394 HIGHLAND AVENUE - ZBA (2) c i 9a-7) - . - - -- ----�
j
i
�� 4« II
��i�� �
�iC-e��
CITY L
COi•it•iGN:dEALTH 0: :ASSACHUSETTS �--
ESSEX, SS . SUPERIOR COURT DEPT.
CIVIL ACTION NO. 86-1539
MIKE STASINOS
VS
CITY OF SALEM BOARD OF APPEAL ,
AND JAMES B. HACKER, RICHARD A.
BENCAL, JAMES M. FLEMING, EDWARD MOTION FOR HEARING ON FORM OF JUDGMENT
LUZINSFCI , PETER STROUT, ARTHUR
LABRECQUE, PETER A. DORE, AS THEY
ARE MEMBERS OF THE-, CITY OF SALEM
BOARD OF APPEAL
Now comes the Plaintiff , Mike Stasinos , pursuant to Rule 58 (a ) of
the Massachusetts Rules of Civil Procedure , and moves this Honorable
Courr. to schedule a hearing on the form that the judgment in this action
should take and to order that judgment enter in the form attached hereto.
f
LtILA- By the Plaintiff ' Attorney
) ' Nicholas G. Curuby, Esq .
7 Franklin Street ,
—( � Lynn , MA. , 01902
`«off ( 617 ) 595-0009
Ass�e..dto by _Defendant orney
r_c3 1 E. O ' Brien
City Solicitor
Citv Hall , 93 Washington St .
Salem , 01970
CIVIL ACTION NO. 86-1534
MIKE STASINOS
VS
CITY OF SALEM BOARD OF APPEAL,
AND JAMES B . HACKER, RICHARD A.
BENCAL, JAMES M. FLEMING , EDWARD CONSENT JUDGMENT
LUZINSKI , PETER STROUT, ARTHUR
LABRECQUE, PETER A. DORE, AS
THEY ARE MEMBERS OF THE CITY OF
SALEM BOARD OF APPEAL
It is hereby agreed by all parties that Consent Judgment
shall be entered in the appeal from a decision of the City of
Salem Board of Appeal, denying the Plaintiff ' s Petition request-
ing the Board to issue a variance to allow construction on prem-
ises located at #394 Highland Avenue, Salem, encompassing appro-
ximately twenty-five ( 25 ) acres end lying in Districts R-1 , R-C,
and BPD , which has been previously described as lying in Dis-
tricts R-1 , R-C and B-2 , and that the contested decision of the
Defendant Board of Appeal be amended and that its decision be
entered granting a variance with the following conditions :
1 ) The Plaintiff , Mike Stasinos , shall withdraw a pending
subsequent petition presently before the Defendant Board of Ap-
peal , with prejudice , upon final approval of this Agreement for
Consent Judgment by this Court.
2 ) That the variance to be granted to the Plaintiff , Mike
Stasinos , by the Defendant Board of Appeal shall contain the fol-
lowing conditions , that the Plaintiff agrees to:
a ) That the Plaintiff , Mike Stasions , shall be allow-
ed to construct 140 condominium residential units and buy�fi-ipg ,
containing a total of 3000 square feet of floor space o�on_
floor on a parcel of land containing 27 , 000 square feet o land ,
all set forth, in a plan entitled "Highland Acres , Salem Highland
Ave. Development Corp. , Owner and Developer, Peter F. MiDeo Assoc.
Arch . " , dated August 3 , 1986 , a copy of which has been furnished
the Defendant Board �of Appeal and the City Planner, City of Salem.
Said building is to be deeded to the Condominum Association with-
in a thirty-six month period from acceptance of this Agreement .
The building is to be used for a temporary job site/real estate
sales . The building is to be used solely by the developer .
That the Plaintiff , hike StasIc;"- shall crar.t to
b ) - tota174_nL1 . . 1 acres of land
in height , par;;i;,c area ana pater -- - --
proved by the City Planner , City ofvSalem, in the location desig of
ed in the aforementioned plan.
c) That the City Planner, subject to the approval of the
Board of Appeal, shall select a qualified professional engineer, at
the Plaintiff ' s cost, who shall provide his services , to include the
duties of Clerk of works , and supervise and oversee the construction
to be underaken by the Plaintiff , to insure that said construction
complies with Section IV and V of the Sub-division Regulations of the
City of Salem; and, that said Engineer shall submit to the Board of
Appeal and City Planner, City of Salem, a written progress report of
two ( 2 ) weeks . That said engineer-
the undertaken construction every
ing services shall include the supervision and overseeing of the im-
provements required in the installation of streets , roadways, i.ndthe
walks , grass strips , monuments and utilities , all as p
approved definitive plans submitted by the Plaintiff . It is agreed
that said services to be furnished by the Plaintiff a�taandnallow
ot exceed
or
any and all normal design standards for trafficiimdeemed proper .
waivers by the Board of Appeal , City sal , which shall
Final approval shall be given .by the Board of App
not unreasonably be with-held.
d ) The Plaintiff , MIke Stasions , shall submit a prelimsub
ary plan of the development trdtof Healhe th, Conservation of Health Commissshall ion,
mitted and approved by theBoar
f Streets , Fire Department, Police
City Engineer , Superintendent o
Department, and School Department , City of Salem.
e ) The Plaintiff , Mike Stasinos , shall submit, prior to
a final definitive
ruction
the start of construction , all n pernform of cand tcontentsto
the Board of Appeal , City of Salem, all division Regulations , City of
proper
as required by Section IIIB, of the Sub-di
Salem.
g ) The Plaintiff , Mike Stasinos , shall, prior to construc-
tion , submit an Environmental Imr000sedStatement
projectltofthe illi totalnd lenvironar m
indicating the relation of the p of such to
ment of 'the City of Salem and Sits inhabitants , and a copy
the Board of Appeal , City
g ) The Plaintiff , Mike Stasinos , shall file with the City
Solicitor , City of Salem, a performance bond , on approved form, and in
an amount approved by the Director of Public Services guaranteeing
that the proposed constructions shall , upon completion , comply with
this Consent Judgment and all pertinent sections of the Sub-division
Regulations , City of Salem, to be applied to the unfinished work ,
prior to issuance of necessary compliance permits .
2 -
h ) That the Plaintiff , Mike Stasinos , in the construction
of the subject project , shall meet all design standards for streets ,
be unreasonably be with-held .
i ) That the plaintiff, Mike Stasinos , in the construction
of the subject project , shall meet all required improvements , as set
forth in Section IV and V, sub-division Regulations , City of Salem.
j ) That a neighborhood review process shall be initiated
between the Plaintiff , neighborhood residents and the City Planning
Department , City of Salem, through which a neighborhood meeting shall
be held to review the project and its components and necessary change
and alterations to such plans shall be made as requested within the
parameters of the approved variance .
k ) The Plaintiff shall contribute to any and all proposed
traffic improvements on the Highland Avenue-Swampscott Road area , as
defined by the City through its Comprehensive Traffic Study now being
undertaken. Such a contribution shall be made with the approval of the
City Planner according to a formula designed such that all development
within the surrounding geographical area shall fairly share such costs
1 ) The Plainitff shall be required to reserve a strip of
land to be defined by the City, along Highland Avenue, for the future
widening of the roadway if deemed necessary by the Comprehensive Traf-
fic Study now being undertaken.
m ) The Petitioner, Mike Stasinos , amend his deed to the re
property located at 394 Highland Avenue , Salem, Massachusetts, and sai
amendment to be a covenant not to build on any portion of said real es
tate , other than on that portion utilized for 140 condominium units ar
3 , 000 square foot building . Said amendment is to be approved in form t
the City Solicitor.
n ) That all exterior building designs , building locations ,
lighting , landscaping, infrastructure, and site planning anal design
elements of the proposed development shall be subject to the review
and approval of the Board of Appeal and City Planner, City of Salem.
o ) That a buffer zone of 200 feet along the -eastern boun-
dary of the property shall be created so that the abutters of Pyburn
Avenue and Madeline Avenue not be adversely impacted ; and , that in
order to eliminate any visual impact of the development upon the ab-
utting neighborhood , the proposed landscaping to screen buildings
from the residences. of the above avenues shall be reviewed and ap-
proved by the City Planner . The Plaintiff shall also provide that
there be no other access to the parcel other than from Highland Ave-
nue , prohibiting any access to said parcel from Appleby Road , Made-
line Avenue , Pyburn Avenue , Ravenna Avenue, or Sophia Road or any
other accebted public way.
P ) That there will be no attempted closure of the median way
on Highland Avenue , at the entrance of Ravenna Avenue by the develop-
er or Condominium Association .
-- -- - 3 -
C ) The Flainti:= s.".all relinquish the foundation and build-
^armits , as i=_soca by the City of Salem currently existing for
r ) That ail water, sewer ana crainage improvements on the
site shall be subject to the review and approval of the City Plan-
ner and Director of Public Services , City of Salem; and , that all
issues and concerns regarding drainage and wetlands shall be re-
viewed and approved by the Conservation Commission, City of Salem.
s ) That an assessment of impact of the proposed project
on existing infrastructure services , including water , sewer and
drainage, shall be made by the City Planner and Director of Pub-
lic Services , City of Salem. That upon such assessment, the Plain-
tiff shall make any necessary improvements , at his costs , if re-
quested by the City Planner and Director of Public Services . If
it is deemed that improvements are necessary, and attributable
to the project, to upgrade the existing wastewater pump station
on Ravenna Ave. said improvements shall be implemented by and at
the cost of the Plaintiff .
t ) If required by the State Department of Public works,
the Plaintiff shall contribute the demanded funds for drainage
improvements proposed in the vicinity of Rich ' s Department Store ,
Highland Avenue , Salem, in an effort to eliminate drainage pro-
blems found in the geographical area .
_ u ) That the City Planner shall submit a written state-
ment of satisfaction of all such conditions to the Building In-
spector , City of Salem prior to the issuance of a building per-
mit .
V ) That the Plaintiff shall complete all cosntruction
and install all required municipal services within three ( 3 )
years from date of approval of the definitive plans ; and , he
shall provide that the proposed construction will be in five
( 5 ) phases , all as provided for in the definitive plan to be
submitted for approval .
1. That, in the work to be done on said pro-
ject , the General Contractor and all sub-contractors shall
restrict the performance of the work between the hours of
7 : 00 A .M. and 6 : 00 P.M. , Monday through Friday, excluding
work of a quiet nature . The hours for blasting shall be de-
termined by the Salem Fire Marshall .
2 . `That the By-Laws of the Condominium Assoc-
iation , to be executed and administered by the Condominium
Association, shall provide that all costs of trash collec-
tion and snow removal shall be paid for .by the Association .
4 -
W ) That the petitioner , Mike Stasinos , upon filing of
the Definitive Plan with the Board of Appeal , shall also file
said ..Definitive FTan 'with the Board of Health .
Mike Stasinos , Plaintiff
by his
aatt�torrnne :
Nicholas G. Curuby
7 Franklin Street
Lynn, MA. , 01902
( 617 ) 595-0009
City of Salem,
and of Appeal ,
b its attorne 1
Michael E. O' Brien
City Solicitor
City Hall
93 Washington Street
Salem, MA. 01970
. August 15 , 1986
- 5 -
NICHOLASG . CURUBY
Auqust 28, 1986
William H. Munroe, Commissioner .1,.
Salem Building Department, Tr z yg'
One Salem Green Re: Highland Avenue Development
Salem, MA. , 01970 Salem Highland Avenue Development Corp.
Dear Commissioner Munroe:
Be advised that the Developer of the above-listed project
is undertaking to proceed with the preparatory and development
construction work. Said work will done at the risk of the Developer.
Should it be determined that additional work arra/or changes
must be made, the Developer shall do so under your instruction
and hold the City of Salem and the Salem Building Department harm-
less from any and all claims of liability.
