Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
30 BROAD STREET - DISTRICT FILES
30 Broad St , r CO Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 30 Broad St Name of Record Owner: William Rocs Description of Work Proposed: Replace back porch steps to replicate existing. No changes in color, material, design, location or outward appearance. Non-applicable due to being in kind maintenance/replacement. Dated: April 26, 2012 SALEMO COMMISSION By: The holneowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. :. RECEIVED 3 ,s APR 2 5 2012 DEPT OF PLANNING 3 �--� CA1Mdt1NiTY DEVELOPMENT Salem Historical Commission 120 WASfUNGTON STREET,SALEM,MA 01970 (978)745-9595 EXT.31 1 FAX(978)740-0404 APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Conuission Ordinance, application is hereby made for issuance of a Certificate of Non-Applicability for: Construction Moving Reconstruction Alteration Demolition Painting Sign Other as described below. / District: f t i/ Q Original Building Construction Date,if known: Address of Property: C? Name of Record Owner(s): Description of Work Proposed: R / J , ?JtV- se v �s Jiro - J+'tG �-o I •Rfications mustto four 35MM DhotoLrraDhs of existing conditions.• • • n Signature of Owner: � , J AV� Z6 Tel.#: o ( -J��l�t�2, 6�,,� Mailing address: �fOC� S City: -�21eA State:AZip: Cl (JPEG Image,2560 x 1920 pixels)-Scaled(44%) https:Hniail-attachment.googleusercontent.com/auachmerd/u/O/?tri-2&i... -= ON 100 11 �� 1� 111� 11 Y I of 1 4/25/2012 12:14 PM (JPEG Image,2560 x 1920 pixels)-Scaled(44%) https:Hmail-auacficentg000cusercontenLeon✓aaachment/u/o/?id=2&i... Now J t• w � ��" ,•`� ,� - � x: < 'A�, `�`'.• s__*1 i �'¢z� 1.ko 2 � r r-a -_zd 6 � N" �, Fv}. 1...• l 1 of 1 4/25/2012 12:14 PM (JPEG Lenge,2560 x 1920 pixels)-Scaled(44%) itttps://mail-auaclunentgoogleuserconlenLcon✓attachnienttu/0/?ui--2&i... mmm Eno r Y: 5 qr� - _ .......,.. � 'yT,� ' '� 1 '. ► y ¢y.Y� - 'i4' may. ,� ' l I of 1 4/25/2012 12:14 PM Nq��W Salem Historical Commission 120 WASHINGTON STREET, SALEM,MASSACHUSETTS 01970 (978)619.5685 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving -J;r Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 30 Broad Street Name of Record Owner: William Ross Description of Work Proposed: Remove existing shed attached to the garage and reconstruct new shed in same location. Siding to be wood clapboards. Conditional that it is not visible from the public way. Non-applicable due to being non-visible from the public way. Dated: March 20, 2012 SAL I OMMISSION By fhe homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits rrom the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. _� r vp'E MAR 20 2012 1Z '� MP of o;_Rr.or ,�• , :::��.:; Salem Historical Commission 120 WASHINGTON STREET.SALEM,NIA 0I970 (978)745-9595 EXT.311 FAX(978)740-0404 APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance,application is hereby made for issuance of a Certificate of Non-Applicability for: Construction Movingeconstruction Alteration Demolition Painting ign Other as described below. District: M C 1 h }(r2 Original Building Construction Date, if known: I 0 Address of Property: 20 Name of Record Owner(s): p Description of Work Proposed: •REMOJ6 EX(STlhf(r c, 14ED A-ITACHE-b IO THE 64'ZA6-iE An►b 2Econ(s-T2ocT 0 &w SEfEa A-TA< I+Ez> TD THF &AF IN TFfE SA-tAE LOCA-TION• Tor S j+EFb IS LoC/FTe`b ZC-141" b TOE 140VSE. IM A• YAkb 3jR2ora fl A Sw -FooT T41-L NZLVAcy FF_NCi" � /4r�� AS 4 2ESu L- T CA4AIO 'gE SEEM F201'A �t b+E ST2EET. 72 Ecpn[ST2 �c-,✓ D S p To 13 E Mfl'b E f= (?_0 M -r4E- S A-rA E 3 L)I t_ b r tJ G-- M (woo D u rpt (4 AS Pff A-LT S I41 AJv-c-eS) i,JCv,1 Slf-ED I`o NP,vC CEDR2 CLf1MARbS 16 MA-�CH 'Ot/ SE, Signature of Owner: Ypp\/ A Tel. #: 9-7? [D 7 S Mailing address: 34 b fb 0.f/ S+re� City: AL-E'K State:MZip: �I��O PROCEDURES FOR FILING APPLICATIONS A. Be prepared to apply for approvals well in advance of commencing any exterior work. Before making any changes to the exterior of a property in an historic district,the owner should call or visit the Commission representative at the Department of Planning&Community Development to discuss proposed alterations and to determine the category of the application(Appropriateness,Non-Applicability or Hardship). B. The Commission normally meets on the first and third Wednesdays of each month and notices are posted at City Hall. The meetings are held at 120 Washington Street,3rd Boor,and begin at 7:30 p.m. All meetings are open to the public and any person is entitled to appear and be heard on any matter before the Commission before it reaches L decision. C. An application for a Certificate of Appropriateness or Hardship must be received by 3:00 p.m.on the Monday 16 days before the meeting in order to make the agenda. An application for a Certificate of Non-Applicability may normally be added to the agenda up to the day of the meeting. In some cases,a Certificate ofNon-Applicability may be issued by the Clerk,without review by the full Commission,afternotifying Commission members and allowing 24 hours for any objection. There is no fee for any applications. D. All applications for Certificates of Appropriateness or Hardship require a public hearing. Notice of the hearing must be posted with the City Clerk 14 days before the hearing and abutters must be notified in writing. Commission staff will handle these procedures. A public hearing is not required for a Certificate of Non-Applicability. E. Applications must be submitted by the owner of the property. A contractor for the owner,at the owner's request,may submit an application on the owner's behalf. In case of a tenant,a waiver of the owner's appearance maybe granted at the discretion of the