Loading...
394 HIGHLAND AVENUE - ZBA (2) c i 9a-7) - . - - -- ----� j i �� 4« II ��i�� � �iC-e�� CITY L COi•it•iGN:dEALTH 0: :ASSACHUSETTS �-- ESSEX, SS . SUPERIOR COURT DEPT. CIVIL ACTION NO. 86-1539 MIKE STASINOS VS CITY OF SALEM BOARD OF APPEAL , AND JAMES B. HACKER, RICHARD A. BENCAL, JAMES M. FLEMING, EDWARD MOTION FOR HEARING ON FORM OF JUDGMENT LUZINSFCI , PETER STROUT, ARTHUR LABRECQUE, PETER A. DORE, AS THEY ARE MEMBERS OF THE-, CITY OF SALEM BOARD OF APPEAL Now comes the Plaintiff , Mike Stasinos , pursuant to Rule 58 (a ) of the Massachusetts Rules of Civil Procedure , and moves this Honorable Courr. to schedule a hearing on the form that the judgment in this action should take and to order that judgment enter in the form attached hereto. f LtILA- By the Plaintiff ' Attorney ) ' Nicholas G. Curuby, Esq . 7 Franklin Street , —( � Lynn , MA. , 01902 `«off ( 617 ) 595-0009 Ass�e..dto by _Defendant orney r_c3 1 E. O ' Brien City Solicitor Citv Hall , 93 Washington St . Salem , 01970 CIVIL ACTION NO. 86-1534 MIKE STASINOS VS CITY OF SALEM BOARD OF APPEAL, AND JAMES B . HACKER, RICHARD A. BENCAL, JAMES M. FLEMING , EDWARD CONSENT JUDGMENT LUZINSKI , PETER STROUT, ARTHUR LABRECQUE, PETER A. DORE, AS THEY ARE MEMBERS OF THE CITY OF SALEM BOARD OF APPEAL It is hereby agreed by all parties that Consent Judgment shall be entered in the appeal from a decision of the City of Salem Board of Appeal, denying the Plaintiff ' s Petition request- ing the Board to issue a variance to allow construction on prem- ises located at #394 Highland Avenue, Salem, encompassing appro- ximately twenty-five ( 25 ) acres end lying in Districts R-1 , R-C, and BPD , which has been previously described as lying in Dis- tricts R-1 , R-C and B-2 , and that the contested decision of the Defendant Board of Appeal be amended and that its decision be entered granting a variance with the following conditions : 1 ) The Plaintiff , Mike Stasinos , shall withdraw a pending subsequent petition presently before the Defendant Board of Ap- peal , with prejudice , upon final approval of this Agreement for Consent Judgment by this Court. 2 ) That the variance to be granted to the Plaintiff , Mike Stasinos , by the Defendant Board of Appeal shall contain the fol- lowing conditions , that the Plaintiff agrees to: a ) That the Plaintiff , Mike Stasions , shall be allow- ed to construct 140 condominium residential units and buy�fi-ipg , containing a total of 3000 square feet of floor space o�on_ floor on a parcel of land containing 27 , 000 square feet o land , all set forth, in a plan entitled "Highland Acres , Salem Highland Ave. Development Corp. , Owner and Developer, Peter F. MiDeo Assoc. Arch . " , dated August 3 , 1986 , a copy of which has been furnished the Defendant Board �of Appeal and the City Planner, City of Salem. Said building is to be deeded to the Condominum Association with- in a thirty-six month period from acceptance of this Agreement . The building is to be used for a temporary job site/real estate sales . The building is to be used solely by the developer . That the Plaintiff , hike StasIc;"- shall crar.t to b ) - tota174_nL1 . . 1 acres of land in height , par;;i;,c area ana pater -- - -- proved by the City Planner , City ofvSalem, in the location desig of ed in the aforementioned plan. c) That the City Planner, subject to the approval of the Board of Appeal, shall select a qualified professional engineer, at the Plaintiff ' s cost, who shall provide his services , to include the duties of Clerk of works , and supervise and oversee the construction to be underaken by the Plaintiff , to insure that said construction complies with Section IV and V of the Sub-division Regulations of the City of Salem; and, that said Engineer shall submit to the Board of Appeal and City Planner, City of Salem, a written progress report of two ( 2 ) weeks . That said engineer- the undertaken construction every ing services shall include the supervision and overseeing of the im- provements required in the installation of streets , roadways, i.ndthe walks , grass strips , monuments and utilities , all as p approved definitive plans submitted by the Plaintiff . It is agreed that said services to be furnished by the Plaintiff a�taandnallow ot exceed or any and all normal design standards for trafficiimdeemed proper . waivers by the Board of Appeal , City sal , which shall Final approval shall be given .by the Board of App not unreasonably be with-held. d ) The Plaintiff , MIke Stasions , shall submit a prelimsub ary plan of the development trdtof Healhe th, Conservation of Health Commissshall ion, mitted and approved by theBoar f Streets , Fire Department, Police City Engineer , Superintendent o Department, and School Department , City of Salem. e ) The Plaintiff , Mike Stasinos , shall submit, prior to a final definitive ruction the start of construction , all n pernform of cand tcontentsto the Board of Appeal , City of Salem, all division Regulations , City of proper as required by Section IIIB, of the Sub-di Salem. g ) The Plaintiff , Mike Stasinos , shall, prior to construc- tion , submit an Environmental Imr000sedStatement projectltofthe illi totalnd lenvironar m indicating the relation of the p of such to ment of 'the City of Salem and Sits inhabitants , and a copy the Board of Appeal , City g ) The Plaintiff , Mike Stasinos , shall file with the City Solicitor , City of Salem, a performance bond , on approved form, and in an amount approved by the Director of Public Services guaranteeing that the proposed constructions shall , upon completion , comply with this Consent Judgment and all pertinent sections of the Sub-division Regulations , City of Salem, to be applied to the unfinished work , prior to issuance of necessary compliance permits . 2 - h ) That the Plaintiff , Mike Stasinos , in the construction of the subject project , shall meet all design standards for streets , be unreasonably be with-held . i ) That the plaintiff, Mike Stasinos , in the construction of the subject project , shall meet all required improvements , as set forth in Section IV and V, sub-division Regulations , City of Salem. j ) That a neighborhood review process shall be initiated between the Plaintiff , neighborhood residents and the City Planning Department , City of Salem, through which a neighborhood meeting shall be held to review the project and its components and necessary change and alterations to such plans shall be made as requested within the parameters of the approved variance . k ) The Plaintiff shall contribute to any and all proposed traffic improvements on the Highland Avenue-Swampscott Road area , as defined by the City through its Comprehensive Traffic Study now being undertaken. Such a contribution shall be made with the approval of the City Planner according to a formula designed such that all development within the surrounding geographical area shall fairly share such costs 1 ) The Plainitff shall be required to reserve a strip of land to be defined by the City, along Highland Avenue, for the future widening of the roadway if deemed necessary by the Comprehensive Traf- fic Study now being undertaken. m ) The Petitioner, Mike Stasinos , amend his deed to the re property located at 394 Highland Avenue , Salem, Massachusetts, and sai amendment to be a covenant not to build on any portion of said real es tate , other than on that portion utilized for 140 condominium units ar 3 , 000 square foot building . Said amendment is to be approved in form t the City Solicitor. n ) That all exterior building designs , building locations , lighting , landscaping, infrastructure, and site planning anal design elements of the proposed development shall be subject to the review and approval of the Board of Appeal and City Planner, City of Salem. o ) That a buffer zone of 200 feet along the -eastern boun- dary of the property shall be created so that the abutters of Pyburn Avenue and Madeline Avenue not be adversely impacted ; and , that in order to eliminate any visual impact of the development upon the ab- utting neighborhood , the proposed landscaping to screen buildings from the residences. of the above avenues shall be reviewed and ap- proved by the City Planner . The Plaintiff shall also provide that there be no other access to the parcel other than from Highland Ave- nue , prohibiting any access to said parcel from Appleby Road , Made- line Avenue , Pyburn Avenue , Ravenna Avenue, or Sophia Road or any other accebted public way. P ) That there will be no attempted closure of the median way on Highland Avenue , at the entrance of Ravenna Avenue by the develop- er or Condominium Association . -- -- - 3 - C ) The Flainti:= s.".all relinquish the foundation and build- ^armits , as i=_soca by the City of Salem currently existing for r ) That ail water, sewer ana crainage improvements on the site shall be subject to the review and approval of the City Plan- ner and Director of Public Services , City of Salem; and , that all issues and concerns regarding drainage and wetlands shall be re- viewed and approved by the Conservation Commission, City of Salem. s ) That an assessment of impact of the proposed project on existing infrastructure services , including water , sewer and drainage, shall be made by the City Planner and Director of Pub- lic Services , City of Salem. That upon such assessment, the Plain- tiff shall make any necessary improvements , at his costs , if re- quested by the City Planner and Director of Public Services . If it is deemed that improvements are necessary, and attributable to the project, to upgrade the existing wastewater pump station on Ravenna Ave. said improvements shall be implemented by and at the cost of the Plaintiff . t ) If required by the State Department of Public works, the Plaintiff shall contribute the demanded funds for drainage improvements proposed in the vicinity of Rich ' s Department Store , Highland Avenue , Salem, in an effort to eliminate drainage pro- blems found in the geographical area . _ u ) That the City Planner shall submit a written state- ment of satisfaction of all such conditions to the Building In- spector , City of Salem prior to the issuance of a building per- mit . V ) That the Plaintiff shall complete all cosntruction and install all required municipal services within three ( 3 ) years from date of approval of the definitive plans ; and , he shall provide that the proposed construction will be in five ( 5 ) phases , all as provided for in the definitive plan to be submitted for approval . 1. That, in the work to be done on said pro- ject , the General Contractor and all sub-contractors shall restrict the performance of the work between the hours of 7 : 00 A .M. and 6 : 00 P.M. , Monday through Friday, excluding work of a quiet nature . The hours for blasting shall be de- termined by the Salem Fire Marshall . 2 . `That the By-Laws of the Condominium Assoc- iation , to be executed and administered by the Condominium Association, shall provide that all costs of trash collec- tion and snow removal shall be paid for .by the Association . 