Very truly yours
Mike Stasinos, President
CITY OF SALENRI, MASSACHUSETTS '
C'7Y PLANNER 01970
CITY 'r (617)744.4580
September 10, 1986
Mr. William Munroe
Building Inspector
City of Salem
One Salem Green
Salem, Ma. 01970
Re: Stasinos Project, 394 Highland Avenue
Dear Bill:
. As required by the Consent Judgement, I have reviewed the proposed
plans for the above—mentioned project and find that Mike Stasinos has
met the following conditions:
1 . submittal of preliminary plans to the appropriate boards (d)
2. submittal of Environmental Impact Statement to the Board of
Appeal (f)
3 . compliance with design standards for streets, easements, open
spaces and protection of natural features as set forth in
Sections IV & V of the Sub—division Regulations and approved by
the City Planner (h)
4. compliance with required improvements as set forth in Section IV
& V of the Sub—division Regulations as per review on Thursday,
Sept. 4th with Paul Niman, Bill Munroe, Bob Turner, myself and
Tom Rouleau (electrical plans still to be reviewed) ( i)
5. establishment of 200' buffer zone (visual impact of development
on abutting neighborhood as yet to be assessed) (o)
6. submittal of all water, sewer and drainage improvements to the
Director of Public Services, approval of which is expected
within the next day ( r)
7 . submittal of plans to the Director of Public Services for
assessment of impact on infrastructure services, which approval
is expected within the next day (s)
- 2 -
2. 4.1 acres of land must be deeded to City for soccer field as
shown on site plan (b)
3 . City Planner must select a qualified engineer to serve as Clerk
of the Works (c)
4. revised definitive plan must be submitted to Board of Appeal
(plan currently in their possession does not reflect changes as
of Sept. 4th) (e)
5. performance bond must be submitted to the City Solicitor (g)
6. neighborhood review process must be completed (j)
7. Covenant must be executed to prohibit construction on any other
portion of the property except portion utilized for 140
condominium units and the 3,000 s. f. office building (m)
8. all exterior building designs, building locations, lighting,
landscaping, infrastructure, site planning and design elements
must be approved by the Board of Appeal and City Planner (n)
9. current foundation and building permits must be relinquished (q)
10. drainage and wetland impact must be reviewed and approved by
the Conservation Commission (on Sept. 11th agenda) (r)
11 . street names must be officially approved
While some further issues need to be resolved, the cooperation we
have received to date from Mike Stasinos leads me to recommend that a
building permit be issued for a small percentage of the total project.
This permit would be granted with the understanding on Stasinos' s part
that he would comply with any changes that may be required at a later
date to meet the conditions of the Consent Judgement even if such
changes affect work already undertaken.
Sincefely,
i
Gerard Kavanaugh
City Plapner
Ctu of
(enc :alcnt (6rectt
Ni-02 13
William H. Munroe
Director of Public Property - Maurice M. Martineau. Asst Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
September 12, 1986
Mike Stasinos, President
Highland Avenue Development Corp.
Off 394 Highland Avco
Salem, MA 01970
RE: Temporary Building Permits
Dear Mr. Stasinos:
Due to the fact that several issues remain to be resolved regarding your
property located off 394 Highland Ave. (i.e. street names, neighborhood meeting,
etc. ) prior to the issuance of Building Permits, this office cannot issue the
permits presently applied for.
However, in view of your letter dated August 28, 1986 in which you state
that work undertaken prior to receipt of all necessary approvals will be done
at the risk of the developer, and City Planner, Gerard Kavanaugh's letter of
September 10, 1986 recommending that due to your cooperation, permits be issued
for a small percentage of the project, this office agrees to the following:
1 . Work may commence on the three thousand (3000) square foot
building to be used as your construction office; `
2. Work may commenceonone (1 ) six (6) unit building.
I will again remind you that this work is undertaken at your risk and that
foundations for these buildings will not be backfilled without the approval of
this department, as well as electrical and plumbing departments if services are
to be concealed by these foundations.
Sincerely,
William H. Munroe
Inspector of Buildings
WHM:bms
cc< City Planner
Councillor O'Leary
Electical
Plumbing
qTiiU of
7.13-02213
William H. Munroe
Director of Public Property Maurice M. Martineau, Asst Inspector
Inspector of Buildings Edgar J. Paquin, Asst Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
December 12, !986
,At. M. Stasinos
544 Chestnut Street
Lynn,MA 01904
RE: Highland Acres
Dear Mr. Stasinos;.
Be aware that there is now confusion as to what and how your project
is being built.
Currently you are not developing your Site as per approved plans. Please
resolve this with both the Planning Department and Fire Department . Finally
an approved plan we all will work from must be provided to this department
for our use in our inpection and permit services.
Further you should be aware that no permits are now in place for Buildings
/17, 8, and 12, where there now exist foundations.
Make immediate application to this department for the needed permits . Failure
to comply ..
1 stop work order on these Buildings.
wil rasult _.. .. Op ..
.Also be aware that because of the discrepancy of the Site plan, no further
pb. :mits will be approved by this department
Should you have any questions in regards to this letter or any other area
of which we may be of assistance, feel free to contact us.
Respectfully,
gar J aquina^�'
u ' lding�spector
EJP/laf
r
CC:. L. Mroz Received by date j 4
City Clerk
Councillor Delivered by �C��-���_ date
Fire Inspector
Planning Dept . Witnessed by -date �a ,
File
CITY OF SALEM,, G1ASSACHUSETTS
C.T.Y PLANNER �{ �„� I '.i : i ,..._._. .. . ., ... 01970
�;�'�iw�•l:r (617)744.4580
January 20, 1987
Mr. William Munroe
Building Inspector
One Salem Green
Salem, MA 01970
Dear Bill:
Five months ago, a Consent Judgment was handed down by the Superior
Court regarding the so—called Stasinos project located at 394 Highland
Avenue. I am writing to you to request that certain conditions of that
Judgment be addressed because of the lack of compliance which currently
exists.
First of all, the developer has been required to deed to the City a
4. 1 acre parcel of land following the construction of soccer fields.
Obviously, we do not want the parcel deeded over until the required
improvements are completed. It would be advisable, though, to do the
following:
1. Request that the developer submit a detailed site plan of the
proposed improvements, including the fields , parking, and
landscaping for review and approval;
2. Request that the developer, upon approval of the plan,
immediately begin to construct such improvements; and
3 . Request that the developer execute an agreement with the City
specifying the timetable for the above steps.
In addition, the site plan was reviewed and approved by the City,
but the developer is now proposing changes in the approved plan. There
are several site design alterations proposed which must be reviewed and
approved again. In this regard, my specific concern relates to the
proposed internal vehicular circulation system in which several
improvements to provide adequate fire access have been eliminated.
These changes should be addressed, and a final decision should be made
regarding the adequacy of the altered plan.
Finally, the developer is required to complete a neighborhood
review process. Because of the above amendments to the plan, I believe
that the developer should hold an additional neighborhood meeting to
review the current status of the project, and make certain that all
concerns of the neighbors are fully addressed. This meeting should take
place immediately.
I would respectfully request that you require these issues to be
resolved to our satisfaction immediately. If that cannot be done, I
would recommend that building permits be revoked.
Thank you for your cooperation in this matter.
Sinc r ly
Gerar Kavanaugh
Cit y/,lam// er
3563
cc: Leonard F. O'Leary
City Council President
NICHOLAS G . CURUBI' - - "-
February 3, 198V V
WILLIAM H. MUNROE , Inspector, /
Public Property Department
Building Department, City of Salem,
One Salem Green
Salem, MA. , 01970
Dear Mr. Munroe: Re: _394 Highland Ave. , Salem
Consent Judgment
Your letter of January 23 , 1987 , was referred to
my office, resulting in a conference with Mr. Stasinos ,
the developer.
The matters set forth in your letter, needing an
answer, were discussed.
No major changes were made in the original plan sub-
mitted to the City Engineer and approved by all concerned
departments. The minor changes , not contravening the inte-
grity of the original plan, were to minimize the impact
of the necessary blasting to the neighborhood.
The developer intends to comply with said original
plan; and, he intends to proceed without any changes.
Therefore, no revised site plan is contemplated,
requiring a neighborhood meeting.
.A copy of the approved general plan will be submitted
to your office for your files .
Very truly yours ,
Nich 1 s G. Curuby
NGC/
cc: Planning Department
City of Salem
Ott II MIL111� Cc�55c�LI11IPfS
Q.h,r alrm t irrni
7.15-112113
William H. Munroe
Director of Public Property ;Maurice M. Martineau. Asst Inspector
Inspector of Buildings Edgar J. Paquin, Asst Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
January 23, 1987
.Mr. Mike Stasino
544 Chestnut Street
Lynn, Ma 01904
RE: Superior Court Consent Judgement
394 Highland Avenue, Salem, MA
Dear Mr. Stasino,
It has been brought to my attention that there has been a lack of compliance
with certain conditions of the Superior Court. Consent Judgement that effect's
your property located at 394 Highland Avenue.
In order for this department to continue issuing Building Permits for your
project I must insist that you give the following your immediate attention.
1 . Submit a detailed site plan of the proposed soccer field's improvements
including field's, parking and landscaping for review and approval.
2. Immediately upon approval of the plan's, start construction on these
improvements.
3. That an agreement with the City of Salem must be executed specifying ,
the time-table for the above steps.
4 . That a revised site plan be submitted for the entire project indicating
changes you are proposing from the plan previously approved by the
City of Salem. These changes must be addressed and final approval
granted by. the City of Salem prior to proceeding with any plan change.
5. If changes are proposed in the site plan, a neighborhood meeting must
be held immediately to review the current status of the project and to
make certain that all concern's of the neighbor' s are fully addressed.
No further Building Permits will be issued for this project until these matters
have been resolo satisfaction of the City of Salem.
Delivered by: Sincerel
WHM/eaf L .• .._
Received by: William H. Munroe
Inspector of Buildings
C.C. Mayor Salvo
Council President O'Leary
City Solictor
r� Gttu cf ;$Ulpllt, .411c�55c C Li5�tt5
(Onr nlrm (6rrrn
7.15-0213
William H. Munroe
Director of Public Property Maurice M. Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
February 13, 1987
To the Honorable City Council
City of Salem
RE: Court Judgement, 394 Highland Ave.
Ladies & Gentlemen:
In response to the Council Order of January 27, 1987 regarding the
Court Judgement for property located at 394 Highland Avenue, I respectfully
submit the following.
Approval of the various sections of the conditions set forth lies with
the various Boards and Departments as specified. The only reference to the
Building Department being in Condition 2.0 which states that, "the City
Planner shall submit a written statement. of satisfaction of all such conditions
to the Building Inspector, City of Salem prior to the issuance of a Building
Permit."
In a letter dated October 21 , 1986 I was advised by the City Planner that
all conditions of the Consent Judgement had been met and that permits could be
issued. Based on this, permits requested were honored by this Department.
In a follow-up letter, dated January 20, 1987, I was advised by the City
Planner that, "certain conditions of the Judgement be addressed because of the
lack of compliance which currently exists." On January 23, 1987, a letter was
hand delivered to Mr. Cris Stasinos,at the development site, outlining the City's
concerns and advising the developer that "no further Building Permits will be
issued for this project until these matters have been resolved to the satisfaction
of the City of Salem." This order still stands and will remain in effect until
such time as I am advised by the City Planner that all conditions have been met.
Respectfully,
William H. Munroe
Inspector of Buildings
;IHM: bms
Cc: Councillor O'Leary
MTV OF SA' CP,f fC6QOArIJIIOCTTO-, '
V11 � u LLIM� IJ VVfIVI\V Vtt i_V..
L;-.Y PLANNERS.
01970
(617(744.4580
February 24, 1987
Mr. William Munroe
Building Inspector
City of Salem
One Salem Green
Salem, MA 01970
Dear Bill:
Today Mike Stasinos submitted a new site plan to my office
for his development at 394 Highland Ave. which includes replacement
of some 6-unit buildings with 8-unit buildings among other changes.
Until this plan is reviewed and approved, I hereby request that you
revoke all existing building permits and not issue any new permits.
Thank you for your assistance.
Si 17,
Geraljd Ka a ugh
City/P1 n r
cc: Mike Stasinos
Eau
7.15-U=13
William H. Munroe
Director of Public Property Maurice M. Martineau, Asst Inspector
Inspector of Buildings Edgar J. Paquin, Asst Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
February 25, 1987
Mr. Mike Stasinos
544 Chestnut Street
Lynn, MA 01904
RE: Stop Work Order, .394 Highland Avenue, Salem
Dear Mr. Stasinos:
I have been informed by the City Planner that you have submitted a
new Site Plan,for. review and approval, to his office.
I would call your attention to Section 115.3 of the Massachusetts
State Building Code which states, in part, "A lot or site shall not be
changed from that shown on the official site plan unless a revised plan
showing such changes shall have been filed and approved."
Until this matter is resolved I .must insist all work on this project
cease immediately upon your receipt of this Order.
Failure to comply with this Order will leave me no alternative but
to initiate the appropriate legal action. Be advised that conviction of
violation of the Massachusetts State Building Code carries a fine, not to
exceed One Thousand dollars ($1 ,000) a day for each violation and each day
the violation continues is a separate offense.
Sincerely,
William H. Munroe
Inspector of Buildings
tdhT1:bms
cc: City Clerk
Council President
City Solicitor
City Planner
CITY OF SALEM, MASSACHUSETTS
m unn. n ncn.nr..-.
CITY PLANNER " __ 01970
Isltl 74e-45e9
uvs
October 21 , 1986
Mr. William Munroe
Building Inspector
City of Salem
One Salem Green
Salem, MA 01970
Dear Bill :
Mike Stasinos has now met all the conditions of the Consent
Judgement (as revised per the October 15, 1986 Board of Appeal Meeting) .
As a result, a building permit can be issued.
If you have any questions, please call me.
SieePely
JGeracd-X-a�"v-anaugh
City Plainer/
bn622
v
STASINO''S PROJECT
10/23/86 11715 1 Spring Pond Road Office Bld. inconjuction with
project
10/24/86 716 IA Indian Hill Lane Erect dwelling
10/24/86 717 1B Indian Hill Lane Erect dwelling
10/24/86 718 IC Indian Hill Lane "
10/24/86 719 1D Indian Hill Lane "
10/24/86 720 3A Indian Hill Lane "
10/24/86 721 3B Indian Hill Lane "
10/24/86 722 3C Indian Hill Lane "
10/24/86 723 3D Indian Hill Lane
10/24/86 724 3E Indian Hill Lane "
10/24/86 725 3F Indian Hill Lane "
10/24/86 726 4A Indian Hill Lane "
10/24/86 727 4B Indian Hill Lane "
10/24/86 728 4C Indian Hill Lane "
10/24/86 729 4D Indian Hill Lane
10/24/86 732 2A Indian Hill Lane "
10/24/86 733 2B Indian Hill Lane "
10/24/86 734 2C Indian Hill Lane "
10/24/86 735 2D Indian Hill Lane
10/24/86 736 2E Indian Hill Lane
10/24/86 737 2F Indian Hill Lane "
STASINO' S PROJECT
10/24/86 11738 2D Overlook Lane Erect Dwelling
10/24/86 739 2C Overlook Lane " I
10/24/86 740 2B Overlook Lane
10/24/86 741 2A Overlook Lane "
10/24/86 742 IA Overlook Lane "
10/24/86 743 1B Overlook Lane
10/24/86 744 IC Overlook Lane "
10/24/86 745 ID Overlook Lane "
10/24/86 746 IE Overlook Lane "
10/24/86 747 IF Overlook Lane " "
PETER F D=MEO AssocrmrEs, Ir4c. AA,CHITECTV1i,E 3P1LANN7NC3
346 MAIN STREET . STONIHAM. MASSACHUSETTS 02190 TCtf ► H0 NC 438.0900
May 18, 1990
Building Department
City of Salem
One Salem Green
Salem, MA . 01970
Attention : Mr. William Munroe
Re: HIGHLAND ACRES
394 HIGHLAND AVENUE, SALEM, MASS.
Dear Mr. Munroe:
I , PETER F. DI MEO, Registration No. 1665, being a Registered
Architect hereby certify that I have prepared or directly supervised
the preparation of all design plans, computations and specifications
for the above-referenced project and that, to the best of my
knowledge , such plans , computations and specifications meet the
applicable provisions of the Massachusetts State Building Code, all
acceptable engineering practices and applicable laws and ordinances
for the proposed use and occupancy .
I further certify that I shall perform the necessary professional
services and be present on the construction site on a regular and
periodic basis to determine that the work is proceeding in accordance
with the documents approved for the Building Permit .
Sincerely ,
PETER F=. 1E0 ASSOCIATES , INC. G\S�tRED-ARcyl
eft O for
l u
BY: 1 �/ 3 a No. 1665 0 y
Peter F. Di eo, AIA STMASSpM `F
w�/
r
+,COW CtV of ttl�nt, Ctts$ttrl�u3E##8
e j Public 'Property Department
'�J��OIMML +'4v lunilbinq pepartment
tlDne linlem VI)reen
7•IS-ort3
William H. Munroe
Director of Public Property Maurice M. Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. Leclerc, Plumbing/Gas Insp.
October 5, 1987
Mr. Mike Stasinos
The Highland Condominium at Salem
394 Highland Avenue
Salem, Ma. 01970
RE: Extension of Building Permits
Dear Mike,
I have discussed your request for extensions of building permits
with Mr. Munroe. This letter is to inform you that your request for
a six (6) month extension has been granted.
I have enclosed a photo copy of your original letter of request.
These are the units and permits that we are extending at this time.
Sincerely,
Stephen W. an zy f�
As Buil ing Spector
CC: Planning Dept.
Engineer
Electrical
Fire Dept.
ENC.
r
r
a
Mr. William H. Munroe
Page -4-
September 28 1987
BUILDING UNIT
NO. NO. STREET ADDRESS PERMIT NO.
24. . . 2406. . . 38 LIONS LANE. . . . . . . 285
24. . . . . 2405. . . 40 LIONS LANE. . . . . . . 286
24. . . . . . 2404. . . 42 LIONS LANE. . . . . 287
24 . . . . . . 2403. . . 44 LIONS LANE. . . . . 288
24. . . . . . 2402. . . 46 LIONS LANE. . . . . . . 289
24 . . . . . . 2401. . . 48 LIONS LANE. . . . . . . 290
25. . . . . 2501. . . 9 CARRIAGE HILL LANE . . . 291
25. . . . . . 2502. . 11 CARRIAGE HILL LANE. . . 292
25. . . . . 2503. . . 13 CARRIAGE HILL LANE. . . 293
25. . . . . . 2504. . . 15 CARRIAGE HILL LANE. . . 294
25. . . . . . 2505. . . 17 CARRIAGE HILL LANE. . . 295
25. . . . . . 2506. . . 19 CARRIAGE HILL LANE. . . 296
26. . . . . . 2601 . . 1 CARRIAGE HILL LANE. . . 297
26. . . . . 2602 . . 3 CARRIAGE HILL LANE. . . 298
26. . . . . 2603 . . . 5 CARRIAGE HILL LANE. . . 299
26. . . . . 2604. . .7 CARRIAGE HILL LANE. . . 300
Your kind attention to this request is greatly
appreciated.
Very truly yours ,
SALEM HIGHLAND D ELOPMENT CORP.
BY:
Mi a Stasinos
President
IJS:.caj
NICHOLAS G . CURUBY
Auqust 28, 1986
William H. Munroe, Commissioner
Salem Building Department, 3
One Salem Green Re: Highland Avenue Development
Salem, MA. , 01970 Salem Highland Avenue Development Corp.
Dear Conmissioner Munroe:
Be advised that the Developer of the above-listed project
is undertaking to proceed with the preparatory and develop Iat
construction work. Said work will done at the risk of the Developer.
Should it be determined that additional work and/or changes
must be made, the Developer shall do so under your instruction
and hold the City of Salem and the Salem Building Department harm-
less from any and all claims of liability.
Very truly yours
•D � J
Mike Stasinos, President
f
CITYCITY nt: CA LE" or, ncSnrunocT"
UI on "111, 111Ptu mu11u V." lu
C.iY PLANNERJ i �` -• y �U1970� __..
:,y�, <Yp/]"I ClS 1 (617) 744-4580
��WfT
September 10, 1986
Mr. William Munroe
Building Inspector
City of Salem
One Salem Green
Salem, Ma. 01970
Re: Stasinos Project, 394 Highland Avenue
Dear Bill:
As required by the Consent Judgement, I have reviewed the proposed
plans for the above—mentioned project and find that Mike Stasinos has
met the following conditions:
1 . submittal of preliminary plans to the appropriate boards (d)
2. submittal of Environmental Impact Statement to the Board of
Appeal (f)
3 . compliance with design standards for streets, easements , open
spaces and protection of natural features as set forth in
' Sections IV & V of the Sub—division Regulations and approved by
the City Planner (h)
4. compliance with required improvements as set forth in Section IV
& V of the Sub—division Regulations as per review on Thursday,
Sept. 4th with Paul Niman, Bill Munroe, Bob Turner, myself and
Tom Rouleau (electrical plans still to be reviewed) ( i)
5 . establishment of 200' buffer zone (visual impact of development
on abutting neighborhood as yet to be assessed) (o)
6. submittal of all water, sewer and drainage improvements to the
Director of Public Services, approval of which is expected
within the next day (r)
7 . submittal of plans to the Director of Public Services for
assessment of impact on infrastructure services, which approval
is expected within the next day ( s)
2. 4. 1 acres of land must be deeded to City for soccer field as
shown on site plan (b)
3 . City Planner must select a qualified engineer to serve as Clerk
of the Works (c)
4. revised definitive plan must be submitted to Board of Appeal
(plan currently in their possession does not reflect changes as
of Sept. 4th) (e)
5. performance bond must be submitted to the City Solicitor (g)
o. neighborhood review process must be completed (j)
7. Covenant must be executed to prohibit construction on any other
portion of the property except portion utilized for 140
condominium units and the 3,000 s. f. office building (m)
8. all exterior building designs, building locations, lighting,
landscaping, infrastructure, site planning and design elements
must be approved by the Board of. Appeal and City Planner (n)
9. current foundation and building permits must be relinquished (q)
10. drainage and wetland impact must be reviewed and approved by
the Conservation Commission (on Sept. 11th agenda) (r)
11 . street names must be officially approved
While some further issues need to be resolved, the cooperation we
have received to date from Mike Stasinos leads me to recommend that a
building permit be issued for a small percentage of the total project.
This permit would be granted with the understanding on Stasinos's part
that he would comply with any changes that may be required at a later
date to meet the conditions of the Consent Judgement even if such
changes affect work already undertaken.
Sincefely,
Gerard Kavanaugh
City Planner
(�'
r
Of
C 1 t
OTIILJ O J�I�LI11, �11c�55c�C�iLI5EfI5
Our �i nlvnt 6rrrtt
� ts-uz to
William H. Munroe
Director of Public Property Maurice M. Martineau, Asst Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
September 12, 1986
Mike Stasinos, President
Highland Avenue Development Corp.
Off 394 Highland Avr'r
Salem, MA 01970
RE: Temporary Building Permits
Dear Mr. Stasinos:
Due to the fact that several issues remain to be resolved regarding your
property located off 394 Highland Ave. ( i.e. street names, neighborhood meeting,
etc. ) prior to the issuance of Building Permits, this office cannot issue the
permits presently applied for.
However, in view of your letter dated August 28, 1986 in which you state
that work undertaken prior to receipt of all necessary approvals will be done
at the risk of the developer, and City Planner, Gerard Kavanaugh's letter of
_ September 10, 1986 recommending that due to your cooperation, permits be issued
for a small percentage of the project, this office agrees to the following:
1 . Work may commence on the three thousand (3000) square foot
building to be used as your construction office; `
2. Work may commence on one (1 ) six (6) unit building.
I will again remind you that this work is undertaken at your risk and that
foundations for these buildings will not be backfilled without the approval of
this department, as well as electrical and plumbing departments if services are
to be concealed by these foundations.
Sincerely,
William H. Munroe
Inspector of Buildings
S•1HM:bms
ccc City Planner
Councillor O' Leary
Electical
Plumbing
I
CITY OF SALEM, C^ASSACHUSETTS
Li.E Sh Li:,i Gnat,.
LITY FLANNER01970
*L lw' ,. � "S•
(617)744-4580
e
October 21 , 1986
Mr. William Munroe
Building Inspector
City of Salem
One Salem Green
Salem, MA 01970
Dear Bill :
Mike Stasinos has now met all the conditions of the Consent
Judgement (as revised per the October 15, 1986 Board of Appeal Meeting) .
As a result, a building permit can be issued.
If you have any questions, please call me.
S i)Scete 1 y,
y
JG//erai d-ZCavanaugh
City Planner/
bn622 (/
r
t
i !yil�J Tr 4 �� v� ZSclrl �i, �cf
7t3-0213
William H. Munroe
Director of Public Property Maurice h1. Aiartincau, Asst Inspector
Inspector of Buildings Edgar J. Paquin, Asst Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
December 12, !986
Mr. M. Stasinos
544 Chestnut Street
Lynn,MA 01904
RE: Highland Acres
Dear Mr. Stasinos;
Be aware that there is now confusion as to what and how your project
is being built.
Currently you are not developing your Site as per approved plans. Please
resolve this with both the Planning Department and Fire Department . Finally
an approved plan we all will work from must be provided to this department
for our use in our inpection and permit services .