Commission if it is requested by the owner. F. All applications must include three to four 35mm photographs of existing conditions. No certificates can be issued prior to receipt of photographs. G. An application will not be considered complete unless all work items are thoroughly described on scaled drawings and include specifications regarding dimensions, materials, and any other intcrmation needed for the Commission to visualize the changes in order to make a determination. Applications for paint colors should in-Rude a paint chip or chart. The following items should be included in your drawings as applicable: 1. Site plan showing location of improvements; 2. Elevation drawings of the specific improvements; 3. Details/profiles(i.e.moldings,fence caps,cornices,vents,etc.); 4. Materials(i.e.wood brick,etc.); 5. Dimensions(i.e.size of trim);and 6. Transformers,heat pump and condenser locations,electrical entries and meters,lamp posts,stove pipes. H. At the hearing,the Commission will discuss the application with the applicant or his representative,hear the abutters and take a vote. Owners having professional consultants such as architects or contractors are urged to have them be present at the hearing. If the application is approved. a Certificate will be mailed to the mailing address prcvided on the application and copies will be sent to the City Clerk and Building Inspector. Please note that the application can be continued until the next meeting if the Commission deems necessary(i.e.for reasons of incomplete drawings,to perform a site visit,etc.). In any case,tYe Commission must make a determination within 60 days from the date the application is received,unless the applicant waives that requirement in writing. 1. A property owner or a contractor cannot receive a building permit unless a Certificate has been issued. Please be sure to obtain appropriate permits from the Inspector of Buildings(or other necessary permits and approvals)prior to commencing work. J. The homeowner may opt not to commence the work approved(unless it relates to resolving an outstanding violation). Work commenced must be completed within one year from the Certificate date unless otherwise indicated. K. The City of Salem reserves the right to inspect the project to determine compliance with the conditions set forth in the Certificate issued. Violations A person commencing or completing work to the exterior of a building in an historic district without the necessary approval of the Commission is subject to tines of up to 5500 per day from the date of violation. The Commission is not responsible for an owners neglect to inquire about necessary City permits and approvals. All records are public and we will confidentially assist you ifyou are concerned that someone in your neighborhood is in violation. Assistance The Commission's guidelines are available for viewing at the ialemPlanning Department and the Salem Public Library. The guidelines provide examples of what is historically appropriate(or inappropriate)for Salem's neighborhoods including trim.siding,doors,fences.gutters,masonry, paint colors, parking solutions,porches,roofing,satellite dishes,secondary egress,skylights.utilities,windows,etc. These guidelines help you understand what changes are likely or unlikely to be approved. The Commission supports your efforts to improve your property and can guide you on historical appropriateness. Further information,in the form of books,articles and pamphlets,City-wide architectural inventories,and photographs,are available at the Historical Commission's office at 120 Washington Street. For more information,contact the Clerk of the Commission.Jane Guy,at the Salem Planning Department, 120 Washington Street,Salem,MA 01970.978 745-9595,Ext.311. Rev.1004 *X114$ w . 8r a�'c .YL E� x ..c� ..S:-.x• x,;. xu`'k�V ':€', .ry'y,+ . . r r• P4 .• 4• i. .ac M. y 'N xwa "rlm ..*` ''n 1 two :�: '.v.. >'T••-,+- Vy. 'Y �3 4�..�. ���,r�7v-x•L V' �,' .: s.'A .ail'A+. ��_v a�q L 't ,�� J�' as ` S .;i f� ,• 'a : ,- :. ,ei ,. � � arm!- ',� � saq� ., s �:. r '".c 10. Ilk APIA , qY N. 4:ft' a ' a • r a ' Zoo'. •�'xH, ga"Z x •+ "f m s w ,yam r y • F � � / 6� ^•r ,ja.2 � .p �� 3r T R $€� may-.. 4-4 • s of wi 4 �St a If `R'Zi a y _ e • y, �D , r .. 4 ay:l`- ,x 4av '� ` i "yip �� _.✓'" `3' r - # r _ d n • x}:' ^'t' i a Yti • r` 7 t r Q • 'i1 i+ ' &r +�'� "� J'�S° 3a k • i � 1 vA � ►. , it � _ !s} � , i. 1 . a i� �� • p � � T _ i '� ♦r. 1 .. 11 F � l N �x ` .N F • � �.: a S � 6F s • . a. a l��• �'.' t 4 , A zi- _ r M V 3Y L 4?• i � .� [ � YK •per.. � ', • .- a 5� - ,• 4a6 r L.., a •Sf � quo✓"` •;��„.- ` .� ti' a' $ i i M w �.aYl Qi' ti`�Yti Y d Y ,.. �>" n. a'- v nn ,_lr� t �A T y � ... ��•: y '� t�� _,i �� iii.}e, ? ra ',t yV �r •.,^ a s i 3 s � �� . ; a' __« 4 � r r•+ � W��-. -;. :> , ` �' � � �. '+. � 111 1� .'' _ y,_ � _ � ;� � �, � ,�� _ _ �� �- �. ,.� O� Lic7 ♦♦` L` ♦`� L:` ♦t. �� C ♦ ♦♦. `� ♦♦.♦ L�♦ ♦♦� . � ,= IJ yam:^=} � '� �� IE� c ' , - 1 N � 11 Il , .. .moi .� .: ' TJh ``, ' ^ - ,` � 1� C.c ��► Ly `4p C4a ��� C.`' �♦ ♦ ♦ � 1 ` � ` � t;``,,J �`�``�� C`'�`►' �`��`�' 1.``,`,, ��,`�'' l`,`,1 �f r t i r `��`♦♦ >w,♦wy1 �`♦>a`♦w wwa`w�}► `4♦♦�♦ 0 ♦ ♦ 1 w ♦♦ ,ww ,>O .ww ,►♦♦ .Sw ,>w♦ IL c ayfi: �.".- Y �1 �✓ '� K 4 Y't eG, ' 4v, t � ♦e O S �e *ee e`ee .2'� ,fie �'•, `ee �, `ee `fie +ti`e `fie +`�+ C`e♦ +e��++ `�♦e �• r � � q .� ``�, 1,,`, `1�� '`,`, ``v' ``,`,` `,�� ��` C2+ P� `r `�o l` Oo s � � � �����, �,,` ���', ���,` ��,v Ate```, ��w, ��~ L3 `,� L a ��� L � `tom 1 ♦ � Oma' `�� ``„''� ����� �`'1 ,���� `�`'� �. � � � � I I 1 , � . � � � . . . . . � � �/« . � � > � � ��/: . \�- - £ ©^ { 2 . J � d \ ` ( \ j| z / � . ( - \ . p . � � � , ~ rw » y . ^ » \� . . � � � / � ° . » � v' L1♦♦ tet, ►,♦ vd'' ,♦♦ '�'� ♦♦Q `tom ♦`� `i ♦♦► `� ♦1� �♦� C: J L r J� L` ♦�� i ♦`' 1 �♦ `' ��♦ `t7 `�♦ 41 l 1 - Aftw i \ i O� `2` e`` �• ee� l-` e`er all Qe e ♦ ♦ e♦yl ♦♦`♦ `�, ♦��` `,♦♦�' cee�,` `♦♦�7 ♦ may' �, ♦♦`, ♦�� ♦♦�' e``�e c♦`l r i � �r>�� ` P' r '�"%'.a...