165 FEDERAL STREET - DISTRICT FILES ■
165 Federal Street
CO T
Salem Historical Commission
120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970
(978)619-5685 FAX(978)740-0404
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
✓ Reconstruction ❑ Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic
Districts Ordinance.
District: McIntire District
Address of Property: 165 Federal Street
Name of Record Owner: Darcy Desautels and Erin Stewart
Description of Work Proposed:
■ Repair and/or in-kind replacement of existing wood gutter on Griffin Place (west)elevation;
■ Paint Griffin Place(west) elevation to match existing colors;
■ Repair and repaint entrance surround on Federal Street(north) to match existing;and
■ Repair damaged clapboards on east elevation and paint to match existing color.
There will be no changes in color, material, design, location or outward appearance. Non-applicable due to
being in-kind replacement and painting.
Upon completion of above work, please notify Historical Commission staff as final sign-off is required to
document compliance with this Certificate.
Dated: October 10-2017 SALEM HISTORICAL COMMISSION
By. C�—�—4c✓ �e� / p zlC�
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
Once completed,please submit a photograph(s)of the final result(maximum of four-i.e. one photograph of
each affected fafade).
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings(or any other necessary permits or approvals)prior to commencing work.
1
OCT 04 2017
Salem Historical Commissioll
DEPT. OF ��oib�idetJseOnJv
COMMUNITY
APPLICATION FOR A CERTIFICATE OF NON-APPLICABILIE2
Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance_
application is hereby made for issuance of a Certificate of Non-Applicability as described below for:
New ConstructionH
Moving ❑ Reconstruction L✓I Afteratiou
❑ Demolition Painting ❑ Sign U Other
District: []Derby Street ❑Lafayette Street ✓❑McIntire []Washington Square
.address of Property: M5 Federal St
Name of Record Owner(s): Darcy Desautels,Erin Stewart
165 Federal St,Salem.MA 01970
Owner Mailing Address:
Description Of Worst Proposed
Please ripe orprml c%ar/y.Attach additional sheets, as neccssar}:
We wish to make repairs to the gutter on the side of the house that faces Griffin Place as the gutter is rotting,and
we also wish to scrape and repaint that side of the house.We will use the same paint colors and wood materials.
We also wish to make repairs to the area around the front door that is on Federal St as the overhang and underneath
the door has rotted.Again,we will use wood and stick to the same colors.
Lastly,a developer has done some damage to the side of the house that faces 161 Federal St,and we wish to make
a few minor repairs to the clapboard.Again,only wood will be used and the same color paint.
Erin Stewart
Name of Applicant: ❑Owner❑Contractot❑Tenant❑Dther:
F
Signature: Date:
617-784-. 5 estewan327@gmail.com
Tel.#: E-mail Address:
Certificate will be mailed to the owner unless oj!qjNf6cated here:
Certificate should be mailed to: Name
165 Federal St Salem M 01970
A TACHED DOCUMENl'A ION
An application will not be considered complete unless all work items are thoroughly described and the application
includes all information needed for the Commission to make a determinarior_
Failure to submit a complete application may result in a continuation to a future meetine.
Recommended information includes:
Photos of existing conditions,taken from all public ways
Site plan showing location of improvements
Elevation drawings of the existing conditions and proposed improvements
Drawings of details and other special conditions, including profiles
Description,photographs, and/or catalog cuts of proposed materials(please bring to the
meeting product samples, if appropriate)
Dimensions(i.e. height of fence, size of pickets and posts,etc.)
Paint color samples, if applicable(no less than 2"x2")
Location and size of all mechanical equipment,such as transformers, HVAC equipment,
electrical service and meters,and proposed screening
MjO
�4+�. Art �b @
♦ Rim ','A
:'. d ;••I�/��
mdk
0 VIM
mom W�
r
C0
1 �tP Q.
Salem Historical Commission
120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970
(978)619-5685 FAX(978)740-0404
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction ❑ Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic
Districts Ordinance.
District: McIntire
Address of Property: 165 Federal Street
Name of Record Owner: Kate Pratt
Description of Work Proposed:
Repair/replacement of wood clapboard on left side of house,painted to match existing. No changes in color,
material, design, location or appearance. Non-applicable due to being in kind maintenance/replacement.
Dated: November 16, 2015 s77
CAL COMMISSION
By:
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals)prior to commencing work.
RECEIVED
. ', NOV 12 2015
DEPT.OF PLANN.NG&
COMMLMNTY DEVFLOPW+('
Salem Historical Commission
120 WASHINGTON STREET.SALEM.MASSACHUSETTS 01970
(978)619-5685 FAX(978)740-0404
APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY
Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance,
application is hereby made for issuance of a Certificate of Non-Applicability as described below for:
❑ New Construction ❑ Moving KIS Reconstruction ❑ Alteration
❑ Demolition Painting ❑ Sign ❑ Other
District: ❑Derby Street ❑Lafayettte Street ❑McIntire ❑Washington Square
Address of Property: �L f Q X ed
Q / I f_
Name of Record Owner(s): kal e- 1- C&
Owner Mailing Address: vi-t, P
Description of Work Proposed:
1 1 • • ' 1 • • rM
A • A • • 1 •
Name of Applicant: 'j t-e L-v ,( '�, / Owner C46intractor Tenant LJ Other: _
Tel. #: �7.:�- —317 — /2/_ 5 E—mail Address: �' �3 ?6:� vn G a gjn� t
Certificate will be mailed to the owner unless otherwise indicated here.-
Certificate should be mailed to: Name k a �e P ri
Mailing address: sI�
�f( � / L Q /off City: _�'lt Ism State{ Zip: 0_
r
PROCEDURES FOR FILING APPLICATIONS
A. Be prepared to apply for approvals well in advance of commencing any exterior work. Before making any changes to the exterior of a property
in an historic district,the owner should call or visit the Commission representative at the Department ofPlanning&Community Development to
discuss proposed alterations and to determine the category of the application(Appropriateness,Non-Applicability or Hardship).
