Loading...
165 FEDERAL STREET - DISTRICT FILES ■ 165 Federal Street CO T Salem Historical Commission 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ✓ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic Districts Ordinance. District: McIntire District Address of Property: 165 Federal Street Name of Record Owner: Darcy Desautels and Erin Stewart Description of Work Proposed: ■ Repair and/or in-kind replacement of existing wood gutter on Griffin Place (west)elevation; ■ Paint Griffin Place(west) elevation to match existing colors; ■ Repair and repaint entrance surround on Federal Street(north) to match existing;and ■ Repair damaged clapboards on east elevation and paint to match existing color. There will be no changes in color, material, design, location or outward appearance. Non-applicable due to being in-kind replacement and painting. Upon completion of above work, please notify Historical Commission staff as final sign-off is required to document compliance with this Certificate. Dated: October 10-2017 SALEM HISTORICAL COMMISSION By. C�—�—4c✓ �e� / p zlC� The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. Once completed,please submit a photograph(s)of the final result(maximum of four-i.e. one photograph of each affected fafade). THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings(or any other necessary permits or approvals)prior to commencing work. 1 OCT 04 2017 Salem Historical Commissioll DEPT. OF ��oib�idetJseOnJv COMMUNITY APPLICATION FOR A CERTIFICATE OF NON-APPLICABILIE2 Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance_ application is hereby made for issuance of a Certificate of Non-Applicability as described below for: New ConstructionH Moving ❑ Reconstruction L✓I Afteratiou ❑ Demolition Painting ❑ Sign U Other District: []Derby Street ❑Lafayette Street ✓❑McIntire []Washington Square .address of Property: M5 Federal St Name of Record Owner(s): Darcy Desautels,Erin Stewart 165 Federal St,Salem.MA 01970 Owner Mailing Address: Description Of Worst Proposed Please ripe orprml c%ar/y.Attach additional sheets, as neccssar}: We wish to make repairs to the gutter on the side of the house that faces Griffin Place as the gutter is rotting,and we also wish to scrape and repaint that side of the house.We will use the same paint colors and wood materials. We also wish to make repairs to the area around the front door that is on Federal St as the overhang and underneath the door has rotted.Again,we will use wood and stick to the same colors. Lastly,a developer has done some damage to the side of the house that faces 161 Federal St,and we wish to make a few minor repairs to the clapboard.Again,only wood will be used and the same color paint. Erin Stewart Name of Applicant: ❑Owner❑Contractot❑Tenant❑Dther: F Signature: Date: 617-784-. 5 estewan327@gmail.com Tel.#: E-mail Address: Certificate will be mailed to the owner unless oj!qjNf6cated here: Certificate should be mailed to: Name 165 Federal St Salem M 01970 A TACHED DOCUMENl'A ION An application will not be considered complete unless all work items are thoroughly described and the application includes all information needed for the Commission to make a determinarior_ Failure to submit a complete application may result in a continuation to a future meetine. Recommended information includes: Photos of existing conditions,taken from all public ways Site plan showing location of improvements Elevation drawings of the existing conditions and proposed improvements Drawings of details and other special conditions, including profiles Description,photographs, and/or catalog cuts of proposed materials(please bring to the meeting product samples, if appropriate) Dimensions(i.e. height of fence, size of pickets and posts,etc.) Paint color samples, if applicable(no less than 2"x2") Location and size of all mechanical equipment,such as transformers, HVAC equipment, electrical service and meters,and proposed screening MjO �4+�. Art �b @ ♦ Rim ','A :'. d ;••I�/�� mdk 0 VIM mom W� r C0 1 �tP Q. Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 165 Federal Street Name of Record Owner: Kate Pratt Description of Work Proposed: Repair/replacement of wood clapboard on left side of house,painted to match existing. No changes in color, material, design, location or appearance. Non-applicable due to being in kind maintenance/replacement. Dated: November 16, 2015 s77 CAL COMMISSION By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. RECEIVED . ', NOV 12 2015 DEPT.OF PLANN.NG& COMMLMNTY DEVFLOPW+(' Salem Historical Commission 120 WASHINGTON STREET.SALEM.MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of Non-Applicability as described below for: ❑ New Construction ❑ Moving KIS Reconstruction ❑ Alteration ❑ Demolition Painting ❑ Sign ❑ Other District: ❑Derby Street ❑Lafayettte Street ❑McIntire ❑Washington Square Address of Property: �L f Q X ed Q / I f_ Name of Record Owner(s): kal e- 1- C& Owner Mailing Address: vi-t, P Description of Work Proposed: 1 1 • • ' 1 • • rM A • A • • 1 • Name of Applicant: 'j t-e L-v ,( '�, / Owner C46intractor Tenant LJ Other: _ Tel. #: �7.:�- —317 — /2/_ 5 E—mail Address: �' �3 ?6:� vn G a gjn� t Certificate will be mailed to the owner unless otherwise indicated here.