� .�. � .r f I :� �, i ., ...../. ., - - � !b� _ C ;� :♦♦ ��_ _fit .'. `♦ i IL 1 .1 .-\Na` `♦♦ ��♦�' i tet~ Ott` tv /r ON . . � , ¥\ »»2? � \•�\: � � . . ! �� . - _ - � \ . a- ~ 1 ♦♦ L. .t `� �7 ``♦♦ v1 z `1 `♦♦ It `a `♦.� `� ``O♦ `� ♦`� `� 3 Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 NOTICE OF DENIAL OF APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS RE: 30 Broad Street On Wednesday,December 7,2011,the Salem Historical Commission,voted unanimously tc deny an application for a Certificate of Appropriateness without prejudice from William and Abigail Ross for replacement of windows. The denial was due to the applicant not being present to provide the additional information requested and the Commission being required to act on the application within 60 days. The applicants may reapply at any time. I attest that this is an accurate record of the vote taken, not amended or m dified in any way to this date. December 12, 2011 JaneXG Clerk of the Con Rion cc: Building Inspector City Clerk .CO -. 3 _ 1 Salem Historical Commission 120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: Construction ❑ Moving ❑ Reconstruction Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance, District: McIntire Address of Property 30 Broad Street Name of Record Owner: William M. Ross, Abigail B. Ross Description of Work Proposed: Re-point deteriorated chimney mortar joints, conditional that the mason match the sand in the mortar mix to the existing sand. Installation of chimney capper photograph submitted 47 x 52 x 10,painted powder black. Installation of white ogee profile aluminum gutters on front and rear of house and option,for either rectangular or.fluted downspouts to run along the corner boards. Existing gate on right side of house to be moved forward with option to either reduce it in height to match the lower height of the fence... or...to raise a section of the lower fence to meet the higher fence and moving the transition section. Install Mitsubishi air conditioning system with one compressor mounted on ground behind relocated gate and one mounted on the left.side of house behind the existing bulkhead, concealed with evergreen or conifer shrubbery. Mechanical wiring/tubing that runs from the compressor up each end of the building to the rooms to be painted the color of the surface they are on. Demolish and reconstruct existing dormer in rear and install new shed dormer per photos provided with wood siding, clapboards, trim and paint to match the existing house. Window portion of application continued to the meeting of November 16, 2011. Dated: November 7. 2011 71late!s M HISTCU C COMMISSJON By. The homeowner has the option not to commence the work (unless itto resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. r Salem Historical Commission 120 WASHINGTON STREET,SALEM,MA 0197��� (978)745-9595 EXT.311 FAX (978)740-0404 OCT 17 2011 DEPT. OF PLANNING& APPLICATION FOR A CERTIFICATE OF APPROPEIMMESEVELOPMENT Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of Appropriateness for: "Construction "Moving construction Olteration "Demolition "Painting "Sign "Other as described below. District: McIntire District Original Building Construction Date, if known: 1830 Address of Property: 30 Broad Street Name of Record Owner(s): William M. Ross, Abigail B. Ross Description of Work Proposed (Please include required scale drawings,paint chips, catalog cuts and/or samples of material proposed, where applicable.) 1) Re-point deteriorated chimney mortar joints tc address moisture damage, install chimney cap to protect chimney flues from future moisture. Chimney cap to be factory painted powder black to improve appearance and match with cast iron railing on front of house. (Photos of similar chimney caps and graphic depiction of proposed cap provided for reference in attachments.) 2)Install aluminum gutters on front and rear of house to reduce water entering basement. Gutters to be installed on the rear of the house are not visible from the road or sidewalk. Downspouts to be positioned in front of building"corner boards" and in an architecturally sensitive manner wherever possible,paint gutters and downspouts to match building trim or body color as appropriate to conceal appearance. 3)Remove existing storm windows and single glazed wooden windows on front and side of house and replace with new double glazed wooden windows. Existing windows are not counter-weighted, are loose fitting and have broken panes which allow drafts, and are partially rotten with badly pealing paint. Proposed replacement windows to be selected from a list of windows previously approved by the Salem Historical Commission including: • Pella Architect Series Wood Double Hung Windows • LePage SDL (wood exterior) • J.B. Sash Proper Bostonian (wood exterior) • Marvin Ultimate Double Hung wood windows • Jeldwen Premium Siteline EX windows in wood (Manufacturer's information on available wood windows with simulated divided lights provided for reference.) 4) Install new air conditioning system to allow permanent removal of window air conditioners on first, second, and third floors. New air conditioning system to include duct-less air conditioning with an exterior compressor mounted on the ground on each end of the building. Mechanical wiring/tubing that runs from the compressor Lp each end of the building to the rooms to be painted the color of the body of the house to conceal appearance. Removal of air conditioning window units will also improve appearance of building by allowing windows to be visib'e. (Manufacturer's information on ductless airon rtioning systems provided for reference in attachments.) Re loc:e, -,d— c.,-P 5 r A-e j,,.4-e o 41 ca . 