To: Tom St.Pierre
Copy: Peter varone
Date: February 3,2012
Re: US Biological
Tom,
Attached are copies of monthly Field Reports which I have been remiss in not submitting to you
in a timely manner.
I have been on the site frequently since last February, several time a week in some instances.
The work has always been performed professionally (sometimes out of sequence due to weather)
and the building is progressing in accordance with the documents and in full compliance with the
building codes.
We have had some recent comments from Tom Devine and the Conservation Commission but
we are paying attention to those issues and we hope to resolve them at the next Commission
meeting.
I would like to walk the building with you next week if you're available and I'll call you Monday
to see when you might be available.
o
iLullo rn
T C7
a� o rm
i zM
J
r—<
rno
q' <
N n
rn
.v�iweu fxrvivyron,�LmMeM
Dsgnq g64mWPm�ce&Mops
16 Crystal Street, Melrose, MA 02176 781-662-3498 (fax)781-662-8389
FieldRgmd
To: Tom St.Pierre
CC: Peter Varone
From: Dan DiLullo
Date: February 15 2011
Re: US Biological
Work in process for this report:
+ Visit site to review beginning of site clearing and excavation
• Installation of hay bales
The work being performed appears to be in compliance with the contract documents and in
accordance with the Code requirements.
10
o
M
Dan DiLullo —�i7o
0
gM
J D—
r—
rn
N c7
N rn
ndiyndg4lcaiW mam exoy...
16 Crystal Street, Melrose, MA 02176 781-662-3498 (fax)781-662-83B9
fleldRepod
To: Tom St.Pierre
CC: Peter Varone
From: Dan DiLullo
Date: March 15 2011
Re: US Biological
We have been at the site once since our last report on February 15th
Work in process for this report:
• Site clearing complete
• Rock removal in area of foundations—excavation for perimeter foundations
The work being performed appears to be in compliance with the contract documents and in
accordance with the Code requirements.
Dan DiLullo
.o
z
M
^' m
rn O
ca M
ao om
zM
rn
J DG
Nm
<
N n
N fr1
N
16 Crystal Street, Melrose, MA 02176 781-662-3498 (fax)781-662-8389
FieldRepod
To: Tom St.Pierre
CC: Peter Varone
From: Dan DiLullo
Date: April 19 2011
Re: US Biological
We have been at the site twice since our last report on March 15th
Work in process for this report:
• Foundation forming and placement in process
• Continued excavation for perimeter foundations
• Continued excavation for site utilities and rough grading
The work being performed appears to be in compliance with the contract documents and in
accordance with the Code requirements.
Dan DiLullo
ti $
o
N M
rn
T n
W orn
t >m
—I 2'—
r<
m m
<
N M
N t'rt
N
4hRsfri Aeryvn.PlamFS EM g:
.:DaNnd A6kzW Prrvbta$Ik4V
16 Crystal Street, Melrose, MA 02176 781-662-3498 (fax)781-662-8389
FieldRepoft
To: Tom St.Pierre
CC: Peter Varone
From: Dan DiLullo
Date: May 17 2011
Re: US Biological
We have been at the site twice since our last report on April 19th
Work in process for this report:
• Excavation for interior footings
• Excavation for elevator pit
• Continued excavation for site utilities and rough grading
• Removal of excess spoil from site
Substantially complete:
• Perimeter foundations
The work being performed appears to be in compliance with the contract documents and in
accordance with the Code requirements.
o
Dan DiLullo
M n
CA ��;Iq
o rn
J D m
r C
Nm
Mo
T <_
N n
N r1i
N
16 Crystal Street, Melrose, MA 02176 761-662-3498 (fax)781-662-8389
FieldRepolt
To: Tom St.Pierre
CC: Peter Varone
From: Dan DiLullo
Date: June 212011
Re: US Biological
We have been at the site several times since our last report on May 17
Work in process for this report:
• Excavation for elevator pit
• Trenching for interior utilities
• Removal of excess spoil from site
Substantially complete:
• Perimeter foundations
• Excavation for interior footings
• Excavation for elevator pit
The work being performed appears to be in compliance with the contract documents and in
accordance with the Code requirements.
z
o
rn
r.1
rn
� orn
Dan DiLullo J D�
Ulm
mca
N n
IV fTl
N
D
16 Crystal Street, Melrose, MA 02176 781-662-3498 (fax)781-662-8389
Field
To: Tom St.Pierre
CC: Peter Varone
From: Dan DiLullo
Date: July 19 2011
Re: US Biological
We visited the site on two occasions since the last report dated June 21:
Work in process for this report:
• Begin installation of pre-engineered steel building
• Continue installation of site utilities
Major materials on Site:
• Building steel structure
• Steel siding panels
The work being performed appears to be in compliance with the contract documents and in
accordance with the Code requirements.
�' rn
Dan DiLullo m .
W orn
rn
J D<
N n
N rst
N
DesgR K%kk xq Prtq,Y.BMApf
16 Crystal Street, McIrDse, MA 02176 781-662-3498 (fax)781-662-8389
FieldRepoit
To: Tom St.Pierre
CC: Peter Varone
From: Dan DiLullo
Date: August 16 2011
Re: US Biological
We visited the site on one occasion since the last report dated July 19:
Work in process for this report:
• Continued installation of pre-engineered steel building
• Continued installation of site utilities
• Begin trenching inside building for interior utilities
Major materials on Site:
• Building steel structure
• Steel siding panels
• Miscellaneous interior pipe materials
The work being performed appears to be incompliance with the contract documents and in
accordance with the Code requirements.
