134 CANAL STREET - WDDO,13 1 Gciv,a 1 ST - wppa Zoog m I
V-rA G* ,
NA'CUttl:
Sl�`r�1t' PRODUCT LS
RECYCLED AND
®®836
RECYCLABLE
Manuwdu red fm S.PPdclwrds Co,Man%GA.
1I\n
0
Salem Historical Commission
120 WASHNGTON STREET,SALEM, MASSACHUSETTS 01970
1978) 745-9595 EXT. 311 FAX 1978) 740-0404
WAIVER OF TI IE DEMOLITION DELAY ORDINANCE
It is hereby certified that the Salem Historical Commission has waived the Demolition Delay Ordinance for the
proposed demolition as described below, as per the requirements set forth in the Historic District's Act (M.G.L.
Ch. IOC) and the Salem Historic Districts Ordinance.
Address of Property: 1' 4 Canal Street
Name of Re.:ord Owner: Snakebite Realty. LLC
Description of Demolition Work Proposed:
Demolition of 22 'x 80'extension on lhe.front gfthe building, the loading docks and canopy on the right(tont
side, the one stor.v ii,00d building on the left fi not side crud the rail car/loading arca on the rear of the building.
Dated: )/20/08 SALEM HISTORICAL COMMISSION
H IIS IS NOT A DEMOLITION PERMIT. Please be sure to obtain the appropriate permits from the Inspector
of Buildings (or any other necessary permits or approvals) prior to commencing work.
Page 1 of 1
Jane Guy
From: Jean Pelletier Upelletier7@hotmail.com]
Sent: Wednesday, March 12, 2008 5:44 PM
To: Jane Guy
Cc: Jason Silva; Iducan@salem.com; Frank Taormina
Subject: RE: Revised HisCom agenda 3/19/08
Jane, Please read this letter at the commission meeting on 3/19/08.
Madam Chair, Members of the Salem Historical Commission, in regards to item # 2,
134 Canal St. Waiver of Demolition Delay Ordinance, while I'm not in out right opposition
to this Waiver there needs to be a discussion regarding the encroachment of this property
on MATA Land, which the City is in negotiations to acquire this land for the bike path extension.
These property's in question run from Ocean Ave to the Hawthorne Animal Hospital on Canal St.agent to the
commuter rail lines.
I would respectfully ask that you contact the City Planner
Lynn Duncan or a member of her staff, most notably Frank Taormina who heads the Bike
Path committee. I will agree an respect their decision on this matter. Do to several other p
meetings scheduled this evening, I can not attend yours. I will be Cc:ing the interested parties
on this matter. Between today an your meeting I will make myself available to all members
for questions.
Respectfully,
Jean Pelletier C
Councilor Ward 3 9
978-745-
978-745-0670
VC (�
Subject: Revised HisCom agenda 3/19/08 S
Date: Wed, 12 Mar 2008 15:25:14 -0400
From: JGuy@Salem.com
To: davidatsalem@comcast.net; dougdesrocher@comcast.net; hannandd@msn.com;
hannandd@verizon.net;jherbert5@comcast.net; kharper345@hotmail.com;
laurie.e.weisman@state.ma.us; salemknitter@comcast.net; spang@arrowstreet.com
CC: CityCouncilors@Salem.com; CLaPointe@Salem.com; LDuncan@Salem.com
New agenda attached....
Jane A. Guy
Assistant Community Development Director
City of Salem
Department of Planning & Community Development
120 Washington St., 3rd Floor
Salem, MA 01970
978-745-9595, Ext. 5685
(F) 978-740-0404
jguy@salem.com
www.salem.com
3/13/2008
Salem Historical Commission
120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970
(978)745-9595 EXT.311 FAX(978)740-04U
APPLICATION FOR WAIVER OF THE DEMOLITION DELAY ORDINANCE
Pursuant to the Historic District's Act(M.G.L.Chapter 40C)and Salem Code 2-1572,application is hereby
made for issuance of a Waiver of the Demolition Delay Ordinance for demolition as described below.
Address of Property: V34 CA NA I - STREET
Name of Record Owner(s): S),IAV-1=l31T C RRALT V ) L LG
Original Building Construction Date, if known_ 1�< No,-�
Is the property listed on the National Register of Historic Places or contributing to a NR District? hj D
Description of Demolition Work Proposed•
Please attach any historical data and photographs, building plans, structural reports, or other pertinent information and
submit at least a week before the scheduled meeting. Applicants who omit this information or submit their application less than
a week before the meeting date should expect to attend additional meeting(s). A site visit of the property may be requested.
