3 CARPENTER STREET - DISTRICT FILES 3 Carpenter St. —
Jane Guy
From: Jane Guy
Sent: Monday,April 06, 2015 10:01 AM
To: 'Firth, Jennifer'
Cc: 'David Hart(davidatsalem@comcast.net)'; jon.firh@microsemi.com'
Subject: RE: Firth - 3 Carpenter Street
Hi Jennifer,
I received no objection to extending your certificate. You may proceed.
-Jane
Jane A. Guy
Assistant Community Development Director
City of Salem
Department of Planning & Community Development
120 Washington St., 3rd Floor
Salem, MA 01970
978-619-5685
(F) 978-740-0404
iouvCcDsalem.com
www.salem.com
From: Jane Guy
Sent:Thursday, April 02, 2015 10:21 AM
To: 'Firth, Jennifer'
Cc: David Hart (davidatsalem0)comcast.net); ion.firth@microsemi.com
Subject: RE: Firth - 3 Carpenter Street
Jennifer,
The Commission is typically receptive to extending certificates. I have forwarded your message to the members. I will
let you know no later than Monday morning if anyone objected (which means yo-i would need to wait until the next
meeting for them to discuss it). Otherwise you will be able to proceed with pulling a building permit.
-Jane
Jane A. Guy
Assistant Community Development Director
City of Salem
Department of Planning & Community Development
120 Washington St., 3rd Floor
Salem, MA 01970
978-619-5685
(F) 978-740-0404
iouyCcDsalem.com
www.salem.com
1
From: Firth, Jennifer [mailto:Jennifer.Firth(o)bos.frb.oral
Sent: Thursday, April 02, 2015 9:33 AM
To: Jane Guy
Cc: David Hart (davidatsalem(acomcast.net); ion.firth(amicrosemi.com
Subject: RE: Firth - 3 Carpenter Street
Jane —I'm forwarding the below question to you — I didn't realize Natalie was out on maternity leave.
Many thanks!
Jennifer Firth
From: Firth, Jennifer
Sent: Thursday, April 02, 2015 9:30 AM
To: 'nlovett@salem.com'
Cc: David Hart (davidatsalem(@comcast.net); ion.firth@microsemi.com
Subject: Firth - 3 Carpenter Street
Natalie—due to competing family priorities last year, we delayed building our sunroom (permitted date March
24, 2014). My builder was just about to pull a permit yesterday, and I noticed my approval from the Historical
Commission ran out a couple of weeks ago. So, I'd like to request an extension for another few
months. Could you let me know the process I need to go through to do so?
Thank you very much. Sorry for the extra work!
Jennifer Firth
3 Carpenter St
508-954-5070
2
0
K
Salem Historical Commission
120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970
(978)619-5685 FAX(978)740-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
0 Construction ❑ Moving
❑ Reconstruction ❑ Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property enter Street
Name of Record Owner: Jonathan & Jennifer Firth
Description of Work Proposed:
Construct a rear sum-oom, per the drawings dated 9/2/13.
The windows will be wood, insulated glass, with bronze spacers. The applicant has the option to install
winclows with muntins, cis shown in the drawings and rendering, or without nluntins.
The foundation will be red brick to match the existing house foundation.
Dated: March 24, 2014 SALEM HISTORICAL COMMISSION
By:pzld�j
l'J L
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.
c
ms`s,
1)at �4t.')':r. � fa i 01s',NJQ .'S
APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS
Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance,
application is hereby made for issuance of a Certificate of Appropriateness for:
X New Construction ❑ Moving ❑ Reconstruction ❑ Alteration
❑ Demolition ❑ Painting ❑ Sign ❑ Other
District: El Derby Street Ll Lafayette Street X McIntire []Washington Square
Address of Property: 3 Carpenter Street
Name of Record Owner(s): Jonathan and Jennifer Firth
Owner Mailing Address: 3 Carpenter Street
Description of Work Proposed
(Please include required scale drawings,paint chips, catalog cuts and/or samples of ntaterialproposed, where applicable.)
Sunroom — one floor, in footprint of'existing deck/staurs.
• Plans and plot plus included separately.
• Photos from public ways included separately.
• Paint color to match existing trim.