CA
z
T
m M,
orn
Dan DiLullo nm
r<
Mo
N n
N U)
N
a�aam¢a de Rvgam.Wunnq.tl�,
tl%yn>FGE and orNxo&+k.q�
16 Crystal Street, Melrose, MA 02176 781-662-3498 (fax)781-662-8389
FieldReport
To: Tom St.Pierre
CC: Peter Varone
From: Dan DiLullo
Date: September 20 2011
Re: US Biological
We visited the site on several occasions since the last report dated Sept 16:
Work in process for this report:
• Prep and installation of concrete slab
• Building metal siding panels in process
• installation of roof panels in process
Major materials on Site:
• Steel roof panels
• Miscellaneous interior pipe materials
• Miscellaneous electric supplies
The work being performed appears to be in with the contract documents and in
accordance with the Code requirements.
z
rn
� c
CO 1 p
m o rn
Dan DiLullo zm
—� D—
r<
Nrn
mo
70
<
N n
N c
N
r
16 Crystal Street, Melrose, MA 02176 781-662-3498 (fax)781-662-8389
FieldRepod
To: Tom St.Pierre
CC: Peter Varone
From: Dan DiLullo
Date: October 18 2011
Re: US Biological
We visited the site on several occasions since the last report dated Sept 16:
Work in process for this report:
• Begin installation of steel stud walls
• Building metalpanels inprocess(substantially complete)
• Installation of roof panels in process
• Duct bank for switch gear and transformer
• Second floor slab
• Rough plumbing/electric
• Begin elevator shaft
Major materials on Site:
Steel roof panels _
• Miscellaneous interior pipe materials
• Miscellaneous electric supplies
HFn
Fn
work being performed appears to be incompliancewith the contract documents and Ju a CD
accordance with the Code requirements. J n
rno
7
<
NCb
N rm
Dan DiLullo
Na.atl[fa Roprem;vtimigam
gxpnafgkk aM aMxe..&9�_ps.
16 Crystal Street, Melrose, MA 02176 781-662-3498 (fax)781-662-8389
FieldRepW
To: Tom St.Pierre
CC: Peter Varone
From: Dan DiLu110
Date: November 15 2011
Re: US Biological
We visited the site on several occasions since the last report dated October 18:
Work in process for this report:
• Continuing installation of steel stud walls
• Installation of rip-rap retaining wall
• Installation of EIFS exteriors
• Site excavation for domestic and fire water
• Elevator shaft complete
• Complete punch list of steel building
Substantially Complete:
• Rough wiring of basic electrical
• Main switchgear installation
• Rough plumbing
• Sprinkler piping(not equipment M
rn —+>o
Major materials on Site: Cl) MC-)
-Owner equipment J yr
• Doors and frames cn
• Lighting fixtures 70
o- <
c'n
The work being performed appears to be incompliance with the contract documents and3 w
accordance with the Code requirements.
Dan DiLullo
DSWnMRpYcwq Rmte Buvbgs.
16 Crystal Street, Melrose, MA 02176 781-662-3498 (fax)781-662-8389
FieldRgpod
To: Tom St.Pierre
CC: Peter Varone
From: Dan DiLullo
Date: December 20 2011
Re: US Biological
We visited the site on several occasions since the last report dated November 15:
Work in process for this report:
• Continuing installation of steel stud walls(mostly complete)
• Reconfigure walls at upper rear lobby and frame upper stairway
• Installation of aluminum window frames
• Rough grading front entranceway and parking
• Begin excavation of detention basin
• Installation of roof curbs for hvac units
Substantially complete:
• Rough wiring of basic electrical
• Rough plumbing
• Sprinkler system piping(equipment not installed)
• Site utilities z
o
• Pre-engineered steel building
M
-n cn
Major materials on Site: ~m
• Miscellaneous interior doors and frames g
J stern
r—
The work continues to be performed in compliance with the contract documents and in r.1rCD
r'r'
accordance with the Code requirements. o 70
N r
w m
Dan DiLullo
CSNkcYs fot Piopram,Phrvivgantl '
De9gnaf.FubNc and PmaDa&tiNlhgs w
16 Crystal Street, Melrose, MA 02176 781-662-3498 (far)781-662-8389
FieldRq)oft
To: Tom St. Pierre
CC: Peter Varone
From: Dan DiLullo
Date: January 17 2012
Re: US Biological
We have been at the site several times since our last report on December 20th
Work in process for this report:
• Installation and taping of gypsum board in approved locations
• Installation of steel stud soffits in atrium
• Installation of exterior aluminum window frames
• Installation of skylites
Substantially complete:
• Roof top units installed
• Steel stud walls
• Elevator installation
Major materials on site
• Owner equipment z
o
• Doors and frames rn
• Lighting fixtures rnn
cm• Kalwall materials for main entry and skylites gCC)
J >m
r-c
� moo
The work being performed appears to be in compliance with the contract documents tom' d-inC�--,S
accordance with the Code requirements. + N
Dan DiLullo
T : (ri#u oftt#enl, Htt�s�zrl�ur##
amtin
(Air -`�ttfem (mesa
TO: i Leo Tremblay, Building Inspector
Peter Caron, Assessor
Charles Quigley, City Engineer
FROM: Beth Debski, A`ssis an�ity/Planner
RE: Form A Decision - Technology Way
DATE: February 2, 1996
Attached please find a Planning Board Decision and a signed Approval Not Required Plan for
property located on Technology Way.
If you have any questions, please do not hesitate to contact me.
jm\bd\memomast
I
eM
Ctu Jaf ttl , � fi�s��rltu�r##s
FORM A — DECISION
Ms . Deborah Burkinshaw
City Clerk
Salem City Hall
Salem, MA 01970
Dear Ms . Burkinshaw:
At a regularly scheduled meeting of the Salem Planning Board
held on January 15 , 1995 it was voted to endorse "Approval Under
Subdivision Control Law Not Required" on the following described
plan :
1 . Applicant : KAK .Realty Trust vafard Real Estate a.-
20 William Street 290 Eliot Street
Welleslev , MA Ashland , MA
2 . Location and Description:
This Property has been designated as the Salem
Business Park and is located ad acent to Swampscott
The plan creates Parcels A&B (not to be considered
buildable lots ) lot 727 .
