Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
96 SWAMPSCOTT ROAD U2 - JAQUELINES COOKIES - BUILDING INSPECTION
`�(c Sd /l e 9 402F4 Certificate No: 894-06 Building Permit No.: 894-06 Commonwealth of Massachusetts Ci>.`y of Salem Building Electrical Mechanical Permits This is to Certify that the BUSINESS located at Dwelling Type 0096 SWAMPSCOTT ROAD in the CITY OF SALEM Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY FIT UP EXISTING SPACE AT 96 SWAMPSCOTT ROAD, FOR MARC HAZEUJACQUELINES COOKIES This permit is granted in conformity with the Statutes and ordinances relating thereto,and expires __ ....... -_ _ unless sooner suspeed or revoked. Expiration Date - --_ -- - 1 1 -41— - Issued On: Fri Sep 1,2006 ----- ------------------------ GeoTMS®2006 Des Lauriers Municipal Solutions,Inc. x.11 r yr a�iL�ivi BUILDING PERMIT 0096 SWAMPSCOTT ROAD ' 894-06 GIS#: 11228 COMMONWEALTH OF MASSACHUSETTS Map: 07 Block: CITY OF SALEM Lot: ' 0070 Category: REPAIR/REPLACE — Permit# x = 89406 BUILDING PERMIT Project# JS-2006-1781-11", ,`,%x Est.Cost: $983,000.00 Fee Charged:' - $10,818.00 Balance Due:` $.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: JMD Construction Co. Lot Size(sq. ff.): 567586.8 « Zoning:' ,I' -- Owner: Marc HazeUJacquelines Cookies Units Gained:`. Applicant: Marc HazeUJacquelines Cookies Units Lost _ ":AT: 0096 SWAMPSCOTT ROAD Dig Safe#: ISSUED ON: 04-May-2006 AMENDED ON: EXPIRES ON: 04-Oct-2006 TO PERFORM THE FOLLOWING WORK: Fit up existing space(22,500)at 96 Swampscott Road,for Jacqueline Cookies POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building - Underground: _ Underground: Underground-.9(9 Excavation: Excavation: A Service: } x, Meter: I Footings: �• ,- -r- C U ... Foundation: Rouglt�.(Jf=%/�� Rough: Rough:�c-t/�4)—/y' -Y -.Final: �,. Final: Final:ep(X 8`1$04- f m Rough Frame: Iwo, �/ Fireplac hi ev: D_l',W. Fire Health ✓/ +"" s v Insulati Meer. Oa: / Final: 0r4_ House# Smoke: Treasury: " -Water; Alarm: V l Sewer: Sprinklers: - THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOL ON OFA OK 11S RULES AND REGULATIONS. Signature: Fee Type: Receipt No: Date Paid: Check No: Amount ` BUILDING REC-2006-002416 04-May-06 4876 $10,818.00 l +l�'413T®CS1I: An inspectionis 3� CERTIFI4A :CCUPANCY Issueit CA LI upon Completion of work, please Grill City oding Dept. 745-9595 Ext.335 ' Y GeoTMS®2006 Des Landers Municipal Solutions,Inc. ,. P 1 � ' O ' y�VE RO ovspL, CITY , : �rl i G r. y ` `*v `y. j Certificate No: 897-06 Building Permit No.: 897-06 Commonwealth of Massachusetts Citiy of Salem $uilding Electrical Mechanical Permits This is to Certify that the BUSINESS located at Dwelling Type 0096 SWAMPSCOTT ROAD in the CITY OF SALEM ---------------------------------------------------------------------------- -------------------------------------------------------------------- Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY UNIT B This pernut is granted in conformity with the Statutes and ordinances relating thereto, and expires ---------------------------------------------unless sooner suspend ed or voked. Expiration Date -- Issued On: Mon Jun 12, 2006 -----------------------A/ ------------------ --------------------- GeoTMS®2006 Des Lauriers Municipal Solutions,Inc. --_---_----_-_-------------_----__-_-_--------__---_-------_---------- a�`�=�' � ,�'+� ��0 � . . ,o ' . , ��yy��,, __ �+ `'�9.D 3� "' ,la 0096 SWAMPSCOTT ROAD _ 897-06 GIS#: 1228 COMMONWEALTH OF MASSACHUSETTS Map: 07 Block: CITY OF SALEM Lot: 0070 Category: Permit# =` 897-06 BUILDING PERMIT Project#, JS-2006-1790 Est.Cost: $14,485.00 Fee Charged: $159.00 Balance Due: $.00 PERMISSION IS HEREBY GRANTED TO: Const.Class:, , Contractor: License: Use Group: Zolotas Bros Plumbing&Heating Lot Slze(sq.ft.): 567586.8 Zoning: II 'JLWner: Tobin&Sons Movers Unit _ _IUntts Gained : 3�A(_mlieant: Tobin&Sons Movers unit Units Lost:` _ `]AT. 0096SWAWSCOTT�ROAD - Dig Safe#: I ISSUED ON: 08-May-2006 JAMENDED ON: EXPIRES ON: 08-Oct-2006 TO PERFORM THE FOLLOWING WORK: Construct handicap restrooms(UNIT#2) POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building Underground_. .�. _ . Underground; _ .Undergtoun: - _ -- __F_xca"tion: Service: Meter: Footings: - Rough f(U -. 6 "d ` Foundation:'^"- --{^/ -- FinaFinal• j.. Final:�'� ��—d�� Rough Frame ldf Fireplace/ mey: D.P.W. Fire Health \\ - Meter.:..: �� �"i ' Oil: � � Insulati '1 ....s.. .. V' 1 ' Final: , House# s Smoke: {Vater. Alarm: Sewer: Sprinklers: r ! THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VI TION4N-0. ITS RULES AND REGULATIONS. Signature: Fee Type: Receipt No: Date Paid: Check No: Amount: �pp BUJL[)ING i'S% 08-May-06 6957 $159.007I 01m: An.in.peease aUl poncompletidn of WO'k,pl 745b'3595 klt•385 ! GeoTMS®2006 Des Lauriers Municipal Solutions,Inc. ' - r •C. . Zv y YSYYE AO CITY :OF SALEM . 6 ' BUILDING PERMIT 4. 1! r CITY OF SALEM, MASSACHUSETTS BUILDING DEPARTMENT i 120 WASHINGTON STREET,3" FLOOR TEL. (978)745-9595 K]MBERLEY DRISGOLL FAX(978)740.9846 MAYOR THOMAS ST.PIERRE DIRECTOR OF PUBLIC PROPERTY/BUILDING COMMISSIONER ALTERED CONSTRUCTION WORK HOURS 96 Swampscott Road Roofing Work July 18, 2017 To whom it may concern: The City of Salem, Building Department has approved U.S. Roofing's request for altered work hours for the roofing work at 96 Swampscott Road, Salem, MA. The approval allows work to be' altered to those listed below starting on Tuesday,July 18, 2017 and ending on Wednesday, August 30, 2017. Monday, Tuesday, Wednesday &Thursday . . . 7:30 a.m. until 7:00 p.m. Friday . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7:30 a.m. until 5:00 p.m. Saturday . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8:00 a.m. until 5:00 p.m. Sundays & Holidays . . . . . . . . . . . . . . . . . . . . . . No work permitted Respectful , Thomas St. Pierre Building Commissioner &Zoning Enforcement Officer Cc: file, Police Department CITY OF SALEM �? PUBLIC PROPERTY DEPARTMENT KIMBERLEY DRISCOLL MAYOR 720 WASHINGTON STREET♦SALEM,MASSACHUSETrS 07970 TEL.978-745-9595♦ FAx:978-740-9846 Altered Construction Work Hours 96 Swampscott Road Roofing Work May 4, 2017 To Whom It May Concern, The Salem Building Department has approved U.S. Roofing's request for altered work hours for the roofing work at 96 Swampscott Road, Salem, Massachusetts. The approval allows work to be altered to those listed below starting on Friday, May 5, 2017 and ending on Saturday, July 15, 2017. Monday,Tuesday, Wednesday and Thursday ....7:30 a.m. until 7:00 p.m. Friday...................................................7:30 a.m. until 5:00 p.m. Saturday................................................8:00 a.m. until 5:00 p.m. Sundays and Holidays.................:...............No Work Permitted Respectfully, G�VI'hY Thomas St. Pierre Building Commissioner and Zoning Enforcement Officer Cc: file, Police Department Certificate Number B-14.1434 Permit Number: B-14-1434 Con-inionwealth of Massachusetts City of Salem This is to Certify that the located at Building Type 9b U2 ST1VAMP, SC07,T,R0,AD,, in the Cita of Salem Address Town/CltyName IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY OCCUPANCY FOR UNIT 3 MARL HAM This Permit is granted in cojiforimty with the Statutes and Ordinances relating thereto, and expires ............... ... .... Not 41v#cqble_ unless sooner suspended or revoked. Expiration Date lF,-,SUCd On: Fl*id6�1, Ma.),; 01, 2015 Certificate No: 1085-12 Building Permit No.: 1085-12 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Perni is This is to Certify that the COMMERCIAL located at ----------------- - Dwelling Type i 96 SWAMPSCOTT ROAD in the CITY OF SALEM - ----------------------------- - - - --------- -------------- -- Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY OCCUPANCY PERMIT FOR THE (NEW MEZZANINE AREA) This permit is granted in conformity with the Statutes and ordinances relating thereto, and expires unless sooner suspended or revoked. Expiration Date Issued On:Tue Oct 16, 2012 GeoTMS®2012 Des Lauriers Municipal Solutions,Inc. -------------------------------------10----------------------------------------- T V i 96 SWAMP SCOT T_ ROAD 1085-12 Gl t, -- I1`zsav COMMONWEALTH OF MASSACHUSETTS °' Block: j CITY OF SALF i l lLot -- !0070-801 i ,C oc ory: ALTL R VHONS Ptuml4d 1053-12 _. -.. BUILDING PERMIT ,rtt,I�et, 12o0307 7„ ; lEst Cost: - I,$178,000.00 'Ili C w,f,ed X1+119741007 Pilan Dae 00 PERMISSION.IS HEREBY GRANTED TO: Dost Class: contractor: License: 'UseGtoup: �— — —IEspn'e5': .,�J?vl l)Construction Co. lot Sizc(sq Lt.): i567-586.S ZonmU. -- --(OW110% JACQUEUirNESGOURNIEI COOKIFiS �Units Gained IAPpliceml: JMa Construction Co_ jUnits Lost �AT: 96 SWAMPSCOTT ROAD iDig Sale it IS,SUF.,D ON. 29-:lun-2412 Afi1E1VDF.D ON: EXPIRES ON: 29-Nov-2012 TO PERFORM THE FOLLOWING I'VORK: CONSTRUCT APPROX. (1800 S.F. MEZZANINE POR NEW OFFICE SPACE t& BAC14ROONI,jbh POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building Underground: Undergromxi: I11dergroand: Fxcttvatiun; Serviro: meter: Footings: Rough: Rol"Ou Rough: Faundatiion: Final: Final: Final: Rough Frame' Fieephee/Chinmey: D.F. V. Fire Health -- lasakttion: Mete': Oil: House g Smoke: Hall: Trcaeuiy: Wattt: ' plarat; Assessor Seiner: Sprinklers: T1IIS PERMIT MAY BE REVOKED 13Y THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. . Signatu Am Fee Type. Receipt No: Dote Patty- CheekAm p�u: mart: 13UAkP*P ANT-OWNF_R OR Gcttl, r%,F, tk�t(y093368 - 29-Jun-12 3260 .$1974.00 ARRANGE f=OR PERIODIC INSPLCT.iQN�1,i,Iufi,iyu CONSTRUCTION,SEE CI,JRRF:'.NT B{JILGIfdG CpDF_ CHAPTF`_R I FOR LIST OF P.EGIUi--LU LSPECTIONS, CALL 978-6195641 70 SCHEDULE AN INSPECTION GeuTMSO 2012 Des t.auriers;N4tmlcipal Solutions,tae. Certificate No: 1085-12 Building Permit No.: 1085-12 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Permits This is to Certify that the COMMERCIAL located at ------ -------- - --- ---- - - Dwelling Type 96 SWAMPSCOTT ROAD in the CITY OF SALEM - - ---- ---- - - - -----------------------Y--------- ---- -- - Address Town/Cit Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY (rytivcyue ' omk,,c< 1 OCCUPANCY PERMIT FOR THE (NEW MEZZANINE AREA) I I This permit is granted in conformity with the Statutes and ordinances relating thereto,and expires unless sooner suspended or revoked. Expiration Date ------------------------------------------------------------------------------- Issued On:Tue Oct 16,2012 -- ` - -- ----------------- --- GeoTMS®2012 Des Lauriers Municipal Solutions,Inc. ---'---" -'-"- '- - ---'-- - '�'- D1cc T��� VSQVE AD CITY OF SALEM Certificate No: 1085-12 Building Permit No.: 1085-12 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Permits This is to Certify that the BUSINESS located at Dwelling Type 96 SWAMPSCOTT ROADin the CITY OF SALEM ------------------------------ -- --- ---------------------------------- - - - Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY 96 SWAMPSCOTT ROAD UNIT 1 This permit is granted in conformity with the Statutes and ordinances relating thereto,and expires ............................... unless sooner suspended orrevoked. Expiration Date Issued On: Tue Nov 13, 2012 - - -------- GeoTMS®2012 Des Lauriers Municipal Solutions,Inc. --------------------------------------- ----------- - --------- 96 SWAMPSCOTT ROAD 1085-12 GIs#: 12589 ; COMMONWEALTH OF MASSACHUSETTS Map 07 'Block. CITY OF SALEM t° ' Loh 0070-801 .;f Category. 'ALTERATIONS Fet# .;. .r,1085_12 BUILDING PERMIT Project# It""XJS-2012-003077,;:; Est. Cost $178,000 00 Fee Charged:" 51,974.00 Balance Duc" $ 00 PERMISSION IS HEREBY GRANTED TO: Const. Class" 1 Contractor: License: Expires: Use Group ,t JMD Construction Co. Lot Sl�e(sq ft.): 567586.8 Zoning. . I .ry NOwner: - JA DU=NES GOUPIvIE,T COOKIES Units Gd: : t -'F Applicant: JMD aineConstruction Co. Units Lost: ` 'fir '''IAT: 96 SWAMPSCOTT ROAD tDig Safe#: $ IT ISSUED ON. 29-Jun-2012 AMENDED ON: EXPIRES ON. 29-Nov-2012 TO PERFORM THE FOLLOWING WORK: CONSTRUCT APPROX. (1800 S.F. MEZZANINE FOR NEW OFFICE SPACE&BACHROOM jbh POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Buildin Underground: Underground: Underground: Excavation: Service: Meter: 1� Footings: Rough:,-30'1.:2- tIVI Rough: V1_ Rough:4J f�'I- � I� YYIM Foundation: ' Final: Final: Final(jq !�}f�uf�/I,� Rough Frame: D ' Fireplace/Chimney: D.P.W. Fire Health Insulation: Meter: Oil: Final: dkl 1 House, Smoke: ` Water: Alarm: Assessor Treasury: Sewer: Sprinklers: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: Fee Type: Receipt No: Date Paid: Check No: Amount: BUILDING REC-2012-003368 29-Jun-12 3260 $1,974.00 GeoTMS©2012 Des Lauriers Municipal Solutions,Inc. COSTA ARCHITECTS 333 MOODY STREET WALTHAM, MA 02453 TEL/FAX 787 /647-5537 STATEMENT OF PROJECT COMPLETION Project Number: 2012.10.4 Project Title: Proposed Tenant Improvements Project Location: 96 Swampscott Road, Unit 1,Salem, Massachusetts 01970 Project Name: Jacqueline's Gourmet Cookies Scope of Work: New interior office;steel mezzanine,GWB,metal studs,doors,frame, hardware;Glazing;suspended ceilings, paint,carpet, life safety, electrical,sprinkler, plumbing,and HVAC (note:some of the disciplines are the responsibility of others) In accordance with section 107.3.4 of the International Building Code IBC 2009 and Massachusetts State Building Code, I Albert Costa Mass Reg. # 1907 being a registered professional architect hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Entire Project_ Architectural XX Structural_Mechanical_ Electrical Fire Protection Other:. For the above named project and that, to the best-of-my-knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable architectural practices and applicable laws for proposed project. I further certify that l shall perform#he necessary professional services and be present on the construction-site'on a'regular and periodic basis to determine that the work is proceeding in accordance with the documents approved for building permit'and shall be responsible for the following as specified section 107.3.4: 1. Reviewed,for the conformance to design concept,shop drawings,samples and other submittals,which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Reviewed and approved of the quality control procedures for all code-required controlled materials. 3. Been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine,in general,if the work was being performed in a manner consistent with the construction documents. I visited the construction site during the building permit application process, an/or sent other appropriately qualified design professionals, and determined to extent possible that the work was done in accordarice'with the documents submitted with the building permit application,and thiolapplicable-provisions of the Massachusetts State Building Code gE0 ARC aT C r u v Signature of Archite �'0 Irl9l. a S` tiyi F'tt rH 0F MPSI Certificate No: 596-08 Building Permit No.: 596-08 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Permits This is to Certify that the BUSINESS located at --------------------------- -------------- --------- Dwelling Type 0096 SWAMPSCOTTROAD in the CITY OF SALEM - - - --------------------------------------- - - - -- ------------------------------ -- ---- - Address TowNCity Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY OCCUPANCY PERMIT FOR UNIT 4 (INSTALLED HANDICAP BATHROOM) This permit is granted in conformity with the Statutes and ordinances relating thereto, and expires .............................. . _ unless sooner suspended or revoked. Expiration Date _--------- - -------- -.. .. _.. -- ----- - - Issued On:Wed Jan 23,2008 ---------- --- -- ---- ----------- - GeoTMS®2008 Des Lauriers Municipal Solutions,Inc. - --- - --- -- ---------------------------------------------------------------- �.CoNDtT� YSpYE AC CITY OF SALEM BUILDING PERMIT DATE. (/id 3 3 3 b CITY 46 SALEM AS FITTING► INSPEC110N ( APPROVAL NOTIC Si. NO. t 1 APARTMENT NO. OCCUPANT - • I THE GAS PIPING AND CONNECTED ANCES SERVED THROUGH THIS METER N. NECTION HAVE REEK INSPECTED AND AP ED "FINN RANGE WATER HEATER DRYER FURNACE INCINERATOR STEAM O0. HOT WATER BOILER n SPACE HEATER OVENI OUNTER Tom_ OTHER"1 ti FITTER one or rep aeementa a ow w t I - out firs securing a permit for same. -All gas Inst" tioru4)ta,bp�mado by Licensed 'Plumber or tier in acco7 ancgeRit Chapter L742,Maaa ct of,79w., Per,`, Inspector of Gas Fitting I t x 0096 SWAMPSCOTT ROAD 596-08 j,.