- Certificate should be mailed to: Name k a �e P ri Mailing address: sI� �f( � / L Q /off City: _�'lt Ism State{ Zip: 0_ r PROCEDURES FOR FILING APPLICATIONS A. Be prepared to apply for approvals well in advance of commencing any exterior work. Before making any changes to the exterior of a property in an historic district,the owner should call or visit the Commission representative at the Department ofPlanning&Community Development to discuss proposed alterations and to determine the category of the application(Appropriateness,Non-Applicability or Hardship). B. The Commission normally meets on the first and third Wednesdays of each month and notices are posted at City Hall. The meetings are held at 120 Washington Street,3rd floor,and begin at 7:00 p.m. All meetings are open to the public and any person is entitled to appear and be heard on any matter before the Commission before it reaches a decision. C. An application for a Certificate of Appropriateness or Hardship must be received by 3:00 p.m.on the Monday 16 days before the meeting in order to make the agenda. An application for a Certificate of Non-Applicability may normally be added to the agenda up to the day of the meeting. In some cases,a Certificate ofNon-Applicability maybe issued by the Clerk,without review by the full Commission,after notifying Commission members and allowing 24 hours for any objection. There is no fee for any applications. D. All applications for Certificates of Appropriateness or Hardship require a public hearing. Notice of the hearing must be posted with the City Clerk 14 days before the hearing and abutters must be notified in writing. Commission staff will handle these procedures. A public hearing is not required for a Certificate of Non-Applicability. E. Applications must be submitted by the owner of the property. A contractor for the owner,at the owner's request,may submit an application on the owner's behalf. In case of a tenant,a waiver of the owner's appearance maybe granted at the discretion of the Commission if it is requested by the owner. F. All applications must include photos of existing conditions,taken from all public ways. No certificates can be issued until receipt of photos. G. An application will not be considered complete unless all work items are thoroughly described on scaled drawings and include specifications regarding dimensions, materials, and any other information needed for the Commission to visualize the changes in order to make a determination. Applications for paint colors should include a paint chip or chart. The following items should be included in your drawings as applicable(exhibits should be 8 Y,x I1 or be able to be folded to 8'f.x 11): 1. Site plan showing location of improvements; 2. Elevation drawings of the specific improvements; 3. Details/profiles(i.e.moldings,fence caps,cornices,vents,etc.); 4. Materials(i.e.wood,brick,etc.); 5. Dimensions(i.e.size of trim);and 6. Transformers,heat pump and condenser locations,electrical entries and meters,lamp posts,stove pipes. H. At the hearing,the Commission will discuss the application with the applicant or his representative,hear the abutters and take a vote. Owners having professional consultants such as architects or contractors are urged to have them be present at the hearing. If the application is approved, a Certificate will be mailed to the mailing address provided on the application and copies will be sent to the City Clerk and Building Inspector. Please note that the application can be continued until the next meeting if the Commission deems necessary(i.e.for reasons of incomplete drawings,to perform a site visit,etc.). In any case,the Commission must make a determination within 60 days from the date the application is received,unless the applicant waives that requirement in writing. 