Deed of property records in Essex Soutn District Registry.
Sincerely,
A)aA
Walter B. Power , III
Chairman
This notice posted on "Official Bulletin Board"
EX\DH\BPFORMA C" Hell Ave., Salem, Mass. on JAN 2 9 1996
at /n: l$ ri n In accordance with, Chap. 39 Sec.
79A & M of M.G.L.
Ctg of �tlem, ttss�ul�usPffs
�9021rb
alitp X411
�*alrm, c9las"Cc Usctts 01970
r..
1
W
NOTICE TO BE ATTACHED TO
FORM"A"APPLICATIONS
See Form "A" applications for
complete instructions for filing. -
All insertions shall be typewritten
or printed neatly in ink.
Date: __January _2, 1996_
City Clerk
Salem, Massachusetts 01970
Dear Sir:
I hand you herewith two copies of Form A, an application submitted by me this day to the Plan-
ning Board of the City of Salem requesting a determination and an endorsement on a plan filed with
said application that Planning Board approval under the Subdivision Control Rules and Regulations is
not required.
The land shown on the accompanying plan is located at _Technology Way ....
—___—_........
- - — --- in Ward -- -----— ------------------
(insert street and street numbers here)
Signature of Owner--------------------
Eliot Street
Street Address ---290---__-- - ---------
City/rown&State Ashland, MA 01721
Telephone Number —(508) 881-1600
a
F
s Ot 1 UlfSalm, fflass Ir4uutts
�iflj all
o$alrm, 'Sarsachuaetis 619713
FORM A
APPLICATION FOR ENDORSEMENT
OF PLAN BELIEVED NOT TO REQUIRE
APPROVAL —
In accordance with provisions of Section II-B, the
applicant must file, by delivery or registered mail, a
Notice with the City Clerk stating the date of sub-
mission for such determination. The notice shall be -
attached to two copies of this Form A application.
The notice and both copies of the application must
be "date stamped' by the City Clerk and then one =
copy of this Form A, with the Plan, filed with the
Planning Board by the applicant. All notices and
applications shall be typewritten or neatly printed
in ink.
Salem, Mass., ___January_ 2----------------------19--45-__
To the Planning Board:
The undersigned, believing that the accompanying plan of his property in the City of Salem does not
constitute a subdivision within the meaning of the Subdivision Control Law because (See Sect. II-A and
The lots created meet local Zoning Bylaws for frontage on an
state specific reasons) --------------------------------------------------------------- — ---- - -
existinz way d contain the requisite_-square_
- ------ ----------------------------------------------------------------------- ----- —=------------
and herewith submits said plan for a determination and endorsement that Planning Board approval
under the Subdivision Control Law is not required.
1. Name of Owner ---KAK Realty Trust -------_---Fa_fard Real_Estate-----_------
-
200 Will liam Street Wel- -
lesley, MA 290 Eliot Street Ashland, MA
Address----------------- ------
Guerriere & Halnon — __--_ —_—_-----------------------
2. Name of Engineer or SU[Ve or ___--__ e______________________________
333 k-est Street Milford, MA
Address-------------------------------------------------
-------------------------------
3. Deed of property records in Essex South District of L.C.---------- ---------- ---------------------------------
Book —----------------------- Page -Document-------------- 11313349
-------
4. Location and Description of Property_ _____________ _ _ ___—_—_-_________ -----------------
This property has been designated as the Salem Business Park and is located
---- ---------------- -- -
- --------- ------- ---------------------
-------------adjacent to Swampscott Road. The plan creates parcels A&B (not to be considered
---------------------------------------------------------------------------------------
buildable lots) and lot 727.
----------- — -----------------------
�', 5. All streets and abutting lot lines shall be shown on theklan t wt a names of the Owners
of the abutting lots.
Signature of O%ner—i - /� v(- - -
Address—•290 E1�3_ �_Cx4sS_�s113zzd._MB------------------------
Telephone Number (508) 881-1600 --- -- — —
r
Co ;
50
-
' %_ '• `_
NCTto
FNO - -
u3 , o
( N F rev rq
- o
N . S . S . S . REALTY TRUST I PIN
Do
L . C . C . # 11802 D / (FND)
a o Sy o P
LOT 524 ° hti o` ' '9
G: h s
hi/F � � \ co-.:M . c, �. I-
<
F . - r q
a JOHN . INGEMI
w J C C 7 9 N/F a >i _ m
L . 15 B m ., e �` � .
l' 0 1 ¢ a
a, A G J , REAL7Y TRUST \r
LOTS .3.14 & 315 IN BRass
I c� o PP , .. '9 o, '9.. ss'� -. ,,.. tFNO) - 4 •/' ,. :.: :' : ,
P . O fi` p ✓' .. ... .
cA-: 1-- .M. .. DISK {FNO) . S
F A \ ti
I c fd -
v \ GOTS 524A & ' 5248 ]
u v
O _ O s y !
o G r -
. \ O G � F
ri D
r
I GZ y op F F
t Qm / v d �j s ., o. p F
6' tr n 9.. 38 29 9� .
v s a LOT 726 p \s
_ ' •r = �¢ 'yam o \ o � \ An3D.00 .• c�., .a o
�� ' \ •.97 �. h P m AREA ,=
9:. o'jry 6 , , , . m 2.15 +/- AC. T=33;D9
± o .: F LP by ey f `(
_ _ o STK A r u} ) _" .,-_ �`' s; .9J- O _
(SET)
• - _ _ � STK `N 2� .� -Z as29'31'SE•.. . R-205.0 � � :b'L.,, a6 . : 15� \9 {SET). Gl• - _ - - .. _ _
AA
V
-N/F Z (SET) - 6� -9 -
4 .L . . SSG QC• CT-67.19 j•••'Sa59.rt \;'„ _ y V\ \ : -
• BARNES ROAD TRUST sy �::. ,_
K. C c Fo N LOT ,727 azo as
L . C . C . 719
l - : ,I PIN .L. 930- --`. ,:n. _- \. o._. 0• `l '. � _
LOT 319 C (FND) 'AREA r' 20 . aPK NAIL q
: 9.. ... S"1a 25 Ua SET
. . . . + - 6'. ( ) � - .16-84'23'32"' •. �'� � -:. dS GqL'- ..