' 1 / 1 • include photos of • 1 ' conditions. takenfrom 1 1
Name of Applicant: Jon and Jennifer Firth X Owner ❑Contractor ❑Tenant ❑Other:
Tel. #: 508-954-5070 E-mail Address: jenniferfirth(@,verizon.net,iennifenfirthctbos.frb.org
ZONING DISTRICT - R2
REQUIRED EXISTING PROPOSED
LOT AREA 15,000 1 3,700 3,700
LOT FRONTAGE 100 31, 50-6' ^,_
FRONT 15 3± 31
SIDE 1D 4'± 4'±
1' 1a' -f
REAR 30 10'± 9'±
LOT COVERAGE M59 30.18 33.5%
i
MAP 26 LOT 555
ESSEX INSTITUTE
138 FEDERAL STREET
I
PROPOSED MAP 26 LOT 558
-��, DECR h STEPS KIMBERLY A. RUSSELL
PROPOSED 5 CARPENTER STREET
SOLARIUM
� w MAP 26 LOT 557
AREA=3,700± S.F.
e�
N Z�
Z
OJ j¢ 2 1/2 STORY DWELLING
J OW
�p�ZO
NWIn�
¢O
¢¢W M
ZU' Z�
#3
DRIVEWAY
#3
Vix
CARPENTER STREET
ZONING BOARD OF APPEALS PLAN
3 CARPENTER STREET
MARBLEHEAD
I CERTIFY THAT THE BUILDINGS PROPERTY OF
HEREON ARE LOCATED ON JONATHON & JENNIFER FIRTH
THE GROUND AS SHOWN, SCALE 1" = 10' JANUARY 8, 2014
NORTH SHORE SURVEY CORPORATION
14 BROWN ST. - SALEM, MA
DATE REG. PROF. LAND SURVEYOR 978-744-4800 #3996
SOLARIUM ADDITION T
EXISTING VICTORIAN
RESIDENCE " 7��
11
3 CARPENTER ST
Y _ i,. pmlep Maregemart
SALEM, MASSACHUSETTS + SOLARWM
ADDMONTO
J G
CTORIAN
DRAWING LIST REMENCE
A100 SITE AND LOCATION PLAN 3 CARP24M ST
A200 FOUNDATION PLAN SAMM
DETAIL WALL SECTION 1 ACHUSEPIB
A201 FRAMING PLAN FLOOR 1
PARTITION PLAN EXISTING VIEW REAR OF DWELLING
A202 ROOF FRAMING PLAN
ROOF PLAN + R s
A300 ELEVATIONS PES R
IN
s°1i ��� q II II II II II
PROPOSED VIEW REAR OF DWELLING
o�
31 —3" N/F MACHADO
BULKHEAD
19' '
AREA=
3700 f S.
y
2-1/2 STORY
/ 14 F DAVIS ` DWELLING
#3
Ll
CARPENTER STREET
THIS PLOT PLAN WAS N
`I 17 AN INSTRUMENT SURVEY
34 PG. 201 THE PURPOSES OF THE
UNDER NO CIRCUMSTAN
L CREDIT UNION TO BE USED FOR ESIAB
FENCES, WALLS, HEDGES
BUILDING SHOWN HEREON
GROUNDAS SHOWN AND IT
(iIM AW MILLWMTO MATLH MING P/JUSE FlASH/LDVNTEFBASHTYPCk.
