Loading...
60 SCHOOL STREET - BUILDING INSPECTION 50 SCHOOL STREET f - x r llll p No. 153L.2 HASTINGS. MN LOS ANGELES-CHICAGO-LOGAN.ON MCGREGOR.TX-LOCUST GROVE.GA U.S.A. No-7a -9 3 City of Salem Ward APPLICATION FOR PERMIT TO BUILD ADDITION, MAKE ALTERATIONS OR NEW CONSTRUCTION IMPORTANT-Applicant tocompleteall items in sections:1, 11, Ill, IV,and IX. 1. AT(LOCATION) O J L�� S �1 D SNING LOCATION (NO.) (STRet� t— / / /- OF BETWEEN _co-tlrrrJeVC 0'` .SCLiGCJ�S / AND scl I�Nc [ /Z� �f/ BUILDING LOT (CROSS STREET) (CROSS ET) SUBDIVISION LOT BLOCK SIZE II. TYPE AND COST OF BUILDING -All applicants complete Parts A -D A. TYPE OF IMPROVEMENT D. PROPOSED USE-FOR"DEMOLITION'USE MOST RECENT USE 1 ❑ New building Residential Nonresidential 2 ❑ Addition(It residential,enter number of new 12 One family 18 ❑ Amusement,recreational housing units added,it any,in part D, 13) 19 [:] Chruch,other religious 13 ❑ Two or more family-Enter number 3 Alteration(See 2 above) of units ....................................................... 20 ❑ Industrial 21 E] Parking garage 4 E] Repair replacement14 E] Transient motel,or dormitory- 22 E] Service station,repair garage Enter numberber o of units ........................... 5 ❑ Wrecking(if multifamily residential,enter number ❑ 23 ❑ Hospital,institutional of units in building in Part D, 13) 15 Garage 24 ❑ Office,bank,professional 6 ❑ Moving(relocation) 16 ❑ Carport 25 ❑ Public utility 26 ❑ School,library,other educational 7 E] Foundation only 17 ❑ Other-Specify 27 ❑ Stores,mercantile B.OWNE HIP 28 ❑ Tanks,towers 8 Private(individual,corporation,nonprofit institution,etc.) 29 ❑ Other-Specify 9 ❑ Public(Federal,State,or local government C.COST (Omit cents) Nonresidential-Describe in detail proposed use of buildings,e.g.,food processing plant, machine shop,laundry building at hospital,elementary school,secondary School,college, }( ;GC parochial school,parking garage for department store,rental office building,office building 10. Cost of improvement ......................................................... $ at industrial plant.If use of existing building is being changed,enter proposed use. To be installed but not included In� � in the above cost a. Electrical........................................................................... b. Plumbing c. Heating,air contlitbning............................................. d. Other(elevator.etc.)..................................................... 11. TOTAL COST OF IMPROVEMENT 111. SELECTED CHARACTERISTICS OF BUILDING -For new buildings and additions,complete Parts E-L;demolition, complete only Parts J&M, all others skip to IV E. PRINCIPAL TYPE OF FRAME F. PRINCIPAL TYPE OF HEATING FUEL G. TYPE OF SEWAGE DISPOSAL I. TYPE OF MECHANICAL 30 ❑ Masonry(wall bearing) 35 ❑�yl Gas 40 ® Public or private company Will there be central air ❑J 31 Wood frame 36 Oil 41 ❑ Private(septic tank,etc.) conditioning? �-y1J 32 ❑ Structural steel 37 E] Electricity 44 ❑ Yes 45 rNo 33 ❑ Reinforced concrete 38 ❑ Coal H. TYPE OF WATER SUPPLY Will there by an elevator? 34 ❑ Oher-Specify - 39 ❑ Other-Specify 42 Public or private company 46 ❑ Yes 47 16 No 43 ❑ Private(well,cistem) J.DIMENSIONS 4e. Number of stories M. DEMOLITION OF STRUCTURES:. 49. Total square based oneoor teriorarea, Has Approval from Historical Commission been received all floors,based on exterior dimensions ......................................................................... for any structure over fifty(50)years? Yes_ No_ 50. Total land area,sq.If....................................................... Dig Safe Number K.NUMBER OF OFF-STREET PARKING SPACES Pest Control: 51. Enclosed ............................................................................. sz. Outdoors............................................................................. HAVE THE FOLLOWING UTILITIES BEEN DISCONNECTED?Yes No L RESIDENTIAL BUILDINGS ONLY Water: 53. Enclosed............................................................................. Electric: Gas: 54. Number of Full......._..._............................. Sewer: bathrooms / DOCUMENTATION FOR THE ABOVE MUST BE ATTACHED Partial....................................... BEFORE A PERMIT CAN BE ISSUED. IV. COMPLETE THE FOLLOWING: Historic District? Yes_ No (If yes, please enclose documentation from Hist. Com.) Conservation Area? Yes_ NoZ (If yes,please enclose Order of Conditions) Has Fire Prevention approved and stamped plans or applications? Yes_ No Is property located in the S.R.A. district? Yes_ No Comply with Zoning? Yes No_ (If no,a close Board of Appeal decision) • Is lot grandfathered? Yes_ No_ y bmit documentation/if no,submit Board of Appeal decision) If new construction,has the proper Routinglip been enclosed? Yes_ No Is Architectural Access Board approval required? Yes_ No (If yes,submit documentation) Massachusetts State Contractor License# 05-3V' Salem License# / 3Jc' Home Improvement Contractor # 10 7 (o / / Homeowners Exempt form (if applicable) Yes_ No_ CONSTRUCTION TO BE COMMENCED WITHIN SIX(6)MONTHS OF ISSUANCE OF BUILDING PERMIT If an extension is necessary, please submit CONSTRUCTION IS TO BE COMPLETED BY: (y y in writing to the Inspector of Buildings. V. IDENTIFICATION - To be completed by all applicants Name Mailing address-Number,street,city,and state ZIP Code Tel.No. "Owner or Lessee Contractor Builders La License No. 3. Architect or Engineer I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his authorized agent and we agree to conform to all applicable laws of this jurisdiction. Signature of applicant Addre =�J Ir,l� - Application date DO NOT WRITE BELOW THIS LINE VI. VALIDATION Building FOR DEPARTMENT USE ONLY Permit number Building Use Group Permit Issued 19 Fire Grading Building / Permit Fee $ 2(7 . c°Z Live Loading Certificate of Occupancy $ Approved by: Occupancy Load Drain Tile $ Plan Review Fee $ ITLE NOTES AND Data • (For department use) PERMIT TO BE MAILED TO: Z 2 C DATE MAILED: Construction to be started by: Completed by: VI ZONING PLAN EXAMINERS NOTES DISTRICT USE FRONT YARD SIDE YARD SIDE YARD REAR YARD NOTES SITE OR PLOT PLAN -For Applicant Use ZY. O N �` �� SCltooL S� ;V- 93 C a �k 60 school St L� 30 �,� 10`fi 3,2f Proposed Driveway ramp IS , y° �� C�✓t f f/U7�1 /Ul^� ' t 13OB-BUILT CARPENTRY 24 LENOX ROAD PEABODY, MA 01960 -yo3y 2d�e4t- %