter dated July 11, 1990 (attached) shall be adhered to. 4. Landscaping Landscaping shall be in accordance with plan entitled, "Grosvenor House Nursing Center - Landscape and Lighting", dated June 19, 1990. a. Trees shall be a minimum of 4" caliper. b. Maintenance of landscape vegetation shall be the responsibility of the developer, his successors or assigns. c. Developer shall construct a ten (10) foot wide berm, ranging in height from 3 to 4 feet, with sloped granite curbing, plantings and other screening (to be approved by the Planning Department), along the entire length of the property line (exclusive of parking lot entrances and egresses) of the property owned by The Loring Hills Condominium which has frontage on Loring Hills Avenue. The Loring Hills Condominium Association shall have ninety (90) days from the filing date of this decision (September 28, 1990) to grant permission to the Developer to access the property belonging to Loring Hills Condominiums for the construction of the berm. If within ninety (90) days, the developer has not received permission in writing from the Loring Hills Condominium Association for construction of the above described berm, the developer shall be required to construct on the City right-of- way, a six (6) foot wide sloped granite bordered berm with 4 inch caliper decidious trees at twenty-five (25) foot intervals. Included in the berm will be a four (4) foot high wooden fence with the design of such fence to be approved by the City Planner. d. After all project landscaping is completed, and prior to the issuance of a Certificate of Occupancy, the developer will be required to add further landscaping if such is requested by the Planning Board or City Planner. 5. Signage Developer shall install "Do Not Enter" sign at the intersection of Loring Hills Avenue and Carol Way and a "Residents and Guests Only" sign on Loring Hills Avenue at the entrance to the Village at Vinnin Square. All project signage shall be reviewed and approved by the City Planner. 6. Maintenance Refuse removal, road and ground maintenance, and snow removal shall be the responsibility of the developer, his successors or assigns. The Planning Board shall write to the City of Salem to request that Loring Hills Avenue be plowed and maintained by the City of Salem. a. Such maintenance shall include the plowing and sanding of off-site parking areas and walkways. 7. On-Street Parking Parking on either side of Carol Way between the pond and the nursing home shall be prohibited. "No Parking" signage shall be installed to indicate such prohibition. 8. Off-Street Parking Developer shall include fifty-seven (57) on-site parking spaces and twenty-five (25) off-site parking spaces as indicated on the approved site plan. 9. Waterf low Test Developer shall provide actual waterflow test results for the site to the Salem Planning Department, City Engineer and Fire Marshall prior to issuance of a building permit. 10. Sidewalk Developer shall construct a five and one-half (5 }) foot concrete sidewalk, and 6" granite curbing along the entire Grosvenor House Nursing Home property frontage, along Carol Way and Loring Hills Avenue. 11. Roof Top Equipment Roof top equipment shall be screened or otherwise mitigated from the abutting condominiums. Such screening shall be approved by the City Planner, prior to issuance of a Certificate of Occupancy. In addition, baffles shall be installed in each exhaust fan to ensure minimal disruption to abutters. construction shall be carried out in accordance with the following conditions: a. Construction and blasting. Operating or permitting the operation of any tools or equipment used in construction or demolition work between the hours of 5:00 p.m. and 8:00 a.m. the following day on weekdays or at any time on Sundays or holidays such that the sound therefrom creates a noise disturbance across a residential real property boundary) or the operation of drilline and/or blasting equipment used in construction, reconstruction, repair, or demolition work between the hours of 5:00 p.m. and 8:00 a.m. the following day on weekdays or at, any time on Saturdays, Sundays, or holidays shall be prohibited except for emergency work of public service_utilities, or by Special Variance issued by the Building Inspector pursuant to the Salem Code of Ordinances, and notification of same to the Salem Police Department. b. All reasonable action shall be taken to minimize the negative effects of construction on abutters. Advance notice shall be provided to representatives of the Loring Hills Condominium Association and the Village at Vinnin Square Condominium Association in writing at least 72 hours prior to the commencement of construction of the entire project. c. All construction vehicles shall be cleaned prior to leaving the site so that they do not leave dirt and/or debris on roadways as they leave the site. d. A Clerk of the Works will be required at the expense of the developer as is deemed necessary by the City Planner. e. Roadways surrounding the development shall be swept by a street sweeper as needed to remove dirt and/or debris from roadways. 