Loading...
4 TECHNOLOGY WAY - US BIO - BUILDING INSPECTION t y�cti.iolao,y L rperTab® 90%Larger Label Area o•w�.a SMEAD KEEPING YOU ORGANIZED No.1W01 arra 111010 Is WA GETORGANIZEDATSMEAD.COM MM.mcvmcpwlwr AM 1OSPMT 6 zap" A&1 Realty Trust ■ PO Box 2027 ■ Salam MA 01970-6227 . 781-593" July 7, 2004 Conservation Commission City Of Salem 120 Washington St Salem, MA 01970 re: 4 Technology Way Dear Commission Members, We are the holders of the property at 56 Swampscott Road, Salem MA(Map 7 lot 64), that abuts along a line, the applicants property at 4 Technology Way, currently under permit review. We have some issues concerning the property located at 4 Technology Way and we have decided to bring these issues forward now. During Farfard's clearing & grading of the industrial park, they had brought the buildable portion of their property, to the same elevation as the rear of our property (see Photo 1). We understand, for your reasons, you required that water run off from 4 Technology Way be routed through the storm drain system at Technology Way. We concur as we do not want their water run off entering our property either. We assume that is why Farfard had then raised the topography of their lot. They did so by delivering a large amount of soil and spreading it out over their property in order to grade their topography to a considerably higher elevation where their property abuts ours. You may not be aware that, in doing so, Farfard had spread some of this soil over the stone boundary that had remained after their first grading (see Photo 2). This stone boundary, now covered, had continued along the same line as a fieldstone boundary that delimits their property from ours. We state that, we reserve the right that if and when alterations are to be made to our topography, they would be in a manner acceptable to us and at a time of our choosing. We are displeased that Farfard had altered this, though small, portion our topography, regardless of their intentions in this act. Second, since Farfard had raised their topography above ours, no retaining wall had been placed against the edge of this higher elevation of soil (see Photo 2 again)which is technically required. Without a wall in place, their soil will spread further onto our property from the compressing and squeezing out of the soil caused by the motion of construction equipment during future construction, and from the continuous changing weight distribution of the future parking lot along that edge, and also from weathering against that open edge. All of the above will result in an erosion and a lessening of the current slope of the grade along this edge of their property, which may also be of concern to you. AWBUTTERN7-727 Ultimately we seek correction of these conditions as follows: 1) The removal of the soil that currently extends onto our property. 2) The construction of a wall, on their property, to retain their soil. We would assume that customarily, the seller being the cause of, would be responsible for, regardless of any potential buyer, and in this situation, the most skilled and able to make these corrections; would offer to make these corrections prior to the property's sale, so as not to hinder a buyer's efforts. Though now that the seller and buyer are under agreement, they could re-negotiate their terms to include these corrections, we hope, amicably, and swiftly, if they have not already done so. So, for the present: We ask that the buyer & seller determine which party will be responsible to make these corrections. We ask for the party assuming these corrections to provide us with a written agreement stating that the corrections will be made within two years, or prior to further development, whichever occurs first; in lieu of immediate correction. We_ack.fnr the City Of Salem to attach a proviso onto the building permit requiring that these corrections are to be made prior to further development, and that they provide us with the written agreement to correct, stated above. We pray that the City Of Salem will consider our requests and concur with us. Sincerely, George J. Corso, Managing Trustee cc: City Of Salem Planning Board, 120 Washington St, Salem NIA 01970 A&AABUTTER6V-727 - l $ _ Y - r Photo of i iLot 64(left), and the property at Technology ,ra F . ,S r A, ? ' �br 40 *, r Photo 2. View of the boundary between Lot 64(left), and the property at 4 Technology Way(right), after raising the topography of 4 Technology Way. ABMBUTTERS17-727 I MW CITY OF SALEM, MASSACHUSETTS BOARD OF APPS AL KIMBERLEY DRISCOLL 120 WASHINGTON STREET♦ SALEM,MASSACHUSEM 01970 _4 A 2b - 9595 TELE:978-745- 4 FAX:978-740-9846 MAYOR FILE # CITY G6f�, 8I+LfM.MASS. February 4, 2015 Decision City of Salem Board of Appeals 'petipetition Of JUDYLYNN MONACO seeking a Special Permit per Sec. 3.1 Principal Uses, to operate a medical tion for r a portion of the