6 CHESTNUT STREET - DISTRICT FILES 6 Chestnut St _
1
(,0 T
Salem Historical Commission
120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970
(978)619-5685 FAX(978)740.0404
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction ❑ Alteration
❑ Demolition ✓ Painting
❑ Signage ❑ Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic
Districts Ordinance.
District: McIntire District
Address of Property: 6 Chestnut Street
Name of Record Owner: _ James and Julianne McLean
Description of Work Proposed:
Repaint house to match existing colors: "Newburyport Blue for main body; Blackfor shutters and white
for trim, molding and quoins.
There will be no changes in color, material, design, location or outward appearance. Non-applicable
due to being in-kind repainting.
Note: Request to change color offront door requires approval under an application for a Certificate of
Appropriateness. This portion of the application will be reviewed at the Commission's public meeting of
August 17, 2016 at 7 pm.
Dated: July 25, 2016 SALEM HISTORICAL COMMISSION
By. titre
The homeowner has the option not to commence the work (unleses to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
Once completed,please submit a photograph(s) of the final result(maximum of four-i.e. one photograph of
each affected faVade).
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.
Date Stamp
al
Salem Histofzcal Commission
120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970C For Office Use Only
(976)619-66BS FAX(978)740-0404
APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Ga/
Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance,
application is hereby made for issuance of a Certificate of Appropriateness for:
❑ New Construction ❑ Moving ❑ Reconstruction ❑ Alteration
❑ Demolition f Painting ❑ Sign ❑ Other
District: ❑Derby Street ❑Lafayette Street &Uclntire ❑Washington Square
Address of Property: _4g C-A iE Z -14--
Name of Record Owner(s): J t t i�/l/4 orl,A d A41 c_ b2q
Owner Mailing Address:C2 G f�,Q
Description of Work Proposed
(� Please type orpruit clearly:Attacli additional sheets, as necessary:
r \ 4 t hfs-v 5
N�w lj v v1��-�.�+ -� /� l r✓ � Gt�t � t•� ✓y��fr y
7 r- cry✓ 1 5�—� /�rm .— /� l t /T
Name of Apphcant:t/k'11 Lt y� ,Owner ❑Contractor ❑Tenant []Other:
Signature: l Date:
Tel. #:_ a/ 'Z Sr 7 -/ o ZI E-mail Address: a Q , C r,7
Certificate will be mailed to the owner unless otherwise indicated here:
Certificate should be mailed to: Name
Mailing address: City: State:_Zip:
C T
v
2
Salem Historical Commission
120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970
(978)619-5685 FAX(978)740-0404
July 16, 2015
James McLean
6 Chestnut Street
Salem, MA 01970
Mr. McLean:
As we previously discussed, your property at 6 Chestnut Street is located within the
McIntire Historic District, which is a local historic district created in accordance with MGL
Chapter 40C. Exterior alterations to the building are under the jurisdiction of the Salem
Historical Commission.
The Salem Historical Commission Guidelines, which are based on the Secretary of
Interior's Standards of Rehabilitation, encourage the retention of existing historic materials
and architectural features whenever possible. In adhering to these guidelines, the
Commission requires that historically appropriate window openings including window
sash, glass, lintels, sills, trim, hoods, and shutters be repaired and/or restored, if at all
possible.
For instances where the windows have deteriorated to the point of no longer being
repairable, the property owner must apply for and receive a Certificate of Appropriateness or
Hardship. An inspection by a Historical Commission representative or a site visit may be
performed as part of this process to determine the condition of all windows.
If you need assistance, please contact me at the Salem Department of Planning and
Community Development, 120 Washington Street, Salem, MA, (978)619-5685.
Since ply,
Natalie Lovett
Community Development Planner
g0 IT
Salem Historical Commission
120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970
(978)619-5685 FAX(978)740-0404
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction ❑ Alteration
❑ Demolition ❑ Painting
❑ Signage l k Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic
Districts Ordinance.
District: McIntire
Address of Property: 6 Chestnut Street
Name of Record Owner: Jim McLean
Description of Work Proposed:
Reroof with Certainteed X725 shingles in black or charcoal gray.
Dated: October 26, 2015 SALEM HISTORICAL COMMISSION
By.
nc.
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals)prior to commencing work.
RECEIVED
OCT 14 2015
\ DEPT.OF PLANNM 8
Salem Historical Commission COMMIL"TY DEVELOPMEN I
120 WASHINGTON STREET SALEM MASSACHUSETTS 01970
1976)619-5685 FA%f9'8,7n0-0=01
APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY
Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance,
application is hereby made for issuance of a Certificate of Non-Applicability as described below for:
❑ New Construction ❑ Moving ❑ Reconstruction ❑ Alteration
❑ Demolition ❑ Painting ❑ Sign ❑ Other
District: ❑Derby Street ❑Lafayette Street 11 McIntire []Washington Square
Address of Property: 1�r 1 VllegNuy+ ;t '
Name of Record Owner(s): �i n /C'Lea��10.,�
Owner Mailing Address: S M< !g N LI 3�l��2-3117y)6V • (O J`1
Description of Work Proposed:
rP side rPAr df c700-�7
�Zy / ell`
���y�F Iar C �a s
NameofApplicant: VVMrr7N Ic&,rScvj LOwner XXontractor lenant _Other: 1
Tel. #: SE-mail Address: warr-fnl Pfe.r-5o1J �°rGM(r7t��.NP I
Certificate will be mailed to the owner unless otherwise indicated here:
Certificate should be mailed to: Name
Mailing address: City: State:_Zip:
t PROCEDURES FOR FILING APPLICATIONS
A. Be prepared to apply for approvals well in advance of commencing any exterior work. Before making any changes to the exterior of a property
in an historic district,the owner should call or visit the Commission representative at the Department of Planning&Community Development to
discuss proposed alterations and to determine the category of the application(Appropriateness,Non-Applicability or Hardship).
