Loading...
1 VICTORY ROAD - BUILDING INSPECTION 1 V1�toR�t ROAD supe0wmrTab® wFdAvS 90%Larger Label Area ••" //d s M E A KEEPING YOU ORGANIZED No. 10301 PATENT PENDM (S^}JSUSTNNABIE FIPLRBCYQID �f Pe1VervF CMTElfrlQ% - owr a POST4mY5 m��.�6ii" MADE IN USA GET ORGANIZED AT SMEAD.COM City of Salem, Massachusetts Inspectional Services 120 Washington St,3rd Floor Salem,MA 01970 Tel.(978)745-9595 x5641 Fax.(978)740-9846 Kimberley Driscoll Thomas J. St. Mayor Inspection Report Pierre . Director Address : 1 VICTORY ROAD Apt: Permit Number B-16-1125 Inspection Type : Building (2/11.5/20117 10:59:34 AM ) Inspector : Harry Wagg Inspection Description Status Comment Final Pass Final okay. Affidavit on file. HW Official Name: hwagg Richard B. Gordon, P.E. P.O. Box 264•Farmville•VA 23901 Ph:434.315.5759.E-mall: grichardpe@aol.com September 28,2016 Salem Building Department Salem,MA Re: Solar Panels Roof Structural Framing Support To Whom It May Concent: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure, roof loading,and proposed site location of installation: 1. Existing roof framing: Conventional framing is 2x6 at 16"o.c.with 9'•6"span(horizontal rafter projection). This existing structure is definitely capable to support all of the loads that are Indicated below for this photovoltaic project 2. Roof Loading • 4.33 psf dead load(modules plus all mounting hardware) • 30 psf snow live load(50 psf ground snow live load reference) • 4.5 psf dead load roof materials • Exposure Category B, 105 mph wind uplift live load of 16.29 psf(wind resistance) 3. Address of Proposed Installation: Residence of David Richard.l Victory Rd.Salem,MA This Installation design will be in general conformance to the manufacturer's specifications,and is in compliance with all applicable laws,codes,and ordinances,and specifically,International Residential Code/IRC 2009. The spacing and fastening of the mounting brackets is to have a maximum of 64"o.c.span between mounting brackets and secured using 5116" diameter corrosive resistant steel lag bolts. In order to evenly distribute the load across the roof rakers,there shall be a minimum of 2 mounting brackets per rafter&min.3"penetration of lag bolt per bracket,which Is adequate to resist all 105 mph wind live loads including wind shear. Very truly yours, t OF • r�� gss9cy . Richard B.Gordon,P.E. o Massachusetts P.E.License No.49993 RMHARO e. m. MECHANICAL ENGINEERING o GORDON CIVIL ENGINEERING u MECHANICAL y. NO.49993 ELECTRICAL ENGINEERING 9�G/sTEP�o ` ' SS/ONALG` Richard B. Gordon, P.E. P.O. Box 264eFarmvllle.VA 23901 Ph: 434.315.5759.E-mail: grichardpe@aol.com November 10, 2016 Salem Building Department Salem, MA Re: Solar Electric Panels Installation To Whom It May Concern: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. The Solar Photovoltaic System installed at the residence of David Richard, 1 Victory Rd. Salem, MA 01970 is installed as per manufacturer's requirements-specifications, and is in compliance with all applicable laws, codes, and ordinances, and specifically, International Residential Code/IRC 2009 and with Massachusetts Amendments, 2014 NEC, and 2012 ICC Energy Code, and will perform as designed. All penetrations and racking are accomplished per town approved-released drawings and roof is adequate to hold the modules/solar system. 1 certify that theabove.solar Panel installation complies with all applicable codes, manufacturers' specifications:and desian load and is acceptable for final approval. The roof,structure is capable of supporting the new loads imposed by the installed panels and snow. Very truly yours, .� Z - OH OFA14 n Richard B. Gordon, P.E. yea RICHARD B, Massachusetts P.E. License No. 49993 o GORDON CIVIL MECHANCIAL & ELECTRICAL ENGINEERING u My O.4 49993999; CIVIL, � NNO. ��rON�1L ENv\ l~or n Harry Wagg From: Evan Marot <evan.marot@trinitysolarsystems.com> Sent: Wednesday, February 15, 2017 10:42 AM To: Harry Wagg Subject: Final Affidavit for 1 Victory Rd Attachments: 1 Victory Rd Engineer Letter.pdf, David Richard 1 Victory Rd.pdf Hi again David, Attached here you will find the Final Affidavit and the Engineer's Letter for 1 Victory Rd. As discussed, please send me the note verifiying job sign-off/ completion, thanks! Evan Evan Marot I Office Administrator I Trinity Solar I IT:(508)291-0007 Ext. 1210 IF:(508)291-00401 E:evan.marotnatrinity-solar coin West Wareham Location:20 Patterson Brook Road,Unit I I West Wareham,MA 02576 1 MA,Master Electric Contractor#21233A I MA,Home Improvement Contractor# 170355 For o th er jurisdictions,please visit:htto://www.trinity-solar.cmn/about-us/loeations-and-licenses 1 e SOLAR IRS Circular 230 Disclaimer:To ensure compliance with requirements imposed by the IRS,we inform you that any U.S.federal tax advice contained in this communication(including any attachments)is not intended m written to be used,and cannot be used,for the purpose of(i)avoiding penalties under the Internal Revenue Code,or(ii)promoting,marketing or recommending to another party any transaction or matter addressed herein. INFORMATION CONTAINED IN THIS E-MAIL TRANSMISSION IS PRIVILEGED AND CONFIDENTIAL.IF YOU ARE NOT THE INTENDED RECIPIENT OF THIS EMAIL,DO NOT READ,DISTRIBUTE OR REPRODUCE THIS TRANSMISSION(INCLUDING ANY ATTACHMENTS).IF YOU HAVE RECEIVED THIS E-MAIL IN ERROR,PLEASE IMMEDIATELY NOTIFY THE SENDER BY TELEPHONE OR EMAIL REPLY. 1