Briefly describe the extent of the demolition: 'THE he vn o L I TI o N w o u L.P ize m ov a -T IA -2Zl X 20(
1=YTE1.34�I011 en The �r-zonT oF-rl¢. -PU;L0tn9 , Tl.e. Ani canoe
oY7- 1zIghT FT rzcn �1�F- , The ane -sroz 1 wcro12 �uiLp7,Lr,?) 0 -rte LEFT r,.ejlT
n T
'51De- A"v l'1-e. P-,&tL cAe / Loo-inrnj Rizen on -rU je_ may- ot=
Briefly describe the reason/justicationfor demolition: io )nG'FeA1,F- Tka u5e�ulLytes� OF TL
t3vIQ21pjl Ah re--T'A�- pno tb ALL-Caw— 9rr T�2 SeTbacc 4KVM GAnaL,
�Tize-e-rt=C, cr- vi'S h,UT-,j ana Fqg-le-I'AI I .
Briefly describe any proposal for future construction1development: PLAnh ARc p T-(-qG�, w
Sltour (scle,t�taT c�a LL lj� A TzeTA"L Lt'NoOT 7h � PorLTlovtS or I(e
?2UiLp I f q (,tt k f c( - VW LG TlrLYYl m i n
Signature of Owner: Tel. #:
Mailing address: & 6-x rV ST City � �
StatejLip: (
(it 4ch /Fe-cT �Ry�nT �n/L -17e- �CuH�,trj�
PROCEDURES FOR FILING APPLICATIONS
A. Be prepared to apply for approvals well in advance of commencing any exterior work. Before making my changes to the exterior of a property
in an historic district,the owner should call or visit the Commission representative at the Department of Planning&Community Development to
discuss proposed alterations and to determine the category of the application(Appropriateness,Non-Applicability or Hardship).
B. The Commission normally meets on the first and third Wednesdays of each month and notices are posted at City Hall. The meetings arc held at
120 Washington Street,3rd floor,and begin at 7:30 p.m. All meetings arc open to the public and any person is entitled to appear and be heard
on any matter before the Commission before it reaches a decision.
C. An application for a Certificate of Appropriateness or Hardship must be received by 3:00 p.m.on the Monday 16 days before the meeting in
order to make the agenda. An application for a Certificate of Non-Applicability may noromlly be added to the agenda up to the day of the
meeting. In some cases,a Certificate ofNon-Applicability may be issued by the Clerk,without review by the full Commission,after notifying
Commission members and allowing 24 hours for any objection. There is no fee for any applications.
D. All applications for Certificates of Appropriateness or Hardship require a public hearing. Notice of the hearing must be posted with the City
Cleric 14 days before the hearing and abutters must be notified in writing. Commission staff will handle these procedures. A public hearing is
not required for a Certificate of Non-Applicability.
E. Applications must be submitted by the owner of the property. A contractor for the owner,at the owner's request,may submit an application on
the owner's behalf. In case of a tenant,a waiver of the awnees appearance may be granted at the discretion of the Commission if it is requested
by the owner. -
F. All applications must include three to four 35mm photographs of existing conditions. No certificates can be issued prior to receipt of
photographs.
G. An application will not be considered complete unless lwork items are thoroughly described on scaled drawings and include specifications
regarding dimensions, materials, and any other information needed for the Commission to visualize the changes in order to make a
determination. Applications for paint colors should include a paint chip or than. The following items should be included in your drawings as
applicable:
I. Site plan showing location of improvements;
2. Elevation drawings of the specific improvements;
3. Details/profiles(i.e.moldings, fence caps,comites,vents,eteJ;
4. Materials(i.e.wood,brick,etc.);
5. Dimensions(i.e.size of trim);and
6. Transformers,heat pump and condenser locations,electrical entries and meters, lamp posts,stove pipes.
H. At the hearing the Commission will discuss the application with the applicant or his representative,hear the abutters and take a vote. Owners
having professional consultants such as architects or contractors are urged to have them be present at the hearing. If the application is approved,
a Certificate will be mailed to the mailing address provided on the application and copies will be sent to the City Clerk and Building Insxctor.