• r_#'cis# " 1zz8 , _ COMMONWEALTH OF MASSACHUSETTS Map: 07 Block: CITY OF SALEM 'Lot: 0070 Category: REPAIR/REPLACE ]'errnit# 596_08 BUILDING PERMIT Project# JS-2008-000888 Est. Cost: $11,000.00 Fee Charged: $126.00 Balance Due: $.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Expires Use Group: Bob Built Carpentry CONSTRUCTIO SUPERVISOR-053841 Lot Size(sq.ft.): 567586.8 , Zoning: I ;Owner: ATLANTIC EXTRUSIONS CORP Units Gained: Applicant: Tobin Movers Units Lost: _ A0096 SWAMPSC0IT ROAD Dig Safe#: ISSUED ON. 26-Nov-2007 AMENDED ON: EXPIRES ON. 25-Jun-2007 TO PERFORM THE FOLLOWING WORK. CONSTRUCT HANDICAP BATHROOM POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building Underground: Underground: Underground: Excavation: Service: ��((��,qq Meter: / ,,1 /�/1 ///'''��I Footings: Rough:Az—/(J-024W! Rougpfil( is O,-(/ / A/ Rough:d( a4-/�0�, Foundation: Final: f�. �� f Fina: „{ I Final: Rough h ho m O k / lz �� �u 12�� D� dX�de l��z�7 g Fireplace/ hi ney: D.P.W. Fire Health Insulation Meter: r Final: HouseN Smoke: ppp y Tr as ry: Water: Alarm: Sewer. Sprinklers. THIS PERMIT MAY BE REVOKED ICY THE CITY OF SALEM UPON Y ATION OF ANY OF ITS RULES AND REGULATIONS. "1 Wd Signature: Fee Type: Receipt No: Date Paid: Check No: Amount: BUII'LLDMG REC-2008-001110 26-Nov-07 0 $126.00 Al Upon ca np 1 ` 4 \i T .. L LL71:I GeoTMS®2007 Des Lauriers Municipal Solutions,Ina `: ,N A� C J loom YSQYE AO 3 " ( ' M v� (-) SAL-+_" Clry I I� PEWIT BUILD .M - itv of1r��t; � �s �c �xzFftS aQ` Vmmin cxttrit Onr �;afrm (Firren ' n>=cision� AUG 5 it SI 4,H #85 ' HLEAgust 2 , 1985 CITY " o` ea.ER,MA56. SPECIAL PERMIT BUSINESS PARK/SITE PLAIT REVIEW Mr . George Director of Engineering Services The Fafard Companies 290 Eliot Street t Ashland, MA. 01721 On Thursday, July 18, 1985 , the Planning Board of the City of Salem held a public hearing regarding the application of the Fafard Compani.es .for Special Permits, under Sections Q. Business Park Development, and R., Site Pian Review, of the Salem Zoning Ordinance, with respect to a �proposa-l,t.o:construct a 110,000 square foot bu.lding_t.o,hause Maynard R1-as.tics Company, on a_13-acre parcel on Swampscott Road, Salem. iA portion of Assessors' Map 7 , Lot 63) . Ata regularly-scheduled meeting of the Planning Board held on Augut st 1 , 1985, the Board voted, by a vote of six in favor, none opposed, one abstention, to approve the application as complying with the requirements for the issuance of the permit with the Following conditions: I BUSINESS PARK/SITE PLAN REVIEW Requirements for Permits. Compliance -` 4 C7 4i to csi I . Location/dimensions of Yes ,ra Clz rn buildings and other construction � < � M3 2. Locacion/dimension of Yes parking, loading, walkways , driveways u-3 3. Location and dimensions of Yes internal roadways & accessways to adjacent public roadways 4. Location and type of external lighting Yes 5. Location, type, dimensions, quantities of landscaping and screening — Page 2 — 6. Locations and dimensions of utilities Yes including water, surface drainage, sewer, and other waste disposal , gas, telephone, electrical, communidation 7 . Location of snow storage areas Yes 8. Location of existing natrual features , Yes including ponds, bridges, streams, and wetlands 9 . Topography of the land at two—foot Yes contours 10. Narrative Yes 11 . Conceptual drawing of building to be Yes erected, including elevations showing architectural styles 1 . All sedimentation and erosion control structures shall be installed at the 100' buffer zone line as determined by the Conservation Commission prior to commencement of work. Such structure shall be maintained during construction. 2 . Stockpiled fill material excavated during the 21—E process which has been deemed to be hazardous shall be removed from the site within four weeks from the date of this decision. This material shall be removed to an approved facility and copies of delivery slips shall be supplied to the Planning Board. Until such material is removed, stockpiled material shall be covered and surrounded by hay bales. 3 . A detail of silt fence to be installed shall be provided to the Planning Board. 3 4. The proposed project in full shall be subject to the review and approval of the Conservation Commission. 5. Drainage calculations for retention area shall be submitted for 10, 50, and 100 year storms to the Engineering Department and Conservation Commission for review and approval . 6. Salt as a de—icing agent shall be prohibited. 7 . All utilities shall be constructed so as to protect from leakage and seepage of water. Page 3 — 8 . Floor levels of habitable living space shall be four feet above seasonal high water table. 9. Basements below seasonal high water table which could be used as habitable space shall be flood—proofed. 10. P. determination of the adequacy and design of internal roadways with respect to roadway widths , curbings, sidewalks, and planting strips shall be subject to the review and approval of the Planning Board and Planning Department. Such determination shall include an assessment of the possibility of widening the exit roadway onto Swampscott Road to better facilitate traffic flow. 11 . . The buirding location shall be altered from location shown on site plan dated July 18 , 1985 in a northerly direction in the amount of 30 feet . 12 . The building location shall be altered from location shown on site plan dated July 18, 1985 in a northerly direction in the amount of 20 feet . 13 . Roadway layout as approved by the Planning Board shall be strictly adhered to. Construction vehicles shall follow roadway layout to minimize impact upon wetlands. 14. Water and sewer designs shall be subject to the review and approval of the Engineering Department and Planning Board. 15 . The number of parking spaces shall be conditional upon an analysis by the Planning Department of Maynard Plastics parking needs . Reserve spaces for additional parking shall be delineated on the approved pian. 16 . A sewer, water, and road profile for the entire 43 acre parcel shall be submitted for the review and approval of the Engineering Department and Planning Board. 17 . Drilling and blasting shall be subject to Fire Dept. codes (M.G.L. 118 S. ICA and 527 C.M.R. 13 .00) A pre—blast survey shall be performed prior to commencement of construction. Drilling and blasting shall only take place during hours as defined by the Planning Department and the Fire Department . 18. The development to take place on the parcel shall be subject to the MEPA process. 19. Proposed signs shall be subject to the review and approval of the Planning Department . Page 4 - 20. Adequacy of culverts on Swampscott Road shall be analyzed by the developer and the Planning Department. upgrading of culverts, if deemed necessary, shall be undertaken by the developer at the cost of the developer. 21 . Fire access to all. four sides of the proposed buildings shall be provided or requested by the Fire Department . 22 . A lighting plan shall be subject to the review and approval of the Planning Board. 23. A landscaping plan shall be subject to the review and approval of the Planning Board. 24. Easements for access purposes to adjoining parcels in the entire 43 acre parcel as defined by the City shall be provided in a form approved by the Planning Board and City Solicitor. 25. The future roadway improvement needs of Swampscott Road shall be analyzed by the Planning Board and Planning Department and needs as defined by such analysis shall be adhered to by the developer in the form of reservation of land necessary for such 'improvements. 26 . A detailed specification of the storage tank areas for Maynard Plastics shall be provided to the Planning Board. Such detailed plans shall include contents of tanks and emergency procedures in the event of electrical failure. 27 . A specification of the proposed control structure shall be supplied to the Engineering Dept. and Conservation Commission for review and approval . 28. Adequacy of fire flows and location of hydrants shall be approved by Fire Department , 29. A policy for the maintenance and cleaning of surface drains shall be presented to the Board of Health. 30. Prior to Certificate of Occupancy, the water system shall be tested for pressure and bacteria. 31 . An acceptable means for the holding and disposal of rubbish shall be submitted to the Board of Health for review and approval . 32 An acceptable means of removal of construction debris and vegetation shall be employed. 33 . Prior to commencement of construction, a licensed pest control firm shall be employed for site evaluation. Copy of results shall be submitted to Board of Health. F Page 5 — 34. An acceptable method for dust control and street cleaning shall be employed during construction. This Special Permit shall not take effect until a copy of the decision bearing the certification of the City Clerk that twenty days have lapsed and no appeal has been filed, or that if such appeal has been filed, or that if such appeal has been filed, and it has been dismissed or denied, is recorded in the Essex County Registry of Deeds and is indexed in the grantor index under the name of the owner of record or is recorded and noted on the owner ' s certificate of title. The fee for recording or - registering shall be paid by the owner or applicant. Walter B. Power, III Chairman �,�owrytb BOARD OF ASSESSORS �v z !4 93 WASHINGTON STREET.CITY HALL, SALEM. MASSACHUSETTS 01970 (617) 744-0660 ' s,€71•7� September 6, 1985 Mrs. Josephine R. Fusco City Clerk City of Salem Salem, MA 01970 Dear Mrs. Fusco: Please bead_v_ised_that the new industrial facility being built for .Maynard Plastics on Swampscott Road on a portion of the parcel located north of the North Shore Tennis and Squash Club (Assessors'Parcel_#07-0063) has been assigned the street address of�96 Swampscott Road. -i Ver truly your Peter M. Caron Assessor PMC:mjg cc: Kenneth B. Cahill, Postmaster Acting Chief Robert J. Crowley, Fire Department Margaret R. Hagerty, Principal Clerk, Water Dept. k illiam H. Munroe, Inspector of Buildings Engineering Dept. , City of Salem Maynard Plastics Co., 49 Congress St., Salem SALEM FIRE DEPARTMENT FIRE PREVENTION BUREAU 48 LAFAYETTE STREET SALEM, MA 01970 (617) 745-7777 2i. INa*I I 10 n1 !( Pnn May 13, 1986 - CITy Mr. William H. Munroe Inspector of Buildings One Salem Green Salem , Ma 01970 Dear Mr . Munroe: On Thursday, May 8th, I signed a conditional/partial approval for the Maynard Plastics factory at #58 Swampscott Road. At the time of approval, several items remained outstanding, and according to Mr. John Chabot of the Fafard Corporation, would be completed in the near future. These items were as follows: 1 . The graphic fire alarm annunciator panel is incomplete and has not been installed . This annunciator is to be equipped with a slience alarm switch and trouble buzzer as per specifications. 2 . The sprinkler systems are not yet connected to the water-motor gongs. 3. The sprinkler systems in the warehouse portion of the factory are not complete as yet. Piping within the rack sprinklers is in the process of completion. 4 . The master fire alarm box is not yet operational . Connection to the fire alarm system is incomplete. 5. Flow data for the sprinkler system has yet to be submitted to the Fire Prevention Bureau from Artec Sprinkler Company. G. Permits for installation of both the fire alarm system and the sprinkler system are to be completed. 7. Certificates of compliance/completion shall be obtained by the installers of both the sprinkler and fire alarm systema. A final inspection and test of both the fire alarm and sprinkler systems will be made prior to a final sign-off for the property. S ' ed, 7 , _ Robert W. Turner, Fire Marshal DATE OF PERMIT PERMIT No. OWNER Maynard Plastic LOCAT)nu 9/3/85 #581 FAFARD & SONS CONSTRUCTION INC 96;-Swampscott, Road BPD STRUCTURE MATERIAL DIMENSIONS No. OF STORIES No.OF FAMILIES WARD COST foundation one 3 . . . . . . BUILDER owner FOUNDATION ONLY APPROVED. SUPER STRUCTURE PLANS MUST BE SUBMITTED AND APPROVED PRIOR TO THE START OF CONSTRUDTION. FEE X8,150.40 12/5/85--#581 certificate of occupancy issued #581-A---12/5/85---superstructure, approval condition, upon approval of Director of Public Services of site plan by December 19, 1985. towner Maynard Plastic ) 7/17/86 #565 Erect Sign Est. Cast 1,500. Fee pd. ck. 17. 11/29/88 #719-88 Erect 40"X10' sign, MAYNARD PLASTICS, cost $ 1 ,800. fee $20.00 )/29/89 581 -A CERTIFICATE OF OCCUPANCY ISSUED ON PER14IT #518-A 4/8/91 ,#126-91 REMOVE & RELOCATE NONBEARING INTERIOR PARTITIONS,CONSTRUCT OFFICE SPACE W/ELECTRICAL CLOSET COST $80,000. fee $485.00 J.S. 1 d CITY OF SALEM, MASSACHUSETTS PLANNING DEPARTMENT WIL- AM E. LUSTER /5°y ��r��. ONE SALEM GREEN City Planner I ? , , _ 01970 (508) 745-9595, EXT. 311 seF -• ��? FAX (508) 744-5918 \mine W� Decision a N Site Plan Review Special Permit r Business Park Development Special Permit Wetlands and Flood Hazard District Special Permit Fafard Real Estate and Development Corporation - CD 290 Eliot Street a Ashland. MA 01721Lin N RE: Thermal Circuits - 58 Swampscott Road On Thursday, April 6, 1995, the Planning Board of the City of Salem held a public hearing regarding the application of The Fafard Real Estate and Development Corporation for Special Permits, under Section 7-16 Wetlands and Flood Hazard District, Section 7-17 Business Park Development and Section 7-18 Site Plan Review, of the Salem Zoning Ordinance, with respect to a proposal to construct a 52,000 s.f. building to house Thermal Circuits at 58 Swampscott Road. At a regularly scheduled meeting of the Planning Board held on April 6, 1995, the Board voted, by a vote of eight in favor, none opposed, to approve the application as complying with the requirements for the issuance of the permit with the following conditions: 1. Conformance With Plan Work shall conform with set of plans entitled, "Layout Plans for Thermal Circuits in Salem, MA," dated March 20, 1995, revised April 18, 1995, containing sheets 1-3, prepared by Fafard Real Estate and Development Corporation, 290 Eliot Street, Ashland, MA 01721. 2. Amendments Any amendments to the Site Plan or waiver of conditions contained within shall require the approval of the Planning Board. 3. Conservation Commission All work shall comply with Order of Conditions N64-152 issued by the Salem Conservation Commission, as amended. If such amendment is determined to be significant to the Planning Board, such change shall require the approval of the Planning Board. 4. Utilities a. Utility installation shall be reviewed and approved by the City Engineer prior to the issuance of a Building Permit. b. Drainage shall be reviewed and approved by the City Engineer prior to the issuance of a Building Permit. 5. Site Li hg ting a. A lighting plan shall be submitted to the City Planner for review and written approval prior to the issuance of a Building Permit. b. All site lighting shall be installed and maintained in such a way so as to not reflect or cause glare on abutting properties, or which adversely affect safe vision of operators of vehicles moving on nearby streets. c. Proposed street lighting for the entrance roadway shall be reviewed and approved by the City Electrician prior to the issuance of a Buiiding Permit. 6. Landscaping a. A detailed landscaping plan and planting schedule shall be submitted to the City Planner and approved in writing prior to the issuance of a Building Permit. b. Trees shall be a minimum of 3 1/2" caliper. c. Sloped granite curbing shall be installed at the entrance radii to Thermal Circuits. d. Concrete curbing shall be installed within the Thermal Circuits site. e. After all project landscaping is completed, and prior to the issuance of a Certificate of Occupancy, the applicant shall be required to add further landscaping if such is required by the City Planner. 