\ F o ; 1:81 / AC. a >50 e
DH NOT FND „a a _ m > ,
,. s L 44:19
m q T 7N.
. 5 V
9
d .
_.., 2 Y '
Fo r 3 l
A-205.00 _
\ .
.. - 003
° - , \
; -�. 8 NOT FND -
/ e a p
9 P .P �\P ti°` INAG,- EASEMENT^-v
m 9 > y t ,
- ,. : " ,� �. -.. ..�- ,a ,, -
- `o .. g4'ci h Sr_ DCC115B6R
FAMILY OF DEL_ENA E30ROUG .c v/y ha �• � ,; ;. I
t o. g v eo :h LOT 720
L . C . C :' 715_ B , 'LOT 2�7 Vin ,:-, �5� %� -r' 'Q��'
- -
_ . ... ". `PP IN BRASS /\ ,O ..:� / ;: _.,Sa 9'' � FJ. '. 1•�.�� p� - . " , : ,.SB DH 9J
P _ , / LOT 728 a• .ti z ..:,9 y• iFNDr c o
DISK (r Nn) DH tsE:) 28 e tE PP \
y A ✓ 5. 1 S
r „ :, , a1 1. .. . 93 ,.. .,. ..Z/� ' F u\i °
.. � { AREA ;• P -,_ a o. � r
15.31 + AC.
/ • a
LOT .725 < o
? o
AREA s o
I ti - A ..
/ r
o / N _ c
4x
2 . C
� o
CLARK ;w ,. D
� A_ �•
S J
T , /
(P 6 r _
IC40 '
0 ,
E)
BB DH
(FN (SUFlyFy-F
, P •. ._�. gyp. 6
o f
.
DH NOT FND-t , / m e .,. - \- S\ O V N ., ( SET
( oN N v '- •o!� \ o 02 A5 13. _ / 1 ).
r STK
(SET) IN
-. r : • , � ,n � _ • s t E, �-o -���c 21 .37 �J6 c p o _. 52 '50
O N ., �a �,, _ Pr. v •.. , •. R=800 .00
A S9pF ! s : e ; G 0a::` Qp \ L-68 . 15
t N/F 4 �rsy y ., a Cip� r �z., BA Ise*
a s.Fo Nr: z 2. ccess u �c9"`a T=34 .09
CITY OF SALEM v n r, q �� � J, 2� e D2? A s rILITY -o Q
\3, e75; r. to N VA rad � EASEMENT DOC #206220 91 \
7159 6 \\ R=n:o2:340
, . LOT 16 \ T=i3: N, ; n
tv ...a s n \ 2 < PLASTICS
STK s< MAYI\ARD
iS..T) _•.
} O11602"42 \ ,o 0
_ m to s :
2 ° av
LOT 699
PK Nail' 1 9
a2
.. pH (FNC) (SET) O
' , o N ,>�. tSUgy 5^.rOr , ,.F. t ti
a= Nq
255 18. OE . �•. Fy` lF' \ i', z 1 .:, ) �`� 'GCO:
( �'... . ...,... . - .. � .. o R=5C.G0 �} `' •Sg FO Np�- N � .. - I P 4.0 - '�
41
�S D,/ 9 -i
I : ,. c� .BO _ ,v 2- q � � '; s 68a 2 A., '�w•'/ro. N
9. LOT 724 e .
AREA ` 61 ,t��. /,LOT .729 g `'m> / ,
't }
d.�✓ 3.86 +/- AC. i •�4 AREA
- DH NOT FND •`.. pH dx r :. /meq -. ". 0..19 + - AC:' t, _ -
f n✓ 4 t T� / DH (FND) -
we 10 nF , r o TENNIS
t °
50 Tcl��ll5 SQUASH CLUB v
Sri
l o O R
\� 90 :39 i' ff < c; > h. NOTES:
ES.
S, a / s voTFND L . C . C .LCC # 11802G m
d, . B o
v N � 4 lv , �. , �'
r , J 3120 ✓ Q.. o 0 ti
3 r v 2 __OT 569, eJ :
0
i
1 ti
P
• 0 1 :' T _
E. THIS I� F
� a -U I A SUBDIVISION r 1 _ BDI ISIO Or
. � , . N LAND COURT CAS,_ NO .. 4
. , 1$.'00 S s 2 o- 1102 �
°\ o: '/
, :J c b _ u- LGTS / .9 7
r � N 4P. 1210, lv -.. .. 11,. p sa, 29 ?� ; ,. � 2Z.' AND , 22 .
. r A J O /"
d` ti ,.„_ 4 oA 1 ,
h .,. 1 &F
ea D 22 A h 2 . LOTS 7 N S
,..�2 °� (SET) 25 AND 729 ARE NOT TO BE CONSIDERED SEPARATE
BUILDING LOTS .
STK's
pr�9u� s 9 ,u?.• S, ", a, ESET) 7 3 TRAVERSE ERROR OF C!_OSUP,E 1 : 23,8 39
\aJF�♦ 6 CLOSURE COURSE: N34°09'11•'4`! 0.2.47'
NIF s, Er r. x r*1z, /
r _ tr .9\�sl !� .. y(Lao ,=.."