Further you should be aware that no permits are now in place for buildings
117, 8, and 12, where there now exist foundations .
Make immediate application to this department for the needed permits . Failure
= ll result 4n :top -k order on
iu cvmp.y w. these Buildings .
...,_
%lso be aware that because of the discrepancy of the Site plan, no further
pbrmits will be approved by this department
Should you have any questions in regards_ to this letter or any other area
of which we may be of assistance, feel free to contact us.
Respectfully
,
igar J ' 7p�aquin
Aj°... udldingJ/nspector
EJP/laf J
CC: L. Mroz Received by `' date I
City Clerk
Councillor Delivered by � ��_ date
Fire Inspector
Planning Dept . Witnessed by -date
File
CITY OF SALEW,, 1`"A%S0,ACNut JSETTI'
C•TY PLANNER �9!'�` I :,i t i -. _. .. . _ ,.. 01970
(617)744-4580
January 20, 1987
Mr. William Munroe
Building Inspector
One Salem Green
Salem, MA 01970
Dear Bill :
Five months ago, a Consent Judgment was handed down by the Superior
Court regarding the so-called Stasinos project located at 394 Highland
Avenue. I am writing to you to request that certain conditions of that
Judgment be addressed because of the lack of compliance which currently
exists.
First of all, the developer has been required to deed to the City a
4. 1 acre parcel of land following the construction of soccer fields.
Obviously, we do not want the parcel deeded over until the required
improvements are completed. It would be advisable, though, to do the
following:
1. Request that the developer submit a detailed site plan of the
proposed improvements, including the fields, parking, and
landscaping for review and approval;
2. Request that the developer, upon approval of the plan,
immediately begin to construct such improvements; and
3 . Request that the developer execute an agreement with the City
specifying the timetable for the above steps.
In addition, the site plan was reviewed and approved by the City,
but the developer is now proposing changes in the approved plan. There
are several site design alterations proposed which must be reviewed and
approved again. In this regard, my specific concern relates to the
proposed internal vehicular circulation system in which several
improvements to provide adequate fire access have been eliminated.
These changes should be addressed, and a final decision should be made
regarding the adequacy of the altered plan.
Finally, the developer is required to complete a neighborhood
review process. Because of the above amendments to the plan, I believe
that the developer should hold an additional neighborhood meeting to
review the current status of the project, and make certain that all
concerns of the neighbors are fully addressed. This meeting should take
place immediately.
I would respectfully request that you require these issues to be
resolved to our satisfaction immediately. If that cannot be done, I
would recommend that building permits be revoked.
Thank you for your cooperation in this matter.
h
Sincere.1y 1
i
i
i�
Gerard Kavanaugh
City lanner
3563
cc: Leonard F. O'Leary
City Council President
/j L:tju of c�11L`llt, C c 55c�L�T�I5Eff5
v.mr _aicm tr�rrrtt
7.13-0213
\Villiam H. Munroe
Director of Public Property Maurice M. Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
January 23, 1987
.Mr. Mike Stasino
544 Chestnut Street
Lynn, Ma 01904
RE: Superior Court Consent Judgement
394 Highland Avenue, Salem, MA
Dear Mr. Stasino,
It has been brought to my attention that there has been a lack of compliance
with certain conditions of the Superior Court. Consent Judgement that effect's
your property located at 394 Highland Avenue.
In order for this department to continue issuing Building Permits for your
project I must insist that you give the following your immediate attention.
1 . Submit a detailed site plan of the proposed soccer field's improvements
including field's, parking and landscaping for review and approval.
2. Immediately upon approval of the plan's, start construction on these
improvements.
3. That an agreement with the City of Salem must be executed specifying
the time-table for the above steps.
4 . That a revised site plan be submitted for the entire project indicating
changes you are proposing from the plan previously approved by the
City of Salem. These changes must be addressed and final approval
granted by. the City of Salem prior to proceeding with any plan change.
5 . If changes are proposed in the site plan, a neighborhood meeting must
be held immediately to review the current status of the project and to
make certain that all concern' s of the neighbor' s are fully addressed.
No further Building Permits will be issued for this project until these matters
have been resole o satisfaction of the City of Salem.
Delivered by: ti —r Sincerely, .Z ,Fr
WHM/ea£ ___��
Received by: tom— William H. Munroe
Inspector of Buildings
C.C. Mayor Sal vo
Co,incil President O'Leary
City Solictor
f
February 3 , 198
WILLIAM H. MUNROE , Inspector,
Public Property Department
Building Department, City of Salem,
One Salem Green
Salem, MA. , 01970
Dear Mr. Munroe: Re: 394 Highland Ave. , Salem
Consent Judgment
Your letter of January 23 , 1987 , was referred to
my office, resulting in a conference with Mr. Stasinos ,
the developer.
The matters set forth in your letter, needing an
answer , were discussed.
No major changes were made in the original plan sub-
mitted to the City Engineer and approved by all concerned
departments . The minor changes , not contravening the inte-
grity of the original plan, were to minimize the impact
of the necessary blasting to the neighborhood.
The developer intends to comply with said original
plan; and, he intends to proceed without any changes .
Therefore, no revised site plan is contemplated,
requiring a neighborhood meeting.
A copy of the approved general plan will be submitted
to your office for your files .
Very truly yours ,
o
Nich 1 , G. Curuby
NGC/ vvv
cc: Planning Department
City of Salem
PETER F. DIMEO ASSOCIATES, INC. ARCIiITECTTJAE PLANNING
546 M A IN S T R E E T . STONE HAM . M A 5 S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 436-0900
October 15, 1986
Building Department
City of Salem
1 Salem Green Street
Salem, Ma. 01970
Attn : Mr. Y!i I I iam Munroe
RE: Highland Acres
394 Highland Avenue
Sa I em , Ma.
Gentlemen:
r This letter is to certify that we have inspected the footings and foundation
walls for Buildings NumL•er One through Nine, at the above referenced Develop-
ment, and found all work to be in conformance with The Massachusetts State
Building Code and drawings provided by this office.
Sincerely,
PET F. DIMEO ASSOCIATES , INC.
Peter F. CWeo
Registered Architect
FFD/rkk
T
' PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN 5T RE E T . ST 0 N E H A M . MA55ACHU5E T T5 02160 TEEEPH0NE 478-0900
Building Department
City of Salem
Page -3-
May 29 , 1987
BUILDING #7. . 6 UNITS "B" TYPE (continued) :
inspection when the work is completed.
BUILDING #8. .4 UNITS "A" TYPE:
1. Roof Shingles - 100% completed.
2. First floor - concrete slab installed.
3. Rough Interior Partitioning - 80% completed.
4. Rough Plumbing - 80% completed.
5. Rough Heating - 80% completed.
6 . Rough Electrical - 80% completed.
BUILDING #9. . 6 UNITS "B" TYPE:
1. Concrete Foundation - 100% completed.
2. Concrete block party walls to second floor completed.
3. wood framing commenced today.
BUILDING #10 . 4 UNITS "A" TYPE:
1. Concrete footing completed.
2 . Forming for concrete walls commenced.
BUILDING #11 . 4 UNITS "B" TYPE:
1.+ Foundation completed.
2. Concrete block party walls completed.
3. Framing completed.
4 . Interior partitioning - 80% completed.
PETER F. MMEO ASSOCIATES, INC. AELCMXTECTLTRE PLANNING
546 MAIN STREET . ST 0NEHAM . MASSACHUSETTS 02180 TELEPHONE 43 8-09 00
Building Department
City of Salem
Page -4-
May 29, 1987
BUILDING #12. . 6 UNITS "A" TYPE:
1. Roof Shingles - 100% completed.
2. Exterior siding - 25% completed.
3. Interior partitioning - 80% completed.
4. Rough Plumbing - 80% completed.
5. Rough Heating - 80% completed.
6. Rough Electrical - 80% completed.
Very truly yours,
PETER F. DI MEO ASSOCCJIATES, INC.
PeterF. DiMeo
PFD:caj
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE" ,'',F AkTNING
546 MAIN STREET . ST 0NEHAM . M A 5 5 A C H U S E T TS 02190 TELEPHONE 43 8-09 00
Mav 297 1987
CITY 0 ... L'= iJ:11;ss.
Building Department
City of Salem
One Salem Green
Salem, MA. 01970
Attention: Mr. William Munroe
Re: HIGHLAND ACRES
394 HIGHLAND AVENUE
SALEM, MASSACHUSETTS
Dear Mr. Munroe:
We have inspected the entire condominium development
at the above address on May 29, 1987 , and the condition of the
development, which includes Buildings numbered 1 through 12,
are as follows:
BUILDING #1. . 4 UNITS "B" TYPE:
Three (3) units have Certificates of Occupancy and
Unit #104 is ready for a Certificate of Occupancy.
BUILDING #2. . 6 UNITS "B" TYPE:
Four (4) units have Certificates of Occupancy and
Units #201 and #206 will be ready for Certificates of
Occupancy in approximately one week.
BUILDING #3. . 4 UNITS "A" TYPE:
1. Siding is completed.
2. Exterior Painting completed.
3. Sheetrock completed.
4. Interior finish on two (2) units completed.
5. Interior prime coat of paint completed on two (2) units.
PETER F. MMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET , S 0NEHAM . MASSACHUSETTS 02180 TELEBH0NE 438-0900
Building Department
City of Salem
Page -2-
May 29, 1987
3UILDIIIG #4. . 6 UNITS "A" TYPE:
1. Exterior painting completed.
2. Finish trim and doors completed.
3. I:itchen cabinets and vanities installed.
4 . Plumbing completed.
5 . Electrical completed.
BUILDING #5. . 4 UNITS "B" TYPE:
1. Exterior painted completed.
2. Interior finish - 100% completed.
3. Interior prime coat of paint completed.
4 . Finish plumbing completed.
5 . Finish electrical - 50% completed.
BUILDING #6 . . 6 UNITS "A" TYPE:
Completed with exception of the following:
A. Second coat of interior paint.
B. Interior Handrails .
BUILDING #7. . . 6 UNITS "B" TYPE:
1. Rough plumbing completed.
2. Rough electrical completed.
3. Rough heating completed.
Building is ready to receive insulation and sheetrock.
N')TE: Units #703 and #704 - A roof truss in each unit, which
i3 adjacent to the concrete block party wall, have sections ,of
the 2" x 4" truss members cut by the chimney flue installer.
We have instructed Bill Katsapetses, of Salem Highland Development
Corporation, on how to repair the roof trusses and to secure the
roof framing in this area. He will call this office for an
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T . 5 TON E HAM . M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L E P H O N E 438-0900
Building Department
City of Salem
Page -3-
July 6, 1987
BUILDI14G #11 . 4 UNITS "B" TYPE:
1. Interior partitioning - 80% completed.
2. Exterior siding completed.
3. Rough Plumbing - 80% completed.
4. Rough Heating - 80% completed.
5. Rough Electrical - 80% completed.
BUILDING #12 . 6 UNITS "A" TYPE:
1. Installation of insulation - 100% completed.
'. Sheetrock - 100% completed.
3. Exterior siding - 95% completed.
4 . Interior partitioning - 100% completed.
5. Rough Plumbing - 100% completed.
6. Rough Heating - 100% completed.
7 . Rough Electrical - 100% completed.
BUILDING #13 . 6 UNITS "'B" TYPE:
1. Concrete footing completed.
2. Concrete foundation walls - 60% completed.
Very truly yours,
PETE F. DI O ESSOCIAES , INC.
BY:
Peter o
PFD: caj
PETER F. DIMEO ASSOCIATES, INC. A3KQ1-iITECTi'FRE PLANNING
546 MAIN STREET , STONE HAM . MASSACHUSETTS 02180 TE L PHONE 438-0900
July 6, 1987 F, C ii'iiD
CITY Cr
Building Department
City of Salem
One Salem Green
Salem, MA. 01970
Attention: Mr. William Munroe
Re: HIGHLAND ACRES
394 HIGHLAND AVENUE
SALEM, MASSACHUSETTS
Dear Mr. Munroe:
We have inspected the entire condominium development
at the above address on July 3, 1987 , and the condition of the
development, which includes Buildings numbered 1 through 13,
are as follows :
BUILDING #1. . 4 UNITS "B" TYPE:
Signed off by Building Department and occupied.
BUILDING #2. . . . 6 UNITS IIBII TYPE:
Signed off by Building Department and occupied.
BUILDING #3. . 4 UNITS "A" TYPE:
Signed off by Building Department and occupied.