Please note that the application can be continued until the next meeting if the Commission deems necessary(i.e. for reasons of incomplete
drawings,to perform a site visit,etc.). In any case,the Commission must make a determination within 60 days from the date the application is
received, unless the applicant waives that requirement in writing
1. A property owner or a contractor cannot receive a building permit unless a Certificate has been issued. Please be sure to obtain appropriate
permits from the Inspector of Buildings(or other necessary permits and approvals)prior to commencing work.
J. The homeowner may opt not to commence the work approved(unless it relate to resolving an outstanding violation). Work commenced must
be completed within one year from the Certificate date unless otherwise indicated.
K. The City of Salem reserves the right to inspect the project to determine compliance with the conditions set forth in the Certificate issued.
Violations
A person commencing or completing work to the exterior of a building in an historic district without the necessary approval of the Commission is subject
to fines of up to$500 per day from the date of violation. The Commission is not responsible for an owner's neglect to inquire about necessary City permits
and approvals. All records are public and we will confidentially assist you if you are concerned that someone in your neighborhood is in violation.
Assistance
The Commission's guidelines are available for viewing at the Salem Planning Department and the Salon Public Library. The guideline provide examples
of what is historically appropriate(or inappropriate)for Salem's neighborhoods including trim, siding doors, fences,gutter, masonry,paint colors,
parking solutions.porches,roofing satellite dishes, secondary egress, skylights,utilities,windows,etc. These guidelines help you understand what
changes are likely or unlikely to be approved. The Commission supports your efforts to improve your property and can guide you on historical
appropriateness. Further information,in the forth of books,articles and pamphlets,City-wide architectural inventories,and photographs,are available at
the Historical Commission's office at 120 Washington Street For more information, contact the Clerk of the Commission, Jane Guy, at the Salem
Planning Department, 120 Washington Street,Salem,MA 01970,978 745-9595,Ext. 311. Rev.I VX
F � i I
a
,-� -1,
r.-
s�� a- - ��
- _ - � .
..--» .
- � -
ark'
��� w
1 y
`, , ' .. ;
. � : � '�E
t �. �;.
R it
II :
.. � ■ 1 ��
,.� - _
_ - :�` r '•
- � '�' °,R
-cm .�- -
' I
40pliLi -
134 Canal
.r 3 .
Street
3/19/2008
3
/ �� � �
� � I �
�� � ' i �
* < k -
���. °
_ .. �� _F
4 -
..rj}f. �J •.
.Q '��,R!'. �tiL�w � .^I � 1.
.. n. 1
�S, � � 1 � — _.__.
i ,..
oIJE SToR� WODD
��iLb n itz� bE GAI�c,Py }
Rcmov p t-OAvinrl Dc>,KS
To p�E
- izEMoY£.D
13� Cl�►.�PI_ ST..
RECEIVED
MAR 1 2 2008
DEPT. OF PLANNING &
COMMUNITY DEVELOPMENT
oesw a r,mrc a,w nmae away
16 Crystal Street, Melrose, MA 02176 781-662-3498 (fax) 781-662-8389
TRANS TTAL
To: Salem Historical Commission
From: Dan DiLullo, DiLullo Associates, Inc.
Date: Manch 11,2008
Re: 134 Canal Street
Attached is an Application for Waiver of the Demolition Delay Ordinance, schematic plans
showing existing conditions and proposed development and photos of the building with our
comments on the sections to be removed.
We are available to walk the site with you or to answer any questions you have regarding the
prsed removals o�the proposed use.
D )' it I
I
20XINB8UmY
ZONING DISTRICT: INDUSTRIAL
MIN LOT SIZE: 40.000 S.F.
.` WN LOT WDTH: 150'
MIN FRONT YARD'. 30'
MIN SIDE YARD: 30'
MIN REAR YARD: 30'
M \ MAX BUILDING HEIGHT A5'
MAX BUILDING FOOTPRINT: 45%
P per'\
II J1S ��
1� 11
I
II IRMI .. .
11 NOT
REFLECT ALL
CRGRDUNO VOIIMAY EXIST
_ THE SUBJECT AND ABUTTING 1 PROPER;
SAFl
E SHAT NOTIFIED PRIOOTO R .
PVnII'v :NrILI IIDN. OR CONSII2U Au11CIi1�.
BENCHMARKS
I \I mr
I �1 Yea'uvo '\ v
gpgV4p 1 _ mac\
E IP1 \ \
1��11 v
F .srtmA'.we""s:�Paxa a \ w.