SALEM CONSERVATLON COMMISSION Sya22'e1
L . C . C . #11602D
LOT 533 DH NOT FNe_-J
.r ...
F
STK
v, -- _
N/r PLAN OF LAND I
m� HUTCHINSON REALTY TRUST IIN
<� 3X SALEM MASS
k APPROVAL UNDER . THE SU$DIVISION PR s
f. � v �. `9� _a`�; PROPERTY OF.
CONTROL -LAW NOT REQUIRED � ��, �� �° ' = LOTS 724 6' 725, JOHN H KELLOGG
TRUSTEE OF KAK REALTY TRUST
k SALEM PLANNING BO 4- TRUSTEE_ ,
LQ7S: 726 729, FAFARD REAL ESTATE
t AND DEVELOPMENT CORP
a ...
' t ALE.. : 100 FEET TO AN- :INCH •
L.
AT
D E. DECEMBER ,29. - 1995 .
I CERTIFY THAT :THIS ACTUAL SURVEY WAS
F
x_
� a+ � h_ T � � l
ti G HE GROUND IN ACCORDANCE i� T ,I E. r f 1 e r°e
E I H . ._ �_:.� b '
ti
_ D
_ ! ,T
. .� �4E : LAND COURT i �.
DINSTRUCTIONS S (1f (gyp }, V ., .
D lFND 95 _..
) h DEC, LI 19 DEC 28 199.. ,. ,I Ilnc
OR BETWEEN r � ���. � H a 1 n o n
r i
F - •^
.. n Ineerin & aSurveying
_.__. 9 8 Land
DECEMBER 29 1995. . :
DATE.
333 WEST
STREET, MILFORD, MASS. 01757
.,
(508). ,473 6630 FAX: (508) 473-8243
DATE: SIGNED.
�_.� �Y .A4 (PLS}
- BE G A AJORITY - �f . ,
50 100 200 FEET 400
,'. .a -�.,:Ts=•:;f .� _ 600
a -
0510 20 - 50 METERS - .100 ..: ..150 `
G - 5845
I
Thermal Circuits - Addition
�One Technology Wa�
- "Technology-Park \
Salem, Massachusetts
Scope of Work
March 6, 1998
Division 1 - General Conditions
• General Conditions would consist of full time project supervision,building permit fee, as-
built construction drawings, design and engineering fees, building layout, safety
equipment, office trailer, construction signage, temporary toilet facilities, temporary
partitions, temporary telephone and facsimile service, daily and final clean-up, concrete
testing, soils testing, steel connections testing, dumpsters, and drawing reproduction.
Division 2 -Earthwork/Sitework
• Sitework to consist of the following:
- site cuts/fills - existing water line relocation
-sanitary piping to existing SMH - 8" gravel under paving
- paving(2"+ I") - 12" gravel under slab
- excavate/backfill foundation - excavate/backfill interior footings
-water detention pond - drainage manhole and RC piping
• Please quote an ADD alternate price for ledge blasting (open and trench)and including
removal off site.
Division 2 - Selective Demolition
• Selective demolition to include removal and disposal of the existing steel wall panels and
framing at the existing rear wall of the building.
Division 3 - Cast-In -Place Concrete
• Concrete would consist of forming, pouring and finishing reinforced concrete
foundations including strip footings, spread footings,foundation walls, and column piers
with 3,000 psi concrete.
• The concrete slab would be 5" thick(4,000 psi)with 6 x 6 10/10 welded wire mesh
reinforcing on a 6 mil poly vapor barrier. The slab would be finished with a standard
hardener/sealer and would have sawcut joints to reduce cracking.
t�NrOLLY
Planning•Design•ConsuWion
Division 4 - Unit Masonry
• Unit masonry would consist of full height exterior walls constructed of 8" split faced
block with accent banding of 8" scored split faced block in colors to match existing block.
Division 5 - Structural Steel and Miscellaneous Metals
• Structural steel would consist of beam and column framing, bar joist,joist girders and
metal decking at the roof structure to match existing structure. (The assumption is made
that the existing endwall was sized for future expansion and that this structure will be
capable of supporting the new structure.)
• Miscellaneous metals would consist of angle and beam lintels required at openings in
masonry and handrails at the new exterior dock stair.
Division 6-Rough Carpentry
• Rough carpentry would consist of the installation of the following: hollow metal frames,
hollow metal doors, finish door hardware, toilet room accessories, and electrical backer
boards.
Division 6 -Finish Carpentry
Finish carpentry would consist of plastic laminate toilet room countertops.
Division 7 - Thermal and,Moisture Protection --Building Insulation
• Thermal and moisture protection would consist of 2" rigid insulation at the foundation
walls,core fill inserts at masonry units, 1" rigid insulation at the walls of the rooms at
column line 1, rigid insulation to match existing at the roof system, caulking and sealants.
Division 8-Hollow Metal Doors/FramesMood Doors/Finish Hardware
• Hollow metal frames, hollow metal doors, hollow metal interior window frames, and
finish hardware would be provided as indicated on the floor plan (exterior doors would be
insulated).
Division 8- Overhead Doors
• Overhead doors would consist of one 8'x 8' motor operated pre-finished insulated
overhead door at the loading dock.
I�IOLLY '
Pbrnng•Design•Cmsuwion
Division 8 - Glass/Glazing
• Glass/glazing would consist of three aluminum framed insulated glass windows at the rear
elevation to match windows at the front of the existing building and three 3'x 6' interior
windows at the Ceramic Assembly Room.
Division 9 - Gypsum Drywall
• Gypsum drywall and metal stud framing would consist of full height interior partitions (to
the deck above) at all locations shown on the drawing. Construction to be 3 5/8" steel
studs, 5/8' gypsum wallboard, and batt insulation.