1. A property owner or a contractor cannot receive a building permit unless a Certificate has been issued. Please be sure to obtain appropriate permits from the Inspector of Buildings(or other necessary permits and approvals)prior to commencing work. J. The homeowner may opt not to commence the work approved(unless it relates to resolving an outstanding violation). Work commenced must be completed within one year from the Certificate date unless otherwise indicated. K. The City of Salem reserves the right to inspect the project to determine compliance with the conditions set forth in the Certificate issued. Violations A person commencing or completing work to the exterior of a building in an historic district without the necessary approval of the Commission is subject to fines of up to$500 per day from the date of violation. The Commission is not responsible for an owner's neglect to inquire about necessary City permits and approvals. All records are public and we will confidentially assist you if you are concerned that someone in your neighborhood is in violation. Assistance The Commission's guidelines are available for viewing at the City of Salem Department of Planning&Community Development(DPCD),at the Salem Public Library or on-line athtm://www.salem.com/Paees/SalemMA Historic/index. The guidelines provide examples ofwhatishistorically appropriate (or inappropriate) for Salem's neighborhoods including trim, siding barrier free access, doors, fences, guttersidownspouts, masonry, mechanical equipment,paint colors,parking solutions,porches/steps,roofing satellite dishes&solar energy systems,secondary egress,skylights,utilities,windows, etc. These guidelines help you understand what changes are likely or unlikely to be approved. The Commission supports your efforts to improve your property and can guide you on historical appropriateness. Further information, including City-wide architectural inventories,is available. For more information,contact the Clerk of the Commission at the DPCD, 120 Washington Street,Salem,MA 01970,978 619-5985. Rev.1072 �t �� .e'' � �- � � � �-�-' �• i---�_, -.�� r� . . wrrrrT� r'„`� • 'v � � 4: '" 7 } ` 6� ' i• i . • 4 � f,.. � Yam%�►��"� ' ��. r 1 i r ljg S.N.fa i - Mr - r i ' 4 .q Y,s w. or M � s I w.r - R C f r - 1 • `' fowl IL ,� >IR I4I A-4 . ®� 1w y„ v� � a - 3 Salem Historical Commission 120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970 (978)745-9595 EXT.311 FAX(978)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage JR� Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Properly' 165 Federal Street Name of Record Owner: 165 Federal St. Condo Association, David O'Connell President Description of Work Proposed: Installation of aluminum gutter on rear of house to match gutters already existing on the house, painted to match existing. Dated: October 26, 2009 SALEM HISTORICAL COMMISSION By: �� / 7 1 1- -e,7 The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings(or any other necessary permits or approvals)prior to commencing work. 0 llP a Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)745-9595 EXT.311 FAX(978)740.0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving Reconstruction ❑ Alteration �f Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property' 165 Federal Street Name of Record Owner: 165 Federal St. Condo Association, David O'Connell President Description of Work Proposed: Repair/replace wood trim as needed to replicate existing, repainting in kind. No changes in color, material, design, location or outward appearance. Non-applicable due to being in kind maintenance/replacement. Dated: October 26, 2009 SALEM HISTORICAL COMMISSION By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. ��� ,. _ � -� _' ,, ; -� -., � � -, q li � I -�� -_ 1. -_ - - - - �. \' - - - - � - � � __ _ � _ �" r��� .i y I -�_ .. - lil �I � ° I e I � e I � V II� '1 . i i17 1 � 1- I �I - - -- - . , -- � fi ,� � � ` �it . ////JJ ®�f �% �j e :�� .�� i, � ��T� � �� �� ��`�- _-� i _ � �� � r � � .y �� i r I �,� � � -�� -� �� ���_ ���----` it �� � . , _ _�.. rz Y -w f ' C I��YJ �iGd �,Yti«-\S • �x,2 �� +a m�e.� �r1 A -�lc..� - J can 5ee 0-1c OIL koSo WOO 1� lvu',ehu� VA CM II m. :n I b ( :I 4 . 1. , 7 , � ( ,e � r i�l'eh4 ��'1s�� r�Tatr<; 7�✓.���+ rl � (fix'�w,b °�( a1r{ K ^ r �� I { 5✓ tC' � w r it bil�xfJi li'� r 1>) '�.$i Tit"t�i �����" Viya� N 1 � M1MK iy l� f xr/ 1 a r u S t sk�T�iA i d�' ;fJY?i �S _ SI � �t "'� 1�'� 't '}s(} rfi N�4� 1r A7i�y`�7 `�'�• l�pbT � lv Salem Historical Commission 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)745-9595 EXT. 311 FAX (978) 740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ DemolitionPainting ❑ Signage � Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District:_ McIntire Address of Property: 165 Federal Street Name of Record Owner:_ 165 Federal St Condo Aacoriation Description of Work Proposed: Repainting of house as needed to replicate existing. No changes in color, material, design or outward appearance. Non-applicable due to being in kind maintenance. Dated: October 13, 2009 COMMISSION By: SALEM The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings(or any other necessary permits or approvals) prior to commencing work. C� 3 a Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)745.9595 EXT.311 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving -f�- Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic Districts Act(M.G.L. Ch. 40C)and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 165 Federal Street Name of Record Owner: Hilario & Adelaide Cunha Description of Work Proposed: Reroof of rear non-visible roof section to replicate existing. Non-applicable due to being non-visible from the public way. Dated: November 30, 2004 SALEM HIS OMMISSION By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. �9 �1 ilk Ffnt � IN � _ �� ' ,•: _� . ,_ . I lean _�. �.. '� � �i Hilario & Adelaide Cunha 165 Federal Street Salem Ma, 01970 Description of Work Proposed ■ Construct two A type dormers facing the church rectory. All materials and paint will match existing house. See attached drawing. ■ Remove and replace asphalt roofing with charcoal colored asphalt shingles and add a ridge vent for proper ventilation. ■ Remove existing siding on left side of the house(facing the rectory). Replace with clapboard siding to match existing siding on the rest of the house. Paint scheme to match existing colors on the house. Submitted to Salem Historical Commission y .CO Salem Historical Commission ONE SALEM GREEN,SALEM, MASSACHUSETTS 01970 (978)745.9595 EXT.311 FAX(978)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction9— Alteration ❑ Demolition Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic Districts Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property 165 Federal Street - Name of Record Owner: HIlario Cunha&Adelaide Quaresma Cunha Description of Work Proposed: Installation of two dormers (on rectory side)per drawing option #2, with roof of rear dormer to be a shed roof. Dormers to have clapboard sides; windows to be wood, true divided light; roof to be 3-tab asphalt, all painted to match house. Remove and replace roofing with black or charcoal grey, 3-tab asphalt roofing. Addition of continuous ridge vent. Remove shingled siding(rectory side) and replace with clapboards to match front of house,paint to match existing. Dated: June 5, 2003 SALEM HISTORICAL COMMISSION The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. Ari � A ' to / 1 t M f �l } T' � \ � � \� ,. r `� *'� � � "di '' � --- � ` .I � � �. � .1 p�w1 1��. :1 -� i' �I II I IIS M pjl� 111111— ��� L]��]i� ,��•• til 1'l (][!1 ' - I Ilp N - ;ri •r ► Ire i 9 I M��v^�M��i" �F2aWiN� 'DoRNER �- '.� _ t � � �� � , !.'L% � f- � : y ' t n' ti ® GFR ■ I l A r L 1Y WiNWWIRE ' '1" G'•II" G 8" N' qwl FM LLU 77 77T L _ - y &4 H `m a a n Salem Historical Commission ONE SALEM GREEN,SALEM,MASSACHUSETTS 01970 (978)745-9595 EXT.311 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic Districts Ordinance. District:_ McIntire Address of Property: 165 Federal Street Name of Record Owner: Hilario & Adelaide Cunha Description of Work Proposed: Replacement of roof to replicate existing. No changes in color, material, design or outward appearance. Non- applicable due to being in kind replacement. Dated: September 19, 2002 SALEM HISTORICAL COMMISSION By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. �. ,� l: , vn 1� --- -_ - _� _- �_- �- �� 17� r �_ _ � _ - A� �; � S r. � s 1. ' b+ �. �� t .,y ,�"' .- ...._:. - �_ _ _ A6 , v. ti■sem.►� `- i ' P asED n�F';. ,� .• 1 . �.Y i � ���✓ - w;'' , .req � Y � � f� rrj _ ! '' �. �I ---- - - ,: 3 �;•:-_:- •�, �� 1 Hilario & Adelaide Cunha 165 Federal Street Salem Ma, 01970 Description of Work Proposed • Replacement of deteriorating roof structure and roof materials and adding a ridge vent for proper ventilation. ■ Roof structure will be buil: using current city and state building codes. ■ Roof design will be replicated including any exterior crown moldings and gutters that are existing with the exception of the roof pitch. In conjunction with replacing the structure and with permission of the Salem Historical Commission we would like to place a 24 inch knee wall above the second floor ceiling. This would create extra room for another bedroom for our family and enhance the side view of the home leaving some space between the second floor windows and the roof line. Attached you will find photos of homes on Federal Street that have the space between their second floor windows and roof line and illustrations that show new proposed roof lines on existing photos. ■ Roofing materials used will be Slate colored architectural asphalt shingles or color chosen in conjunction with the Commission. ■ Colors of new replicated moldings will match existing color scheme on home at the present time. ■ In addition to the roof we would like to place a 3 foot by 4 foot skylight centered on the new roof facing Griffins Place. This would enhance the interior natural light of the home on the attic and second floor. Submitted to Salem Historical Commission /6S �R rl �r I6S I I �aOR FRONT vIE,JA-nvrJ 'AT k55F-r--'T- TME I FRDrJr - y�vR F0.0ntr E-LeoA-m9r.1 ASR 24" Kntc. UJALL