7. Signage Proposed signage shall be reviewed and approved in writing by the City Planner. 8. Board of Health All Board of Health requirements shall be strictly adhered to. 9. Hydrants Location of hydrants shall be approved in writing by the Fire Department prior to the issuance of a Building Permit. 10. Water Test The water system shall be tested by the City of Salem's Clerk of the Works for pressure and bacteria prior to the issuance of a Certificate of Occupancy. It. Underground Utilities All utilities shall be installed underground. 12. Roof Too Equipment A detailed plan showing the location of any roof top equipment and the proposed screening shall be submitted to the City Planner prior to the issuance of a Building Permit. HVAC catalog cuts and information related to proposed decibel levels shall be submitted to the City Planner. Any potential screening shall be reviewed and approved in writing by the City Planner prior to the issuance of a Building Permit. 13. Clerk of Works A Clerk of Works shall be provided and paid for by the applicant as deemed necessary by the City Planner. 14. Maintenance a.The applicant shall employ an acceptable method or means for the holding and disposal of trash (rubbish) after site development with a copy of this method sent to the Planning Department and Health Department in writing for their approval. b.Refuse removal, ground maintenance and snow removal shall be the responsibility of the developer, his successors or assigns. c.Winter snow and ice maintenance process shall be approved by the City Engineer. d.There shall be no salt used as a de-icing agent. e.Winter snow in excess of the snow storage areas on the site shall be removed off site. 15. Construction Practices All construction shall be carried out in accordance with the following conditions: a. No work shall commence before 8:00 A.M. on weekdays and Saturdays. No work shall continue beyond 5:00 P.M. There shall be no work conducted on Sundays and holidays. Inside work of a quiet nature may be permitted at other times. b. All reasonable action shall be taken to minimize the negative effects of construction on abutters. Advance notice shall be provided to all abutters in writing at least 72 hours prior to commencement of construction. Notification shall also be submitted to the Planning Department. c. Maintenance of all landscaping shall be the responsibility of the developer, his successors or assigns. d. All construction shall be performed in accordance with the Rules and Regulations of the Planning Board, and in accordance with any and all rules, regulations and ordinances of the City of Salem. 16. As-Built Plans As-built plans, stamped by a Registered Professional Engineer or Land Surveyor, shall be submitted to the Planning Department and Engineering Department prior to the issuance of a Certificate of Occupancy. 17. Violations Violations of any condition may result in revocation of this permit by the Planning Board. I hereby certify that a copy of this decision and plans have been filed with the City Clerk and copies are on file with the Planning Board. The Special Permit shall not take effect until a copy of this decision bearing the certification of the City Cleric that twenty(20) days have elapsed and no appeal has been filed or that if such appeal has been filed, and it has been dismissed or denied, is recorded in the Essex South Registry of Deeds and is indexed under the name of the owner of record or is recorded on the owner's Certificate of Title. The 'fee for recording or registering shall be paid by the owner or applicant. Walter B. Power, III Chairman � ' CITY OF SALEM, MASSACHUSETTS ' PLANNING DEPARTMENT /t �pNUIL,�J' WIL IAM E. LUSTER Wyly s, 4�kl ONE SALEM GREEN City Planner 01970(508) 745-9595. EXT. 311 fi FAX (508) 744-5918 Decision ' n z N Definitive Subdivision Plan Fafard Real Estate and Development Corporation 41 290 Eliot Street _ 4, Ashland. MA 01721 RE: Thermal Circuits - 58 Swampscott Road u1 On Thursday, April 6, 1995, the Planning Board of the Cuy of Salem held a public hearing regarding the application of The Fafard Real Estate and Development Corporation for a Definitive Subdivision Plan for a proposal to construct a road and associated utilities to service the Swampscott Road Industrial Park at 58 Swampscott Road. At a regularly scheduled meeting of the Planning Board held on April 6, 1995, the Board voted, by a vote of eight in favor, none opposed, to approve the application as complying with the requirements for the issuance of the permit with the following conditions: 1. Conformance With Plan Work shall conform with set of plans entitled, "Definitive Plan of Land in Salem, MA," dated March 24, 1995, revised April 18, 1995, containing sheets 1-6, prepared by Fafard Real Estate and Development Corporation, 290 Eliot Street, Ashland, MA 01721. 2. Amendments Any amendments to the Site Plan or waiver of conditions contained within shall require the approval of the Planning Board. 3. Conservation Commission All work shall comply with Order of Conditions #64-152 issued by the Salem Conservation Commission, as amended. If such amendment is determined to be significant to the Planning Board, such change shall require the approval of the Planning Board. 4. Utilities a. Utility installation shall be reviewed and approved by the City Engineer prior to the issuance of a Building Permit. b. Drainage shall be reviewed and approved by the City Engineer prior to the issuance of a Building Permit. 5. Site Liehtine a. A lighting plan shall be submitted to the City Planner for review and written approval prior to the issuance of a Building Permit. b. All site lighting shall be installed and maintained in such a way so as to not reflect or cause glare on abutting properties, or which adversely affect safe vision of operators of vehicles moving on nearby streets. c. Proposed street lighting for the entrance roadway shall be reviewed and approved by the City Electrician prior to the issuance of a B :: :'.ing Permit. 6. Landscaoine a. A detailed landscaping plan and planting schedule shall be submitted to the City Planner and approved in writing prior the issuance of a Building Permit. b. Trees shall be a minimum of 3 1/2" caliper. c. A concrete sidewalk and a planting strip with deciduous trees planted 50 feet on center shall be installed along the Easterly side of the new road up to and along the entire length of the Thermal Circuits parcel. The applicant shall install a concrete sidewalk on the entire length of the subdivision road upon the sale and development of future lots within the subdivision. d. Sloped vertical granite curbing shall be installed along the new road and around the cul- de-sac and also along the radii at the Thermal Circuits entrance. e. Concrete curbing shall be installed within the Thermal Circuits site. f. After all project landscaping is completed, and prior to the issuance of a Certificate of Occupancy, the applicant shall be required to ad•i F;Ldier landscaping if such is required by the City Planner. 7. Signage Proposed signage shall be reviewed and approved in writing by the City Planner. 8. Board of Health All Board of Health requirements shall be strictly adhered to. 9. Hydrants Location of hydrants shall be approved in writing by the Fire Department prior to the issuance of a Building Permit. 10. Water Test The water system shall be tested by the City of Salem Clerk of the Works for pressure and bacteria prior to the issuance of a Certificate of Occupancy. 11. Undereround Utilities All utilities shall be installed underground. 12. Roof Top Equipment A detailed plan showing the location of any roof top equipment and the proposed screening shall be submitted to the City Planner prior to the issuance of a Building Permit. HVAC catalog cuts and information related to proposed decibel levels shall be submitted to the City Planner. Any potential screening shall be reviewed and approved in writing by the City Planner prior to the issuance of a Building Permit. 13. Clerk of Works A Clerk of Works shall be provided and paid for by the applicant as deemed necessary by the City Planner. 14. Maintenance a.The applicant shall employ an acceptable method or means for the holding and disposal of trash (rubbish) after site development with a copy of this method sent to the Planning Department and Health Department in writing for their approval. b.Refuse removal, ground maintenance and snow removal shall be the responsibility of the developer, his successors or assigns. c.Winter snow and ice maintenance process shall be approved by the City Engineer. d.There shall be no salt used as a de-icing agent. e.Winter snow in excess of the snow storage areas on the site shall be removed off site. 15. Construction Practices All construction shall be carried out in accordance with the following conditions: a. No work shall commence before 8:00 A.M. on weekdays and Saturdays. No work shall continue beyond 5:00 P.M. There shall be no work conducted on Sundays and holidays. Inside work of a quiet nature may be permitted at other times. b. All reasonable action shall be taken to minimize the negative effects of construction on abutters. Advance notice shall be provided to all abutters in writing at least 72 hours prior to commencement of construction. Notification shall also be submitted to the Planning Department. c. Maintenance of all landscaping shall be the responsibility of the developer, his successors or assigns. d. All construction shall be performed in accordance with the Rules and Regulations of the Planning Board, and in accordance with any and all rules, regulations and ordinances of the City of Salem. 16. As-Built Plans As-built plans, stamped by a Registered Professional Engineer or Land Surveyor, shall be submitted to the Planning Department and Engineering Department prior to the issuance of a Certificate of Occupancy. 17. Violations Violations of any condition may result in revocation of this permit by the Planning Board. I hereby certify that a copy of this decision and plans have been filed with the City Clerk and copies are on file with the Planning Board. The Special Permit shall not take effect until a copy of this decision bearing the certification of the City Clerk that twenty(20) days have elapsed and no appeal has been filed or that if such appeal has been filed, and it has been dismissed or denied, is recorded in the Essex South Registry of Deeds and is indexed under the name of the owner of record or is recorded on the owner's Certificate of Title. The fee for recording or registering shall be paid by the owner or applicant. �- Walter B. Power, III Chairman jmlbd�58..e pa.dep City of 6atem, ;ffiag2;acbU2;ettg Public Propertp Mepartment �q�mg �T JOuitbing Mepartment One &salem Oreen 745-9595 GCxt. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer November 19, 1990 TO: Maynard Plastics Company, Applied Extrusion Technologies, Inc. and Lane & Altman RE: Business Park/Site Plan review Special Permit and Wetlands and Flood Hazard Special Permit, both dated August 2, 1985, for the premises at 96 Swampscott Road, Salem,Massachusetts This is to confirm that the manufacture of plastic products by various methods (including injection molding, extrusion process and blow molding) are lawful uses in a BPD zoning district. 01i ✓/H. Munroe Zoning Enforcement Officer Inspector of Buildings WHM:bms �_ THIS PERMIT NOT VALID UNLESS I 1 1 BUILDING °n PROPERLY RECEIPTED BY CASHIER } *... 9 CITY OL SALEM : 1� 5 SAL -MP'MASSACHUSETTS OI970 PERMIT: T o� T VALIDATION S EY DATE - :i. 19 113 PERMIT NO ?T APPLICANT Y... "I[�..L ✓r*-+ 44•. :..C. �._.. . ADDRESS :.anA (H0.) ISTREETI - - " - (FONT R'$ LICENYEI ., . 1 ^f} n*Tq.'S:-.5. ,:-r :. NUMBER OF..: PERMIT TO. n M I_I STORY TI'f.l{a;'%'TTA.' DWELLING UNITS ITYPE OF IMPROVEMENT) NO. _ (PROPOSED USE) A r; :- •- ZONING AT (LOCATION) ^.!'F.F CO _ _ 1 'O.1 - - - (STREET)/ —�� DISTR IGT 9ETWEEN _ - AND " (CROSS STREET) (CPO$$ STREET) LOT 1; 'SUBCIVIS ION -LOT-BLOCK—SIZE BUILDING I$ TO BE FT. WIDE BY FT. LONG BY FT. IN HEIGHT AND SMALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP —BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: 'Ell- 1. i°T✓ 1.t :OS FUf L T::3 Ai7P. I AREA OPl -.r. PERMIT p VOLUME - ESTIMATED COST FEE :CUBIC/SOLARE FEET) ADDRESS ,"I- . S !1' - .�� �' a :'.�':�i E . ssa -�'RTAT'vA'T—�'YTITE7- -- F P V D PLANS MUST BE RETAINED_D ON'jB ANG HI N'1-.GRE A �, nrEf EC TIONS REOW RED FCR - CARD KEPT POSTED UNTIL FINAL INSPECTION HAS SEEN PERMITS ARE ECUIRED FOR ALL CONSTRUCTION WORK: ELECTRICAL, PLUMBING AND I FOVNDATICI:S pR FpOTING S. MADE: WHERE A CERTIFICATE OF OCCUPANCY 15 RE- MECHANICAL INSTALLATIONS. PRIOR Tp toll ERlNc STRUCTURAL CUIRED,SUCH BUILDING SHALLNOTBE OCCUPIED UNTIL ' MEM6E RS(RE TI TO LATH). FINAL INSPECTION HAS BEEN MADE. +, FINAL INSPECTION BEFORE • CC!UPA NC Y. '. HOST THIS CAR® S® BT IS VISIBLE FROM STREET BV'LDING INSPECTION APPROVALS P GING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS �2 AS J� ze� 2 ov GAASS INSPECTION APPROVALS - IRE DEPT.INSPECTING APPROVALS /10 oe OTHER CITY ENGINEER, z ip/� 2 _ 0 woe[ SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CON�DATETIIE INSPECTIONS INDICATED ON THIS CARO INSPECTOP HAS APPROVED THE VARIOUSCAN BE ARRANGED FOR BY TELEPHONE WORK 15 NOT STARTED WITHIN SIX MONTHS OF OR WRITTENNr ,'ATION. 0 (fi#v ofttlPm, ttssttrusE##s LRepartment of Public Works DEC 10 9 �9 (One �2IIEm I�HTEPn RECEIVRp CITY OF SAL E14,HASS. PAUL S.NIMAN DIRECTOR OF PUBLIC SERVICES December 9, 1985 Mr. Joseph Trolla H. A. Fafard & Sons Construction, Inc. 290 Eliot Street Ashland, MA. 01721 • RE: Development - Maynard Plastics Dear Mr. Trolls: Atryour_request—l—submitted-t-he.design_criteria for the sprinkler system for the Maynard Plastics building_on_Swampscott`ti` ur consultant for comments. As you are aware the L.E.A. Group is currently performing hydraulic analyses on our water pumping station on Highland Avenue which will service the Swampscott Road area. Eased on their findings, it appears that we can meet all of your criteria _ except the 90 psi residual pressure at 2500 gpm. I have attached a copy of their findings. Accordingly, I must advise you to include a fire booster pump system in your sprinkler system design. If you have any additional questions please feel free to call me at 744-0241. ' CVery truly yours, Paul S. Niman Director of Public Services PSN/cmc cc: Gerard Kavanaugh William Munroe Capt. Turner LL E Pkx GROUP ENGINEERS/rll2CHITECTS/PL,-\NERS December 2, 1985 Mr. Paul S. Niman Director of Public Services One Salem Green Salem, Massachusetts 01970 RE: Salem Water Improvements Highland Avenue Area LEA Project No. 59623.01 Dear Mr. Niman: We have. reviewed the Fafard Company's letter of November 19, 1985 concerning the required water pressure and fire flow for the Maynard Plastics building on Swampscott Road, and have the following comments: 1. The Highland Avenue system can and will be able to produce a normal static pressure of 100 psi in the area of Maynard Plastics. 2. The existing pumps, based on flow testing, appear to have a maximum discharge rate of 1800 gpm. We are working on the hydraulic analysis and recommendations to enable the booster station to deliver a fire flow of between 2500 and 3000 gpm. 3. The residual pressures in the distribution system in the area of Maynard Plastics will likely be in the range of 30 to 40 psi when a flow of 2500 gpm is being drawn. We currently estimate that a flow of 2500 gpm at Maynard would cause a head loss of approximately 40 psi in the distribution systema This would require a pressure of nearly 130 psi at the pump station, which we feel is excessive. The DEQE Guidelines for Water Supply generally do not want system pressures to exceed 100 psi, and prefer working pressures between 35 and 60 psi. Based on the foregoing, we feel that Maynard Plastics may have to install a fire booster pump system for its sprinklers, if they require 2500 gpm @ 90 psi. The evaluation of Highland Avenue is to be completed by January 1, 1986. We need to get accurate flow and head curves for the station and system from the new meter to complete the work. Upon completion, we can provide a more accurate evaluation of the above. ii Kneeland Street,BOSUAI.Vass:idnisetts 02111 Telephone(617)426-6300 LEA GROUP Mr. Paul S. Niman December 2, 1985 - 2 - . If you pave any questions, please contact us. Very truly yours, LEA GROUP Peter B. Knowlton Project Manager PBK:peg . _ nru __ Pub it Propertg Department ns Pepartmerd William H. Munroe One Salem Green 745-0213 i May 13, 1986 Mr. Sohn Chabot H.A: Fafard Construction Co. Inc. 290 Eliot Street Ashland, MA 01721 RE: Maynard Plastics, Swampscott Road, Salem, MA Dear Mr. Chabot, This letter will serve to confirm our on site conversation of May 12, )986 with regards to the Maynard Plastics building off Swampscott Road. As I indicated at that time this letter will serve as a temporary Certificate of Occupancy to occupy the building with the following condition's: 1 . All "Punch List" items remaining the responsibility of the Fafard Company shall be completed. 