• The Ceramic Assembly Room, the two Toilet Rooms and the Storage Room will have
their exterior walls strapped with metal zee furring with vapor barrier, 1" rigid insulation
and 5/8" gypsum wallboard to 6" above the ceiling height.
Division 9 - Suspended Acoustical Ceilings
• Suspended acoustical ceilings would consist of 2' x 2'x 5/8" standard white ceiling tile in
standard white aluminum grid in the Ceramic Assembly Room,the two Toilet Rooms rand
the Storage Room.
Division 9 -Flooring
• All toilet rooms would have standard 12" x 12" x 1/8'vinyl composition the flooring with
a standard 4" vinyl base.
• All gyp board walls would have 4" standard vinyl base.
Division 9 -Painting
• All gypsum wallboard areas would be painted with a three coat paint system(primer+two
coats finish):
• Steel door frames would be painted with a three coat paint system.
• The Acid Storage Room would have an epoxy paint floor system.
Division 10-Specialities
• All toilet rooms would receive the required toilet room accessories including toilet paper
holders, paper towel holders, soap dispensers, grab bars, and mirrors.
A manually operated hydraulic dock board, dock bumpers and dock seals would be
provided at the new dock area.
Division 15 - Fire Protection System
• A complete wet pipe fire protection system would be extended from the existing sprinkler
service.
WNMY
Planning•Design•Constwion
• The sprinkler system would be designed for the possibility that the area between column
lines B' and E' may be split-off as a tenant space in the future.
• Adequate water pressure from the existing water supply has been assumed at this time,
therefore no fire pump has been included.
Division 15- Plumbin¢
• Plumbing would include the replication of the existing toilet room facilities in the new
location as indicated on the plans. Plumber to include gaspipingfor hot water heater.
• If possible, the new sanitary should exit the building in the southwest comer to an existing
sanitary manhole. If this is not allowed, the sanitary should be tied into the existing
sanitary (slope will need to be verified).
• Plumbing would also include a continuation of the existing compressed air system.
Division 15 - HVAC
• HVAC to include heating the new area by using rooftop mounted makeup air units similar
to existing system.
• The heating system would be designed for the possibility that the area between column
lines B' and E' may be split-off as a tenant space in the future.
• HVAC contractor to include gas piping for rooftop units.
• Exhaust fans similar to existing should be provided at the Acid Storage Room.
Division 16 - Electrical
• Electrical systems would include two separate 600 amp subpanels fed from the existing
main panel.
• The electrical system would be designed for the possibility that the area between column
lines B' and E' maybe split-off as a tenant space in the future.
• Power wiring to mechanical equipment including rooftop units.and exhaust fans would be
included.
Strip fluorescent lighting to match existing would be provided (layout and switching of
lighting to reflect future tenant possibility).
• Power to one overhead door motor would be included.
• 2 x 4 suspended ceiling mounted fluorescent light fixtures with prismatic lenses to be
included at the Ceramic Assembly Room, the two Toilet Rooms and the Storage Room.
• Emergency exit signage and lighting would be included.
An extension of the existing fire alarm system would be provided. Electrical contractor to
verify the capacity of the existing fire alarm pane.
• Outletting per code at the exterior walls and interior walls would be included.
• Four 220 volt outlets would be provided in the Print Room in addition to code outletting.
• Power to equipment is not to be provided at this time.
• No telephone and data conduit are included at this time.
• Temporary light and power for construction would be included.
• Power to water heater would be included.
CMMY
Plarnng•Design•Construction
4-6 COL
2
a � o
ON
QLEVEL ...... ...... ....... .. ... : : :. :•
LANDG
77
l9 i i a i i
c} I - ---------------
------------- ---- -r = -- --- - ----
7
ll
3 _ Col i i 11/4" MET. HANDRAIL
Q i ALONG BOTH SIDES.
CONC. RAMP
cv GONC. FOUNDATION AND FTG
4�1
ELEVAMON
LEVEL DN.
LAND'G �I Q
(V
O °GOL
3.6 — coL
1r'-'-'*AM P PLAN
1114 " O.D. MET. PIPE RAIL CONT.
WITH EXP. BOLTS TO GMU/GONG. FOUND.
WALL
11/4 " O.D. MET. PIPE RAIL CONT.
NOTE : MET. HANDRAIL WITH RETURN AND GONT.
AS SHOW ON ELEVATION
Planning Design Construction
m 152 Conant Street, Beverly, Mass
GONG. FOUND. /GMU WALL
(978)927-0053 (781) 655-9146
5" REINF. GONG.RAMP/ LANDO W/ O� gevisim Fax(978)927-7928
6X6-2.1/2.1 WWF ON 6" COMP.
GRAVEL WITH DOWELS GROUT INTO
------------
0 .
_ • • • • • Q
00 00 00 00 00 00 00 00 00 0 0 #5 BENT
0 000 000 000 000 000 000 000 000 aoo 000 @ 12 N
0; 0'ooC�OooCP0oCP00o00000000000�00000�0 0
�/j�/j�/ j� jjo�
\\ \\ \\ \\�\\ \\j\\ \\�\\�\\,\�)'0 10 REINF. GONG. WALL
Drawn By
Date JULY 6, 1998
#4'5 012" O.G. E.W. Scale 1v8• = r-a'
0 5 10 20
J►�
Project Title
#5 BENT @ 12" TMRMALCIRCUITS
sni.Eri,minssncHUsMrrs
Drawing Title
REINF. GONG. FOOTING
12" TO BE 4'-0" BELOW FIN. GRADE NEW RAW
L — � #4'S
Drawing Number
;RAMP SECTION
SK- 1
- �- _ -- - ---- -- - . T - -r- - - - - - -- - - -- -- -- -
- T
�' 1 ,
CERTIFICA E OF OCCUPANCY
Issued. P 2 Permit N: 539-�Y
CITY OF SALEM
SALEM, MASSACHUSETTS 01970 City of Salem Building Dept._
DATE - ii - 19 PERMIT NO.