property located at 4 TECHNOLOGY WAY (Map 7, Lot 79) (BPD Zoning District). A public hearing on the above Petition was opened on January 21, 2015 pursuant to M.G.L Ch. 40A, The hearing was closed on that date with the following Salem Board of Appeals mem Curran (Chair),Mr. Duffy,Mr. Watkins,Mr. Copelas,Mr. Tsitsinos (alternate). bets present: Ms. The Petitioner seeks a Special permit Ordinance. from the Provisions of Sec. 3.1 Principal Uses of the Salem Zoning Statements of fact: 1. In the petition date-stamped December 29, 2014, the Petitioner requested a Special permit to allow the use of a medical clinic for a portion of the property located at 4 Technology Way. 2• Ms.Joanne O' Connell, architect with NEMD Architects, Inc. of Providence,Rhode Island presented the petition on behalf s. the applicant Davita Healthcare Partners. The petitioner,Judylynn Monaco, Project manager and Ms.Julie Higgins Van Sickle, facility administrator for Davita Healthcare Services regional office located in Salem,MA were also present. 3. The petitioner,Davita Healthcare Partners is requesting a Special Permit per.Sec. 3.1 Principal Uses to operate a medical clinic in a portion of property located at 4 Technology Way. 4. The current use of 4 Technology Way is research, technology and general office space. 5. The proposed medical clinic is a dialysis center that would provide services patients per day and staff thirty-two (32) employees per day, to approximately 66-88 6. The current facility located at 10 Colonial Road in Salem does not meet current service demand. Therefore the company is seeking the possibility of relocation to 4 Technology Way. 7. The proposed hours of operation of the dialysis clinic are from 5am to 8pm. 8. Approximately 22 patients would access the site independently by car or by ambulance services in three shifts per day starting at Gam, l lam,and 4pm. 9. The facility will also have 1-2 deliveries made per week by a tractor trailer. 10. There are a total of ninety-five (95) parking spaces for the entire shared facility. The handicapped center,while the remaining parking Options for spaces that are located closest to the proposed clinic entrance would be designated for the dialysis patients and employees will be first come first serve. 11. The requested relief, if granted, would allow the Petitioner to the property at 4 Technology Way. operate a medical clinic for a portion of City of Salem Board ofA February4,2015 Appeals Project: 4 Technology Way Page 2 of 2 12. A petition in opposition was submitted as part of the records for this petition. 13. At the public hearin Opposition to g no (0) members of the public spoke in favor o£and five 5 the petition. The opposition was generally on the grounds that the conflict with the industrial ark ( ) members spoke in The Salem Board of Appeals, P proposed use was in after thorough review of ahs, after careful consideration of the evidence presented at the the petition, ding the application narrative and Public hearing, and Presentation and public testimony, makes the following � Provisions of the City of Salem ZoningOr pis' and the Petitioner s Ordinance gs that the Proposed project meets the Findings for Special Permit The Board expressed its Therefore co understanding that Technology spay was created as commercial and retail based uses present conflicts with the existing an industrial park. uses in this building and industrial park area. In particular, the found to be in co ting and future industrial conflict with other uses in the buil Proposed P Park a hen client Enda that this use is inconsistent with and industrial traffic was park specifically: the existing uses and in Park area. The Board therefore CO�het with the current industrial 2.1• The socia], economic and community needs would be served by the proposal. this Traffic flow and safety,including Parking and loading as proposed and discussed are inadequate this location. 3• The utilities q ate for and other public services are adequate. 4• There are no impacts on the natural environment including drainage as no additional cons Proposed. 5. A medical clinic, as ro construction is 6. The potential fiscal Proposed,is inconsistent and incompatible with current uses at impact,including impact on the City's tax base and employmenttins location. positive. On the basis of the above statements of facts and findings, would be favor and five (5) opposed (Rebecca C the Salem Board of Appeals Tsitsinos), to grant a S ecial Pe on'Peter A. Co elas Watkivoted none (0)in P rnrit, to allow the operation of a medical c��Tom Watkins and Jy�y THE PETITION IS DENIED. hntc located at 4 Technology Way, 19 cc jeecca—Curran' Chair ��ard of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK -*peal from this deanon,if any,sha!!be made panwwt to Section 17 0 dy's o,f f:(ixg of thu decinon in the offrre of the Ci C .Jthe Massarbarettr ap Special Femrit granted berein shall not take xH by a PHrsH°°t to the MarrachHretts Generalllamr Chapter¢0 q, and shall be filed untbin 20 Registry of Deeds. py of The deciriox bearing the rertifirate a the wCi Cb ter 40A Section >7, the Variance or ./ ry Clerk has been filed xath the Essex Smsb 4s 810 t tP ,y' accmGr - x � Nehmacta � Y � 16 Crystal Street, Melrose, MA 02176 781-662-3498 ((ax)781-662-8389 fiddRepolt To: Tom St.Pierre CC: Peter Varone From: Dan DiLullo Date: May 18,2012 Re: US Biological We have been at the site repeatedly over the last 3 months and,to be blunt,work was proceeding very slowly until the past month beginning in early April. In that 4 to 6 week period a lot of the cosmetic work has been substantially completed. That work includes: • Interior painting • Vinyl tile flooring • Suspended ceiling installation • Installation of carpet tiles in most areas • Ceramic tile floors in toilets and janitor closets • Installation of toilet fixtures and accessories • Installation of electrical devices and fixtures with completed wiring • Completion of fire alarm and life safety equipment • Installation of welded stair rails at egress stairs Work in process for this report: • Continuation of glass rail installation at front stair and atrium(bases and clips are in place) • Enclosure and completion of egress stairs • Installation of porcelain tile in main lobby • Installation of vinyl base at vinyl tiled and carpeted floors • Installation of interior glass walls,windows and doors Also substantially complete: • HVAC systems (currently operating in all"occupied"areas of the building. • Elevator(inspection scheduled the week of May 21-25) • Emergency generator installation(equipment in place—wiring in process) Major materials on site • Owner equipment • Doors and frames The exterior of the building is complete with the exception of 2 broken windows and some door hardware replacement. May 18, 2012 In the original design of the building US Biological was proposing to occupy 60%of the first floor and 50%of the second floor. Those percentages have remained thru the construction but the layouts have changed,mostly by field changes co-ordinated by the Owner,his interior designer,our firm and the MEP engineers. There is currently some discussion about modifying the back area of the building by installing a floor over the existing atrium and developing tenant spaces. We are encouraging the Owner to allow us to further study of that back area while we assess the changes required(architectural,structural and mechanical)to incorporate any such modifications. We feel strongly that the US Bio portions of the building should be completed and occupied prior to any work being done in the back. The only work in process is the enclosure of the back egress stair as required by Code. Although we are not responsible for it we offer the following regarding site work. The site is still in some state of disarray but,as we understand it,is getting closer to completion. The Owner has engaged the services of Alliance Engineering from Saugus to survey the site,the utilities as installed,the drainage and grading. Alliance has the list of concerns form the Conservation Commission,the Planning Department and DPW. He is addressing those areas of interest to them including: • Existing site grading and pavements will be modified as required to ensure slope to drainage structures • The site drainage and structures will be surveyed and modified(if required)to ensure proper drainage to the detention basin • The slope on the left side of the site will be designed as a sloped stone revetment to safely hold the bank(the wall has been designed and submitted to Dave Knowlton and written permission from the abutter is in hand) • The street repair and catch basin at the comer of Technology Way and Swampscott Rd has been designed and submitted to Dave Knowlton,he has made some continents which will be incorporated. • The final parking layout has been determined(at a meeting with me,Danielle McKnight and Tom Devine) and will be incorporated in"as built'site plan. • Grades and final configuration of sidewalks and HC ramps as shown on the approved site plans. The interior work being performed appears to be in substantial compliance with the contract documents and in accordance with the Code requirements. If the work proceeds at the current pace we anticipate we will be prepared to issue Final Affidavits by the end of the this month. Dan DiLullo 2 Certificate No: 922-11 Building Permit No.: 922-11 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Permits This is to Certify that the BUSINESS located at ----------------------------------------------------- Dwelling Type TECHNOLOGY WAY in the CITY OF SALEM ---------------------------------------------------------------------- -------------------------- ------------- --- - -------- ---- - Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY OCCUPANCY PERMIT FOR(2 NEW STORY OFFICE BUILDING) This permit is granted in conformity with the Statutes and ordinances relating thereto, and expires unless sooner suspended or revoked. Expiration Date --i-------------------------------------- ---- Issued On:Thu Apr 25,2013 --- -- --- GeoTMS®2013 Des Lauriers Municipal Solutions,Inc f i TECHNOLOGY WAY 922-11 PIS# 15s93 COMMONWEALTH OF MASSACHUSETTS Map. ' T 07 Block a v uil. ;I ;e. CITY OF SALEM Lot ; 0087 Category '�4; New Commerwal Buil` P rmt#. ,�` 922 11 : ri.0 �. BUILDING PERMIT Ptolect#ua,'_n;� JS-2012-000236 Est. Cost: $1,647,300.00 Fee Charged:!, $0.00 Balance Due $ oo aa� PERMISSION IS HEREBY GRANTED TO: Const Class "1 a Contractor: License: Expires: Use Group: 0-1 ,I'll Dan DiLullo Construction Control-6033 LotSlze(sq ft.) i'i ih . ,�I¢ Til Zoinng Owner: U S Biological Units Gamed �F ;n ,iApplieant: Da DiLullo Un is Lost: AT: TECHNO OGY WAY Dig Safe#: � ISSUED ON 02-Aug-2011 AM NDED N. `��EX 1IRE ON. 02-Jan-2 12 TO PERFORM THE FOLLO&ING W RK NEW(2) STORY OFFICE BUILDING/43,000 SF PER OR BLDG TO7fNGj -ENG FRED STEEL. G ERAL OFFICE SPACE AND LABORATO SPACE REASON FOR DELAY WOR A ITIONAL INF ATIONjbh (CHECK FOR PERMIT WAS AL Y DEPOSITED FOR$18,125.33 POST T ISCARD SOITISVISIBLEF HE STREET Electric Gas Plumbing Building Underground: Undergr und: Underground: Excav mn: Service: Meter: `,� Footings: Rough: Rough: Rough: Foundation: Final: Final: F' Rough Frame: Fireplace/Chimney: D.P.W. Fire Health Insulation: Meter: Oil: Final: House# Smoke: Water: Alarm: Assessor Treasury: Sewer: Sprinklers: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: Fee Type: Receipt No: Date Paid: Check No: Amount: BUILDING REC-2012-000260 02-Aug-11 x $0.00 I;GeoTMS@ 2013 Des Lauriers Municipal Solutions,Inc. t i CITY OF SALEM ROUTING SLIP New Construction Certificate of Occupannccy LOCATION t'I l�GDATE ASSESSOR DATE L\ 13 93 Washingto t. CITY CLER E 4 -2 -J 3 93 Washington StAil C [120 LIC SERVICES ATE Washin to St. — ER DATE Washington St.SS CONNECTIONDATEferson Ave PLANNING DATE Z i 120 Washington St--. CONSERVATION ATE J (� 120 Washington St. _ ELECTRICAL DATE 48 Lafayette St. FIRE PREVENTION DATE 29 Fort Avenue HEALTH L DATE 13 120 Washington66 BUILDING INSPECTOR ATE S 120 Washington St. CITY OF SALEM, MASSACHUSETTS f BUILDING DEPARTMENT t 120 WASHINGTON STREET,3RD FLOOR TEL. (978) 745-9595 FAx(978) 740-9846 KIMBERLEY DRISCOLL MAYOR TrIoMAs ST.PIERRE DIRECTOR OF PUBLIC PROPERTY/BUILDING COMNBSSIONER Daniel Dillulo 16 Chrystal Street Melrose Ma. 02176 Re. U.S Bio- Technology Way Dear Mr. Dilullo, Per the Construction Control Affadavit, submitted by you and dated June 12,2011, you stated in part the following. "I shall submit periodically, in a form acceptable to the building official, progress reports together with pertinent comments". To date, seven months later, this office has received no reports, no communications or correspondence from your office. Work has proceeded to a point where mechanicals are being installed and walls are being covered without any inspections by this office. It has further come to our attention, subsequent to Planning Board and Con-Com approvals, that no Civil Engineer has been involved in the actual construction of this project . I am writing this letter to try to correct problems now rather than wait until the end of the project. I look forward to a response from you and your plan going forward . Sincerely, C'.mqz�, Thomas St.Pierre Director of Inspectional Services/Building Commissioner ZADE ZADE ASSOCIATES, LLC Consulting Engineers Mohammed Zade Ph.D., P.E. 140 Beach St., Boston,MA 02111 Muzaffer Muctehitzade M.Sc.,RE Phone: (617)338-4406 Fax: (617)451-2540 Email ZadeCo(cbAOL.com HVAC FINAL AFFIDAVIT To the Inspectional Services Commissioner: I certify that I, or my authorized representative, have inspected the work associated with Permit No. , dated, Locus_, U.S. Biological, Technology Way, Salem, MA Ward, on several occasions during construction, and that to the best of my knowledge, information and belief, the work has been done in conformance with the permit and plans approved by the Inspectional Services Department with the provisions of the Massachusetts State Building Code and all other pertinent laws, rules, regulations and ordinances. I also certify that, with the completion of the work per the approved plans and provisions, to the best of my knowledge and belief, the building is ready for occupancy. Mohammed Zade 27233 2t ASN Of bfq�r Engineer Mass Reg. No. Signature 9= \ Zade Associates, LLC o MoZApMEo No. 27233 140 Beach Street, Boston, MA 02111 Oct 18: 2012 /? Address Date �� �ECittr ,``Q/, Then personally appeared the above named Mohammed Zade, and made oath that the above statements by them are true. —� Before me, _I J Q 120 1 L M S; ?'