13. Deliveries No service deliveries by tractor trailer trucks shall be allowed. The Planning Department shall receive a copy of a letter sent to each vendor or service contractor indicating this restriction. 14. Violations Violations of any conditions shall result in revocation of this approval by the Planning Board. I hereby certify that a copy of this decision and plans have been filed with the City Clerk and copies are on file with the Planning Board. The Special Permit shall not take effect until a copy of this decision bearing the certification of the City Clerk that twenty (20) days have elapsed and no appeal has been filed or that if such appeal has been filed, and it has been dismissed or denied, is recorded in the Essex County Registry of Deeds and is indexed under the name of the owner of record or is recorded on the owner's Certificate of Title. The fee for recording or registering shall be paid by the owner or applicant. Walter B. Power, III �3 Chairman M5WP CO.On� 7 '. CITY OF SALEM HEALTH DEPARTMENT 07 BOARD OF HEALTH - 9 North Street ROBERT E. SLENKHORN Salem. Massachusetts 01970 HEALTH AGENT 508-741-1600 July 11, 1990 0 - n John Serafini ` - Attornev At Law 63 Federal Street �.. Salem, MA. 01970 _j Dear Mr. Serafini: c At the Board of Health meeting held on July 10, 1990, a motion was made and passed to conditionally approve the Site Plan Review for the Vinnin Associates Realty Trust, 123 bed Nursing Home Facility, in the. City of Salem, with the following ammended Board of Health comments: 1. The design proposal concur with the city Engineering Department and City Plumbing Inspector for utility tie-ins for drinking water, sanitary waste (sewerage) , gas lines and/or other utility service. 2. Prior to drinking water service being nut into service it be tested for pressure and bacteria by a certified laboratory and the results submitted to the Planning and Health Departments in writing. 3. Employ an acceptable method for removal of all construction debris and any unacceptable excavation material from the site during construction. 4. Submit results of any 21E Tests for Health and Planning Departments in writing. 5. Employ an acceptable method or means for the holding and disposal of trash (rubbish) , and medical waste, after site development with a copy of this method sent to the Health and Planning Departments in writing. 6. Measures be taken to assure that air pollution due to odors and noise does not occur during and after site construction (i.e. air exchange units, ventilation, excavation, etc.) Hours of site work to be 7:00 A.M. - 5:00 P.M. Monday gh Saturday. ploy an acceptable method for dust and street cleaning control during site construction and submit copy of method ucilized to the Health and Planning Departments in writing. See attached page 2 Y SALEM HEALTH DEPARTMENT 9 North Street Saierr, MA 01970 John Serafini July 11 , 1990 Page Z Comments continued 8. Prior to site start—up and also during site construction employ a licensed pest control firm for site evaluation and service with a copy of the service invoice sent to the Planning and Health Departments. 9. All backfilling be done in accordance with good engineering practices to prevent future damage to all underground utilities. Only acceptable back— fill materials are to be used. 10. The design must be in accordance with Massachusetts General Laws and the State Sanitary Code, Construction of Nursing Home Facilities. Very truly yours, FOR THE BOARD OF HEALTH Robert E. Blenkhorn, C.H.O. Health Agent REB/jm cc: Beth Debski, Planning Department City Hall pvwc' i': su i�lZ a:rt bull9tiln Boars" "' le Be .aon Oab. ,j, 1990 o.. 3:1 ) 'ae once with Chap, 68f , sY th oY 1958. � , —, � .l �Ittnnillg 3nttrd MSP �$aleit Green REQUEST FOR REVIEW COMMENTS SPECIAL PERMIT DATE: TO: (BUILDING INSPECTOR ( ) CONSERVATION COMMISSION ( ) CITY ENGINEER ( ) Other: ( ) BOARD OF HEALTH Attached please find the application referenced below. The Planning Board re- quests that you review this application relative to Section VII of of the Zoning Ordinance. We would appreciate vour completing the form below and returning it to us. Notice of the public hearing for this application will be forwarded to you. (Y) WETLANDS AND FLOOD HAZARD DISTRICTS (V ' SITE PLAN REVIEW ( ) CLUSTER DEVELOPMENT ( ) BUSINESS PARK DEVELOPMENT DISTRICT ( ) PLANNED UNIT /nDEVELOPMENT L APPLICANT: PROJECT NAME & ADDRESS: 2,f�L��C��`�� CONTACT PERSONS AND PHONE: Applicant: COMMENTS DUE BY: (Failure to comment within 35 days shall be deemd l/acck�of opposition.) 1) ( oncur with proposal (Explain on reverse side) I ( ) Need more information (Explain on reverse side) ( ) Cannot concur with proposal (Explain on reverse side) (:-YComments included REVIEWER`S SIGNATURE TITLE J DA SERAFINI, SERAFINI ANO DARLING ATTORNEYS AT LAW NAR N 2 07 f rJ f97 63 FEDERAL STREET SALEM, MASSACHUSETTS 01970 C11Y Ii! �;I: ! 