HUWJLANE nE AT EVERY Jp15T TYBGI
C0V"U5LYADHER lV0&RPt@ — "2®2x IZ IPG IO FXISnNG Ir OLTYRfi1
ROOF A55EMBLYWI BASHING RRMWU SPEC-
Orie CeNCMMBp•Suety
0® IG'OC CALpN ENGINEERED HANGER TYPICAL LrING G
------- 9]a]41.0410
ALIGN 4 amwr®scnoar�r
_
b4O Nesterr Planers
Master Deennp
Proletl Menepemeni
SOLARIUM
ADDITION TO
EXISTING
8CTORIAN
WNB —______ RESIDENCE
J CARFENTERST
r--- SALEM
IACHUS6CI9
I/7 ANLigRB01T®4'OOO 2®2%I DGroaasraG 17OL TYPIfAI I I B'PROSi WN10N 10%IB'RC
I I
I
I
I
® 16'OC TYPIGL'ON ENGINEERED IIMGHtTYPICAL — --- I I I ebw
WM
mi I I WINDWA5504tY 1 Etizd exra
P _ I
I HDRIZONTAL REINFORCING I I I
2@ 75 Dar TOP AND BOTTOM I I I I
i 3'MINIMUM COVERAGE
4'RIGID POAM FOUNDATION I I I 1
IN5ULUION TYPICAL I I
3 I I w. oeaumx
� I L
a o 90%COMPACTED OR UNDI5TURBED I I
EARTH TYPICAL
gI _______________
/5 Bari'MIN COVERAGE(fyp)
$ 9'.{y4• 9,_6•
r.02.20131
-- VAMOUS
ADVIIIUN
DETAIL 5ECTION FROST WALL/FOUNDATION PLAN D
A200 ADDITION-3 CARPENTER 5TREET,5AIEM,MA55ALHUSETT5 SCALE I/4'=1'-0' A200 ADDITION-3 CARPENTER 5TREET,5NEM,MA55ACHU5ET15 5CAIE1/4'=1'-0' A200
OR.calnBMiga aaael
8elein,MASSA 019"lj B
mause
M.➢41.oflo
Da5TK MR mTOR N M�aPT tenet
12'Tlwa'MMf ln�
flDD FRMaD 5T MasutP nnn,
Pealed Management
LARIUM
t
t;gADDITIONTO
el _ n��� O
2XG K DEQ FRAMING Cl'ORIAN
TMORIXIMMQNG RESIDENCE
CARPENTER ST
AWN DEVAna Of FlN6n
SALEM
ITOORTWIDPLI
MASSAMUSETTS
/2•BQMR 5MM1 OR11'ROd F 22%10 tAb TO I
2X6®I6•ocrmw az OronxG wMSrRANDBaWO .q`4T t>fl Marrn eo5nNG5kvl
IINUSEY 8 x000rt=5Y5Tae�
F1#119A wm CASING PND VIM I I
CABINU AWIN.5!K.NIDO M
LMXNFTS AW flNE�iQ ROJNN 1 2-13 QfTR
— — I I t0&23 PERMri
Rm�_
2
p� A200
DeMOOOSnNG'All
a m .�
I
IXI TIN FIELD EXI TING FIELD ,�e.oz.zots
vARwus
�,� +3ae
L` 1 FRAMING PIAN FLOOR I PARTITION PIAN FLOOR I ma
A201 AODmON-3 LARPUMRSTREtT,SALEM,MASgAGNU5ETr5 5W u4'=1'-0 A201 ADDRION-3 LARMfU5TRM.5AlEM,M 55ACNusETTs scat Iw'=ra
A201
ON o Mdp s9eet
BWm.MA99ACHu9ETT5
019]0 USA
9)9]41-0410
�9P��Wenat
1m Mre
InixOe
W si9n
Mw Mm.gq
etad ena9ament
SOLARIUM
ADDITION TO
EMSTING
VICTORIAN
RESIDENCE
CARPENTER 6T
EM
GUIT AW MammTO MAT NG ram ALB
I I i MASSACHUSETTS
1 i I
I 1
i
CPMA55DAYPDn[WhNG MR
RpOFA559v W7 fl15nING PDtANf
MAYU stet
I 1 2-13 CLIEHTRFO
-2 IW23 3 PERMR
AZ00 I A200
I
EXISTING FIELD I EXISTING FIELD wwou
/ 1 ROOF FRAMING PIAN ROOF PLAN sm
A202 ADOMON-3 CWTEW ER STRITT.5A Ent Mf55ACHU5EM 5GA E lW=1'- A202 ADDMON-3 CARPENTER 5TREET,544.MA5WHU5ETT5 5CAIf IW=1'1&
A202
N Ore Cvndk9e S US
Sr.m,MAssACRusErrs
019>O USA
CU SIZE —_—_—_—_—_—_—_—_ C COST SIZE CUTS Off CUs 511E COST SM
NIIF 4 M1F 4 NIIF 4 MUF 24 MI 24 NUF 4oPP1
_—_—_—_—_—_—_—_—_ _
\ __ __ _— Inlerla oeslBn
Meelel Pleming
\ Pmled Meregement
SOLARIUM
� ADDITION TO
EXISTING
NUF 72 MA 72 MF 72
L
L
72 VICTORIAN
RESIDEIIJCE
CARPENTER ST
SALEM
MASSACHUSETTS
C5
3 C5
------------
Z Y 1 2-13 9UT R
1S PERMR
xe, or ucuwipx
09.1YL2013
VARIOUS
13th
' 1 LEPf 51DE ELEVATION I REAR ELEVATION RIGHT 51DE ELEVATION ma
A201 AOOMON-3CARPENTER6 5G1E114'=1'-9 A201 ADDM0N-3CARTEMER5IREE7 5CAlEl/4'=I'-0' A201 ADDM0N-3CARPENIER5TREET 5CNE1/4'=1'1T A300
1
t � `
• a�
< �I
I
a
r
♦ yi
rpRi
rr •� ,
41
.r4A
�liq �.