B. The Commission normally meets on the fist and third Wednesdays of each month and notices are posted at City Hall. The meetings are held at
120 Washington Street,3rd floor,and begin at 7:00 p.m. All meetings are open to the public and any person is entitled to appear and be heard
on any matter before the Commission before it reaches a decision.
C. An application for a Certificate of Appropriateness or Hardship must be received by 3:00 p.m.on the Monday 16 days before the meeting in
order to make the agenda. An application for a Certificate of Non-Applicability may normally be added to the agenda up to the day of the
meeting. In some cases,a Certificate of Non-Applicability may be issued by the Clerk,without review by the full Commission,after notifying
Commission members and allowing 24 hours for any objection. There is no fee for any applications.
D. All applications for Certificates of Appropriateness or Hardship require a public hearing. Notice of the hearing must be posted with the City
Clerk 14 days before the hearing and abutters must be notified in writing. Commission staff will handle these procedures. A public hearing is
not required for a Certificate of Non-Applicability.
E. Applications must be submitted by the owner of the property. A contractor for the owner,at the owner's request,may submit an application on
the owner's behalf. In case of a tenant,a waiver of the owners appearance maybe granted at the discretion of the Commission if it is requested
by the owner.
F. All applications must include photos of existing conditions,taken from all public ways. No certificates can be issued until receipt of phots.
G. An application will not be considered complete unless all work items are thoroughly described on scaled drawings and include specificaticns
regarding dimensions, materials, and any other information needed for the Commission to visualize the changes in order to make a
determination. Applications for paint colors should include a paint chip or chart. The following items should be included in your drawings as
applicable(exhibits should be 8'F:x 11 or be able to be folded to 8'/�x 11):
I. Site plan showing location of improvements;
2. Elevation drawings of the specific improvements;
3. Details/profiles(i.e.moldings,fence caps,comites,vents,etc.);
4. Materials(i.e.wood,brick,etc.);
5. Dimensions(i.e.size of trim);and
6. Transformers,heat pump and condenser locations,electrical entries and meters, lamp posts,stove pipes.
H. At the hearing,the Commission will discuss the application with the applicant or his representative,hear the abutters and take a vote. Owners
having professional consultants such as architects or contractors are urged to have them be present at the hearing. If the application is approved,
a Certificate will be mailed to the mailing address provided on the application and copies will be sent to the City Clerk and Building Inspector.
Please note that the application can be continued until the next meeting if the Commission deems necessary(i.e. for reasons of incomplete
drawings,to perform a site visit.etc.). In any case,the Commission must make a determination within 60 days from the date the application is
received,unless the applicant waives that requirement in writing.
1. A property owner or a contractor cannot receive a building permit unless a Certificate has been issued. Please be sure to obtain appropriate
permits from the Inspector of Buildings(or other necessary permits and approvals)prior to commencing work.
J. The homeowner may opt not to commence the work approved(unless it relates to resolving an outstanding violation). Work commenced must
be completed within one year from the Certificate date unless otherwise indicated.
K. The City of Salem reserves the right to inspect the project to determine compliance with the conditions set forth in the Certificate issued.
Violations
A person commencing or completing work to the exterior of a building in an historic district without the necessary approval of the Commission is subject
to fines of up to$500 per day from the date of violation. The Commission is not responsible for an owner's neglect to inquire about necessary City permits
and approvals. All records are public and we will confidentially assist you if you are concerned that someone in your neighborhood is in violation.
Assistance
The Commission's guidelines are available for viewingat the City of Salem Department of Planning.&Community Development(DPCD),at the Salem
Public Library or on-line athup:/hvww.salem.com/Paees/SalemMA Historic/index. The guidelines provide examples of what is historically appropriate
(or inappropriate) for Salem's neighborhoods including trim, siding, barrier free access, doors, fences, gutters/downspouts, masonry, mechanical
equipment,paint colors,parking solutions,porches/steps,roofing,satellite dishes&solar energy systems,secondary egress,skylights,utilities,windows,
etc. These guidelines help you understand what changes are likely or unlikely to be approved. The Commission supports your efforts to improve your
property and can guide you on historical appropriateness. Further information, including City-wide architectural inventories,is available. For more
information,contact the Clerk of the Commission at the DPCD, 120 Washington Street,Salem,MA 01970,978 619-5985. Rev.10'12
Natalie Lovett
From: Jim McLean <jmclean4343@gmail.com>
Sent: Thursday, October 15, 2015 9:19 AM
To: Natalie Lovett
Subject: 6 Chestnut
Attachments: TraditionalShinglesBrochNortheast.pdf
Good morning Natalie or Nick. I apoolgize for not knowing as Bob Laughlin left your contact information in a
message. The roofing shingle Bob is recommending are Certainteed XT25 in black to match my existing
roof. I have attached the Certainteed catalog.