YE Salem Massachusetts Greek Revival Architecture Page 1 of 2 �f'�r�,txraeP Jn SALSA NWSACHUSETTS About Salem Calendar Community Message Board Salern Tales Web Guide Greek Revival 1825 - 1850 Greek Revival I Italianate I Second Empire I Victorian Eclectic I Georgian Revival 17 & 18th Century Architecture 1 19th & 20th Century Architecture 4Ga3LE ,."O TO THE +i.J117E CORNEK 7 : 6LAP1130AKU.5 OR I�r •— IF 1.1 Jrr- Cr-NIFEZ ENTRY - RrlFll,�5fER5, ENTn61r�TURE — - SI�E 4 QANfInu From The Salem Handbook, Historic Salem Incorporated, 1977 Plan For the first time, the focus shifted from the long side of the house to the short gabled end. Doorway Fanlights and other elaborate details of the Federal doorway were replaced by a recessed doorway. Generally, a four-panel door was used in the entry. The door was often framed by narrow, floor-length SOME TERMS sidelights and a transom, and usually rnalding /// fascia flanked by flat pilasters and an architrave. Windows edging /�' �' strip fi/frieze - Elongated windows with six over six panes. Kti cover Roofline _LS,COY@ Gable of medium pitch, sometimes with a •--molding low triangular pediment. Chimneys became overhang small and insignificant. I corner board"----- Materials — - Siding was usually clapboard. Matched or pilaster if wider) _.._ flatboards, designed to resemble stone, littp://www.salemweb.com/guide/arch/greek.htm 8/20/2002 Salem Massachusetts Greek Revival Architecture Page 2 of 2 were often found on the facade. Decoration Simple lines with a concern for classical formalities. Massive pilasters or wide columns supporting a triangular pediment and a flat band under the eaves gave the appearance of a Greek temple. Greek Revival I Italianate I SecondEmote I Victorian Ec._Jectic I Georgian Revival 17 & 18th Century Architecture 119th &20th Century Architecture About Salem Calendar CoSmm Message Board Salem Tales Web Guide Last Updated July 11, 2000 http://www.salemweh.com/guide/arch/greek.htm 8/20/2002 • Architecture Glossary - What is a pediment? Page 1 of 2 About > Arts & Entertainment > Architecture WHAT YOU NEED TO KNOW Architecture Abut_ phone .- W with Jackie Craven Your Guide to one of hundreds of sites search!. inthistopic ' Home . Articles • Forums • Chat• Classifieds Free Newsletter Get the latest and greatest info from our Guides. CI" Want the jump on Back to School Shopping? Let About help. Dorm Life, Dell Computers, and more! Subjects What is a pediment? NEWT Classifieds ATCTWiretess BUYER'S GUIDE A pediment is a low-pitched triangular gable on the ,..-..,. front of some buildings in the Grecian or Greek Revival 7 GET A FRI Before You Buy style of architecture. NOKIA 33E Top Picks • Design Your Deck • Pave Your Patio 11 1 , • House Style Guides -�'� l l " Product Reviews ESSENTIALS ice% vmwcwt _ SEPTEMBER 11 — ] _ c IIIIi �Ji FRIEZE s BACK TO SCHOOL - �a�HirnAv6 l - Schools Careers ,p s IN Build Your House Remodel Your House Paint Your Hou_s_e_ Your Find A Pro Architecture Glossary career ir Find House Plans Find Supplies I'lustration copyright OAK today Great Architects Subscribe to the About House&Home Newsletter Great Buildings Historic Periods Name Email House Styles Subscribe Ornaments & TrimNJ �£ j C Books & Magazines Recent Discussions Computer Software About.com Architecture 'J' ForumslListservs Join these forum conversations Organizations Photos & Clipart In-Ground Fire Pit...An_ yone? History of Architectural Education Name the Strange House, please lhttp://architecture.about.comllibrarylblgloss-pediment.htm 9/3/2002 Hilario & Adelaide Cunha 165 Federal Street Salem Ma, 01970 Description of Work Proposed ■ Replacement of deteriorating roof structure and roof materials and adding a ridge vent for proper ventilation. ■ Roof structure will be built using current city and state building codes. ■ Roof design will be replicated including any exterior crown moldings and gutters that are existing with the exception of the roof pitch. In conjunction with replacing the structure and with permission of the Salem Historical Commission we would like to place a 24 inch knee wall above the second floor ceiling. This would create extra room for another bedroom for our family and enhance the side view of the home leaving some space between the second floor windows and the roof line. Attached you will find photos of homes on Federal Street that have the space between their second floor windows and roof line and illustrations that show new proposed roof lines on existing photos. ■ Roofing materials used will be Slate colored architectural asphalt shingles or color chosen in conjunction with the Commission. ■ Colors of new replicated moldings will match existing color scheme on home at the present time. 2 k 9 ■ In addition to the roof we would like to place a 3 foot by 4 foot skylight centered on the new roof fac_ng Griffins Place. This would enhance the interior natural light of the home on the attic and second floor. Submitted to Salem Historical Commission P A I y"GaaaN Obn RooF L�NE SH6 DET)!