5) Demolish and reconstruct the existing third floor shed dormer on the rear of the building. Existing shed dormer over abandoned bathroom is too low to meet code for a bathroom. Proposed reconstructed dormer to Existing and proposed dormer are not visible from the road or sidewalk. Proposed alteration to the dormer to include extending the length of the dormer approximately 10-feet. (Photos of similar shed dormer on neighboring building and schematic of typical "shed dormer" framing plan provided for reference in attachments.) Signature of Owner:�� Tel. #: 978-767-5415 Mailing address: 30 Broad Street City: Salem State: MA Zip: 06371 y aF �i t Y7 t. Y i YI,� .r\t•Ar3 � �`• R' t R •v i s Im b.. k/• f Si I �- i - _ � .� � \\�\\ � r \� \ *�� A�II� . ` � ' �. \ ,� �`"'�\ _z �'�� -_ .. 4`'7 •n _ _. nor— ....:..". eAh : �f �.�� n �e � ' t 1 1 ,, � 'T,v d _ _ �� r r �.,, }.� �* ;. _ 4 1�,, ^�,�, ;y ; � , f%% .: moi,./ ,.- Y r .' '�: /J •-�� i i '4`^ i� y��c^.� � ��T ® fµ^' ® , ^' ;. ,.y..... -, �. .v' !M r>l ri+ 'r \ 101r �--" k IIIA f J 12, rj !7 i Y+ .+.A ti 9'e + dCI�Y� ����• 4 ['may _ C �r n r u� Al,• �y�y gat k Jl '... � -" .. .. �'�• \.!vim •�` +- �' # ` n. �.1 ,_ 1 r 3 3 n �. s t %c t 7 � ��� ,� I oll kiwi ryn, - I _ p , �r I ' 4 � A n a t9 I 10 Y. 8 �,. ,;, , ,., �;..• �� i�pFq��/ A M �J - J�.A F ��� ', ti� i 0... M�{�� 1 ' M�� vLn':� _ � �.. 1 4n • r 4 ��. l 1y�' �C 'L. ."ti"n ` � —e �y � _ Y 1 � IS y � s^ = — � _ h r � Y f �� � — E � ___! w i �--� - :. r ! � w ruuur awn ew:�� .nw � y � �'M 11 M'V��6 wy u v �,�`'�'4 Y1 � .rim ' n r y i, - _,.. .. It 1.:4 `Y T. r:�. ? ' :ff.`s.. t. ."S.� i, -ra� �•.ar e> Ma.�W.". I: Y e � ,"�17 �11 �11e '�\111 _ ,��. \� �. s =; _ Y J� 1' YRwwE� ;�: SII '��." t� �� n�i � .�.'�-..- - I� 'Il n L7.'... i �. ��y_y66) . I i II ` "^Eil� `" ' � t � v<v� '�i1 �$,�F}„y��Ypd� t d C t �3' _ �7R�1� t jrj� r} _ {%' 'CII `� I iA 17� � ?.fit. .f '.. r s+d4y a � +I'dt (� i X 1 1.L 71 �rr� t C�. 1 �,ne �.' �.; � r j Y F �t� �� III ';RC If j.-i`:. .. � • - // 1a �'X`� 'yd y c. t 1 ��, Z�y11 4 tl, � �'�iY �1Y61 ��z �jt � i"t�l � ,�,�, .s o _.ee ' e, � �.q, '� M 7�'s i n { 4.'tl e,5.r t.. i�� Fr ' F r2 - A► r r i w a L 1 I � 7411n /� r O . I �1 sk ► i � I U4CL11111L.JJ J�.l.l.t, 1Y1V41111G11 Jlll�'1G-1'1llG 4 1S i�w r Stainless Steel, Outside Mounted, Flat Lid ode o � 3 / 6 .S�a. .v/r.fs S9'r� � �6' rx. diZ r 97 > rZx !o Ductless Air-Conditioning I Mitsubishi Electric Product Showcase http://www.niitsubisWcomfbrLcom/eiVconstmrer/product-solutions/prod.. Introducing the STAR Lineup of Ductless Air Conditioning and Heating Units I nlr of uctlon Indoor Unas Controls QW.r Single-Zone Un,M Outdoor Mulo-Zone Units Introducing the STAR Lineup of Ductless Air Conditioning and Heating Units A breakthrough in pure comfort t We offer more ENERGY STAR systems than ever. 1t * ENERGY STAR Systems incorporate eco-comfort technology, dual and triple-allergen filtration, and whisper-quiet operation. • New technology revolutionizes the heat pump. 0 Space-saving design means easy and unobtrusive installation. We offer more ENERGY STAR systems than ever,and we're the Industry leader. We have 15 new Energy rergy Ster rated systems with dramatic increases all I the way up to 26 SEER.Arid we have nine new systems t•at qualify for a federal tax credit of ry to$300. Our units Incorporate ecocomfort technology,dual and tnpleallergen filtration,and are whisper�qulet. Eco-comfort technology makes these systems smarter in row they use eny and minimizes their impact on the environment.Plus there are marry seadwncetl features like the i- e"'Sensor,that automatically detects room temperature differences and adjusts for greater comfort.Mksubisli Electric's advanced muitFstage filtration systems dramatically reduce allergens and help eliminate SEA odors.And our indoor units operate with sound levels starting as low as igda(A). That sound is even cluster than a human whisper. New technology revolutionizes the heat pump. Unlike older,inefficient heat pumps.there is w cold air delivery with Mitsubishi Electrics HVAC systems.Larger coils heat faster,and the Hot Start TM system doesn't activate the fan until the desired temperature is reached so it never blows cold air.What's more,select rtodels use Hyper-Heating INVERTER(1-t2ii technology that operates effectively down to-13°F.With this improvement these models give true year-round comfort from a single system.Even wen this ama2ing cold weather performance,there are no energy consuming electric resistence heating elements to increase your utility bills. These units provide easy installation,simple service and longer warranties. Mitsubishi Eledric's urds are easy to install with little or no ductwork.They're also designed for easy servicing.Although,with our industry-leading reliability record, you won't have to worry much about that.Better yet,we ve amended our warranties to seven years on compressors and five years on parts. Ready to buy?Click here to learn how. PlaNW9 I �K'q 1 of 1 10/14/20119:33 AM Inti ling Yft Mitsubishi Air Conditioning System http://www.mitsubishicomfort.con/en/consmter/how-it-works/easy-ins... Mitsubishi Air Conditioning System How To Buy Easy Installation with little disorder or disruption to your We. KEYES NORM ATLANTIC INC. NEWIIXJ,MA 02480 4 Installing our system is easy for a contractor. (MIDDLESEXI 1 We offer different styles of indoor unit options ornrX a options to meet your personal eds. ❑ CnrOa[I me Clickfor.PM1one 