^ NOTARY PUBLIC DATE SIGNED Br v x = My commission expires: 21 2014 r 1F„y2!IlPlil`P�• USS-'logical Packing List Date Order# reducing the cost of research 11/01/2012 108904 Bill To: Ship To: Cosmo Genetech Co., Ltd. Cosmo Genetech Co., Ltd. 7FI, Jeil B/D, 275-16 SeongSu 2G 7FI, Jail B/D, 275-16 SeongSu 2G SeongDong-Gu Seo, 133-831 Korea SeongDong-Gu Seo, 133-831 Korea Customer Salesperson Department Ship Method Terms US0231 Simon, Katie Customer's Acct. Net 30 Catalog No Product Name Size Qty Ship 8/0 Lot No Control No "For in-vitro laboratory use only". Biochemicals/Molecular biology-3822.00-2019 Antibodies-3002.10-909 /FED EX 4652-9134-6/email: overseas@cosmogenetech.com I certify that the goods referenced on this invoice comply with the originrequirements specified for goods manufactured in the United States and that further processing or assembly in a third country has not occurred subsequent to processing or assembly in the United States. Steve Kim Tel:+82-2-922-7307 We appreciate your business. Thanks! See www.usbio.net for specifications on over 20,000 products #Boxes Wt Blue Ice Dry Ice Tracking# Date Packed Checked United States Biological• PO Box 261 • Swampscott MA 01907 Tel: 800-520-3011 • Fax: 781-639-1768 • chemicals@usbio.net • www.usbio.net ZADE ZADE ASSOCIATES,LLC Consulting Engineers Mohammed Zade Ph.D., P.E. 140 Beach St.,Boston, MA 02111 Muzaffer Muctehitzade M.Sc.,P.E Phone: (617)338-4406 Fax: (617)451-2540 Email: ZadeCo@AOL.com PLUMBING FINAL AFFIDAVIT To the Inspectional Services Commissioner: I certify that I, or my authorized representative, have inspected the work associated with Permit No. dated, Locus_, U.S. Biological, Technology Way, Salem, MA Ward, on several occasions during construction, and that to the best of my knowledge, information and belief, the work has been done in conformance with the permit and plans approved by the Inspectional Services Department with the provisions of the Massachusetts State Building Code and all other pertinent laws, rules, regulations and ordinances. I also certify that, with the completion of the work per the approved plans and provisions, to the best of my knowledge and belief, the building is ready for occupancy. Mohammed Zade 27233 � e Engineer Mass Reg. No. Signatu a Z MOHAMMED Zade Associates, LLC NO- 27233 140 Beach Street, Boston, MA 02111 Oct 18. 2012 w ?Fclsr,n"�,✓ 1,; Address Date Then personally appeared the above named Mohammed Zade, and made oath that the above statements by them are true. Before me, 20( L F, NOTARY PUBLIC DATE SIGNED, 1 . My commission expires: x ,gy l� r aislsR'��r, us logical Packing List Date Order# reducing the cost of research 11/02/2012 108924 k Bill To: }n Ship To: Johns Hopkins Enterprise ! J Johns Hopkins University Email:crada@jhmi.edu j Attn: F..Belmonte, Mole & Comp athdf 733 N. Broadway, MRB Building, Rm 811 Baltimore, MD 21205 USA Customer Salesperson Department Ship Method Terms MC Simon, Katie FedEx St ON MCNISA . Catalog No Product Name Size Qty Ship BAD Lot No Control No A3340-35 Arg,SH3/SH2,Pab RbxMo 200ul 1 Blue Ice P4090 Picante Sauce,Original 16 oz 1 200/Mary Rada 443 287 2953 crada@jhmi.edu We appreciate your business. Thanks! See www.usbio.net for specifications on over 20,000 products #Boxes Wt Blue Ice Dry Ice Tracking# Date Packed Checked ` United States Biological • PO Box 261 • Swampscott, MA 01907 Tel: 800-520-3011 • Fax: 781-639-1768 • chemicals@usbio.net • www.usbio.net ZADE ZADE ASSOCIATES, LLC ' Consulting Engineers Mohammed Zade Ph.D.,P.E. 140 Beach St.,Boston,MA 02111 Muzaffer Muctehitzade M.Sc.,P.E Phone: (617)338-4406 Fax: (617)451-2540 Email: ZadeCo@AOL.com FIRE ALARM FINAL AFFIDAVIT To the Inspectional Services Commissioner: I certify that I, or my authorized representative, have inspected the work associated with Permit No. , dated, locus,_ U.S. Biological, Technology Way, Salem, MA Ward, on several occasions during construction, and that to the best of my knowledge, information and belief, the work has been done in conformance with the permit and plans approved by the Inspectional Services Department with the provisions of the Massachusetts State Building Code and all other pertinent laws, rules, regulations and ordinances. I also certify that, with the completion of the work per the approved plans and provisions, to the best of my knowledge and belief, the building is ready for occupancy. Muzaffer Muctehitzade 32579 �1 $ Engineer Mass Reg. No. Signat MuzavrEe a .