Aeewr I I f�iv2,r'� s-c. ..
u
I 11 AY "� m ��• , n
ie
YI Mar er` urcccma w=N vAa+
OADWA
-----"v
_______- W
W
�I^ pN•i
Z .� AssEssaRw ae
i PAReeLasea _
" �,ra lD H
�_ SBBS45
sq.'T D pa
Yew ( e 73 ACTION ae^ T rr1 ° �� d W J U
ni I' IA.rr i 1 d 1 a z a J
i °'"tl ! I Asss� ,s rxml e , ex.mrx a V Q
�� I T av,ncas o
1 ar sa n "
cwu n � o
o V" � lAo � ssamo'r0 cw�
rZw
In ei
s m
cove W ^� F
linrcv LRUw( '" /V\ Q m
eaK.are cove e� I ax„w �++avd?� !"”' AAre L..., vi Y
z;
a aRt ( = , 1
oar.Nnwa xan' s ewf $ /' a/ER7l a'vneo scrwacx rar /ia e' __ ---� _.� Z Q' Q
c one.rnxr � _ N 7 AeeeAr iwr..a ur' Y 07 ul
.:cxnas'we rse o � � � �.. �ii enJx .� � Anm p ��l� '�.�• � m�ru� '�V� � w�ia � -- �iea � � t♦
rum'
urea waexe cG' �,y am® -. »! vrsru 1_-� h M
ri
aww Mwaxr Y .wa-w `a �-
Urww, v — .Ra»w�Pm M T cAAIA STRZFW -
\. wI p IMF- xa - Marchionda
& Associates, L.P.
rar.1 .-.1 Engineering and
R
rraa �� ew I IRrp sl Planning Consul tants
i 62 Ma NEY.I. Avenue
Suite I
Slanehom, MA 02180
TEL: (781) 438-6121
FAX: (781) 438-9654
Email: engineering®morchlondoa
40 20 0 40 80 120 Website: www.marchiondo.com
DATE: APRIL 25, 2007
R�TpLA7�-Of uw I'liei uw
M. & A. NO. 709-03 Si 1"=40'
SHEET 1 OF 1
0
>z�
s'^
cl
— — — —
45A�y.
o'
/ �•� / N��gl mg
�'N I
I
I �
L
___— _� W>N a
D
m I 10
rn
�
K
O
z dl
I Z N
z
I
--� ME
Cc
iii
I ��
F
i I� II jl � Fi s� OI
s
a
.s? =^P a I it 4
10 �F. A
E
pN Ib
�fA 1190 Sq. Ft.
A \\
N I
� z L
a m �
A
Ngm
PROPOSED RETAIL DiLULLO ASSOCIATES INC.
DEMOLITION PLAN ! I ..o.�,: ftAWM
• CANAL STREET
NI SALEM, MASS ocmmk a.MELWM MASSRCNmro win
_ m(m)«a-aa. cm).n-.a.
dn�m:fW .mlc]/]]• = i'-0 dole 1/]D/Op
!
i
!
!
36
U
a
i
a
.9Z i / cnm _0
0
� a �•o
N to
M �
I d G
V ' :(1 -0
co.0. O {r8
co e. O
to
N
C
I
O, O-o
1
O N
w N
a
A,
a ae
rn 1
,,Z
u
5 SPACES ��
s� Co.
y
i
p/anter
i
(n (n
, RM.M T—m.r.m eM lqa� R1A,.GR
rn rn PROPOSED FOOTPRINT & PROPOSED RETAIL Ttso.oe1 DiLULLO ASSOCIATES INC.
wn..a T�wM r.e.aM ,wwm 6t.OR.OR uRaRrzcrs w.ntn¢
3 PARKING SCHEME CANAL STREET
m
SALEM, MASS If�r n• tnRog, ussw uscm Mt)R
D tr: (70t)M-uRR
d. z 1W .cm.:1/16' . t•-c' a : n/n/aT
CD
N. O N.N.O N.N. O N
cop O �p O �p O (0, 0 O
N N N N N N ry
00 M
Z11�
n — 'o
D O Oo O
m
N
m O r a
N
u d.
T
o �
T
O
0 e e e
(O :u D
ti Lo , O
m o O
O = O
N
� m
a
I;
I"nYd T�m1 0r0a aM 10p0 .01.00.00
D PROPOSED FLOOR PLAN PROPOSED RETAIL DiLULLO ASSOCIATES INC.
CANAL STREET
SALEM, MASS 0G"mc t"W041Rmm mt„
w rn0 t®rnt)em-nr
d— IW 1/10/0!