UTS Job 22528 Report 29 Compressive Strength Report - Concrete 07-24-2019 (002)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-24-2019Compressive Strength Report - Concrete Report No.29 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:5000# 3/8"No. Of Sets: 4 165CUBIC YARDS: SET 1 LOCATION:SOD level 64 at 31 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type T887 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 46,500 3,700 2 T888 4 x 8 12.57 Good 07/24/19 08/07/19 14 T889 4 x 8 12.57 Good 07/24/19 08/21/19 28 T890 4 x 8 12.57 Good 07/24/19 08/21/19 28 T891 4 x 8 12.57 Good 07/24/19 08/21/19 28 Slump (in.)7, 6 Air Temp. (F.)66 Conc Temp (F)79 Truck No.200 Ticket No.9002 Time 8:00 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:SOD level 64 at 37 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type T872 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 44,000 3,500 1 T873 4 x 8 12.57 Good 07/24/19 08/07/19 14 T874 4 x 8 12.57 Good 07/24/19 08/21/19 28 T875 4 x 8 12.57 Good 07/24/19 08/21/19 28 T876 4 x 8 12.57 Good 07/24/19 08/21/19 28 Slump (in.)7, 6 Air Temp. (F.)67 Conc Temp (F)80 Truck No.253 Ticket No.9029 Time 8:35 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:SOD level 64 at 44 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type T902 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 45,000 3,580 2 T903 4 x 8 12.57 Good 07/24/19 08/07/19 14 T904 4 x 8 12.57 Good 07/24/19 08/21/19 28 T905 4 x 8 12.57 Good 07/24/19 08/21/19 28 T906 4 x 8 12.57 Good 07/24/19 08/21/19 28 Slump (in.)* Air Temp. (F.)73 Conc Temp (F)79 Truck No.188 Ticket No.9039 Time 9:35 Unit Wt lbs/cu ft Air Content (%) SET 4 LOCATION:SOD level 64 at 49 Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-24-2019Compressive Strength Report - Concrete Report No.29 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type T892 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 42,000 3,340 1 T893 4 x 8 12.57 Good 07/24/19 08/07/19 14 T894 4 x 8 12.57 Good 07/24/19 08/21/19 28 T895 4 x 8 12.57 Good 07/24/19 08/21/19 28 T896 4 x 8 12.57 Good 07/24/19 08/21/19 28 Slump (in.)6, 5 Air Temp. (F.)73 Conc Temp (F)81 Truck No.249 Ticket No.9050 Time 10:35 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:*Two slumps set 3 - 6 1/2, 5/2. Same day call in. Cylinders received on 7-28-19. Inspector Premium Travel Name Time Hours Time D. Montello No Min Day .5 Hr(s) Zean Bradley No Min Day .5 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-24-2019Compressive Strength Report - Concrete Report No.29 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-24-2019Compressive Strength Report - Concrete Report No.29 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:SOD level 64 at 19-53 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)4 to 6 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 5 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-24-2019 Report No.29 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment