53 INTERVALE ROAD - WDDO I h tem Vnle R-d
W DDO - Zvo�
-Y AAI,a' C.Lh 1.0.-
�3?aECYCIEp�p
UPC 10350
NNo. 1�� tot.co
HAATIU Ge, pyl
„f r!
5,11
Salem Historical Commission
120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970
(978) 745-9595 EXT.311 FAX (978) 740-0404
WAIVER OF THE DEMOLITION DELAY ORDINANCE
It is hereby certified that the Salem Historical Commission has waived the Demolition Delay Ordinance for the
proposed demolition as described below, as per the requirements set forth in the Historic District's Act (M.G.L.
Ch. 40C) and the Salem Historic Districts Ordinance.
Address of Property: 53 Intervale Road
Name of Record Owner: Mathew W. Nichols
Description of Demolition Work Proposed:
Demolition of house.
Dated: 3/19/09 SALEM HISTORICAL COMMISSION
By:
THIS IS NOT A DEMOLITION PERMIT. Please be sure to tain the appropriate permits from the Inspector
of Buildings (or any other necessary permits or approvals) prior to commencing work.
R
Mq
�®
014I2 tPT qcF 10009
Salem Historical Commission' "
120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970
(978)745.9598 EXT.311 FAX(978)740-OQ4
APPLICATION FOR WAIVER OF THE DEMOLITION DELAY ORDINANCE
Pursuant to the Historic District's Act(M.G.L.Chapter 40C)and Salem Code 2-1572,application is hereby
made for issuance of a Waiver of the Demolition Delay Ordinance for demolition as described below.
Address of Property: 53 --'z4 i e✓ylt le A'o tc tl
Name of Record Owner(s): zt/ltl c oZ
Original Building Construction Date, if known CAP1/S
Is the property listed on the National Register of Historic Places or contributing to a NR District? �
Description of Demolition Work Proposed:
Please attach any historical data and photographs, building plans, structural reports, or other pertinent information and
submit at least a week before the scheduled meeting. Applicants who omit this information or submit their application less than
a week before the meeting date should expect to attend additional meeting(s). A site visit of the property may be requested.
Briefly describe the extent of the demolition:
fPUL. til rXIS/7Ky S-Aruc - turP
Briefly describe the reason/justicatiol/n for demolition: /
�Xi s �5 Sal v c�vre //i7 SA,4 X.4 / .bei/U� � Ve�wi
Briefly descri a any proposal for future construction/development:
9v%/'7 on S�l�e /a� � �%ny�Q httl y 2,000
Signature of Owner: //l�7/l/is� i� �,� Tel. #: �/7� 335- 2,2 5-6
Mailing address: 7 d'R/ e City: St Stateezip: 0
PROCEDURES FOR FILING APPLICATIONS
A. Be prepared to apply for approvals well in advance of commencing any exterior work. Before making An changes to the exterior of a property
in an historic district,the owner should call or visit the Commission representative at the Department of Planning t.2 Community Development to
discuss proposed alterations and to determine the category of the application(Appropriateness,Non-Applicability or Hardship).
B. The Commission nomally mats on the fust and third Wednesdays of each month and notices are posted at City Hall. The meetings arc held at
120 Washington SmcM 3rd floor,sod begin at 7:30 p.m. All matings arc open to the public and any person is entitled to appear and be heard
on any matter before the Commission before it reaches a decision.
C. An application for a Certificate of Appropriateness or Hardship must be received by 3:00 p.m.on the Monday 16 days before the meeting in
order to nuke the agenda. An application for a Certificate of Non-Applicability may normally be added to the agenda up to the day of the
mating. In some asm a Certificate ofNon-Applicability may be issued by the Clerk,without review by the full Commission,after notifying
Commission members and allowing 24 hours for any objection. There is no fee for any applications
D. All applications for Certificates of Appropriateness or Hardship require a public hearing. Notice of me hearing must be posted with the City
Clerk 14 days before the hearing and abutters must be notified in writing. Commission staff will handle these procedures A public hearing is
not required for a Certificate of Non-Applicability.
E. Applications must be submitted by the owner of the property. A contractor for the owner,at the owner's request,may submit an application on
the owner's behalf. In ase of a tenant,a waive of the owner's appearance may be granted at the discretion of Lie Commission if it is requested
by the owner.
F. All applications must include three to four 35mm photographs of existing conditions No certificates an be issued prior to receipt of
photographs
G. An application will not be considered complete unless g()_work items are thoroughly described on scaled drawings and include specifications
regarding dimensions, materials, and any other information needed for the Commission to visaalize the changes in order to make a
determination. Applications for paint colors should include a paint chip or chart. The following items should be included in your drawings as
applicable:
1. Site plan showing location of improvements;
2. Elevation drawings of the specific improvements;
3. Details/profiles(i.e. moldings,fence caps,comicm vents,etc.);
4. Materials(i.e.wood,brick,etc.);
5. Dimensions(i.e.sirs of trim);and
6. Transformers,heat pump and condenser locations,electrical entries and meters,lamp pogs,stove pipes.
H. At the hearing,the Commission will discuss the application with the applicant or his representative,hear the ebutters and take a vote. Owners
having professional consultants such as architects or contractors are urged to have them be present at the hearing. If the application is approved,
a Certificate will be mailed to the mailing address provided on the application and copies will be sent to the City Clerk and Building Inspector.
Please note that the application an be continued until the next meeting if the Commission deems necessary(i.e. for reasons of incomplete
drawings,to perform a site visit,etc.). In any ase,the Commission must make a determination within 60 days from the date the application is
received,unless the applicant waives that requirement in writing.
1. A property owner or a contractor cannot receive a building permit unless a Certificate has been issued. Please be sure to obtain appropriate
permits from the Inspector of Buildings(or other necessary permits and approvals)prior to commencing work.
J. The homeowner may opt not to commence the work approved(unless it relates to resolving an outstanding violation). Work commenced must
be completed within one year from the Certificate date unless otherwise indicated.
K. The City of Salem reserves the right to inspect the project to determine compliance with the conditions set forth in the Certificate issued.
Violations
A person commencing or completing work to the exterior of a building in an historic district without the necessary approval of the Commission is subject
to fines of up to S500 per day from the date of violation. The Commission is not responsible for an owner's neglect to inquire about necessary City permits
and approvals. All records are public and we will confidentially assist you if you are concerned that someone in your neighborhood is in violation.
A cciaanre
The Commission's guidelines are available for viewing at the Salem Pli ming Department and the Salon Public Library. The guidelines provide examples
of what is historically appropriate(or inappropriate)for Salem's neighborhoods including trim, siding,door, fences,gutters, masonry,paint colors,
parking solutions,porches, roofing, satellite dishes, secondary egress, skylights utilities, windows, etc. Ilex guidelines help you understand what
changes arc likely or unlikely to be approved. The Commission supports your efforts to improve your property and can guide you on historical
appropriateness. Further information,in the form of books,articles and pamphlets,City-wide architectural inventories,and photographs,are available at
the Historical Commission's office at 120 Washington StrccL For more information, contact the Clerk of the Commission, Jane Guy, at the Salem
Planning Department, 120 Washington Street.Salem,MA 01970,978 745-9595,Ext. 311. Rev.I U04
a �
N11
�1
-
M- .
�eR
ty
i