Loading...
FEDERAL STREET - DISTRICT FILES Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ✓ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire District Address of Property: 82 Federal Street Name of Record Owner: Linda and Chris Juneau Description of Work Proposed: Replace rear deck and stair to match existing. There will be no changes in color, material, design, location or outward appearance. Non-applicable due to being in-kind replacement and work not being visible from Federal Street and all other streets named and included within the boundaries of the McIntire Historic District. Dated: Aueust 4, 2016 SALEM HISTORICAL COMMISSION By: The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. - Once completed,please submit a photograph(s)of the final result(maximum of four-i.e. one photograph of each affected fagade). THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. MPJ If- Mii i4 iY ( 4- T 011 i A E 10% Ifs R 4 a I Aot I I ! I lWoric thtnrioi AaAl GA Ch", r 44,9 JI aTW I*, "eni MAkwicAl itm �dmdbvd hew lc9P: Sip Otbcr Y MS it r MaHmo Addre-,A gj Ag[h tb�#�� /(' f i.:f.. ILA I. -N-m o� � !. .' * �a i�.l' ,.6 � di; �� s r � � � 1 4 � � � � � � 3�i ��' ;' �. � � � ,, � � � -�= � �' �� � �' �' � � � r,��� ,, 4 ? � � � } � �� -� m � . � ��� J � G �� iI �' ��G I � '� T; !� � t 'r'• 1 i«, o 4 f f' pby 6 {j 1 f { e Salem Historical Commission 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ® Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 82 Federal Street Name of Record Owner: Peabody Essex Museum Description of Work Proposed: Restore fence along Federal Street. There will be no change to the design, material, color, or outward appearance of the fence. Dated: October 28.2015 SALEM HISTORICALCOMMISSION The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. RECEIV O _ OCT 26 2015 J �J � DEPT OF PLANNING& Salem Llistorical/ l.ommission� DEVELOPMENT 120 WASHINGTON STREET, SALEM,MA 01970 (978)745-9595 EXT.311 FAX(978)740-0404 APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of Appropriateness for: Construction Moving Restoration Alteration Demolition Painting Other as described below. District: McIntire Original Building Construction Date, if known: c 1782 Address of Property: 82 Federal St Peirce Nichols House Name of Record Owner(s): Peabody Essex Museum Description of Work Proposed (Please include required scale drawings,paint chips, catalog cuts and/or samples of material proposed, where applicable.) Rc,toiauon of sidewalk fence and Wates along Federal St frontage. Non Applicability as all materials and colors will be in-kind. applicationsAll i of Signature of Owner: Tel.#: Q 7 —1-4Y? a$t7LT {Mom+� kl Mailing address: j61 E�Se:w S-r- City: State:_A�,tZip: D[$Z PROCEDURES FOR FILING APPLICAIONS A.Be prepared to apply for approvals well in advance of commencing any exterior work. Before making any changes to the exterior of a property in an historic district,the owner should call or visit the Commission representative at the Department of Planning&Community Development to discuss proposed alterations and to determine the category of the application(Appropriateness,Non-Applicability or Hardship). B.The Commission normally meets on the first and third Wednesdays of each month and notices are posted at City Hall. The meetings are held at 120 Washington Street,3rd floor,and begin at 7:30 p.m. All meetings are open to the public and any person is entitled to appear and be heard on any matter before the Commission before it reaches a decision. C.An application for a Certificate of Appropriateness or Hardship must be received by 3:00 p.m.on the Monday 16 days before the meeting:n order to make the agenda. An application for a Certificate of Non-Applicability may normally be added to the agenda up to the day of the noting. In some cases, a Certificate of Non-Applicability may be issued by the Clerk, without review by the full Commission, after notifying Commission members and allowing 24 hours for any objection. There is no fee for any applications. D.All applications for Certificates of Appropriateness or Hardship require a public heariig. Notice of the hearing must be posted with the City Clerk 14 days before the hearing and abutters must be notified in writing. Commission staff will handle these procedures. A public hearing is not required for a Certificate of Non-Applicability. E. Applications must be submitted by the owner of the property. A contractor for the owner,at the owner's request,may submit an application on -the-owner's behalf.--In case of a tenaM!a waiver of the owner's-appearancemay bcTmnted-at+.he discretion of the Commission if it is requested by the owner. F.All applications must include three to four 35mm photographs of existing conditions. No certificates can be issued prior to receipt of photographs. Ar G. An application will not be considered complete unless all work items are thoroughly described on scaled drawings and include specifications regarding dimensions, materials, and any other information needed for the Commission to visualize the changes in order to make a determination. Applications for paint colors should include a paint chip or chart. The following items should be included in your drawings as applicable: 1.Site plan showing location of improvements; 2.Elevation drawings of the specific improvements; 3.Details/profiles(i.e.moldings,fence caps,cornices,vents,etc.); 4.Materials(i.e.wood,brick,etc.); 5.Dimensions(i.e.size of trim);and 6.Transformers,heat pump and condenser locations,electrical entries and meters,lamp posts,stove pipes. H. At the hearing, the Commission will discuss the application with the applicant or his representative,hear the abutters and take a vote. Owners having professional consultants such as architects or contractors are urged to have them be present at the hearing. If the application is approved, a Certificate will be mailed to the mailing address provided on the application and copies will be sent to the City Clerk and Building Inspeocor. Please note that the application can be continued until the next meeting if the Commission deems necessary(i.e. for reasons of incomplete drawings, to perform a site visit,etc.). In any case,the Commission must make a determination within 60 days from the date the application is receives,unless the applicant waives that requirement in writing. 1.A property owner or a contractor cannot receive a building permit unless a Certificate has been issued. _Please be sure to ob_tain appropriate permits ` $ora fbeihspector of Buildings(or of c oRisary permits and'approvals)pnor to commencing work. J.The homeowner may opt not to commence the work approved(unless it relates to resolving an outstanding violation). Work commenced must be completed within one year from the Certificate date unless otherwise indicated. K.The City of Salem reserves the right to inspect the project to determine compliance with the conditions set forth in the Certificate issued. Violations A person commencing or completing work to the exterior of a building in an historic district without the necessary approval of the Commission is subject to fines of up to $500 per day from the date of violation. The Commission is not responsible for an owners neglect to incuire about necessary City permits and approvals. All records arc public and we will confidentially assist you if you are concerned that someone in your neighborhood is in violation. Assistance The Commission's guidelines are available for viewing at the Salem Planning Department and the Salem Public Library. The guidelines provide examples of what is historically appropriate(or inappropriate)for Salem's neighborhoods including trim,siding,doors,fences,gutters,masonry,paint colors,parking solutions,porches,roofing,satellite dishes,secondary egress,skylights,utilities,windows,etc. These guidelines help you understand what changes are likely or unlikely to be approved. The Commission supports your efforts to improve your property and can guide you on historical appropriateness. Further information, in the form of books, articles and pamphlets, City-wide architectural inventories, and photographs, are available at the Historical Commission's office at 120 Washington Street. For more information,contact the Clerk of the Commission,lane Guy,at the Salem Planning Department, 120 Washington Street,Salem,MA 01970,978 745-9595,Ext.311. Rev. 10/04 . ;,t ��: ''� *yam .• ' ' ..• ._ i _ ���J..--� �Ik1-'�~� .41( a•-----yip-. -�. i. ill •'� !•�►. ` i L _A� JAn- ;a I�ltl�Nb tet „ �: rope I Ilez , f ! of r I � Y . .fir �.•ICT..{� .- � MMY77...a +IM• �. ' r Iw 4y,. yyy � 1 Ar � k • � Orel. 1 �,`�'z Vy i' :tr • r r� 1 5 � + li IIL a. R: t i 11m - aR� 4 ;• It Muslimlonemilm a �. i.• 39 •� 1 r r n:f i , • � r)yP a • 4.1 +`. _ ' •yam -. �, ' Leh •,��► r _ + ` t /• 0. tJ J► �,.t. � .. ♦M t • y R s I .1.. _ 1 t : * Nutp��Q Salem Historical Commission 120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntir Address of Property: 82 Federal Street - Name of Record Owner: Christopher I uneau Description of Work Proposed: Replace existing vinyl windowgwith new vinyl nvindows,for first front anti rear as needed. No changes in color. design, location or outward appearance. Non-applicable due to being in kind maintenance/replacement. Dated: October 17, 2011 SALE L COMMISSION By: The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. TI TIS IS NOT A BUILDING PERMIT. Please he sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. I F h g �qm\ �f Aox NkS Aftv �'� •\� �� p�ry4\ 11 moi.i' t_` . a . .- � f, Y J• b•Tr�t rC' - �\\ie - �.�q'� •'may, +-'s��v.v' � y�� F -61 �.,, '..I`.1� 1. . `� ��� t ft�(r 1T�' w r .a may.. � ..�..��'.n 1 _ $. ;e ,.W;. �.i � � a;';:'y. r �5 \I \Y 2(�cl� v.c���� �� _ 1 � 1 � L� � .�, �. �� -�6 tits _� _ �,`-.... ti r Z,evp,'wa�5 s..,.aw ��," j, 'gip; 2\ 4 ,9eM1ps \ � 'i� DK STC � 7 _ ;gyp" kk F" -" Lha R __ 3•` a' Aviv _� d , � > r r_ l .sig i I R Y ry OCT 17 2011 Salem Historical Commissah, MG& 120 WAST IING'[T)N STREET,SALEM, 1IA 01970 1973) 745-9595 EXT.311 FAX(973)740-0404 APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of Non-Applicability for: Construction Moving Reconstruction Alteration Demolition Painting Sign her as described below. i District: r Original Building Construction Date, if known: 1 0 0 Address of Property: �j Z rej zd`6L( S I Name of Record Owner(s): CI��PS D��2U LV_LA_e CLU. Description of Work Proposed: ayes • kw t • l Rr_� c,e vt� .A),Ina DWS wLA Vlhy h w F.,rS-V floor �� a� �Pnm� , • • � • • • • • • • a . • • FIFIR11111109111111TI Signature of Owner: " 'ted "I Tel. 9: 145-142.9 Mailing address: Z ed oy a `�`f City: 6140A✓A State O Zip: ON -7 D PROCEDURES FOR FILING APPLICATIONS A. Be prepared to apply for approvals well in advance of commencing any exterior work. Before making any changes to the exterior of a property in an historic district,the owner should call or visit the Commission representative at the Department of Planning&Community Development, to discuss proposed alterations and to determine the category of the application(Appropriateness,Non-Applicability or Hardship). B. The Commission normally meets on the first and third Wednesdays ofeach month and notices are posted at City Hall. The meetings aro held at 120 Washington Street,3rd floor,and begin at 7:30 p.m. All meetings are open to the pudic and any person is entitled to appear and be heard on tiny matter before the Commission before it reaches a decision. C. An application for a Certificate of Appropriateness or Hardship most be received by 3:03 p.m.on the Monday 16 days before the meeting in order to make the agenda An application for a Certificate of Non-Applicability may formally be added to the agenda up to the day of the meeting. In some cases,a Certificate ofNon-Applicability maybe issued by the Clerk,without review by the full Commission,aftenotifying Commission members and allowing 24 hours for any objection. There is no fee for any applications. D. All applications for Certificates of Appropriateness or Hardship require a public hearing Notice of the hearing must be posted with the City Clerk 14 days before the bearing and abutters mus'be notified in writing. Commission staffwill handle these procedures. A public hearing is not required for a Certificate of Non-Applicability. E. Applications must be submitted by the owner of the property. A contractor for the owner.at the owner's request,may submit an application on the owner's behalf. In case of a tenant,a waiver of the owner's appearance maybe granted at the discretion of the Commission if it is requested by the owner. F. All applications must include three to four 35mm photographs of existing conditions. No certificates can be issued prior to receipt of photographs. G. An application will not be considered complete unless all work items are thoroughly described on scaled drawings and include speci 1cations regarding dimensions, materials, and any other information needed for the Commission to visualize the changes in order to make a determination. Applications for paint colors should include a paint chip or chart. The following items should be included in your drawings as applicable: 1. Site plan showing location of improvements; 2. Elevation drawings of the specific improvements; 3. Details/profrles(i.e.moldings,fence caps,comices,vents,etc.); 4. Materials(i.e.wood,brick,etc.); 5. Dimensions(i.e.size of trim);and 6. Transformers,heat pump and condenser locations,electrical entries and meters,lamp posts.stove pipes. H. At the hearing,the Commission will discuss the application with the applicant or his representative,hear the abutters and take a vote. Owners having professional consultants such as architects or contractorsare urged to have them be 3resent at the hearing. Ifthe application is approw_d, a Certificate will be mailed to the mailing address provided on the application and copies will be sent to the City Clerk and Building Inspector. Please note that the application can be continued until the next meeting if the Commissi:m deems necessary(i.e.for reasons of incomplete drawings,to perform a site visit,etc.). In any case,the Commission must make a determination within 60 days from the date the application is received,unless the applicant waives that requirerreni in writing. 1. A property owner or a contractor cannot receive a building permit unless a Certificate has been issued. Please be sure to obtain appropriate penn its from the Inspector of Buildings(or other necessary permits and approvals)prior to commencing work. J. The homeowner may opt not to commence the work approved(unless it relates to resolving an outstanding violation). Workeommencedmast be completed within one year from the Certificate date unless otherwise indicated. K. The City of Salem reserves the right to inspect the project to determine compliance with-.he conditions set forth in the Certificate issued. Violations A person commencing or completing work to the exterior of a building in an historic district without the necessary approval of the Commission is subject to tines of up to$500 per day from the date of violation. The Commission is not responsible for an owners neglect to inquire about necessary C_ty permits and approvals. All records are public and we will confidentially assist you ifyou are concemel that someone in your neighborhood is in violation. Assistance The Commission's guidelinesare available for viewing at the Salem Planning Department and the Salem Public Library. The guidelines provideex3mples of what is historically appropriate(or inappropriate)for Salem's neighborhoods including trim,siting,doors,fences,gutters,masonry,paint colors, parking solutions,porches,roofing,satellite dishes,secondary egress,skylights.utilities,windows,etc. 'These guidelines help you understar.d wt:at changes are likely or unlikely to be approved. The Commission supports your efforts to improve your property and can guide you on historical appropriateness. Further information,in the form ofbooks,articles and pamphlets,City-wide architetural inventories,and photographs,are available at the Historical Commission's office at 120 Washington Street. For more information,contact the Clerk of the Commission,Jane Guy,at the Salem Planning Department 120 Washington Street,Salem,MA 01970,978 745-9595.Ext 311. Rev.1004 iQ 1 � � n Salem Historical Commission 120 WASHINGTON STREET, SALEM,MASSACHUSETTS 01970 (978)745-9595 EXT.311 FAX(978) 740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction -Z� Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 82 Federal Street Name of Record Owner: Christopher& Linda Luneau Description of Work Proposed: Retain bracket.feature below third floor soffit(to remain.shingled and painted body color) and replace existing PVC gable vent with wood in either oval (max. 20"x 24'), circular (max 24') or octagonal (max 24"x 24". In addition to the approvals on Certificate of Appropriateness dated 10/7/10, option for 3 d floor shingles in gable to be circular in clustered courses of 5, 2, 3 and 2 and option for mahogany top rail on porch railing. Dated: October 25, 2010 M HIST RICAL COMMISSION /7 By: i/„ The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. ,THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. �I gay 1 l!ra4yy'.Nf�< A. • .q ' I 1., r r. is �n �r z y m .Cj m to G n� c r [r. ri fd i J �J N r_n i 1 �?,:i' bee` •,_anT�ar�s 999r 0 T 06F. ` `� � w N L `9 .0 y r C-4 rm r A U7 I� L f`- L SI iJ T C IT, � L t_ lin/ wrr' AFFIDAVIT OF SERVICE City of Salem provision M.G.L., Chapter 39, Section 23D. (For a City Councilor, board, or commission member, to sign upon listening to the audio of a missed meeting and examining all evidence.) Per the City of Salem rovision M.G.L., Chapter 39 Section 23D, I, hereby certify under the pains and penalties of perjury that I have examined all evidence pertaining to gc� F� which was distributed at the single missed session on /O/G/� ,n which evidence included an audio recording of the missed session. This certification was submitted prior to the undersigned's participation in a vote on the matter and shall become part of the record of the hearing. Name /(�L '/ _r�� Date �! b70 /O Board or Commission Salem Historical Commission AFFIDAVIT OF SERVICE City of Salem provision M.G.L., Chapter 39, Section 23D. (For a City Councilor, board, or commission member, to sign upon listening to the audio of'a missed meeting and examining all evidence.) P City of Salem pr vision M.G.L., Chapter 39 Section 23D, [, hereby certify under the pains and penalties of perjury that I have examined all evidence pertaining to ��i ' f/vgic which was distributed at the single missed session on /Q / 20/-0 which evidence included an audio recording of the missed session. This certification was submitted prior to the undersigned's participation in a vote on the matter and shall become part of the record of the hearing. Name Q :L—:7Date 1019-012--b14111) Board or Commission Salem Historical Commission �♦ i �,� T�sT r^1' rK III hill IIII Lattice below porch 82 Federal Street, Salem, MA t Wv �- T� 30"W x 37 1/2"H Vertical 18"W x 24"H Oval Louver, 20"W x 29"H Oval Louver. Oval Louver, with Vertical, Functional, Vertical with Flat 'rrim and Decorative Trim and Urethane Keystones, Functional, Keystones, Functional, List Price: $111.11 Urethane Urethane Your Price: $77.78/each List Price: 1135 Mfg. Part#: FOVLV18X24V Your Price: ;148.16/each YoLisur Price: 6 Mfg. Part#: FOVLV20X29VTK Your Price: $13138.99/each Mfg. Part#: FOYL28X35K215V Usually ships in 10-12 business days Usually ships in 10-12 business days Usually ships in 5-7 business days �� 4-a/Ly I {L11. s j& 4s4 it +Y� ��MNe Wei Salem Historical Commission 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978) '45-9595 EXT 011 FAX 1578) 7400404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction 0 Moving ❑ Reconstruction Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set north in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: M -lutir Address of Property- Name of Record Owner: Christopher& Linda Luneau Description of Work Proposed: Remove existing porch & balcony knee wall railing and replace with wood columns, halusters and railinizs• as proposed in cb-au-in'vs dated 9/20/10. Balusters to be 2 x 2. ('oluna7.v !n hen r rrccs.ved panels u77 hose. Lattice rmcle•r porch to he .vgiictr•e. Replace balcony decking. Remove vitt l.viding u!first Poor elevation and install wood c•Iciphourds•. Res•tor•e card paint exi.vliiTg wood cecictr shakes curl stout/h•hn. Reniove exi.vti;ig hr•ic•k.vtaii- and metal railings cit porch crnd replace it ith r1 ood stair and balusters. Stair treudv to he prude n/composite. Install hes shins;le.Jnr third flour section under gable peak. Paint colors: Sherman 66illianis Naval or Rookwood Green for body, trim to be white, door, slurm door cmd vtortrr windows to he black. Option for window lush to be white or black. Lattice under porch to he bluck. (iuble vent cmd bracket tinder third floor snf/it continued to the meeting n/October 20x' Dated: October 7 2010 SAL WM ISTORICAL COMMISSION I he homasssner has the option not to commence the vcork (unless it relates to resolving an outstanding violation). :AIt work commenced must he completed within one %ear from this date unless othcrscisc indicated. I l [IS IS NO I A lit 111-DING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or ane o(hrr necessarc permits or approvals) prior to commencing ssork. 1 Id-alereerts 0063 0 10/05/10 ,_ .. ;.`�� �:���K -�; �>:� h� a V __ � 1 P ^I. h � _ '` w� � � � -. .I •���� �' f , �� � __ ,;� - , . rf� r �_`. � .. ;:- ,., , . - - �, ��r L ,!: * � `, i „ .,. � ; 1 / V a 01/9[/of C) '79ozo suaa..49lgpl 1900" IT WAS ,A PFR IOD OF CONTRAS-IS.Natural shades of sand, stone. slate and earth, on homes designed in the style of Gothic Retinal. Accents were euerithing, with ornate windows, doors and cornices painted in vivid hues thut featured every ornament. And whethelyou're raithfidly restoring a home in perfect detail, or simply lee the look. our Victorian Arseruation Palette"has all the authentic colors you need. NONE ige SW 2801 SW 2802 SW 2805 5W 2809 NONE iBe sW 2808 SW 2807 SW 2806 SW 2805 NONE kwood lade sW 2809 sW 2810 sW 2811 SW 2812 NONE — SW 2816 SW 2815 Sw 2816 SW 2815 Renwick Golden Oak Reekwoad Cloy Dewnin8 Sind Dawning Slone SW 2824 SW 2823 SW 2822 SW2821 u I I ow�o EXTERIOR C "•1LOR PRESERVATION PALETTE® NONE SW 2817 SW 2818 SW 2819 SW 2820 (rz�s>ihle p��leftr. 1iOi�+ Renwid Olive SW 2815 ___ Rookwood Bbe Green SW 2811 . .,� Rookwood Dark Brawn SW 2808 -. R..kw0od Term Cana SW 2803 r Renwick Gold..Oak SW 2824 r.. .. Renwick Rose Beige SW 2804 Downing Straw SIN 2813 Renwick Heath.- SW 2818 n..• Rookwood Red SW 2802 `ViM Downing 51.1. SW 2819 .._z�i•a Rookwood Dark Greet SW 2816 .ai Dawning$I... SW 2821 .ann:nla�uppmcnnuie�hc"o—I Some caors•mnlnd w telRrl pica{u:11:n §J[.'• Downing Eortb SW 2820 r.. Downing Sand SW 2822 A Rookwoad Amb., SW 2817 FROM THE NATURAL. TONES popularized by Andrew Jackson Downing, to the dark body colors and strong accents introduced by the Aesthetic Movement, the Victorian Preservation Palette has every color you need to create a historically correct Victorian ecterior. A sumptuous assortment of browns, olives, reds and oranges is atyour fingertips, shown in stunning combinations that would make any 19th century homeowner proud. : • • 657-2838 CS 5/o8 C. 035777 54371 9 . d d � �i Cry rD i O South Elevation D N ` X Juneau residence-porch restoration 82 federal street salem me m Salem Historical Commission 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978) 745-9595 EXT.311 FAX (978) 740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 82 Federal St. Name of Record Owner: Christopher L mea i Description of Work Proposed: Replacement of black/charcoal grey, 3-tab asphalt roof over first floor overhang in rear to replicate existing. No changes in color, material, design or outward appearance. Non-applicable due to being in kind maintenance/replacement. Dated: April 13, 2010 SALEM H MMISSION By: The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. sfir, to Mr `2 Q' t �.4 I yr 1 ti M lli� 1Wtk.♦ �`. ,� r 1 �; � W#J_1N�rY1pi1 civ LJ Yt Y��qt•a i��F ♦ � C iC � `�f ,, i 11 P. T �Ip ly" e ♦ y g �i0. 2 p _.t��P: App . ;„ w �B.t'� +��Q" �a.;�,8 .!t��• S ren � c lir!. r '• �f f� r •r N 10 I 2L I � � Z ve v��co Salem Historical Commission ONE SALEM GREEN,SALEM, MASSACHUSETTS 01970 (978)745-9595 EXr..311 FAX(978)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction Alteration ❑ Demolition ❑ Painting ❑ Signage Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 89 Federal Street Name of Record Owner: Christopher&Linda Luneau Description of Work Proposed: Installation of wood fence utilizing the design (scalloped pickets) of the vinyl fence shown on the cover of the Bufftech catalog submitted, installed across the rear of the driveway and to include a 3-4'wide gate. Fence post height not to exceed the height of the posts of the abutting fence of the Peirce-Nichols House. Lowest pickets of scallop not to exceed the height of the running length of the Peirce-Nichols Hous. Fence to be painted white. Dated: September 6, 2002 SALEM HISTORICAL COMMISSION The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. C 5 � 4 yffid Salem Historical Commission ONE SALEM GREEN,SALEM,MASSACHUSETTS 01970 (978)745.9595 EXr.311 FAX(978)740.0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District,as per the requirements set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 82 Federal Street Name of Record Owner: Chris& Linda Luneau Description of Work Proposed: Painting of all cedar shingled areas to New England Red. Removal of shutters. Replacement of roof with black or charcoal grey asphalt. Install 6'stockade fence across rear lot line to match style and connect with 84 Federal Street fence (gothic pickets with no spacing). Fence to be left natural. Insrall flat, rectangular Velux skylight on slope facing 84 Federal in location where skylight previously existed. Not to exceed 21"x 27", located near peak of roof(no more than 12"from ridge) and toward Webb Street end of house. Dated: April 19, 2002 SALEM 7HISTORICAL COMMISSION By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. 1 R\` *3883 t9 11/25181 Ualgreens weaiblen 1e1sua 81 ease. •� ,� � 'a - `_�;''�' - •�` ��� %i� 1.- _� � ' � � � � � �1� J `Oo� �� �- �. � � �' � \�� �4 C � W \� 6, �`�, 6� 1 \\� \ �4 • - st:,r dS"l w a.Y .- 1. .\ ... a;+, suaahler, 181SZ/l{ Lt £88£+ ��/ - _ 1 L � ` N � ``� � � ,:; \{� � � . , s� d � � 'x y � y E` f. -�`' . ; �� J s!'`f 1 �' ��✓ ,yam �. �.�,_ . ._..� _ r 'r creat: r ' ��R � w. ..,PLO$ 4La � •�_ r �� � { r .�. -�. .� �. - ,� -- ��� .,,,:. a - . '�..j' '* a _— �.` d b � �i �- i�� ti f ��-Np � � �� - � ��, �, V ��'Jr � i �L l Ih� ' r i\ � J� t 1 L i -- .� . � 1 "n � �' / i "r ' :._� *^e: r .•. � � y. :� - �, ' z� r ., 1M��� �' y� �._ �.. -. `\ a t .fit \ ` `�� 'r `� � � 0 �`� � � ;� � ���� ._ � .. suaajo en 181SUR 91 £88£+ AW _ _ £ _ - L� LS •ll O L1 / �G AS�� 7b V- � � 1 ss ► 11► -"rm r_ ZZ jl A4q 0 Old Village® Paint Colours A Collection of authentic 18th and 19th Century Colours SATIN OIL 13ASE& 100% ACRYLIC SOFT SHEEN FOR INSIDE AND OUTSIDE A collection ofauthentic colrnna,far raswnuion and deUlrolinC tat die Colonial, Federal, mid Viuortam periods. Thry Lan He used inside or ou(side on am aurtace properly prepared. All are made in a Soft Sheen Fi ikh, pleasing to the eve mad ensu to use- OLD VILLAGE CRAFTSMEN )IJ Cill.tIT, Palm C,.II I a r,:ur:n i d m n:i,reprudueol m,A thu,e axed he The rctvdlag cilfi,mvn to 1790 i mJ It iiI;ige peint,n.t 1840.Tl,,- we[, hewere nt the same tantilie,ha Char entire tint,and seer, Cued in a ca rico of ways. induul,and outdoor,. M.,.at ut the()LI Villa,,c Paint(Llour Circ nteJe with natural 1:11111 picntenra 111,:1 ummTIJ the world,ineludin",„sides Front SPain anJ Indy and linseed ails tram Americo',,otcn Midwest. The c„lours are warm anJ friendly in �uznnlanc,with Culoniod, Federal,Ind Vicn.ri:m ardiitraure. Thry il,,, create strikine backgmmnd, for modern,ening,,. Use eonJ painYim_Principle.. Sand 0,)ssv surticcs,md r,mmr am Jin, oil,toad ere ase. Takc your time; he rueful in cnurtpplic n,.11 and enjoy rhe czperwme of painting. You will ke H,,,,,J wtth the caae�mh which our point.,apply and%:o%,r at 1,ne.,,at. We o iamik-nm btuine„dc,11eorcd it,high,tLin,lard, mJ persnnnl s,mc,. Let us hc.ir from you;N%mr ct,mni,nr,arc appreciated. Old Village Paints P.O. Boz 1030 16101 238-9001 Fort),Vashington, PA 190341030 Fax(610) 238.9002 Original Old Village®Paint Colours OIL LATEX OIL LATEX 1216 Cabiner Makers Blue 1716 1123 Rittenhouse Ivory 1723 1203 Peatwood 1703 1212 Colonial Green 1712 1208 Soldier Blue 1708 1124 Village Tavern Yellow 1724 1207 New England Red 1707 1125 Valley Forge Mustard 1725 1214 Wild Bayberry 1714 1217 Cupboard Blue 1717 1204 Antique Pewter 1704 1117 Rittenhouse Red 1711 1209 Antique Yellow 1709 1118 Rittenhouse Blue 1718 1119 Society Hill Blue 1719 1202 Colonial White 1702 1206 Salem Brick 1706 1215 Forest Green 1715 1122 Tea Caddy t nrrn 1722 1205 British Red 1705 1211 Golden Mustard 1710 1121 Rittenhouse Green 1721 Also available in 1201 Pure White 1120 Village Tavern Blue 1720 and 1226 Satin Black O • ROOF WINDOWS AND SKYLIGHTS THE COMPLETE GUIDE • BRINGING LIGHT TO LIFE" 'J 1 <,. � � �,�f �; - � �� x _ , �` ,:.. I� � `� Y fk'� r , t ' 1 �: R' Yi 3 ""t,. '. S� 1 , � <.. § 'r ? :'.t k 'j i; ��'°�� .s g: `, �� _ '; D:. �.� I 4 � 3 2 0 Where there is light, there is 11 v • • This philosophy is at the heart of what we do, linking natural resources with human needs. 1 • BRINGING LIGHT TO LIFETM Nothing transforms a space like natural light and fresh air. The beauty it brings into your surroundings is a quality that no artificial light source can imitate. Providing 30% more light than vertical windows and enhanced air circulation, VE!Ur Roof Windows and Skylights deliver a constant source of natural elements to your home. But they do more than just let light in. 2ecause of their unique overhead position, tney bring light to life. They transform the :oom. It looks more spacious. Brighter. Lighter. There is a sparkle in the space that wasn't there before. So add VELUX Roof Windows and Skylights to your space and let the light into your home. After all, that light traveled millions of miles to get here. The least you can do is let it in. 44 J 40 T x R �e%L 4 ffim THE VELUX° PROMISE As the world leader in roof windows and skylights, we stand behind our products with a promise of lasting service and satisfaction. That is a promise we have kept for over 50 years, and we are pleased to extend our promise to you. The most trusted name in skylights is also If you think that all skylights leak, it's time the company that invented them. to think again. VELUX'P Roof Windows and Skylights do not leak. Proven In installations ind climates throughout the world, our exclusive flashing systems will keep you dry cnd comfortable. We believe the best guarantee is the one you never have to use, therefore, we build quality into every product. We dooffer the VFA 2C/10 Limited Warranty for specific coseroge issues. For more information and a • coFy of this warranty please call us toll-free at 1-800-88-VELUX. *r — 40 4= M I INDEX DECK MOUNT INSTALLATION NNWI The skylight and frame are one uni that'nstalls directly to the -oof decking, Electric Venting Skylight.................................. .............................R-9 • Designed for outof-reach us-- 0 sa• Push button electrical operation with remote control • Rain sensors ensure extra protection from the elements • All inclusive electronics allow for simple installation Manual Writing Skylight..............................................................10.11 e Designed for outof-reach or within-reach use • Fully opens for ventilation • Manual operation _ . . -- Fixed Skylight wOh Flap............................. ................................12.13 • Designed for outof-reach use • Limited fresh air circulation • Exclusive vent flap cai be open in any weather Fixed Skylight......................................................................14.15 • Designed for out-of-reach use • Abundant natural light t • Dramatic views Tap Hinged Raaf Window ...............................................................16 • Designed for within-reach use • Opens to 45'aigle • Can satisfy emergency escape standards • 6 CABRIO•"Balcony Roof Window.......................................................... 17 / • Provides ventilation and outdoor views for attics, bonus rooms and lofts y/ • Bottom sash opens out, creating roof balcony with side railings J • Top sash opens for ventilation; flap permits ventilation when sash is closed CURB MOUNT INSTALLATION In these installations, the skylight curb is built on site. The skylight is then mounted onto the curb and fastened into place. V FixedCurb Mount...................................................................24.25 • • Works with all sizes of site-built curbs • Appropriate for various types of sitebuilt flashing and roofing materials • Can be installed in any direction • Perfect replacement for deteriorated, plastic, curb mounted bubbles r r - Comfort"Glazing Flashing Systems...20-21 Sunscreening . . . . . 22 Options ... ... 18-19 • Maximum weather- • For cddh;ora�. • Insulated glazing tightness and protec- r'lli control of light choices for maximum tion in any weather. := evels, temperature energY efficiency. � and privacy. Controls . .......23 Product Data ...28-31 • Convenient electric • Information and and manual controls specifications to find \ for skylights and the roof window or sunscreening. skylight for your needs. • 7 F ELECTRIC VENTING SKYLIGHT- THE ULTIMATE VELUX® EXPERIENCE Not only does the Model VSET' Venting Skylight Electric bring abundant natural light into your home but with the touch of a butbn, it opens to let fresh air in, making this 'fie ultimate VELUX® Skylight. As state, humid air is released, your home wil feel comfortable any time day or night. The Model VSE can be opened and closed quickly anc quietly from anywhere in the room with the slimline VSE SIZE DIAGRAM remote. (outside frame dimensions) Sizes Sixes With its remote-control operation. the Model VSE is perfect for for Trusses Rafters _ for any room that needs natural light and fresh air. VSE VSE •m 104304 _ In addition to the remote, the VSE VSE VSE Model VSE cones with a pre-installed concealed moor, cotrol system and 106 306 d06 two rain senscrs and is prewired for VSE VSE sunscreening accessories. And — installation is simple because unlike _ __— other motorized skylights, the Model -- 11081 308 VSE installs using a single hard wire Mh 121 t t ao 1A H aaa t kh that connects into a standard junction box. The Madel VSE also comes with a select wood frame and sash, insect screen, and aluminum or copper cladding. Insulated glazing options Dual rain sensors in Comfort"or Ccmfo&lus'Glass emure extra ensure energy efficiency and comfort protection(tam the elements. in any climate or.Heather condition. INSTALLATION PITCH 85' FLASHINGS • /A `aLc,211-21 - R i • i i AltLAW. 1 ( Nit, s • 9 MANUAL VENTING SKYLIGHT 0 With a VELLX4 Model VS® Venting Skylight Monual, any home can embrace the best of what nature has to offer. Open ng for maximum fresh air, the Model VS contributes to a home's proper moisture balance and comfort level by alowing stale, humid air to be released. This is an especially important feature for installations in kitchens, bates, laundry rooms, and pool enclosu-es. VS SIZE DIAGRAM (toutside frame dimensional perfect for kitchen and bath installations o Sim Sites the Model VS opens to allow maximum ventilation. ter Trusses Rafters 1 a For out-of-reach installations, 101 601 the Model VS is easily opened and • closed manually wi-h VELUX Control 93 Rods. A smooth-turning handle is 104 304 available when the skylight is installed vs vs vs within-reach. 106 306 606 A select wood frame and sash, insect screen, and aluminum or copper cladding provide durable protection. Insulated glazing options in Comfort" 108 308 or ComfortPlus"Glcss ensure energy rn - _ 4 zr; eo% H av r Wa efficiency anc comfort in any climate or weather ccndition. ` An insect screen is included with the Model VS for protection when the skylight is open. INSTALLATION PITCH 85 ZONTRpLS • VELUX® I VCR Oilf y 4 - { 4`l FIXED SKYLIGHT WITH VENTILATION FLAP We created our Model FSF® Fixed Skylight to bring beautiful day- light aylight into your home along with an added benefit-a breath of fresh air. Model FSF features a ventilation flap that opens to allow air to circulate and is perfect for bedrooms, family rooms, and hallways where air tends to get stale and stagnant. Available with ComfortPlus- insulated glass, the Model FSF ensures comfort in anv climate or weather FSF SIZE DIAGRAM condition. A wood frame, gosketing to loutside frame dimensions) drain any cordensation outside, and Sims Sizes for for Ra Along with light and sky views, the Model FSF Trusses _ W r9 brings a breath of fresh air into your home. z 101 601 • rsr r3r protective aluminum or copper 104 304 cladding ensue durability and w rs' `9 weathertightness. The Mocel FSF also features a 106306 606 streamlined exterior with a smooth, z rsr s' low profile that does not obstruct your roofline. 