APPLICANT ADDRESS ��'.�� :^I 1n I.I: �. L.i -._.. , .7..,.
(NOJ (STREET) (CONTR'S LICENSE) '
CITY STATE "=IZIPCODE 7i I
TEL.NO l i'f7 I;- 7 ."
PERMITTO :'; Ir":'' O STORY ",I':" ('T j'1 NUMBER OF
DWELLING UNITS Y
(TYPE OF IMPROVEMENT( NO, (PROPOSED USE)
AT(LOCATION) " ' I`" ZONING
(NO) (STREET)
- DISTRICT 7 4;
..
BETWEEN AND
(CROSS STREET) (CROSS STREET)
SUBDIVISION c. I'r7 LOT %"-' :`(jBLOCK LOTSIZE 4 Vl t (ILEE� a
BUILDING IS TO BE FT.WIDE BV FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION _
i
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION
(TYPE)
REMARKS
i
AREA OR - PERMIT
VOLUME ESTIMATED COST d4q'2 (-f:."% FEE
(CUBIC/SQUARE FEET)
OWNER [:.L. ..,. . . ..
.'�: \'I - BUILDING DEPT.
ADDRESS !
C.0. COPY _ CERTIF E':OF'OCCUPANCY
CITY OF SALEM Issues a9 9G Permit Q_��dti-9
'1 jr a SALEM, MASSACHUSETTS 01970 Ofty it`Salem Bi win 'Dept.
DATE NOVEMBER 13, 19 96 PERMITNO. 606-1995
APPLICANT DACON CORP. ADDRESS 16 HURON DR. 1531
(NO.) (STREET) (CONTR'S LICENSE)
CITY NATICK STATE MA ZIPCODE 01760 TEL.NO.
MBEROF
PERMIT TO NEW BUILDING NUELLING
_ (TYPE OF IMPROVEMENT) ( N0. ) STORY INDUSTRIAL
USE) DWELLING UNITS 0
--
AT(LOCATION i TZONING
ECHNOLOGY WAY A D STRICT
(NOS)—(STREET)--
BETWEEN AND
(CROSS STREET) (CROSS STREET)
LOT
SUBDIVISION MAP 7 LOT 63 BLOCK SIZE
BUILDING IS TO BE FT.WIDE BV FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION
(TYPE)
REMARKS CONSTRUCT INDUSTRIAL BUILDING AS PER PLANS SUBMITTED @ #1 TECHNOLOGY WAY. L.E.T.
AREA OR 1,075,760 PERMIT6351
VOLUME ESTIMATED COST FEE $
(CUBICISQUARE FEET)
THERMAL CIRCUITS
OWNER BUILDING DEPT.
MA L.E.T.
AnnRRca � ' ' BY
Co
Cowl
CITYOFSALEM
BUILDING
t SALEM, MASSACHUSETTS 01970
PERMIT
,
DATE
--19 PERMITNO 3 5
APPLICANT
ADDRESS -l'il
(NO) (STREET) (CONTR S LICENSE)
I 1:�T STATE E `'q ZIP CODE TEL NO.
PERMIT TO Ir.. -.1; 17 STORY �N-DLJSTRIAL NUMBEROF
DWELLING UNITS
(TYPE OF IMPROVEMENT) NO (PROPOSED USE)
AT(LOCATION) DZONING
ISTRICT
(NO) (STREET)
BETWEEN AND
(CROSS STREET) (GROSS STREET)
LOT
SUBDIVISION SIZE —
`'AP- -�.,17 LOT l� BLOCK 29. qCRES
BUILDING IS TO BE FT.WIDE BV FT.LONG BVFT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION
(TYPE)
R j 1— -E:D -
REMARKS: 1'7,1 T -IDLJS F;;.1A— IjICG P L P ki c! E4M �.d
AZ3 P 3 TEC1-iNQLGGV
L A
'^r
til J'.U� iliL LU i V, PERMIT
AREA OR 1 --7
VOLUME ESTIMATED COS FEE $
(CUBIC/SQUARE FEET)
R CL-i 1 Ilii OWNER— H BUILDING DEPT.
ADDRESS `I' JEI—F�RSQN PVE BY
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS
ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION.STREET OR ALLEY GRADES AS WELL
AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE
APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE
REQUIRED FOR ALL CONSTRUCTION WORK. PERMITS ARE REQUIRED FOR
1 FOUNDATIONS OR FOOTINGS POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A ELECTRICAL,PLUMBING AND
2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS.
MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE.
3.FINAL INSPECTION BEFORE OCCUPANCY
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS
Akv
(')ij
�cl 0 L�Px�- L.;-
2 2
BOARD OF H 14 GAS INSPECTION APPROVALS FlRfceEPT. SPECTING APPROVALS
X". L V
OTHER CITY ENGINEER 2
,
WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD
S E PERMIT7
ISISSUED
INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE T EPERMITISISSUED CAN BE ARRANGED FOR BY TELEPHONE
STAGES OF CONSTRUCTION AS NOTED ABOVE. OR WRITTEN NOTIFICATION.
Titu of 0$ttlem, massar4uaetts
'. Public Propertg Department
wilding Department
Mrit dalem l5reen
508-745-9595 Ext. 300
Leo E. Tremblay
Director of Public Property
Inspector of Building
Zoning Enforcement Officer
December 26, 1995
Board of Assessors
City Hall
Salem MA 01970
Re: Technology Way
Dear Board Members:
Pursuant to the provisions of Section 72A of Chapter 59 of the General Laws,please be advised
that I am the officer in charge of a certain parcel of land purchased by the City of Salem on
November 3, 1995,as described in a deed filed with the Land Court as Document#313347 and
issued Certificate of Title #66196.