2. All items the responsibility of Maynard Plastics shall be completed to the satisfaction of the variousCity Inspection Departments. '93. Sewerage generated during the "Set-Up" operation will not exceed two thousand (2,000) gallons daily urtil such time as a State Discharge Permit has been issued and a City Sewer Permit approved by the Director of Public Services. 4. Prior to the start-up of plant operation's final approvals must be received from all involved city departments and a final Certificate of Occupancy issued by this department. If I can be of further service please contact me. Sincerely, William H. Munrooefie Inspector of Buildings WHM/djg 3100 (/ /P -rip . /_�A.—�i41�R�-+) C�.t�,fy`ia-�crtr�►ti G��2r-G_. 2g'v .�Gi o_r s'rzztSr� lZls�/_rlAy�� �s r�—,_s_w�►► P sc.rr �.o.�� —O_U� Div S/7 off' /rlAy 2 , i96� 6y• t s � Df 7'a Tfr� /17i4y.✓rst-j /OL�y�'+ cr /�� G�i.�.`- o FF T' ALA• Thea T T 0" o*s 04 737K Ad-4—AL7— G�itJ1�, - C.c,es�= o� �c� �� 7 � occ � ,o•� �d. LDS�.i.-. wi the T7� �i/ri✓. �.o- GD�.�.'1��.�'!, /• /ALL ��aw-dl-f Lo r T 7Ajot -A Of T f �ifrt� coA+ ,o-00*7- �onxo=ra,D/- 2, �. . , _ y ., . „. . , . .. .y [ a'' � �1 6 „� .- y •, - � - c ' � a ro !i _ ti } 1 � .. +.. y �. M: y . . � . ,y � y � L � , 0 � �y ' d.. . y. .. "'^y, ate'-' �: _ -•, w . . , - , ` �• . _ �, . . _ .. - '� ry a —t -,� { �' __w A . _y — _ . r _ — • k .. ... ------ ''od" y 4 � 52FW&A 06& - �;�-- as �► lj��er�?"> .►>+� �v. t/ .�+ T ,rix c.c"�� --. -Af CTar Aft RKY �"�2M 7 v.�s G S✓cam r�•+, � /i-1 _ ___ _ —._—,#At "a > J'SJ�,U_.. Ttt OIA Crok Or Pddur reltulCf — . 4.t r /' re�►`►r �r�-y.r.. r -G.t.. �,i,���lv Gc rt, G. '(�T.:t -- �_ _ � _ y � �. � .3 Q i `1 4 � ! i � of 2Wmi, One �;alrm (fruit N r v DECISION s. a m August 2, 1x85 NNSPECIAL PERMIT WETLANDS,„AND.,FLQ04,LAZARD.SP-ECIAL_P RMIT_- Mr. George Seeley Director of Engineering Services The Fafard Companies 290 Eliot Street Ashland, MA. 01721 On Thursday, July 18, 1985, the Planning Board of the City of Salem held a public hearing regarding the application of the Fafsrd Companies for Special Permits, under Sections P, Wetlands and Flood Hazard Special Permits, of the Salem Zoning Ordinance, with respect to_a,proposa.l:to+� construct a 170,000 square foot bulding to house Maynard Plastics Company, on a 13-acre parcel o� cmps_cctt_R_oad, Sa-l.em-.— (A portion of Assessors' Map 7 , Lot 63) . At a regularly-scheduled meeting of the PIanning Board held on August 1 , 1985, the Board voted, by a vote of six in favor , none opposed, one abstention, to approve the application as complying with the requirements for the issuance of the permit with the following conditions : BUSINESS PARK/SITE PLAN REVIEW Requirements for Permits Compliantmg 7 c` 9P o� c� ri �ry� 1 . Location/dimensions of Yes rr• M- buildings and other construction Onrnem 2 . Location/dimension of Yes parking, loading, walkways, driveways t^ 3. Location and dimensions of Yes internal roadways & accessways to adjacent public roadways 4. Location and type of external lighting yes 5. Location, type , dimensions, quantities of landscaping and screening Page 2 - 6. Locations and dimensions of utilities Yes including water, surface drainage, sewer, and other waste disposal, gas, telephone, electrical , communidation 7. Location of snow storage areas Yes 8. Location of existing natrual features , Yes including ponds, bridges, streams, and wetlands 9. Topography of the land at two-foot Yes contours 10. Narrative Yes 11 . Conceptual, drawing of building to be Yes erected, including elevations showing architectural styles 1 . All sedimentation and erosion control structures shall be installed at the 100' buffer zone line as determined by the Conservation Commission prior to commencement of work. Such structure shall be maintained during construction. 2. Stockpiled fill material excavated during the 21-E process which has been deemed to be hazardous shall be removed from the site within four weeks from the date of this decision. This material shall be removed to an approved facility and copies of delivery slips shall be supplied to the Planning Board. Until such material is removed, stockpiled material shall be covered and surrounded by hay bales. 3. A detail of silt fence to be installed shall be _provided to the Planning Board. 4. The proposed project in full shall be subject to the review, and approval of the Conservation Commission. 5. Drainage calculations for retention area shall be submitted for 10, 50, and 100 year storms to the Engineering Department and Conservation Commission for review and approval. 6. Salt as a de-icing agent shall be prohibited. 7. All utilities shall be constructed so as to protect from leakage and seepage of water. Page 3 — 8. Floor levels of habitable living space shall be four feet above seasonal high water table. 9. Basements below seasonal high water table which could be used as habitable space shall be flood—proofed. 10. A determination of the adequacy and design of internal roadways with respect to roadway widths, curbings, sidewalks, and planting strips shall be subject to the review and approval of the Planning Board and Planning Department . Such determination shall include an assessment of the possibility of widening the exit roadway onto Swampscott Road to better facilitate traffic flow. 11 . The building location shall be altered from location shown on site plan dated July 18, 1985 in a northerly direction in the amount of 30 feet . 12 . The building location shall be altered from location shown on site plan dated July 18, 1985 in a northerly direction in the amount of 20 feet . 13 . Roadway layout as approved by the Planning Board shall be strictly adhered to. Construction vehicles shall follow roadway layout to minimize impact upon wetlands. 14. Water and sewer designs shall be subject to the review and approval of the Engineering Department and Planning Board. 15 . The number of parking spaces shall be conditional upon an analysis by the Planning Department of Maynard Plastics parking needs. Reserve spaces for additional parking shall be delineated on the approved plan. 16. A sewer, water, and road profile for the entire 43 acre parcel shall be submitted for the review and approval of the Engineering Department and Planning Board. 17 . Drilling and blasting shall be subject to Fire Dept . codes (M.G.L. 118 S. 10A and 527 C.M.R. 13 .00) A pre—blast survey shall be performed prior to commencement of construction. Drilling and blasting shall only take place during hours as defined by the Planning Department and the Fire Department . 18 . The development to take place on the parcel shall be subject to the MEPA process. 19. Proposed signs shall be subject to the review and approval of the Planning Department. — Page 4 — 20. Adequacy of culverts on Swampscott Road shall be analyzed by the developer and the Planning Department . Upgrading of culverts, if deemed necessary, shall be undertaken by the developer at the cost of the developer . 21 . Fire access to all four sides of the proposed buildings shall be provided or requested by the Fire Department. 22 . A lighting plan shall be subject to the review and approval of the Planning Board. 23 . A landscaping plan shall be subject to the review and approval of the Planning Board. 24. Easements for access purposes to adjoining parcels in the entire 43 acre parcel as defined by the City shall be provided in a form approved by the Planning Board and City Solicitor. 25 . The future roadway improvement needs of Swampscott Road shall be analyzed by the Planning Board and Planning Department and needs as defined by such analysis shall be adhered to by the developer in the form of reservation of land necessary for such improvements . 26 . A detailed specification of the storage tank areas for Maynard Plastics shall be provided to the Planning Board. Such detailed plans shall include contents of tanks and emergency procedures in the event of electrical failure . 27 . A specification of the proposed control structure shall be supplied to the Engineering Dept . and Conservation Commission for review and approval . 28. Adequacy of fire flows and location of hydrants shall be approved by Fire Department . 29. A policy for the maintenance and cleaning of surface drains shall be presented to the Board of Health. 30. Prior to Certificate of Occupancy, the water system shall be tested for pressure and bacteria. 31 . An acceptable means for the holding and disposal of rubbish shall be submitted to the Board of Health for review and approval . 32 An acceptable means of removal of construction debris and vegetation shall be employed. 33. Prior t6 commencement of construction, a licensed pest control firm shall be employed for site evaluation. Copy of results shall be submitted to Board of Health. Page 5 — 34. An acceptable method for dust control and street cleaning shall be employed during construction. This Special Permit shall not take effect until a copy of the decision bearing the certification. of the City Clerk that twenty days have lapsed and no appeal has been filed, or that if such appeal has been filed, or that if such appeal has been filed, and it has been dismissed or denied, is recorded in the Essex County Registry of Deeds and is indexed in the grantor index under the name of the owner of record or is recorded and noted on the owner' s certificate of title. The fee for recording or registering shall be' paid by the owner or applicant. Walter B. Power, III Chairman MINUTES OF MEETING_ 1ULJ �Juy 11 , 1985 9i 3 13TH +9C v ai �7 J RECEIVEO CITY OF S1;{,NIIAM {The`Salem Conservation Commission met at One Salem Green, second floor lconference-room`on-ThuPiday, May 23,1985. Present were Philip Moran, Glenn Yale , Raymond Lavender, Harry Takis, David Lash, Paul Geoghegan and Staff Advisor Dale Pale . Chairman Philip Moran called the meeting to order at 7 : 40 P.M. PUBLIC HEARING - MAYNARD PLASTICS - SWAMPSCOTT ROAD Chairman Moran read the notice of the public hearing. The purpose of this hearing is to explore the effects of the construction of a 100,000 sq. ft . building with attendant parking to house Maynard Plastics Corp. This building is proposed for a parcel of land on Swampscott Road, which is within a wetlands area . john Serafini, attorney representing The Fafard Companies, was present to discuss plans for the project. A contract has been signed between Howard Fafard and Maynard Plastics to construct a new facility for Maynard on 15 acres of a 43 acre parcel. Mr. Fafard has agreed to have a building ready for occupancy by May of 3986 . He stated that some vegetation and a small stream exists on the site butt that by repositioning the building, it would be angeied so as not to touch any wetlands areas . 11r . Howard Fafard referred to a large topographical map of the area and stated the building has been' angeled on the site to preclude any filling of a wetland. it will be necessary to cross the stream at the front of the property for access , necessitating installation of culverts. The building is sited so the office portion of the business is facing up Swampscott Road toward Highland .Avenue. To the rear of the property chemical storage tanks will be positioned and they propose to submerge . the tanks to conseal their visibility from Swampscott Roac. Loading cocks will be located to the rear of the building and natural vegetation will remain in the front. A. small pond at the front of the property will remain untouched and part of an upland area at the front of the property is proposed for a retention pond. Mr . Jim Merloni, , an engineer , presented a drainage plan to the Board and noted that his calculations indicate the need for a retention basin to compensate for the two small culverts presently existing on Swampscott Road. His calculations indicate the use of this retention basin will decrease runoff by 50% during peak storm periods. Philip Moran asked what the dimensions of the building would be and Howard Fafard replied that it would be 163 ,000 sq . ft. , (500' x 160' ) . Mr. Moran asked about the impact of increased runoff on neighboring properties and Mr. Merloni replied they will retain the majority of the increased runoff. — Page 2 — Glenn Yale asked if . the water level and retention design of the Ebershoff project was considered in calculating this design and Mr. Merloni replied in the affirmative. Glenn Yale asked what preconstruction runoff coefficients were and Mr. Merloni replied 57 cubic feet per second. Mr. Yale asked what would be done about the existing reinforced culverts and Staff Advisor Dale Yale replied that the City would have to address this. Mr. Merloni added that the proposed retention area would somewhat improve that situation. Dale Yale asked what type of control structure would be installed and Mr. Merloni answered they probably would use an open pipe which would be the easiest type of structure to maintain. Glenn Yale asked what elevation the top of the retention pond would be and Mr . Merloni calculated that elevation to be approximately 90. Glenn Yale noted the slope of the berm on the retention pond could encroach on neighboring property. Glenn Yale further questioned how the slope would be stabilized and Mr. Fafard stated they would likely rip—rap the slope . Further, the slope is proposed to be at Philip Moran inquired as to how many employee=_ Maynard Plastics has in their employ , how many parking spaces were available to them and where parking was available on the site . Mr. Fafard answered that there are approximately 250 employees, 125 parking spaces , and that parking will be available on both sides of the entrance to the building. It was the consenus of the commission that this was too feta parking spaces . Mr . Moran asked if parking would also be available along Swampscott Road and Mr. Fafard stated that the Planning Department would have to address this. Glenn Yale asked what type of chemical=_ would be stored in the tanks and Mr . Fafard stated he would provide that information. Because of the need to facilitate this project as quickly as possible , Chairman Moran asked David Lash and Glenn Yale to serve on a sub—committee to work with the developer in obtaining all necessary information to draft an Order of Conditions . Following some discussion, a motion was made by Glenn Yale and seconded by Raymond Lavender to continue this public hearing until the next meeting. It was so voted. WETLANDS VIOLATIONS UPDATE Regarding Mr. Mackey ' s property on Legg' s Hill , Staff Advisor Dale Yale had received a request from Mr. Mackey ' s attorney to remove more gravel from the site. It was agreed the Commission had acted in good faith by allowing Mr. Mackey to remove in the agreed upon area. Therefore, he will be notified that no further removal can take place until a formal filing with the Commission is made . Page 3 — The Enforcement Orders for Mr . Ferris and Mr. N.acke_v ' =_ land on Broadway have been recorded at the Registry of Deeds. APPROVAL OF MINUTES Upon the motion of Raymond Lavender and second of David Lash, a motion was made to approve the minutes of June 27 . It was so voted. OLD/NEW BUSINESS Philip Moran noted that the annual Conservation Commission report will be due in September. The MBTA will be notified that the Commission feels the storage of branches cut from the trees along the railroad line within a wetland area is a violation of their Order of Conditions . Following our next meeting; the Commission has been invited to Philip Moran' s house for a social gathering. There being no further business , a motion was made to adjourn. Having passed unanimously, the meeting was declared adjourned at 4 : 20 P.M. Respectfully submitted, Nance Syatt Y U -! 