106 308 M Y 421-60 s 30% N 44% 1 Zh The ventilation flap can be left open year-round for fresh air circulation—even when it's mining. INSTALLATION PITCH esu FLASHINGS 12 % 9; . � � POPE I \ - � � �� , � � � &��■� r � FIXED SKYLIGHT 0 The Model FS® Fixed Skylight is perfect for visua ly expanding areas such as hallways, stairwells, and other closed-in, dark spaces that can be transformed with light and sky views. The Model FS provides an economical alternatve in creating a spacious home that is filled with natural light. Desisned for out-of- reach use, the Model FS captures abundant daylight for rooms in which FS SIZE DIAGRAM maximum lighting is the only requirement. (outside frame dimensions) Size, Sizes At a price to fit every budge:, the Model FS captures for for Trusses Rafters abundant daylight for every style and size home. _ f5 FS 101 601 -X • Fs For durability, weathertightness, 302 and energy efficiency, the Model FS is Fs Fs quality constricted with a select wood frame, gaskets to drain any 104 304 condensation to the outside, and a Fs Fs Fs Fs choice of Comfort- or ComfortPlue insulated glass. 106 056 306 606 Protective exteror cladding, Fs Fs z available in awminum or copper, offers protection anc a streamlined, lowprofile appearance. 108 308 - z ]112 Sleek design and economicalprice make the Madel FS a beautiful choice for every home. Iah 127'G 1 115%04 30% H k1: 1 hd INSTALLATION PITCH BS' --""N-17 14Roio i t • v N o .. a • 15 TOP HINGED ROOF WINDOW The Model GPL-Roof Window lets 45° angle to satisfy Egress require- you expand o-t-ansfarm upstairs ments for emergency escape. space into beawiful living areas filled For easy glass cleaning from inside with daylight, outdoor views, and the room, the sash rotates completely fresh air. inward. A select wood frame and sash Designed tc be installed within-reach, coated with a clear finish, protective such as in attics, above-garage bonus aluminum or copper cladding, and rooms, and loft areas, the Model GPL Comfort" Glass ensure durability opens to provide maximum ventilation. and energy efficiency. An optional When the roof w ndow is closed, a insect screen and sunscreening are ventilation flap can be opened to allow also available. in a breath of fresh oir in any weather. Additionally, this Model GPL comes GPL Slg DIAGRAM in two large sizes and opens to a (outside frame dimensions) Sizes for xatbr: 606 s (SSD6) M08 �ll w +Model GPL 308 and 6L6 meet w Egress requirements om `� Ae sash on Model GPL pivots inward for easy and safe cleaning of the out- .vide glass pane from inside the room. INSTALLATION PITCF 55° MF FLASHINGS 16 CABRIOTM BALCONY ROOF WINDOW I A true innovation for the window A floor-to-ceiling glass area industry, the Model GDL CABRIO'' brings in abundant daylight while Balcony Roof Window transforms ComfortPlus" insulated glass keeps .mused attics or above-garage bonus interiors comfortable in January and rooms into extraordinary living space July. When the CABRIO is closed, that embraces the best of the a ventilation flap allows fresh air outdoors. circulation in any weather. The CABRIO features an exclusive The CABRIO is durably constructed dual-sash operation: The top sash with a select wood frame and sashes opens for maximum ventilation and coated with a clear protective finish olso pivots completely inward for and exterior aluminum or copper easy glass cleaning from inside the cladding. An optional insect screen -oom; the bottom sash opens and sunscreening are also available GDL SIZE DIAGRAM outward to actually create a roof (outside frame dimensions) oalcony. 419 (P19) lel ]) 1 yy AM The innovative Model CDL CABRIO opens to create a spacious roof balcony. 1 INSTALLATION PITCH G sa COMFORTSNWZNG GLAZINGS Pa.", I's. 8J� . Page 22 Tempered safety glass Comforff GWINGS / Specially formulated law-E'coating for With VELUX® Roof Windows and hear gain andjade Skylights, you can bring the beauty 1 protection of the outdoors into your home comfortably and efficiently, even in extreme weather Argon gas conditions. increas ford increased We utilize the latest technology in thermal producing our own insulated glass to perfornance ensure it meets the highest efficiency standards while also allowing you a perfectly clear view and maximum Stainlen steel liht. Our exclusive Comfort"Glazin s, spacer reduces ght. 9 � condensation designed specifically for sloped \ and increases applications, ensure that VELUX products Comfort Gkss energy efficiency provide unparalleled protection against Stancard in all VELUX products. Comfo-t Glass heat gain and heat loss, fading, and consists of two panes of tempe-ed safety glass dual-sealed and condensation. injects with argon gas. A double layer of our exclusive Low-E Two glazing options are available to coating provides excellent thermal performance. ensure maximum customer satisfaction, laminated pane o`glass • for safety and marbnam �.��(�� protection from beth heat conti UrMUS,G6ss gain and fading Also available is our laminated, Low-E' ComfortPlus"Glass for maximum protection and indoor comfort. ComfortPlus features c laminated pane of glass for added safety and p-otection from fade-causing rays.. PROTECTS AGAINST HEAT GAIN RESISTS CONDENSATION 500ma 1000M 1500wm 2000 me Comfort Glazings 9] 90% clear Gloss provide up to 73% mon =. to. M. x protection against 6) Comfort Gfos 40% soar heat gain versus Is just 23% protection T Clow Glass x • 30% ' wi-h clear glass. 33 n wYyY WY 0% w hdu.utht i.r,,,.a Him 3( 0 30 60 18 Outdoor temperature(OF) THE CLEAR CHOICE Glass, particularly the Comfort" Glass used in all VELUX0 Roof Windows and Skylights, is superior to plastic in every respect. It's more energy efficient. More durable. It reduces external noises, it such cs pouring rain. And, unlike plastic, it wont discolor, leak, or allow drafts. � t Our glass looks beautiful inside t and out, provides you with a clear view of the sky, and lets in natural light for yeors to come. Quite simply, VELUX Roof Windows and Skylights will look and perform better, longer. • The Energy Star'windows program is a voluntary partnership between the U.S. Department of Energy and the fenestration industry to promote soles of energy efficient windows, doors and skylights. By choosing Energy Star qualifying products, homeowners can cut their i heating and cooling costs, help make their homes more comfortable / and reduce air pollution without sacrificing versatility or style. „ All VELUX Skylights meet Energy Star approval guidelines, and they're 40% more efficient than most national building codes require. Which means they promote energy efficiency and save you money on utility bills—all while making your home brighter and more comfortable. PROTECTS AGAINST FADING With Comfo-t Comfort Glazings Glazings, o home O protect your interiors can contain up to by controlling up to 50% more h tmidity 9 83% of the sun's •before condensation fade-causing rays. will occur. 83%Fading Protection ComfortPlus"Glass 19 FLASHING SYSTEMS TYPE EDL® STEP FLASHING For use with thin roofing materols such as asphalt or fiberglass shingles, slate, cedar shirgles and shakes*. Each piece of step flashing is interwoven wi"h a layer of roofing material for proper water drainage. No caulk or sealays are needed. Type EDL® is designed for roof pitches from 15° (3/12) to 85°. * ZZZ 165 required for shakes and other thick roofing material TYPE EDWN HIGH PROFILE FLASHING For use with high profile roofing materials such as concrete and Spanish tile. The patented sill flashing piece features pliable pleats that can be easily formed to most ty s and heights of tile. Side and head lashing pieces form a = gutter which directs water away from the skyligh-and off the roof. Type EDW" _ is designed for roof pitches from 15° (3/12) to 850. -- TYPE EDM"METAL ROOF FLASHING A VELJr exclusive, Type EDM" Metal Roo-' Flash ng makes installing skylights in metal roofs a snap. Type % EDM flashing pieces interlock directly with the roofing material for a fast, weathertigit instcllotion and streamlinec exterior. A sill ap-on features pliable pleats that form to the roof. Type ED,%A is designed for roof pitches from 15' (3/12) to 850. I Copper claddingFlashing Systems VELUX Type ZDZ 121 andfiashing are Type EDL,EDW Skylight Roofing available for VELUX and EDM are Underlayment wraps Roof Windows and ' required for sings ® skylights in a water.• Skylights,excluding 85*; unit insudLanoas wits. proofbarrier ro pre FCMP 1}* roof pitches from 15° vent water infiUratlon (3/12)to S5°. when ice accumulates on the roof.' 20 Note:Curb Mounted Fired Skvlights require site-built curb and flashing. G � s. li lama F- L A 7Wfl 7 .. ., A 1!! 1112 ii 9H: as we of ! �1 alu 1 a iii" ie F! 'see ME / `3!B 091'! O4 911 II91 l ,ll l9. 'D® e i1 as TYPE ECX®/EMX"FLAT ROOF CURBS V_LUX' prefoxicated Roo'Cubs provide the proFe- pitch necesscry for VE_UX Skyligh' insallotions on ict or low- slooed roofs. Factoryapplied insilation increases energy efficiency. • Type ECX* Roof Curb is recgri-ed for -VPE EKL/EKW COMBI-FLASHING` roof ptches from 0°to 10 (2/121. Type This modular system allows easy Eb1X'" Roof Curb is required fo- roof installation of an unlimited number of pitches from 10` 12/12) to 1_`° 0/121. skylights closely together to dramatically 85° transform interiors aces with light. 15° ECS ° 100" EMX ..._".15° p g 10° Type EKL works with groupings on lowprofile roofing materials such as shingles and shakes. Type EKW works with groupings on !'"