{. s_ �] d i i I ,o. 8., FkiOe - �'-W a A—, P 7743kE FP41T BEV ATI WI W r,-� �yv) f_oY gzicfI orf P6,41A) ''' �-- � -I tip•, IS �e Mo��INr� Iti �blAlNf� W-1 5'Iz j2e, I CLAW SDkQ—P T36E,SNS MDIDlNfa r N 29 —---------- ------------- ❑ ❑ 6yr7Z,7e 1057 � �bw� yV�OLT�ItiJC �� �Z e Liv I a>� CROWN MOL-n'^�4 �f POUND FR�ELE � OL➢ RWF (JNE I , r � I _.T LT _ ' �T ��✓p�ronl w�rl N4W uasie�f , i� t110LD1r c <7[Ow�.! MOLDiN NHLF RJUNI� xcePrcawa ._ _ 1�7}} FT1UnT ITFI Fili r � CII - , Sim EcEvqnoN s,D�Ng -ro ma+cff £.�IsnnKj ,a tffaor DovnH 3v,�T W)TW .vo a,npzuS '"o . Eusn f��E - w,u Ruu C-AW70 of ,aomB Gwau,Nq 3 pre ro"Az PkOm E+A94,e mics. f` ij I }I 1 I If 0 Q i ij I �sTlME, E[�9�aN W,rrf DOCi�/A ( y fbo-r CO v� 5 � fR n t 5) �M N6 W� Salem Historical Commission ONE SALEM GREEN,SALEM, MASSACHUSETTS 01970 (978)745-9595 EXT.311 FAX(978)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 165 Federal Street Name of Record Owner: Hilario M. Cunha& Adelaide O. Cunha Description of Work Proposed: Remove asbestos siding and repair clapboard siding underneath. Retain, repair or replace any cornerboard or watertable found underneath. Paint to match existing house colors. Removal of metal awning. Dated: May 22, 2001 SALEM HISTORICAL COMMISSION By. The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. P ..�, Illi SII J 1 ' i 1� I ��,_. .,:� �.� i� , � ���d J :� � ; � � _ � � ' /I ,, -�.-� � _� _ :�. ]t y` sj '1 1 ,.r qr IF a 4 . r 014 AA 1 f g� y Y = L .0 s� w i ti 1 ' _ � / b / �i f' zh i k ���� �� IIII i�� �! ii;, �q,� � '!�� � � �" � � - - � ,, � , �, E � . . iii 1 . . / N `\ c- 1 0 v a Y � Salem Historical Commission ONE SALEM GREEN,SALEM,MASSACHUSETTS 01970 (978)745-9595 EXT.311 FAX(978)740.0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 165 Federal Street Name of Record Owner: Hilario Cunha&Adelaide Ouaresma Description of Work Proposed: Repair or replace trim of house as necessary to replicate existing. No changes in color, material, design or outward appearance. Non-applicable due to being in kind maintenance/replacement. Dated: April 6,2000 SALEM HISTORICAL COMMISSION By:�� The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. �1 Salem Historical Commission ONE SALEM GREEN,SALEM,MASSACHUSETTS 01970 (978)745.9595 EXT.311 FAX(978)740.0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction Alteration ❑ Demolition Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 165 Federal St. Name of Record Owner: Hilario Cunha&Adelaide Ouaresma Description of Work Proposed: Paint colors: Body—Sierra Vista Trim & windows—Linen White or similar off-white Doors—Brigade Replacement of window sash per sample Brosco 6 over 6 replacement sash provided with energy panel. Installation of second egress per drawing submitted with I"square balusters, not to exceed 2"spacing between balusters, 44 capped posts cased in pine, solid wood handrail with beveled sides. Egress door to be wood, with true divided lights. Remove chain link fence. Install in location noted on plan a wood 1"x 4"picket fence (not shadow box,pickets on one side only), height not to exceed the sill of the first floor windows,finish side out, cap as proposed in plan,fence left natural or painted trim white. Dated: April 6.2000 SALEM HISTORICAL COMMISSION By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings(or any other necessary permits or approvals)prior to commencing work. Proposed Remodeling Plans n"ECEIVED to the residence of IG ASI 0- 44 Mr. Hilario M Cunka,.SALEM . Ms. Adelaide B Quaresma location 165 Federal St. Photo Image: Federal St. View Submitted to Salem Historical Commission One Salem Green , Salem, Massachusetts 01970 (978) 745-9595 Ext.311 Fax(978) 740-0404 t Description of Work Proposed & Applications 1. Application for a certificate of Non-Applicability (page 1) 2. Application for a certificate of Appropriateness (page 2) ' 3. Paint House and Trim with New Submitted Colors (page 3) 4. Replace Window sashes (page 4) 5. Reinstall second means of egress ( page 5) 6. Replace and alter backyard fence ( page 6) 7. Site Plan (page 7) of Photo Image: Back View of House C V1.111 bll?t. Salem Ristorical cominISS1011 ' ONE SALEM GREEN. SALEM. MASSACHUSETTS 01970 (508)745.9595 EXT. 311 FAX (508)740-0404 ' APPLICATION FOR A CERTIFICAT OF NON-APPLICABILITY Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commissio Ordinance, application is hereby made for issuance of a Certificate of Non-Applicability for: t ❑ Construction ❑ Moving Er Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Sign ❑ Other as described below. District: Building Construction Date, if known: �`N"UA-V r rAddress of Property: I('5 FE aEW L. ST- SA(t..>^HM It O 19-D Name of Record Owner: NILARto M CJIJ 4A �1 4ELMDE 13 Quavas M 4 Description of Work Proposed: -r-o REPAIK o2 Rli;-PLA*-E " TKI N 09- STr_7_e10„r, SIr)INo '$Erig V_F_ PA-INnNcN --rF \,JE o0 gfyL1KF 2T W1 L- S); IZFFLAC" W fru SCmf_ -rilInC7 zo�unLkc iv ►�hA-r NO(A Signature of Owner: Tel. #: 97g�� J 9�f o 06 / Mailing address: f(9 S F�DECA� ST City: .��??1� f State:A Zip: 0974 J' b/ s� 2M_ eta _> /Yfr,4my,, ,Salem Historical Commission ONE SALEM GREEN, SALEM, MASSACHUSETTS 01970 (508) 745.9595 EXT.311 FAX (508) 740.0404 ' APPLICATION FORA CERTIFICATE OF APPROPRIATENESS ' Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commissio: Ordinance, application is hereby made for issuance of a Certificate of Appropriateness for: 0 Construction ❑ Moving ❑ Reconstruction W Alteration ❑ Demolition W� Painting ❑ Sign ❑ Other as described below. District: Building Construction Date, if known:_ _ U Address of Property: /6S R-:b6;gW _ 37— .SfKXM Mss 019'70 Name of Record Owner: A4,1A,cso M �"tW W ;F/ Description of Work Proposed: (Please attach required scale drawings, paint chips and/or samples of work and material proposed, where applicable.) . rSC R (Pi1vN Of- W o(2K Proe osizp 1 S -r iF--M tz D R N D AITA 1 Signature of Owner: Tel. #: y/7J�' 3 4 �[ - 600 ' Mailing address:__/ (o � iffL S T City: ga- � State: AZip: 0/92 Paint Body and Trim with New submitted colors Body: Sheepskin 1 ( Behr Pa=nt 3A17-4) I Trim: Sierra Vista i (Behr Paint 2A14-4) ' Doors: Brigade 1 (Behr Paint 3B62-6) * The following page contains pictures of historic homes located on Federal St. We have taken serious consideration in keeping with the color scheme of the neighborhood. 1 Additional Homes on Federal Street,, � 1 P'K. 1 NIL Allifll. 1 � - 1 - I NS 7 1 End. 1 Additional Homes on Pederal �l s qe Replace Window Sashes 'IiJUBLE-HUNG REPLACEMENT SASH �ROSCO's Replacement Sash can be used to upgrade old, Windows are true divided lite worn out double-hung windows.Choose oin a complete set of sash � And solid wood exterior finish our Replacement tsh Kit,which These windows are very similar v �cludes a set of insulating In style and all the sizes will remain ass sash with tilt hardware applied, �iIt'N Clean balances and a weatherstripped \ The same. head parting stop.All windows shown in this brochure ,e available to satisfy your replacement needs. LThe plans below are to indicate which windows will be replaced. They will ' highlighted to be better visible. as 11 =1 ow All c ea r -- — �i (,�� I �� *There will Aad I a,— Be also !E�i () Two windows Replaced in the oAttack. One in IThe front and F n - One in the back e • A O A ,y 0 0 B 0C 0 Reinstall Second Means of Egress on the Second Floor. ' Below you will see a plan of the land and the building drawn in 1925. This plan shows a detailed drawing of the second means of egress that at one time ' existed on the backside of the house. This house at one point lost that second means of egress and we would like to restore that with some changes to better improve the back driveway. The steps instead of coming straight down they will hug the backside of the house and utilize the back yard better. J-C, PLAN OF LAND A- SALEM, MASSACHUSETTS. OWN£D BY OR/L L E LHEUREUX SCALE 1/NCH,/OFEET OcC./9P5 SHAY B LEARY, C/V/L ENG/NEERS. 25 EXCHANGE ST, LYNN,MASS. �I I 5/ WASHINGTON ST.,SALEM,MASS. 0 airjaAan has been n:duced. For co:-,eel stating see original on file. Ll � na to ' 4 lino'JF. ' mot of Plans 43, Plan Ho"P90 S9/em,J0a.6,19P6 Rtc.SEnLH i Erten RtµDeed: Sa Dist. With deed Orille A.L'Heoreur to Thomas •' F.Little. Ret B.P663 P.163 i.r vl Attest: Moody Kimball, Reg. h I I (F.H ' rorsier/y Jhe/idan 1 Reinstall Second Means of Egress on the Second Floor. (Cont.) ' The second means of egress will be constructed out of pressure treated wood and covered with pine to give it a nice finish. This stairway will be constructed 1 according to the building code. The balusters are to be made out of fur and painted to match the trim of the house( see page 3). The dimensions and the layout are attached on a separate sheet. 1 77- 1 1 1 Nov 1 1 1 Photo Image: Side view 1 *Note: Next page contains drawing of proposed second means of egress. 1 1 ---------- 1 �WK ii g .. .........------- OR4 wwp WocO FNPTW .