� MUCTEHITZADE ELECTRICAL Zade Associates, LLC No.32s7s��� ' 140 Beach Street, Boston, MA 02111 Oct 18, 2012 �oI�eE'�/���� .?,. Address Date NA Then personally appeared the above named Muzaffer Muctehitzade, and made oath that the above statements by them are true. Before me, p\��UrTFr/j y�Fj� rt � C^ '�, 17n� /�/� •.; , 1 4l.. ,�� L.yI I ,24� z- x LLQ•�� 0'�+9y yr1 NOTARY PUBLIC' DATE SIGNED My commission expires: o;y ti psi S'tfp•�,Y PUB�'i4'OQ \`�i� It 20L+ i ZADE 4 ZADE ASSOCIATES,LLC Consulting Engineers Mohammed Zade Ph.D.,P.E. 140 Beach St.,Boston,MA 02111 Muzaffer Muctehitzade M.Sc.,P.E Phone: (617)338-4406 Fax: (617)451-2540 Email: ZadeCo@AOL.com FIRE PROTECTION FINAL AFFIDAVIT To the Inspectional Services Commissioner: I certify that I, or my authorized representative, have inspected the work associated with Permit No. dated, locus_ U.S. Biological; Technology Way, Salem, MA Ward, on several occasions during construction, and that to the best of my knowledge, information and belief, the work has been done in conformance with the permit and plans approved. by the Inspectional Services Department with the provisions of the Massachusetts State Building Code and all other pertinent laws, rules, regulations and ordinances. I also certify that, with the completion of the work per the approved plans and provisions, to the best of my knowledge and belief, the building is ready for occupancy. Muzaffer Muctehitzade 39362if at;H c,r M'a Engineer Mass Reg. No. Signatu Zade Associates L.L.C. 140 Beach Street, Boston, MA 02111 Oct 18, 2012 Address Date vs� Then personally appeared the above named Muzaffer Muctehitzade, and made oath that the above statements by them are true. Before me, C NOTARY PUBLIC U DATE SIGNED My commission expires: b e United States Biological Corporation P.O. Box 261 Invoice Swampscott, MA 01907-2208 USA 781.639.5092 Fax: 781.639.1768 11/1/12 109493 URL: www.usbio.net University Of California San Diego University Of California San Diego Email: pilluslab@biomail:ucsd.edu Pillus Lab, Pacific Hall 2115 9500 Gilman Drive La Jolla, CA 92093-0347 VISA Simon, Katie UPS Ground MCNISA P3306 Peptone Y 500g 2 69 138.00 P4090 Picante Sauce, Original 16 oz 1 .00 P A I D NOV 0 2 2011 Pillus Lab 858 822 2443 . . - 138.00 pilluslab@biomail.ucsd.edu .00 in stock All states are responsible to pay directly,except MA Sales Tax.Thank you for your order! BEEN= ,; �,� 1900. I it.S>:'1 157.00 ZADE ZADE ASSOCIATES, LLC Consulting Engineers Mohammed Zade Ph.D., P.E. 140 Beach St.,Boston, MA 02111 Muzaffer Muctehitzade M.Sc., P.E Phone: (617)338-4406 Fax: (617)451-2540 Email: ZadeCo P_AOL.com ELECTRICAL FINAL AFFIDAVIT To the Inspectional Services Commissioner: I certify that I, or my authorized representative, have inspected the work associated with Permit No. '`" , dated, locus,_ U.S. Biological, Technology Way, Salem, MA Ward, on ' several occasions during construction, and that to the best of my knowledge, information and belief, the work has been done in conformance with the permit and plans approved by the Inspectional Services Department with the provisions of the Massachusetts State Building Code and all other pertinent laws, rules, regulations and ordinances. I also certify that, with the completion of the work per the approved plans and provisions, to the best of my knowledge and belief, the building is ready for occupancy. Muzaffer Muctehitzade 32579Ljacc � uzaErEe ``'. Engineer Mass Reg. No. Signat _� MUCTEHITZADE s ELECTRICAL Zade Associates, LLC No a27 140 Beach Street, Boston, MA 02111 Oct 18. 2012 ° Address Date �`sSfONAIfa:'s'`cs" Then personally appeared the above named Muzaffer Muctehitzade, and made oath that the above statements by them are true. Before me, 4�K '��G%!�teGn`�,e�acf�� r-� 120 2 NOTARY PUBLIC DATE SIGNED c•- My commission expires: F 4 A le.6 2( I 2014 "�"[(1tfJt111i4A1\R United States Biological Corporation P.O. Box 261 Invoice Swampscott, MA 01907-2208 USA 781.639.5092 Fax: 781.639.1768 7-117/1717-77109494 URL: www.usbio.net NIH NIH-NCI Department Email: whitetr@mail.nih.gov Attn: Shifand Dai, Building 37 9000 Rockville Pike, Room 6066 Bethesda, MD 20892 tw13-006305 on, Katie UPS Ground MCNISA ..- • E • F5050 Fluoroorotic Acid 10g 1 199 199.00 P4090-10 Picante Sauce, XXX-Rated 16 oz 1 .00 P A I D NOV 0 2 2012 Tracy White 301 496 3771 - • • 199.00 • whitetr@mail.nih.gov .00 in stock All states are responsible to pay directly, except MA Sales Tax.Thank you for your order! . , , • 17.00 216.00 SENDER: COMPLETETHIS S ON COMPLETE THIS SECTION ON DELIVERY ■ Complete items 1,2,and 3.Also complete A. Signature item 4 if Restricted Delivery is desired. 11Agent ■ Print your name and address on the reverse X (- ❑Addressee so that we can return the card tO you. B. Received by(Printed Name) I I C. Date of Delivery ■ Attach this card to the back of the mailpiece, . or on the front If space permits. D. Is delivery address different from item 17 ❑Yes 1. Article Addressed to: If-YES,-enter delivery address below: ❑ No 0 Serviceryp�t7`i G�.Cerbfled NI�iY O Express Mail �oReglstered ❑Return Receipt for Merchandise ❑ Insured Mail ❑C.O.D. 4. Restricted Delivery?