4 - W ) That the petitioner , Mike Stasinos , upon filing of the Definitive Plan with the Board of Appeal , shall also file said ..Definitive FTan 'with the Board of Health . Mike Stasinos , Plaintiff by his aatt�torrnne : Nicholas G. Curuby 7 Franklin Street Lynn, MA. , 01902 ( 617 ) 595-0009 City of Salem, and of Appeal , b its attorne 1 Michael E. O' Brien City Solicitor City Hall 93 Washington Street Salem, MA. 01970 . August 15 , 1986 - 5 - NICHOLASG . CURUBY Auqust 28, 1986 William H. Munroe, Commissioner .1,. Salem Building Department, Tr z yg' One Salem Green Re: Highland Avenue Development Salem, MA. , 01970 Salem Highland Avenue Development Corp. Dear Commissioner Munroe: Be advised that the Developer of the above-listed project is undertaking to proceed with the preparatory and development construction work. Said work will done at the risk of the Developer. Should it be determined that additional work arra/or changes must be made, the Developer shall do so under your instruction and hold the City of Salem and the Salem Building Department harm- less from any and all claims of liability. Very truly yours Mike Stasinos, President CITY OF SALENRI, MASSACHUSETTS ' C'7Y PLANNER 01970 CITY 'r (617)744.4580 September 10, 1986 Mr. William Munroe Building Inspector City of Salem One Salem Green Salem, Ma. 01970 Re: Stasinos Project, 394 Highland Avenue Dear Bill: . As required by the Consent Judgement, I have reviewed the proposed plans for the above—mentioned project and find that Mike Stasinos has met the following conditions: 1 . submittal of preliminary plans to the appropriate boards (d) 2. submittal of Environmental Impact Statement to the Board of Appeal (f) 3 . compliance with design standards for streets, easements, open spaces and protection of natural features as set forth in Sections IV & V of the Sub—division Regulations and approved by the City Planner (h) 4. compliance with required improvements as set forth in Section IV & V of the Sub—division Regulations as per review on Thursday, Sept. 4th with Paul Niman, Bill Munroe, Bob Turner, myself and Tom Rouleau (electrical plans still to be reviewed) ( i) 5. establishment of 200' buffer zone (visual impact of development on abutting neighborhood as yet to be assessed) (o) 6. submittal of all water, sewer and drainage improvements to the Director of Public Services, approval of which is expected within the next day ( r) 7 . submittal of plans to the Director of Public Services for assessment of impact on infrastructure services, which approval is expected within the next day (s) - 2 - 2. 4.1 acres of land must be deeded to City for soccer field as shown on site plan (b) 3 . City Planner must select a qualified engineer to serve as Clerk of the Works (c) 4. revised definitive plan must be submitted to Board of Appeal (plan currently in their possession does not reflect changes as of Sept. 4th) (e) 5. performance bond must be submitted to the City Solicitor (g) 6. neighborhood review process must be completed (j) 7. Covenant must be executed to prohibit construction on any other portion of the property except portion utilized for 140 condominium units and the 3,000 s. f. office building (m) 8. all exterior building designs, building locations, lighting, landscaping, infrastructure, site planning and design elements must be approved by the Board of Appeal and City Planner (n) 9. current foundation and building permits must be relinquished (q) 10. drainage and wetland impact must be reviewed and approved by the Conservation Commission (on Sept. 11th agenda) (r) 11 . street names must be officially approved While some further issues need to be resolved, the cooperation we have received to date from Mike Stasinos leads me to recommend that a building permit be issued for a small percentage of the total project. This permit would be granted with the understanding on Stasinos' s part that he would comply with any changes that may be required at a later date to meet the conditions of the Consent Judgement even if such changes affect work already undertaken. Sincefely, i Gerard Kavanaugh City Plapner Ctu of (enc :alcnt (6rectt Ni-02 13 William H. Munroe Director of Public Property - Maurice M. Martineau. Asst Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. September 12, 1986 Mike Stasinos, President Highland Avenue Development Corp. Off 394 Highland Avco Salem, MA 01970 RE: Temporary Building Permits Dear Mr. Stasinos: Due to the fact that several issues remain to be resolved regarding your property located off 394 Highland Ave. (i.e. street names, neighborhood meeting, etc. ) prior to the issuance of Building Permits, this office cannot issue the permits presently applied for. However, in view of your letter dated August 28, 1986 in which you state that work undertaken prior to receipt of all necessary approvals will be done at the risk of the developer, and City Planner, Gerard Kavanaugh's letter of September 10, 1986 recommending that due to your cooperation, permits be issued for a small percentage of the project, this office agrees to the following: 1 . Work may commence on the three thousand (3000) square foot building to be used as your construction office; ` 2. Work may commenceonone (1 ) six (6) unit building. I will again remind you that this work is undertaken at your risk and that foundations for these buildings will not be backfilled without the approval of this department, as well as electrical and plumbing departments if services are to be concealed by these foundations. Sincerely, William H. Munroe Inspector of Buildings WHM:bms cc< City Planner Councillor O'Leary Electical Plumbing qTiiU of 7.13-02213 William H. Munroe Director of Public Property Maurice M. Martineau, Asst Inspector Inspector of Buildings Edgar J. Paquin, Asst Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. December 12, !986 ,At. M. Stasinos 544 Chestnut Street Lynn,MA 01904 RE: Highland Acres Dear Mr. Stasinos;. Be aware that there is now confusion as to what and how your project is being built. Currently you are not developing your Site as per approved plans. Please resolve this with both the Planning Department and Fire Department . Finally an approved plan we all will work from must be provided to this department for our use in our inpection and permit services. Further you should be aware that no permits are now in place for Buildings /17, 8, and 12, where there now exist foundations. Make immediate application to this department for the needed permits . Failure to comply .. 1 stop work order on these Buildings. wil rasult _.. .. Op .. .Also be aware that because of the discrepancy of the Site plan, no further pb. :mits will be approved by this department Should you have any questions in regards to this letter or any other area of which we may be of assistance, feel free to contact us. Respectfully, gar J aquina^�' u ' lding�spector EJP/laf r CC:. L. Mroz Received by date j 4 City Clerk Councillor Delivered by �C��-���_ date Fire Inspector Planning Dept . Witnessed by -date �a , File CITY OF SALEM,, G1ASSACHUSETTS C.T.Y PLANNER �{ �„� I '.i : i ,..._._. .. . ., ... 01970 �;�'�iw�•l:r (617)744.4580 January 20, 1987 Mr. William Munroe Building Inspector One Salem Green Salem, MA 01970 Dear Bill: Five months ago, a Consent Judgment was handed down by the Superior Court regarding the so—called Stasinos project located at 394 Highland Avenue. I am writing to you to request that certain conditions of that Judgment be addressed because of the lack of compliance which currently exists. First of all, the developer has been required to deed to the City a 4. 1 acre parcel of land following the construction of soccer fields. Obviously, we do not want the parcel deeded over until the required improvements are completed. It would be advisable, though, to do the following: 1. Request that the developer submit a detailed site plan of the proposed improvements, including the fields , parking, and landscaping for review and approval; 2. Request that the developer, upon approval of the plan, immediately begin to construct such improvements; and 3 . Request that the developer execute an agreement with the City specifying the timetable for the above steps. In addition, the site plan was reviewed and approved by the City, but the developer is now proposing changes in the approved plan. There are several site design alterations proposed which must be reviewed and approved again. In this regard, my specific concern relates to the proposed internal vehicular circulation system in which several improvements to provide adequate fire access have been eliminated. These changes should be addressed, and a final decision should be made regarding the adequacy of the altered plan. Finally, the developer is required to complete a neighborhood review process. Because of the above amendments to the plan, I believe that the developer should hold an additional neighborhood meeting to review the current status of the project, and make certain that all concerns of the neighbors are fully addressed. This meeting should take place immediately. I would respectfully request that you require these issues to be resolved to our satisfaction immediately. If that cannot be done, I would recommend that building permits be revoked. Thank you for your cooperation in this matter. Sinc r ly Gerar Kavanaugh Cit y/,lam// er 3563 cc: Leonard F. O'Leary City Council President NICHOLAS G . CURUBI' - - "- February 3, 198V V WILLIAM H. MUNROE , Inspector, / Public Property Department Building Department, City of Salem, One Salem Green Salem, MA. , 01970 Dear Mr. Munroe: Re: _394 Highland Ave. , Salem Consent Judgment Your letter of January 23 , 1987 , was referred to my office, resulting in a conference with Mr. Stasinos , the developer. The matters set forth in your letter, needing an answer, were discussed. No major changes were made in the original plan sub- mitted to the City Engineer and approved by all concerned departments. The minor changes , not contravening the inte- grity of the original plan, were to minimize the impact of the necessary blasting to the neighborhood. The developer intends to comply with said original plan; and, he intends to proceed without any changes. Therefore, no revised site plan is contemplated, requiring a neighborhood meeting. .A copy of the approved general plan will be submitted to your office for your files . Very truly yours , Nich 1 s G. Curuby NGC/ cc: Planning Department City of Salem Ott II MIL111� Cc�55c�LI11IPfS Q.h,r alrm t irrni 7.15-112113 William H. Munroe Director of Public Property ;Maurice M. Martineau. Asst Inspector Inspector of Buildings Edgar J. Paquin, Asst Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. January 23, 1987 .Mr. Mike Stasino 544 Chestnut Street Lynn, Ma 01904 RE: Superior Court Consent Judgement 394 Highland Avenue, Salem, MA Dear Mr. Stasino, It has been brought to my attention that there has been a lack of compliance with certain conditions of the Superior Court. Consent Judgement that effect's your property located at 394 Highland Avenue. In order for this department to continue issuing Building Permits for your project I must insist that you give the following your immediate attention. 1 . Submit a detailed site plan of the proposed soccer field's improvements including field's, parking and landscaping for review and approval. 2. Immediately upon approval of the plan's, start construction on these improvements. 3. That an agreement with the City of Salem must be executed specifying , the time-table for the above steps. 4 . That a revised site plan be submitted for the entire project indicating changes you are proposing from the plan previously approved by the City of Salem. These changes must be addressed and final approval granted by. the City of Salem prior to proceeding with any plan change. 