B. The Commission normally meets on the first and third Wednesdays of each month and notices are posted at City Hall. The meetings are held at
120 Washington Street,3rd floor,and begin at 7:00 p.m. All meetings are open to the public and any person is entitled to appear and be heard
on any matter before the Commission before it reaches a decision.
C. An application for a Certificate of Appropriateness or Hardship must be received by 3:00 p.m.on the Monday 16 days before the meeting in
order to make the agenda. An application for a Certificate of Non-Applicability may normally be added to the agenda up to the day of the
meeting. In some cases,a Certificate ofNon-Applicability maybe issued by the Clerk,without review by the full Commission,after notifying
Commission members and allowing 24 hours for any objection. There is no fee for any applications.
D. All applications for Certificates of Appropriateness or Hardship require a public hearing. Notice of the hearing must be posted with the City
Clerk 14 days before the hearing and abutters must be notified in writing. Commission staff will handle these procedures. A public hearing is
not required for a Certificate of Non-Applicability.
E. Applications must be submitted by the owner of the property. A contractor for the owner,at the owner's request,may submit an application on
the owner's behalf. In case of a tenant,a waiver of the owner's appearance maybe granted at the discretion of the Commission if it is requested
by the owner.
F. All applications must include photos of existing conditions,taken from all public ways. No certificates can be issued until receipt of photos.
G. An application will not be considered complete unless all work items are thoroughly described on scaled drawings and include specifications
regarding dimensions, materials, and any other information needed for the Commission to visualize the changes in order to make a
determination. Applications for paint colors should include a paint chip or chart. The following items should be included in your drawings as
applicable(exhibits should be 8 Y,x I1 or be able to be folded to 8'f.x 11):
1. Site plan showing location of improvements;
2. Elevation drawings of the specific improvements;
3. Details/profiles(i.e.moldings,fence caps,cornices,vents,etc.);
4. Materials(i.e.wood,brick,etc.);
5. Dimensions(i.e.size of trim);and
6. Transformers,heat pump and condenser locations,electrical entries and meters,lamp posts,stove pipes.
H. At the hearing,the Commission will discuss the application with the applicant or his representative,hear the abutters and take a vote. Owners
having professional consultants such as architects or contractors are urged to have them be present at the hearing. If the application is approved,
a Certificate will be mailed to the mailing address provided on the application and copies will be sent to the City Clerk and Building Inspector.
Please note that the application can be continued until the next meeting if the Commission deems necessary(i.e.for reasons of incomplete
drawings,to perform a site visit,etc.). In any case,the Commission must make a determination within 60 days from the date the application is
received,unless the applicant waives that requirement in writing.
1. A property owner or a contractor cannot receive a building permit unless a Certificate has been issued. Please be sure to obtain appropriate
permits from the Inspector of Buildings(or other necessary permits and approvals)prior to commencing work.
J. The homeowner may opt not to commence the work approved(unless it relates to resolving an outstanding violation). Work commenced must
be completed within one year from the Certificate date unless otherwise indicated.
K. The City of Salem reserves the right to inspect the project to determine compliance with the conditions set forth in the Certificate issued.
Violations
A person commencing or completing work to the exterior of a building in an historic district without the necessary approval of the Commission is subject
to fines of up to$500 per day from the date of violation. The Commission is not responsible for an owner's neglect to inquire about necessary City permits
and approvals. All records are public and we will confidentially assist you if you are concerned that someone in your neighborhood is in violation.
Assistance
The Commission's guidelines are available for viewing at the City of Salem Department of Planning&Community Development(DPCD),at the Salem
Public Library or on-line athtm://www.salem.com/Paees/SalemMA Historic/index. The guidelines provide examples ofwhatishistorically appropriate
(or inappropriate) for Salem's neighborhoods including trim, siding barrier free access, doors, fences, guttersidownspouts, masonry, mechanical
equipment,paint colors,parking solutions,porches/steps,roofing satellite dishes&solar energy systems,secondary egress,skylights,utilities,windows,
etc. These guidelines help you understand what changes are likely or unlikely to be approved. The Commission supports your efforts to improve your
property and can guide you on historical appropriateness. Further information, including City-wide architectural inventories,is available. For more
information,contact the Clerk of the Commission at the DPCD, 120 Washington Street,Salem,MA 01970,978 619-5985. Rev.1072
�t
��
.e''
� �- � � �
�-�-' �•
i---�_,
-.��
r�
. . wrrrrT�
r'„`�
• 'v �
� 4: '"
7 }
` 6� ' i• i
. •
4 �
f,..
� Yam%�►��"� ' ��.
r
1
i
r
ljg S.N.fa
i -
Mr
-
r
i '
4
.q
Y,s
w.
or
M
� s
I
w.r -
R
C
f
r - 1
• `'
fowl IL
,�
>IR I4I A-4 .