4PASS f QJS %lCi2K'S mF'iCF JOHN N. SERAFINI, SR. TELEPHONE JOHN R. SERAFINI.JR. 508.744-0212 JOHN E. DARLING 817.581.2743 ELLEN M. WINKLER TELECOPIER JOSEPH C. CORRENTI AA 508-741.4883 � April 3 , 1997 n � z Walter B. Power, III, Chairman z saa Salem Planning Board T„ One Salem Green Salem, Massachusetts 01970 RE: Village at Vinnin Square ^+> Phase 4 - Carol Way Condominium _4 Dear Mr. Power: On behalf of Vinnin Associates Realty Trust, owner of the property situated along Carol Way and along Weatherly Drive/America Way, described on plans submitted herewith, application is hereby made for the following permits: all permits required under the City of Salem Zoning ordinance that apply to this project, including Special Permits under section 7-18 and section 7-16. An Environmental Impact Statement, which addresses the proposed construction and build-out of this phase, is included with this filing. This Statement addresses each of the environmental issues outlined in the Appendix A of the Subdivision Regulations of the City. The proposed project involves construction of four (4) mid-rise buildings containing 178 dwelling units on eleven plus (11+) acres of land, all as shown on the submitted plans. This will be the final phase of construction for the Village at Vinnin Square. Also included with this filing is a Traffic Impact and Access Study prepared by Vanasse Hangen Brustlin, Inc. This study addresses the Phase 4 build-out and its projected impact (minimal) on the surrounding traffic. 1 Walter B. Power, III , Chairman April 3 , 1997 Page 2 The site development has been designed to be responsive to the natural qualities and topography of the land and to complement the existing buildings. The building locations have been set to optimize the existing terrain, creating an attractive scale and setting. Extensive landscaping is proposed to beautify the entrances to the Village as well as to the individual buildings. Additionally, drive-in basement level garage parking is incorporated into each of the four buildings so as to minimize the visual impact of parking lots while maximizing convenience and comfort for the residents. The plans as filed, together with the supplemental documentation which serves as the narrative under the list of requests contained in the Site Plan Review requirements, give a comprehensive view of this proposed project. Wherefore, we respectfully request that the Board grant the permits as requested herein. Sincerely, VINNIN ASSOCIATES REALTY TRUST By its attorney, JOHN R. SERAFINI , SR. JRS,SR. /ln 4 Environmental Impact Statement Carol Way Condominium Salem, Massachusetts Prepared for Vinnin Associates Realty Trust Waltham, Massachusetts Prepared by VMNanasse Hangen Brustlin, Inc Watertown, Massachusetts Vanasse Hangen Bnvstim Inc Introduction Vanasse Hangen Brustlin Inc. (VHB)on behalf of Vinnin Associates Realty Trust is submitting this Environmental Impact Statement(EIS) for the final phase of development at the Village at Vinnin Square in Salem, Massachusetts in accordance with the Rules and Regulations Governing the Subdivision of Land Salem, Massachusetts,Section III. This application has been prepared to support the application for definitive site plan approval process for the development of the proposed residential project consisting of a total of 178 units. The site is located on the northerly side of Loring Avenue at the Swampscott town line. The site is shown in relation to the surrounding area in Figure 1. This EIS includes a description of potential impacts of the proposed project and the site improvements to the existing site that will be provided to support the project. Particular attention has been paid to traffic improvements and stormwater management. Project Background and Description The proposed project consists of four discrete undeveloped parcels of land, totaling + 11.2 acres,located within a 46-acre master planned residential community called The Village at Vinnin Square. Total development to date includes 338 dwelling units,a skilled nursing facility and recreational facilities. According to the zoning interpretation provided by the land owner, the 11.2 acres of land have been zoned for 139 residential units as-of-right,plus a recapture of 39 units of additional unused density from prior permitted and constructed phases, for a total of 178 units. This project represents the fourth and final phase of the Village at Vinnin Square project in Salem, Massachusetts. The first three phases of the project were constructed between 1984 and 1997 and include 338 townhouse/mid-rise units. The proposed site development has been designed to be responsive to the site's natural qualities as well as to the character of earlier developed phases of The Village at Vinnin Square. Building locations have been established to optimize the goals of graciously setting the buildings into the existing terrain,creating attractive residential scale environments surrounding the units,and offering attractive vistas outward from the units. Entrance drives and parking areas have been developed in a manner which minimizes grading,respects on-site wetlands, and reduces perceived scale through introduced shade trees and shrub masses internal to the parking lots. Parking impact is further reduced through the use of garage parking which