6 of 15alenl ���ZMSUCljU5jAf4RD OF APP�k,Ls �3 '; w� � /?sal ��l�in►itcg marl � & 4 05 AM ?5 @rip 27alriY1 Own RECEIVED Form A - Decision CITY OF SALE A. MAS S, October 10, 1985 Ms. Josephine Fusco - City Clerk City Hall Salem, MA 01970 Dear Ms. Fusco: i At a regularly scheduled meeting of the Salem Planning Board held on Oct. 3, 1985 it was .voted to endorse "Approval Under Sub- division Control Law Not Required" on the following described plan: 1. Applicant: Howard A. Fafard 29rE1i`ot`St. Ashland, MA 01721 2. Location and Description - Located on the westerly side of(,"S,`wwmpscott Road approximately 1600' from the intersection of-�-�-�1 Highland Avenue and Swampscott Road, thereby being identified as Lot 11698 containing 29.5320 AC and Lot 11600 containing 13.0280 AC. Certificate 11 54812 Deed of property records in Essex South District Registry. Sincerely, WD_W�c Uva Walter Power III Chairman WP/sm (11ifu of 'Salem' f ttssa rhuse#fs '���,, �Iunnaig �attrD . QIOp �init �nlem, �i3{nesachuee!!s 0197D 4 03 PH #B5 FILE NOTICE TO BE ATTACHED TO CI7Y.Cg.;a4, iI,EM.F145$ FORM 'A' APPLICATIONS See Form "A" applications for complete instructions for filing. All insertions shall be typewritten or printed neatly in ink. Date: --------------� a5---------------- City Clerk Salem, Massachusetts 01970 Dear Sir: I hand you herewith two copies of Form A, an application submitted by me this day to the Plan- ning Board of the City of Salem requesting a determination and an endorsement on a plan filed with said application that Planning Board approval under the Subdivision Control Rules and Regulations is not required. The land shown on the accompanying plan is located at __5 WA^^nzccTt__fZGao------------—------ ----------------------- ------ — -- — in Ward ---3---------------—------------------------------- (insert street and street numbers here) Signature of Owner'_'/7 �I� _--- ----------_.--- Street Address --------90---E 1 icT •'_S EE—i------------------------•--- City/I'own & State `� LANp ��4 A _ Q b l I bUG Telephone Number ---------------------------------------•--- 'i c. (nitU of �$ttleut, cfassar4usetts Planning 23oarb alitg Pull 'Sulem,Aaesuchusette 111470 -t FORM A APPLICATION FOR ENDORSEMENT OF PLAN BELIEVED NOT TO REQUIRE „ APPROVAL In accordance with provisions of Section II-B, the applicant must file, by delivery or registered mail, a Notice with the City Clerk stating the date of sub- i3 mission for such determination. The notice shall be attached to two copies of this Form A application. The notice and both copies of the application must be "date stamped" by the City Clerk and then one V7. copy of this Form A, with the Plan, filed with the Planning Board by the applicant. All notices and applications shall be typewritten or neatly printed in ink. A Salem. Mass-- -----------9---1f!=----------------------19L5– To the Planning Board: U The undersigned, believing that the accompanying plan of his property in the City of Salem does not _ constitute a subdivision within the �jcaning of the Subdivision Control Law because (See Sect. II-A and state specific reasons) t� � 1e ------------- Z # eMen17 c� inanC --- --------------- .'a. --------- ------------------- -------------------------- -•------------------------------------------------------------------—----- ---------------------------- --------------------- ----- ---------- --------------------- ------------------------ - - --------------------------------------- ---------------—---- —---------------------- ------ ------------- av and herewith submits said plan for a determination and endorsement that Planning Board approval under the Subdivision Control Law is not required. r r- I. Name of Owner u..A-,_FAFn2� --------------------- – – – – – – – Address ------- !2a2X:E7------- i! 2. Dame of Engineer or Surveyor iLA _A!n PKIV ---`- _vs r2+ai�u - JUh----------------------------- Address ------ --------------` A_-int-. Ktv�__SNA ws�-i---•-- .'. 3. Deed of property records to ... -E X------.---!H __-1--Is�_ 'y , j Book ---- --------------•--------------- Page 4. Location and Description of Property: ---------------_------------ ---------------------------•--- – e[o-aid o� tiro. t.vts�ul e ) Swa ,os�atf - - 7 - 4 _ .- _ hc,__.1^}?-� GTJA,.....4 --�151�IGr•c1 I �; - 1 I I q ----1"��➢.n�4?� C2C.�1`� �u`Cn x11'1 C.C� G� .�L_y' /.G Qe_.CL't�rw1nj/ ----L.h-_52)Z_�__-�eV Pte,---._ ------- -------------------- - --__----- .......-------------------------.......—-------.-_—--------—----—• k -.--------------------------------------------------------------------------------------------------------------------------.__-_..____-__--____- ..._----------- ----------—-----------—••-•------------_---------—---- --------- 5. All streets and abutting lot lines shall be shown on the Plan together with the names of the Owners g' of the abutting lots. Signature of Owner//----r---`- — 1 � 1 ` ---------' " - - B Address ctL --Elio –�T._ –/k i-LA J o– M A----------------------- i TelephoneNumber --------- -------------------------------------------------- r Commonwealth of Massachusetts a { i City of Salem 'e _ T 120 Washington St,3rd Floor Salem, MA 01970(978)745-9595 x5641 F1N1 ll � CERTIFICATE OF INSPECTION OFFICE OF: BUILDING OFFICIAL DATE OF APPROVAL: 2/5/2015 This is to certify that the installation of a/an Other Building Permit authorized under B-14-1434 issued to MH LLC or his/her authorized agent, located at 96-U2 SWAMPSCOTT ROAD, Salem, MA 01810 has been completed and is in substantial compliance with the Massachusetts State Building Code. �� ""kms i�yLL2/5/2015 Chief Building Official Date To: MH LLC 96 SWAMPSCOTT RD U2 SALEM MA 01970 Commonwealth of Massachusetts 4\- City of Salem 120 Washington St,3rd Floor Salem, MA 01970(978)745-9595 x5641 CERTIFICATE OF INSPECTION OFFICE OF: BUILDING OFFICIAL DATE OF APPROVAL: 2/5/2015 This is to certify that the installation of a/an Other Building Permit authorized under B-14-1434 issued to MH LLC or his/her authorized agent, located at 96-U2 SWAMPSCOTT ROAD, Salem, MA 01810 has been completed and is in substantial compliance with the Massachusetts State Building Code. 2/5/2015 Chief Building Official Date To: MH LLC 96 SWAMPSCOTT RD U2 SALEM MA 01970 —"T Commonwealth C`achuseft ion 1 s a City of 6aiem - + 120 Washington St,3rd Floor Salem,MA 01970(978)745"9595 X6641 Return card to Building Division for Certificate of occupancy PermP $8o. Q-.14-1434 FEE FEE PAID:: $8,173.00 PERMIT TO BUILD DATE ISSUED: 9/41201 This certifies that MH LLC ` has permission to erect,alter, or demolish a building 9$-U2 SWAMPSCOTT ROAD Map(Lot: 70070-801 as follows: Other Building Permit DEMO CONCRETE FLOOR&DEMISING WALL BETWEEN UNIT 2 & 3. CONSTRUCT A NEW TENANT FREEZER& DOCK. Contractor Name: dMD Construction Co. - DBA: Contractor License No: 1907 9/4/2014 Building bfficiar Date This permit shall be deemed abandoned and Invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this perrrat shall conform to the approved application and the aprvoved construction documents for which this permit has been granted. Ail construction,alterations and changes of use of any budding and strictures shall be in compliance with the local zoning by-taws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintahed open for public,inspe:tion.for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. r+ MIC#: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). .. Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Commonwealth of Massachusetts Citwaf Salem 120 Washington St.and Fiaor Salem,MA 01970(978)7459595 X5641 t v' Return card to Building Division for Certificate of pecupancy lug Structure CITY OF SALEM BUILDING PERMIT �FXo, PERMIT TO BE POSTED IN THE WINDOW (Footing INSPECTION RECORD IFoundationp ,/� fm FramingPl � ! T - Mechanical {:insulation INSPECTION: Blf - DATE F Chimney/Smoke Chamber - {Final Qxvre k PlumbmglGas " Rough:Plumbing � Rough:Gas P ( '_l t Final Electrical Pere Rough- /2/;2 Final ! Fire Department reiknin awry Final M Health Department - * rZolmi nary -final J COSTA ARCHITECTS 681 MAIN STREET WALTHAM, MA 02451 TEL/FAX 781 /647-5831 FINAL CONSTRUCTION CONTROL AFFIDAVIT Project Number: 2014.07.114 Project Title: Interior Freezer/Dock Expansion Improvements Project Location: 90 Swampscott Street/Unit 1 Salem, Massachusetts 01970 Project Name: Jacqueline's Gourmet Cookies Permit No: Scope of Work: New interior tenant freezer and dock(shipping/receiving) expansion; Removal concrete slab, new conc. Insulated slab; Pre insulated panels (PIP),GWB, metal studs, doors,frame, hardware;suspended ceilings PIP panels, paint, life safety, electrical, plumbing,and HVAC(note:some of the disciplines are the responsibility of others) I Albert Costa MA Registration Number: iJ am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Entire Project_ Architectural XX Structural_Mechanical Electrical Fire Protection Other: for the above named project. 1,or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.1 A ARCg7l C 9 n No, 1907, Signature of Archite 3- ecswn, 9hFgtrH OF ttv- Version 06 11 2013:2014 Building Official Use Only Building Official Name: Permit No.: Date: cc: L71 Building Department LL ❑ General Contractor COSTA ARCHITECTS 613 1 MAIN STREET ❑ owner WALTHAM, MA 172451 ❑ File Copy TE✓FAx: 791.547.5a31 CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Renovations FIELD REPORT NO: One(1) to Existing Building at Jacqueline's Cookies 90 Swampscott Street/Unit 1,Salem,MA for CONTRACT: JMD Construction,Co. PROJECT NO: 2014.07.114 99 Wells Village Rd.,Chester, NH DATE: 9/25/14 TIME: 8:00 AM WEATHER: Overcast TEMP. 55 F° EST.%OF COMPLETION: 10% CONFORMANCE WITH SCHEDULE(+,): N/A OBSERVATIONS & WORK IN PROGRESS: PRESENT AT SITE: Site Superintend(1) 1. Ritev ork&€xnavation 0^! seRlplefe(1) Concrete Cutter(2) 2. ° Laborer(1) 3. Struotllral Sleelframklg 9°!°-024 Sprinkler(2) 4. Exterior Panel Cutting- 5%complete(4)Overhead Doors 5. Exterior Overheads- 5%complete(5)Overhead Doors 6. Sub-Floor Preparation- 90%complete(6)Demolition 7. Rough Under/Floor Plumbing- 5%complete(7) 8. Concrete Sub/Floor Slab- 0%complete(8) 9. Finish Concrete Floor Slab- 0%complete(9) 10. Finish Concrete Curbing- 0%complete(10) 11. Freezer Area—PIP 10%complete(11)Demolition of existing GWB 12. Freezer/Dock Ceiling—PIP 0%complete(12) 13. Cooler Dock Area-PIP 0%complete(13) 14. Cooler Dock OH Doors/Lever- 0%complete(14) 15. Miscellaneous Steel&Metal - 0%complete(15) 16. Production LA Rlaff 0%complete(16) 17. Painting-[Miscellaneous] 0%complete(17) 18. Floor Finishes-[Sealer] 0%complete(18) 19. Miscellaneous—Offices(Existing S/R) 0%complete(19) a. GWB Partitions- 0%complete(19a) b. Doors/Frames- 0%complete(1 9b) c. Painting- 0%complete(19c) d. Suspended Ceiling- 0%complete(19d) 20. Rough Electrical Work- 10%complete(20)Demolition 21. Finish Electrical Work- 0%complete(21) 22. Rough Plumbing Work- 10%complete(22) 23. Finish Plumbing Work- 0%complete(23) 24. Rough Sprinkler Work- 20%complete(24) 25. Finish Sprinkler Work- 0%complete(25) 26. Rough H.V.A.C.Work-(Refrigeration)By-other 10%complete(26) 27. Finish H.V.A.C.Work-(Refrigeration)By-other 0%complete(27) 28. Life Safety 10%complete(28) ITEMS TO BE VERIFY: INFORMATION OR ACTION REQUIRED: 1. PIP Panels on site 2. Sub-Floor insulation onsite ATTACHMENTS: REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: L 40 Contractor/Architect Field Report in pursuant to codes of the Massachusetts State Buildi Co a(Eighth Edition)780 CMR 110 Chapter 107 Construction Control cc: [YJ Building Department ❑ General Contractor COSTA ARCHITECTS ❑ Owner 6B 1 -MAIN STREET WALTHAM, MA 02451 ❑ File Copy - TEL/FAX: 781.647.5-3 1 CONSTRUCTION FIELD REPORT ..,: PROJECT: Interior Tenant Renovations FIELD REPORT NO: Two(2) to Existing Building at Jacqueline's Cookies 90 Swampscott Street/Unit l,Salem,MA for CONTRACT: JMD Construction,Co. PROJECT NO: 2014.07.114 99 Wells Village Rd.,Chester, NH DATE: A10/10/14 TIME: 9:00 AM WEATHER Clear TEMP. 56 F° ' EST.% COMPLETION: 20% CONFORMANCE WITH SCHEDULE(+;):';N/A OBSERVATIONS & WORK IN PROGRESS: PRESENT AT SITE: Site Superintend(1) 1. Sitewerle&€xsavalion 0%complete(1) sprinkler(2) 2. Ca ne otTFeundatiens&Feating Work 0%-somplete(2) Laborer(1) 3. Struetural Steel Framing ^0 ete-t3) PIP Installers(2) 4. Exterior Panel Cutting- 15%complete(4) - 5. Exterior Overheads—Dock lever Conc. 25%complete(5) 6. Sub-Floor Preparation- 90%complete(6) 7. Rough Under/Floor Plumbing- _ 45%complete(7) _ 8. Concrete Sub/Floor Slab- 50%complete(8) 9. Finish Concrete Floor Slab- 0%complete(9) 10. Finish Concrete Curbing- 0%complete(10) 11. Freezer Area—PIP 20%complete(11) 12. Freezer/Dock Ceiling—PIP 0%complete(12) 13. Cooler Dock Area-PIP 0%complete(13) 14. Cooler Dock OH Doors/Lever- 10%complete(14) 15. Miscellaneous Steel&Metal - - 0%complete(15) 16. Prodi sticin Lift Platform 9%complete(16) 17. Painting-[Miscellaneous] 0%complete(17) 18. Floor Finishes-[Sealer] 0%complete(18) 19. Miscellaneous—Offices(Existing SIR) 0%complete(19) a. GWB Partitions- 0%complete(19a) b. Doors/Frames- _ 0%complete(19b) c. Painting- 0%complete(I 9c) d. Suspended Ceiling- 0%complete(1 9d) 20. Rough Electrical Work- 20%complete(20)Demolition 21. Finish Electrical Work- - 0%complete(21) - 22. Rough Plumbing Work- 10%complete(22) 23. Finish Plumbing Work- : 0%complete(23) 24. Rough Sprinkler Work- 30%complete(24) 25. Finish Sprinkler Work- ll%o complete(25) 26. Rough H.V.A.C.Work-(Refrigeration)By-other 10%complete(26) 27. Finish H.V.A.C.Work-(Refrigeration)By-other 0%complete(27) 28. Life Safety 10%complete(28) ITEMS TO BE VERIFY: INFORMATION OR ACTION REQUIRED: ATTACHMENTS: REPORTED BY Manuel P.Escobar,Project Architect SIGN BY: Contractor/Architect Field Report in pursuant to codes of the Massachusetts State Building Code(Eighth Edition)780 CMR 110 Chapter 107 Construction Control cc: O/Building Department ❑ General Contractor COSTA ARCHITECTS J. ❑ owner 681 MAIN STREET '.. WALTHAM, MA 02451 ❑ File Copy TEL/FAx: 761.647.563 1 wsn ne�w:c:. CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Renovations FIELD REPORT NO: Three(3) to Existing Building at Jacqueline's Cookies 90 Swampscott Street/Unit 1,Salem,MA for CONTRACT: JMD Construction,Co. _ - PROJECT NO: 2014.07.114 99 Wells Village Rd.,Chester,NH DATE: 10/31/14 TIME: 9:00 AM WEATHER: Partly Cloudy TEMP. 51 F° EST.%OF COMPLETION : 65% CONFORMANCE WITH SCHEDULE(+,.): N/A OBSERVATIONS & WORK IN PROGRESS: PRESENT AT SITE: Site Superintend(1) 1. Sitewerk&€xGavation 0"1 complete(1) Laborer(2) 2. ° PIP Installer CS(6) 3. Structural Steel Framing 0%Gemplete MS Refer.Mech(2) 4. Exterior Panel Cutting- 100%complete(4) 5. Exterior Overheads-Dock lever Conc. 85%complete(5) 6. Sub-Floor Preparation- 90%complete(6) 7. Rough Under/Floor Plumbing- 75%complete(7) 8. Concrete Sub/Floor Slab- 90%complete(8) 9. Finish Concrete Floor Slab- 50%complete(9) _ 10. Finish Concrete Curbing- 90%complete It 0) 11. Freezer Area-PIP 80%complete It 1) 12. Freezer/Dock Ceiling-PIP 80%complete(12) 13. Cooler Dock Area-PIP 10%complete It 3) 14. Cooler Dock OH Doors/Lever- 70%complete(14)Installed - 15. Miscellaneous Steel&Metal - - 30%complete(15) - 16. Produotien Gift platform 0;6-complete-(tg) 17. Painting-[Miscellaneous] 0%complete(17) 18. Floor Finishes-[Sealer] 0%complete If 8) 19. Miscellaneous-Offices(Existing SIR) - 30%complete(19) - a. GWB Partitions- 50%complete(1 9a) b. Doors/Frames- 30%complete(1 9b) c. Painting- - 0%complete(19c) d. Suspended Ceiling- 10%complete(19d) 20. Rough Electrical Work- 80%complete(20) 21. Finish Electrical Work- 40%complete(21) ; 22. Rough Plumbing Work- 50%complete(22) - 23. Finish Plumbing Work- 10%complete(23) 24. Rough Sprinkler Work- 80%complete(24) 25. Finish Sprinkler Work- 40%complete(25) 26. Rough H.V:A.C.Work-(Refrigeration)By-other 80%complete(26) 27. Finish H.V.A.C.Work-(Refrigeration)By-other 30%complete(27) 28. Life Safety " 40%complete(28) ITEMS TO BE VERIFY: 1. Racks installed. 