®�
1w
y„
v�
� a -
3
Salem Historical Commission
120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970
(978)745-9595 EXT.311 FAX(978)740-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction ❑ Alteration
❑ Demolition ❑ Painting
❑ Signage JR� Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Properly' 165 Federal Street
Name of Record Owner: 165 Federal St. Condo Association, David O'Connell President
Description of Work Proposed:
Installation of aluminum gutter on rear of house to match gutters already existing on the house, painted to
match existing.
Dated: October 26, 2009 SALEM HISTORICAL COMMISSION
By: �� / 7 1 1-
-e,7
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings(or any other necessary permits or approvals)prior to commencing work.
0
llP a
Salem Historical Commission
120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970
(978)745-9595 EXT.311 FAX(978)740.0404
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
Reconstruction ❑ Alteration
�f Demolition ❑ Painting
❑ Signage ❑ Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic
Districts Ordinance.
District: McIntire
Address of Property' 165 Federal Street
Name of Record Owner: 165 Federal St. Condo Association, David O'Connell President
Description of Work Proposed:
Repair/replace wood trim as needed to replicate existing, repainting in kind. No changes in color, material,
design, location or outward appearance. Non-applicable due to being in kind maintenance/replacement.
Dated: October 26, 2009 SALEM HISTORICAL COMMISSION
By:
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.
���
,.
_ � -�
_'
,, ; -� -.,
� � -,
q li � I -��
-_
1. -_ - - - -
�. \' - - - -
� -
� � __ _ � _
�" r���
.i
y
I
-�_
.. - lil �I
� ° I
e
I � e
I �
V
II�
'1
.
i
i17
1 �
1-
I
�I
- - --
- . , -- � fi
,�
� �
` �it . ////JJ
®�f �%
�j e
:�� .�� i,
� ��T� � ��
��
��`�- _-�
i _ �
�� � r
� � .y ��
i r I �,�
� � -�� -�
�� ���_
���----` it
��
� . , _ _�..
rz
Y
-w
f '
C I��YJ �iGd �,Yti«-\S
• �x,2 �� +a m�e.� �r1 A -�lc..�
- J
can 5ee
0-1c
OIL
koSo
WOO 1�
lvu',ehu�
VA CM
II m. :n I
b
( :I
4 .
1.
, 7 , � ( ,e � r i�l'eh4 ��'1s�� r�Tatr<; 7�✓.���+ rl � (fix'�w,b °�( a1r{
K ^ r
�� I { 5✓ tC' � w r it bil�xfJi li'� r 1>) '�.$i Tit"t�i �����" Viya� N
1 � M1MK
iy l�
f
xr/ 1 a r u S t
sk�T�iA i d�' ;fJY?i �S _ SI � �t "'� 1�'� 't '}s(} rfi N�4� 1r A7i�y`�7 `�'�•
l�pbT �
lv
Salem Historical Commission
120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970
(978)745-9595 EXT. 311 FAX (978) 740-0404
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction ❑ Alteration
❑ DemolitionPainting
❑ Signage � Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic
Districts Ordinance.
District:_ McIntire
Address of Property: 165 Federal Street
Name of Record Owner:_ 165 Federal St Condo Aacoriation
Description of Work Proposed:
Repainting of house as needed to replicate existing. No changes in color, material, design or outward
appearance. Non-applicable due to being in kind maintenance.
Dated: October 13, 2009 COMMISSION
By: SALEM
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings(or any other necessary permits or approvals) prior to commencing work.
C�
3
a
Salem Historical Commission
120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970
(978)745.9595 EXT.311 FAX(978)740-0404
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
-f�- Reconstruction ❑ Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic Districts Act(M.G.L. Ch. 40C)and the Salem Historic
Districts Ordinance.
District: McIntire
Address of Property: 165 Federal Street
Name of Record Owner: Hilario & Adelaide Cunha
Description of Work Proposed:
Reroof of rear non-visible roof section to replicate existing. Non-applicable due to being non-visible from the
public way.
Dated: November 30, 2004 SALEM HIS OMMISSION
By:
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals)prior to commencing work.
�9 �1
ilk
Ffnt �
IN
� _ �� ' ,•: _� . ,_ . I lean _�. �.. '� � �i
Hilario & Adelaide Cunha
165 Federal Street
Salem Ma, 01970
Description of Work Proposed
■ Construct two A type dormers facing the church rectory. All materials and paint will match existing
house. See attached drawing.
■ Remove and replace asphalt roofing with charcoal colored asphalt shingles and add a ridge vent for
proper ventilation.
■ Remove existing siding on left side of the house(facing the rectory). Replace with clapboard siding to
match existing siding on the rest of the house. Paint scheme to match existing colors on the house.
Submitted to
Salem Historical Commission
y .CO
Salem Historical Commission
ONE SALEM GREEN,SALEM, MASSACHUSETTS 01970
(978)745.9595 EXT.311 FAX(978)740-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction9— Alteration
❑ Demolition Painting
❑ Signage ❑ Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic Districts Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property 165 Federal Street -
Name of Record Owner: HIlario Cunha&Adelaide Quaresma Cunha
Description of Work Proposed:
Installation of two dormers (on rectory side)per drawing option #2, with roof of rear dormer to be a shed roof.
Dormers to have clapboard sides; windows to be wood, true divided light; roof to be 3-tab asphalt, all painted
to match house.