BUILDING #4. . 6 UNITS "A" TYPE:
Signed off by Building Department and occupied.
BUILDING #5. . 4 UNITS "B" TYPE:
Signed off by Building Department and occupied.
BUILDING #6. . 6 UNITS "A" TYPE:
Five (5) units signed off by Building Department.
Unit #602 ready for Certification of Occupancy inspection.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T . ST O N E H A M . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 43 8-09 00
Building Department
City of Salem
Page -2-
July 6, 1987
BUILDING #7. . 6 UNITS "B" TYPE:
1. Sheetrock completed.
2. Interior Finish - 50% completed.
3. Interior prime coat completed.
4. Rough plumbing completed.
5. Rough electrical completed.
6. Rough heating completed.
NOTE: Wood trusses between Units numbered 703 and 704 have been
repaired and are structurally secured.
BUILDING #8 . . 4 UNITS "A" TYPE:
1. Installation of insulation completed.
2. Sheetrock started and 25% completed.
3 . Rough interior partitioning - 100% completed.
4 . Rough plumbing - 100% completed.
5 . . Rough Heating - 100% completed.
6 . Rough Electrical - 100% completed.
BUILDING #9. . 6 UNITS "B" TYPE:
1. Concrete block party walls - 80% completed.
2. Wood framing completed to roof trusses.
BUILDING #10 . 4 UNITS "A" TYPE:
1. Concrete foundation completed.
2 . Concrete floor slab completed in all units.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET . STONE HAM , M A 5 S A C H USE T TS 02180 TE L'EFH0 NE 43 8-09 00
Building Department
City of Salem
Page -3-
July 6, 1987
BUILDING #11 . 4 UNITS "B" TYPE:
1. Interior partitioning - 808 completed.
2. Exterior siding completed.
3. Rough Plumbing - 808 completed.
4. Rough Heating - 808 completed.
5. Rough Electrical - 808 completed.
BUILDING #12 . 6 UNITS "A" TYPE:
1. Installation of insulation - 1008 completed.
'. Sheetrock - 1008 completed.
3. Exterior siding - 958 completed.
4 . Interior partitioning - 1008 completed.
5. Rough Plumbing - 1008 completed.
6 . Rough Heating - 1008 completed.
7. Rough Electrical - 1008 completed.
BUILDING #13 . 6 UNITS "B" TYPE:
1. Concrete footing completed.
2. Concrete foundation walls - 608 completed.
Very truly yours,
PETE F. DI OES , INC.
ISESOCIA
BY: \
Peter DiW6
PFD: caj
PETER F. DIMEO ASSOCIATES, INC. ARCMXTECTX73RE PLANNING
546 MAIN STREET , STONE HAM . MASSACHUSETTS 02180 TE L PHONE 438-0900
August 31 , 1987
- -o
Building Department
City of Salem T, —
One Salem Green
Salem, MA. 01970
Attention : Mr. William Munroe _
0T J
Re : HIGHLAND ACRES
394 HIGHLAND AVENUE
SALEM, MASSACHUSETTS
Dear Mr. Munroe :
We have inspected the entire condominium development
at the above address on August 31 , 1987 , and the condition of the
development , which includes Buildings numbered 1 through 14,
are as follows:
BUILDING #1 . . 4 UNITS "B" TYPE:
Signed off by Building Department and occupied.
3UILDING #2. . 6 UNITS "B" TYPE :
Signed off by Building Department and occupied.
BUILDING #3 . . 3 UNITS "A" TYPE :
Signed off by Building Department and occupied.
BUILDING #4. . 6 UNITS "A" TYPE :
Signed off by Building Department and occupied.
BUILDING #5. . 4 UNITS "B" TYPE:
Signed off by Building Department and occupied.
BUILDING #6. . 6 UNITS "A" TYPE:
Signed off by Building Department and occupied.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET , STONEHAM . MASSACHUSETTS 02180 7E L PHONE 478-0900
Building Department
City of Salem
Page -2-
August 31 , 1987
BUILDING #7. . 6 UNITS "B" TYPE :
1 . Interior Finish completed.
2. Interior prime coat completed.
3. Kitchen cabinets and vanities installed.
4. Electrical completed.
5. Plumbing completed.
6. Heating completed.
BUILDING #8. . 4 UNITS "A" TYPE:
1. Sheetrock completed.
2. Interior prime coat completed.
3 . Interior Finish - 50% .completed.
4. Kitchen cabinets and vanities installed.
5. Plumbing completed.
6. Electrical completed.
7. Heating completed.
BUILDING #9 . 6 UNITS "B" TYPE:
1 . Rough Framing and Partitioning completed.
2. Insulation completed.
3 . Rough plumbing completed.
4. Rough electrical completed.
5. Rough heating completed.
6. Sheetrock installed and taping 50% completed.
f
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET . STONEHAM , MASSACHUSETTS 02180 TE l'EPH0NE 438-0900
Building Department
City of Salem
Page -3-
August 31 1987
BUILDING #10. 4 UNITS "A1l TYPE:
1. Rough Framing completed.
2. Windows installed.
3. Roof Shingles completed.
4. Rough Plumbing - 50% completed.
5. Rough Electrical - 50% completed.
6. Rough Heating - 50% completed.
BUILDING #11 . . 4 UNITS "B" TYPE :
1 . Sheetrock - 100% completed.
2. Two (2) units have kitchen cabinets and vanities
installed.
3. Rough Plumbing completed.
4. Rough Electrical completed.
5. Rough Heating completed.
BUILDING #12. . 6 UNITS "All TYPE :
1. Interior finish - 100% completed.
2. Interior prime coat completed.
3. Kitchen cabinets and vanities installed.
4. Finish plumbing - 50% completed.
3. Finish electrical -100% completed.
6. Finish heating - 50% completed.
f .
PETER F. DIA4EO ASSOCIATES, INC. ARCHITECTURE PLANNING
506 MAIN STREET , STONE HAM . MASSACHUSETTS 02180 TE L'EPH0N L' 038-0900
Building Department
City of Salem
Page -4-
August 31, 1987
BUILDING #13 . . 6 UNITS "B" TYPE:
1 . Concrete foundation walls - 100% completed.
2. Underground utilities completed.
3. Concrete floors completed.
3UILDING #14. 6 UNITS "A" TYPE :
1. Footings and foundation completed.
2. Underground utlities completed.
3. Concrete slab floors completed.
Very truly yours,
PET -P. DI MEO SSOCIATES, NC.
BY:
Peter F. DiMeo
PFD: caj
PETER F. DIMEO ASSOCIATES, INC. ARCFIITECT'?R$.; PLANNING
546 M A I N S T R E E T . S TO N E H AM , M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L E P H O N E 4] 8-09 00
uJL
July 24 , 1987 CIT'j ur <.,_- -'•`S
William H. Munroe,
Director of Public Property
Public Property Department
City of Salem
One Salem Green
Salem, 11A. 01970
Re: THE HIGHLAND CONDOMINIUM at SALEM
BUILDINGS numbered 3 , 4 , 5 and 6
Building #3 - 14-16-18-20 INDIAN HILL LANE
Building #4 - 2-4-6-8-10 INDIAN HILL LANE
Building #5 - 2-4-6-8 LONGFELLOW LANE
Building #6 - 1-3-5-7-9-11 LONGFELLOW LANE
Dear Mr. Munroe :
This letter is to inform you that we have made our final
inspection of the buildings numbered 3 , 4, 5 and 6 of the
above-referenced development .
We find that the buildings have been constructed substantially
in accordance with the plans and specifications provided by this
office and in accordance with the State Building Code of the
Commonwealth of Massachusetts and the requirements of the
City of Salem.
Sincerely,
ET F I 1/7,►'//nE�/0 ASSOCIATES, INC.
11-44
Peter F. DiPo
Registered Architect
%i0g41anW
A4 4
COnd0lynnhan at e'aloll
September 15, 1387
William H. Munroe
Director of Public Property _
Public Property Department
City of Salem
One Salem Green
Salem, 11A. 01970 7.
Re : THE HIGHLAND CONDOMINIUM at SALEM
BUILDINGS numbered 7 , 8 , 11 and 12 —'
- BUILDII4G #7 - 1-3-5-7-9-11 TANGLEWOOD LANE
- BUILDING #8 - 13-15-17-19 TANGLEWOOD LANE
- BUILDING #11- 14-16-18-20 TANGLEWOOD LANE
- BUILDING #12- 2-4-G-8-10-12 TANGLEWOOD LANE
Dear Mr. .Munroe :
This letter is to inform you that we have made our final
inspection of the above-referenced buildings at the above
condominium development .
We find that the buildings have been constructed substantially
in accordance with the plans and specifications provided by this
office and in accordance with the State Building Code of the
Commonwealth of Massachusetts and the requirements of the City
of Salem.
Sincerely ,
SALEM HIGHLAND DEV L/OPMENT 'CORP.
BY :
Th as iQ. Katsapefses . 3ftilder
LICENSE NO. 865
One Olde Village Drive, Salem, MA 01970 Phone (617) 741-2003
(Formerly 394 Highland Avenue, Salem, MA 01970)
F
of *ttlem, fflttssar4usP##s
Public Propertg Pepnrtmeut
9
2401MM1 �Muilhhtvq Pepartntent
QDnr -I%nlem 05reen
7.15-0213
William H. Munroe
Director of Public Property Maurice M. Martineau, Asst Inspector
Inspector of Buildings Edgar J. Paquin, Asst Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp,
October 5, 1987
Mr. Mike Stasinos
The Highland Condominium at Salem
399 Highland Avenue
Salem, Ma. 01970
RE: Extension of Building Permits
Dear Mike,
I have discussed your request for extensions of building permits
with Mr. Munroe. This letter is to inform you that your request for
a six (6) month extension has been granted.
I have enclosed a photo copy of your original letter of request.
These are the units and permits that we are extending at this time.
Sincerely,
;Stephen W. an�
�
As Buil ing spector
CC: Planning Dept.
Engineer
Electrical
Fire Dept.
ENC.
r
Mr. William H. Munroe
Page -4-
September 28 1987
BUILDING UNIT
NO. NO. STREET ADDRESS PERMIT NO.
24. 2406. . . 38 LIONS LANE. . . . . . . 285
24 . . . . 2405. 40 LIONS LANE. . . . . . . 286
24. . . . . . 2404. . . 42 LIONS LANE. . . . . 287
24 . . . . . . 2403. . . 44 LIONS LANE. . . . . 288
24. . . . . . 2402. . . 46 LIONS LANE. . . . . . . 289
24 . . . . . . 2401. . . 48 LIONS LANE. . . . . . . 290
25. . . . . . 2501 . . . 9 CARRIAGE HILL LANE . . . 291
25. . . . . . 2502. . 11 CARRIAGE HILL LANE. . . 292
25. . . . . . 2503. . . 13 CARRIAGE HILL LANE. . . 293
25. . . . . . 2504. . . 15 CARRIAGE HILL LANE. . . 294
25. . . . . . 2505. . . 17 CARRIAGE HILL LANE. 295
25. . . . . . 2506. . . 19 CARRIAGE HILL LANE. . 296
26. . . . . . 2601 . . . 1 CARRIAGE HILL LANE. . . 297
26 . . . . . 2602. . .3 CARRIAGE HILL LANE. . . 298
26. . . . . 2603 . . . 5 CARRIAGE HILL LANE. . . 299
26. . . . 2604 . . .7 CARRIAGE HILL LANE. . . 300
Your kind attention to this request is greatly
appreciated.
Very truly yours ,
SALEM HIGHLAN'D D ELOPMENT CORP.
BY:
Mbe Atasin0s
President
IJS:.caj
YYg Man
d c.
4 i
r, i j d•.0
�O111�O171111111111 rlt�'a/c'))���
September 28 , 1987
:Mr. William H. Idunroe
Building Inspector
Building Department
City of Salem
Salem, ASA . 01970
Re: EXTENSION OF BUILDING PERMITS
THE HIGHLAND CONDO-MINIUM AT SALEM
394 HIGHLAND AVENUE, SALEM, MASS .
Dear Air . Munroe :
Request is hereby made that the Building
Permits for the following units at The Highland Condominium
at Salem, 394 Highland Avenue, Salem, Massachusetts, be
, extended for an additional six (6) month period :
BUILDING UNIT
INTO. NO. STREET ADDRESS PEMIT NO.