4 Our outdoor units have a small footprint and can be plecetl conveniently or even hidden by foliage to complete the system. Typical installation One of the great features of the Mitsubishi Electric system is its ease of installation. BELMONT ENGINEERING INC. A qualified contractor can usually install i1 in about a day.There is Idle to co ductwork BELMONT,MA 02478 required so you don't have to worry about disorder In your Mme interrupting yew life (MIDDLESEX) or costly remodeling expenses.The sleek indoor and mounts discreetly within the vAnrow space,and a pair of refrigerant lines plus power and control wiring connect it to the ❑ coNea me Gr;xnor FM1one outdoor urrl through a small three-inch opening in the wall. NEEDMM MECHANICAL SYSTEMS .. NEEDMM HEIGHTS,MA 024W .._. - (NORFOLK) � ❑ GnNad ma Clck for Phone Click here to only receive a 1 brochure. 1 T e Case Studies —J Video Different styles of indoor units Ducted style.When a ducted model is selected as the indoor unit that best fits your reed,it can easily be installed either in the ceiling or beneath the flocr in a crawl space or basement.The style accommodates the use of short duct runs and registers to deliver and return air from the space to the unit. Wall-mounted style.A wall-mounted unit mounts high on a wall and is unobtrusive to the visual area within a room.The wall unit models are similar In white color but come in two different designs that have different features that enhance their functions,wdNn the space. Floor-standing style.The floor-standing model attaches to the wall six Inches above the floor in areas where there is minimal or no wall space. Click here to view our Product Showcase for more information on the indoor unit models. Outdoor units complete the system The outdoor units for each of the systems have a small physical footp1m to lake up as little space outside as possible and can even be hidden by foliage.With the use of LINE-HIDE Ilia-set cover accessory,the linos connecting the indoor Ic outdoor unit can be clearly hidden. The PVC material of UNE-HIDE can be painted to match the exterior so that as little visual change as possible will be apparent. Click here to view our Product Showcase for more information on the outdoor unit specifications. Ready to buy?Click h=to team how. I of 1 10/14/20119:39 AM Framing Gake and Shed Dormers http://www.toolsofthetrade.net/industry-news.asp?seef onED=O&articl... After the walls,ridge,and common rafters are set,I overlay the val ey framing on top of the main roof sheathing to save from cutting a true valley.The roofing material wil need to be stripped back for this step. SHED DORMERS Framing a shed dormer is a simpler process than building a gable dormer.The end wall of a shed dormer carries the load rather than the sidewalls.There is generally no load-bearing issue when the and wall is framed directly Over He exterior wall of the first floor.But it the dower wall is positioned in from the exterior wall,the floor joists bearing the load must be adequate to carry the weight.The joists may need to be doubled-up to provide the support or engineered beams such as LVLs . may need to be inserted to carry header loads transferred to the floor system. Mom,rock smfafky I start by determining where Strad dormers am easier bun am are °N 'Wa the top of the dormer less costly than gable dormers. rafters will intersect with the main roof.They can either meet the main ridge or intersect with awfl the existing roof below the ridge.When the intersection is below 6 the ridge,a header needs to be inserted to support the dormer rafters.I double or triple the common roof rafters on either side of the dormer opening and insert a header between them at the Intersection point.The header must be sized to carry the tail joists that fill between the header and the ridge and carry the dormer rafters. e.afaf., L % Then I determine the height for the end wall that provides a rafter slope of at least 4 N 12 and allows for adequate headroom in the dormer.To minimize open time that the roof is exposed to the elenards during the framing process,I pre-cut the dormer rafters and header(if needed)and frame up the end emaati-a chuck Lock all.Once the existing roof is cut out,I can raise the wall,set the rafters,and sheathe the dormer in a matter of hours ready to dry-in with sheamrg and paper. The sidewalls of a shed dormer don't carry any load,so they can either rest on the floor or the roof rafters with no additional Nrew framing.Rather than precutting studs beforehand,I frame sidewalls after the new dormer rafters are set. rrr No matter whether I'm framing a gable or a shed dormer,I like to do as much planning and pre-cutting before opening up the roof.The shorter the time the roof is open before the new roof is tied into the old,the less time I have to spend keeping the house weather-tight.In most cases,I cut a roof open and frame np to a 12-Foot-wide gable dormer ora 20.foot-witle ` shed domrer to the point of being dried-in,in less than two days with pat one other worker,and very often in just one day. r'?+;, Naas —Mike Guertin is a home builder and remodeler in East Greenwich,R.I...and is a member of the JLC Livel and The rsrwsr�i Remodeling Show construction demonstration teams. -__. - ILae[Wnf:GuckLanaen Guideiines for posting on TOOLS OF THE TRADE Post you comment below. Please read ou Content Guidelines before posting: Learn more about our commenting uolim by clielduz here Like Is and 2 others liked this. SHOWING 3 COMMENTS Son by Po Warnew . Subscribe by email Q Subscribe by RSS at J&S construction 3 months ago build up the bad of it so that the new addition drains water property .Like Reply Jasongemma 3 months ago You can add domrers to any pitch roof uke Reply 2 of 3 10/17/2011 11:37 AM Y, y y •�il�.