2. Freezer Refer been tested INFORMATION OR ACTION REQUIRED: 1. Schedule opening between spaces. ATTACHMENTS: REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: Contractor/Architect Field Report in pursuant to codes of the Massachusetts State Building Code(Eighth Edition)780 CMR 110 Chapter 7107 Construction Control - M: Building Department ❑ General Contractor COSTA ARCHITECTS 681 MAIN STREET . ❑ owner WALTHAM, MA 02451 'y � ta+<1 . . ^:.ZI�,�1L� CONSTRUCTION :FIELD REPORT PROJECT: Interior Tenant Renovations FIELD REPORT NO: Four(4) - to Existing Building at Jacqueline's Cookies 90 Swampscott Street/Unit 1,Salem,MA for CONTRACT: JMD Construction,Co. PROJECT NO: 2014.07.114 99 Wells Village Rd.,Chester,NH DATE: 12/4/14 TIME: 12:45 PM WEATHER: Partly Cloudy TEMP. 43 F° EST.%OF COMPLETION: 80% CONFORMANCE WITH SCHEDULE(+,.): N/A OBSERVATIONS & WORK IN PROGRESS: PRESENT AT SITE: JMD Contractor(1) Site Superintend(1) 1. Silewerk P.€xcavatien ^ e{1) Laborer(1) 2. Concrete Fetmdations R.Feeling W9Fk 004 Gemplete(2) PIP Installer CS(4) 3. SEraeleral Steel Framing 0%Gemp,ete{3) Refer.Mach(2) 4. Exterior Panel Cutting- 100%complete(4) Sprinkler(1) 5. Exterior Overheads—Dock lever Conc. 100%complete(5) Alarm(2) 6. Sub-Floor Preparation- 90%complete(6) 7. Rough Under/Floor Plumbing- 95%complete(7) & Concrete Sub/Floor Slab- 100%complete(8) 9. Finish Concrete Floor Slab- 100%complete(9) 10. Finish Concrete Curbing- 100%complete(10) 11. Freezer Area—PIP 90%complete(11) 12. Freezer/Dock Ceiling—PIP 90%complete(12) 13. Cooler Dock Area-PIP 90%complete(13) 14. Cooler Dock OH Doors/Lever- 100%complete(14) 15. Miscellaneous Steel&Metal - 90%complete(15) 16. PFGdlietinn Lift Platfertn 00/ complete(16) 17. Painting-[Miscellaneous] 20%complete(17) 18. Floor Finishes-[Sealer] 90%complete(18) 19. Miscellaneous—Offices(Existing SIR) 80%complete(19) a. GWB Partitions- 80%complete(1 gal b. Doors/Frames- 80%complete(I 91b) c. Painting- 40%complete(19c) d. Suspended Ceiling- 80%complete(19d) 20. Rough Electrical Work- 90%complete(20) 21. Finish Electrical Work- 70%complete(21) 22. Rough Plumbing Work- 90%complete(22) 23. Finish Plumbing Work- 70%complete(23) 24. Rough Sprinkler Work- 90%complete(24) 25. Finish Sprinkler Work- 75%complete(25) 26. Rough H.V.A.C.Work-(Refrigeration)By-other 100%complete(26) 27. Finish H.V.A.C.Work-(Refrigeration)By-other 90%complete(27) 28. Life Safety 80%complete(28) ITEMS TO BE VERIFY: 1. Schedule rough Inspection for restrooms and stairs INFORMATION OR ACTION REQUIRED: ATTACHMENTS: REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: Contractor/Architect Field Report in pursuant to codes of the Massachusetts State Building Cade(Eighth Edition)780 CMA 110 Chapter 107 Construction Control co: Building Department ❑ General Contractor COSTA ARCHITECTS .� 601 MAIN STREET ❑ Owner WALTHAM, MA 02451 ❑ File Copy TEL/FAX: 781.647.583 1 CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Renovations FIELD REPORT NO: Five(5) Final to Existing Building at Jacqueline's Cookies 90 Swampscott Street/Unit 1,Salem,MA for CONTRACT: JMD Construction,Co. PROJECT NO: 2014.07.114 99 Wells Village Rd.,Chester, NH DATE: 12/18/14 TIME: 11:45 AM WEATHER Cloudy TEMP. 40 F° EST.%OF COMPLETION: 100% CONFORMANCE WITH SCHEDULE(+,.): N/A OBSERVATIONS & WORK IN PROGRESS: PRESENT AT SITE: JMD Constr. (1) 1. Siteynrk P.€xeavation 0"/ complete(1) Site Super(1) 2. Canc etc re Jndatiens R.Feeting Werk 3. SEructuml SteelFralning 0%co...p.o,o 43) 4. Exterior Panel Cutting- 100%complete(4) 5. Exterior Overheads—Dock lever Conc. 100%complete(5) 6. Sub-Floor Preparation- 100%complete(6) 7. Rough Under/Floor Plumbing- 100%complete(7) 8. Concrete Sub/Floor Slab- 100%complete(8) 9. Finish Concrete Floor Slab- 100%complete(9) 10. Finish Concrete Curbing- 100%complete(10) 11. Freezer Area—PIP 100%complete(11) 12. Freezer/Dock Ceiling—PIP 100%complete(12) 13. Cooler Dock Area-PIP 100%complete(13) 14. Cooler Dock OH Doors/Lever- 100%complete(14) 15. Miscellaneous Steel&Metal - 100%complete(15) 16. Production Lift Platform -„-w...r„�.e-(i6) 17. Painting-[Miscellaneous] 100%complete(17) 18. Floor Finishes-[Sealer] 100%complete(18) 19. Miscellaneous—Offices(Existing SIR) 100%complete(19) a. GWB Partitions- 100%complete(19a) b. Doors/Frames- 100%complete(1 9b) c. Painting- - 100%complete(19c) d. Suspended Ceiling- 100%complete(19d) 20. Rough Electrical Work- 100%complete(20) 21. Finish Electrical Work- 100%complete(21) 22. Rough Plumbing Work- 100%complete(22) 23. Finish Plumbing Work- 95%complete(23)Vanity 24. Rough Sprinkler Work- 100%complete(24) 25. Finish Sprinkler Work- 100%complete(25) 26. Rough H.V.A.C.Work-(Refrigeration)By-other 100%complete(26) 27. Finish H.V.A.C.Work-(Refrigeration)By-other 100%complete(27) 28. Life Safety 100%complete(28) ITEMS TO BE VERIFY: 1. Final Inspection to be scheduled INFORMATION OR ACTION REQUIRED: ATTACHMENTS: REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: �P Contractor/Architect Field Report in pursuant to codes of the Massachusetts State Building Code(Eighth Edition)780 CMR 110 Chapter 107 Construction Control odor CITY OF SALEM, MASSACHUSETTS BOARD OF APPEAL n 120 WASHINGTON STREET, 3RD FLOOR a �! SALEM, MASSACHUSETTS 01970 TELEPHONE: 978-745-9595 poi FAX 978-740-9846 2009 SEP - I P I: 30 KIMBERLEY DRISCOLL MAYOR September 1,2009 Decision City of Salem Zoning Board of Appeals Petition of JACQUELINE'S GOURMET COOKIES,seeking Variances from minimum distance of an accessory structure to the main building and maximum height of an accessory structure to allow for construction of two storage structures on the property located at 96 SWAMPSCOTT ROAD in the Business Paris Development District(BPD). Petitioner seeks Variances pursuant to the Salem Zoning Ordinance, §7-8:Accessory Buildings and Structures. Statements of fact: 1. Mark Hazel,President of Jacqueline's Gourmet Cookies, and Bill Yuhas,consultant architect on the project, presented the petition. 2. In a petition dated August 12,2009,the petitioner requested Variances from minimum distance of an accessory structure to the main building and maximum height of an accessory structure,to allow for construction of two storage structures. 3. A public hearing on the above mentioned Petition was opened on August 19, 2009, pursuant to Mass General Law Ch. 40A, % 11. The pubic hearing was closed on August 19, 2009,with the following Zoning Board of Appeals members present: Robin Stein (Chair), Becky Curran,Beth Debski,Bonnie Belair(alternate), and JimmyTsitsinos (alternate). 4. At the hearing, a resident spoke in opposition to the project, saying he was concerned about impacts to his business due to dust. The petitioner stated that the flour storage and delivery system would be fullyenclosed and hermetically sealed, with no dust or flour emissions. 5. The Board of Appeals received a letter from Thermal Circuits, another business in the same development at 96 Swampscott Road, in support of the project. 6. At its meeting on August 19, 2009, the Board of Appeals voted five (5) in favor and none (0) opposed to grant a Special Permit under§7-8: Accessory Buildings and Structures. f 2 The Board of Appeal, after careful consideration of the evidence presented at the public hearing, and after thorough review of the plans and petition submitted, makes the following findings: 1. Special conditions and circumstances exist affecting the parcel or building, which do not generally affect other land or buildings in the same district. 2. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent or purpose of the zoning ordinance. 3. The applicant mayvarythe terms of the Business Park Development District to construct the proposed development, which is consistent with the intent and purpose of the City of Salem Zoning Ordinance. 4. In permitting such change,the Board of Appeals requires certain appropriate conditions and safeguards as noted below. On the basis of the above findings of fact and all evidence presented at the public hearing including, but not limited to,the Plans,Documents and testimony,the Zoning Board of Appeals concludes: 1. To allow for the construction of two storage silos,the requested Variances from dimensional requirements for accessory structures in the Business Park Development zone are granted. In consideration of the above,the Salem Board of Appeals voted, five (5) in favor(Stein, Belair, Curran, Debski and Tsitsinos) and none (0) opposed, to grant petitioner's requests for Variances subject to the following terms, conditions,and safeguards: 1. Petitioner shall comply with all city and state statutes,ordinances, codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner. 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. A Certificate of Inspection is to be obtained. 6. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to, the Planning Board. 3 bm Stem, Chair Salem Zoning Board of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE QTY CLERK Appeal from this decision, if any,shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days of filing of this decision in the office of the City Clerk Pursuant to the Massachusetts General Laws Chapter 40A, Section 11,the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the Gty Clerk has been filed with the Essex South Registry of Deeds. Space STATEMENT OF PROJECT COMPLETION Planning City or Town: City of Salem, Salem Massachusetts Design Project Number. SPDG No. 2006-04 Group Project Title: Jacqueline's Gourmet Cookies INCORPORATED project Location: 90 Swampscott Road, Salem, MA Name of Building: Salem Commerce Park architects space planning Project Name: Tenant Interior Improvements consultants In accordance with section 116.0 of the Massachusetts State Building Code, 1 Albert Costa Mass Reg. # 1907 being a registered professional architect hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Entire Project_ Architectural X Structural_Mechanical Electrical Fire Protection Other: For the above named project and that, to the best of my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable architectural practices and applicable laws for proposed project. I further certify that I shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to determine that the work is proceeding in accordance with the documents approved for building permit and shall be responsible for the following as specified section 116.2.2- 1. Reviewed,for the conformance to design concept,shop drawings,samples and other submittals,which are submitted by the contractor in accordance with the requirements of the construction documents. - 2. Reviewed and approved of the quality control procedures for all code-required controlled materials. 3. Been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine,in general,if the work was being performed in a manner consistent with the construction documents. - I visited-the construction site during the building permit application process, an/or sent other appropriately qualified design professionals, and determined to extent possible that the work was done in accordance with the documents submitted with the building permit application, and the applicable provisions of the Massachusetts State Building Code. �'S�D TFC .SA \ r H Signature of Architect P.O.Box 302 Y� fro norwood, ma 020624302 Date: Of tAA L 781.71185693 f. 781.762.9858 e-mail: spdg@nrn.com P.O.Box 302 Norwood,MA 02062-0302 - T781-716-5693 I F 781-762-9858 r spdg@msn.mm li t ' f 1 E 1 I Memo To: Albert Costa, Costa Architects From: Manuel Escobar, Space Planning Design Group CC: Jim Doherty,JMD Construction Date: 08/14/06 Re: Construction Field Reports, Salem, MA Enclosed are the field reports (Construction Field Reports) in accordance with Chapter 1, Article 780 CMR 116.0-Section 116.2.1, Registered Architectural Services-Construction Control, to codes of the Commonwealth of Massachusetts, (Sixth Edition ),for Jacqueline's Gourmet Cookies, 90 Swampscott t Road, Salem, MA Also The final Affidavit report(does not need to be notarized.) If you have any further questions or information, you required please contact me. Manny Escobar(781-718—5693) End.Construction Reports May 2006 to August 2006(13)/Final Affidavit f Albert Costa Jim Doherty f Albert Costa Architects JMD Construction Co. tf 333 Moody Street 93 Wells Village Road Waltham, MA 02453 Chester, NH 03036 781-647-5831 603-887-8218 T 603-887-8881 F 978-697-5148 cell Archu4 ds + Space Mannas CConsdant y •Page 1 t cc: ❑ Building Department Space ❑ General Contractor Planning ❑ owner Design ❑ File Copy Group P.O.Box 302 INCORPORATED Norwood,MA 02062-0302 T:781.718.5693 F:781.762.9858 CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO : 1 One 90 Swampscott Street, Salem, MA for Jacqueline's Cookies Corp CONTRACT: JMD Construction Co. PROJECT NO: 2006.04 jmd 92 Wells Village Rd.,Chester,NH 03036 DATE: May 18,2006 TIME: 10:35 AM WEATHER:Partly Cloudy TEMP. 57°t r EST.%OF COMPLETION: 15% CONFORMANCE WITH SCHEDULE(+,-):On Time WORK IN PROGRESS: PRESENT AT SITE : Freezer PIP walls&ceiling being installed At Costa,SPDG Manny Escobar,SPDG f` OBSERVATIONS: 4-PIP Installers 'f 1. Sitework&Excavation- 40%complete(1) 2. Concrete Foundations&Footing Work- 20%complete(2) 3. Structural Steel Framing- 0%complete(3) �l 4. Exterior Metal Siding Panels-[Match existing] 0%complete(4) ;{ 5. Roofing(patch&repair)- 0%complete(5) 6. Sub-Floor Preparation - 80%complete(6) 7. Rough Under/Floor Plumbing- 90%complete(7) YTM 8. Concrete Sub/Floor Slab- 30%complete(8) 9. Finish Concrete Floor Slab- 0%complete(9) 10. Finish Concrete Curbing- 00%complete(10) 11. (PIP)Prefnished Insulated Wall Panels- 10%complete(11) { 12. (PIP)Prefinished Insulated Ceiling Panels- 10%complete(12) f 13. (PIP)Prefnished Insulated Miscellaneous Items- 0%complete(13) 14. Low Temp. Doors and Frames-[Freezer] 0%complete(14) 15. Structural Steel Mezzanine&Stairs- 0%complete(15) 16. Miscellaneous Steel&Metal - 0%complete(16) 17. Steel Curbing- 0%complete(17) j 18. Painting-[Miscellaneous] 0%complete(18) fi 19. Floor Finishes-[Sealer] 0%complete(19) 20. Production Doors/Frames- 0%complete(20) 21. Exterior Windows/Frames- 0%complete(21) 22. Loading Dock Doors/Mics. 0%complete(22) a 23. Miscellaneous- 0%complete(23) a. b. 24. Rough Electrical Work- 10%complete(24) 25. Finish Electrical Work- 0%complete(25) 26. Rough Plumbing Work- - 70%complete(26) 27. Finish Plumbing Work- 0%complete(27) 28. Rough Sprinkler Work- 0%complete(28) 29. Finish Sprinkler Work- 0%complete(29) 30. Rough H.V.A.C.Work-(Refrigeration) 0%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 0%complete(31) 32. Life Safety 0%complete(32) ITEMS TO BE VERIFY: r INFORMATION OR ACTION REQUIRED : 1 ATTACHMENTS : [. REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: , Contractor/Architect Field Report in pursuant to Chapter I :Administration-780 CMR 116 .2 Co struction Control to codes of the Commonwealth of Massachusetts(Sixth Edition) t cc: ❑ Building Department Space ❑ General Contractor Planning ❑ Owner Design ❑ File Copy Group P.O.Box 302 INCORPORATED Norwood,MA 02062-0302 T:781.718.5693 F:781.762.9858 CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO: ( 2 ) TWO 90 Swampscott Street, Salem, MA for Jacqueline's Cookies Corp I CONTRACT: JMD Construction Co. PROJECT NO: 2006.04jmd 92 Wells Village Rd.,Chester,NH 03036 DATE: May 24,2006 TIME: 10:20 AM WEATHER:Partly Cloudy TEMP. 63°t EST.%OF COMPLETION : 17% CONFORMANCE WITH SCHEDULE(+,);On Time WORK IN PROGRESS: PRESENT AT SITE: t Staging PIP panels for installation,forming and compacting soil for 1-Supervisor,JMD Const. 