has been carefully integrated into the building architecture. The extensive proposed landscaping program utilizes a diverse palette of plant material for seasonal interest, placing major beds of shrubs and ornamental trees surrounding uvkwnonaa.,,;a„sus.a« i Vanas a Hangen Br tlin,Inc proposed buildings as well as at gateways to both Carol Way and at each of the building site entrances. Environmental Impact Statement The following section summarizes the environmental impact of the project on each of the listed sections in Appendix A of the Planning Board Rules and Regulations Governing the Subdivision of Land in Salem,Massachusetts. Natural Environment 1. Air The proposed development will have insignificant impacts on the quality of air surrounding the site. The two sources of potential air emissions associated with the project will be the short term impact due to construction activity and the long term impact due to the slight increase in automobile traffic. Short term impacts from construction operations may include fugitive dust and equipment emissions. Measures will be taken to minimize these impacts during the construction period. The construction air impact is only temporary due to the heavy construction equipment needed for excavation work. To minimize the impact all construction entrances and roadways into/out of the development will be wetted periodically to keep dust from rising. This procedure will also take place on an as necessary basis during the earthwork operation of the project when dust accumulation is at its potential highest. Loring Towers Road will be used as a construction entrance to minimize the impact to area roadways. All construction access points will provide a crushed stone apron to remove trapped mud prior to traveling on Loring Towers Road and Loring Avenue. 2. Land The proposed project site is currently undeveloped,comprised of lots A, B,D2 and Carol Way. The total land area is 11.2 acres,6.0±acres of which will be disturbed due to the development. The existing sites have been summarized based upon the existing cover characteristics, field visits, preliminary soils inspections,Soil Conservation Service soils mapping and site history as follows: Preliminary soils inspection indicates that the majority of the underlying soil is composed of a silty,clayey gravel,a moderately well draining soil. According to the Soil Conservation Service(SCS)mapping designation the land within the 2 . In.I_i Vanasse Hangen BrustUn,Inc. project area is "urban land". The SCS uses this designation for soils which have been previously disturbed. The surrounding soil designations indicate B/C hydrologic soil groups which correspond to the preliminary soil tests performed in areas outside the limits of the visible ledge and/or altered portions of the sites. Lot A contains mostly ledge outcroppings covered with a heavy moss.The topography within Lot A has not been significantly altered and, therefore,still contains more variation in grade demonstrated by an isolated knoll of ledge outcropping.The maximum elevation of the project site,elevation 104 feet is located at the top of the knoll within Lot A. Lot B is partially covered with unusable excess fill relocated to the current location during prior construction. The fill stockpiled on Lot B is not suitable for bearing the foundation loads and, therefore,will be removed prior to construction. In addition,approximately 50% of Lot B is made up of a wetland area,as depicted on tke Existing Conditions site plan. The entire area within the limit of the wetland resource area,as well as a undisturbed transitional zone, will remain unaltered by construction activities.The undisturbed transitional zone on average will be approximately 15 to 20 feet wide. Lot B contains the lowest elevations of the entire property with a minimum elevation of approximately 56 within the wetland system. The cover characteristics of Lot D2 currently consist of controlled compacted fill and overflow parking used by adjacent property owners. Lot D2 also has a portion of ledge outcroppings on site. The proposed grading of the lots,after the fill has been removed, will minimize the amount of earthwork required. Gradual slopes will be utilized when possible to allow for landscaped buffers in each of the lots.The use of stone retaining walls are planned to minimize the impact on the area surrounding areas of the site. Runoff will directed away from the buildings and toward the pre- construction discharge points to replicate existing conditions drainage flow patterns. �ulMueauee�vanw.�«,ao< 3 . v� Vanasse Hangen BmAin,Inc. 3. Water and Wetlands The proposed development requires earth moving to construct the buildings, their associated garages and parking areas. Erosion of open cuts or fills will be minimized by utilizing silt fences, haybales, inlet protection, watering to control airborne dust and protection of steep slopes with hay mulch and/or erosion control fabric until permanently stabilized. These erosion control measures will be monitored and maintained on a regular basis,particularly after a heavy rainfall. These measures will not be removed until disturbed areas are adequately stabilized. The proposed work within the buffer zone of the existing wetland systems requires a filing of a Notice of Intent with the Salem Conservation Commission. This filing will contain a thorough description of any possible impacts to surrounding wetland systems. 