9. 901 . . . 21 TANGLEWOOD LANE. . . . 206
9. 902 . . . 23 TANGLEWOOD LANE. . . . 207
9 903 . . . 25 TANGLEWOOD LANE. . . . 208
9. . . . . 904 . . . 27 TANGLEWOOD LANE. 209
9. . . . . 905 . . . 29 TANGLEWOOD LANE. 210
9. . . . . 906. . . . 31 TANGLEWOOD LANE. 211
10 . . . . 1001 . . . 28 TANGLEWOOD LANE. 212
10 . . . . 1002 . . . 26 TANGLEWOOD LANE. 213
10 . . 1003 . . . 24 TANGLEWOOD LANE. . . . 214
10 . . 1004 . . . 22 TANGLEWOOD LANE. . 215
13 . . 171306 . . . 12 COUNTRYSIDE LANE . 147
13 . . . . 1305. . . 10 COUNTRYSIDE LANE . 148
13 . . . . 1304 . . . 8 COUNTRYSIDE LANE. . . . 149
13. . . . . 1303 . . . 6 COUNTRYSIDE LANE. 150
13 . . . . 1302 . . . 4 COUNTRYSIDE LANE. 151
13 . . . . 1301 . . . 2 COUNTRYSIDE LANE. 152
14 . . . . 1401 . . . 1 COUNTRYSIDE LANE. 220
14 . . . . 1402 . . . 3 COUNTRYSIDE LANE. . . . 221
14 . . . . 1403 . . . 5 COUNTRYSIDE LANE. .' 222
One O!ce Village Drive, Salem, MA 07970 Phone (617) 74
(former'c ,-94 Highland Avenue, Salem, AIA 07970)
Mr. P7illiam H. ?iunroe
Page -2-
SentemUer 28 , 1987
BUILDING UNIT
N0, NO. - STREET ADDRESS PERMIT NO.
14. 1404 . 7 COUNTRYSIDE LANE. . . . . . . 223
14. . 1405 . . . 9 COUNTRYSIDE LANE. . . . . . . 224
14. . . . . 1406 . 11 COUNTRYSIDE LANE . . . . 225
15. 1501 . 3 OLDE VILLAGE DRIVE . . . . . . 233
15. . 1502 . 5 OLDE VILLAGE DRIVE. . . . 234
15. . 1503 . 7 OLDE VILLAGE DRIVE . . . . . . 235
15.
1504 . 9 OLDE VILLAGE DRIVE: 236
15. . 1505 . 11 OLDE VILLAGE DRIVE .. 237
15. . 1506 . 13 OLDE VILLAGE DRIVE . 238
15. . 1507 . 15 OLDE VILLAGE DRIVE . 239
15. . . . . 1508 . 17 OLDE VILLAGE DRIVE . 240
16. 1601 . 19 OLDE VILLAGE DRIVE . . . . . 241
16. 1602 . 21 OLDE VILLAGE DRIVE . . . 242
16. 1603 . 23 OLDE VILLAGE DRIVE . . . 243
16. . . 1604 . 25 OLDE VILLAGE DRIVE . . . . 244
16. . 1605 . . . 27 OLDE VILLAGE DRIVE . . . 245
16. 1606 . . 29 OLDE VILLAGE DRIVE . . . . . 246
17. 1701 . 2 LIONS LA`1E: . . . . . . . 247
17. 1702 . 4 LIONS LANE. . . . . . . . . . . 248
17. . . . . 1703 . 6 LIONS LANE. 249
17. . . . . 1704 . 8 LIONS LANE. . . . . . . . . . 250
17. . . . . 1705 . 10- LIONS LANE . . . . 251
17. . . . . 1706 . . . 12 LIONS LANE . . . . . . . . . 252
18. 1801 . . . 14 LIONS LANE . . . . . . . . . 253
18. . . . . 1802 . . . 16 LIONS LANE . . . . . . . . . 254
18. . . 1803 . . . 18 LIONS LANE . . . . . . . . 255
18. . . . . 1804 . . . 20 LIONS LANE . . . . . . . . . 256
19. . . 1901 . . . 36 LIONS LANE . . . . . . . . . 264
19. . . . . 1902 . . . 34 LIONS LANE . . . . . . . . . 263
19. . . . . 1903 . . . 32 LIONS LANE . . . . . . . . . 262
19 . . . 1904 . . . 30 LIONS LANE . . . . . . . . . 261
19. . . 1905 . . . 28 LIONS LANE . . . . . . . . . 260
19. . . 1906 . . . 26 LIONS LANE . . . . . . . . . 259
19. . . . . 1907 . . . 24 LIONS LANE . . . . . . . . . 258
19 . . . . . 1908 . . . 22 LIONS LANE . . . . . . . . . 257
?r. jYilliam H. Munroe
Page -3-
September 28 , 1987
BUILDING UNIT
NO. STREET ADDRESS PERMIT NO.
20 . . 2001 . . . 9 LIONS LANE. . . . . . . . 265
20 . . 2002 . 11 LIONS LANE . 266
20 . 2003 . 13 LIONS LANE . . . . . . . 267
20. . 2004 . 15 LIONS LANE . . . . . . 268
20 . . 2005 . 17 LIONS LANE269
E
20. . . . . . 2006 . 19 LIONS LAN . . . . . . . 270
21 . . . 2101. 1 LIONS LANE . . . . . . . 271
21 . . 2102. 3 LIONS LANE. . . . . . . . 272
21 . . . 2103 . 5 LIONS LANE.. . . . . . . 273
21 . . . . . . 2104 . 7 LIONS LANE. . . . . . . . 274
22 . . 2206 . 12 CARRIAGE HILL LANE . . . 275
22. . 2205. . . 10 CARRIAGE HILL LANE . . . 276
22. . 2204. . . 8 CARRIAGE HILL LANE . . . . 277
22. . 2203 . . . 6 CARRIAGE HILL LANE. . . . 278
22. . 2202. . . 4 CARRIAGE HILL LANE . . . . 279
22. . . . . . 2201 . 2 CARRIAGE HILL LANE. . . . 280
23 . . 2301 . . . 14 CARRIAGE HILL LANE . . . 281
23 . . 2302. . . 16 CARRIAGE HILL LANE . . . 282
23.' .'. . 2303 . . . 18 CARRIAGE HILL LANE . . . 283
23 .. . . . . . 2304 . . . 20 CARRIAGE HILL LANE . . . 284
24. . . . . . 2406 . . . 38 LIONS LANE. 285
24. . . 2405. . . 40 LIONS LANE. . . . . . . 286
24 . . . . 2404. . . 42 LIONS LANE. . . . . 287
24 . . . . . . 2403 . . . 44 LIONS LANE. . . . . 288
24 . . . 2402 . . . 46 LIONS LANE. . . . . . . 289
24 . . . . . . 2401 . . . 48 LIONS LANE. . . . . . . 290
25. . 2501 . . . 9 CARRIAGE HILL LANE . . . 291
25. . 2502. . 11 CARRIAGE HILL LANE. . . 292
25 . . . 2503 . . . 13 CARRIAGE HILL LANE. . . 293
25 . . 2504 . . . 15 CARRIAGE HILL LANE. . . 294
25 . . 2505 . . . 17 CARRIAGE HILL LANE. . . 295
25 . . . . . . 2506 . . . 19 CARRIAGE HILL LANE. 296
William H. Vunroe
Page -4-
Seoteirber 28, 1987
BUILDING UNTIT
N0. NO. STREET ADDRESS PERMIT NO.
26 . . . 2601 . . . 1 CARRIAGE HILL LANE . 297
26 . . 2602 . . . 3 CARRIAGE HILL LANE . 298
26 . . 2603 . . . 5 CARRIAGE HILL LANE. 299
26 . . . . . 2604 . . . . 7 CARRIAGE HILL LANE. 300
Your kind attention to this request is greatly
appreciated.
Very truly yours ,
SALEM HIGHLA9D D '=LOP`.4ENT CORP.
BY: / ✓
I1iC;e Stasinos
President
MS : caj
7
PETER F. MMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
506 MAIN ST Y EE T . ST 0NEHAM . MASSACHUSETTS 02180 TELEPHONE 638-0900
Building Department
City of Salem
Page -2-
October 5, 1987
BUILDING #10. . . 4 UNITS "A" TYPE :
1. Rough Framing completed.
2. Windows and doors installed.
3 . Roof Shingles and exterior siding completed with one
coat of stain.
4. Rough Plumbing completed.
5. Rough Electrical completed.
6. Rough Heating completed.
7. Insulation installed .
BUILDING #11 . . . 4 UNITS "B" TYPE :
1 . Four units 100% completed - two units have been signed
off by Building Department and the remmining two
units are ready for final inspection by the Building Department .
BUILDING #12 . . . 6 UNITS "A" TYPE :
Signed off by Building Inspector and 507o occupied.
BUILDING #13 . . . 6 UNITS "B" TYPE :
1 . Concrete foundation walls 100% completed.
2. Underground utilities completed.
3 . Concrete floors completed.
4. Rough framed to second floor plate.
5. Concrete block party walls up to second floor plate.
BUILDING #14 . . . 6 UNITS "A" TYPE :
1 . Footings and foundation complete.
2 . Underground utilities complete.
3 . Concrete slab floors complete .
4. Rough framed to second floor level .
r
PETER F. DIMEO ASSOCIATES, INC. ARCIIITECTVRE PLANNING
546 MAIN STREET . STONEHAM, MASSACHUSETTS 02180 TE IE PHONE 439-0900
Building Department
City of Salem
Page -3-
October 5, 1987
BUILDING #17. . . 6 UNITS "B" TYPE :
1. Footings - 100% completed.
2. Foundation walls - 70% completed.
BUILDING #21 . 4 UNITS :
1 . Footings - 100`/o completed.
4. Foundation - 100% completed.
3 . Underground plumbing and electrical completed .
4 . Interior grading to receive concrete slab floor .
MAIL HOUSE - 72UNITS :
1 . 'Sail house complete except for electrical.
Very truly yours ,
PETER F DI MEO ASSOCIATES, INC.
BY: M 4 - I
Peter F. Di..Se 04 0 ARC&
�S lFc
PFD: caj �6`�Rf 0"W<'\ \
a No.1665 o
O STONEHAM. W
MASS. J
�o2�FA[7'H OF �PSSPv�
PETER F. 13IMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T . S T O N E H A M . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 4 3 6-0900
October 5, 1987
n
-e
Building Department
City of Salem
One Salem Green
Salem, MA. 01970 �
Attention : Mr . William Munroe l ^
Re: HIGHLAND ACRES
394 HIGHLAND AVENUE
SALEM, MASS .
Dear Mr. Munroe :
We have inspected the entire condominium development at
the above address on October 2 , 1987 , and the condition of
the development , which includes Buildings numbered 7 through
14 and Buildings numbered 17 and 21 are as follows :
BUILDING #7. . 6 UNITS "B" TYPE :
Signed off by Building Inspector and 500,10 occupied .
BUILDING #8. . . 4 UNITS "A" TYPE :
Signed off by Building Inspector and 100`10 occupied.
BUILDING #9. . . 6 UNITS "B" TYPE :
1 . Rough Framing and Partitioning completed.
2. Insulation completed.
3 . Rough nlumbing completed.
4. Rough Electrical completed.
5. Rough Heating completed.
6. Sheet rock installed and taping completed.
7. Interior finish - 807o completed.
8. Interior prime coat completed.
9. Kitchen cabinets and vanities installed except for
countertops.
10. Exterior siding completed with one coat of stain .
PETER F. DIMEO ASSOCIATES, INC. AFLCMIXTECTUiLM PLANNING
546 M A I N S T R E E T . ST O N E H A M . M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L-E P H O N E 43 8-09 00
January 20 , 1988
Building Department C „
City of Salem
One Salem Green
Salem, Ma. 01970
Attention: Mr. William Munroe
Re: Highland Acres
394 Highland Avenue
Salem, Ma.
Dear Mr. Munroe:
We have inspected the entire condominium development at the
above address on January 19, 1988, and the condition of the
development, which includes Buildings number 9, 10, 13, 14, 15,
17, 19, 20 and 21 are as follows:
BUILDING #9. 6 UNITS "B" TYPE:
1008 COMPLETED
BUILDING #10. 4 UNITS "A" TYPE:
100% COMPLETED
BUILDING #13. 6 UNITS "B" TYPE:
1 . Siding - 1008 completed.
2. Exterior Painting 1008 completed.
3. Exterior stairs 100% completed.
4. Drywall 1008 completed.
5. Interior Finish 508 completed.
6. Rough Plumbing, Heating and Electrical 1008 completed.
BUILDING #14. 6 UNITS "A" TYPE:
1 . Rough framing 1008 completed.