1E Concrete slab at the freezer,stockroom and mechanical areas. Manny Escobar,SPDG OBSERVATIONS: 5-PIP Installers 1. Sitework&Excavation- 40%complete(1) 2-Labors,JMD Const. 2. Concrete Foundations&Footing Work- 30%complete(2) 3. Structural Steel Framing- 0%complete(3) 4. Exterior Metal Siding Panels-[Match existing] 0%complete(4) 5. Roofing(patch&repair)- 0%complete(5) 6. Sub-Floor Preparation - 85%complete(6) 7. Rough Under/Floor Plumbing- 95%complete(7) 8. Concrete Sub/Floor Slab- 40%complete(8) 9. Finish Concrete Floor Slab- 0%complete(9) 10. Finish Concrete Curbing- 0%complete(10) 11. (PIP)Prefinished Insulated Wall Panels- 20%complete(11) 12. (PIP)Prefinished Insulated Ceiling Panels- 20%complete(12) 13. (PIP)Prefinished Insulated Miscellaneous Items- 0%complete(13) 14. Low Temp. Doors and Frames-[Freezer] 0%complete(14) 15. Structural Steel Mezzanine&Stairs- 0%complete(15) 16. Miscellaneous Steel&Metal - 0%complete(16) 17. Steel Curbing- 0%complete(17) - 18. Painting-[Miscellaneous] 0%complete(18) 19. Floor Finishes-[Sealer] 0%complete(19) 20. Production Doors/Frames- 0%complete(20) 21. Exterior Windows/Frames- 0%complete(21) 22. Loading Dock Doors/Mics. 0%complete(22) 23. Miscellaneous- 0%complete(23) a. b. 24. Rough Electrical Work- 10%complete(24) 25. Finish Electrical Work- 0%complete(25) i 26. Rough Plumbing Work- 70%complete(26) 27. Finish Plumbing Work- 0%complete(27) 28. Rough Sprinkler Work- 0%complete(28) 29. Finish Sprinkler Work- 0%complete(29) 30. Rough H.V.A.C.Work-(Refrigeration) 0%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 0%complete(31) 32. Life Safety 0%complete(32) '( ITEMS TO BE VERIFY: INFORMATION OR ACTION REQUIRED: ATTACHMENTS : REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: Contractor/Architect Field Report in pursuant to Chapter 1 :Administration-780 CMR 116.2.2 tonstruction Control to codes of the Commonwealth of Massachusetts(Sixth Edition) 3 I cc: ❑ Building Department Space f .1 ❑ General Contractor Planning a ❑ Owner Design . ❑ File Copy Group P.O.Box 302 INCORPORATED Norwood,MA 02062-0302 T:781.718.5693 ,i F:781.762.9858 ,t CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO : ( 3 ) Three 90 Swampscott Street, Salem, MA for Jacqueline's Cookies Corp CONTRACT: JMD Construction Co. PROJECT NO: 2006.04 jmd 92 Wells Village Rd.,Chester,NH 03036 DATE: May 31,2006 TIME: 10:00 AM WEATHER:Partly Cloudy TEMP. 60'± EST.°/OF COMPLETION : 20% CONFORMANCE WITH SCHEDULE(+,-) :On Time WORK IN PROGRESS : PRESENT AT SITE : Staging PIP panels for installation,placing concrete in freezer slab for 1-Supervisor,JMD Const. Steel on site erection in progress Manny Escobar,SPDG OBSERVATIONS: 5-PIP Installers 1. Sitework&Excavation- 50%complete(1) 2-Labors,JMD Const. 2. Concrete Foundations&Footing Work- 40%complete(2) 3-Steel erectors 3. Structural Steel Framing- 10%complete(3) 4. Exterior Metal Siding Panels-[Match existing] 0%complete(4) 5. Roofing(patch&repair)- 0%complete(5) 6. Sub-Floor Preparation - 95%complete(6) 7. Rough Under/Floor Plumbing- 95%complete(7) 8. Concrete Sub/Floor Slab- 60%complete(8) 9. Finish Concrete Floor Slab- 10%complete(9)freezer 10. Finish Concrete Curbing- 0%complete(10) 11. (PIP)Prefinished Insulated Wall Panels- 30%complete(11) 12. (PIP)Prefinished Insulated Ceiling Panels- 30%complete(12) 13. (PIP)Prefinished Insulated Miscellaneous Items- 0%complete(13) 14. Low Temp. Doors and Frames-[Freezer] 0%complete(14) 15. Structural Steel Mezzanine&Stairs- 10%complete It 5) 16. Miscellaneous Steel&Metal - 0%complete(16) 17. Steel Curbing- 0%complete(17) 18. Painting-[Miscellaneous] 0%complete(18) 19. Floor Finishes-[Sealer] 0%complete(19) 20. Production Doors/Frames- 0%complete(20) 21. Exterior Windows/Frames- 0%complete(21) 22. Loading Dock Doors/Mics. 0%complete(22) 23. Miscellaneous- 0%complete(23) a. b. 24. Rough Electrical Work- 20%complete(24) 25. Finish Electrical Work- n, 0%complete(25) 26. Rough Plumbing Work- 80%complete(26) 27. Finish Plumbing Work- 0%complete(27) 28. Rough Sprinkler Work- 20%complete(28) 29. Finish Sprinkler Work- 0%complete(29) 30. Rough H.V.A.C.Work-(Refrigeration) 10%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 0%complete(31) 32. Life Safety 0%complete(32) ITEMS TO BE VERIFY: t INFORMATION OR ACTION REQUIRED: ATTACHMENTS : REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: Contractor/Architect Field Report in pursuant to Chapter I :Administration-780 CMR 116.2. Construction Control to codes of the Commonwealth of Massachusetts(Sixth Edition) cc: ❑ Building Department Space ❑ General Contractor Planning ❑ Owner Design ❑ File Copy Group P.O.Box 302 INCORPORATED Norwood,MA 02062-0302 T:781.718.5693 F:781.762.9858 CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO: ( 4 ) Four 90 Swampscott Street, Salem, MA for Jacqueline's Cookies Corp CONTRACT: JMD Construction Co. PROJECT NO: 2006.04]mc! 92 Wells Village Rd.,Chester,NH 03036 DATE: June 15,2006 TIME: 11:0 AM WEATHER:Showers TEMP. 58°t EST.%OF COMPLETION : 25% CONFORMANCE WITH SCHEDULE(+,-):On Time WORK IN PROGRESS : PRESENT AT SITE: Compacting and placing wire mesh;placing concrete slab in processing area 1-Supervisor,JMD Const. :j Staging PIP panels for processing area. Manny Escobar,SPDG OBSERVATIONS: 3-PIP Installers 'i 1. Sitework&Excavation- 55%complete(1) 3-Labors,JMD Const. 2. Concrete Foundations&Footing Work- 45%complete(2) 8-concrete finishers 3. Structural Steel Framing- 25%complete(3) 4. Exterior Metal Siding Panels-[Match existing] 0%complete(4) 5. Roofing(patch&repair)- 0%complete(5) 1 6. Sub-Floor Preparation - 90%complete(6) 7. Rough Under/Floor Plumbing- 100%complete(7) 8. Concrete Sub/Floor Slab- 70%complete(8) 9. Finish Concrete Floor Slab- 40%complete(9) 10. Finish Concrete Curbing- 0%complete(10) 11. (PIP)Prefinished Insulated Wall Panels- 40%complete(11) i 12. (PIP)Prefinished Insulated Ceiling Panels- 40%complete(12) #3f 13. (PIP)Prefinished Insulated Miscellaneous Items- 0%complete(13) 14. Low Temp. Doors and Frames-[Freezer] 0%complete(14) 15. Structural Steel Mezzanine&Stairs- 0%complete(15) 16. Miscellaneous Steel&Metal - 0%complete(16) 17. Steel Curbing- 0%complete(17) 18. Painting-[Miscellaneous] 0%complete(18) 19. Floor Finishes-[Sealer] 0%complete(19) I 20. Production Doors/Frames- 0%complete(20) 21. Exterior Windows/Frames- 0%complete(21) 22. Loading Dock Doors/Mics. 0%complete(22) 23. Miscellaneous- 0%complete(23) a. b. 24. Rough Electrical Work- 40%complete(24) 25. Finish Electrical Work- 0%complete(25) 26. Rough Plumbing Work- 80%complete(26) { 27. Finish Plumbing Work- 30%complete(27) 28. Rough Sprinkler Work- 0%complete(28) 29. Finish Sprinkler Work- 0%complete(29) 30. Rough H.V.A.C.Work-(Refrigeration) 40%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 0%complete(31) 32. Life Safety 0%complete(32) ITEMS TO BE VERIFY: INFORMATION OR ACTION REQUIRED: ATTACHMENTS: REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: Contractor/Architect Field Report in pursuant to Chapter 1 :Administration-780 CMR I'Al Construction Control to codes of the Commonwealth of Massachusetts(Sixth Edition) 1 cc: ❑ Building Department Space ❑ General Contractor Planning I ❑ Owner Design ,f ❑ File Copy Group P.O.Box 302 '( INCORPORATED Norwood,MA 02062-0302 T:781.718.5693 a F:781.762.9858 } CONSTRUCTION FIELD REPORT t PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO: ( 5 ) Five 90 Swampscott Street, Salem, MA k for Jacqueline's Cookies Corp CONTRACT: JMD Construction Co. PROJECT NO : 2006.04]mc! 92 Wells Village Rd.,Chester,NH 03036 DATE: June 21,2006 TIME: 11:15 AM WEATHER: Partly Cloudy/Showers TEMP. 78 °t j� EST.% COMPLETION : 28% CONFORMANCE WITH SCHEDULE(+,-):On Time WORK IN PROGRESS: PRESENT AT SITE: Concrete pump,and slab(remainder);PIP panels installation;mechanical/piping 1-Supervisor,JMD Const. Manny Escobar,SPDG OBSERVATIONS: 5-PIP Installers 1. Sitework&Excavation- 60%complete(1) 2-Labors,JMD Const. 2. Concrete Foundations&Footing Work- 80%complete(2) 13-concrete finishers 3. Structural Steel Framing- 70%complete(3) 3-Mechanical 4. Exterior Metal Siding Panels-[Match existing] 0%complete(4) 2-Electrical 5. Roofing(patch&repair)- 10%complete(5) 6. Sub-Floor Preparation - 95%complete(6) 7. Rough Under/Floor Plumbing- 100%complete(7) 8. Concrete Sub/Floor Slab- 80%complete(8) 9. Finish Concrete Floor Slab- 50%complete(9) 10. Finish Concrete Curbing- 0%complete(10) 11. (PIP)Prefnished Insulated Wall Panels- 50%complete(11) 12. (PIP)Prefnished Insulated Ceiling Panels- 50%complete(12) 13. (PIP)Prefnished Insulated Miscellaneous Items- 10%complete(13) 14. Low Temp.Doors and Frames-[Freezer] 0%complete(14) 15. Structural Steel Mezzanine&Stairs- 60%complete(15) 16. Miscellaneous Steel&Metal - 20%complete(16) 17. Steel Curbing- 0%complete(17) 18. Painting-[Miscellaneous] 0%complete(18) 19. Floor Finishes-[Sealer] 0%complete(19) 20. Production Doors/Frames- 0%complete(20) 21. Exterior Windows/Frames- 0%complete(21) 22. Loading Dock Doors/Mics. 10%complete(22) 23. Miscellaneous-Office mezzanine 10%complete(23) a. Partition 10%complete(23a) b. Ceiling 0%complete(23b) c. Finishes 0%complete(23c) 24. Rough Electrical Work- 30%complete(24) 25. Finish Electrical Work- 0%complete(25) 26. Rough Plumbing Work- 85%complete(26) 27. Finish Plumbing Work- 0%complete(27) 28. Rough Sprinkler Work- 60%complete(28) 29. Finish Sprinkler Work- 10%complete(29) 30. Rough H.V.A.C.Work-(Refrigeration) 30%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 0%complete(31) i 32. Life Safety 10%complete(32) 4fFk ITEMS TO BE VERIFY 1 INFORMATION OR ACTION REQUIRED: ATTACHMENTS: REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: , Contractor/Architect Field Report in pursuant to Chapter I :Administration-780 CMR 110t.2 Construction Control to codes of the Commonwealth of Massachusetts(Sixth Edition) cc: ❑ Building Department Space . ❑ General Contractor Planning ❑ Owner Design ❑ File Copy Group P.O.Box 302 s INCORPORATED Norwood,MA 02062-0302 T:781.718.5693 F:781.762.9858 CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO: ( 6 ) SIX 90 Swampscott Street, Salem, MA j for Jacqueline's Cookies Corp CONTRACT: JMD Construction Co. PROJECT NO : 2006.04 jmd [ 92 Wells Village Rd.,Chester,NH 03036 DATE: June 29,2006 TIME: 11:35 AM WEATHER: Partly Cloudy TEMP. 82 °t rt EST.%OF COMPLETION : 34% CONFORMANCE WITH SCHEDULE(+,-) :On Time Ir WORK IN PROGRESS : PRESENT AT SITE : PIP panels installation;mechanical/piping;electrical;metal studs drywall;Sprinkler work 1-Supervisor,JMD Const. Manny Escobar,SPDG OBSERVATIONS: 3-PIP Installers 1. Sitework&Excavation- 60%complete(1) 1-Labors,JMD Const. 2. Concrete Foundations&Footing Work- 90%complete(2) 4-GWD Installers 3. Structural Steel Framing- 80%complete(3) 3-Mechanical 4. Exterior Metal Siding Panels-[Match existing] 10%complete(4) 2-Pipe Fitters 5. Roofing(patch&repair)- 40%complete(5) 2-Sprinkler 6. Sub-Floor Preparation - 100%complete(6) 2-Electrical 7. Rough Under/Floor Plumbing- ' :. 100%complete(7) 8. Concrete Sub/Floor Slab- 100%complete(B) 9. Finish Concrete Floor Slab- 50%complete(9) 10. Finish Concrete Curbing- 0%complete(10) 11. (PIP)Prefinished Insulated Wall Panels- 60%complete(11) 12. (PIP)Prefinished Insulated Ceiling Panels- 60%complete(12) 13. (PIP)Prefinished Insulated Miscellaneous Items- 10%complete(13) 14. Low Temp. Doors and Frames-[Freezer] 0%complete(14) 15. Structural Steel Mezzanine&Stairs- 70%complete(15) 16. Miscellaneous Steel&Metal - 30%complete(16) 17. Steel Curbing- 0%complete(17) 18. Painting-(Miscellaneous] 0%complete(18) 19. Floor Finishes-[Sealer] 0%complete(19) 20. Production Doors/Frames- 0%complete(20) 21. Exterior Windows/Frames- 0%complete(21) 22. Loading Dock Doors/Mics. 10%complete(22) 23. Miscellaneous-Office mezzanine 20%complete(23) a. Partition 40%complete(23a) b. Ceiling 0%complete(23b) c. Finishes 0%complete(23c) 24. Rough Electrical Work- 40%complete(24) 25. Finish Electrical Work- 0%complete(25) 26. Rough Plumbing Work- 90%complete(26) 27. Finish Plumbing Work- 0%complete(27) 28. Rough Sprinkler Work- 70%complete(28) 29. Finish Sprinkler Work- 20%complete(29) 30. Rough H.V.A.C.Work-(Refrigeration) 40%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 0%complete(31) 32. Life Safety 10%complete(32) - ITEMS TO BE VERIFY: ,i INFORMATION OR ACTION REQUIRED: t ATTACHMENTS : REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: Contractor/Architect Field Report in pursuant to Chapter 1 :Administration-780 CMR 116,f.2 Construction Control to codes of the Commonwealth of Massachusetts(Sixth Edition) cc: ❑ Building Department Space ❑ General Contractor Planning ❑ Owner /Design El File Copy - Group P.O.Box 302 INCORPORATED Norwood,MA 02062-0302 T:781.718.5693 F:781.762.9858 CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO: ( 7 ) Seven 90 Swampscott Street, Salem, MA for Jacqueline's Cookies Corp CONTRACT: JMD Construction Co. PROJECT NO: 2006.04]mc! 92 Wells Village Rd.,Chester,NH 03036 DATE: July 12,2006 TIME: 10:00 AM WEATHER:Partly Cloudy/Hot TEMP. 87 °t EST.%OF COMPLETION : 40% CONFORMANCE WITH SCHEDULE(+,-):On Time WORK IN PROGRESS: PRESENT AT SITE: Metal stairs been installed;PIP panels installation;mechanical/piping;electrical;Sprinkler work 1-Supervisor,JMD Const. Manny Escobar,SPDG OBSERVATIONS: 2-PIP Installers 1. Sitework&Excavation- 60%complete(1) 1-Labors,JMD Const. j 2. Concrete Foundations&Footing Work- 100%complete(2) 3-Steel erectors 3. Structural Steel Framing- 100%complete(3) 3-Mechanical 4. Exterior Metal Siding Panels-[Match existing] 20%complete(4) 2-Refrigeration 5. Roofing(patch&repair)- 50%complete(5) 2-Sprinkler 6. Sub-Floor Preparation - 100%complete(6) 2-Electrical 7. Rough Under/Floor Plumbing- 100%complete(7) 8. Concrete Sub/Floor Slab- 100%complete(8) 9. Finish Concrete Floor Slab- 100%complete(9) 10. Finish Concrete Curbing- 0%complete(10) 11. (PIP)Prefinished Insulated Wall Panels- 70%complete(11) 12. (PIP)Prefinished Insulated Ceiling Panels- 70%complete(12) 13. (PIP)Prefinished Insulated Miscellaneous Items- 20%complete(13) .{ 14. Low Temp. Doors and Frames-[Freezer] 10%complete(14)on-site 15. Structural Steel Mezzanine&Stairs- 90%complete(15) �l 16. Miscellaneous Steel&Metal - 40%complete(16) 17. Steel Curbing- 0%complete(17) 18. Painting-[Miscellaneous] 0%complete(18) 19. Floor Finishes-[Sealer] 0%complete(19) 20. Production Doors/Frames- 0%complete(20) 21. Exterior Windows/Frames- 0%complete(21) 22. Loading Dock Doors/Mics. 10%complete(22) 23. Miscellaneous-Office mezzanine 30%complete(23) a. Partition 50%complete(23a) b. Ceiling 0%complete(23b) c. Finishes 0%complete(23c) 'S 24. Rough Electrical Work- R, 70%complete(24) 25. Finish Electrical Work- 20%complete(25) i 26. Rough Plumbing Work- 95%complete(26) 27. Finish Plumbing Work- 0%complete(27) 28. Rough Sprinkler Work- 80%complete(28) 29. Finish Sprinkler Work- 30%complete(29) 30. Rough H.V.A.C.Work-(Refrigeration) 50%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 0%complete(31) 32. Life Safety 10%complete(32) ITEMS TO BE VERIFY: INFORMATION OR ACTION REQUIRED: i { ATTACHMENTS : REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: F Contractor/Architect Field Report in pursuant to Chapter 1 :Administration-780 CMR 116.2.2 Construction Control to codes of the fffF Commonwealth of Massachusetts(Sixth Edition) :1 ,i cc: ❑ Building Department Space ❑ General Contractor Planning ❑ owner Design ❑ File Copy Group P.O.Box 302 INCORPORATED Norwood,MA 02062-0302 T:781.718.5693 F:781.762.9858 CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO: ( H ) Eight 90 Swampscott Street, Salem, MA for Jacqueline's Cookies Corp CONTRACT: JMD Construction Co. PROJECT NO : 2006.04 jmd tt 92 Wells Village Rd.,Chester,NH 03036 ] DATE: July 20,2006 TIME: 10:30 AM WEATHER:Sunny/PC TEMP. 78 °t {{ EST.%OF COMPLETION : 50% CONFORMANCE WITH SCHEDULE(+,.):On Time WORK IN PROGRESS : PRESENT AT SITE : Concrete curbs;PIP panels installation;mechanicallpiping;electrical; 1-Supervisor,JMD Const. Manny Escobar,SPDG OBSERVATIONS: 2-PIP Installers 1. Sitework&Excavation- 70%complete(1) 2-Labors,JMD Const. 