5. If changes are proposed in the site plan, a neighborhood meeting must be held immediately to review the current status of the project and to make certain that all concern's of the neighbor' s are fully addressed. No further Building Permits will be issued for this project until these matters have been resolo satisfaction of the City of Salem. Delivered by: Sincerel WHM/eaf L .• .._ Received by: William H. Munroe Inspector of Buildings C.C. Mayor Salvo Council President O'Leary City Solictor r� Gttu cf ;$Ulpllt, .411c�55c C Li5�tt5 (Onr nlrm (6rrrn 7.15-0213 William H. Munroe Director of Public Property Maurice M. Martineau, Ass't Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. February 13, 1987 To the Honorable City Council City of Salem RE: Court Judgement, 394 Highland Ave. Ladies & Gentlemen: In response to the Council Order of January 27, 1987 regarding the Court Judgement for property located at 394 Highland Avenue, I respectfully submit the following. Approval of the various sections of the conditions set forth lies with the various Boards and Departments as specified. The only reference to the Building Department being in Condition 2.0 which states that, "the City Planner shall submit a written statement. of satisfaction of all such conditions to the Building Inspector, City of Salem prior to the issuance of a Building Permit." In a letter dated October 21 , 1986 I was advised by the City Planner that all conditions of the Consent Judgement had been met and that permits could be issued. Based on this, permits requested were honored by this Department. In a follow-up letter, dated January 20, 1987, I was advised by the City Planner that, "certain conditions of the Judgement be addressed because of the lack of compliance which currently exists." On January 23, 1987, a letter was hand delivered to Mr. Cris Stasinos,at the development site, outlining the City's concerns and advising the developer that "no further Building Permits will be issued for this project until these matters have been resolved to the satisfaction of the City of Salem." This order still stands and will remain in effect until such time as I am advised by the City Planner that all conditions have been met. Respectfully, William H. Munroe Inspector of Buildings ;IHM: bms Cc: Councillor O'Leary MTV OF SA' CP,f fC6QOArIJIIOCTTO-, ' V11 � u LLIM� IJ VVfIVI\V Vtt i_V.. L;-.Y PLANNERS. 01970 (617(744.4580 February 24, 1987 Mr. William Munroe Building Inspector City of Salem One Salem Green Salem, MA 01970 Dear Bill: Today Mike Stasinos submitted a new site plan to my office for his development at 394 Highland Ave. which includes replacement of some 6-unit buildings with 8-unit buildings among other changes. Until this plan is reviewed and approved, I hereby request that you revoke all existing building permits and not issue any new permits. Thank you for your assistance. Si 17, Geraljd Ka a ugh City/P1 n r cc: Mike Stasinos Eau 7.15-U=13 William H. Munroe Director of Public Property Maurice M. Martineau, Asst Inspector Inspector of Buildings Edgar J. Paquin, Asst Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. February 25, 1987 Mr. Mike Stasinos 544 Chestnut Street Lynn, MA 01904 RE: Stop Work Order, .394 Highland Avenue, Salem Dear Mr. Stasinos: I have been informed by the City Planner that you have submitted a new Site Plan,for. review and approval, to his office. I would call your attention to Section 115.3 of the Massachusetts State Building Code which states, in part, "A lot or site shall not be changed from that shown on the official site plan unless a revised plan showing such changes shall have been filed and approved." Until this matter is resolved I .must insist all work on this project cease immediately upon your receipt of this Order. Failure to comply with this Order will leave me no alternative but to initiate the appropriate legal action. Be advised that conviction of violation of the Massachusetts State Building Code carries a fine, not to exceed One Thousand dollars ($1 ,000) a day for each violation and each day the violation continues is a separate offense. Sincerely, William H. Munroe Inspector of Buildings tdhT1:bms cc: City Clerk Council President City Solicitor City Planner CITY OF SALEM, MASSACHUSETTS m unn. n ncn.nr..-. CITY PLANNER " __ 01970 Isltl 74e-45e9 uvs October 21 , 1986 Mr. William Munroe Building Inspector City of Salem One Salem Green Salem, MA 01970 Dear Bill : Mike Stasinos has now met all the conditions of the Consent Judgement (as revised per the October 15, 1986 Board of Appeal Meeting) . As a result, a building permit can be issued. If you have any questions, please call me. SieePely JGeracd-X-a�"v-anaugh City Plainer/ bn622 v STASINO''S PROJECT 10/23/86 11715 1 Spring Pond Road Office Bld. inconjuction with project 10/24/86 716 IA Indian Hill Lane Erect dwelling 10/24/86 717 1B Indian Hill Lane Erect dwelling 10/24/86 718 IC Indian Hill Lane " 10/24/86 719 1D Indian Hill Lane " 10/24/86 720 3A Indian Hill Lane " 10/24/86 721 3B Indian Hill Lane " 10/24/86 722 3C Indian Hill Lane " 10/24/86 723 3D Indian Hill Lane 10/24/86 724 3E Indian Hill Lane " 10/24/86 725 3F Indian Hill Lane " 10/24/86 726 4A Indian Hill Lane " 10/24/86 727 4B Indian Hill Lane " 10/24/86 728 4C Indian Hill Lane " 10/24/86 729 4D Indian Hill Lane 10/24/86 732 2A Indian Hill Lane " 10/24/86 733 2B Indian Hill Lane " 10/24/86 734 2C Indian Hill Lane " 10/24/86 735 2D Indian Hill Lane 10/24/86 736 2E Indian Hill Lane 10/24/86 737 2F Indian Hill Lane " STASINO' S PROJECT 10/24/86 11738 2D Overlook Lane Erect Dwelling 10/24/86 739 2C Overlook Lane " I 10/24/86 740 2B Overlook Lane 10/24/86 741 2A Overlook Lane " 10/24/86 742 IA Overlook Lane " 10/24/86 743 1B Overlook Lane 10/24/86 744 IC Overlook Lane " 10/24/86 745 ID Overlook Lane " 10/24/86 746 IE Overlook Lane " 10/24/86 747 IF Overlook Lane " " PETER F D=MEO AssocrmrEs, Ir4c. AA,CHITECTV1i,E 3P1LANN7NC3 346 MAIN STREET . STONIHAM. MASSACHUSETTS 02190 TCtf ► H0 NC 438.0900 May 18, 1990 Building Department City of Salem One Salem Green Salem, MA . 01970 Attention : Mr. William Munroe Re: HIGHLAND ACRES 394 HIGHLAND AVENUE, SALEM, MASS. Dear Mr. Munroe: I , PETER F. DI MEO, Registration No. 1665, being a Registered Architect hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications for the above-referenced project and that, to the best of my knowledge , such plans , computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices and applicable laws and ordinances for the proposed use and occupancy . I further certify that I shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to determine that the work is proceeding in accordance with the documents approved for the Building Permit . Sincerely , PETER F=. 1E0 ASSOCIATES , INC. G\S�tRED-ARcyl eft O for l u BY: 1 �/ 3 a No. 1665 0 y Peter F. Di eo, AIA STMASSpM `F w�/ r +,COW CtV of ttl�nt, Ctts$ttrl�u3E##8 e j Public 'Property Department '�J��OIMML +'4v lunilbinq pepartment tlDne linlem VI)reen 7•IS-ort3 William H. Munroe Director of Public Property Maurice M. Martineau, Ass't Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer John L. Leclerc, Plumbing/Gas Insp. October 5, 1987 Mr. Mike Stasinos The Highland Condominium at Salem 394 Highland Avenue Salem, Ma. 01970 RE: Extension of Building Permits Dear Mike, I have discussed your request for extensions of building permits with Mr. Munroe. This letter is to inform you that your request for a six (6) month extension has been granted. I have enclosed a photo copy of your original letter of request. These are the units and permits that we are extending at this time. Sincerely, Stephen W. an zy f� As Buil ing Spector CC: Planning Dept. Engineer Electrical Fire Dept. ENC. r r a Mr. William H. Munroe Page -4- September 28 1987 BUILDING UNIT NO. NO. STREET ADDRESS PERMIT NO. 24. . . 2406. . . 38 LIONS LANE. . . . . . . 285 24. . . . . 2405. . . 40 LIONS LANE. . . . . . . 286 24. . . . . . 2404. . . 42 LIONS LANE. . . . . 287 24 . . . . . . 2403. . . 44 LIONS LANE. . . . . 288 24. . . . . . 2402. . . 46 LIONS LANE. . . . . . . 289 24 . . . . . . 2401. . . 48 LIONS LANE. . . . . . . 290 25. . . . . 2501. . . 9 CARRIAGE HILL LANE . . . 291 25. . . . . . 2502. . 11 CARRIAGE HILL LANE. . . 292 25. . . . . 2503. . . 13 CARRIAGE HILL LANE. . . 293 25. . . . . . 2504. . . 15 CARRIAGE HILL LANE. . . 294 25. . . . . . 2505. . . 17 CARRIAGE HILL LANE. . . 295 25. . . . . . 2506. . . 19 CARRIAGE HILL LANE. . . 296 26. . . . . . 2601 . . 1 CARRIAGE HILL LANE. . . 297 26. . . . . 2602 . . 3 CARRIAGE HILL LANE. . . 298 26. . . . . 2603 . . . 5 CARRIAGE HILL LANE. . . 299 26. . . . . 2604. . .7 CARRIAGE HILL LANE. . . 300 Your kind attention to this request is greatly appreciated. Very truly yours , SALEM HIGHLAND D ELOPMENT CORP. BY: Mi a Stasinos President IJS:.caj NICHOLAS G . CURUBY Auqust 28, 1986 William H. Munroe, Commissioner Salem Building Department, 3 One Salem Green Re: Highland Avenue Development Salem, MA. , 01970 Salem Highland Avenue Development Corp. Dear Conmissioner Munroe: Be advised that the Developer of the above-listed project is undertaking to proceed with the preparatory and develop Iat construction work. Said work will done at the risk of the Developer. Should it be determined that additional work and/or changes must be made, the Developer shall do so under your instruction and hold the City of Salem and the Salem Building Department harm- less from any and all claims of liability. Very truly yours •D � J Mike Stasinos, President f CITYCITY nt: CA LE" or, ncSnrunocT" UI on "111, 111Ptu mu11u V." lu C.iY PLANNERJ i �` -• y �U1970� __.. :,y�, <Yp/]"I ClS 1 (617) 744-4580 ��WfT September 10, 1986 Mr. William Munroe Building Inspector City of Salem One Salem Green Salem, Ma. 01970 Re: Stasinos Project, 394 Highland Avenue Dear Bill: As required by the Consent Judgement, I have reviewed the proposed plans for the above—mentioned project and find that Mike Stasinos has met the following conditions: 1 . submittal of preliminary plans to the appropriate boards (d) 2. submittal of Environmental Impact Statement to the Board of Appeal (f) 3 . compliance with design standards for streets, easements , open spaces and protection of natural features as set forth in ' Sections IV & V of the Sub—division Regulations and approved by the City Planner (h) 4. compliance with required improvements as set forth in Section IV & V of the Sub—division Regulations as per review on Thursday, Sept. 4th with Paul Niman, Bill Munroe, Bob Turner, myself and Tom Rouleau (electrical plans still to be reviewed) ( i) 5 . establishment of 200' buffer zone (visual impact of development on abutting neighborhood as yet to be assessed) (o) 6. submittal of all water, sewer and drainage improvements to the Director of Public Services, approval of which is expected within the next day (r) 7 . submittal of plans to the Director of Public Services for assessment of impact on infrastructure services, which approval is expected within the next day ( s) 2. 4. 