�Tn,Y Ti � J. M5'A' ��i �; r ____ _ _ - -- - r �. _ A - __!' a �s - - 1 .��- .�` ., ..., r -- �; x Marvin DoublyHung Windows for New Construction&Remodeling http://www.marvin.com/windows/wood-double-hung-windows/design... T FNDADEAIER SEARGHSRE nS/�R�■N Ptl► ZIP/Postal Code il, Keyword 'A.n ter. ..: poor• SuAlamndyou: MERNAigNPL REOUESneFORMATDN Home mrIwnvova I DouGa Hung I'Jlnmale DooWv Hing [kngn Pattens And Gats DOUBLE HUNG REOUESTINFORMAtION ENEWSSCN IIP y . t OPTIONS SIZES,PERFORMANCE AND SPECS � 'ALLtc' r FEATURES AND BENEFITS INTERIOR FINISH OPTIONS EXTERIOR FINISH OPTIONS DESIGN PATTERNS AND GRILLES DNldod Lite Options Marvin has a variety Cf ways to bring out the best in your window designs: • Simulated Divided Lite with Spacer Bar(SDLS)-an energy-efficient way to create the look of divided lites.SDLS bars are permanently adhered to both sides of the glass.A spacer bar is installed between the glass,creating the essence of Authentic Divided Lites. • Simulated Divided Lite(SDL)-SDL bars are pemeaentty,adhered to both sides of the glass. • Authentic Div Ida it Lha(ADL)-Separate pieces of glass are glazed between month bars-Ihe way windows have been made since the beginning.Only now.Marvin's stateaf-Ihead design adds energy efficiency to traditional appeal. • Grilles-between-the-Glass(GBGs).Grilles are permanently installed between the glass panes.This low-maintenance option creates the lock of divided lines. • G IGS the Choices for Exterior and interior-Color options allow for two tone grilles-between-the-glass.Choose from 13 extents-colors of 4 interior colors. • Removable Grilles-Solid wood Grilles on the interior offer the look of a classic divided rites.but can be easily removed for cleaning. m I Simulated Onvoed Use With Slmulaned DiNded Lila(SDL) AurkoxC Diwdad Lite(ADL) Spacer Bar(SDLS) GdlesbeMean-the-Glass GEGs Exanor ab otenor Ranovabb Cribs (GROS) Color 1 of3 10/14/20118:43 AM Marvin Doubt;Hung Windows for New Construction&Remodeling hrip://www.marvin.com/windows/wood-double-hung-windows/design... Divided Lite Patterns MarAn's custom capabilities allow us to create almost any divided lite pattern you can dream up.Below are some of the most frequently-requested: � I COMBO College COMBO ClaWail i I CheckrailT O'iel Prone 4 Bottom-Lee Prairie 4 BetabmRigfa Prairie 4 Top-Left Prairie 4 Top-Ripht Prairie 6 Bottom Prairie 6 Lefi-Hand }ISI `IIJ Prairie 8 F09h4HeM Praide 6 Top Prone 9A Prairie 98 L p EU 1Ll -LSI LL Il LIII 1L1 Prairie CMclowl Trots Horizontal TIAS Vertieal Violation I; �I - s I ' Mcusion Prairie R FOU E SI INFORM At ION . F NE W551GrN U P FINDADEALER zop.sWOoite HARDWARE AND ACCESSORIES GLASS,ENERGY EFFICIENCY AND SCREENS SIGNATURE SOLUTIONS STORMPLUS 2 of 10/14/2011 8:43 AM Taming Gable and Shed Dormers http://www.toolsofthetrade.net/industry-news.asp?sectionID=O&artici... After the walls,ridge,and common rafters are set,I overlay the valley framing on top of the main roof sheathing to save from cutting a true valley.The roofing matenal will need to be stripped back for this step. SHED DORMERS Framing a shed dormer is a simpler process than building a gable dormer.The eM wall of a shed dormer carries the load rather than the sidewalls.There is generally no load-bearing issue when the end wall is framed directly over the eMerior wall of the first floor.But if the dormer wag is positioned in from the a derior wall,the floor joists bearing the bad must be adequate to carry the weight.The joists may need to be doubled-up to provide the support or engineered beams such as LVLa io may need to be inserted to carry header bads transferred to the floor system. ITab:R k .iqi I start by determining where SW dormers art eaaler to bub and as the top of the dormer an wslymanaebk dormers. rafters will intersect with the min roof.They can either meet the main ridge or intersect with owaexe the existing roof below the ridge.When that intersection Is below 1, the ridge,a header needs to be Maned to support the dormer GGG"' rafters.I double or triple the common roof rafters on either side of the dormer opening and mean a header between them at the intersection point.The header must be sized to carry the tail joists that fill between the header and the ridge and carry the dormer rafters. Then I determine the height for the end wall that protides a rafter slope of at least 4 in 12 and slims for adequate headroom In the dormer.To minimize open time that the roof is exposed to the elements during the framing process,I pre-cut the dormer rafters and header(it needed)and frame up the end aa.n.mar area LttN wall.Once the wasting roof bat out.I can raise the wall,set the rafters,and sheathe the dormer in a matter of hours ready to dry-in with sheathing and paper. The sidawalls of a shed dormer don't carry any bad,so they can either rest on the floor or the roof rafters with n,additional `ay.tiw„ fretting,Rather than pre-cubirg studs beforehand,I frame sidewalls after the new dormer rafters are set. No matter whether I'm freming a gable or a shed dormer,I Ike A to do as much planning antl pre-cutting before opening up the roof.The shorter the time the roof is open before the new roof - is tied into the old,the less Uma I have to spend keeping the house weather-tight.In most cases,I cut a roof open and frame up to a 12-foot-wide gable dormer or a 26-(clot-wide shed dormer to the point of being dried-in,in less then two days with just one other worker,and very often in just one day. I —Mike Guertin is a home builder and remodefer in East Greenwich,R.l.,and is a member of the JLC Live!and The Remodeling Show construction demonstration teams. Ibetreewn:Chuck