w
.xeJ naE41
.- 1
-- -
sa
y
4111
mr
��1
�kl
i
1� I
I
y:
l {
/ v
wzQL'LJ -
dr-- C
Z (n Q One Cambridge Street
(, Z F v O Salem, MASSACHUSETTS01970 USA
Q QZ (A W J
J W J 978.741.0410
t1 U) CJ Q �r
schopf@schopf.net
Architecture
V- I ( Z Interior Design
J Master Planning
t) (/) Project Management
W ? LLi c3 U
2 Z 2 Z O W SOLARIUM
j— F— Z) F- li ADDITION TO
EXISTING
VICTORIAN
96.6' RESIDENCE
3 CARPENTER ST
t,J J SALEM
} MASSACHUSETTS
`
LLJ LJ
W N J -�
J 1 9-2-13 LIENT R S
� q 2 109-23-13 PERMIT
s
I'7 •• -T{
C / I Na, TION
I I L
►7 In z
0 T
Q �CL Q syrs?s B
Lii
q
�✓ .,� HLIJ
OS=f.1RSs ;.a;
09.02.2013
O O U) VARIOUS
�b
Z � 13-66
Z ioe Ho.
r' Q D, nay ms
_ O
~
o Z ZA1007) Ctf .
�t U CLQ 0
J SHEE
GUTTER AND MILLWORK TO MATCH EX15TING HOU5E FLA5H/COUNTER FIA5H TYPICAL
HURRICANE TIE AT EVERY J015T TYPICAL
CONTINUOU5LY ADHERED MEMBRANE ---
ROOF A55EM5LY W1 PlA5HiNG PER MANU SPEC 2@ 2 X 12 LAG TO EXISTING 12'OC TYPICAL
One Cambridge Street
Salem, MASSACHUSETTS
10 @ I G"OC ICAL`ON ENGINEERED HANGER TYPICAL u% L15TI 4NG 01970 USA
-------_ 978.741.0410
-------------
�� `
ALIGN schopf@schopf.net
Architecture
[}QInterior Design
WIN B Master Planning
`� Project Management
SOLARIUM
ADDITION TO
o EXISTING
s 28 VICTORIAN
W/VBr------- RESIDENCE
3 CARPENTER ST
I r--- SALEM
I I MASSACHUSETTS
1I2'ANCHOR BOLT @ 4'-0"OC 2@ 2 X I LAG TO EX15TING 12"OC TYPICAL i i 8"FR05T WALLON 10"X 1 B"RCF OTIN
I I
I I
@ I G"OC TYPICAL`ON ENGINEERED HANGER TYPICAL A LIOTIN
IN
OR FRA G I— EX15TING
_ BA5EMENT
I I I I WINDOW A55EMBLY
° ,� �� I I m I I 1 9-2-13 CLIENT R I S
> I 2 109-23-13 PERMIT
HORIZONTAL REINFORCING I I
2@ #5 Bar TOP AND BOTTOM
3" MINIMUM COVERAGE i h �I o f 2 I I
J „ 4" RIGID FOAM FOUNDATION w I I A2O
o INSULATION TYPICAL I 3 1 I I
I L ——— Rcy
' �r
0 ° i 990%COMPACTED OR UNDISTURBED z pyo Fns
EARTH TYPICAL o
--------------- J .5125
I 6 L
SALEM
o :j1 MA