1 acres of land must be deeded to City for soccer field as shown on site plan (b) 3 . City Planner must select a qualified engineer to serve as Clerk of the Works (c) 4. revised definitive plan must be submitted to Board of Appeal (plan currently in their possession does not reflect changes as of Sept. 4th) (e) 5. performance bond must be submitted to the City Solicitor (g) o. neighborhood review process must be completed (j) 7. Covenant must be executed to prohibit construction on any other portion of the property except portion utilized for 140 condominium units and the 3,000 s. f. office building (m) 8. all exterior building designs, building locations, lighting, landscaping, infrastructure, site planning and design elements must be approved by the Board of. Appeal and City Planner (n) 9. current foundation and building permits must be relinquished (q) 10. drainage and wetland impact must be reviewed and approved by the Conservation Commission (on Sept. 11th agenda) (r) 11 . street names must be officially approved While some further issues need to be resolved, the cooperation we have received to date from Mike Stasinos leads me to recommend that a building permit be issued for a small percentage of the total project. This permit would be granted with the understanding on Stasinos's part that he would comply with any changes that may be required at a later date to meet the conditions of the Consent Judgement even if such changes affect work already undertaken. Sincefely, Gerard Kavanaugh City Planner (�' r Of C 1 t OTIILJ O J�I�LI11, �11c�55c�C�iLI5EfI5 Our �i nlvnt 6rrrtt � ts-uz to William H. Munroe Director of Public Property Maurice M. Martineau, Asst Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. September 12, 1986 Mike Stasinos, President Highland Avenue Development Corp. Off 394 Highland Avr'r Salem, MA 01970 RE: Temporary Building Permits Dear Mr. Stasinos: Due to the fact that several issues remain to be resolved regarding your property located off 394 Highland Ave. ( i.e. street names, neighborhood meeting, etc. ) prior to the issuance of Building Permits, this office cannot issue the permits presently applied for. However, in view of your letter dated August 28, 1986 in which you state that work undertaken prior to receipt of all necessary approvals will be done at the risk of the developer, and City Planner, Gerard Kavanaugh's letter of _ September 10, 1986 recommending that due to your cooperation, permits be issued for a small percentage of the project, this office agrees to the following: 1 . Work may commence on the three thousand (3000) square foot building to be used as your construction office; ` 2. Work may commence on one (1 ) six (6) unit building. I will again remind you that this work is undertaken at your risk and that foundations for these buildings will not be backfilled without the approval of this department, as well as electrical and plumbing departments if services are to be concealed by these foundations. Sincerely, William H. Munroe Inspector of Buildings S•1HM:bms ccc City Planner Councillor O' Leary Electical Plumbing I CITY OF SALEM, C^ASSACHUSETTS Li.E Sh Li:,i Gnat,. LITY FLANNER01970 *L lw' ,. � "S• (617)744-4580 e October 21 , 1986 Mr. William Munroe Building Inspector City of Salem One Salem Green Salem, MA 01970 Dear Bill : Mike Stasinos has now met all the conditions of the Consent Judgement (as revised per the October 15, 1986 Board of Appeal Meeting) . As a result, a building permit can be issued. If you have any questions, please call me. S i)Scete 1 y, y JG//erai d-ZCavanaugh City Planner/ bn622 (/ r t i !yil�J Tr 4 �� v� ZSclrl �i, �cf 7t3-0213 William H. Munroe Director of Public Property Maurice h1. Aiartincau, Asst Inspector Inspector of Buildings Edgar J. Paquin, Asst Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. December 12, !986 Mr. M. Stasinos 544 Chestnut Street Lynn,MA 01904 RE: Highland Acres Dear Mr. Stasinos; Be aware that there is now confusion as to what and how your project is being built. Currently you are not developing your Site as per approved plans. Please resolve this with both the Planning Department and Fire Department . Finally an approved plan we all will work from must be provided to this department for our use in our inpection and permit services . Further you should be aware that no permits are now in place for buildings 117, 8, and 12, where there now exist foundations . Make immediate application to this department for the needed permits . Failure = ll result 4n :top -k order on iu cvmp.y w. these Buildings . ...,_ %lso be aware that because of the discrepancy of the Site plan, no further pbrmits will be approved by this department Should you have any questions in regards_ to this letter or any other area of which we may be of assistance, feel free to contact us. Respectfully , igar J ' 7p�aquin Aj°... udldingJ/nspector EJP/laf J CC: L. Mroz Received by `' date I City Clerk Councillor Delivered by � ��_ date Fire Inspector Planning Dept . Witnessed by -date File CITY OF SALEW,, 1`"A%S0,ACNut JSETTI' C•TY PLANNER �9!'�` I :,i t i -. _. .. . _ ,.. 01970 (617)744-4580 January 20, 1987 Mr. William Munroe Building Inspector One Salem Green Salem, MA 01970 Dear Bill : Five months ago, a Consent Judgment was handed down by the Superior Court regarding the so-called Stasinos project located at 394 Highland Avenue. I am writing to you to request that certain conditions of that Judgment be addressed because of the lack of compliance which currently exists. First of all, the developer has been required to deed to the City a 4. 1 acre parcel of land following the construction of soccer fields. Obviously, we do not want the parcel deeded over until the required improvements are completed. It would be advisable, though, to do the following: 1. Request that the developer submit a detailed site plan of the proposed improvements, including the fields, parking, and landscaping for review and approval; 2. Request that the developer, upon approval of the plan, immediately begin to construct such improvements; and 3 . Request that the developer execute an agreement with the City specifying the timetable for the above steps. In addition, the site plan was reviewed and approved by the City, but the developer is now proposing changes in the approved plan. There are several site design alterations proposed which must be reviewed and approved again. In this regard, my specific concern relates to the proposed internal vehicular circulation system in which several improvements to provide adequate fire access have been eliminated. These changes should be addressed, and a final decision should be made regarding the adequacy of the altered plan. Finally, the developer is required to complete a neighborhood review process. Because of the above amendments to the plan, I believe that the developer should hold an additional neighborhood meeting to review the current status of the project, and make certain that all concerns of the neighbors are fully addressed. This meeting should take place immediately. I would respectfully request that you require these issues to be resolved to our satisfaction immediately. If that cannot be done, I would recommend that building permits be revoked. Thank you for your cooperation in this matter. h Sincere.1y 1 i i i� Gerard Kavanaugh City lanner 3563 cc: Leonard F. O'Leary City Council President /j L:tju of c�11L`llt, C c 55c�L�T�I5Eff5 v.mr _aicm tr�rrrtt 7.13-0213 \Villiam H. Munroe Director of Public Property Maurice M. Martineau, Ass't Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. January 23, 1987 .Mr. Mike Stasino 544 Chestnut Street Lynn, Ma 01904 RE: Superior Court Consent Judgement 394 Highland Avenue, Salem, MA Dear Mr. Stasino, It has been brought to my attention that there has been a lack of compliance with certain conditions of the Superior Court. Consent Judgement that effect's your property located at 394 Highland Avenue. In order for this department to continue issuing Building Permits for your project I must insist that you give the following your immediate attention. 1 . Submit a detailed site plan of the proposed soccer field's improvements including field's, parking and landscaping for review and approval. 2. Immediately upon approval of the plan's, start construction on these improvements. 3. That an agreement with the City of Salem must be executed specifying the time-table for the above steps. 4 . That a revised site plan be submitted for the entire project indicating changes you are proposing from the plan previously approved by the City of Salem. These changes must be addressed and final approval granted by. the City of Salem prior to proceeding with any plan change. 5 . If changes are proposed in the site plan, a neighborhood meeting must be held immediately to review the current status of the project and to make certain that all concern' s of the neighbor' s are fully addressed. No further Building Permits will be issued for this project until these matters have been resole o satisfaction of the City of Salem. Delivered by: ti —r Sincerely, .Z ,Fr WHM/ea£ ___�� Received by: tom— William H. Munroe Inspector of Buildings C.C. Mayor Sal vo Co,incil President O'Leary City Solictor f February 3 , 198 WILLIAM H. MUNROE , Inspector, Public Property Department Building Department, City of Salem, One Salem Green Salem, MA. , 01970 Dear Mr. Munroe: Re: 394 Highland Ave. , Salem Consent Judgment Your letter of January 23 , 1987 , was referred to my office, resulting in a conference with Mr. Stasinos , the developer. The matters set forth in your letter, needing an answer , were discussed. No major changes were made in the original plan sub- mitted to the City Engineer and approved by all concerned departments . The minor changes , not contravening the inte- grity of the original plan, were to minimize the impact of the necessary blasting to the neighborhood. The developer intends to comply with said original plan; and, he intends to proceed without any changes . Therefore, no revised site plan is contemplated, requiring a neighborhood meeting. A copy of the approved general plan will be submitted to your office for your files . Very truly yours , o Nich 1 , G. Curuby NGC/ vvv cc: Planning Department City of Salem PETER F. DIMEO ASSOCIATES, INC. ARCIiITECTTJAE PLANNING 546 M A IN S T R E E T . STONE HAM . M A 5 S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 436-0900 October 15, 1986 Building Department City of Salem 1 Salem Green Street Salem, Ma. 01970 Attn : Mr. Y!i I I iam Munroe RE: Highland Acres 394 Highland Avenue Sa I em , Ma. Gentlemen: r This letter is to certify that we have inspected the footings and foundation walls for Buildings NumL•er One through Nine, at the above referenced Develop- ment, and found all work to be in conformance with The Massachusetts State Building Code and drawings provided by this office. Sincerely, PET F. DIMEO ASSOCIATES , INC. Peter F. CWeo Registered Architect FFD/rkk T ' PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MAIN 5T RE E T . ST 0 N E H A M . MA55ACHU5E T T5 02160 TEEEPH0NE 478-0900 Building Department City of Salem Page -3- May 29 , 1987 BUILDING #7. . 6 UNITS "B" TYPE (continued) : inspection when the work is completed. BUILDING #8. .4 UNITS "A" TYPE: 1. Roof Shingles - 100% completed. 2. First floor - concrete slab installed. 3. Rough Interior Partitioning - 80% completed. 4. Rough Plumbing - 80% completed. 5. Rough Heating - 80% completed. 6 . Rough Electrical - 80% completed. BUILDING #9. . 6 UNITS "B" TYPE: 1. Concrete Foundation - 100% completed. 2. Concrete block party walls to second floor completed. 