Please let me know if you need anything else.
Jim McLean
1
ertain dd`
SAINT-GOBAIN
Traditional Shingles
CertainTeed A',r��2s
•205 Ib.per scuare
•25-year Rented transferable warranty against
manufacturing defects
•10-year StreakFighter'algae-resistance warranty
•5-year SureStart—protection
•5-year warranty against winds up to 60 mph
, t
` +®r
S I
r
,, - • t
tW r ! .
e. r
'any
(r•' ��'1?!-'fir _. _ . , .`� sz..,�e
r
J. 4AR�s
. F i r �i6 t*err
rrM �apr
i
r
MOIRE BLACK i.
t
N
WIATIILRIDAA'OOD •`u.�� �
BRICK RED CHESTNUT BROWN
5 wlcn
"MAxav STREAKFigghter'
STAR WHITE WEATHERED WOOD
SEA GREEN OAKWOOD
GRAY FROST BRICK RED
BiACKPEPPER CHESTNUT BROWN
SLUE GRA) TIMBER BLEND
MOIRE BLACK NICKEL GRAY
BLACK SLATE BLEND
■
SUPERIOR
SCIENCE lk
lhebess]ormuk underonerool We ssan wiN the highest-quality
raw materials and add slate of-the art technology to monitor our
nuhduring process and
hereon finished Products.
The results wperlar Performance hom^be,loning to end.
X1 23 Star White is an ENERGY S'PAR'ramd pruJuct
vl1'� �pminwws
\OI'E:REPRODUCTION OP COLORS thnuiShm, PuMiuu ccnrssc
mlxlcsn Pnming 1stl11 prnnnCahn unsuhja[to chango hr granule nauftrcturers.m FSC
�, FSC C003R5]
ASK ABOUT ALL OF OUR OTHER CERTAINTEED" PRODUCTS AND SYSTEMS: Certain-Feed Corporation
P.O. Box 860
ROOFING SIDING • TRIM • DECKING • RAILING • FENCE Valley Forge,PA 19482
GYPSUM CEILINGS • INSULATION
Professional:800.233-8990
www.certalnteed.com http:)Vblog.cortainteed.com Consumer.800-782-8777
rs,2015 Oerwoneed corporsawn.Printed in U.S.A.
Code No,20-20-1880
SAINT-OOSAIN
Wo
Z
!i w p ' 'q" � r��♦ yip. "'_
S � � � ��r�Iy�•
opi
01
1
•Av.
i
r
Jan _ ♦.. ♦ r - 14 d 'N'.: �.�.�. ✓C,
� illk
Al
P $�K r a�F�J-Y 4� y�, j 3�, ✓r :r'4 .r ..r'v
1c f
' L ma�yy'' a, r'/T ]\y�' 4• b T_: ::
t
l�
Ouahh You Can Trust... q
Fiat,Modh Amem s
Largest Roofing Manulaclurall tCi' 's' y-_'I
TMBERL►NEUIRAHD
i T�`_ r tr 4. ^.. s i'n� ,.t unm sawsm•4a
IMBERLINEHD'
r a1 �_ '.�jz f' �{'`°{ • '".,:'Fbt'3 c �,.��yr�� ��J�ry rt !��7S �° vw.w.a w�owe ma
s" ne
' '14 .44` r '1 '7 k. �cfyy' s• '15' .s.JaZ'x•yr. _`^=..:.
C��.�i,, -7i
�
� r,
si LeakBarrievB tea.
${ /y(�yry a,
!^f on
'h.. a.a:"t-C,< �, 2.+ „17:• N VGrnr �I
i
v� gE,yra
-
� , yR: t e !.�" \„i itt y'I�i'h+.�. � f '' U3 : �`•'Y� ., £4gr F !`5' �
y,� H
P 11
r>
'�
x`3►xxxx�y "` I i�I '
Al-
•
� .
N
t !
Salem Historical Commission
120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970
(978) 745-9595 EXT.311 FAX(978) 740-0404
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction 0 Moving
❑ Reconstruction f°l Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic
Districts Ordinance.
District: McIntire
Address of Property: 6 Chestnut St
Name of Record Owner: James & Julianne McLean
Description of Work Proposed:
Change approved French door of rear fagade to a simulated divided light sliding glass door. Replacement of
window to the right of the French door with two new wood 6 over 6 windows (true divided or simulated divided
light) in same size and design as existing(no transom over windows), with placement of the two new windows to
be symmetrical in clapboard exposure. Surrounding clapboards and painting to match existing.
Non-applicable due to being non-visible from the public way.
Dated: September 19, 2007 SALEM HISTO AL COMMISSION
By:
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.
rFA
JON
low
r
i
ry
is
Ji
�S
Ti
�I
I
Replacement Window Images and Details
Marvin Ultimate Double Hung Windows
• Marvin's Ultimate Double Hung combines state-of-the-art window design with the
style and beauty of an earlier era. Traditional lines, profiles and proportions make the
interior of Ultimate Double Hung exceptionally beautiful.