(Extra Fee) ❑Yes 2. Article Number (Transfer from service label) PS Form 3811,February 2004 Domestic Return Receipt 102595-02-M-1540 UNITED STATES POSTAL 1A 3• Z • Sender: Please print your name, address, and ZIP+4 in this box City Of Salem Bulding Department 120 Washington Street SC,alen-,, '\AA 01970 I . g213 212 °214 °215 ° 216 °211 N °217 X210 °218 J 9 C-1 tlW °219 V 28 O� } °2U8 °220 .230 NF 4127 207 2 °207 Npp ' / °221 Rx pp' �'d CB °126 CB RIM=75.19 12" CPP/F] INV=72.4 °2C81 °222 0 °125 INV=72.9 °20 RIM=91.23 229 ° .04 INV=88.2(IN) °223 Btm. of INV=87.9(OUT) 02\ Concrete Structur DETENTION N Q2 3 El=71.83 Grass r F 228 -BASIN ° °224 °227 10/ \ ' %�i wUA 4t MAP 7 LOT 79 . 226 JF i qi Wood25 0/ \ i //X 1 is CPP 206,743 sq.ft n / p X 1 '11 v ° _ _ 9 Bit. Conc. o Guardrail o �;/ J , Inv=76.4 23 4.75 acres i / 200 00 p / Parking _O B , � � 2 ' '/ /i �/ Emergency Spillway °12 ro ,g3-t3\1 : "Conc. o �Q rm \ a ° C\� ��°'' /��/' Crushed / / 18"CPP 121 N ° \ e /�.i / /� Stone // In v=71i 5 o,,3 / �/� i/// 120 / O aI RIMy91.95 - ,� 1�1�� /�/i' / I o _`!°�' cyj I19 ilP1V=86.O(IN) 1 Vim' ( ( ( grus e \ .6 INV=85.7(OUT) X11 \\�\ ,�� '1. Sts 10U Concrete , 1 - /- O F 12 CPP �cl\6; , �� / Loading - o \90\ \ : A Dock Inv--81.7 ' ° 101 C ` �i Rip-Rap100' BUFFER E1-94.35 D102crRIM=92.02NeI-94.28 _ _ INV=84.0 ° 03 m c`^6 12 CPP 9 114 °'"104 \ \ p / l� ��\ \ Inv=80.4 5 97 Roof 1+ :gear `�_ / I J /( ° 106 i CB3 ° O / Drain \Gon // \ 1\ RIM=92.99 r; l y / \ \ DMH1 ° 11 5. 00 Q Trench (Typical) U \ \ 0 107 0- Drain 5 INV=89.9 DMI u \ RIM=90.33 \ Rim=90.21 ;., �, I cp \ \ \ INV-84.5 1N FROM CB) 2 Inv=89.5 / \\ o.�c o I \ INV=8.�1�f� FROM DMf/dt CB8 4 X\ DINV=83: 0 / i � BUILDING � ° RIM=84.44 CO INV=80.8(IN) w\, ° Concrete U.S.BIO INV=80.9(OUT) Bumpers 0 oof ppk a�cA / Drain O,. ho \ PI (TypLool) / Gp, \I ' ��\\�� o �j 0 , / ea Trench /' / �\ , \\ \ 7� m i � e��oQ RIM= � ' O - I Drain coe o Q / / Grags\�_ \ l Om, CO � , Grori IN 6 eta . \Cd Rim=92.28 to - / . o -) 1 \\ / / 0 p Inv--91.6 �� i / 03 , I \ G D S 0 Bit. Co c. l / \� y- pw Parkng 9 0 o, R=230.03 i oncrete t � •o � > Lo ding .a� G`�t ; l/ / �; �` Ac L=87.41' �\, �, o k moo• ewe t��P // / / /" 11 / n - - - �:. ` of a �/ i /� Rip-Rap O S �. Concrete o� G°c %� i / ' , / / orae DMH5 Retaining ,t. Conc. {' Bumper / / //H' RIM=80.61 .Wall � P rking � � �. --- ,�., O � Gras�e% � __ -_ INV=74.5 . Pipe / y� / /'�� ® '\ S62'41'08"W 9 B lard RIM=90.81 ' 9` wv/ ' , ypi al) \ O / /� 7 275.86 INV=84.3(IN) N5100'43"W \ ��D D ( � �cl INV=84.1(OUT) . 28 14' ` MFP, � G DMH4 \\ \® o RIM=94.41 O m LEGEND Nv=87.s Pipe Bollard i Y wV N WATER GATE (Typical) 77 .1 Granite Sloped GG GAS GATE Edging DMH3 HYDRANT INV=85.8(IN FROM DMH4) CB CATCH BASIN INV=86.6(IN FROM CB) 13 ® DRAIN MANHOLE CB5 INV=85.7(OUT) AS-BUILT PLAN E00H ELECTRIC MANHOLE4 TECHNOLOGY WAY RIM=91.62 Os SEWER MANHOLE wv=Ss.4 SALEM, MASSACHUSETTS -II- SIGN ®H ELECTRIC HANDHOLE Prepared B P y 0 CLEANOUT � `aOf LeBlanc Survey Associates, inc. FLOW ARROW o161 Holten Street � Rs TREEBea Danvers, MA 01923 LIGHT POLE plp•3�3N �' (978) 774-6012 PROPERTY LINE - _90 - - CONTOUR LINE December 17, 2012 Scale: 1 "=40' WOOD GUARDRAIL STONE WALL HOR. SCALE IN FEET D UNDERGROUND DRAIN LINE 0 40 100 200 Engineering Alliance, Inc. Civil Engineering&Land Planning Consultants January 31, 2013 194 Saugus,MAS01906 Portsmouth,NH 1950 03801 3801 Tel:(781)231-1349 Tel:(603)610-7100 Fax:(781)417-0020 Fax:(603)610-7101 Mr. David Knowlton, P.E. Re: EAI Project#: 12-39501 City Engineer U.S. Biological City of Salem 4 Technology Way 120 Washington Street, 4th Floor Salem, MA Salem, MA 01970 Dear Mr. Knowlton: On behalf of our client, U.S. Biological, Engineering Alliance, Inc. (EAI) is pleased to submit the following for your review regarding the above referenced project: • One (1) copy of a plan entitled "As-Built Plan" prepared by Leblanc Survey Associates, Inc. and dated December 17, 2012. • One (1) copy of a letter by Roome & Guarracino, LLC Consulting Structural Engineers dated January 21, 2013. Representatives from EAI have been on-site at various times since June, 2012 to witness construction activities at the subject property. Based on our review of the enclosed As-Built Plan and inspection of the site, we find the project to have been constructed in substantial compliance with the approved plans, Planning Board Decision and Order of Conditions issued by the Salem Conservation Commission. The As-Built plan illustrates some deviations from the approved plans; however, based on our review, we feel that overall the plan is in substantial compliance with all approvals and generally accepted engineering practices. The deviations include the following: • CB-2 shown on the approved plan was eliminated and replaced with a high point and CB- 3 was shifted to the north. Although this results in a slight change to the grading and drainage, all storm water runoff generated from the site is captured on-site, treated and discharged to the