° high-profile roofing materials such as Spanish tile or corrugated metal roofing. Designed for roof pitches from 15° 13/121 to 850 . I 1luw61 II .. ai • y 21 SUNSCREENING ACCESSORIES UghtBlock"'Shade Pleated Shades The LightBlock" Pleated Shades can Shade can increase increase energy energy Efficiency up efficiency up to 12%. to 20%.It provides - They offer soft total room ' lighting or room darkening when darkening with lowered excluding convenient electric or even the brightest manual operation. sunlight.Electric controls raise or lower the shade at the touch of a button. Venetian Blinds Roller Shades Venetian Blinds Roller Shades increase thermal t-- �.. provide filtered performance up to I .. lighting or room 12%,and allow �N 'e. darkening and are flexible control of I easily raised and lighting levels lowered with a pull either manually cord or optional or electrically. - Cord Pulley. I Eledric Heatill"n' Manual Awning for HeatBlock" the VSE"" Awning for Electric HeatBlock" Roof Windows Awning blocks up to Manual HeatBlock'" 40%more heat than the already energy Awning blocks up to efficient Comfort'" 40%more heat than Glaring.The special the already energy awning material efficient Comfort blocks heat while Glazing.The special still allowing a clear awning material view to the outside. blocks heat while The awning connects still allowing a clear directly into the view to the outside. pre-installed control Available for the system of the VSE" GPL'Roof Window. Note:For Sunscreening Accessories,hr Curb Mounted Fixed SkyligHs seepage 24. VELUX® Sunscreening Accessories offer convenient control of interior lighting levels and improve energy efficiency up to 20%. Every s a data Roof WindowandSkylight • features n data plate mounted on the frame that give:you the information you need to select the right accessoryfor your unit. VELU%-AMERICA INC. c.O. So, 500 rroonwood, SC 29610 22 Mode 11 U.5 A 4 CONTROLS VELUX Eiectric Controls bring operation within easy reach with just the touch of a button - regardless of the height, location, or number of VELUX Skylights and Sunscreening Accessories installed. We offer a selection of control options created to suit your particular installation perfectly. Whether you Keypad WU 160 COMBlcontrol WLC 160 for Electric Accessories for Electric Accessories Simply want f0 control one electric Features a remote-reinb-derign rm, r OMBlcomml unit pawerr up to Venetian blind Installed on a fixed that ran be progra nmcd forunit der, ;Irro'i, arrexsor'ies.Applications Skylight, or one-touch remote operation rums nr whole-fun¢ r'n mid I...I,n/ n 11 nmrr than err--�r electric If, rh �rih fie ,m np,'uI0 ane sun- ,sanies sill nquitr one Of multiple skylights and SUnSCreening su nmg iroesc mt (OA1Bhvnb'ol unit Jiireven'three accessories, our Electric Control Systems accessories.Keypad WLI I6o is allow you to enjoy any number of required for operation in applications skylights installed at any height without Nut do not include a VSE" sacrificing convenient operation. CHL/CHS Remote WLR 160 Crank Handle for Electric Accessories Handles are available to operate VS"°Skylights in Used in . this sli nn wren the Keypad Wfr o60 tchnolmoirit,renioneopetat utilizes svilhin-reach applications. in/tared teclmnoogy a operate electric actcessories from unvwlie,v in the room. UNlcontrol KES 160 for Electric Accessories Operates one electric.sun.screening necessary. • 6'-10' Motorized 6'-10' Manual 3' Rod Extension Rod ZMT 300 Rod ZCT 300 ZCT 100 Note:No cantrn(s air required far the VSE bean -operated Oil,' r,� i none Attaches to the 0 because lite VSE includes a pre-installed c'ontrrol buten-operated rad units and manual Boo and ZCT 300 ,system and includes a remote control. nllarvs entry conrgd sursrreenting with Rads. (if renting units and a smoodo-tu ring manual sunscreening. operation. 23 CURB MOUNTED FIXED SKYLIGHT Where a curb mounted installation method is required, there is no better solution for natural light than the Model FCM' Curb Mounted Fixed Skylight. Whether for new construction or for old skylight replacement, the Model FCM is the clear choice. Model FCM is sized to work with all types of site-built curbs. And since the FCM has no designated top, bottom, or side, you can install \ it in whatever direction you want. Heavy-d.tty materials ensure the Model FCM is built to withstand Site-built curb Site-built M SIZE DIAGRAM the installation process, as well as waremmoFng FCSI (inside curb dimensions) anything Moher Nature throws its way. A maintenance-free exterior Sim kr s combined with a JV-resistant ABS for Trusses Rahn interior and integrated gasket, seals rv4 rete - out water, wind, and hassles for 2222 2234 2216 years to come. 3030e Model FCM" is the per replacement for X deteriorated, plastic, curb mounted bubbles. _ e 2234 X raw rcM X 2246 4646 Ird 122'5 / 1 30'6 N 34'6 /1 46'5 I Irc� *Custom sizes are available. _ Call l-800-88-VELUX for more 1W Will information. Pleated Shade for Curb Mounted Skylight The comfort control solution for curb mounted skylights.Minimizes heat gain or loss and condensation, while softening direct sunlight. Improves energy efficiency of the skylight INSTALLATION PITCH up to 12'%due to a unique thermal coating on the back of the fabric. Controlled with Manual Rod ZST. 0 6'-10' Manual Rod ZST 300 24 i 2 x • 25 CONSIDERATIONS Consider ' I any room, no matter what ' or roof / ' 4*4 26 � I \ e 441 I � VELJX' Roof Windows and Skylights can enhance any room L with drematic natural light no matter what type of ceiling stands in the way. Di ferent types of flared light shafts can be constructed to maximize natural lighting and to FLAT CEILINGS CATHEDRAL CEILINGS create architectural drama in rooms Alight shaft lets nanuallightinro morns avithflai Skylights installed in high sloped ceilings add with flat ceilings, cathedral ceilings, ceilings andslaped roofs. visutdspace and create architectural drama. sloped walls, and flat or low-pitched roofs. SLOPED WAILS FLAT OR LOW-SLOPED ROOFS • A flared light shafi.spiruds sunlight across mous ECX'IEMX'rvol curbs allow skclights to be with staled walls. insudled un flat or low-pitched rr oli'. Whether your house is built using rafters or trusses, VELUX Roof Windows and Skylights come in a size to match. RAFTERS TRUSSES VELUX Roof Windows and Skylights come in We offer five sizes designed to fit perfectly in a variety oj'sizes for homes built using rafters between trusses(24"on center).And even (16"on center). Since rafters can be cut, trough trusses shouldn't be cut,multiple sky- these sizes are constructed to fit between nvo, lights can be joined together using Combi- • three,at four rafters.This means greater Flashing'to let in more light and increase design flexibility for large,clear openings. architecrural drama. 27 PRODUCT DATA ; To assist you in your planning, these charts provide the dcta useful for specification and installation of your VELUX®Roof Windows and Skylights. Each model is shown with the available size measurements and other necessary inforrrwtion. • Venting Skylights V5" Models 101 IOa N106 108 304 306 308 601 606 Outside home (wxh) in. 21%x27'/, 21%08% 21'%x46% 21'%x55 30'6x38'% 30`6x46% 30%x55 44%x27% 44%x46% mm (548x699) (548x978) (548x1178) (50x139E) (778x978) (778x11181 (778x1398) (1138x699) (1138x1178) Finished home (wxh) in. 20Yx26Y 20%x37%e 20%x45%, 20%x531 29%x37Y, 29%x45'6, 29%.x53Y 43'6x26% 43%x45%r dimension room (521 x667) (521 x945) (521 x 1145) 621 x 1369 (751 x945) (751 x1145) V51 x 1365) (1111 x667) (1111045) 1145) RUhofix (wxhl n. 21% 28 21%x9 %x46 71%x SSA 30%x39 0%x46 3 %x55% 44%x28 44Yx46nM mm (548x711) (548x991) (548091) (548x1411) (775x991) (775x1191) (775x1411) (1138x711) (1138x1191) Rfoorpgfor (wxh) in. 21Xx34A 21%x46% 21%x54% 21'6x63% 30%x46% 30%x54% 30%x63% 44%x34% 44%x54'% It RoofEA mm (548x877) (548x1172) (548x1383) (AB x1615) (775x1in) (775x1383) (775x1615) (1138x877) (1138x1383) Wh�opfm_mg fix (wxh) n. 21'%x30% 21'%x41% 21'%x49% 11'%x58% 30%x41% 30%x49% 30%x58% 44%x30% 44%x49% RR Grtb mon (548yVx��768) (548x1051) (548x1254) (548x1477) (775xx 1051) U75x1254) (775x1477) (1138yx5767) (1138x1254) aNy VSEISEISEE � KE �VSEB � 1% E Model VS(on y) Daylight arm(gkm) (wxh) in. 16%x21'%, 16Yx32% 16%x40'%, 15%x49% 25'%232'% 25'%.x40'% 25'%x 49N 40221'%. 40x40'% Daylight area sq N. 254 3B2 474 5.75 5.88 7.30 8.85 6.06 11.30 VennWion area(opeiM) sq.N. 1.82 2.35 271 3.14 376 4.25 4.84 3.07 5.19 Not might(wilhtemp.glass) 0n. 38 44 53 62 62 73 75 63 90 Model VSE(Only) 0ayf onea(glos) (wxh) n. N/A 1001% WON INx48% 25%x N% 25%x39% 25%x48% 40x20% 40x39% Daylight area sq.h. N/A 3.7 4.6 5.6 5.1 7.1 8.7 N/A 11 Ventilation am(opening) sq N. N/A 3.58 4.11 4.17 424 477 5.33 N/A 5.76 • Nei weigh(with temp.glens) Is N/A 49 56 63 61 70 80 N/A 94 Fixed Skylights PVT ModelsFli: FSF®& F$® 056 ®101 104 106 ` 108 112 ®302 ®304 306 308 601 606 In. 15%.x46% 21%x27'6 21'%x38% 21%x46% 21%x55 21Xx70A 30'6x30`6 30'6x38% 30%x46% 30'6x55 44Yx27% 44%x46% Outside home mm (389x1178) (548x699) (548078) 1548x1178) (548x1398) (548x1830) (778x778) (778x978) (778x1178) (778x1398) (1138x699) (1138x1178) (x*Whmdlg in. 14%x49/ 20%z 26% 20'6x3PAr 20%x456, 20%x53% 20'6x6'.