Standard Features
• 4 9/16" (116 mm)jambs
• All-wood Brick Mould Casing (wood units)
• 81 sill bevel
• Bare wood interior
• Satin Taupe sash lock
• Clear, one-lite insulating glass
A
1
. y
Simulated Divided Lite with Spacer Bar(SDLS)
SDL is an energy-efficient way to create the look of divided lites. SDL bars are permanently adhered to both
sides of the glass.A spacer bar is installed between the glass, creating the essence of Authentic Divided
Lites.
9
i
i
Marvin Door Images and Details
Ultimate Sliding French Door
• The Ultimate Sliding French Door delivers the elegance of a French door in a space-
saving sliding version.
• It features the traditional lines of a French door, including extra-wide stiles and tall
bottom rails.
• An ergonomically designed handle is easily cradled in your palm and a multi-point
lock delivers added security.
• Now available with the beautiful traditional shadow-lines of a raised panel or the
crisp, clean look of a flat panel
Standard Features
• Tempered, one-lite insulating glass
• Multi-point locking system with Satin Taupe handle
• Oak liner on beige Ultrex®sill (What's this?)
• All wood Brick Mould Casing (wood units)
• 4 9/16" (116 mm)jambs
• Bare wood interior
Simulated Divided Lite with Spacer Bar(SDLS)
SDL is an energy-efficient way to create the look of divided lites. SDL bars are permanently adhered to both
sides of the glass.A spacer bar is installed between the glass,creating the essence of Authentic Divided
Lites.
4
IM
"popp
1 ki
� l �
' � r
,y
� I
4 -
140482105 3886571856-1001-0001
Walereen= < 1i 09/16/07
�e� ��:�
d�ti `l `�T`i�'Ht• � r
I M
Y ,��Yi
'� �vkar -
�— i� ., .
e `'.- r
w ��
-�
�.i [.
- ; -,
� .
-� � •,
, �
'� � .
<� ;, � �
- - �' ��.
^.
- �..
;�
Page I of 2
Jane Guy
From: Jane Guy
Sent: Monday, September 17, 2007 2:02 PM
To: 'Jim McLean'
Subject: RE: 6 Chestnut Street
Hi Jim,
If I get the drawing by Wed., 9/26, then I will provide it to the Commission members. If it is not ready by
then, just bring it to the meeting.
I agree it not visible in summer and comparing it to one of the winter photo's I have on file, it is barely
visible. When the row of trees at neighbor's yard mature, it will probably not be visible in winter. Whether
to approve it under non-applicability is up to the Commission. I will try to have a staff person scan the
photos and send them to the Commission members. If they agree to go with non-applicability, then you
can withdraw your current application and file one for non-applicability - there is no deadline for it. If even
one member wants to review it under Appropriateness, then we will go forward with your current
application on 10/1. 1 will let you know by this Wednesday.
Jane
Jane A. Guy
Asst. Community Development Director
City of Salem
Department of Planning &Community Development
120 Washington Street
Salem, MA 01970
(978) 745-9595, Ext. 5685
Fax: (978) 740-0404
iguy@salem.com
www salem.com
-----Original Message-----
From: Jim McLean [mailto:jmclean@ibeyond.com]
Sent: Monday, September 17, 2007 12:50 PM
To: Jane Guy
Subject: 6 Chestnut Street
Good morning Jane. I dropped off another form to get on historical commission agenda for 10/3 meeting. Included with
form were current photographs of my house from Essex Street,door and window images with product details and
photograph of rear of my house. I am having my architect provide drawing as suggested and will bring to next meeting.
Would commission members get a copy of this drawing prior to meeting if I got it to you next week? Does this matter?My
architect is out of town until next week.
As you can see in current photographs from Essex Street,my house is barely visible from Essex Street. Proposed work area
is not visible. I also took a closer look at evergreen trees planted in neighbor's yard (yellow carriage house with Summer
Street address. Not sure number)immediately behind my house. I believe these trees block the view of my house from
Essex Street and will block view regardless of seasons they do not drop their needles/leaves. Can I show this to you? If
view is obscured by these trees can I go with "Non-Applicability"? Would I need to apply for this by today?
Please let me know what you think. Best number to reach me is 857-204-8220.
9/17/2007
Page 2 of 2
Thanks again for your help
Jim McLean
9/17/2007
r � �
;�
* � r
h r ; 1 �tA, + ��fl
i y 61 �.,��� 'y
1 1 � 1� .'
• ^7
,'',�� � �A� /
y,, ` 1 `� �` , ��
��
� � � �
y
i
y ,. <_
�F ��4`rrsr �r-_
',
140482105 388E565852_1001_0002
Jalereers <2> 09/16/0
Salem Historical Commission
120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970
(978)745-9595 EXT 311 FAX(978)740-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property: 6 Chestnut Street
Name of Record Owner: James & Julie McLean
Description of Work Proposed:
Relocate existing window to the left of the back door and install it to the left of and abutting the window to the
right of the back door.
Dated: September 6. 2007 SALE�M�HISTORICAL COMMISSION
By.
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.
� - ,, :-
, ,
_,
i
s , �
. �,
- _
. ._,.. ...r ..
��� 4 ..
� .,_
I
� ' �� ,
.. 1
-- --
'i
f.
�� ��
f !-A_
j __ _-
t
� �
.: �:: 1'._ � .. ..
.k
�� �/
�a}
! ,_
l,.