(W",To 6OWk C44 If) Replace and Alter backyard fence. The old fence is made out of chain link and we would love to replace it with a Shadow Box fence (see below). However, the fence now does not optimize the parking situation in the driveway. If we remove approx. ten feet of fence in ' front of the driveway this will allow better access to park the cars. sp ' Picture of existing fence in backyard. Proposed plan of new fence. The highlighted section will Be where the new fence will ' Be located. The Shadow Ohadow Box Box fence will Be 6ft tall $ ` " And will contain Built with 1" x 4" cedar , boards on both sides, the � � � q�.' • A fence cap ;� Shadow box fence looks ' That is Drawn below. ' from the front or eae same when r. Boards are staggered al- lowing air flow and visi- ility from an angle but jc tprivacy when viewed straight on. FEDERAL STiQEET i , p J6J-4JF 2272-'S.F. C i a of � - � t 4 i 1 C •' 1 1 (F./4 ' Former/y -�heria"/, PLAN OF LAND u� SALEM, MASSACHUSETTS. -� OWNED BY - ORIL L E L'HEUREUX I Boot o/ Plans 45, Plan No.P9a SCALE IINCH=IOF£ET Salem,✓on.6,I9P6 Ars.BEnl.h Dc C.I9P5 Esser Rep.Der✓s Sa DW. With SHAY B LEARY, CIVIL ENGINEERS. deed Orille A.L'Hevreur to Thomas PS EXCHANGE SLYNN,AIA SS. F.Lille. Ree8.2663 P./63 51 WASH/NGTON ST-,SALEN,AIASS. Allesl: AlooCr Kimball, Rey. - nisplan has been /rduceD. For correct scat'ny see criyinol on file. GRAPHIC SCALE IN FEET Additional I 1 � s � l r ri. Additional Photos:Ion z �P. r - - � • r i !°aCO„�`` , Salem Hi storicai Commission 2 J CITY HALL. SALEM, MASS. 01270 A 7A /� 1Y �f�1MIM6 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed construction [ ]; reconstruction [X]; demolition [ ]; moving [ ]; alteration [ ]; painting [ ]; sign or other appurtenant fixture [ ] work as described below in the . . . McIntire Historic District. (NAME OF HISTORIC DISTRICT) Address of Property: 165 Federal St. Name of Record Owner: Paul s Jeanette Malawka DESCRIPTION OF WORK PROPOSED: Re-roof one side of roof as existing. Remove and replace one wood gutter and facia board. Non-applicable due to being an in-kind replacement. does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act (Federal Laws, Ch. 40C) and the Salem Historical Commission. Dated:August 16, 1990 SALEM HISTORICAL COMMISSIIOONN Bocc-1(�_, G / Chairman -s ... I�� - � � I� � �� ' -- �_ - - �I�F I� _I� � _ a ._ — �,� -� � t .� l�o� Fede mac/' ��, j9� -_ ' � � i Ale ' yyMC4"� H T' Salem Historical Commission CITY HALL. SALEM. MASS. 01970 744-4580 NOTICE. OF DENIAL OF APPLICATION FOR CERTIFICATE OF APPROPRIATENESS On 'Wednesday, June 5, 1985, the Salem Historical Commission voted 5 to 1 to deny the application for a Certificate of Appropriateness for vinyl siding at 165 Federal Street. This vote was based on the Commission's finding that this installation would be incongruous to the historic aspects and architectural characteristics of the surroundings and of the McIntire Historic District. I, �-. . �� Joan F. Pizzello, Clerk of Commission, att t that this is app curate record of the vote taken, not amended or mo fied in any way to this date. cc: Building Inspector City Clerk 4 Q00 D )OAK FLY KODAK Flux KODAK rem 1 cc: Building Inspector c City Clerk �. •• ^ 'tel F . t '�'�GU4�T-dam _atmiii Historical Comarfi�foii CITY -TALL, SALEM. MASS. 01970 744-4580 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that. the proposed construction ( ) ; reconstruction ( ); demolition ( ) ; moving ( ) ; alteration (30; painting ( ) ; sign or other appurtenant fixture ( ) work as described below in the . .. McIntire Historic District (NAME OF HISTORIC DISTRICT) Address of Property: 165 Federal St. Name of Record Owner: Paul & Jeanette Malawka DESCRIPTION OF WORK PROPOSED: Removal of existing side exterior door (on west elevation) and replacement with new 6-panel Brosco Fir door with two -upper lights, #F66-2. Existing casing and trim to remain. will be appropriate to the preservation of said Historic District, as per 'the requirements set forth in the Historic Districts' Act (Federal Laws, Ch. 40C) and the Salem Historical Commission. Dated: April 2, 1987 SALEM HISTORICAL COMMISSION ,[ BY—"—C II/�. Chairman s � • _ > _ � � � ��� � 1 .� - _, !65 Peel cr�� S4• 6(3l Y5 II I E g! s 6 IsIrs l(oS Fe@c,-rt S4, G(s1YS r -- L� ('6 Fc4rat SF . `6k(7 ti i ��' -- i ` 6'•6" �L fir ht Helg 7�-^y :!( ® DOORS ONLY. +' 4 --- {r{'F; I - i ,i 2" may a cut from r �? 1 G. �� Ili �i l•I bottom rail of 81•6" fir doors(byY• ilf others). .} y BROSCO Will , � � • � '� � P�7 F•66 _ F•66.2 F•66.4 F•790 (F•2130) (F-2132) ` (F•2134) Tempered Safety Glass ' - Tempered Safety Giase �t F Salon Historical Commission CITY HALL, SALEM. MASS. (.1970 744-4580 NOTICF. OF DENIAL OF APPLICATION FOR CERTIFICATE OF APPROPRIATENESS On Wednesday, June 5, 1985, the Salem Historical Commission voted 5 to 1 ro deny the application for a Certificate of Appropriateness for vinyl :tiding at 165 Federal Street. This vote was based on the Commission's finding that this installation would be incongruous to the historic aspects and architectural characteristics of the surroundings and of the McIntire Historic District. Joan F. Pizzello, Clerk of Commission, attes't that this is an/ztcurate record of the vote taken, not amended or mokfied in any way to this date. cc: Building Inspector City Clerk