Remove and replace roofing with black or charcoal grey, 3-tab asphalt roofing. Addition of continuous ridge
vent.
Remove shingled siding(rectory side) and replace with clapboards to match front of house,paint to match
existing.
Dated: June 5, 2003 SALEM HISTORICAL COMMISSION
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.
Ari �
A
' to
/
1
t
M
f �l
}
T'
� \
� � \�
,.
r
`�
*'� � �
"di '' � --- � `
.I � � �. �
.1
p�w1
1��. :1 -�
i'
�I
II
I
IIS
M
pjl� 111111—
��� L]��]i� ,��•• til 1'l (][!1 ' -
I
Ilp N -
;ri •r ► Ire
i
9
I
M��v^�M��i" �F2aWiN� 'DoRNER
�- '.�
_ t
� � ��
� , !.'L% �
f-
� : y
' t
n'
ti
® GFR
■
I
l A r
L 1Y WiNWWIRE
' '1" G'•II" G 8"
N' qwl
FM
LLU
77 77T
L _ -
y &4
H `m
a a
n
Salem Historical Commission
ONE SALEM GREEN,SALEM,MASSACHUSETTS 01970
(978)745-9595 EXT.311 FAX(978)740-0404
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
Reconstruction ❑ Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic
Districts Ordinance.
District:_ McIntire
Address of Property: 165 Federal Street
Name of Record Owner: Hilario & Adelaide Cunha
Description of Work Proposed:
Replacement of roof to replicate existing. No changes in color, material, design or outward appearance. Non-
applicable due to being in kind replacement.
Dated: September 19, 2002 SALEM HISTORICAL COMMISSION
By:
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.
�.
,� l: ,
vn 1�
--- -_ - _�
_- �_- �- �� 17� r
�_
_ � _ -
A� �;
� S r.
� s 1. ' b+
�. �� t
.,y ,�"'
.-
...._:. -
�_
_ _
A6 ,
v.
ti■sem.►� `- i '
P asED
n�F';.
,�
.•
1 .
�.Y i
� ���✓ -
w;'' ,
.req � Y � � f�
rrj _ ! ''
�. �I
---- -
- ,: 3
�;•:-_:-
•�,
��
1
Hilario & Adelaide Cunha
165 Federal Street
Salem Ma, 01970
Description of Work Proposed
• Replacement of deteriorating roof structure and roof materials and adding a ridge vent for proper
ventilation.
■ Roof structure will be buil: using current city and state building codes.
■ Roof design will be replicated including any exterior crown moldings and gutters that are existing with
the exception of the roof pitch. In conjunction with replacing the structure and with permission of the
Salem Historical Commission we would like to place a 24 inch knee wall above the second floor ceiling.
This would create extra room for another bedroom for our family and enhance the side view of the home
leaving some space between the second floor windows and the roof line. Attached you will find photos
of homes on Federal Street that have the space between their second floor windows and roof line and
illustrations that show new proposed roof lines on existing photos.
■ Roofing materials used will be Slate colored architectural asphalt shingles or color chosen in
conjunction with the Commission.
■ Colors of new replicated moldings will match existing color scheme on home at the present time.
■ In addition to the roof we would like to place a 3 foot by 4 foot skylight centered on the new roof facing
Griffins Place. This would enhance the interior natural light of the home on the attic and second floor.
Submitted to
Salem Historical Commission
/6S
�R
rl �r
I6S
I
I
�aOR
FRONT vIE,JA-nvrJ 'AT k55F-r--'T- TME
I
FRDrJr -
y�vR
F0.0ntr E-LeoA-m9r.1 ASR 24" Kntc. UJALL YE
Salem Massachusetts Greek Revival Architecture Page 1 of 2
�f'�r�,txraeP Jn
SALSA NWSACHUSETTS
About Salem Calendar Community Message Board Salern Tales Web Guide
Greek Revival 1825 - 1850
Greek Revival I Italianate I Second Empire I Victorian Eclectic I Georgian Revival
17 & 18th Century Architecture 1 19th & 20th Century Architecture
4Ga3LE ,."O TO THE
+i.J117E CORNEK 7 :
6LAP1130AKU.5 OR
I�r •—
IF 1.1
Jrr- Cr-NIFEZ ENTRY
-
RrlFll,�5fER5, ENTn61r�TURE — -
SI�E
4 QANfInu
From The Salem Handbook, Historic Salem Incorporated, 1977
Plan
For the first time, the focus shifted from
the long side of the house to the short
gabled end.
Doorway
Fanlights and other elaborate details of the
Federal doorway were replaced by a
recessed doorway. Generally, a four-panel
door was used in the entry. The door was
often framed by narrow, floor-length SOME TERMS
sidelights and a transom, and usually rnalding /// fascia
flanked by flat pilasters and an architrave.
Windows edging /�' �'
strip fi/frieze -
Elongated windows with six over six panes. Kti cover
Roofline _LS,COY@
Gable of medium pitch, sometimes with a •--molding
low triangular pediment. Chimneys became overhang
small and insignificant. I
corner board"-----
Materials — -
Siding was usually clapboard. Matched or pilaster if wider) _.._
flatboards, designed to resemble stone,
littp://www.salemweb.com/guide/arch/greek.htm 8/20/2002
Salem Massachusetts Greek Revival Architecture Page 2 of 2
were often found on the facade.