�_
�� �L _ I
p k
`I
}I
�A
Yd
,
,4L
� ttlL'
e f '
rl �
`c3 1
o :y ,
tz
-
-_ _
-51
❑C_�"sa t, ,�
-,. 11Q,
• RECEIVED
JUL 16 2007
DEPT.OF PLANNING&
Salem Historical Commission COMMUNITY DEVELOPMENT
120 WASHINGTON STREET,SALEM,MA 01970
(978) 745-9595 EXT. 311 FAX(978)740-0404
APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS
Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission
Ordinance, application is hereby made for issuance of a Certificate of Appropriateness for:
Construction Moving Reconstruction Alteration 1
Demolition Painting Sign et- ��-
as described below.
District: M e- I ^v'-r-1 V2 Original Building Construction Date, if known:
Address of Property: & e-" -
Name of Record Owner(s): ��Ak--� E`' 4—> >I U L 0I ^,O` /"e- L-V- T �
Description of Work Proposed
(Please include required scale drawings,paint chips, catalog cuts and/or samples of materialproposed, where applicable.)
t3S +—r rti-r-n 5 / k4 v t_a--,-ZEZij r,>j fit Z>� L rcr -r i
I 1z- S f ►'L �Lr�t i tE
>1 t/ ! L /G, f�� CtO�-lz 5
e--e?t� �L C 5 2 eTnJ u 'S
Signature of Owner:1n!
Tel. #: /SMailing address: v% `�`r City: State(R/Zip:69--/-/-Z
'I
---- _
,� �� -
-.�_ ', ,�
,C-----
-- �
_ __.
,��
m....
i _ -...
�:�\��d
0
t?
Salem Historical Commission
120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970
(978) 745-9595 EXT.311 FAX(978) 740-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction Alteration
❑ Demolition Painting
❑ Signage ❑ Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property:_6 Chestnut Street
Name of Record Owner: James&Julianne McLean
Description of Work Proposed:
Addition of transom similar to those existing on the house over rear doors approved on certificate dated 415/07.
Dated: June 21, 2007 SALEM
HISTORICAL COMMISSION
By:
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.
Salem Historical Commission
120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970
(978)745-9595 EXT.311 FAX(978)740-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property- h Chestnut Street
Name of Record Owner: James McLean
Description of Work Proposed:
Replace existing door and window in rear with two panel, wood, French style door with one side fixed, 15 true
divided lights per panel. Instead of transom proposed, door to have lintel with maximum 9"projection. Option
to move door to the left a maximum of 12 inches. Painted to match existing.
Ifabove is not,feasible, option to replace existing door only with wood, IS light, true divided light door, painted
to match existing.
Dated: April 5. 2007 SALEM HISTORICAL COMMISSSSIION
By: � 7'�"/
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.
AnderserfDivided
Specified Equal Lights
Frenchwood® Patio Door Pattem Examples
1-Wide 2-Wide 3-Wide 4-Wide 5-Wide
1-High
FWH/FWO 3168 FWH/FWO 3168 FWH/FWO 3168
2-High -A
FWH/FWO 3168 FWH/FWO 3168 FWH/FWO 3168 FWH/FWO 3168 5
0
U
3-High
FWH/FWO 3168 FWH/FWO 3168 FWH/FWO 3168 FWH/FWO 3168
4-High
FWH/FWO 3168 FWH/FWO 3168 FWH/FWO 3168 FWH/FWO 3168
5-High
FWH/FWO 3168 FWH/FWO 3168 FWH/FWO 3168 FWH/FWO 3168
Standard Colonial y
Kj v L T7 P
TU 3 w D 4E
7-High Custom
To qualify as a specified equal light pattern, up to 1 extra column and/or 1 extra row beyond the standard
colonial pattern may be added.More lights in addition to this maximum constitutes a custom pattern.
32
400 Series Frenchwood® Sidelights & Transoms Andersen �
WINDOWS • DOORS
Table A Basic Sidelight and Transom Unit Sizes Scale 1/8"- 1'-0"(1:96)
UnlUimensicn 1'-213/16" P613/16' 2'-01/xT-61/6" 2'-81/8" 3'-01/6' 4'-0' 4'.111/4" 5'-31/4" 5'-111/4"
(376) 0�264)
(622) (765) (816) (918) (1219) (1505) (1607) (1810)
Minimum 1'31/x' 2'-1' 2'-7• 2'A• 3'-1' 5'-0• 5'-4• 9-17
Roughopenng (394) (635) (789) (838) (940) (1245) (1524) ('6267 (1829)
63/9• 136/16" 181fi/16" 2Gi5/I6• 241fi/Ifi" 3613/16' 481/16' S21/1fi" 6G1/I6"
Unotstruclec Glass (162) (338) (481) (532) (633) (935) (1221) (1322) (1526)
Unobstweted Glass 136hr"13i'lu' 18`/a"18 6/u' 20�tr/W 20'ih 24"Ar' 24�`/ti
(2-witle units) (338)(338) (481) (481) (532) (532) (633) (633)
00000
' FWSLT1311 FWSLT1711 FWT2111 FWT2711 FWT2911 FWT3111 FWT4111 FWT5011 FWT5411 FWT6011
m m j m m
o in •� res '+ l� t� O O [� D D D
FWf-24111 FWf-2.5011 FWT-2-5411 FWT-2-6011
•t 14'3'3 t L ,c-- -rz -r4—t E- S L �7—Y L
V " ` FWSLT1336 FWSLT1716 FWT2116 FWT2716 FWT2916 FWQ3116 FWT4116 FwT5016 L FwT5436. M6015 1
na a � O D O 0 O D 10-1
D O
FW17-24116 FWr.2-5016 FWT-2-5416 FWT-2-6016
n C N O u a M M
m .n � rn m r4i
FWSLT13110 FWSLT77110 FWT21110 FWT27110 FWF29110 FWT31110 FWT41110 FwT50110 FWr5411G FWT60110
mai
> < ❑ ❑ DD DD � �
m io m ro
FWT-2-01110 FWT-2-50110 FWT-2-54110 FW17-2-60110
HOR00H]
m FWSL1368 FWSL1768
FWSL13611 FWSL17611
FWSL1380 FWSL1780
• Robot oper ing dimensions may need to to mmeased 0 a@aw for use of tuildingwraps,4aspings,tap panning,dmchem,fasteners a over mms
• Andersen•or on parm6 are attenuated for an ung;on vis page.