#5 Bar 3" MIN COVERAGE(typ) N I y�fly D., tdPs`-T%'
I ' 3 n
i n _
8'-6" __-- -- 9-4 4 9 6 oa09.02.2013
ADDITION
;��VARIOUS
2 DETAIL SECTION
FR05T WALL/ FOUNDATION PLAN .li ms
A2Q0 ADDITION --3 CARPENTER 5TREET, 5ALEM, MA55ACHU5ETT5 SCALE 1/4"=1'-0" A2Q11)
ADDITION -- 3 CARPENTER 5TREET, 5ALEM, MA55ACHU5ETT5 5CALE 1/4"=I'-0"
A200
HE=T J
One Cambridge Street
Salem,MASSACHUSETTS
01970 USA
978.741.0410
EX15TING KITCHEN TO REMAIN schopf@schopf.net
12'TRED 8"MAX RI5 Architecture
FIELD FRAMED STAIR Interior Design
Master Planning
Project Management
o
-0 w SOLARIUM
,L ADDITION TO
Cn I� EXISTING
2X6 PT DECK FRAMINGI VICTORIAN
TREY OR EQUAL DECKING I \� RESIDENCE
co
3 CARPENTER ST
ALIGN ELEVQTIQN OF FIN1511 SALEM
FLOOR TYPIGALI MASSACHUSETTS
1/2'BOARD AND 5KIM INTE OR TYPICAL 2 @ 2X10 LAG TO I I
2X6 @ I G'OC TYPICAL IXISTING RIM JOIST TYPIC kl
1/2'5TRAND80ARD MATCH EXISTING 5ALVt'IGE4
HOUSEWRAP WOOD FLOOR5Y5TEM1 I
FINISH WOOD CA5WG AND RIM I I
o o IX15TING CABINETS,5MN AND OTHER
2 m o CABINET5 AND FINI51-1E�TQ REMAIN 1 9-2-13 CLIENT R S
2 109-23-13 PERMIT
xy, I
N Ifl 1L 2 I
I
A2 0 A200 i I
tu°. Dab
DEMO EX15TING WALL 1ARC
FAS L.So
O Qq
R 5125
SALEM
o MA y
yX�Y O,-
6 OiT— Nchie
6' p'I+ a 09.02.2013
EXISTING FIELD EXI5TING FIELD VARIOUS
13-66
2 FRAMING PLAN FLOOR I I PARTITION PLAN FLOOR I ms
A20 I ADDITION — 3 CARPENTER STREET, SALEM, MASSACHUSETTS SCALE I/4"=I'-0" A201 ADDITION --3 CARPENTER STREET, 5ALEM, MA55ACHU5ETT5 SCALE 1/4"=1'-0"
A201
One Cambridge Street
Salem,MASSACHUSETTS
01970 USA
978.741.0410
schopf@schopf.net
Architecture
Interior Design
Master Planning
Project Management
SOLARIUM
ADDITION TO
EXISTING
VICTORIAN
RESIDENCE
Co
3 CARPENTER ST
SALEM
GUTTER AND MILLWORK TO MATH EX15TING HOU5E MASSACHUSETTS
I I
I
I ' I
I I I
CONTINUOU5LY ADHERED MEMBRANE
i ROOF A55EMBLY W/FlA511ING PER MANU SPEC
ch I 1 9-2-13 CLIENTRIAS
2 109-23-13 PERMIT
� I
2 I I 2 I
I
A200 I � A200 I
No.