Decoration
Simple lines with a concern for classical
formalities. Massive pilasters or wide
columns supporting a triangular pediment
and a flat band under the eaves gave the
appearance of a Greek temple.
Greek Revival I Italianate I SecondEmote I Victorian Ec._Jectic I Georgian Revival
17 & 18th Century Architecture 119th &20th Century Architecture
About Salem Calendar CoSmm Message Board Salem Tales Web Guide
Last Updated July 11, 2000
http://www.salemweh.com/guide/arch/greek.htm 8/20/2002
• Architecture Glossary - What is a pediment? Page 1 of 2
About > Arts & Entertainment > Architecture
WHAT YOU NEED
TO KNOW
Architecture Abut_
phone .-
W
with Jackie Craven Your Guide to one of hundreds of sites search!. inthistopic '
Home . Articles • Forums • Chat• Classifieds Free Newsletter Get the latest and greatest info from our
Guides.
CI" Want the jump on Back to School Shopping? Let About help. Dorm Life, Dell
Computers, and more!
Subjects What is a pediment?
NEWT Classifieds ATCTWiretess
BUYER'S GUIDE A pediment is a low-pitched triangular gable on the ,..-..,.
front of some buildings in the Grecian or Greek Revival 7 GET A FRI
Before You Buy style of architecture. NOKIA 33E
Top Picks
• Design Your Deck
• Pave Your Patio 11 1 ,
• House Style Guides -�'� l l "
Product Reviews
ESSENTIALS ice% vmwcwt _
SEPTEMBER 11 — ] _ c
IIIIi �Ji FRIEZE
s
BACK TO SCHOOL - �a�HirnAv6
l -
Schools
Careers
,p s
IN
Build Your House
Remodel Your House
Paint Your Hou_s_e_ Your
Find A Pro Architecture Glossary career ir
Find House Plans
Find Supplies I'lustration copyright OAK today
Great Architects Subscribe to the About House&Home Newsletter
Great Buildings
Historic Periods Name Email
House Styles Subscribe
Ornaments & TrimNJ
�£
j C
Books & Magazines Recent Discussions
Computer Software About.com Architecture 'J'
ForumslListservs Join these forum conversations
Organizations
Photos & Clipart In-Ground Fire Pit...An_ yone?
History of Architectural Education
Name the Strange House, please
lhttp://architecture.about.comllibrarylblgloss-pediment.htm 9/3/2002
Hilario & Adelaide Cunha
165 Federal Street
Salem Ma, 01970
Description of Work Proposed
■ Replacement of deteriorating roof structure and roof materials and adding a ridge vent for proper
ventilation.
■ Roof structure will be built using current city and state building codes.
■ Roof design will be replicated including any exterior crown moldings and gutters that are existing with
the exception of the roof pitch. In conjunction with replacing the structure and with permission of the
Salem Historical Commission we would like to place a 24 inch knee wall above the second floor ceiling.
This would create extra room for another bedroom for our family and enhance the side view of the home
leaving some space between the second floor windows and the roof line. Attached you will find photos
of homes on Federal Street that have the space between their second floor windows and roof line and
illustrations that show new proposed roof lines on existing photos.
■ Roofing materials used will be Slate colored architectural asphalt shingles or color chosen in
conjunction with the Commission.
■ Colors of new replicated moldings will match existing color scheme on home at the present time.
2 k 9
■ In addition to the roof we would like to place a 3 foot by 4 foot skylight centered on the new roof fac_ng
Griffins Place. This would enhance the interior natural light of the home on the attic and second floor.
Submitted to
Salem Historical Commission
P
A
I
y"GaaaN
Obn RooF L�NE
SH6 DET)!{.
s_
�] d i
i
I ,o. 8., FkiOe -
�'-W a A—, P 7743kE
FP41T BEV ATI WI W r,-� �yv) f_oY gzicfI orf
P6,41A)
''' �-- � -I tip•,
IS
�e
Mo��INr�
Iti
�blAlNf�
W-1
5'Iz
j2e, I CLAW SDkQ—P
T36E,SNS
MDIDlNfa r
N 29
—----------
-------------
❑ ❑
6yr7Z,7e 1057
� �bw� yV�OLT�ItiJC ��
�Z
e
Liv I
a>�
CROWN MOL-n'^�4 �f POUND
FR�ELE
� OL➢ RWF (JNE
I
, r �
I
_.T
LT _
' �T ��✓p�ronl w�rl N4W uasie�f
,
i� t110LD1r c <7[Ow�.! MOLDiN NHLF RJUNI�
xcePrcawa ._ _
1�7}} FT1UnT
ITFI
Fili
r � CII
- ,
Sim EcEvqnoN
s,D�Ng -ro ma+cff £.�IsnnKj
,a tffaor DovnH 3v,�T
W)TW .vo a,npzuS '"o .
Eusn f��E - w,u Ruu C-AW70 of
,aomB Gwau,Nq 3
pre ro"Az
PkOm E+A94,e mics.
f`
ij
I }I 1 I
If
0 Q i ij I
�sTlME, E[�9�aN W,rrf DOCi�/A ( y fbo-r
CO
v� 5
� fR
n t 5)
�M N6 W�
Salem Historical Commission
ONE SALEM GREEN,SALEM, MASSACHUSETTS 01970
(978)745-9595 EXT.311 FAX(978)740-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property: 165 Federal Street
Name of Record Owner: Hilario M. Cunha& Adelaide O. Cunha
Description of Work Proposed:
Remove asbestos siding and repair clapboard siding underneath. Retain, repair or replace any cornerboard or
watertable found underneath. Paint to match existing house colors. Removal of metal awning.