As provided by said section, I hereby request that all unpaid fiscal year 1996 real estate taxes
assessed on said parcel of land be abated for the balance of the fiscal year.
Very truly yours
Leo Tremblay
Director of Public Property
ARCHITECT' FIEW-REPORT
1C jt'U
• • • PROJECT:
Thermal Circ M,l rtc.
ADDRESS: t RFS 4E O*t'f'S5
PLANNERS DESIGNERS ARCHITECTS,INC.
16HURON DRIVE C;"I -echnology
NATICK,MASSACHUSETTS 01760 Salem, Massachusetts 01970
TEL 508 6513600 FAX 508 6552229
CONSTRUCTION PERIOD: October 12, 1995-November 8, 1995 FIELD REPORT NUMBER: 1642-001
CONSTRUCTION SUPERVISOR: Rick Ruffini SUPERVISOR'S LICENSE NO. 051604
In accordance with Section 127.0 of the Massachusetts State Building Code,the Architect's authorized representative has made
periodic inspections during the above construction period and made observations of work in progress as summarized below:
Work In Proaress•
1. Sitework
2. Concrete Work
3. Sewer Line
Observations:
1. Building Layed Out
2. Forming and Pouring Concrete
3. Working on Sewer Line _
4. Setting Reinforcing Steel
PDA INCORPORATED CERTIFIES THAT IT HAS PERIODICALLY INSPECTED WORK AT THE AE,--AIE ADDRESS AND FIND
THAT,TO THE BEST OF OUR KNOWLEDGE,THE CONSTRUCTION COMPLIES WITH THE PLANS AND SPECIFICATIONS
FOR THIS PROJECT AND THE PROVISIONS OF THE MASS C SETTS STATE ING CODE.
Keit urtis, R.A., Project Architect
1
Date: November 9. 1995
Distribution:
Leo E.Tremblay, City of Salem Building Inspector
Rick Ruffini, Dacon Corporation
KC/mpm
1642-FR.01
ARCHITECT'S FIELD REPORT
• • • 6r1L DiG DEPT.
PROJECT:
Thermal Circuitsml c. ( $g5
ADDRESS: �� RECEIVED
PLANNERS DESIGNERS ARCHITECTS,INC. 3 Technology wQ TY OF SAL EN,MASS,
16HSalem Massachusetts 01970
NATICK,CK,MASSACHUSETTS
CHUSETTS 01760 �
TEL 508 6513600 FAX 508 6552229
CONSTRUCTION PERIOD: November 9, 1995 -November 22, 1995 FIELD REPORT NUMBER: 1642-002
CONSTRUCTION SUPERVISOR: Rick Ruffini SUPERVISOR'S LICENSE NO. 051604
In accordance with Section 127.0 of the Massachusetts State Building Cade,the Arch tect's authorized representative has made
periodic inspections during the above construction period and.made observations of work in progress as summarized below:
Work In Progress:
1. Sitework
2. Concrete Work
3. Insulation
Observations:
1. Perimeter foundation walls complete
2. Placing insulation at perimeter foundation wall
3. Backfilling around foundation wall
PDA INCORPORATED CERTIFIES THAT IT HAS PERIODICALLY INSPECTED WORK AT THE ABOVE ADDRESS AND FIND
THAT,TO THE BEST OF OUR KNOWLEDGE,THE CONSTRUCTION MPLIES WITH THE PLANS AND SPECIFICATIONS
FOR THIS PROJECT AND THE PROVISIONS OF THE MASS SETTS STATEIDI CODE
40
fe0hurtis, R.A., olect Architect
Date: November 27. 1995
Distribution:
Leo E.Tremblay, City of Salem Building In=. octor
Rick Ruffini, Dacon Corporation
KC/mpm
1642-FR.02
ARCHITECT'S FIELD REPORT
• • • PROJECT:
UThermal Circuits, Inc.
ADDRESS:
PLANNERS DESIGNERS ARCHITECTS,INC. _ 3`TechnOlOgy Way
16 HURON DRIVE
NATICK.MASSACHUSETTS 01760 �Sa`Iem,Massachusetts 01970
TEL 508 6513600 FAX 508 6552229
CONSTRUCTION PERIOD: February 1, 1996-February 14, 1996 FIELD REPORT NUMBER: 1642-008
CONSTRUCTION SUPERVISOR: Rick Ruffini SUPERVISOR'S LICENSE NO. 051604
In accordance with Section 127.0 of the Massachusetts State Building Code,the Architect's authorized representative has made
periodic inspections during the above cunstructiun period and made observations of work in progress as summarized below:
Work In Progress:
1. Plumbing
2. Electrical
3. Metal Stud Erection
Observations:
1. Concrete floor slab finished
2. Setting plumbing fixture hangers
3. Connecting plumbing vents
4. Heating units on roof
5. Roof curbs installed
6. Installing electrical conduit
7. Electrical switch gear installed
8. Setting electrical sub panels
9. Office metal stud work 90% complete
10. Office duct work installed
11. Overhead doors at truck dock installed
12. Serco door bumpers installed at truck dock.
PDA INCORPORATED CERTIFIES THAT IT HAS PERIODICALLY INSPECTED WORK AT THE ABOVE ADDRESS AND FIND
THAT,TO THE BEST OF OUR KNOWLEDGE,THE CONSTRUCTION COMPLIES WITH THE PLANS AND SPECIFICATIONS
FOR THIS PROJECT AND THE PROVISIONS OF THE MASSAC SETTS STA BDING CODE.
KeitV Curtis, R.A., Project Architect
Date: February 14 1996
Distribution:
Leo E. Tremblay, City of Salem Building Inspector
Anthony Klein, Thermal Circuits, Inc.
Rick Ruffini, Dacon Corporation
KC/jds
1642-fr.08