Lockned Guidelines for posting on TOOLS OF THE TRADE Post your comment below. Please read our Content Guidelines before posting: Taro mom about orz commenting pWoeyby clicking ber_e. Like N and 2 others liked this. SHOWING 3 COMMENTS Son by Papaw nn., . Subscribe by amen Q Subsoibe by RSS IJSS construction 3months ago build up the bark of it so that the new addition drains water pmperly Uka i.Rpt( Jasongemma 3monthsago You can add dormers to any pitch roof Like j Ratify) of 3 10/17/2011 11:37 AM vg��o 7• Salem Historical Commission 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)619-5685 FAX (978)740-0404 NOTICE OF HEARING The Salem Historical Commission will give a public hearing to all persons interested in the application of: William M. Ross,Abigail B. Ross on the property at: 30 Broad Street concerning: Repoint chimney and install chimney cap, install aluminum gutters on front & rear and downspouts on corners, replace single glazed windows with double glazed, install air conditioning compressors and associated wiring/tubing, relocation ofside gate, and demolish and reconstruct shed dormer. Date of Hearing: Wednesday,November 2, 2011 Time of Hearing: 7:30 p.m. Location of Hearing: 120 Washington Street, 3'd Floor Conference Room By Order of the Salem HistorjW Commission Jane A. G Clerk of the Commission Persons with special needs should contact the Clerk of the Commission to arrange for reasonable accommodation. Please allow ample time for us to arrange for your request. -� U�v� w I� �q�!MINB tP�/ Salem Historical Commission CLRI IFl(':\ 11: OI NON-APPI,K':\1311.1 Fy It is hereby certified that the Salem Historical Commission has detcrmined that the proposed: ❑ Construction ❑ Moving Reconstruction ❑ Alteration : Denx,lition ❑ Painting ❑ Other Work 11 Signage as described below does not involve an exterior architectural feature or im ok es a loatw'c u,cered h\ the exemptions or limitations set forth in the I listoric District's Act (M.G.L. Ch. 40C) and the ialcm I listoric Districts Ordinance. District: McIntire Address of Property: 30 Rroad St Name of Record Owner: Description of Work proposed: Replace halhroom n-indou" to replic•ute existing (hrond, h over G, single s;lu�e, h•ne divided light, c•leur gl ass). No rhm7,rs in calor, maler•ial, tlesig,7 ar ouhrard uppetu•unce. Nun-applic•ahle titre to hems in kind nnrinlenalwe repluc•emenl. Dated: Januar' 10. 2008 SALEM F ) AL COMMISSION By. The honle(mi cr has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. Y _!' _..� .T�v. t Y T �. L t 1 f h� y R . ..lWl�HiiYelYrl :dYtl1i�: C • -�.. - ,,1 r F A I � , � 3 �� _ 8 ,q F r �� i � � � - _� � ��� N _ � �. - ,,�, x 1 . K I l i + � 1. � t ,�, ��� �, t �� ' _ '�; iiM A � , ,:� � r '�-..' � . _�' �'I9r�� y 1'4 I�, �i �b l I 1 - �. � _ �• y * tt �. 41��� e � w. �>, J. � ` ! �_ i e �' ,i� �'�je •` � `,'= - �� '`� �- _. _ + _ ��� I , ''4 � ��� .,�� .. ,; '�. `^__ �., �- '-; o -- �. �� ,�`' I �� - - ,- ,= �_ �:-- - - ,. _ ,,,._ , . .--- ,--- - _�-- �� _� � g'' Salem Historical Commission 120 WASHINGTON STREET, SALEM,MASSACHUSETTS 01970 (978)745-9595 EXT 311 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 30 Broad Street Name of Record Owner: Stephen Benevento & Kevin Do lewillo Description of Work Proposed: Replace asphalt shingles on roof to replicate existing. No changes in color, material, design or outward appearance. Non-applicable due to being in kind maintenance/replacement. Dated: May 1, 2007 SALEM HIST C OMMISSION By: The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. �_!� . _. .- - -_ _� _. .�__. r._._. �_f__.._.f�....9 - - - _ -�--� - --- -- � - - - _ ` � ° _ -- - m �. .���, � � - �K �^ yy�� ��yy titi ,�y ` � -�- � �" • YAR\ J Y _ �J i ,i - n�.. �e l o-� P 1 �• - �.� }« .�� � 1 � i . . �� � �� ������I�U�����, .- s .-"z =-._,._ .. �Bd F• .:7 r3Livi.sht� 7 _ 3� ��� - - �/-� ss -_ . _ . Y R r _ 3a %lo+J S 11kJ aC Lep iw: 1 ,y: . . � :,h • ti �, �� "�, �� �. -". l �r �, I ., _.-„v_� . .. _� -:� _...,�._ i 3a- Br�a� /U��-Jf93 i a M1 J sY1 �4a '?o gZoAq 51. SI6187 !I �_ 0 "I Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)745-9595 EXT.311 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 30 Broad St- Name of Record Owner: Stephen Benevento &Kevin Dougwillo Description of Work Proposed: Replace wooden gutters to replicate existing. No changes in color, material, design, location or outward appearance. Non-applicable due to being in kind maintenance. Dated: July 26, 2006 SALEMHIST SSION By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. Salem Historical Commission 120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970 (978)745-9595 EXT.311 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving Reconstruction ❑ Alteration Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 30 Brand St. Name of Record Owner: Stephen Benevento & Kevin Dmig cillo Description of Work Proposed: Replacement of windows to replicate existing(wood, true divided light, single glaze, clear glass). Replacement of trim around windows in kind. No changes in color, material, design, location or outward appearance. Non- applicable due to being in kind maintenance/replacement. Dated: June 26, 2006 SALEM HISTORIC COMMISSION By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. t. 4 a. y IBM i I} � t r' y A � 1 �_, i�F��I, , LAY. S ! - � � : ,.