2. Concrete Foundations&Footing Work- 100%complete(2) 4-conc.finishers 3. Structural Steel Framing- 100%complete(3) 2-Mechanical 4. Exterior Metal Siding Panels-[Match existing] 20%complete(4) 2-Refrigeration 5. Roofing(patch&repair)- 50%complete(5) 2-Electrical 6. Sub-Floor Preparation - 100%complete(6) 7. Rough Under/Floor Plumbing- 100%complete(7) _ S. Concrete Sub/Floor Slab- 100%complete(8) 9. Finish Concrete Floor Slab- 100%complete(9) 10. Finish Concrete Curbing- 20%complete(10) 11. (PIP)Prefinished Insulated Wall Panels- 80%complete(11) 12. (PIP)Prefinished Insulated Ceiling Panels- 80%complete(12) 13. (PIP)Prefinished Insulated Miscellaneous Items- 30%complete(13) 14. Low Temp. Doors and Frames-[Freezer] 20%complete(14)on-site 15. Structural Steel Mezzanine&Stairs- 100%complete(15) 16. Miscellaneous Steel&Metal - 50%complete(16) 17. Steel Curbing- 20%complete(17) 18. Painting-[Miscellaneous] 0%complete(18) 19. Floor Finishes-[Sealer] 20%complete(19) 20. Production Doors/Frames- 10%complete(20) 21. Exterior Windows/Frames- _ 10%complete(21) - 22. Loading Dock Doors/Mics. 10%complete(22) 23. Miscellaneous-Office mezzanine 40%complete(23) a. Partition 50%complete(23a) b. Ceiling 0%complete(23b) c. Finishes 0%complete(23c) 24. Rough Electrical Work- 80%complete(24) 25. Finish Electrical Work- 30%complete(25) 26. Rough Plumbing Work- 95%complete(26) 27. Finish Plumbing Work- 20%complete(27) 28. Rough Sprinkler Work- 90%complete(28) 29. Finish Sprinkler Work- 50%complete(29) 30. Rough H.V.A.C.Work-(Refrigeration) 60%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 20%complete(31) 32. Life Safety 10%complete(32) ITEMS TO BE VERIFY: INFORMATION OR ACTION REQUIRED: ATTACHMENTS : REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: Contractor/Architect Field Report in pursuant to Chapter 1 :Administration-780 CMR 116. .2 Construction Control to codes of the Commonwealth of Massachusetts(Sixth Edition) cc: ❑ Building Department Space ❑ General Contractor Planning ❑ Owner Design ❑ File Copy Group P.O.Box 302 INCORPORATED Norwood,MA 02062-0302 T:781.718.5693 F:781.762.9858 CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO : ( 9 ) Nine 90 Swampscott Street,Salem, MA for Jacqueline's Cookies Corp CONTRACT: JMD Construction Co. PROJECT NO: 2006.04 jmd 92 Wells Village Rd.,Chester,NH 03036 DATE: July 27,2006 TIME: 11:45 AM WEATHER:Sunny/PC TEMP. 84 °t EST.%OF COMPLETION: 56% CONFORMANCE WITH SCHEDULE(+,-) :On Time WORK IN PROGRESS : PRESENT AT SITE: Concrete curbs;PIP panels installation;mechanical;electrical;cone.curb finishers 1-Supervisor,JMD Const. Manny Escobar,SPDG OBSERVATIONS: 2-PIP Installers 1. Sitework&Excavation- 70%complete(1) 2-Labors,JMD Const. 2. Concrete Foundations&Footing Work- 100%complete(2) 4-cone.finishers 3. Structural Steel Framing- 100%complete(3) 2-Mechanical 4. Exterior Metal Siding Panels-[Match existing] 20%complete(4) 2-Electrical 7 5. Roofing(patch&repair)- 50%complete(5) 'i 6. Sub-Floor Preparation - 100%complete(6) I 7. Rough Under/Floor Plumbing- 100%complete(7) l 8. Concrete Sub/Floor Slab- 100%complete(8) 9. Finish Concrete Floor Slab- 100%complete(9) i 10. Finish Concrete Curbing- 40%complete(10) .k 11. (PIP)Prefnished Insulated Wall Panels- 90%complete(11) I 12. (PIP)Prefnished Insulated Ceiling Panels- 90%complete(12) 13. (PIP)Prefinished Insulated Miscellaneous Items- 40%complete(13) 14. Low Temp. Doors and Frames-[Freezer] 40%complete(14) �r 15. Structural Steel Mezzanine&Stairs- 100%complete(15) 16. Miscellaneous Steel&Metal - 60%complete(16) 17. Steel Curbing- 40%complete(17) 18. Painting-[Miscellaneous] 10%complete(18)primer 19. Floor Finishes-[Sealer] 60%complete(19) 20. Production Doors/Frames- 20%complete(20) 21. Exterior Windows/Frames- 20%complete(21)on-site 22. Loading Dock Doors/Mics. 10%complete(22) 23. Miscellaneous-Office mezzanine 50%complete(23) a. Partition 60%complete(23a) b. Ceiling 0%complete(23b) c. Finishes 0%complete(23c) 24. Rough Electrical Work- 90%complete(24) 25. Finish Electrical Work- - 40%complete(25) 26. Rough Plumbing Work- 95%complete(26) 27. Finish Plumbing Work- 30%complete(27) 28. Rough Sprinkler Work- 100%complete(28) 29. Finish Sprinkler Work- 70%complete(29) 30. Rough H.V.A.C.Work-(Refrigeration) 70%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 20%complete(31) 32. Life Safety 10%complete(32) ITEMS TO BE VERIFY: INFORMATION OR ACTION REQUIRED: 'j Sprinkler loop was cut off at the demising partition.JMD Const.Verifying with Landlord. ATTACHMENTS : REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: Contractor/Architect Field Report in pursuant to Chapter 1 :Administration-780 CMR 116-3r2 Construction Control to codes ofthe Commonwealth of Massachusetts(Sixth Edition) 1 cc: ❑ Building Department Space ❑ General Contractor Planning d ❑ owner Design ❑ File Copy Group P.O.Box 302 INCORPORATED Norwood,MA 02062-0302 T:781.718.5693 F:781.762.9858 CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO: ( 10 ) Ten 90 Swampscott Street, Salem, MA for Jacqueline's Cookies Corp CONTRACT: JMD Construction Co. PROJECT NO: 2006.04 jmd 92 Wells Village Rd.,Chester,NH 03036 DATE: August 3,2006 TIME: 10:00 AM WEATHER:Sunny/PC TEMP. 86 °t EST.%OF COMPLETION : 65% CONFORMANCE WITH SCHEDULE(+,-):On Time WORK IN PROGRESS : PRESENT AT SITE: G.W.B Installer/Tapers;mechanical;electrical;oonc. 1-Supervisor,JMD Const. Manny.Escobar,SPDG OBSERVATIONS: 2-PIP Installers 1. Sitework&Excavation- 70%complete(1) 2-Labors,JMD Const. 2. Concrete Foundations&Footing Work- 100%complete(2) 4-cone.finishers 3. Structural Steel Framing- 100%complete(3) 2-Mechanical 4. Exterior Metal Siding Panels-[Match existing] 20%complete(4) 5. Roofing(patch&repair)- 100%complete(5) 6. Sub-Floor Preparation - 100%complete(6) 7. Rough Under/Floor Plumbing- 100%complete(7) 8. Concrete Sub I Floor Slab- 100%complete(8) 9. Finish Concrete Floor Slab- 100%complete(9) 10. Finish Concrete Curbing- 100%complete It 0) 11. (PIP)Prefnished Insulated Wall Panels- 95%complete(11) 12. (PIP)Prefnished Insulated Ceiling Panels- 95%complete It 2) 13. (PIP)Prefnished Insulated Miscellaneous Items- 80%complete(13) 14. Low Temp.Doors and Frames-{Freezer] 80%complete It 4) 15. Structural Steel Mezzanine&Stairs- 100%complete(15) 16. Miscellaneous Steel&Metal - 70%complete If 6) 17. Steel Curbing- 70%complete(17) 18. Painting-[Miscellaneous] 10%complete(18) 19. Floor Finishes-[Sealer] 70%complete(19) 20. Production Doors/Frames- 40%complete(20) 21. Exterior Windows/Frames- 40%complete(21)on-site 22. Loading Dock Doors/Mics. 20%complete(22)on-site 23. Miscellaneous-Office mezzanine 60%complete(23) a. Partition 80%complete(23a) b. Ceiling 0%complete(23b) c. Finishes 0%complete(23c) 24. Rough Electrical Work- 95%complete(24) 25. Finish Electrical Work- 50%complete(25) 26. Rough Plumbing Work- 95%complete(26) 27. Finish Plumbing Work- 40%complete(27) 28. Rough Sprinkler Work- 100%complete(28) 29. Finish Sprinkler Work- 80%complete(29)' 30. Rough H.V.A.C.Work-(Refrigeration) 80%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 40%complete(31) 1 32. Life Safety 20%complete(32) }[ ITEMS TO BE VERIFY: ' INFORMATION OR ACTION REQUIRED: !{ 'Rework existing Sprinkler loop ATTACHMENTS : REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: , Contractor/Architect Field Report in pursuant to Chapter 1 :Administration-780 CMR 116. .2 Construction Control to codes of the Commonwealth of Massachusetts(Sixth Edition) i cc: ❑ Building Department Space ❑ General Contractor Planning ❑ owner Design } ❑ File Copy Group P.O. Box 302 r INCORPORATED Norwood,MA 02062-0302 T:781.718.5693 ' F:781.762.9858 'I CONSTRUCTION FIELD REPORT 1 PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO: ( 11 ) Eleven i 90 Swampscott Street, Salem, MA 'j for Jacqueline's Cookies Corp ' CONTRACT: JMD Construction Co. PROJECT NO : 2006.04 imd 92 Wells Village Rd.,Chester,NH 03036 DATE: August 10,2006 TIME: 10:10 AM WEATHER:Sunny TEMP. 76 °t EST.% COMPLETION : 87% CONFORMANCE WITH SCHEDULE(+,-):On Time WORK IN PROGRESS : PRESENT AT SITE : G.W.B Installer/Tapers;painters;mechanical;electrical;carpenters installation of doors and i-Supervisor,JMD Const. Frames,hardware;epoxy Floor finishers;Exterior stairs and grading Manny Escobar,SPDG OBSERVATIONS: 3-Painters f 1. Sitework&Excavation- 70%complete(1) 1-Labors,JMD Const. 2. Concrete Foundations&Footing Work- 100%complete(2) 3-G.W.B.Contractor 3. Structural Steel Framing- 100%complete(3) 2-Mechanical 4. Exterior Metal Siding Panels-[Match existing] 20%complete(4) 3-Electrical 5. Roofing(patch&repair)- 100%complete(5) 2-epoxy Flooring 6. Sub-Floor Preparation - 100%complete(6) 5-site/cont.workers 7. Rough Under/Floor Plumbing- 100%complete(7) 8. Concrete Sub/Floor Slab- 100%complete(8) 9. Finish Concrete Floor Slab- 100%complete(9) 10. Finish Concrete Curbing- 100%complete(10) 11. (PIP)Prefinished Insulated Wall Panels- 100%complete(11) 12. (PIP)Prefinished Insulated Ceiling Panels- 100%complete(12) 13. (PIP)Prefinished Insulated Miscellaneous Items- 90%complete(13) 14. Low Temp. Doors and Frames-[Freezer] 100%complete(14) 15. Structural Steel Mezzanine&Stairs- 100%complete(15) 16. Miscellaneous Steel&Metal - 90%complete(16) 17. Steel Curbing- 100%complete(17) 18. Painting-[Miscellaneous] 40%complete(18) 19. Floor Finishes-[Sealer]Epoxy 100%complete(19) 20. Production Doors/Frames- 80%complete(20) 21. Exterior Windows/Frames- 90%complete(21) 22. Loading Dock Doors/Mics. 80%complete(22) 23. Miscellaneous-Office mezzanine 70%complete(23) a. Partition 100%complete(23a) b. Ceiling 50%complete(23b) c. Finishes 20%complete(23c) 24. Rough Electrical Work- 100%complete(24) 25. Finish Electrical Work- 70%complete(25) 26. Rough Plumbing Work- 100%complete(26) 27. Finish Plumbing Work- 70%complete(27) 28. Rough Sprinkler Work- 100%complete(28) 29. Finish Sprinkler Work- 90%complete(29)' 30. Rough H.V.A.C.Work-(Refrigeration) 100%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 100%complete(31) 32. Life Safety 50%complete(32) ITEMS TO BE VERIFY : Exterior landscaping,by tenant? INFORMATION OR ACTION REQUIRED: `Rework existing Sprinkler loop Processing equipment arriving;coordinate intallation ATTACHMENTS : REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: { Contractor/Architect Field Report in pursuant to Chapter 1 :Administration-780 CMR I I 6+231tcostruction Control to codes of the 1 Commonwealth of Massachusetts(Sixth Edition) cc: ❑ Building Department Space ❑ General Contractor Planning ❑ Owner Design ❑ File Copy Group P.O.Box 302 INCORPORATED Norwood,MA 02062-0302 T:781.718.5693 F:781.762.9858 CONSTRUCTION FIELD REPORT PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO: 12 Twelve 90 Swampscott Street, Salem, MA for Jacqueline's Cookies Corp ` CONTRACT: JMD Construction Co. PROJECT NO: 2006.04]md i 92 Wells Village Rd.,Chester,NH 03036 k 'I. DATE: August 16,2006 TIME: 11:45 AM WEATHER:Sunny TEMP. 78 °t EST.% COMPLETION: 91 % CONFORMANCE WITH SCHEDULE(+,-) :On Time 'I WORK IN PROGRESS: PRESENT AT SITE: Site work,stairs site grading;electrical;sprinkler;painting;plumbing 1-Supervisor,JMD Const. Manny Escobar,SPDG OBSERVATIONS: 3-Painters 1. Sitework&Excavation- 90%complete(1) 1-Labors,JMD Const. 2. Concrete Foundations&Footing Work- 100%complete(2) 2-Sprinklers 3. Structural Steel Framing- 100%complete(3) 2-Electrical 4. Exterior Metal Siding Panels-[Match existing] 90%complete(4) 3-Site/conc.Worker 5. Roofing(patch&repair)- 100%complete(5) 2-plumbing 6. Sub-Floor Preparation - 100%complete(6) 7. Rough Under/Floor Plumbing- 100%complete(7) t 8. Concrete Sub/Floor Slab- 100%complete(8) ,# 9. Finish Concrete Floor Slab- 100%complete(9) 10. Finish Concrete Curbing- 100%complete(10) 11. (PIP)Prefnished Insulated Wall Panels- 100%complete(11) 12. (PIP)Prefnished Insulated Ceiling Panels- 100%complete(12) ;i 13. (PIP)Prefinished Insulated Miscellaneous Items- 95%complete(13) 14. Low Temp. Doors and Frames-[Freezer] 100%complete(14) {#f 15. Structural Steel Mezzanine&Stairs- 100%complete(15) 16. Miscellaneous Steel&Metal - 95%complete(16) 17. Steel Curbing- 100%complete(17) k 18. Painting-[Miscellaneous] 80%complete(18) 'r 19. Floor Finishes-[Sealer]Epoxy 100%complete(19) ! 20. Production Doors/Frames- 100%complete(20) 21. Exterior Windows/Frames- 100%complete(21) 22. Loading Dock Doors/Mics. 100%complete(22) 23. Miscellaneous-Office mezzanine 90%complete(23) a. Partition 100%complete(23a) b. Ceiling 100%complete(23b) c. Finishes 80%complete(23c) 24. Rough Electrical Work- 100%complete(24) 25. Finish Electrical Work- 80%complete(25) 26. Rough Plumbing Work- 100%complete(26) 27. Finish Plumbing Work- 80%complete(27) 28. Rough Sprinkler Work- 100%complete(28)new pipes arrived' 29. Finish Sprinkler Work- 90%complete(29)' 30. Rough H.V.A.C.Work-(Refrigeration) 100%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 100%complete(31) 32. Life Safely 70%complete(32) r ITEMS TO BE VERIFY: Exterior landscaping,by tenant? INFORMATION OR ACTION REQUIRED: '+ 'Rework existing Sprinkler loop Processing equipment arriving;coordinate installation ATTACHMENTS: REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: , Contractor/Architect Field Report in pursuant to Chapter I :Administration-780 CMR 116.2. Con ruction Control to codes ofthe Commonwealth of Massachusetts(Sixth Edition) 3� l 1 I cc: ❑ Building Department Space 1 li ❑ General Contractor Planning 't ❑ Owner Design ❑ File Copy Group P.O.Box 302 'f INCORPORATED Norwood,MA 02062-0302 1! T:781.718.5693 F:781.762.9858 CONSTRUCTION FIELD REPORT j PROJECT: Interior Tenant Improvements Existing Building at FIELD REPORT NO: ( 13 ) Thirteen 90 Swampscott Street, Salem, MA { for Jacqueline's Cookies Corp f CONTRACT: JMD Construction Co. PROJECT NO: 2006.04 jmd 92 Wells Village Rd.,Chester, NH 03036 DATE: August 14,2006 TIME: 12:25 AM WEATHER:Sunny TEMP. 84 °t EST.%OF COMPLETION : 100% CONFORMANCE WITH SCHEDULE(+,-):On Time WORK IN PROGRESS : PRESENT AT SITE: Glazing installation in offices;electrical;painting;carpet installation 1-Supervisor,JMD Const. Manny Escobar,SPDG OBSERVATIONS: 2-Painters 1. Sitework&Excavation- 100%complete(1) 1-Labors,JMD Const. 2. Concrete Foundations&Footing Work- 100%complete(2) 1-Glazing 3. Structural Steel Framing- 100%complete(3) 2-Electrical 4. Exterior Metal Siding Panels-[Match existing] 100%complete(4) 2-Carpet 5. Roofing(patch&repair)- 100%complete(5) 6. Sub-Floor Preparation - 100%complete(6) 7. Rough Under/Floor Plumbing- 100%complete(7) 8. Concrete Sub/Floor Slab- 100%complete(8) 9. Finish Concrete Floor Slab- 100%complete(9) 10. Finish Concrete Curbing- 100%complete(10) 11. (PIP)Prefinished Insulated Wall Panels- 100%complete(11) 12. (PIP)Prefinished Insulated Ceiling Panels- 100%complete(12) 13. (PIP)Prefinished Insulated Miscellaneous Items- 100%complete(13) 14. Low Temp. Doors and Frames-[Freezer] 100%complete(14) 15. Structural Steel Mezzanine&Stairs- 100%complete(15) 16. Miscellaneous Steel&Metal - 95%complete(16)Exterior railing by 8.18.06 17. Steel Curbing- 100%complete(17) 18. Painting-[Miscellaneous] 100%complete(18) 19. Floor Finishes-[Sealer]Epoxy 100%complete(19) 20. Production Doors/Frames- 100%complete(20) 21. Exterior Windows/Frames- 100%complete(21) 22. Loading Dock Doors/Mics. 100%complete(22) 23. Miscellaneous-Office mezzanine 10%complete(23) a. Partition 100%complete(23a) b. Ceiling 100%complete(23b) c. Finishes 100%complete(23c) 24. Rough Electrical Work- 100%complete(24) 25. Finish Electrical Work- 100%complete(25) 26. Rough Plumbing Work- 100%complete(26) 27. Finish Plumbing Work- 100%complete(27) 28. Rough Sprinkler Work- 100%complete(28)new pipes arrived' 29. Finish Sprinkler Work- 90%complete(29)' 30. Rough H.V.A.C.Work-(Refrigeration) 100%complete(30) 31. Finish H.V.A.C.Work-(Refrigeration) 100%complete(31) 32. Life Safety- 80%complete(32) ITEMS TO BE VERIFY: Final inspection by 8.18.2006 INFORMATION OR ACTION REQUIRED: `Rework existing Sprinkler loop _ Processing equipment arriving;coordinate installation ATTACHMENTS: REPORTED BY: Manuel P.Escobar,Project Architect SIGN BY: I Contractor/Architect Field Report in pursuant to Chapter 1 :Administration-780 CMR 116f.2 Construction Control to codes of the ( Commonwealth of Massachusetts(Sixth Edition)