3. wood framing commenced today. BUILDING #10 . 4 UNITS "A" TYPE: 1. Concrete footing completed. 2 . Forming for concrete walls commenced. BUILDING #11 . 4 UNITS "B" TYPE: 1.+ Foundation completed. 2. Concrete block party walls completed. 3. Framing completed. 4 . Interior partitioning - 80% completed. PETER F. MMEO ASSOCIATES, INC. AELCMXTECTLTRE PLANNING 546 MAIN STREET . ST 0NEHAM . MASSACHUSETTS 02180 TELEPHONE 43 8-09 00 Building Department City of Salem Page -4- May 29, 1987 BUILDING #12. . 6 UNITS "A" TYPE: 1. Roof Shingles - 100% completed. 2. Exterior siding - 25% completed. 3. Interior partitioning - 80% completed. 4. Rough Plumbing - 80% completed. 5. Rough Heating - 80% completed. 6. Rough Electrical - 80% completed. Very truly yours, PETER F. DI MEO ASSOCCJIATES, INC. PeterF. DiMeo PFD:caj PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE" ,'',F AkTNING 546 MAIN STREET . ST 0NEHAM . M A 5 5 A C H U S E T TS 02190 TELEPHONE 43 8-09 00 Mav 297 1987 CITY 0 ... L'= iJ:11;ss. Building Department City of Salem One Salem Green Salem, MA. 01970 Attention: Mr. William Munroe Re: HIGHLAND ACRES 394 HIGHLAND AVENUE SALEM, MASSACHUSETTS Dear Mr. Munroe: We have inspected the entire condominium development at the above address on May 29, 1987 , and the condition of the development, which includes Buildings numbered 1 through 12, are as follows: BUILDING #1. . 4 UNITS "B" TYPE: Three (3) units have Certificates of Occupancy and Unit #104 is ready for a Certificate of Occupancy. BUILDING #2. . 6 UNITS "B" TYPE: Four (4) units have Certificates of Occupancy and Units #201 and #206 will be ready for Certificates of Occupancy in approximately one week. BUILDING #3. . 4 UNITS "A" TYPE: 1. Siding is completed. 2. Exterior Painting completed. 3. Sheetrock completed. 4. Interior finish on two (2) units completed. 5. Interior prime coat of paint completed on two (2) units. PETER F. MMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MAIN STREET , S 0NEHAM . MASSACHUSETTS 02180 TELEBH0NE 438-0900 Building Department City of Salem Page -2- May 29, 1987 3UILDIIIG #4. . 6 UNITS "A" TYPE: 1. Exterior painting completed. 2. Finish trim and doors completed. 3. I:itchen cabinets and vanities installed. 4 . Plumbing completed. 5 . Electrical completed. BUILDING #5. . 4 UNITS "B" TYPE: 1. Exterior painted completed. 2. Interior finish - 100% completed. 3. Interior prime coat of paint completed. 4 . Finish plumbing completed. 5 . Finish electrical - 50% completed. BUILDING #6 . . 6 UNITS "A" TYPE: Completed with exception of the following: A. Second coat of interior paint. B. Interior Handrails . BUILDING #7. . . 6 UNITS "B" TYPE: 1. Rough plumbing completed. 2. Rough electrical completed. 3. Rough heating completed. Building is ready to receive insulation and sheetrock. N')TE: Units #703 and #704 - A roof truss in each unit, which i3 adjacent to the concrete block party wall, have sections ,of the 2" x 4" truss members cut by the chimney flue installer. We have instructed Bill Katsapetses, of Salem Highland Development Corporation, on how to repair the roof trusses and to secure the roof framing in this area. He will call this office for an PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 M A I N S T R E E T . 5 TON E HAM . M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L E P H O N E 438-0900 Building Department City of Salem Page -3- July 6, 1987 BUILDI14G #11 . 4 UNITS "B" TYPE: 1. Interior partitioning - 80% completed. 2. Exterior siding completed. 3. Rough Plumbing - 80% completed. 4. Rough Heating - 80% completed. 5. Rough Electrical - 80% completed. BUILDING #12 . 6 UNITS "A" TYPE: 1. Installation of insulation - 100% completed. '. Sheetrock - 100% completed. 3. Exterior siding - 95% completed. 4 . Interior partitioning - 100% completed. 5. Rough Plumbing - 100% completed. 6. Rough Heating - 100% completed. 7 . Rough Electrical - 100% completed. BUILDING #13 . 6 UNITS "'B" TYPE: 1. Concrete footing completed. 2. Concrete foundation walls - 60% completed. Very truly yours, PETE F. DI O ESSOCIAES , INC. BY: Peter o PFD: caj PETER F. DIMEO ASSOCIATES, INC. A3KQ1-iITECTi'FRE PLANNING 546 MAIN STREET , STONE HAM . MASSACHUSETTS 02180 TE L PHONE 438-0900 July 6, 1987 F, C ii'iiD CITY Cr Building Department City of Salem One Salem Green Salem, MA. 01970 Attention: Mr. William Munroe Re: HIGHLAND ACRES 394 HIGHLAND AVENUE SALEM, MASSACHUSETTS Dear Mr. Munroe: We have inspected the entire condominium development at the above address on July 3, 1987 , and the condition of the development, which includes Buildings numbered 1 through 13, are as follows : BUILDING #1. . 4 UNITS "B" TYPE: Signed off by Building Department and occupied. BUILDING #2. . . . 6 UNITS IIBII TYPE: Signed off by Building Department and occupied. BUILDING #3. . 4 UNITS "A" TYPE: Signed off by Building Department and occupied. BUILDING #4. . 6 UNITS "A" TYPE: Signed off by Building Department and occupied. BUILDING #5. . 4 UNITS "B" TYPE: Signed off by Building Department and occupied. BUILDING #6. . 6 UNITS "A" TYPE: Five (5) units signed off by Building Department. Unit #602 ready for Certification of Occupancy inspection. PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 M A I N S T R E E T . ST O N E H A M . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 43 8-09 00 Building Department City of Salem Page -2- July 6, 1987 BUILDING #7. . 6 UNITS "B" TYPE: 1. Sheetrock completed. 2. Interior Finish - 50% completed. 3. Interior prime coat completed. 4. Rough plumbing completed. 5. Rough electrical completed. 6. Rough heating completed. NOTE: Wood trusses between Units numbered 703 and 704 have been repaired and are structurally secured. BUILDING #8 . . 4 UNITS "A" TYPE: 1. Installation of insulation completed. 2. Sheetrock started and 25% completed. 3 . Rough interior partitioning - 100% completed. 4 . Rough plumbing - 100% completed. 5 . . Rough Heating - 100% completed. 6 . Rough Electrical - 100% completed. BUILDING #9. . 6 UNITS "B" TYPE: 1. Concrete block party walls - 80% completed. 2. Wood framing completed to roof trusses. BUILDING #10 . 4 UNITS "A" TYPE: 1. Concrete foundation completed. 2 . Concrete floor slab completed in all units. PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MAIN STREET . STONE HAM , M A 5 S A C H USE T TS 02180 TE L'EFH0 NE 43 8-09 00 Building Department City of Salem Page -3- July 6, 1987 BUILDING #11 . 4 UNITS "B" TYPE: 1. Interior partitioning - 808 completed. 2. Exterior siding completed. 3. Rough Plumbing - 808 completed. 4. Rough Heating - 808 completed. 5. Rough Electrical - 808 completed. BUILDING #12 . 6 UNITS "A" TYPE: 1. Installation of insulation - 1008 completed. '. Sheetrock - 1008 completed. 3. Exterior siding - 958 completed. 4 . Interior partitioning - 1008 completed. 5. Rough Plumbing - 1008 completed. 6 . Rough Heating - 1008 completed. 7. Rough Electrical - 1008 completed. BUILDING #13 . 6 UNITS "B" TYPE: 1. Concrete footing completed. 2. Concrete foundation walls - 608 completed. Very truly yours, PETE F. DI OES , INC. ISESOCIA BY: \ Peter DiW6 PFD: caj PETER F. DIMEO ASSOCIATES, INC. ARCMXTECTX73RE PLANNING 546 MAIN STREET , STONE HAM . MASSACHUSETTS 02180 TE L PHONE 438-0900 August 31 , 1987 - -o Building Department City of Salem T, — One Salem Green Salem, MA. 01970 Attention : Mr. William Munroe _ 0T J Re : HIGHLAND ACRES 394 HIGHLAND AVENUE SALEM, MASSACHUSETTS Dear Mr. Munroe : We have inspected the entire condominium development at the above address on August 31 , 1987 , and the condition of the development , which includes Buildings numbered 1 through 14, are as follows: BUILDING #1 . . 4 UNITS "B" TYPE: Signed off by Building Department and occupied. 3UILDING #2. . 6 UNITS "B" TYPE : Signed off by Building Department and occupied. BUILDING #3 . . 3 UNITS "A" TYPE : Signed off by Building Department and occupied. BUILDING #4. . 6 UNITS "A" TYPE : Signed off by Building Department and occupied. BUILDING #5. . 4 UNITS "B" TYPE: Signed off by Building Department and occupied. BUILDING #6. . 6 UNITS "A" TYPE: Signed off by Building Department and occupied. PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MAIN STREET , STONEHAM . MASSACHUSETTS 02180 7E L PHONE 478-0900 Building Department City of Salem Page -2- August 31 , 1987 BUILDING #7. . 6 UNITS "B" TYPE : 1 . Interior Finish completed. 2. Interior prime coat completed. 3. Kitchen cabinets and vanities installed. 4. Electrical completed. 5. Plumbing completed. 6. Heating completed. BUILDING #8. . 4 UNITS "A" TYPE: 1. Sheetrock completed. 2. Interior prime coat completed. 3 . Interior Finish - 50% .completed. 4. Kitchen cabinets and vanities installed. 5. Plumbing completed. 6. Electrical completed. 7. Heating completed. BUILDING #9 . 6 UNITS "B" TYPE: 1 . Rough Framing and Partitioning completed. 2. Insulation completed. 3 . Rough plumbing completed. 4. Rough electrical completed. 5. Rough heating completed. 6. Sheetrock installed and taping 50% completed. f PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MAIN STREET . STONEHAM , MASSACHUSETTS 02180 TE l'EPH0NE 438-0900 Building Department City of Salem Page -3- August 31 1987 BUILDING #10. 4 UNITS "A1l TYPE: 1. Rough Framing completed. 2. Windows installed. 3. Roof Shingles completed. 4. Rough Plumbing - 50% completed. 5. Rough Electrical - 50% completed. 6. Rough Heating - 50% completed. BUILDING #11 . . 4 UNITS "B" TYPE : 1 . Sheetrock - 100% completed. 2. Two (2) units have kitchen cabinets and vanities installed. 3. Rough Plumbing completed. 4. Rough Electrical completed. 5. Rough Heating completed. BUILDING #12. . 6 UNITS "All TYPE : 1. Interior finish - 100% completed. 2. Interior prime coat completed. 3. Kitchen cabinets and vanities installed. 4. Finish plumbing - 50% completed. 3. Finish electrical -100% completed. 6. Finish heating - 50% completed. f . PETER F. DIA4EO ASSOCIATES, INC. ARCHITECTURE PLANNING 506 MAIN STREET , STONE HAM . MASSACHUSETTS 02180 TE L'EPH0N L' 038-0900 Building Department City of Salem Page -4- August 31, 1987 BUILDING #13 . . 6 UNITS "B" TYPE: 1 . Concrete foundation walls - 100% completed. 2. Underground utilities completed. 3. Concrete floors completed. 3UILDING #14. 6 UNITS "A" TYPE : 1. Footings and foundation completed. 2. Underground utlities completed. 3. Concrete slab floors completed. Very truly yours, PET -P. DI MEO SSOCIATES, NC. BY: Peter F. DiMeo PFD: caj PETER F. DIMEO ASSOCIATES, INC. ARCFIITECT'?R$.; PLANNING 546 M A I N S T R E E T . S TO N E H AM , M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L E P H O N E 4] 8-09 00 uJL July 24 , 1987 CIT'j ur <.,_- -'•`S William H. Munroe, Director of Public Property Public Property Department City of Salem One Salem Green Salem, 11A. 01970 Re: THE HIGHLAND CONDOMINIUM at SALEM BUILDINGS numbered 3 , 4 , 5 and 6 Building #3 - 14-16-18-20 INDIAN HILL LANE Building #4 - 2-4-6-8-10 INDIAN HILL LANE Building #5 - 2-4-6-8 LONGFELLOW LANE Building #6 - 1-3-5-7-9-11 LONGFELLOW LANE Dear Mr. Munroe : This letter is to inform you that we have made our final inspection of the buildings numbered 3 , 4, 5 and 6 of the above-referenced development . We find that the buildings have been constructed substantially in accordance with the plans and specifications provided by this office and in accordance with the State Building Code of the Commonwealth of Massachusetts and the requirements of the City of Salem. Sincerely, ET F I 1/7,►'//nE�/0 ASSOCIATES, INC. 11-44 Peter F. DiPo Registered Architect %i0g41anW A4 4 COnd0lynnhan at e'aloll September 15, 1387 William H. Munroe Director of Public Property _ Public Property Department City of Salem One Salem Green Salem, 11A. 01970 7. Re : THE HIGHLAND CONDOMINIUM at SALEM BUILDINGS numbered 7 , 8 , 11 and 12 —' - BUILDII4G #7 - 1-3-5-7-9-11 TANGLEWOOD LANE - BUILDING #8 - 13-15-17-19 TANGLEWOOD LANE - BUILDING #11- 14-16-18-20 TANGLEWOOD LANE - BUILDING #12- 2-4-G-8-10-12 TANGLEWOOD LANE Dear Mr. .Munroe : This letter is to inform you that we have made our final inspection of the above-referenced buildings at the above condominium development . We find that the buildings have been constructed substantially in accordance with the plans and specifications provided by this office and in accordance with the State Building Code of the Commonwealth of Massachusetts and the requirements of the City of Salem. Sincerely , SALEM HIGHLAND DEV L/OPMENT 'CORP. BY : Th as iQ. Katsapefses . 