Dated: May 22, 2001 SALEM HISTORICAL COMMISSION
By.
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals)prior to commencing work.
P
..�, Illi SII
J 1 '
i 1� I
��,_.
.,:� �.�
i� , � ���d
J
:� � ;
� � _ �
� ' /I
,, -�.-� �
_� _ :�.
]t y`
sj
'1 1
,.r
qr IF
a 4 .
r
014
AA
1
f
g�
y Y
= L
.0 s�
w
i
ti
1 ' _ � /
b
/ �i
f'
zh
i
k
���� �� IIII i�� �! ii;,
�q,�
� '!��
� � �"
� � - - �
,,
� , �,
E � . . iii 1
. . /
N `\
c- 1
0
v
a
Y �
Salem Historical Commission
ONE SALEM GREEN,SALEM,MASSACHUSETTS 01970
(978)745-9595 EXT.311 FAX(978)740.0404
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
Reconstruction ❑ Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic
Districts Ordinance.
District: McIntire
Address of Property: 165 Federal Street
Name of Record Owner: Hilario Cunha&Adelaide Ouaresma
Description of Work Proposed:
Repair or replace trim of house as necessary to replicate existing. No changes in color, material, design or
outward appearance. Non-applicable due to being in kind maintenance/replacement.
Dated: April 6,2000 SALEM HISTORICAL COMMISSION
By:��
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals)prior to commencing work.
�1
Salem Historical Commission
ONE SALEM GREEN,SALEM,MASSACHUSETTS 01970
(978)745.9595 EXT.311 FAX(978)740.0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction Alteration
❑ Demolition Painting
❑ Signage ❑ Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property: 165 Federal St.
Name of Record Owner: Hilario Cunha&Adelaide Ouaresma
Description of Work Proposed:
Paint colors: Body—Sierra Vista
Trim & windows—Linen White or similar off-white
Doors—Brigade
Replacement of window sash per sample Brosco 6 over 6 replacement sash provided with energy panel.
Installation of second egress per drawing submitted with I"square balusters, not to exceed 2"spacing between
balusters, 44 capped posts cased in pine, solid wood handrail with beveled sides. Egress door to be wood,
with true divided lights. Remove chain link fence. Install in location noted on plan a wood 1"x 4"picket fence
(not shadow box,pickets on one side only), height not to exceed the sill of the first floor windows,finish side
out, cap as proposed in plan,fence left natural or painted trim white.
Dated: April 6.2000 SALEM HISTORICAL COMMISSION
By:
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings(or any other necessary permits or approvals)prior to commencing work.
Proposed Remodeling Plans
n"ECEIVED
to the residence of
IG ASI 0- 44
Mr. Hilario M Cunka,.SALEM .
Ms. Adelaide B Quaresma
location
165 Federal St.
Photo Image: Federal St. View
Submitted to
Salem Historical Commission
One Salem Green , Salem, Massachusetts 01970
(978) 745-9595 Ext.311 Fax(978) 740-0404
t
Description of Work Proposed
& Applications
1. Application for a certificate of Non-Applicability (page 1)
2. Application for a certificate of Appropriateness (page 2)
' 3. Paint House and Trim with New Submitted Colors (page 3)
4. Replace Window sashes (page 4)
5. Reinstall second means of egress ( page 5)
6. Replace and alter backyard fence ( page 6)
7. Site Plan (page 7)
of
Photo Image: Back View of House
C V1.111
bll?t.
Salem Ristorical cominISS1011
' ONE SALEM GREEN. SALEM. MASSACHUSETTS 01970
(508)745.9595 EXT. 311 FAX (508)740-0404
' APPLICATION FOR A CERTIFICAT OF NON-APPLICABILITY
Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commissio
Ordinance, application is hereby made for issuance of a Certificate of Non-Applicability for:
t ❑ Construction ❑ Moving
Er Reconstruction ❑ Alteration
❑ Demolition ❑ Painting
❑ Sign ❑ Other
as described below.
District: Building Construction Date, if known: �`N"UA-V r
rAddress of Property: I('5 FE aEW L. ST- SA(t..>^HM It O 19-D
Name of Record Owner: NILARto M CJIJ 4A �1 4ELMDE 13 Quavas M 4
Description of Work Proposed: -r-o REPAIK o2 Rli;-PLA*-E " TKI N 09-
STr_7_e10„r, SIr)INo '$Erig V_F_ PA-INnNcN --rF \,JE o0
gfyL1KF 2T W1 L- S); IZFFLAC" W fru SCmf_ -rilInC7
zo�unLkc iv ►�hA-r NO(A
Signature of Owner: Tel. #: 97g�� J 9�f o 06 /
Mailing address: f(9 S F�DECA� ST City: .��??1� f State:A Zip: 0974
J' b/
s�
2M_ eta _>
/Yfr,4my,,
,Salem Historical Commission
ONE SALEM GREEN, SALEM, MASSACHUSETTS 01970
(508) 745.9595 EXT.311 FAX (508) 740.0404
' APPLICATION FORA CERTIFICATE OF APPROPRIATENESS
' Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commissio:
Ordinance, application is hereby made for issuance of a Certificate of Appropriateness for:
0 Construction ❑ Moving
❑ Reconstruction W Alteration
❑ Demolition W� Painting
❑ Sign ❑ Other
as described below.