4. Energy Natural gas will be used as the heat source for the buildings. 5. Noise The site is located in a residential area made up of town homes,mid-rises and apartments. Since the end product is a residential use itself, the daily operation of the completed project is not expected to generate any additional noise. The only sources of noise associated with the project will be from the increase in automobile traffic and mechanical equipment.The use of gas fired heating and air conditioning units will result in substantially lower noise levels as compared to prior phases of the Village at Vinnin Square. Please note,significant noise levels are present due to the traffic volume on adjacent roadways. Normal construction noise will be generated during the construction period. Construction and operation of equipment will be limited to the hours allowed by the Salem regulations. 6. Local Flora Each of the three sites has a distinct vegetated character. Lot A is currently comprised primarily by an outcrop of bedrock which has a minimal cover of scattered ground juniper and sweetfern generally confined to fissures and perimeter areas. This outcrop is surrounded by lawn facing Carol Way and Weatherly Drive. A small massing,comprised primarily of deciduous oaks and maples, faces out upon Loring Avenue. A buffer strip of existing trees will be maintained along Loring Avenue. uxwroszam.,��,.w..ao4 Vanasse Hangen Br tlin,Inc. The portion of Lot D-2 proposed for development is substantially cleared of vegetal on other than grassed areas. Two existing paved parking lots occur on this lot. A second portion of the lot which is separated from the area of development by a connecting drive to Loring Hills Avenue is comprised of a pond surrounded largely by grassed areas and scattered existing_ and introduced evergreen and deciduous trees. A significant portion of Lot B is comprised of a wetland swamp primarily vegetated by red maple. Upland portions of the site are characterized by a large cleared area adjacent to Weatherly Drive and deciduous woodlands dominated by oak and maple on the southeasterly portion of the ridge. Man-made Environment 1. Land Use The regional land use in the vicinity of the project is predominantly commercial (retail malls and strip centers)and high density residential developments. The uses immediately adjacent to the site include, a Kinder Care day care center located to the east of Lot D2 ,a Nursirrg home to the north,and the Loring Towers between Lots A and B. wavamszaa..�w.w.as 5 r1].0 Vanasse Hangen Brusdin,Inc. 2. Density Table 1 Land Coverage Summary Lot A Lot B Lot 02 Total Land Use Area is t 1 6 of Lot Area Is it of Lot Area(sI 1 6 of lo, AM of Lot Building Coverage 14.280 29 36,020 13 9.610 8 59,910 13 Paved Sunace Cvr, 11,650 24 54,840 19 19.160 15 85,650 19 Open Space 23,625 47 196,615 68 97.085 77 317,325 68 Total 49,555 100 287,475 100 125,855 100 462,885 100 Table 2 Parking Summary Lot A Lot B Lot D2 Total Reauire4 Provided Reaulred Provided Reouim4 Provided Reouueff Provided Regular parking' 66 spaces 76 spaces 159 spaces 168 spaces 42 spaces 59 spaces 267 spaces 313 spaces: Handicap Accessible 3 spaces 4 spaces 6 spaces 6 spaces 2 spaces 3 spaces 12 spaces 12 spaces spaces-' 1 parking spaces required per dwelling unit. "Handicapped accessible parking spaces and access provided in garage. Table 3 Zoning Table Zone. R-3 Use: Multi-Family Residential Lot A Lot B Lot D2 Total Resured Provded Provided Provided Provided Min.Lot Area 25,000 S.F. 49,555 BE 287,475 SF. 125,855 SF. 462.885 Max.Lot Coverage By all buildings M 29% 13% 8% 13% Min.Depth of Front Yard 15 FT. 18.6 FT. 19 FT. 15.8 Fr. 15 FT. Min.Width of Side Yard 20 FT. 23.2 FT. 21 Fr. 21.4 FT. 21 FT. Min.Depth of Rear Yard 30 FT. 48 FT, 72.3 FT. 30 FT. 30 FT, Max.Building Height 50 FT./4 stores' 45.5 FT. 46.5 FT. 46.0 FT. 46.5 FT. Multi-family dwelling buildings on lots held under a single ownership and consisting of a min.of 200,000 SF.may be built to a Max. height of 50 Fr.or 4 stories high. (tomer lots-the min,front yard depth,rather than the min.side yard width,shall be applied to determine the setback of any building from lot lines abutting any public way. �WArea5243%vanwsu.e 6 IM Vnnasse Hangen Bmstlin,Inc. 3. Zoning The four parcels of land,as well as the surrounding area are entirely within the R3,Residential, btuld-Family District . 4. Architecture In keeping with the prior phases of the Village at Vinnin Square, the proposal will utilize the Georgian Federalist mid-rise style of buildings. The exterior will reflect articulation and fenestration to engage the viewer whether they are pedestrian or within passenger vehicles. 