3ftilder LICENSE NO. 865 One Olde Village Drive, Salem, MA 01970 Phone (617) 741-2003 (Formerly 394 Highland Avenue, Salem, MA 01970) F of *ttlem, fflttssar4usP##s Public Propertg Pepnrtmeut 9 2401MM1 �Muilhhtvq Pepartntent QDnr -I%nlem 05reen 7.15-0213 William H. Munroe Director of Public Property Maurice M. Martineau, Asst Inspector Inspector of Buildings Edgar J. Paquin, Asst Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp, October 5, 1987 Mr. Mike Stasinos The Highland Condominium at Salem 399 Highland Avenue Salem, Ma. 01970 RE: Extension of Building Permits Dear Mike, I have discussed your request for extensions of building permits with Mr. Munroe. This letter is to inform you that your request for a six (6) month extension has been granted. I have enclosed a photo copy of your original letter of request. These are the units and permits that we are extending at this time. Sincerely, ;Stephen W. an� � As Buil ing spector CC: Planning Dept. Engineer Electrical Fire Dept. ENC. r Mr. William H. Munroe Page -4- September 28 1987 BUILDING UNIT NO. NO. STREET ADDRESS PERMIT NO. 24. 2406. . . 38 LIONS LANE. . . . . . . 285 24 . . . . 2405. 40 LIONS LANE. . . . . . . 286 24. . . . . . 2404. . . 42 LIONS LANE. . . . . 287 24 . . . . . . 2403. . . 44 LIONS LANE. . . . . 288 24. . . . . . 2402. . . 46 LIONS LANE. . . . . . . 289 24 . . . . . . 2401. . . 48 LIONS LANE. . . . . . . 290 25. . . . . . 2501 . . . 9 CARRIAGE HILL LANE . . . 291 25. . . . . . 2502. . 11 CARRIAGE HILL LANE. . . 292 25. . . . . . 2503. . . 13 CARRIAGE HILL LANE. . . 293 25. . . . . . 2504. . . 15 CARRIAGE HILL LANE. . . 294 25. . . . . . 2505. . . 17 CARRIAGE HILL LANE. 295 25. . . . . . 2506. . . 19 CARRIAGE HILL LANE. . 296 26. . . . . . 2601 . . . 1 CARRIAGE HILL LANE. . . 297 26 . . . . . 2602. . .3 CARRIAGE HILL LANE. . . 298 26. . . . . 2603 . . . 5 CARRIAGE HILL LANE. . . 299 26. . . . 2604 . . .7 CARRIAGE HILL LANE. . . 300 Your kind attention to this request is greatly appreciated. Very truly yours , SALEM HIGHLAN'D D ELOPMENT CORP. BY: Mbe Atasin0s President IJS:.caj YYg Man d c. 4 i r, i j d•.0 �O111�O171111111111 rlt�'a/c'))��� September 28 , 1987 :Mr. William H. Idunroe Building Inspector Building Department City of Salem Salem, ASA . 01970 Re: EXTENSION OF BUILDING PERMITS THE HIGHLAND CONDO-MINIUM AT SALEM 394 HIGHLAND AVENUE, SALEM, MASS . Dear Air . Munroe : Request is hereby made that the Building Permits for the following units at The Highland Condominium at Salem, 394 Highland Avenue, Salem, Massachusetts, be , extended for an additional six (6) month period : BUILDING UNIT INTO. NO. STREET ADDRESS PEMIT NO. 9. 901 . . . 21 TANGLEWOOD LANE. . . . 206 9. 902 . . . 23 TANGLEWOOD LANE. . . . 207 9 903 . . . 25 TANGLEWOOD LANE. . . . 208 9. . . . . 904 . . . 27 TANGLEWOOD LANE. 209 9. . . . . 905 . . . 29 TANGLEWOOD LANE. 210 9. . . . . 906. . . . 31 TANGLEWOOD LANE. 211 10 . . . . 1001 . . . 28 TANGLEWOOD LANE. 212 10 . . . . 1002 . . . 26 TANGLEWOOD LANE. 213 10 . . 1003 . . . 24 TANGLEWOOD LANE. . . . 214 10 . . 1004 . . . 22 TANGLEWOOD LANE. . 215 13 . . 171306 . . . 12 COUNTRYSIDE LANE . 147 13 . . . . 1305. . . 10 COUNTRYSIDE LANE . 148 13 . . . . 1304 . . . 8 COUNTRYSIDE LANE. . . . 149 13. . . . . 1303 . . . 6 COUNTRYSIDE LANE. 150 13 . . . . 1302 . . . 4 COUNTRYSIDE LANE. 151 13 . . . . 1301 . . . 2 COUNTRYSIDE LANE. 152 14 . . . . 1401 . . . 1 COUNTRYSIDE LANE. 220 14 . . . . 1402 . . . 3 COUNTRYSIDE LANE. . . . 221 14 . . . . 1403 . . . 5 COUNTRYSIDE LANE. .' 222 One O!ce Village Drive, Salem, MA 07970 Phone (617) 74 (former'c ,-94 Highland Avenue, Salem, AIA 07970) Mr. P7illiam H. ?iunroe Page -2- SentemUer 28 , 1987 BUILDING UNIT N0, NO. - STREET ADDRESS PERMIT NO. 14. 1404 . 7 COUNTRYSIDE LANE. . . . . . . 223 14. . 1405 . . . 9 COUNTRYSIDE LANE. . . . . . . 224 14. . . . . 1406 . 11 COUNTRYSIDE LANE . . . . 225 15. 1501 . 3 OLDE VILLAGE DRIVE . . . . . . 233 15. . 1502 . 5 OLDE VILLAGE DRIVE. . . . 234 15. . 1503 . 7 OLDE VILLAGE DRIVE . . . . . . 235 15. 1504 . 9 OLDE VILLAGE DRIVE: 236 15. . 1505 . 11 OLDE VILLAGE DRIVE .. 237 15. . 1506 . 13 OLDE VILLAGE DRIVE . 238 15. . 1507 . 15 OLDE VILLAGE DRIVE . 239 15. . . . . 1508 . 17 OLDE VILLAGE DRIVE . 240 16. 1601 . 19 OLDE VILLAGE DRIVE . . . . . 241 16. 1602 . 21 OLDE VILLAGE DRIVE . . . 242 16. 1603 . 23 OLDE VILLAGE DRIVE . . . 243 16. . . 1604 . 25 OLDE VILLAGE DRIVE . . . . 244 16. . 1605 . . . 27 OLDE VILLAGE DRIVE . . . 245 16. 1606 . . 29 OLDE VILLAGE DRIVE . . . . . 246 17. 1701 . 2 LIONS LA`1E: . . . . . . . 247 17. 1702 . 4 LIONS LANE. . . . . . . . . . . 248 17. . . . . 1703 . 6 LIONS LANE. 249 17. . . . . 1704 . 8 LIONS LANE. . . . . . . . . . 250 17. . . . . 1705 . 10- LIONS LANE . . . . 251 17. . . . . 1706 . . . 12 LIONS LANE . . . . . . . . . 252 18. 1801 . . . 14 LIONS LANE . . . . . . . . . 253 18. . . . . 1802 . . . 16 LIONS LANE . . . . . . . . . 254 18. . . 1803 . . . 18 LIONS LANE . . . . . . . . 255 18. . . . . 1804 . . . 20 LIONS LANE . . . . . . . . . 256 19. . . 1901 . . . 36 LIONS LANE . . . . . . . . . 264 19. . . . . 1902 . . . 34 LIONS LANE . . . . . . . . . 263 19. . . . . 1903 . . . 32 LIONS LANE . . . . . . . . . 262 19 . . . 1904 . . . 30 LIONS LANE . . . . . . . . . 261 19. . . 1905 . . . 28 LIONS LANE . . . . . . . . . 260 19. . . 1906 . . . 26 LIONS LANE . . . . . . . . . 259 19. . . . . 1907 . . . 24 LIONS LANE . . . . . . . . . 258 19 . . . . . 1908 . . . 22 LIONS LANE . . . . . . . . . 257 ?r. jYilliam H. Munroe Page -3- September 28 , 1987 BUILDING UNIT NO. STREET ADDRESS PERMIT NO. 20 . . 2001 . . . 9 LIONS LANE. . . . . . . . 265 20 . . 2002 . 11 LIONS LANE . 266 20 . 2003 . 13 LIONS LANE . . . . . . . 267 20. . 2004 . 15 LIONS LANE . . . . . . 268 20 . . 2005 . 17 LIONS LANE269 E 20. . . . . . 2006 . 19 LIONS LAN . . . . . . . 270 21 . . . 2101. 1 LIONS LANE . . . . . . . 271 21 . . 2102. 3 LIONS LANE. . . . . . . . 272 21 . . . 2103 . 5 LIONS LANE.. . . . . . . 273 21 . . . . . . 2104 . 7 LIONS LANE. . . . . . . . 274 22 . . 2206 . 12 CARRIAGE HILL LANE . . . 275 22. . 2205. . . 10 CARRIAGE HILL LANE . . . 276 22. . 2204. . . 8 CARRIAGE HILL LANE . . . . 277 22. . 2203 . . . 6 CARRIAGE HILL LANE. . . . 278 22. . 2202. . . 4 CARRIAGE HILL LANE . . . . 279 22. . . . . . 2201 . 2 CARRIAGE HILL LANE. . . . 280 23 . . 2301 . . . 14 CARRIAGE HILL LANE . . . 281 23 . . 2302. . . 16 CARRIAGE HILL LANE . . . 282 23.' .'. . 2303 . . . 18 CARRIAGE HILL LANE . . . 283 23 .. . . . . . 2304 . . . 20 CARRIAGE HILL LANE . . . 284 24. . . . . . 2406 . . . 38 LIONS LANE. 285 24. . . 2405. . . 40 LIONS LANE. . . . . . . 286 24 . . . . 2404. . . 42 LIONS LANE. . . . . 287 24 . . . . . . 2403 . . . 44 LIONS LANE. . . . . 288 24 . . . 2402 . . . 46 LIONS LANE. . . . . . . 289 24 . . . . . . 2401 . . . 48 LIONS LANE. . . . . . . 290 25. . 2501 . . . 9 CARRIAGE HILL LANE . . . 291 25. . 2502. . 11 CARRIAGE HILL LANE. . . 292 25 . . . 2503 . . . 13 CARRIAGE HILL LANE. . . 293 25 . . 2504 . . . 15 CARRIAGE HILL LANE. . . 294 25 . . 2505 . . . 17 CARRIAGE HILL LANE. . . 295 25 . . . . . . 2506 . . . 19 CARRIAGE HILL LANE. 296 William H. Vunroe Page -4- Seoteirber 28, 1987 BUILDING UNTIT N0. NO. STREET ADDRESS PERMIT NO. 26 . . . 2601 . . . 1 CARRIAGE HILL LANE . 297 26 . . 2602 . . . 3 CARRIAGE HILL LANE . 298 26 . . 2603 . . . 5 CARRIAGE HILL LANE. 299 26 . . . . . 2604 . . . . 7 CARRIAGE HILL LANE. 300 Your kind attention to this request is greatly appreciated. Very truly yours , SALEM HIGHLA9D D '=LOP`.4ENT CORP. BY: / ✓ I1iC;e Stasinos President MS : caj 7 PETER F. MMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 506 MAIN ST Y EE T . ST 0NEHAM . MASSACHUSETTS 02180 TELEPHONE 638-0900 Building Department City of Salem Page -2- October 5, 1987 BUILDING #10. . . 4 UNITS "A" TYPE : 1. Rough Framing completed. 2. Windows and doors installed. 3 . Roof Shingles and exterior siding completed with one coat of stain. 4. Rough Plumbing completed. 5. Rough Electrical completed. 6. Rough Heating completed. 7. Insulation installed . BUILDING #11 . . . 4 UNITS "B" TYPE : 1 . Four units 100% completed - two units have been signed off by Building Department and the remmining two units are ready for final inspection by the Building Department . BUILDING #12 . . . 6 UNITS "A" TYPE : Signed off by Building Inspector and 507o occupied. BUILDING #13 . . . 6 UNITS "B" TYPE : 1 . Concrete foundation walls 100% completed. 2. Underground utilities completed. 3 . Concrete floors completed. 4. Rough framed to second floor plate. 5. Concrete block party walls up to second floor plate. BUILDING #14 . . . 6 UNITS "A" TYPE : 1 . Footings and foundation complete. 2 . Underground utilities complete. 3 . Concrete slab floors complete . 4. Rough framed to second floor level . r PETER F. DIMEO ASSOCIATES, INC. ARCIIITECTVRE PLANNING 546 MAIN STREET . STONEHAM, MASSACHUSETTS 02180 TE IE PHONE 439-0900 Building Department City of Salem Page -3- October 5, 1987 BUILDING #17. . . 6 UNITS "B" TYPE : 1. Footings - 100% completed. 2. Foundation walls - 70% completed. BUILDING #21 . 4 UNITS : 1 . Footings - 100`/o completed. 4. Foundation - 100% completed. 3 . Underground plumbing and electrical completed . 4 . Interior grading to receive concrete slab floor . MAIL HOUSE - 72UNITS : 1 . 'Sail house complete except for electrical. Very truly yours , PETER F DI MEO ASSOCIATES, INC. BY: M 4 - I Peter F. Di..Se 04 0 ARC& �S lFc PFD: caj �6`�Rf 0"W<'\ \ a No.1665 o O STONEHAM. W MASS. J �o2�FA[7'H OF �PSSPv� PETER F. 13IMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 M A I N S T R E E T . S T O N E H A M . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 4 3 6-0900 October 5, 1987 n -e Building Department City of Salem One Salem Green Salem, MA. 01970 � Attention : Mr . William Munroe l ^ Re: HIGHLAND ACRES 394 HIGHLAND AVENUE SALEM, MASS . Dear Mr. Munroe : We have inspected the entire condominium development at the above address on October 2 , 1987 , and the condition of the development , which includes Buildings numbered 7 through 14 and Buildings numbered 17 and 21 are as follows : BUILDING #7. . 6 UNITS "B" TYPE : Signed off by Building Inspector and 500,10 occupied . BUILDING #8. . . 4 UNITS "A" TYPE : Signed off by Building Inspector and 100`10 occupied. BUILDING #9. . . 6 UNITS "B" TYPE : 1 . Rough Framing and Partitioning completed. 2. Insulation completed. 3 . Rough nlumbing completed. 