District: Building Construction Date, if known:_ _ U
Address of Property: /6S R-:b6;gW _ 37— .SfKXM Mss 019'70
Name of Record Owner: A4,1A,cso M �"tW W ;F/
Description of Work Proposed:
(Please attach required scale drawings, paint chips and/or samples of work and material proposed, where
applicable.)
. rSC R (Pi1vN Of- W o(2K Proe osizp 1 S -r iF--M tz D R N D AITA
1
Signature of Owner: Tel. #: y/7J�' 3 4 �[ - 600
' Mailing address:__/ (o � iffL S T City: ga- � State: AZip: 0/92
Paint Body and Trim with New submitted
colors
Body: Sheepskin
1
( Behr Pa=nt 3A17-4)
I
Trim: Sierra Vista
i
(Behr Paint 2A14-4)
' Doors: Brigade
1
(Behr Paint 3B62-6)
* The following page contains pictures of historic homes located on
Federal St. We have taken serious consideration in keeping with the
color scheme of the neighborhood.
1 Additional Homes on Federal Street,,
� 1
P'K.
1
NIL
Allifll.
1 � -
1 - I
NS 7
1 End.
1
Additional Homes on Pederal
�l
s qe
Replace Window Sashes
'IiJUBLE-HUNG REPLACEMENT SASH
�ROSCO's Replacement Sash can be used to upgrade old, Windows are true divided lite
worn out double-hung windows.Choose
oin a complete set of sash � And solid wood exterior finish
our Replacement
tsh Kit,which These windows are very similar
v
�cludes a set of insulating
In style and all the sizes will remain
ass sash with tilt hardware applied,
�iIt'N Clean balances and a weatherstripped \ The same.
head parting stop.All windows shown in this brochure
,e available to satisfy your replacement needs.
LThe plans below are to indicate which windows will be replaced. They will
' highlighted to be better visible.
as 11 =1 ow All c ea r -- —
�i
(,�� I �� *There will
Aad I a,— Be also
!E�i () Two windows
Replaced in the
oAttack. One in
IThe front and
F n - One in the back
e
• A O
A ,y
0
0
B
0C 0
Reinstall Second Means of Egress on the
Second Floor.
' Below you will see a plan of the land and the building drawn in 1925. This
plan shows a detailed drawing of the second means of egress that at one time
' existed on the backside of the house. This house at one point lost that second
means of egress and we would like to restore that with some changes to better
improve the back driveway. The steps instead of coming straight down they
will hug the backside of the house and utilize the back yard better.
J-C,
PLAN OF LAND
A- SALEM, MASSACHUSETTS.
OWN£D BY
OR/L L E LHEUREUX
SCALE 1/NCH,/OFEET
OcC./9P5
SHAY B LEARY, C/V/L ENG/NEERS.
25 EXCHANGE ST, LYNN,MASS.
�I I 5/ WASHINGTON ST.,SALEM,MASS.
0
airjaAan has been n:duced. For
co:-,eel stating see original on file.
Ll
�
na to
'
4
lino'JF.
' mot of Plans 43, Plan Ho"P90
S9/em,J0a.6,19P6 Rtc.SEnLH
i Erten RtµDeed: Sa Dist. With
deed Orille A.L'Heoreur to Thomas
•' F.Little. Ret B.P663 P.163
i.r vl Attest: Moody Kimball, Reg.
h
I I
(F.H
' rorsier/y Jhe/idan
1 Reinstall Second Means of Egress on the
Second Floor. (Cont.)
' The second means of egress will be constructed out of pressure treated wood
and covered with pine to give it a nice finish. This stairway will be constructed
1 according to the building code. The balusters are to be made out of fur and
painted to match the trim of the house( see page 3). The dimensions and the
layout are attached on a separate sheet.
1
77-
1
1
1
Nov
1
1
1
Photo Image: Side view
1 *Note: Next page contains drawing of proposed second means of egress.
1
1
----------
1
�WK
ii g
.. .........-------
OR4 wwp
WocO
FNPTW .(W",To 6OWk C44 If)
Replace and Alter backyard fence.
The old fence is made out of chain link and we would love to replace it with a
Shadow Box fence (see below). However, the fence now does not optimize the
parking situation in the driveway. If we remove approx. ten feet of fence in
' front of the driveway this will allow better access to park the cars.
sp
' Picture of existing fence in backyard.
Proposed plan of new fence.
The highlighted section will
Be where the new fence will
' Be located.
The Shadow
Ohadow Box Box fence will
Be 6ft tall
$ ` " And will contain
Built with 1" x 4" cedar
, boards on both sides, the � � � q�.'
• A fence cap
;�
Shadow box fence looks ' That is
Drawn below.
' from the front or eae same when r.
Boards are staggered al-
lowing air flow and visi-
ility from an angle but jc
tprivacy when viewed
straight on.
FEDERAL STiQEET i
, p
J6J-4JF 2272-'S.F.
C i
a
of �
-
� t
4
i
1 C •'
1 1
(F./4
' Former/y -�heria"/,
PLAN OF LAND
u�
SALEM, MASSACHUSETTS.
-�
OWNED BY -
ORIL L E L'HEUREUX
I
Boot o/ Plans 45, Plan No.P9a SCALE IINCH=IOF£ET
Salem,✓on.6,I9P6 Ars.BEnl.h Dc C.I9P5
Esser Rep.Der✓s Sa DW. With SHAY B LEARY, CIVIL ENGINEERS.
deed Orille A.L'Hevreur to Thomas PS EXCHANGE SLYNN,AIA SS.
