Loading...
38 SABLE ROAD - BUILDING INSPECTION 38 Sable Rd. JOB SITE COPY CITY OF SALEM UILDING SALEM, MASSACHUSETTS 01970 PERMIT DATE AUGUST 22 19 96 PERMIT NO. 477-1996 APPLICANT ROBERT ABRAHAM ADDRESS 45 BALCOMB ST 412 (NO.) (STREET) (CONTR'S LICENSE) CITY - SALEM STATE MA ZIPCODE 01970 TEL.NO. 508-745-9455 PERMITTO ALTERATION ( ONE FAMILY NUMBER OF 1 (TYPE OF IMPROVEMENT NO. STORY DWELLING UNITS (PROPOSED USE) AT(LOCATION) 0038 SMEL"E ROAD"{ ZONING (NOJ (STREET) DISTRICT BETWEEN AND (CROSS STREET) (CROSS STREET) SUBDIVISION MAP 09 LOT 0121 BLOCK LOT 0008300 SO FT SIZE BUILDING IS TO BE FT.WIDE BV FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE - USE GROUP BASEMENT WALLS OR FOUNDATION IVPE) REMARKS: BLOCK GARAGE DOOR, ADD WINDOWS TO MAKE DEN AS PER PLANS. L. E. T. Call for Permit to OccuPY AREA OR VOLUME ESTIMATED COST$ 5, 000 FEEMIT (CUBIGSOUARE FEET) $ 35. 00 OWNER VOLPE STEPHEN C BUILDING DEPT. ADDRESS 38 SABLE ROAD BY L. E. T THIS PERMITCONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINALINSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. ELECTRICAL,PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS LUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 Q�L l�—ao �b ' -ot: �� lis 016 4vr C7_ BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEP .INSPECTING APPROVALS 1 1 OTHER CITY ENGINEER 2 2 CERTIFfO OCCUPANCII ssued: Permft 0, WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PER IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. qS NOTED ABOVE. OR WRITTEN NOTIFICATION.