%, 2111%x2T66 29'6'x37%, 29'6.x45Y. 29'6rx53Y 43%x26% 43%x494 dimemion mm (368x 1145) (521 x 667) (521 x 945) (521 x 1145) (521 x1365) (521 x 1767) (751 x 751) (751 z 945) V51 x 1145) V51 x 1365) (l l l l x667) (1111 x 1145) Rough opening n. IVx46% 21% '6 x28 21x39 21'6x46% 21%x596 21%x71% 30%x31 30%x39 30%x46% 30'6x55'6 44%x28 44Yx46A forMVMW/EDM mm (368x1191) (548x711) (548x991) (548x1191) (548x14111 (548x1813) (775x787) (775x991) (/75x11911 (775x1411) (1138x711) (1138x1191) Roughapeing in. 21'%x30 21%x41% 2PAx49% 21%x58% 21WLY, N/A 30%x41% 30%x49% 30%x58% 44%x30% 44%x496 for FMX mm N/A (548x768) (548x1051) (548x1191) (548x1477) (548x1886) N/A (791x1270) (775x1254) (775x1477) (1138x768) (1130x1254) Roughopemg in. N/A 21'%x34'6 21%x46% 21%x54% 21Xx63X 21%x806 N/A 30%x46% 30'%x54% 30'Ax63% 44%x34% 44%x54% fa K1( nm (548x877) (548x1172) (548x1383) (548x1615) (548x2039) K/A (775x1172) V75x1383) (775x1615) (1138x877) (1138x1383) Model FSF(only) Daylight arm(dm) n N/A 18%x9N MOV, IBY,x 406 18'%x49% N/A N/A 2P6 x 37% 27'6x40% 27'6x49% 0,01% OAS, 0ayiglnmen sq.B. N/A 2.73 4.11 5.11 6.21 N/A N/A 6.16 7.65 9.30 6.22 11.64 VmlilolnnFlop arm sqn. R/A 13.30 13.30 13.30 13.30 N/A WA 19.50 19.50 19.50 29.10 29.10 Net might 6s. R/A 34 44 52 60 N/A N/A 58 68 77 66 94 I�Imn.g1o51 Model FS(only) Daylight mea tghsl in 12x42'% 18%.x21% 18%,05% MAIN. IBM51% IRMO, 2Vx29% 2PAx39% 27'6x47%, 21'6x51% 41%x24%, 41%,x42'% • 0oylghl arm g.0. 3.58 3.04 4.43 5.42 6.52 8.52 5.23 6.64 8.12 9.78 6.92 12.36 Net weigh In. 35 23 31 35 43 68 34 41 53 62 43 65 (wish temp,glms) fi i i Curb Mounted Skylights xx Model F(M" ®2222 2234 2246 3030 LA 4646 Imide Curb in. 226x22'6 22%x34% 22%x46% 30%x30% 46'6x46% Dimension mm (572x572) (572x876) (572x1181) (775x775) 0181x1181) Outside Curb in. 25%x25'6 25%x37% 25%x49:5 33%x33% 49%x49% Dimension mm (648 x 648) (648 x 953) 1648 x 1257) (851 to B51) 11257 x 1257) Skylight in. 26%x26% 26%x38% 26%x SOF 34%x34% 50%x50% Dimension mm (676x 6761 (676 x 981) (676 x 1286) (880 x 880) 0286 x 1286) Daylight arm(gons) in. 22%x22% 22%x34'6 22%x46'6 30%x30% W 46'6 Daylight area sq.h. 3.52 5.39 7.27 6.46 15.02 Net weight lM 16 31 47 40 86 IA temp.gMsl • *Actual das•liydt stress varies ha.ced nn enrb eonxtrnclion. Note:Co mm sizes arailnhle. Call I-300-33-V23LUXfar more infannalion. Roof Windows Model GPL'" 308 606 Model (Poll (MOB) (506) GDL(ABRIO'" 419 (wxh) in. 30'6 x 55 44%z 46% Ouhide Game (w x h) in. 37 x 100 Onside home mm (778 x 1398) (1138 x 1178) mm (940 x 2540) Rough opening (wxh) in. 31%is 55% 45%x 47 Rough opening (w x h) in. 37'6 x I OOA mm (953 x 2553) mm (791 x141 O) (1149x1194) ) (wxh) in. 30x53'/+ Daylight area(glass) (wxh) in. 23%c x 61 37'%,x 36'6 �gMmes(WPB Daylighlarm(ipper) sq.N. 11.1 Daylight area sq.h. 7.38 9.58 Daylight area(lower) its x h) in. 30 x 28% Ventilation arm(opening) sq.h. 11.34 18.27 Daylight area(lower) sq.h. 6.0 Ventilation Flip area sq.in. 30.00 47.81 VernihoWn area sq.0 12.55 Net weight(with glass) lbs. 86 108 (upper sash sedion only) Venlilutian Nop area sq.in. 36.7 Net weghi(wiih glass) lbs. 220 Nute: hi Condn applimtianc is lost Model GD2.. J"(ranre-tn frunre spacing i.c required ftrr proper l7o�hing. • 29 PRODUCT TESTING MODEL VSE"TEST RESULTS MODEL VS®TEST RESULTS AIR INFILTRATION' AIR INFILTRATION' 1.57 Tiff 75 Pa 1.56 psf 6.24 psf (25 mph) 140 km/h) 125 mph) (50 mph) 0.17 cfm/ff 0.86 I/s/ma 0.07 cfm/ft 0.18 cfm/ft WATER RESISTANCE' WATER RESISTANCE' 2.86 psf 140 Po WTP a 2.86 psf 133 mph)@ 5 US gal/h'yh (53 km/h)@ 3,4 /m'/min 133 mph)@ 5.01C gph/h' No Entry No Entry No Entry THERMAL PERFORMANCE THERMAL PERFORMANCE Complete unit values.) 1Compleas unit values) All thermal performance SHGC,VI values For VELUX Skylights All thermal performance SHGC,VI vases for VELUX Skylights are NFRC cerfiked,labeled and Ibtad in the NFRC Proi are NFRC certified,labeled and liner in the NFRC Product Directory.(1n accordance with NFRC procedures.) Daecrory(1n accordance with NFRC p.aches) GLASS Comfort 175) Comforti(74) GLASS Comfort 1751 Comfortf(74) Tempered,tow{', Laminand,lowEF, Tempered,Lowe, Lominoled,lowE', Argon Argon Argon Argon Gosfilld Gosfilled Gasfilkd Gosklled Ufoop,lRiaclarl 0.40(2.50) 0,41 (2.44) Ufadarllffodor) OAT (2.4) 0.42(2,38) SHGC 0.29 0.29 SHGC 0.29 0.29 N 0.44 0.43 044 0'" FADING PROTECTION% FADING PROTECTION GLAZING CLASSICAL W TOTAL FADING GLAZING CLASSICAL Ut' TOTAL FADING PROTECTION% PROTECTION% PROTECTION% PROTECTION% Comfort r751 87% 75% Comfort PB 87% 75% CamtatFlm 1741 99,9% 83% Comf ersus 1741 99,9% 83% STRUCTURAL PERFORMANCE" STRUCTURAL PERFORMANCE" DOWNWARD LOADI WIND UPl DOWNWARD LOAD I WIND UPLIFT lamimd, laminated, tbd5fien*end 12.75 f all 22296(pQ Hem.stre tiered 12s0 Psq PP.las in 1° d0ed• 10&1 heat 22-96(1 iemyeredd' 108.1821psq 31.96M sten Tested[noa &d wRAAMM/VN•M1600/5720W,VOILPJ Y inbd in aaerdnnn witA AMM IdWc0,VIXIIMARY SPECIFIGIION SPKIFICATOV FORSNYIM,NIS.Sae 606 unit temd at o IS°rad piNn FOR SUIIGMS.So 606 unit bead at a 5°.of land. '• Ti in aaani nor with K80EwWafim Se,,ioe,ac.Amptmre •' Tend in arradoae win RYOEuFnficn iwvtms,Hc.Ac,"Pon e Ctiwb la Shped Glmgxsda;no.Pdof iird W56ioewf U'twbhSlaped Gburg b5dwbmr.Polo conn ad Refabrokd Sk>W'pM1e VHUX Real No.NEP R16. gyVes.MA Rpm Na.NR 216, CODE COMPLIANCE VELUX®Roof Windows and Skylights meet the general requirements of all model building codes including the Standard Building Code (SBCCI(, — International tine and Two Family Dwelling Code, Uniform Building Code IICBO), and National Building Code (BOC-.A). (See NES Evaluation • Report NER-216.( 11 addition, all VELUX electrical components are UL/CSA approved. 30 • MODEL FSFO TEST RESULTS MODEL FS®TEST RESULTS MODEL FCM•"TEST RESULTS AIR INFILTRATION" AIR INFILTRATION" AIR INFILTRATION" 1.56 psf 6.24 psf 1.57 psf 75 Pa 1.57 psf 75 Pa (25 mphl i50 mph) 125 mph) 140 km/h I 125 mph) 140 km/h) 0.07 Cfm/h 0.18 cfm/ft 0.05 cfm/f1= 0.25 /s/m' 0.20 Cfm/N' 1.00 /S/m'' WATER RESISTANCE' WATER RESISTANCE' WATER RESISTANCE" W'TP=7.50 psf WTP=6.0 psf 140 Pa 6.0 psf 287 Pa 155 mphl @ 5.00 gph/h149 mph)@ 5 US c: - 179 k, - - - �„ (49 mph)@ 5.US pl/F/h (79 km/h)@ 3.4/m/m No EntryNo Entry No Entry No Entry No Entry THERMAL PERFORMANCE THERMAL PERFORMANCE THERMAL PERFORMANCE Complee,unit volueel Complete unit Values.) All fhamal performance SHGC.VI values for VEIUX Skylight All thermal performance SHGC,Vt values for VELUX Skylights 'FLUX Skyllghls are NFRC nathed,labeled and lined in the NFRC N dud are NFRC orehlad,labeled and listed is the NFRC Product Diretlary.(In aRc.,d.n,e wilh NFRC promlmes.) Near.,,(in ocmrdlem.with NFRC procedures.) _ GLASS ComfortPlus(74) GLASS Comfort(75) ComfortPlus(74) GLASS Comfort p5) ComfortPIUS i74i Laminoted'la,v-°• Tempered,Lo-F, Laminoted.L.E TempareJ,LOW�E, Lm'aataJ,L.vv-E Argon Argon Argon Argon Argon Gas filled Gas filled Gas-filled Gaslilled Gmfilled UTadar Rtoaorl 0.41 (2 44) UEodN IRhowl 0.37(2.70) 0.41 (2 44) U{aow IR Fam') 0.44(2.27) 0.44 12.271 SHGC 0.29 SHGC 029 0.29 SHGC 0.35 0.35 0 46 VI 0.44 0.43 v! 0.51 0.50 FADING PROTECTION % FADING PROTECTION%9 FADING PROTECTION% GLAZING CASSICAL W TOTAL FADING GLAZING CLASSICAL UV TOTAL FADING GLAZING CIASSICAL W TOTAL FADING PROTECTION% PROTECTION% PROTECTION% PROTECTION% PROTECTION% PROTECTION% CombtFus7e999°: 83% Confan 1751 A]°, 7P° Comfw11751 87`; 75° l ' ComfNlPlm bel 99,9 A3°b CW.11Plus P41 999`% 631s AOR In rcrardrnrr wet•In' -ro,VOLUNTARY"'k "'cA"o STRUCTURAL PERFORMANCE'" STRUCTURAL PERFORMANCE"' VOR SRYIIG...d Sloe N.15 rmV envy'm°IS'and akh DOWNWARD LOAD I WIND UPLIFT DOWNWARD LOAD WIND UPLIFT Laminated. 12-75 s 2296 laminated, H 1'!o',en Ihened P IPsl Hea4Sna 'heed 3535 ps! dp60 PA Lom�ed, Temed log.182 IPs9 2246 J4 Uled• 9d132psQ 56-168pI Tamper ' Tesled In aaordn°re wrrh AAfl4/WPNA 1d167 2M,VOLUNTARY Toned in occardoVicewIts AA6AIVD I6W/157=WWNIARY SPEUFICATICI'1 FOR SOLRRPo Sure 606 umr Vaned of o 15`-1 prkk SPEOPICATION MR SXYL'C $bre 606-1 Irsmd°V r 15"roof ol,h knell In-d°m w'r,cBO{'alrmmrn �seca.Ins,Adept d m°ccmd n •• toed vA r8obalrono°5-is,me Aoepmrce olmre 6 sloped Gamy In 5olniumr,Pa.cam and PrcbbcsAsd Ciern.656*o4amgn S,Ar.mr,Pore Corers and Rahbnm,N S4ylrghrs.VEIUX Ronan Na.NEA 216 SFyIyhn.VEIUX Penin No NFP 216 .j^'. BOCA o NATIONAL LUMBER CO. 33 IMASO l STREET =T u�� d VELUX-AMERICA INC. s; Lw Md11 M 450 Old Brickyard Road P.O. Box 5001 Greenwood, SC 29648-5001 Phone: 1-800-888-3589 • Fax: 1.800-388-1329 Internet: http://www.VELUX-AMERICA.com ®VELUX,W=Logo,FS,VS,FSF,EDI,ECX,and Cumin lashi-9 ore regiskred wdemada. TMGPL,ECL,EDW,EDM,EMX,FCM,VSE,CASK),CanW,CcunW ,,H.orBb&,099 Doak,BRINGING UGHF TO UFE are r.da.,6 0l VELUX GRO'U? V USA 15170101 Prined in U.S.A. ®1997,2001 VELUX GROUP Co T Salem Historical Commission ONE SALEM GREEN,SALEM,MASSACHUSETTS 01970 (978) 745-9595 EXT.311 FAX(978)740.0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: 82 Federal Street Address of Property: 82 Federal Street Name of Record Owner: Christopher& Linda Luneau Description of Work Proposed: Replacement of bathroom window to replicate existing. No changes in color, material, design or outward appearance. Non-applicable due to being in kind replacement. Dated: April 2, 2002 SALEM HISTORIC COMMISSION By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. 04 Salem Historical Commission CITY HALL. SALEM. MASS. 01970 r JA�0IMML CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed construction [ ] ; reconstruction [x]; demolition [ ] ; moving [ ]; alteration [ ] ; painting [ ]; sign or other appurtenant fixture [ ] work as described below in the . . . McIntire Historic District. (NAME OF HISTORIC DISTRICT) Address of Property: 82 Federal St. Name of Record Owner: Eva Fournier DESCRIPTION OF WORK PROPOSED: Repair trim ( facia, soffits, crown molding, rakeboards, skirt molding, band molding) as necessary. Shingle repairs, lattice repairs . Repairs/replacement to comprise no more than 10% of the total surface area. Repainting to match existing . No changes in color, material or design. Non-applicable due to being an in-kind replacement. does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act (Federal Laws, Ch. 40C) and the Salem Historical Commission. Dated: November 8, 1990 SALEM HISTORICAL C�O-MMMMISSION By Chairman ;,ai, •`•'ql Vl Ai ,-� J aiem !