5. Historic Buildings,Historical Sites and Archeological Sites There are no historic structures, properties or areas located in the vicinity of the proposed development. The project will not affect any known archeological sites. Public Facilities 1. Water Supply The City of Salem water supply is under the jurisdiction of the Salem/Beverly Water Board. There are several reservoirs in the region that are filtered through the treatment plant. There is a cement lined 12" ductile iron pipe(DIP) through the subdivision development of Loring Hills Avenue, Loring Towers Road and Weatherly Drive/America Way. All buildings will be connected directly into this 12" waterline which connects into a 16" cement lined cast iron pipe in Loring Avenue. According to the city engineering department the static pressure available is ample, however,sufficient pressure for fire flow is not available. Therefore,booster pumps will likely be needed for each of the proposed buildings for fire protection. Flow tests will be performed to confirm adequate capacity for the domestic water and requirements for a booster pump for the fire protection.The details of any necessary booster pump stations will be provided upon completion of the building architectural pians and submitted for review with the building permit application. The proposed project will generate approximately 40,000 gallons per day (gpd). This is approximately 10%n above what is expected as an average sewer flow from the site. The 10% increase is a typical allowance utilized to account for irrigation and recreation,etc. \\kirkVCA52�\ranwa4is.Ex 7 Vanasge Hang,, Br din,Inc. 2. Sanitary Sewer Salem is under the jurisdiction of the South Essex Sewer District which operates a regional waste water treatment plant. The plant currently averages 27 million gallons per day(mgd) with a design flow of 41 mgd. The proposed project is expected to generate 35,420 gallons per day (gpd)of wastewater and convey it into the City of Salem sewer system in Loring Avenue. The sewer generation is based on the state code,314 CMR 7.15 which stipulates a generation rate of 110 gallons per day per bedroom for residential units. The estimated numbered of bedrooms, which includes dens and lofts, was calculated to be a total of 322. There is an existing 12"AC sewer line in Loring Towers Road which collects the sewer generated by Loring Towers and flows by gravity to an existing 12" AC sewer in Weatherly Drive/America Way, This 12" line presumably flows to Loring Hills Avenue which connects to the 15" sewer line in Loring Avenue. An 8" PVC sewer line is located in Weatherly Drive which also connects to the existing 12"line flowing towards Loring Hills Avenue. One proposed building located on Lot B will require a pump station to connect into the 12" line in Weatherly Drive, due to the elevation differences between the two sites. The buildings on Lots A and D2 as well as the second building on Lot B will connect via gravity to the existing 12" line in Weatherly Drive/America Way. The three new buildings ultimately discharge to the sewer flow on Loring Avenue. According to the City engineering department the sewer lines have become surcharged under heavy rainfall conditions. Aside from the infrequent condition associated with this inflow and infiltration into the sewer system, there are no known sewer capacity problems in the area of Loring Avenue. The owner is committed to working with the city to identifying the source of the inflow and infiltration and supporting efforts necessary for corrective action.The sewer line further north in Loring Avenue does flatten out in the area of Intervale Road which may cause a system restriction. However, the line increases to a 30" diameter adding significant capacity to the system within a short distance. The engineering department does not believe the addition of 178 units will present a capacity problem.Notwithstanding, the owner has commenced a comprehensive analysis of the existing sewer system within the Village at Vinnin Square to identify other areas for potential improvements. It is important to note that the original Master Plan development received a sewer connection permit for build-out of the entire development. �wunosz.aw.�w.w.d,o 8 In•t Vanasse Hangen Br tlin,Inc 3.(and 4.) Storm Drainage The existing drainage system for the Weatherly Drive/America Way residential area is a closed system. Stormwater runoff is collected in a series of catch basins and pipes and routed to a discharge point. The first discharge point is the wetland area depicted on Lot B. A 12" drain line in the western portion of Weatherly Drive collects the runoff from the surrounding area and discharges into the wetland area. Another 12"drain line collects the runoff from the eastern side of Weatherly Drive and routes it to the Loring Hills Avenue drainage system (discharge point 2) which eventually connects to the City drainage system in Loring Avenue. The proposed drainage system has been designed to collect and control runoff from impervious areas and treat stormwater flows prior to discharge. The proposed drainage system will be a closed drainage system utilizing a series of catch basins, with oil separation hoods and