__ .:���.. `L 0 Salem Historical Commission 120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970 (978)745-9595 EXT.311 FAX 978)740.0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction Alteration ❑ Demolition I Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act(M.G.L. Ch. 40C)and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 10 Brand Street Name of Record Owner: Kevin S. Dougwillo& Stephen W. Benevento Description of Work Proposed: Removal of existing fencing and between this property and 28 Broad, 32 Broad and S Warren Street and install a solid white cedar fence with white cedar posts around the perimeter of property, 6'high with 2 access gates (one 8'gate on the driveway side and one 4'gate on the right side of the properly, both to have hidden hinges so fence appears solid) as per drawings submitted. Fence on lot line of 30 and 28 Broad to taper from 6'to 4' and continue as a 4'fence to the sidewalk. All fencing to be stained Cabot Driftwood Grey. Dated: Apri16. 2006 SALEM HISTORICAL COMMISSION By: The homeowner has the option not to commence the work(unless it relates to resolving aan outstandin violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings(or any other necessary permits or approvals)prior to commencing work. 02/19/2006 10:55 97877777100 SENTRY FENCE AND IRO PAGE 01 SENTRY FENCE CO. 48ti2 North Putnam Street Danvers, MA 01923 (978) 777-7771 Fax (978) 777-7710 PROP TIED TO PHONE W�= DATE 1DouAWJlo 9 8 7NS- $o1'R H JOB NAME £:TREET S A (poA. w 3o ri3ro4 � SY 8- CRY.STATE wy ZIP CODE JOB LOCATION I g s4a 101103 FAx AnCNrrECT DATE OF JOBPNONE We hereby wbmh a Maaellere an0 eaknMm br: /' A '`"CJrmVL COIOy114 L 900el 0 61Y9 PD M c}- C4 AS (vXLI ")KA-Ale- !o Xg cid GAT-e- wJR[acK or„ame✓ N_ da4dugCc.- C gPe2 &I co Ont9b 80 Ct'AS 9 1 3�. r 8 ' Ave) cid P 5 X rL as' We PMPOW hereby to furnish material and labor—complete in accordance with above specifications,for the sum of: dollars Payment to tips follows,U / D 2 down rc, T 1 -76 All material is guarehteed to be as specified.All work to be Inmpleted in a Authorize ',( /t� tf workmanlike manneracccrdingto standard praatices.Any alteraton ordeviation Signature IC" 'NoLrdCll from above specifications involving extra costs will be examted only upon written orders,and will become an extra charge over and above the estimate. Note:This proposal may be All agreements contingent upon strikes,accidents or delays beyond our control. Q Owner to carry fire,tomado and other necessary Insurance.Our workers are withdrawn by us If not accepted within days. fully covered by Workman's Compensation Insurance. Acceptance of ProPosal . rt/ The above prices specifications to SignaturA/ and conditions are satisfactory and are hereby accepted.You ale authorized to Cr' do the work as specified.Payment will boa made as outlined above. Date of Acceptance 21 Z 3 1o( _ Signature 02/22/2006 12: 06 97877777100 SENTRY FENCE AND IRO PAGE 01 02/23/2006 14:04 9792364004 NORTH SHOP.E FENCE CP PAGE 01 CLASSIC DELUXE SERIES WESTERN RED CEDAR 1^XV, PYRAMID CAP 1^X A"CAP FA9CIA (OPTIONAL) BOARD p3OARD 2" r 1 .[5" CEDAR BOARDS FLAT V-GRooVE BACKING 'TONGUE 6 GROOVE RAILS DOWELED SQUARE CEDAR POST 1 I I I p COLONIAL SCREEN I i 1 � I I STYLE A NOT C_e ° dir, Privac T 100 /o Privacy.Type Fence Hand Nailed With Aluminum Ring Shank Nails Weights Available: 3' 3 1/2' 4' 5' 6 8' 11 Sen rR I'G�nGe Co. NAME' evi n �GU tvl�(� Li�Ya ND. Pl-Yvlam gy. ADDRESS: ris a PHONE. o18 FAX: J�}� ' is I DATE; a a y J o v rf'f irl _ .`.�. f � r t ti o n w ao U fl to to z 3 N Q �D '9 lT N W LNO v ifm M r,:3e s - _ mLL 7453 20060302 Walereens, New Derham Salem (No. :!E;f2li 323 J L M ` 9JaT / w �CIA » � dV4 7453 20060302 klal ereens, hk-w Derby+ Salem <'No.!2' 1A; 327 C J c� :... �, 1 .� * � `� � 7 �_ ._� - - .�. �.. _ - � i ,� _ . . r '� �.� � .. Y ��_ � _ h. .yam __: � s►_ z � rn :J m ?J� N m 'ro ro n a ro r 3 T iL W fNJI y ro t- r. �. <•11. X.s ' � _551,wl , r Y ti 2 A o cn Cmil �7 ko m to to z m 0 w v _ +IIII':9�idllllllllllllilll � - t - K a ot n. -J J; ri rA (A fV �' � T �D z m �D z Cn �r p m ! it S.J N 6'1 T v �T + L v z � p rrl r� p m v 9 6/u99 E ID m z m it 3 tAT n m z P W T Y Salem Historical Commission 120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970 (978)745-9595 EXT 311 FAX{978)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction '0— Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic Districts Act(M.G.L. Ch. 40C)and the Salem Historic Districts Ordinance. District: McIntire Address of Property- 30 Broad Street Name of Record Owner: 30 Broad Street Realty Trust Description of Work Proposed: Option for current or new owner for either: o Permanent removal offence in front ofproperty; or o Replacement of front fence to replicate what was existing, with no change in color, material, design, location or outward appearance. Dated: February 2, 2006 SA.LCAL COMMISSION By: "' � The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspecto-of Buildings (or any other necessary permits or approvals)prior to commencing work. Ot . 0 e t. LI _ _ 1110 Ali zk AmW*r:l.&,10 l,: I jr r� EEC fir► � -- - �_ �i�•s r . "'� I OPINION r _ 3: r• iJ 5 t '' Salem Historical Commission (1pµrt�as d CITY HALL. SALEM. MASS. 01876 t� �alMMLSPTT , CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed construction [ ]; reconstruction [ ]; demolition [ ]; moving [ ]; alteration [ ]; painting [ ]; sign or other appurtenant fixture [ ] work as described below in the . . . McIntire Historic District. (NAME OF HISTORIC DISTRICT) . Address of Property: 30 Broad Street Name of Record Owner: Roland S. Baker DESCRIPTION OF WORK PROPOSED: Reclapboard front, east, west facades with cedar clapboards, same number of inches to the weather as existing; replace window molding with new molding to duplicate existing; and stain with Cabot' s O.V.T Stain, gray body, with white trim to duplicate present colors. does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act (Federal Laws, Ch. 40C) and the Salem Historical Commission. Dated: April- 17, 1986 SALEM HISTORICAL COMMISSION By OVWVAL Chairman eh