ON
C//;
L.SC\iG
� 0
No.5125 N
SALEM Jk
MA �
Archlteeo' 7rvF'�
9' 6" G'-011+- 6'-011+- 99.02.2013
EXI5TING FIELD I EXISTING FIELD °
VARIOUS
� sdN
J�No. 13-66
ROOF FRAMING PLAN I ROOF PLAN ms
l
A202 ADDITION -- 3 CARPENTER 5TKEET, 5ALEM, MA55ACHU5ETT5 SCALE I/4"=I'-0" A2Q2 ADDITION -- 3 CARPENTER STREET, SALEM, MA55ACHU5E75 SCALE 1/4"= I'-0" A202
- - —— - q„cp_,
N One Cambridge Street
Salem, MASSACHUSETTS
— - ------ - -- - 01970 USA
CUST SIZECUST SIZE CUST( SIZE CUS 11 SIZE CU ST SIZE COST SIZE 978.741.0410
MJF 024 MJF- 024 WUF 024 'NUF 024 M.) 024 WUF 024 schopf@schopf.net
- - - --- - - - - - - - - - - - - --- Architecture
Interior Design
Master Planning
Project Management
O �
�o SOLARIUM
/ ADDITION TO
/ EXISTING
// N11F 072 WUF 072 WUF 072 WUF 072 WUF 072 VICTORIAN
RESIDENCE
3 CARPENTER ST
SALEM
MASSACHUSETTS
z
a S
- m m
z z
_�_�__ _ _ _ _ _
O O
a ¢ 1 9-2-13 CUENTRIAS
2 109-23-13 PERMIT
N TON
Ci �y�A cf
N .5125 C0
SALEM
MA
-.71hc GAJ
' A��Or F1PSS�
fthite
o.m
09.02.2013
VARIOUS
13-66
D ms
LEFT 51DE ELEVATION I REAR ELEVATION I RIGHT 5IDE ELEVATION
A20 I ADDITION -- 3 CARPENTER STREET 5CALE 1/4"=P-0" A20 I ADDITION -- 3 CARPENTER 5TREEf 5CALE 1/4"=1'-0 A20 I ADDITION --3 CARPENTER STREET 5CALE 1/4"=P-0" A300
SOLARIUM ADDITION TO
EXISTING VICTORIANOne Cambridge Street
" Salem,MASSACHUSETTS
01970 USA
RESIDENCE
t 978.741.0410
schopf@schopf.net
* ' Architecture
3 CARPENTER ST I Interior Design
It, Master Planning
I,I - - :� ProJed Management
SALEM, MASSACHUSETTS ; ; LARIUM
ADDITION TO
EXISTING
,s VICTORIAN
DRAWING LIST RESIDENCE
A100 SITE AND LOCATION PLAN 3 CARPENTER ST
A200 FOUNDATION PLAN
ivisassacxusETrs
DETAIL WALL SECTION - a
A201 FRAMING PLAN FLOOR 1
PARTITION PLAN EXISTING VIEW REAR OF DWELLING
A202 ROOF FRAMING PLAN
ROOF PLAN _119-2-13 CLIENT R14S
2 109-23-13 PERMIT
A300 ELEVATIONS
400v
j
`
ES EDq�Cy
_ F1 L i
c F
11 N met
1 YI I�� it Itl it Itl II I E.'A
�Jh
it it II III �o;:k,nss'6
ii II NI II �I O'09.02OUS
VARIOUS
13-88
ms
V _
PROPOSED VIEW REAR OF DWELLING SHEET
v��CO T
�eiyn�rf�'
Salem Historical Commission
ONE SALEM GREEN, SALEM,MASSACHUSETTS 01970
(978)745-9595 EXT.311 FAX(978)740-0404
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction ❑ Alteration
❑ Demolition ji�' Painting
❑ Signage ❑ Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic
Districts Ordinance.
District: McIntire
Address of Property: 3 Carpenter Street
Name of Record Owner: James J. Walsh
Description of Work Proposed:
Repainting in existing colors. No changes in color, material, design or outward appearance.
Dated: 1%Iav 26, 1998 SALEM HISTppOJJRICAL COMMISSION
By: r7�,CYa-
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.
. :�
"►'�
�:.
r1 =�
,�
V 1 � ��iv- <J_
1 � {'
a.
� �
V � � �1 `
I
„�_
r
11732053777 POLAROID® 3 W
tip,
11732053777 POLAROID® 3N'
j
dxl\F.
Salem Historical Commission
ONE SALEM GREEN, SALEM, MASSACHUSETTS 01970
(508) 745-9595 EXT. 311 FAX (508) 740-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction ❑ Alteration
❑ Demolition ❑ Painting
❑ Signage Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property: 3 Carter St.
Name of Record Owner: James Walsh
Description of Work Proposed:
Relocation of electric service from front of house to location per application submitted conditional that the
meters be located below the level of the top of the shrubs so as to be screening for the meters and that the piping
be the minimal diameter allowed, painted the body color of the house.
Dated: March 5. 1998 SALEM HISTO /AL COMMISSION
By: . = -
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals)prior to commencing work.