sediment sumps,connected to manholes that direct the runoff to the two existing discharge points,described above. All pavement area will be routed through either a detention facility, which is designed for both water quality as well as water quantity management, or a stormwater treatment structure. Therefore, both water quality and water quantity will be regulated leaving the proposed developed areas. The existing and proposed runoff quantities for the proposed development for the 2,10, 100 year storm events were developed using standards published by the Soil Conservation Service(SCS),Technical Release 20. While groundwater recharge is currently being evaluated to infiltrate the proposed for the roof runoff, the proposed analysis was performed without the benefit of the reduction in flow due to the leaching basin recharge quantities. This simplified analysis has provided a conservative estimation of the post-development runoff quantities. The proposed closed drainage system will be designed such that the proposed peak rates of runoff at the two discharge points will be equal to or less than the existing peak rates of runoff. The stormwater management system calculations will be submitted in support of the Notice of Intent filing with the Conservation Commission. The proposed comprehensive stormwater management system incorporates the following features for the project to reduce the peak rate of runoff and to provide mechanisms for the improvement of runoff water quality. • A stringent erosion and sedimentation control program will be implemented during the construction of the project and stormwater management systems. This program will eliminate any short-term construction related impacts to the site that might be anticipated from land disturbance and will leave the site in a stable, non-erosive condition with measures to reduce the transport of sediment off-site. 9 Vanasse Hangen Br din.Inc. • A stormwater management system incorporating a closed drainage system including multiple redundant pollution control structures such as catch basins with oil separation hoods and sediment sumps and the gradual,controlled release of treated stormwater from detention basins to downgradient municipal drainage systems and wetland areas. • The catch basins with hoods and sumps,as well as stormwater sedimentation structures where needed will facilitate the collection of runoff from all paved surfaces, reduce the transport of sediment and enhance water quality. • Construction phasing will be sequenced to allow initial construction of the detention basins providing both a temporary and permanent means of sediment removal. 5. Refuse Disposal The proposed project will generate normal residential quantities of domestic waste. All occupants will be encouraged to separate and recycle all allowable materials. All dumpsters will be equipped with compactors to minimize the volume of waste. In addition, the dumpsters will be located inside the garage areas to eliminate any adverse visual impacts. A private hauler will be contracted to collect the waste and transfer it to a licensed disposal station. During construction clearing and grubbing of vegetation associated with the site preparation is planned. All construction waste will be removed and properly disposed of by a private contractor. 6. Traffic Facilities The following information summarizes the findings of this traffic impact and access study a copy of which is provided with this submission. > Based on ITE trip rates, the project is expected to generate a total of 1130 (565 entering and 565 exiting) vehicle trips on an average weekday. Similarly, the project is expected to generate SO(20 entering and 60 exiting) vehicle trips during the morning peak hour and 90 vehicle trips (60 entering and 30 exiting)during the afternoon peak hour. > The proposed development will increase traffic volumes by 2.5 percent or less over those that currently exist. The traffic generated by the proposed development, therefore, will have a minimal impact on the area roadway network. > Intersections on the perimeter of Vinnin Square currently operate with considerable delays during the peak traffic hours. Roadway improvements u�aumoszar..�w.w.aoe 10 YM Vanasse Hangen Brustlin,Inc. have been proposed by area municipalities and are currently under review by the MHD; the improvements include new traffic signals at three nearby intersections which will improve capacity and safety on study area roadways and intersections. > The site drive roadways will operate at acceptable levels of service with minimal delays experienced by traffic on Loring Hills Avenue and moderate delays experienced by traffic on Carol Way with the project and the proposed improvements. > A review of the accident records for the most recent three year period(1994- 1996)at each of the study area intersections revealed minimal accident incidence at each of the study intersections with the exception of Paradise Road at Vinnin Street. The records indicate that between 8 and 9 accidents occur at this intersection each year. The accidents are evenly split between rear-end