F.Lille. Ree8.2663 P./63 51 WASH/NGTON ST-,SALEN,AIASS.
Allesl: AlooCr Kimball, Rey. -
nisplan has been /rduceD. For
correct scat'ny see criyinol on file.
GRAPHIC SCALE IN FEET
Additional I 1
� s
� l
r
ri.
Additional Photos:Ion
z
�P.
r - - � •
r
i
!°aCO„�`` , Salem Hi storicai Commission
2 J CITY HALL. SALEM, MASS. 01270
A
7A
/� 1Y
�f�1MIM6
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has
determined that the proposed construction [ ]; reconstruction [X];
demolition [ ]; moving [ ]; alteration [ ]; painting [ ]; sign or
other appurtenant fixture [ ] work as described below in the . . .
McIntire Historic District.
(NAME OF HISTORIC DISTRICT)
Address of Property: 165 Federal St.
Name of Record Owner: Paul s Jeanette Malawka
DESCRIPTION OF WORK PROPOSED:
Re-roof one side of roof as existing. Remove and replace one wood gutter and
facia board.
Non-applicable due to being an in-kind replacement.
does not involve an exterior architectural feature or involves a feature
covered by the exemptions or limitations set forth in the Historic District's
Act (Federal Laws, Ch. 40C) and the Salem Historical Commission.
Dated:August 16, 1990 SALEM HISTORICAL COMMISSIIOONN
Bocc-1(�_, G /
Chairman
-s ...
I�� - � �
I� � �� ' --
�_ - -
�I�F I� _I� � _ a
._ —
�,� -� � t
.�
l�o� Fede mac/'
��, j9�
-_
' � �
i
Ale
' yyMC4"�
H
T'
Salem Historical Commission
CITY HALL. SALEM. MASS. 01970
744-4580
NOTICE. OF DENIAL OF APPLICATION FOR CERTIFICATE OF APPROPRIATENESS
On 'Wednesday, June 5, 1985, the Salem Historical Commission voted 5 to 1
to deny the application for a Certificate of Appropriateness for vinyl
siding at 165 Federal Street. This vote was based on the Commission's
finding that this installation would be incongruous to the historic
aspects and architectural characteristics of the surroundings and of
the McIntire Historic District.
I, �-. . �� Joan F. Pizzello, Clerk of Commission,
att t that this is app curate record of the vote taken, not amended or
mo fied in any way to this date.
cc: Building Inspector
City Clerk
4
Q00 D
)OAK FLY KODAK Flux
KODAK rem 1
cc: Building Inspector
c City Clerk
�. •• ^ 'tel F .
t
'�'�GU4�T-dam
_atmiii Historical Comarfi�foii
CITY -TALL, SALEM. MASS. 01970
744-4580
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has
determined that. the proposed construction ( ) ; reconstruction ( );
demolition ( ) ; moving ( ) ; alteration (30; painting ( ) ; sign or other
appurtenant fixture ( ) work as described below in the . ..
McIntire Historic District
(NAME OF HISTORIC DISTRICT)
Address of Property: 165 Federal St.
Name of Record Owner: Paul & Jeanette Malawka
DESCRIPTION OF WORK PROPOSED:
Removal of existing side exterior door (on west elevation) and replacement
with new 6-panel Brosco Fir door with two -upper lights, #F66-2.
Existing casing and trim to remain.
will be appropriate to the preservation of said Historic District, as per
'the requirements set forth in the Historic Districts' Act (Federal Laws,
Ch. 40C) and the Salem Historical Commission.
Dated: April 2, 1987 SALEM HISTORICAL COMMISSION
,[
BY—"—C II/�.
Chairman
s
� • _
> _ �
� �
��� � 1
.� -
_,
!65 Peel cr�� S4• 6(3l Y5
II
I
E
g! s 6 IsIrs
l(oS Fe@c,-rt S4, G(s1YS
r --
L�
('6 Fc4rat SF . `6k(7
ti
i
��' -- i `
6'•6" �L
fir ht Helg 7�-^y :!(
®
DOORS ONLY.
+' 4 --- {r{'F; I - i ,i
2" may a cut from
r �? 1 G. �� Ili �i l•I
bottom rail of 81•6"
fir doors(byY• ilf
others). .} y
BROSCO Will , � � • � '� � P�7
F•66 _ F•66.2 F•66.4 F•790
(F•2130) (F-2132) ` (F•2134)
Tempered Safety Glass ' - Tempered Safety Giase
�t F
Salon Historical Commission
CITY HALL, SALEM. MASS. (.1970
744-4580
NOTICF. OF DENIAL OF APPLICATION FOR CERTIFICATE OF APPROPRIATENESS
On Wednesday, June 5, 1985, the Salem Historical Commission voted 5 to 1
ro deny the application for a Certificate of Appropriateness for vinyl
:tiding at 165 Federal Street. This vote was based on the Commission's
finding that this installation would be incongruous to the historic
aspects and architectural characteristics of the surroundings and of
the McIntire Historic District.
Joan F. Pizzello, Clerk of Commission,
attes't that this is an/ztcurate record of the vote taken, not amended or
mokfied in any way to this date.
cc: Building Inspector
City Clerk