-�� zioncai ,.jmmisswn .iNE S.=.L__.J GRE_`!.SALEM. MASSACHUSETT3 0197r, 17T 745-9595, EXT. 311 NOTICE OF DENIAL OF APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY RE: 82 Federal Street On Wednesday, November 7 , 1990 , the Salem Historical Commission unanimously denied an application for a Certificate of Non-applicability from Eva Fournier for her property at 82 Federal Street regarding the reconstruction of a rear porch and railings. The application was denied due to the work constituting a change from what is existing and therefore would necessitate review under an application for Certificate of Appropriateness . I attest that this is an accurate record of the vote taken, not amended or modified in any way to this date. November 8, 1990 JaW A* Guy Clikkk of the Co ssion cc: Building Inspector City Clerk JHisCom8/Denial5 � � .�:. � , � �� � ,� ,_,. ` .• ffgg__ � C t 1. � �q� - �e ., , - ��= �` :� - �ca� _. �.�-��� .�/� i �� z - _ '� `~l =�= =� -- — .•�_ ��'1 �� � � a `..x �/ — _ = �: �� �: `� � r . � p' � �- �-`-�c+l9�l�j ./,1�� �S - �GLMIVF. Salem Historical Commission CITY HALL. SALEM, MASS. 01970 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed construction ( ) ; reconstruction ( ) ; demolition ( ) ; moving ( ) ; alteration (x) ; painting ( ) ; sign or other appurtenant fixture ( ) work as described below in the . . . Mr Tntirp Historic District (NAME OF HISTORIC DISTRICT) Address of Property: 82 Federal St. Name of Record Owner: Eva Fournier DESCRIPTION OF WORK PROPOSED: Replace rear porch railing with wood railing as per drawings and pictures submitted. Steps, poles and porch size to remain the same. Wood to weather no stain. will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic Districts' Act (Mass. Gen. Law Ch. 40C) and the Salem Historical Commission. Dec. 3, 1990 Dated: SALEM HISTORICAL COMMISSION By ay( ( % Chairman C9a/N��2 EyRV�K< - CoNr?e�e� Ser Pfr w irlr /g " „- To i "0 Prot QJCb '6d X Ftk v.$ :h � 1 I fn s ii ` y i _ V 1 t 7q- _ f Y. 5. -]� r s _. --- - , �` ' "�- ' � � 1� ��_u 8� ffpCA^ ST. «<slrc/ z t Salem Historical Commission CITY HALL. SALEM. MASS. 01970 tir Rf�NM6�� CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed construction [ ] ; reconstruction [ ]; demolition [ ] ; moving [ ] ; alteration [x] ; painting [ ] ; sign or other appurtenant fixture [ ] work as described below in the . . . FEDERAL STREET AREA Historic District. (NAME OF HISTORIC DISTRICT) Address of Property: 82 Federal St. Name of Record Owner: Francis Fournier DESCRIPTION OF WORK PROPOSED: Installation of vinyl siding, shutterst and painting as described belows On ffont of house and bay on left side at front, First floor, white vinyl siding, door and window casings exposed, trim reapplied where removed; Second floor and above, new shingles to be installed in all areas where currently shingles, stained white, top of porch rail to be white vin*l siding, all trim and casings to remain; Painting of casings, window trim to be white, doors black, and three pairs of wooden shutters installed on front to be black jj/oojt � On rest of sides and back, vinyl siding. will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act (Federal Laws , Ch. 40C) and the Salem Historical Commission. Dated: SALEM HISTORICAL COMMISSION B lI II Y V hai ma r Q Site LOGotion O N +' O EXISTING LIVING ROOM EXISTING N feel PARLOR 4CC% Bdy N p, N O 2606310 01 ��063TTTT 4 - Addrp4a 82 FEDERAL STREET ` LWO Use 104 gook and Page 15319-574 Let 8:20(Actee) 0.13 0635 L .� Assessed YaWe $349,000.00 INC BALCONY 250m F. 1 Mahogany Ramng Gap Z uj 5'-z,. 5'-2„ 5'-2, 26I'' % W 6x6 Wood Golumn- yq Second Floor Plan Paint U 6'-I" �6 0"" hse Coa pnnmM ma bp from Ute tlrdptldwn J Ilst SCALE: 3/I15' = I'-O" 0497 a a (Select Printable Map) � W � 28 E Z v U FO Site Plan w V) o � a v U EXISTING LIVING ROOM 25-5 EXISTING PARLOR z W M LL./ W N cc 00 Q W EXISTING PORON O w J Mahogany Ralling Gap bxb Wood Column- First Floor Plan i Paint z o 0 Remove Exlr t. V1 SCALE: 3Ab" = 1'-0" Brick 5talr5 g 5'-I.. 5'-B" 5'-P 8x8 Wood Column- E Point F °' Exist. Granite Bottom x Tread to Remain ij o Q N � W L L v W u H ti Y ♦ — Remove vinyl siding. w trim. Scope of Work: Remove aluminum •• Replace porch and balcony railing. Remove balcony decking. Restore and paint wood cedar shakes and wood trim. LU LLJ LU Existing Porch/Balcony _ _ 3_ _ - ,,•r • '�1' �- .. ♦�• � � ,amu,. _�� •A. � Existing Front Elevation Z LU LL- W 00 Ui 8 82 ' n. �• i t � • I � Existing Front Existing Front D• • from ' • ' Replace Existing Oval Gable Vent Remove Existing Wgad Cedar Shakes p Replace w/ Profile Wood Shingle-Paint !V AT o g P IIIIII 9 -- n As halt Roof Shin les'� �' l � '- ❑ ❑ \\�.' Prep 1 Paint i I � LI L I III UPropWood Cedar Shakes zis In __.j: Existing Wood Trim Existing Wood Trim Prep it Paint Prep S Paint Z W W n ------'---g Wood __ _------------------ Remove Alum Trim tG V d 5hakee II �^ Prep i Paint Exist. Wood Trim ® a --'-- � Pre d Paint Existing Wood Cedar Shakes W ❑ L . El Prep 6 Paint Replace Balcony 0) Remove Alum Trim 1' Mahogany Rail w/ RaElev tioneFe to South ■ 6 Prepi Polnt 1 - 2x2 Wood Dollaeters-Paint Elevation For Notes V Exist. Wood Trlm- I, ' N T All Windows - ,i" IIS 6X6 Wood Post-Paint O ��- Replace Deck w/ 5/4x (5El Gqm Ite Decking i cort�ltlon Exls�> ------ —_.... _ 1 'Wood Trim '� l 5EGON FLOOR V � Pr 74 Fa — ------- ----- EL. 10_O - - - - Z fu �f' _I� place Alum, - - Existing 51ding to Remain - W v Pr -fin h tt '££ C -0 "mbv rxist:`Vihyl c Shingles w/ - ._ 51clihg5 ■ ■ I I i No d Gla ds-Point _ ■ W N Inst ad Glgpboott��'QF{5I��I lI eX 'Z�.l( CO �Pdtnt � P t _ ahogany Rall w/ W 2 Wood Ballosters-Paint Z condition Exist. f Wood Trim FI FLOOR = m— Prop B Paint Exlslting Brick — _ Com osl Wood Trim- Fxfq to Remaln Poor — -- --- Exisiting Grade I Gompo5ite Wood Tread5 Wood Lattice-Paint Replace Porch Z m South Elevation Select Pine Risers-Paint Railing-Refer to South East Elevation Elevation For Notes E a U � g F_ v y y 6 O' q V y v � v y � L 4" MAH06ANY RAIL GAP WOOD P05T GAP W/MOLDING-PAINT LJ u i c� c 2x2 WOOD BALLASTER-PAINT 4" MAX. CLEARANCE CD N 6x6 P.T COMP051TE WOOD COLUMN -PAINT N In O u i p GOMP051TE DEGKIN6 MEMBRANE ROOFING REPLACE PRE-FIN15HE12 ALUM. GUTTER Z W EXISTING TRIM-PAINT � W IOxIO WOOD CAPITAL-PAINT U a a a W Sample Balaster & Railing = U m REMOVE EXI5TIN6 VINYL 51DIN6 w PREP 6 PAINT EXI5TIN6 WOOD SHAKES O y, 4" MAH06ANY RAIL GAPLu N (f`f Ix2 WOOD MOLDING PAINT V _� Z � _ W v 2x2 WOOD BALLA5TER-PAINT Q) 4" MAX. CLEARANCE VI LL W N 4 i - bxb P.T W00OOD COLUMN � ��—— WRAP W/(4) Ixb WOOD GOLUMN-PAINT GOLONIAL BASE TRIM-PAINT W IOxIO WOOD BASE-PAINT Z COMPOSITE WOOD TRIM-PAINT n • _� - 55?UARE HOOD LATTICE-PAINT z o -�'-. EXI5TIN6 GRADE [W., 2 n � U � e Detail Sample Column-similiar scale: 1/2"=I,-o° W g � � e � 4" MAH06ANT RAIL GAP + WOOD P05T GAP W/MOLDING-PAINT _! � O ti 2x2 EWJOD BALLASTER-PAINT N 4" MAX. CLEARANCE O N bxb P.T COMP051TE WOOD COLUMN -PAINT O 1 N I Q COMPOSITE DECKING MEMBRANE ROOPIN6 R152LACE PRE-FIN15HED ALUM.GETTER Z W EXI5TIN6 TRIM-PAINT z UJI 7D FASCIA EX15T. I0x10 WOOD CAPITAL.-PAINT 'I � V -OUT Ix2 WOOD TRIM-PAINT -i a EXI5TIN6 CW bxb WOOD OLUMN At M #1933 Sample Balaster & Railing GROWN MOLDING-PAINT WRAP W/(4) Ixb WOOD COLUMN-PAINT = N EXI5TIN6 bxb WOOD COLUMN CEDAR VINYL 51DIN6 4 � WOOD-PAINT Ix8 GOMf OSITE IN5TALL ! PAINT C.OMP051TE GLAPBOARD5 Q 4' EXPOSURE a N 4" CEDAR RAIL GAP-PAINT ,. Ix2 P400D MOLDING PAINT u - 5/4x3 WOOD TRIM Z _= 5LOPE TOP W a) 2x2 WOOD 15ALLA5TER-PAINT H LCJ L 4" MAX. CLEARANCE (A - - - _ R I/4 ROUND EXISTING WOC PERIME bxb OD OLUMN19 00 TRIM PAIN - _ TRIM W/ Ix 3 COMPOSITE WD.-PAINT W 4" EXI5TIN6 bxb WOOD COL. COLONIAL BA5E TRIM-PAINT Q (_- - - — TRIM W/ Ix 3 COMPOSITE WD. I W t -- -PAINT (4 51 DE5) IOxIO WOOD 5A5E-PAINT Z _ COLONIAL BASE TRIM-PAINT j IOxIO WOOD BA5E-PAINT - 1' I += COMPOSITE WOOD TRIM-PAIN' V � o .. .. 5WARE WOOD LATTICE-PAINT- _ o m - _ EXI5TING GRADE [Wi v Q Column Detail Detail x Sample Column-similiar scale: 1/2"=1'-0" scale: 1/2°=1'-0" � � r M I Q Replace Existing Oval Gable Vent 11 if H 111 1 O N O N O Prep ng P od Cedar Shakes a nt u � A Remove Existing Wood Cedar Shakes Replace W Profile Wood Shingle-Paint ------- Existing AsphaltRoof SMngles III 111fil 1111 _ Existing Wood Trim Existing Wood Trim Prep 6 Paint Prep b Paint W W ng WRemove Alum Trim Q Ged Shakeood s - r ------ ----------------------'---------- Prep C Paint Exist. Wood Trim ,� Q Pre E Paint _ _ l _ Existing Wood Cedar Shakes W Prep 6 Paint Replace Balconyy Remove Alum Trim ❑ Gedar Rall Gap-Paint Ralling-Refer to South _ ❑ = v Prep d Paint 2x2 Wood Ballasters-Paint Elevation for Notes7 (� t0 Exist. Wood Trim- 0 T All W down �% 6X6 Wood Poet-Paint Replace Deck w/ 5/4x 6 - 13 G It Decking co Itlon Exl I _ W U') Wood T Im '----- - ------ -- SEGO _ LOOR - — - V Pr 6 I ------ -------------------- E1. 14-O Z is lace Alum. S _Existing Siding to Remain W v Pr -fin h t - - N Ist. 1 c Shin99�Ds w/ (A LL Sidiy d GI ds-Isalnt NInst o GIap s 00 Int P t B edar Rall Gap-Paint W 2 ad Bollastere-Paint Z oondltion Exist. Q J Wood Trlm FI ' FLOOR hf Prep 4 Paint - - -0. - — - — - - Exlsltin9 Brick - GompO51 Wood Trim- _ to Remain Paint Exlsitln Grade Gomposita Wood Treads Wood Lattice-Paint Replace Porch South Elevation Select Plne Rlsers-Palntg- Railln Refer to South East Elevation Elevation For Notes 4 N y Q N