4. Rough Electrical completed. 5. Rough Heating completed. 6. Sheet rock installed and taping completed. 7. Interior finish - 807o completed. 8. Interior prime coat completed. 9. Kitchen cabinets and vanities installed except for countertops. 10. Exterior siding completed with one coat of stain . PETER F. DIMEO ASSOCIATES, INC. AFLCMIXTECTUiLM PLANNING 546 M A I N S T R E E T . ST O N E H A M . M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L-E P H O N E 43 8-09 00 January 20 , 1988 Building Department C „ City of Salem One Salem Green Salem, Ma. 01970 Attention: Mr. William Munroe Re: Highland Acres 394 Highland Avenue Salem, Ma. Dear Mr. Munroe: We have inspected the entire condominium development at the above address on January 19, 1988, and the condition of the development, which includes Buildings number 9, 10, 13, 14, 15, 17, 19, 20 and 21 are as follows: BUILDING #9. 6 UNITS "B" TYPE: 1008 COMPLETED BUILDING #10. 4 UNITS "A" TYPE: 100% COMPLETED BUILDING #13. 6 UNITS "B" TYPE: 1 . Siding - 1008 completed. 2. Exterior Painting 1008 completed. 3. Exterior stairs 100% completed. 4. Drywall 1008 completed. 5. Interior Finish 508 completed. 6. Rough Plumbing, Heating and Electrical 1008 completed. BUILDING #14. 6 UNITS "A" TYPE: 1 . Rough framing 1008 completed. 2. Roof shingles 1008 completed. 3. Exterior windows and doors installed. 4. Rough Plumbing, Heating and Electrical 1008 completed. 5. Insulation started. PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 M A I N S T R E E T . 5 TO N E H AM . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 4 3 8-0900 Building Department City of Salem Re; Highland Acres Page 2. January 20, 1988 BUILDING #15. 6 UNITS "B" TYPE: 1 . Rough framing 100% completed. 2. Roof shingles 100% completed. 3. Exterior windows and doors installed. 4. Rough Plumbing, Heating and Electrical 100% completed. 5. Insulation started. BUILDING #17. 6 UNITS "B" TYPE: 1 . Exterior framing 100% completed. 2. Interior Partitions 50% installed. 3. Rough Plumbing and Heating 508 completed. 4. Roof Shingles 75% installed. BUILDING #19. 6 UNITS "A" TYPE: 1 . Foundation 100% completed. 2. Interior grading ready to receive concrete slab floor. 3. Rough exterior grading 1008 completed. BUILDING #20. 6 UNITS "A" TYPE: 1 . Foundation 100% completed. 2. Interior grading ready to receive concrete slab floor. 3. Rough exterior grading 1008 complete. PETER F. MMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MA I N STREET . ST ONE H AM . M A 5 5 A C H U S E T T S 0 2 1 9 0 T E L P H O N L' 43 B-0900 Building Department City of Salem Re: Highland Acres Page 3. January 20, 1988 BUILDING #21 . 4 UNITS "A" TYPE: 1 . Rough framing 1008 completed. 2. Interior partitions 508 completed. All work is progressing satisfactory in accordance with drawings provided by this office. If there are any questions regarding any of the above, please do not hesitate to contact this office. Sincerely, RZTER F. DIMEOkSSOCIATES, INC. Peter F. DiMeo, AIA PFD/rkk PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MAIN 5T REE T , ST ONEHAM . MA55ACHU5ET T5 02180 T E L E P H 0 N L 43 8-09 00 Building Department '.. City of Salem , Re : Highland Acres Page 2 . February 10 , 1988 Continuation of Building 1114 5 . Insulation completed . Building ready to receive drywall . BUILDING 1115 . . 6 UNITS "B" TYPE : 1 . Foundation completed . 2 . Underslab Utilities completed . 3 . Concrete Slab Floor completed . 4 . Concrete Block Party Wall up to first floor . 5 . Rough Framing to first floor . BUILDING 1116 . . 6 UNIT "A" TYPE : 1 . Excavated and ready to receive footings and foundation walls . BUILDING 1117 . 6 UNITS "B" TYPE : 1 . Exterior Framing 100% completed . 2 . Interior Partitions 100% installed . 3 . Rough Plumbing , Heating , and Electrical 100% completed . 4 . Roof Shingles 100% installed . 5 . Clapboard Siding started . 6 . Doors & Windows installed . BUILDING 1119 . 6 UNITS "A" TYPE : 1 . Foundation 100% completed . 2 . Interior grading ready to receive concrete slab floor . 3 . Rough exterior grading 100% completed . PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLAMMIMG 546 M A I N 5 T R E E T . 5 T O N E H A M M A S S A C H U 5 E T T 5 0 2 1 8 0 T E L E P H O N L 43 8-0900 Building Department City of Salem Re : Highland Acres Page 3 . February 10 , 1988 BUILDING #20 . 6 UNITS "A" TYPE : 1 . Foundation 1007 completed . 2 . Interior Grading ready to receive concrete slab floor . 3 . Rough exterior grading 1007 complete . BUILDING #21 . . 4 UNITS "A" TYPE : I . Rough Framing 1007 completed . 2 . Interior Partitions 1007 completed . 3 . Doors & Windows installed . 4 . Clapboard Siding 507 completed . All work is progressing satisfactory in accordance with drawings provided by this office . If there are any questions regarding any of the above , please do not hesitate to contact this office . Sincerely , P -" F . DI EO ASSOCIATES , INC . ,�� G\S,�EpED ARpH/l F. � O��Fcs Peter F . DiMeo , AIA o No. 16650 1 3 STONEHAM. W MASS. Jy PFD/bjg y �Fq H S PETER F. DIMEO ASSOCIATES, INC. AEtCMXTECTVItE- FLiA1PTNI1qG 546 MAIN STREET . STONEHAM , M A 5 S A C H U S E T TS 02180 TE L'EPH0NE 43 8-09 00 February 11 , 1988 "" CIIw O I Lf� „ r;i�IJS. Building Department City of Salem One Salem Green Salem, MA 01970 Attention : Mr . William Munroe Re : Highland Acres 394 Highland Avenue Salem, MA 01970 Dear Mr . Munroe : We have inspected the entire condominium development at the above address on February 10 , 1988 , and the condition of the development , which includes Buildings number 13 , 14 , 15 , 16 , 17 , 19 , 20 and 21 are as follows : BUILDING 1113 . . 6 UNITS "B" TYPE : 1 . Siding - 100% completed . 2 . Exterior Painting 100% completed . 3 . Exterior stairs 100% completed . 4 . Drywall 100% completed . 5 . Interior Finish 100% completed . 6 . Prime Coat Interior Paint completed . 7 . Rough Plumbing Completed . 8 . Finish Heating 90% completed . 9 . Finish Electrical 100% completed . BUILDING 1114 . . 6 UNITS "A" TYPE : 1 . Rough Framing 100% completed . 2 . Roof Shingles 100% completed . 3 . Exterior windows and doors installed . 4 . Rough Plumbing , Heating and Electrical 100% completed . PETER F. 13IMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MAIN STREET . ST ONEHAM . M A 5 5 A C H U 5 E T TS 02180 TE L'EPH0NE 43 8-09 00 March 1 , 1988 Building Department City of Salem One Salem Greenj Salem, Ma. 01970 J Attention: Mr. William Munroe ?r ' ej Re: Highland Acres T� 394 Highland Avenue Salem, Ma. `� J7 N Dear Mr. Munroe: We have inspected the entire condominium development at the above address on February 29, 1988, and the condition of the development, which includes Buildings number 13, 14, 15, 16, 17, 19, 20 and 21 are as follows: BUILDING #13. 6 UNITS "B" TYPE: 1 . Siding - 1008 completed. • 2. Exterior Painting 1008 completed. 3. Exterior stairs 1008 completed. 4. Drywall 1008 completed. 5. Interior Finish 1008 completed. 6 . Prime Coat Interior Paint completed. 7. Rough Plumbing completed. 8. Finish Heating 908 completed. 9. Finish Electrical 1008 completed. BUILDING #14. 6 UNITS "A" TYPE: 1 . Rough Framing 1008 completed. 2. Roof shingles 1008 completed. 3 . Exterior windows and doors installed. • 4. Rough Plumbing, Heating and Electrical 1008 completed. 5. Insulation completed. 6 . Drywall 508 completed. PETER F. DIMEO ASSOCIATES, INC. ARCIiITECTiIRE PLANNING 546 M A I N S T R E E T , S T O N E H A M , M A S S A C H U S E T T 5 0 2 1 9 0 T E L E P H O N E 43 B-0900 Building Department City of Salem Re: Highland Acres Page 2. March 1 , 1988 t' G; BUILDING #15. 6 UNITS "B" TYPE: 1 . Foundation completed. 2. Underslab Utilities completed. 3. Concrete Slab Floor Completed. 4, Concrete Block Party Wall up to Second Floor. 5. Rough Framing to Second Floor. • BUILDING #16. 6 UNITS "A" TYPE: 1 . Footings completed, ready to receive Foundation Walls BUILDING #17. 6 UNITS "B" TYPE: 1 . Exterior Framing 100% completed. 2. Interior Partitions 1008 installed. 3. Rough Plumbing, Heating, and Electrical 100% completed. 4. Roof Shingles 100% installed. 5. Clapboard Siding 50% completed. 6. Doors and Windows installed. 7. Interior ready to receive Insulation. BUILDING #19. 6 UNITS "A" TYPE: 1 . Foundation 100% completed. • 2. Interior grading ready to receive concrete slab floor. 3. Rough exterior grading 100% completed. PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MAIN STREET . ST 0NEHAM , M A 5 5 A C H U S E T T 02180 TE L PH0NC 438-0900 Building Department City of Salem Re: Highland Acres Page 3. �r March 1 , 1988 BUILDING #20. 6 UNITS "A" TYPE: - y ua 1 . Foundation 1008 completed. 2. Interior grading ready to receive concrete slab floor. . 3. Rough exterior grading 1008 complete. BUILDING #21 . 4 UNITS "A" TYPE: 1 . Rough Framing 100% completed. 2. Interior Partitions 100% completed. • 3. Doors and Windows installed. 4 . Clapboard Siding 100% completed. 5. Rough Plumbing, Heating and Electrical 508 completed. All work is progressing satisfactory in accordance with drawings provided by this office. If there are any questions regarding any of the above, please do not hesitate to contact this office. Sincerely, P F. DIMEO ASSOCIATES, INC. G`S1r<AED ARC, ` Peter F. D Meo,elCAIA Q e F ;' a N0. 1665 C STUNT NAM. r- r MASS. • PFD/rkk o``F t� r PETER F. DIMEO ASSOCIATES, INC. AI�CIiITECTURE PLANNING 546 MAIN STREET . ST 0NEHAM . MASSACHUSETTS 02180 TE L'EPH0NE 438-0900 March 15, 1988 II •,� Building Department City of Salem CITi - - One Salem Green Salem, Ma. 01970 Attention: Mr. William Munroe Re: Highland Acres 394 Highland Avenue Salem, Ma. Dear Mr. Munroe: We have inspected the entire condominium development at the above address on March 14 , 1988, and the condition of the development, which includes Buildings number 13, 14, 15, 16 , 17 , 19, 20 and 21 are as follows: BUILDING #13. 6 UNITS "B" TYPE: 1 . Siding - 1008 completed. 2. Exterior Painting 1008 completed. 3. Exterior stairs 1008 completed. 4 . Drywall 1008 completed. 5 . Interior Finish 1008 completed. 6 . Prime Coat Interior Paint completed. 7. Rough Plumbing completed. 8. Finish Heating 908 completed. 9 . Finish Electrical 1008 completed. BUILDING #14. 6 UNITS "A" TYPE: 1 . Rough Framing 1008 completed. 2. Roof shingles 1008 completed. 3 . Exterior windows and doors installed. 4 . Rough Plumbing, Heating and Electrical 1008 completed. 5. Insulation completed. 6 . Drywall 1008 completed. PETER F. DIMEO ASSOCIATES, INC. ARCIiITECTVRE PLANNING 546 MAIN STREET . ST ONEHAM . MA ; S A C H U S E T T5 02190 TELEPHONE 438-0900 Building Department City of Salem Re: Highland Acres Page 2. March 15, 1988 BUILDING #15. 6 UNITS "B" TYPE: 1 . Foundation completed. 2. Underslab Utilities completed. 3. Concrete Slab Floor completed. 4. Concrete Block Party Wall up to Second Floor. 5. Exterior Rough Framing to Roof. BUILDING #16. 6 UNITS "A" TYPE: 1 . Footings completed. 2. Foundation Walls completed BUILDING #17. 6 UNITS "B" TYPE: 1 . Exterior Framing 1008 completed. 2. Interior Partitions 100% installed. 3 . Rough Plumbing, Heating, and Electrical 1008 completed. 4. Roof Shingles 100% installed. 5. Clapboard Siding 1008 completed. 6. Doors and Windows installed. 7. Insulation 100% completed. 8. Drywall 50% completed. BUILDING #19. 6 UNITS "A" TYPE: 1 . Foundation 1008 completed. 2 . Interior grading ready to receive concrete slab floor. 