• -UnI:DIIllensbn*aMgs refer;W outrade frame to frame admonition.
• DOnen9ons Ir parentheses are in milimeters.
• Campgrounds of door uninspired Ngemer ma/require nonIDnmI orwmwl minfoR6lnenLIIl6 reinforcement woud to specified by d Vmfessuanalengineer.
• Warn manning,to wre M spetifyoolof de9red:Waite,Sanctmm,kmmne•or Forest Green.
I'
-
N ' e
s
b
1 ,
C
i
1
i
I �G
r:
,�- ��•���..:_ .. lam, ,
S
r
i
RY i
I
Ell .
r
i
, s
i
A ! '
�j
J
r
t 11
;�f
POO i2 q
wi.,.mow
L=�
,
k>
fI
i
r.
n 1'
�/I'r�y24
S F Jr)
'�' 1l sem. � �• � � \ /�
r,i
rW
— — e-•r. R,. Iv-
❑E , f o
�}ry%• 1.SG, .� ,fir. •
/' • .12W �.
�0
aa
Salem Historical Commission
120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970
(978)745.9595 EXT.311 FAX(978)740-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction �a Alteration
❑ Demolition -fi�: Painting
❑ Signage ❑ Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property: 6 Chestnut Street
Name of Record Owner: James A. McLean
Description of Work Proposed:
Replacement of existing gutters with seamless aluminum gutters per sample submitted and replace downspouts
as needed with round, galvanized conditional that all downspouts be uniform. Gutters and downspouts to
match trim color.
Paint colors:
Body- Option for Newburyport Blue or Hale Navy
Trim and sash - White
Shutters - Black
Detailing of paint delegated to Commissioner Doug Desrocher (978-745-8794). Please contact him prior to
painting.
Dated: December 8, 2005 SALEM HISTORIIICCA-L COMMISSION
By: i--� O Zj
The homeowner has the option not to commence the work(unless it relates to resolving an ooutstand ng
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals)prior to commencing work.
Benjamin Moore personal colour viewer 2 .0
1206 trim 1 December 7, 2005
i -
�N
m _ _
Historical Colours Off-White Colours Colour Preview (No colour)
HC-154 OC-67 2132-10
Hate Navy Ice Mist Black
Please note that the printed colour representations are not precise representations of actual paint colours due to variance In printer colour calibrations. page 1 Of 1
Benjamin Moored recommends that you bring your colour choices to your local Benjamin Moore®retailer for an exact colour match.
All-Season Gutters supply information for Half-Round and K-Style Gutter available in se... Page 1 of 1
?�h
ALL-SEASON GUTTERS ABOUT OUR COMPANY PRODUCTS I ACCESSORIES CONTA,
PRODUCT INFORMATION
All Season Gutters offers a comprehensive line of seamless historical half round copper.
aluminum,and galvanized gutters for commercial or residential structures. For added beauty,
we also offer a wide variety of decorative finials, conductor heads,and specialty straps. PleaserClick
view our full gallery below to select the system that best meets your specifications.
Contact our sales staff at 1.888.662.2550 or sales@allseason-gutters.com for more
information. rc
to
"K" GUTTER SYSTEM HALF
• 'R-STYLE GUTTER
n El,
A
I
i
TESTIMOrHALS INSTALLATIONS I GISTHWUTORS
http://allseason-gutters.com/products/ 11/13/2005
All-Season Gutters supply information for Half-Round and K-Style Gutter available in se... Page 1 of 1
ALL-SEASON(W FFERS ABOUT OUR COMPANY PRODUCTS ACCESSORIES CONTA
PRODUCT INFORMATION
All Season Gutters offers a comprehensive line of seamless historical half round copper,
aluminum, and galvanized gutters for commercial or residential structures. For added beauty,
we also offer a wide variety of decorative finials, conductor heads, and specialty straps. Please
view our full gallery below to select the system that best meets your specifications.
Contact our sales staff at 1.888.662.2550 or sales@allseason-gutters.com for more
information. Click Here
to
HALF ROUND GUTTER SYSTEM HAI r ROUND GUTTER SYSTEM
d'
i u aI.:LL. ihi._ CI]IiaL �I�P.�
1.888.662.
http://allseason-gutters.com/products/ 11/13/2005
+f� �'��SAY 1��� ��k 1S.i ` `T�i j!ep; •2. • y
y t�
Y4 y
Y v .