and angle-type collisions. The new MHD traffic signal installation will likely improve safe travel through this intersection. > Results of the traffic analyses reveal that the project will have no noticeable impact on the adjacent street system. Traffic operations at the nearby study area intersections will be unaffected by the project related traffic. > The intersection of Weatherly Drive and Carol Way will be modified to operate in a traditional T-type intersection. In addition, the roadway vertical and horizontal geometry of the approaches will be modified, including the elimination of an existing reverse curve and widening of an inadequate section of roadway. These modifications will significantly improve the roadway creating a safer,more efficient intersection. > To address project related traffic increases at the main site driveway (Carol Way)during the weekday peak hour conditions, the proponent proposes a minor widening of the Carol Way approach to provide two exclusive tum lanes. The project at full build-out will result in insignificant increases to area traffic of between I and 2.5 percent and will have no noticeable impact to the adjacent street network. Additionally, the Build condition levels of service at the main site intersection of Carol Way with Loring Avenue will improve to better than existing levels of service, with the implementation of the proposed improvements. Improvements in traffic operations at the intersection of Carol Way with Weatherly Drive are also expected with the realignment of Carol Way with Weatherly Drive to the west. ki,kVeoszamvu�wn«..sc t 1 Ili Vanasse Hangen Brmdin,Inc. 7. Electrical Power Massachusetts Electric is the electrical service provided for the City of Salem. There is an underground electrical conduit located within Weatherly Drive. The Conduit appears to end at Loring Towers Road from Weatherly Drive west to east. The remainder of Lot B will access the underground conduit directly from Weatherly Drive. Lot A, however, will connect to a utility pole, via a riser section, located in Loring Towers Road. Lot D2 will utilize an existing electric manhole located on the eastern end of Weatherly Drive/America Way towards Loring Hills Avenue. All under ground conduits will be used for the utility work. 8. Gas There is a 6" medium pressure gas line available in Loring Avenue. According to the Boston Gas Company the 6" line ends at Loring Hills Avenue,just before Carol Way. However,there is an existing gas line(size unknown at this time)in Loring Towers Road which shows a connection into Loring Avenue. This proposed project will connect into the gas line that runs through Loring Towers Road. Community Services 1. Schools Based upon a survey conducted by the landowner and confirmed by the City, the existing 338 units within the Village at Vinnin Square contain no school age children.Therefore,it is anticipated that the proposed development will have minimal impact to the school system.The project is located within 1 mile of a public elementary school. 2. Recreation The Village at Vinnin Square contains on-site recreation facilities including a pool, tennis courts,clubhouse and access to the Forest River Preserve and Trails. 3. Police Units will be privately monitored with alarm systems. 4. Fire The municipal fire station is within 1 1/2 miles of the project. All buildings will be fully sprinklered and constructed using 2B type construction. wnutaszuw.,;a....aee 12 IM Vanasse Hangen Brustlin,Inc 5. Public Works The project will be privately maintained. Human Considerations 1. Aesthetics and visual impact As previously stated the proposed building architecture will be in keeping with the prior phases of the Village at Vinnin Square.The proposal will utilize the Georgian Federalist mid-rise style of buildings.The exterior will reflect articulation and fenestration to engage the viewer whether they are pedestrian or within passenger vehicles. Garages will be used within the basements of all proposed buildings to minimize the amount of exterior impervious areas necessary to support the buildings. The proposed buildings have been sited in a manner which is responsive to the site's natural qualities as well as to the character of earlier developed phases of the project. An extensive landscaping program provides major beds of shrubs and ornamental trees surrounding the proposed buildings as well as at their entrances and as an upgrade to the entrance to Carol Way. Evergreen buffer plantings are introduced at key.perimeter areas of the development both to soften the projects visual impact upon neighboring land as well as to provide a higher quality landscape experience for occupants of the proposed project. 2. Parks, forests and recreational areas See the discussion above on recreation. 3. Public Health No deleterious impacts to public health are anticipated. a�aveoszo..da,:w..a� 13 Rffl§ 7PARK i i. SALEM I r 16.8 Project ,_ '\x 'N SWAIMP "w'1 Off Rock XLincoln iHo Pof 19 Tedesco - Pes Poin In' rGut W A M 2, s u ter.. Gat a 21 19 0 1000 2000 Feet Source: USGS Quadrangle;Lynn.IMA Site Location, Map Figure 1