3 . Rough exterior grading 1008 completed. PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MAIN STREET . STONE HAM . MA55ACHUSET T5 02180 TE l'EPH0 NC 43 8-09 00 Building Department City of Salem Re: Highland Acres Page 3. March 15, 1988 BUILDING #20. 6 UNITS "A" TYPE: 1 . Foundation 1008 completed. 2. Interior grading ready to receive concrete slab floor. 3. Rough exterior grading 1008 complete. BUILDING #21 . 4 UNITS "A" TYPE: 1 . Rough Framing 100% completed. 2. Interior Partitions 100% completed. 3. Doors and Windows installed. 4. Clapboard Siding 100% completed. 5. Rough Plumbing, Heating and Electrical completed. All work is progressing satisfactory in accordance with drawings provided by this office. If there are any questions regarding any of the above, please do not hesitate to contact this office. Sincerely, PETER F. DIMEO ASSOCIATES, INC. \SSERED ARCyT _ e�V F. Q FCl C 5w' u1' a No. 1665 o y TONEHAM. .�-. Peter F. DiMeo, AIA SMA55. H O J 2 PFD/rkk PETER F. DIMEO ASSOCIATES, INC. ARCHITECTUFLE PLANNING 546 M A I N 5 T R E E T . S TO N E H AM , M A S S A C H U 5 E T T S 0 2 1 8 0 T E L E P H O N E 43 9-0900 April 5, 1988 Building Department City of Salem One Salem Green Salem, Ma. 01970 Attention: Mr. William Munroe Re: Highland Acres - 394 Highland Avenue Salem, Ma. Dear Mr. Munroe: We have inspected the entire condominium development at the above address on April 4, 1988, and the condition of the development, which includes Buildings number 13, 14, 15, 16, 17, 18, 19, 20 , 21 and 22 are as follows: BUILDING #13. 6 UNITS "B" TYPE: 1 . Siding - 1008 completed. 2. Exterior Painting 1008 completed. 3. Exterior stairs 1008 completed. 4. Drywall 1008 completed. 5. Interior Finish 1008 completed. 6. Prime Coat Interior Paint completed. 7. Rough Plumbing completed. 8. Finish Heating 908 completed. 9. Finish Electrical 1008 completed. BUILDING #14. 6 UNITS "A" TYPE: 1 . Rough Framing 1008 completed. 2. Roof shingles 1008 completed. 3. Exterior windows and doors installed. 4. Rough Plumbing, Heating and Electrical 1008 completed. 5 . Insulation completed. 6 . Drywall 1008 completed. PETER F. 13IMEO ASSOCIATES, INC. ARCMITECTIMM PLANNING 546 MAIN 5T REE T . STONEHAM , MASSACHUSETTS 02180 TELEPHONE 43 8-09 00 Building Department City of Salem Re: Highland Acres Page 2. April 4, 1988 BUILDING #15. 6 UNITS "B" TYPE: 1 . Foundation completed. 2. Underslab Utilities completed. 3. Concrete Slab Floor completed. 4. Concrete Block Party Wall up to Second Floor. 5 . Exterior Rough Framing to Roof. 6. Roofing Completed. 7. Exterior Doors and Windows Installed. 8. Rough Plumbing and Electrical Completed. BUILDING #16. 6 UNITS "A" TYPE: 1 . Footings completed. 2 . Foundation Walls completed 3. Underground Utilities Completed. BUILDING #17. 6 UNITS "B" TYPE: 1 . Exterior Framing 1008 completed. 2. Interior Partitions 1008 installed. 3. Rough Plumbing, Heating, and Electrical 1008 completed. 4. Roof Shingles 1008 installed. 5. Clapboard Siding 1008 completed. 6 . Doors and Windows installed. 7. Insulation 1008 completed. 8. Drywall 1008 completed. 9 . Exterior Prime Coat of Paint. PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 M A I N S T R E E T . S T O N E H A M . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 43 B-09 00 Building Department City of Salem. Re: Highland Acres Page 3. April 4, 1988 BUILDING #18. 6 UNITS "B" TYPE: 1 . Foundation 1008 Completed. 2 . Interior Grading Completed. 3 . Underground Utilities Completed. 4. Concrete Floor Slab Completed. 5. Masonry Party Walls to First Floor. 6. Rough Exterior Grading Completed. BUILDING #19. 6 UNITS "A" TYPE: 1 . Foundation 1008 completed. 2. Interior grading ready to receive concrete slab floor. 3. Rough exterior grading 1008 completed. 4. Underground Utilities Completed. BUILDING #20. 6 UNITS "A" TYPE: 1 . Foundation 1008 completed. 2. Concrete Floor Slabs Completed. 3. Rough exterior grading 1008 complete. 4 . Underground Utilities Installed. 5. Masonry Party Walls to First Floor. PETER F. 13IMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MA I N 5T RE ET . 5TONE H AM . M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L P H O N L' 438-0900 Building Department City of Salem Re: Highland Acre Page 4 . April 4 , 1988 BUILDING #21 . 4 UNITS "A" TYPE: 1 . Rough Framing 1008 completed. 2. Interior Partitions 1008 completed. 3 . Doors and Windows installed. 4 . Clapboard Siding 1008 completed. 5. Rough Plumbing, Heating and Electrical completed. 6. Drywall 508 completed. BUILDING #22. 6 UNITS "B" TYPE: 1 . Foundation 1008 Completed. 2 . Interior Grading Completed and ready to receive Concrete Floor Slab. 3 . Rough Exterior Grading 1008 Completed. All work is progressing satisfactory in accordance with drawings provided by this office. If there are any questions regarding any of the above, please do not hesitate to contact this office. Sincerely, PETER F. DIMEO ASSOCIATES, INC. Peter F. DiMeo, AIA PFD/rkk 2ETER R I)IMEO ASSOCIATES, INC. ARCUXTECTVRE PLANNING 546 M A I N S T RE E T . 5 T O N E H A M . M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L E P H O N E 43 9-0900 May 16, 1988 Building Department City of Salem One Salem Green Salem, Ma. 01970 Attention: Mr. William Munroe Re: Highland Acres 394 Highland Avenue Salem, Ma Dear Mr. Munroe: We have inspected the entire condominium development at the above address on May 16, 1988, and the condition of the development, which includes Buildings number 13, 14, 15, 16, 17, 18, 19, 20, 21 , 22 and 23 are as follows: BUILDING #13. 6 UNITS "B" TYPE: 1 . Siding - 1008 completed. 2. Exterior Painting 1008 completed. 3. Exterior stairs 1008 completed. 4. Drywall 1008 completed. 5. Interior Finish 1008 completed. 6. Prime Coat Interior Paint completed. 7. Rough Plumbing completed. 8. Finish Heating 1008 completed. 9. Finish Electrical 1008 completed. 10. Exterior Landscaping completed. BUILDING x/14. 6 UNITS "A" TYPE: 1 . Rough Framing 1008 completed. 2. Roof shingles 1008 completed. 3. Exterior windows and doors installed. 4. Exterior Siding completed. 5. Rough Plumbing, Heating and Electrical 1008 completed. 6. Insulation completed. 7. Drywall 1008 completed. ' ZTER F. DIMEO ASSOCIATES, INC. ARCI;ITECTLJRE PLANNING 546 M A I N S T R E E T . 5 T O N E H A M . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 438-0900 Building Department City of Salem Re: Highland Acres Page 2. May 16 , 1988 BUILDING #14. 6 UNITS "A" TYPE: (cont'd. ) 8. Prime coat interior paint completed. 9. Exterior Stain completed. 10. Exterior Landscaping completed. BUILDING #15. 6 UNITS "B" TYPE: 1 . Foundation completed. 2. Underslab Utilities completed. 3. Concrete Slab Floor completed. 4. Concrete Block Party Wall completed. 5. Exterior Rough Framing completed. 6. Roofing Completed. 7. Exterior Doors and Windows Installed. 8. Exterior Siding completed. 9. Installing of Interior insulation has commenced. 10. Rough Plumbing, Heating and Electrical Completed. 11 . Exterior Stairs completed (no railings) . 12. Exterior Driveway grading ready to receive bituminous concrete paving. BUILDING #16. 6 UNITS "A" TYPE: 1 . Footings completed. 2. Foundation Walls completed 3. Underground Utilities Completed. PETER F. DIMEO ASSOCIATES, INC. ARCHITECTVRE PLANNING 546 M A I N S T R E E T . S T O N E H A M . M A 5 S A C H U S E T T 5 0 2 1 8 0 T E L-E P H O N E 43 8-0900 Building Department City of Salem Re: Highland Acres Page 3. May 16, 1988 BUILDING #17. 6 UNITS "B" TYPE: 1 . Exterior Framing 1008 completed. 2. Interior Partitions 1008- installed. 3. Rough Plumbing, Heating, and Electrical 100% completed. 4. Roof Shingles 100% installed. 5. Clapboard Siding 100% completed. 6. Doors and Windows installed. 7. Insulation 1008 completed. 8. Drywall 1008 completed. 9. Exterior Coat of Stain completed. 10. Exterior Brick Stairs completed (no railings) . 11 . Exterior Driveway grading ready to receive bituminous concrete paving. BUILDING #18. 6 UNITS "B" TYPE: 1 . Foundation 100% Completed. 2. Interior Grading Completed. 3. Underground Utilities Completed. 4. Concrete Floor Slab Completed. 5. Masonry Party Walls to Second Floor. 6. Rough Framing up to 2nd. floor ready to receive roof trusses. 7. Rough Exterior Grading Completed. PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MAIN STREET . 5TONE HAM , MASSACHUSETTS 02180 TEL-E P H 0 N E 438-0900 Building Department City of Salem Re: Highland Acres Page 4. May 16 , 1988 BUILDING #19. 6 UNITS "A" TYPE: 1 . Foundation 1008 completed. 2. Concrete Floor Slab completed. 3 . Rough exterior grading 1008 completed. 4. Underground Utilities Completed. BUILDING #20. 6 UNITS "A" TYPE: 1 . Foundation 1008 completed. 2. Concrete Floor Slabs Completed. 3. Rough exterior grading 100% complete. 4. Underground Utilities Installed. 5. Masonry Party Walls to Second Floor. 6. Rough Framing to 2nd. Floor, Roof Framing 508 completed. BUILDING #21 . 4 UNITS "A" TYPE: 1 . Rough Framing 1008 completed. 2. Interior Partitions 1008 completed. 3. Doors and Windows installed. 4. Clapboard Siding 1008 completed. 5. Exterior Stain completed. 6. Rough Plumbing, Heating and Electrical completed. 7 . Drywall 758 completed. 8 . Rough grading completed, ready to receive Driveways. PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING 546 MAIN STREET . ST 0NEHAM . MASSACHUSETTS 02180 TEL-EPH0NE 438-0900 Building Department City of Salem Re: Highland Acres Page 5. May 16, 1988 BUILDING #22. 6 UNITS "B" TYPE: 1 . Foundation 1008 Completed. 2. Underground Utilities completed. 3 . Concrete Floor Slab installed. 4. Rough Exterior Grading 1008 Completed. BUILDING #23. 4 UNITS "A" TYPE: 1 . Foundation 100% completed. 2. Interior Grading completed, ready to receive concrete slab. 3. Underground Utilities completed. All work is progressing satisfactory in accordance with drawings provided by this office. If there are any questions regarding any of the above, please do not hesitate to contact this office. Sincerely, PE R F. DIMEO ASSOCIATES, INC Qk. �Fi F. pr Cl Peter F. DiMeo, AIA a o.1665 0 STONEHAM. - MASS. Jy PFD/rkk ry�Fq�TN 0 fMP ` Citp of *alem, lHazoacbU15CM5 `f P. +l t n= Vublic i9ropertp Department on,„so� 3liuilbing Mepartment One balrm Oreen 745-9595 CXt. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer May 18, 1990 Informational Memo To: David Shea Chief Administrative Aide From: William H. Munroe Inspector of Buildings RE: Stasino' s Condos I have been contacted by William and Thomas Katsepetsis who have purchased the rights to the twenty six (26) remaining condos at the former Stasino's project at 394 Highland Avenue regarding finishing these units. Six (6) of the units are almost complete and an inspection of these units will be made by the Building, Plumbing and Electrical Departments on Monday, May 19 1990 to determine what permits will be necessary to complete them. (Building Permits expire in six (6) months when work has stopped) . The remaining twenty (20) units willrequire new building permits at a cost of three hundred, thirty three dollars ($333.00) per unit . Tom Katsepetsis has stated that he will re-apply for the twenty units the first of the week as they are needed as collateral for the lender. A little back-ground on the brothers: They are currently building four unit sub division of medium priced houses on Malone Drive. Served as construction supers for Stasinos and own "Ornimental Tron Company" , a metal pre fabrication Co. in Danvers. Will keep you advised.