�� YY
R
t i pi
d �' flpa
• r -���• ,�. ter.- '� �, I
>v
1
4
9
I
-x
t
s
;ST
!L.
l�b:.�r-• 4.
�'���
� •
°�� ; t.
`�^ i
i ',..
r _ t ,, .:
�,..
, 1� r �`� �
� �'� .
�'N a
� � � � � �
� - � � '�� - . fir '-
�2�, � �
`'tia jk a, a �L,?+
1
�.
1
l
��/=P� ;.
_. �
� .� � �.a ... - i.r '�-.
4
1
W�::
- c
1 _
' ' I
a �^
.a,
I
rrII ,�
I
I I
1
' IN
CA`fes �, /� - t1y � RSpt"~, . .,� , ,F /• ^� '@ d• a L'Y
f+ .i__ f;y��./�i 1_ •tr ii'" ";�'���,a l��� ,�„i.. 'l• -�`J�"J+�i�"1 `�a'�s+',y;y'p .
.�.
, z
��,_� � �I
f � ^
�.
_ ;
����.
_ � �
. �';, �"
�:_ ., � _ .
` O �
�k
l
f
Aft z
II
,5
b
i
I
f'
I
�,,� , � �,
�ia, �� li
�; �'� *+
� ,
C5,
R P
Mal � µ \
0
Ir
_ -� -�� �1
1
,�' � , 111 �
_ _, .�..
'AFI ��
■
_ �
��� ��
a
b
J
f
a
1 1ylj
R
. _
�;� - / `
__ �
'�
r— n _
� �
�_
/� _
��
_ _�
_ ' •r�'�.
A � 1
`\°',►/
`v J'`` �`
�d �" ,. _
� � O� � 1
fl � t 1 ?, d
r
b
o �
�� �► -- t
,. 1 �.. f � '� �
Q,} � �s6F
� ,
/^
�� ,� a _ .
i
�� �i�i9
�s %
% 0.
o
b
� T d
b
3
d
L Lai il* -.
.t.
_ - - `
_ ■
PRO
..----�
� ,�
� �` ,��,�
d �
}
I
-V � o�
'.� �
i
0
f
���
g \.� � d
� 'r .
Ilk-
i
a.
0
f
f
4 !/J f+
i
y
e �
f i I 11
R..
sY.:. �:.� ..
- c. � . ' .�
r - h 'i� T� '0 1 4� "dp � r/
r_� � 1.�. .' 0"'}�_ YY�-�
hey T1, ,,(.3 ��1i 1� �.t
' t Yi I �
,{� y R
rRSY
I �
I
--! �� !I
I
� v 1� .
' i'��"'�utMmtmn'1� !I
-�
Y
' 1
91,9
Sim
_Ilk
a
• _: _ y � , .• ter}.
• '�
� � � ��'ie rh.. '�� . :Il+, , ':
.� a iF ' �-' ,�-.�.
. . �.lr, .. � t-
°"�.
xt ' V��� � ��SAP M
� ��
i�
C'
I
i�
,�
� y �. �
05 a r
_ �:.:
..,,
, � � � \
,�,_.._
�$. , - s �
� , � ,,
��.,� :,
�+`''
�:�:
c'
\h ,��ai'�``, a
1�
���
i
'v � � �ti ��
� z- �
x
�, r:
j d
.� '" .� ��
_ _ -` �
f'� 'r ,T, � ��
� `
� W
h
a I
� \ _r .� � �
c0 T
n i �
Salem Historical Commission
ONE SALEM GREEN,SALEM,MASSACHUSETTS 01970
(978)745.9595 EXT.311 FAX(978)740-0404
CERTIFICATE OF NON-APLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction ❑ Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic
Districts Ordinance.
District: McIntire
Address of Property: 6 Chestnut St.
Name of Record Owner: Robert Busteed
Description of Work Proposed:
Replace roof to replicate existing. No changes in color, material, design or outward appearance. Non-
applicable due to being in kind maintenance/replacement.
Dated: Al2ri120 1999 SALE HISTORICAL COMMISSION
By:
r
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings(or any other necessary permits or approvals)prior to commencing work.
�.r
� '7
� � (il
N'�
� `1.��
F
• � � ���•
•:: - !' T -
�\1►�
�_ ' `_ ,
�l s_�-
� r �
'v 1
� �
_ _
Q ,,: � �
Q � `�
��
� � �
y c
'" � �
z � � ' `
� ��
���
�'
� �'
4. � �r.
♦N —'�
` ;
`�. _ _i
� �, !�
1
���l �
• — _�.` ��" is �
Lam' � �r � '�
■
' ■ , i�
� �� .:
� 4, +
4
i
-vamArl
t Y.
Fl
�cmmtti
�a
r
Salem Historical Commission
ONE SALEM GREEN, SALEM, MASSACHUSETTS 01970
(508) 745-9595 EXT. 311 FAX (508) 740-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstructi6n' ❑ Alteration
❑ Demolition ❑ Painting
❑ Signage Y Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property: 6 Chestnut St.
Name of Record Owner: Robert B. Busteed
Description of Work Proposed:
Installation of retractable chimney cap (Lyemance Pop-top Damper). Color to be black, if available.