2. Roof shingles 1008 completed.
3. Exterior windows and doors installed.
4. Rough Plumbing, Heating and Electrical 1008 completed.
5. Insulation started.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T . 5 TO N E H AM . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 4 3 8-0900
Building Department
City of Salem
Re; Highland Acres
Page 2.
January 20, 1988
BUILDING #15. 6 UNITS "B" TYPE:
1 . Rough framing 100% completed.
2. Roof shingles 100% completed.
3. Exterior windows and doors installed.
4. Rough Plumbing, Heating and Electrical 100% completed.
5. Insulation started.
BUILDING #17. 6 UNITS "B" TYPE:
1 . Exterior framing 100% completed.
2. Interior Partitions 50% installed.
3. Rough Plumbing and Heating 508 completed.
4. Roof Shingles 75% installed.
BUILDING #19. 6 UNITS "A" TYPE:
1 . Foundation 100% completed.
2. Interior grading ready to receive concrete slab floor.
3. Rough exterior grading 1008 completed.
BUILDING #20. 6 UNITS "A" TYPE:
1 . Foundation 100% completed.
2. Interior grading ready to receive concrete slab floor.
3. Rough exterior grading 1008 complete.
PETER F. MMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MA I N STREET . ST ONE H AM . M A 5 5 A C H U S E T T S 0 2 1 9 0 T E L P H O N L' 43 B-0900
Building Department
City of Salem
Re: Highland Acres
Page 3.
January 20, 1988
BUILDING #21 . 4 UNITS "A" TYPE:
1 . Rough framing 1008 completed.
2. Interior partitions 508 completed.
All work is progressing satisfactory in accordance with drawings
provided by this office.
If there are any questions regarding any of the above, please do
not hesitate to contact this office.
Sincerely,
RZTER F. DIMEOkSSOCIATES, INC.
Peter F. DiMeo, AIA
PFD/rkk
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN 5T REE T , ST ONEHAM . MA55ACHU5ET T5 02180 T E L E P H 0 N L 43 8-09 00
Building Department '..
City of Salem ,
Re : Highland Acres
Page 2 .
February 10 , 1988
Continuation of Building 1114
5 . Insulation completed . Building ready to receive drywall .
BUILDING 1115 . . 6 UNITS "B" TYPE :
1 . Foundation completed .
2 . Underslab Utilities completed .
3 . Concrete Slab Floor completed .
4 . Concrete Block Party Wall up to first floor .
5 . Rough Framing to first floor .
BUILDING 1116 . . 6 UNIT "A" TYPE :
1 . Excavated and ready to receive footings and foundation
walls .
BUILDING 1117 . 6 UNITS "B" TYPE :
1 . Exterior Framing 100% completed .
2 . Interior Partitions 100% installed .
3 . Rough Plumbing , Heating , and Electrical 100% completed .
4 . Roof Shingles 100% installed .
5 . Clapboard Siding started .
6 . Doors & Windows installed .
BUILDING 1119 . 6 UNITS "A" TYPE :
1 . Foundation 100% completed .
2 . Interior grading ready to receive concrete slab floor .
3 . Rough exterior grading 100% completed .
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLAMMIMG
546 M A I N 5 T R E E T . 5 T O N E H A M M A S S A C H U 5 E T T 5 0 2 1 8 0 T E L E P H O N L 43 8-0900
Building Department
City of Salem
Re : Highland Acres
Page 3 .
February 10 , 1988
BUILDING #20 . 6 UNITS "A" TYPE :
1 . Foundation 1007 completed .
2 . Interior Grading ready to receive concrete slab floor .
3 . Rough exterior grading 1007 complete .
BUILDING #21 . . 4 UNITS "A" TYPE :
I . Rough Framing 1007 completed .
2 . Interior Partitions 1007 completed .
3 . Doors & Windows installed .
4 . Clapboard Siding 507 completed .
All work is progressing satisfactory in accordance with drawings
provided by this office .
If there are any questions regarding any of the above , please do
not hesitate to contact this office .
Sincerely ,
P -" F . DI EO ASSOCIATES , INC .
,�� G\S,�EpED ARpH/l
F.
� O��Fcs
Peter F . DiMeo , AIA o No. 16650 1
3 STONEHAM. W
MASS. Jy
PFD/bjg y
�Fq H S
PETER F. DIMEO ASSOCIATES, INC. AEtCMXTECTVItE- FLiA1PTNI1qG
546 MAIN STREET . STONEHAM , M A 5 S A C H U S E T TS 02180 TE L'EPH0NE 43 8-09 00
February 11 , 1988 ""
CIIw O
I Lf� „ r;i�IJS.
Building Department
City of Salem
One Salem Green
Salem, MA 01970
Attention : Mr . William Munroe
Re : Highland Acres
394 Highland Avenue
Salem, MA 01970
Dear Mr . Munroe :
We have inspected the entire condominium development at the
above address on February 10 , 1988 , and the condition of the
development , which includes Buildings number 13 , 14 , 15 , 16 ,
17 , 19 , 20 and 21 are as follows :
BUILDING 1113 . . 6 UNITS "B" TYPE :
1 . Siding - 100% completed .
2 . Exterior Painting 100% completed .
3 . Exterior stairs 100% completed .
4 . Drywall 100% completed .
5 . Interior Finish 100% completed .
6 . Prime Coat Interior Paint completed .
7 . Rough Plumbing Completed .
8 . Finish Heating 90% completed .
9 . Finish Electrical 100% completed .
BUILDING 1114 . . 6 UNITS "A" TYPE :
1 . Rough Framing 100% completed .
2 . Roof Shingles 100% completed .
3 . Exterior windows and doors installed .
4 . Rough Plumbing , Heating and Electrical 100% completed .
PETER F. 13IMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET . ST ONEHAM . M A 5 5 A C H U 5 E T TS 02180 TE L'EPH0NE 43 8-09 00
March 1 , 1988
Building Department
City of Salem
One Salem Greenj
Salem, Ma. 01970
J
Attention: Mr. William Munroe
?r ' ej
Re: Highland Acres T�
394 Highland Avenue
Salem, Ma.
`� J7
N
Dear Mr. Munroe:
We have inspected the entire condominium development at the
above address on February 29, 1988, and the condition of the
development, which includes Buildings number 13, 14, 15, 16,
17, 19, 20 and 21 are as follows:
BUILDING #13. 6 UNITS "B" TYPE:
1 . Siding - 1008 completed.
• 2. Exterior Painting 1008 completed.
3. Exterior stairs 1008 completed.
4. Drywall 1008 completed.
5. Interior Finish 1008 completed.
6 . Prime Coat Interior Paint completed.
7. Rough Plumbing completed.
8. Finish Heating 908 completed.
9. Finish Electrical 1008 completed.
BUILDING #14. 6 UNITS "A" TYPE:
1 . Rough Framing 1008 completed.
2. Roof shingles 1008 completed.
3 . Exterior windows and doors installed.
• 4. Rough Plumbing, Heating and Electrical 1008 completed.
5. Insulation completed.
6 . Drywall 508 completed.
PETER F. DIMEO ASSOCIATES, INC. ARCIiITECTiIRE PLANNING
546 M A I N S T R E E T , S T O N E H A M , M A S S A C H U S E T T 5 0 2 1 9 0 T E L E P H O N E 43 B-0900
Building Department
City of Salem
Re: Highland Acres
Page 2.
March 1 , 1988 t'
G;
BUILDING #15. 6 UNITS "B" TYPE:
1 . Foundation completed.
2. Underslab Utilities completed.
3. Concrete Slab Floor Completed.
4, Concrete Block Party Wall up to Second Floor.
5. Rough Framing to Second Floor.
• BUILDING #16. 6 UNITS "A" TYPE:
1 . Footings completed, ready to receive Foundation Walls
BUILDING #17. 6 UNITS "B" TYPE:
1 . Exterior Framing 100% completed.
2. Interior Partitions 1008 installed.
3. Rough Plumbing, Heating, and Electrical 100% completed.
4. Roof Shingles 100% installed.
5. Clapboard Siding 50% completed.
6. Doors and Windows installed.
7. Interior ready to receive Insulation.
BUILDING #19. 6 UNITS "A" TYPE:
1 . Foundation 100% completed.
• 2. Interior grading ready to receive concrete slab floor.
3. Rough exterior grading 100% completed.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET . ST 0NEHAM , M A 5 5 A C H U S E T T 02180 TE L PH0NC 438-0900
Building Department
City of Salem
Re: Highland Acres
Page 3.
�r
March 1 , 1988
BUILDING #20. 6 UNITS "A" TYPE: - y
ua
1 . Foundation 1008 completed.
2. Interior grading ready to receive concrete slab floor. .
3. Rough exterior grading 1008 complete.
BUILDING #21 . 4 UNITS "A" TYPE:
1 . Rough Framing 100% completed.
2. Interior Partitions 100% completed.
• 3. Doors and Windows installed.
4 . Clapboard Siding 100% completed.
5. Rough Plumbing, Heating and Electrical 508 completed.
All work is progressing satisfactory in accordance with drawings
provided by this office.
If there are any questions regarding any of the above, please do
not hesitate to contact this office.
Sincerely,
P F. DIMEO ASSOCIATES, INC.
G`S1r<AED ARC, `
Peter F. D Meo,elCAIA Q e F
;' a N0. 1665 C
STUNT NAM. r-
r MASS.
• PFD/rkk o``F
t�
r
PETER F. DIMEO ASSOCIATES, INC. AI�CIiITECTURE PLANNING
546 MAIN STREET . ST 0NEHAM . MASSACHUSETTS 02180 TE L'EPH0NE 438-0900
March 15, 1988
II •,�
Building Department
City of Salem CITi - -
One Salem Green
Salem, Ma. 01970
Attention: Mr. William Munroe
Re: Highland Acres
394 Highland Avenue
Salem, Ma.
Dear Mr. Munroe:
We have inspected the entire condominium development at the
above address on March 14 , 1988, and the condition of the
development, which includes Buildings number 13, 14, 15, 16 ,
17 , 19, 20 and 21 are as follows:
BUILDING #13. 6 UNITS "B" TYPE:
1 . Siding - 1008 completed.
2. Exterior Painting 1008 completed.
3. Exterior stairs 1008 completed.
4 . Drywall 1008 completed.
5 . Interior Finish 1008 completed.
6 . Prime Coat Interior Paint completed.
7. Rough Plumbing completed.
8. Finish Heating 908 completed.
9 . Finish Electrical 1008 completed.
BUILDING #14. 6 UNITS "A" TYPE:
1 . Rough Framing 1008 completed.
2. Roof shingles 1008 completed.
3 . Exterior windows and doors installed.
4 . Rough Plumbing, Heating and Electrical 1008 completed.
5. Insulation completed.
6 . Drywall 1008 completed.
PETER F. DIMEO ASSOCIATES, INC. ARCIiITECTVRE PLANNING
546 MAIN STREET . ST ONEHAM . MA ; S A C H U S E T T5 02190 TELEPHONE 438-0900
Building Department
City of Salem
Re: Highland Acres
Page 2.
March 15, 1988
BUILDING #15. 6 UNITS "B" TYPE:
1 . Foundation completed.
2. Underslab Utilities completed.
3. Concrete Slab Floor completed.
4. Concrete Block Party Wall up to Second Floor.
5. Exterior Rough Framing to Roof.
BUILDING #16. 6 UNITS "A" TYPE:
1 . Footings completed.
2. Foundation Walls completed
BUILDING #17. 6 UNITS "B" TYPE:
1 . Exterior Framing 1008 completed.
2. Interior Partitions 100% installed.
3 . Rough Plumbing, Heating, and Electrical 1008 completed.
4. Roof Shingles 100% installed.
5. Clapboard Siding 1008 completed.
6. Doors and Windows installed.
7. Insulation 100% completed.
8. Drywall 50% completed.
BUILDING #19. 6 UNITS "A" TYPE:
1 . Foundation 1008 completed.
2 . Interior grading ready to receive concrete slab floor.
3 . Rough exterior grading 1008 completed.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET . STONE HAM . MA55ACHUSET T5 02180 TE l'EPH0 NC 43 8-09 00
Building Department
City of Salem
Re: Highland Acres
Page 3.
March 15, 1988
BUILDING #20. 6 UNITS "A" TYPE:
1 . Foundation 1008 completed.
2. Interior grading ready to receive concrete slab floor.
3. Rough exterior grading 1008 complete.
BUILDING #21 . 4 UNITS "A" TYPE:
1 . Rough Framing 100% completed.