proposed storm water detention facility. The storm water detention facility was built in accordance with the approved plan. In addition, the slopes of all drainage pipes meet or exceed the designed values (many were designed at 0.05 ft/ft, and most were constructed at 0.08 ft/ft). Based on our review, the storm water management system is functioning as designed and meets the goals of the original drainage design. • The transformer and generator were relocated from the area shown on the approved plan (South side of building)to the south side of the parking lot. The relocation of this equipment does not appear to have an impact on the layout of the site. The additional parking spaces that were added to the rear of the building offset the spaces that were lost due to the relocation of the generator and transformer. • The landscaped island to the rear of the building is smaller than the previously approved plan. Although this area is smaller than shown on the original plan, all storm water generated from the site is captured, treated and discharged to the down gradient storm water facility. The storm water detention facility has ample capacity to handle this modest increase in impervious area. Mr. David Knowlton, P.E. Page 2 January 31, 2013 • A stone wall was constructed on the northerly side of the site in lieu of the modular block wall and a 1:1 stone slope was constructed on the south side of the parking lot in lieu of the proposed ledge cut. The stone wall and rip rap slope were inspected by Roome & Guarracino, LLC Consulting Structural Engineers and determined to be structurally stable and adequate. Overall, the site was found to be stable, well constructed and functioning as the original design and approvals intended. We are hopeful that upon your review of the site and this information, a recommendation for a final occupancy permit may be granted for this project. Should you have any questions or require additional information, please feel free to contact me. Very Truly Yours, ENGINEERING ALLIANCE, INC. OF MAS ff G RILHf.RD A. Richard A. Salvo, P.E. Principal 9OFFS SloPPILE Copy to: Salem Planning Board Salem Conservation Commission Warren Shore --Applicant EAI File#: 12-39501 ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA 02144 Tel: 617.628.1700 Fax: 617.628.1711 January 21,2013 City of Salem Inspectional Services Department Mr. David Knowlton,PE,City Engineer 120 Washington Street,4bFloor Salem,MA 01907 Reference: Review of New Stone Retaining Walls at US Biological 4 Technology Way Salem,MA Dear Mr. Knowlton: The office of ROOME & GUARRACINO LLC has been retained in order to review the stone wall construction at the above referenced project address. The review is based solely on our visual observations made on site, as well, as conversations 'and discussions with the general contractor and site contractor in charge of the wall construction. After careful review of the walls in place and the methodology of construction and back-filling operations, it is our professional opinion that the walls appear to be stable, safe and built in accordance with the applicable provisions of the Massachusetts State Building Code 8th Edition. Should you have any questions or require further assistance,please feel free to call me. Very truly yours, ROOME&GUARRACINO, LLC ST71 OF R9 CARMINE�o� GUARRACING " STRUCTURAL w No.401 <9OF.Q�Ot .Ci X44- fs NO�� Carmine Guarracino,P.E. Partner cc: Mr. Richard A. Salvo,P.E.—Engineering Alliance,Inc. 7 s x ' }v e IT I LIC % r i Q N�r�¢• RM C' Moi u VIII Ali 'g'" '• • ..ori{ ' YV nrcmifarPn9raT Phmtln9 eM �. Icesq bPw_oc aik M.ms iaNgs '� 16 Crystal Street, Melrose, MA 02176 781-662-3498 (fax)781-662-8389 January 8,2012 Mr.Thomas St. Pierre Director of Inspectional Services 120 Washington Street Salem, MA Re: US Biological Mr. St. Pierre, I received your letter regarding the reporting of construction as required by the Construction Control Affidavit. I have visited the site at frequent intervals(sometimes more than weekly)since last May and have kept written records of those visits. I will assemble those reports and send them to you immediately. While we have made some internal floor plan changes to accommodate the Owners program the building is substantially the same as shown on the Permit drawings. In all cases in the course of my visits the work observed has been proceeding in accordance the plans and specifications and entirely in accordance with the Building Code. By copy of this letter I will refer you to Peter Varone and Peter Holland to confirm the actions required by a Site Engineer. I know that Engineers have been on site to lay out the site and utilities, confirm the foundation location and dimensions and lay out the site perimeters and grading. I apologize for not getting these reports to you sooner. Sincerely, Dan DiLullo c.Peter Varone Warren Shore