Dated: September 5. 1997 SALEM HISTORICAL COMMISSION
By:
The homeowner has the option not to commence the work(unless it relates to resolving an ousf tanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals)prior to commencing work.
-fir 1� 3i�, `f� �• -=t
i a
1 eM
,Al
Ir ,� !ate- .
i
1 ' �I
F
`�
_ f � i
<�\ r --
� � . � �� ��
� �� ,�.
�:-.
��
��� .=
II � br IA� ,
< �r�
��,'' �xre
��l� -— - —
All,
1
C ►�
4
-----�
" �� a-
�� � /`
�� ( ��
r •' � �� �
' �
L}• '
• r
P�.
� L
a 9R 7 ` '
[^ {^ ��
�� i �Y 1
y� �� �
1
L,` W
o.
f: _��
V_ IZ-
14V
l�
I
aw 4a 11
r-
.
fl•< Lccmance Pop-Top Damper shown the Pop-Top herr on a
(11 L: , >:-effective nag to --see-through chintnec"so you
provide your customer,with all can see the Prneer Lever.Of
the advantages of a spring- course. it would be inside the
loaded top-sealing damper. chimney in a"real-world"
The Pop-Top Damper installation.
operates on the same principle The Pop-Top is the perfect
as Lyemanee's Top-Sealing solution for your customer,
Damper Cap.featured below. who want a spring-loads. top-
The spring-loaded system opens sealing damper and do no,
the damper top as the stainless require the protection of a spat I
steel cable is released from the arrestor.
firebox. The Pop-Top Damper is mad,
Q� The standard cable is 32' of cast aluminum and is long,and a 50'Replacement available in 8'x8'.9"x 1'.
Cable is available.The Pop-Top 13"x 13".and 13'x 18"sizes.It
Damper mounts to the flue tile has a two-year syarranq.x251
with adhesive which is
provided.
Lyemance's popular Power
Lever is incorporated in the
Pop-Top Damper as welI.We've
,4en
- i
LYEIY►ANCE TOP-SEALING DUYIPEP CAP LYEMANCE "W" DAMPER. WITH UP
It's a traditional-looking simple tug.The spring-loaded The "OPC" (Original Plus Capi t and comes complete with a
chimney cap with the added arms that connect the plate to is a super unit that gives you 32' cable. the Power Lever.all
features of a built-in.top- the top of the chimney,cap then all the benefits of an original necessary installation hard-
sealing damper. snap the plate into its open Lyemance Damper and a chim- ware.and a tube of sealant to
This cast aluminum cap has position,tucked up underneath nev cap with spark arrestor. bond it to the flue tile.40 and
four removable. '."mesh. the cap lid. The cast aluminum"OPC" 50' replacement cables.and
aluminum spark arrestor panels This popular Top-Sealing has:V4' mesh.aluminum spark packets of extra damper mount-
(photo shows three sides Damper Cap from Lyemance is arrestor panels.and is available ing hardware are also available.
removed),A standard 32'cable available in 9"x 13". 13"x 13", in 9"x13". 13"x 13".and Try the ,OPC"—it•s a great
mounts in the firebox and easilyand I"px 18".1-,4) 13"x18"sizes. damper/cap combination!
releases the damper plate with a It carries a two-year warran-
28 Price List page number follows each descriptive:
—o
L � � . Y.
�• � � ��f
�� �_-
3
.� •'�'�
F"
T
[��
I _ 1� � _
��� �'--
l
rp CA es 1'n�°
)I1Y( 9r
R
�S
�GL.avF.
Salem Historical Commission
i HA,-. .�ALEM. MASS _1970
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has
determined that the proposed construction ( ) ; reconstruction ( ) ;
demolition ( ) ; moving ( ) ; alteration ( ) ; painting (X ) ; sign or other
appurtenant fixture ( ) work as described below in the . . .
MrTn$irA Historic District
(NAME OF HISTORIC DISTRICT)
Address of Property: 6 Chestnut Street
Name of Record Owner: Margaret Busteed
DESCRIPTION OF WORK PROPOSED:
Change of paint color from what was previously existing to
that which was recently painted.
will be appropriate to the preservation of said Historic District, as per
the requirements set forth in the Historic Districts' Act (Mass. Gen. Law
Ch. 40C) and the Salem Historical Commission. Please be sure to obtain the
appropriate permits from the Inspector of Buildings prior to commencing work.
Dated: November 18, 1991 SALEM HISTORICAL COMMISSION
By 2,t6
Chairman
1
�
Salem Historical Commission
ONE SALEM GREEN.SALEM,MASSACHUSETTS 01970
(617) 735-9595. EXT.311
NOTICE OF DENIAL OF APPLICATION FOR A CERTIFICATE OF NON-
APPLICABILITY
RE: 6 Chestnut Street
On Wednesday, November 6 , 1991, the Salem Historical Commission,
unanimously voted to deny an application for a Certificate of Non-
applicability from Margaret Busteed for the painting of 6 Chestnut
Street as was recently painted. The denial was due to the work
requiring approval under a Certificate of Appropriateness due to a
deviation from the previously existing color.
I attest that this is an accurate record of the vote taken, not
amended or modified in any way to this date.
November 6 , 1991
Jin-e7#. Guy
ClerV of the Co ssion
cc: Building Inspector
City Clerk
JG\JANE\DENIAL