2. Interior Partitions 100% completed.
3. Doors and Windows installed.
4. Clapboard Siding 100% completed.
5. Rough Plumbing, Heating and Electrical completed.
All work is progressing satisfactory in accordance with drawings
provided by this office.
If there are any questions regarding any of the above, please do
not hesitate to contact this office.
Sincerely,
PETER F. DIMEO ASSOCIATES, INC. \SSERED ARCyT
_ e�V F. Q FCl
C 5w' u1' a No. 1665 o y
TONEHAM. .�-.
Peter F. DiMeo, AIA SMA55. H
O J
2
PFD/rkk
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTUFLE PLANNING
546 M A I N 5 T R E E T . S TO N E H AM , M A S S A C H U 5 E T T S 0 2 1 8 0 T E L E P H O N E 43 9-0900
April 5, 1988
Building Department
City of Salem
One Salem Green
Salem, Ma. 01970
Attention: Mr. William Munroe
Re: Highland Acres -
394 Highland Avenue
Salem, Ma.
Dear Mr. Munroe:
We have inspected the entire condominium development at the
above address on April 4, 1988, and the condition of the
development, which includes Buildings number 13, 14, 15, 16,
17, 18, 19, 20 , 21 and 22 are as follows:
BUILDING #13. 6 UNITS "B" TYPE:
1 . Siding - 1008 completed.
2. Exterior Painting 1008 completed.
3. Exterior stairs 1008 completed.
4. Drywall 1008 completed.
5. Interior Finish 1008 completed.
6. Prime Coat Interior Paint completed.
7. Rough Plumbing completed.
8. Finish Heating 908 completed.
9. Finish Electrical 1008 completed.
BUILDING #14. 6 UNITS "A" TYPE:
1 . Rough Framing 1008 completed.
2. Roof shingles 1008 completed.
3. Exterior windows and doors installed.
4. Rough Plumbing, Heating and Electrical 1008 completed.
5 . Insulation completed.
6 . Drywall 1008 completed.
PETER F. 13IMEO ASSOCIATES, INC. ARCMITECTIMM PLANNING
546 MAIN 5T REE T . STONEHAM , MASSACHUSETTS 02180 TELEPHONE 43 8-09 00
Building Department
City of Salem
Re: Highland Acres
Page 2.
April 4, 1988
BUILDING #15. 6 UNITS "B" TYPE:
1 . Foundation completed.
2. Underslab Utilities completed.
3. Concrete Slab Floor completed.
4. Concrete Block Party Wall up to Second Floor.
5 . Exterior Rough Framing to Roof.
6. Roofing Completed.
7. Exterior Doors and Windows Installed.
8. Rough Plumbing and Electrical Completed.
BUILDING #16. 6 UNITS "A" TYPE:
1 . Footings completed.
2 . Foundation Walls completed
3. Underground Utilities Completed.
BUILDING #17. 6 UNITS "B" TYPE:
1 . Exterior Framing 1008 completed.
2. Interior Partitions 1008 installed.
3. Rough Plumbing, Heating, and Electrical 1008 completed.
4. Roof Shingles 1008 installed.
5. Clapboard Siding 1008 completed.
6 . Doors and Windows installed.
7. Insulation 1008 completed.
8. Drywall 1008 completed.
9 . Exterior Prime Coat of Paint.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T . S T O N E H A M . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 43 B-09 00
Building Department
City of Salem.
Re: Highland Acres
Page 3.
April 4, 1988
BUILDING #18. 6 UNITS "B" TYPE:
1 . Foundation 1008 Completed.
2 . Interior Grading Completed.
3 . Underground Utilities Completed.
4. Concrete Floor Slab Completed.
5. Masonry Party Walls to First Floor.
6. Rough Exterior Grading Completed.
BUILDING #19. 6 UNITS "A" TYPE:
1 . Foundation 1008 completed.
2. Interior grading ready to receive concrete slab floor.
3. Rough exterior grading 1008 completed.
4. Underground Utilities Completed.
BUILDING #20. 6 UNITS "A" TYPE:
1 . Foundation 1008 completed.
2. Concrete Floor Slabs Completed.
3. Rough exterior grading 1008 complete.
4 . Underground Utilities Installed.
5. Masonry Party Walls to First Floor.
PETER F. 13IMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MA I N 5T RE ET . 5TONE H AM . M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L P H O N L' 438-0900
Building Department
City of Salem
Re: Highland Acre
Page 4 .
April 4 , 1988
BUILDING #21 . 4 UNITS "A" TYPE:
1 . Rough Framing 1008 completed.
2. Interior Partitions 1008 completed.
3 . Doors and Windows installed.
4 . Clapboard Siding 1008 completed.
5. Rough Plumbing, Heating and Electrical completed.
6. Drywall 508 completed.
BUILDING #22. 6 UNITS "B" TYPE:
1 . Foundation 1008 Completed.
2 . Interior Grading Completed and ready to receive
Concrete Floor Slab.
3 . Rough Exterior Grading 1008 Completed.
All work is progressing satisfactory in accordance with drawings
provided by this office.
If there are any questions regarding any of the above, please do
not hesitate to contact this office.
Sincerely,
PETER F. DIMEO ASSOCIATES, INC.
Peter F. DiMeo, AIA
PFD/rkk
2ETER R I)IMEO ASSOCIATES, INC. ARCUXTECTVRE PLANNING
546 M A I N S T RE E T . 5 T O N E H A M . M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L E P H O N E 43 9-0900
May 16, 1988
Building Department
City of Salem
One Salem Green
Salem, Ma. 01970
Attention: Mr. William Munroe
Re: Highland Acres
394 Highland Avenue
Salem, Ma
Dear Mr. Munroe:
We have inspected the entire condominium development at the
above address on May 16, 1988, and the condition of the
development, which includes Buildings number 13, 14, 15, 16,
17, 18, 19, 20, 21 , 22 and 23 are as follows:
BUILDING #13. 6 UNITS "B" TYPE:
1 . Siding - 1008 completed.
2. Exterior Painting 1008 completed.
3. Exterior stairs 1008 completed.
4. Drywall 1008 completed.
5. Interior Finish 1008 completed.
6. Prime Coat Interior Paint completed.
7. Rough Plumbing completed.
8. Finish Heating 1008 completed.
9. Finish Electrical 1008 completed.
10. Exterior Landscaping completed.
BUILDING x/14. 6 UNITS "A" TYPE:
1 . Rough Framing 1008 completed.
2. Roof shingles 1008 completed.
3. Exterior windows and doors installed.
4. Exterior Siding completed.
5. Rough Plumbing, Heating and Electrical 1008 completed.
6. Insulation completed.
7. Drywall 1008 completed.
' ZTER F. DIMEO ASSOCIATES, INC. ARCI;ITECTLJRE PLANNING
546 M A I N S T R E E T . 5 T O N E H A M . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 438-0900
Building Department
City of Salem
Re: Highland Acres
Page 2.
May 16 , 1988
BUILDING #14. 6 UNITS "A" TYPE: (cont'd. )
8. Prime coat interior paint completed.
9. Exterior Stain completed.
10. Exterior Landscaping completed.
BUILDING #15. 6 UNITS "B" TYPE:
1 . Foundation completed.
2. Underslab Utilities completed.
3. Concrete Slab Floor completed.
4. Concrete Block Party Wall completed.
5. Exterior Rough Framing completed.
6. Roofing Completed.
7. Exterior Doors and Windows Installed.
8. Exterior Siding completed.
9. Installing of Interior insulation has commenced.
10. Rough Plumbing, Heating and Electrical Completed.
11 . Exterior Stairs completed (no railings) .
12. Exterior Driveway grading ready to receive bituminous
concrete paving.
BUILDING #16. 6 UNITS "A" TYPE:
1 . Footings completed.
2. Foundation Walls completed
3. Underground Utilities Completed.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTVRE PLANNING
546 M A I N S T R E E T . S T O N E H A M . M A 5 S A C H U S E T T 5 0 2 1 8 0 T E L-E P H O N E 43 8-0900
Building Department
City of Salem
Re: Highland Acres
Page 3.
May 16, 1988
BUILDING #17. 6 UNITS "B" TYPE:
1 . Exterior Framing 1008 completed.
2. Interior Partitions 1008- installed.
3. Rough Plumbing, Heating, and Electrical 100% completed.
4. Roof Shingles 100% installed.
5. Clapboard Siding 100% completed.
6. Doors and Windows installed.
7. Insulation 1008 completed.
8. Drywall 1008 completed.
9. Exterior Coat of Stain completed.
10. Exterior Brick Stairs completed (no railings) .
11 . Exterior Driveway grading ready to receive bituminous
concrete paving.
BUILDING #18. 6 UNITS "B" TYPE:
1 . Foundation 100% Completed.
2. Interior Grading Completed.
3. Underground Utilities Completed.
4. Concrete Floor Slab Completed.
5. Masonry Party Walls to Second Floor.
6. Rough Framing up to 2nd. floor ready to receive roof
trusses.
7. Rough Exterior Grading Completed.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET . 5TONE HAM , MASSACHUSETTS 02180 TEL-E P H 0 N E 438-0900
Building Department
City of Salem
Re: Highland Acres
Page 4.
May 16 , 1988
BUILDING #19. 6 UNITS "A" TYPE:
1 . Foundation 1008 completed.
2. Concrete Floor Slab completed.
3 . Rough exterior grading 1008 completed.
4. Underground Utilities Completed.
BUILDING #20. 6 UNITS "A" TYPE:
1 . Foundation 1008 completed.
2. Concrete Floor Slabs Completed.
3. Rough exterior grading 100% complete.
4. Underground Utilities Installed.
5. Masonry Party Walls to Second Floor.
6. Rough Framing to 2nd. Floor, Roof Framing 508 completed.
BUILDING #21 . 4 UNITS "A" TYPE:
1 . Rough Framing 1008 completed.
2. Interior Partitions 1008 completed.
3. Doors and Windows installed.
4. Clapboard Siding 1008 completed.
5. Exterior Stain completed.
6. Rough Plumbing, Heating and Electrical completed.
7 . Drywall 758 completed.
8 . Rough grading completed, ready to receive Driveways.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET . ST 0NEHAM . MASSACHUSETTS 02180 TEL-EPH0NE 438-0900
Building Department
City of Salem
Re: Highland Acres
Page 5.
May 16, 1988
BUILDING #22. 6 UNITS "B" TYPE:
1 . Foundation 1008 Completed.
2. Underground Utilities completed.
3 . Concrete Floor Slab installed.
4. Rough Exterior Grading 1008 Completed.
BUILDING #23. 4 UNITS "A" TYPE:
1 . Foundation 100% completed.
2. Interior Grading completed, ready to receive concrete slab.
3. Underground Utilities completed.
All work is progressing satisfactory in accordance with drawings
provided by this office.
If there are any questions regarding any of the above, please do
not hesitate to contact this office.
Sincerely,
PE R F. DIMEO ASSOCIATES, INC
Qk. �Fi F. pr Cl
Peter F. DiMeo, AIA a o.1665 0
STONEHAM. -
MASS. Jy
PFD/rkk ry�Fq�TN 0 fMP `
Citp of *alem, lHazoacbU15CM5
`f P.
+l t n= Vublic i9ropertp Department
on,„so� 3liuilbing Mepartment
One balrm Oreen
745-9595 CXt. 380
William H. Munroe
Director of Public Property
Inspector of Buildings
Zoning Enforcement Officer
May 18, 1990
Informational Memo
To: David Shea
Chief Administrative Aide
From: William H. Munroe
Inspector of Buildings
RE: Stasino' s Condos
I have been contacted by William and Thomas Katsepetsis who have purchased the
rights to the twenty six (26) remaining condos at the former Stasino's project
at 394 Highland Avenue regarding finishing these units.
Six (6) of the units are almost complete and an inspection of these units will
be made by the Building, Plumbing and Electrical Departments on Monday, May 19
1990 to determine what permits will be necessary to complete them. (Building
Permits expire in six (6) months when work has stopped) .
The remaining twenty (20) units willrequire new building permits at a cost of
three hundred, thirty three dollars ($333.00) per unit .
Tom Katsepetsis has stated that he will re-apply for the twenty units the first
of the week as they are needed as collateral for the lender.
A little back-ground on the brothers:
They are currently building four unit sub division of medium priced houses on
Malone Drive. Served as construction supers for Stasinos and own "Ornimental
Tron Company" , a metal pre fabrication Co. in Danvers.
Will keep you advised.