Loading...
19 1/2- 21 1/2 BROAD STREET - DISTRICT FILES 19' -21lj Broad St. ,a r 6 5 Salem Historical Commission 120 WASHINGTON STREET, SALEM,MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Cammission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ✓ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire District Address of Property: 19 '/z - 21 '/z Broad Street Name of Record Owner: 19 '/2- 21 '/Z Broad Street Condominium Trust Description of Work Proposed: Re paint exterior with like colors: C2 "Portage"for clapboards and "Eggplant"for doors and Benjamin Moore "Antique White"for trim. In-kind replacement of any rotted or damaged clapboards. No changes in color, material, design, location or outward appearance. Non-applicable due to being in- kind repainting and replacement. Dated: August 31, 2016 SALEM HISTORIICAL COMMISSION By: / ff-'4� The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. Once completed,please submit a photograph(s) of the final result(maximum of jour-i.e. one photograph of each affected fagade). THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. Date Stamp xi � nom. qil(` fl 2 u nn UJ 2 D IG Salem Historical CommissiowEFT. COMiv1UNl' YD' v r OWm L,'I 120 WASHINGTON STP•EET SALEM,MASSACHUSETTS 01470 Office Use Only 078)619-5685 FAX(9781 74"404 APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of'Non-Applicability as described below for: ❑ New Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ❑f Painting ❑ Sign ❑ Other District: ❑Derby Street ❑Lafayette Street QMclntire ❑Washington Square Address of Property: 191/2-21 1/2 Broad Street Name of Record Owner(s): 19 1/2-21 1/2 Broad Street Condominium Trust Owner Mailing Address: 21 1/2 Broad Street Description of Work Proposed I'/ease type or-pnnt rlear/P. Attach additional slx•els, as uec•essuy. Using existing color scheme, repaint front and east side(rear and west side of unit was repaired and painted in 2015). The clapboards are a C2 color Portage The doors are C2 Eggplant. The trim&railings are Antique White (Benjamin Moore). Any rotted or damaged clapboards will be replaced before re-painting. Name of Applicant: isabell Leshko ZOwner❑Contractor❑Tenant❑Other: Signature:g ISABELL LESHKO Date: 8/26/16 Tel. #:978-590-8129 E-ma.l Address: isaleshko@gmail.com C'er417cate witl be mailed to the owner unless otherwise indicated hese: Certificate should be mailed to: Name isabell Leshko Mailing address:21 1/2 Broad Street City: Salem State:_1 bZip: 01970 C� a Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)619-5685 FAX(978)740.0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ✓ Painting ❑ Signage ✓ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire District Address of Property: 21'/2 Broad Street Name of Record Owner: Isabell Leshko and Matt Kleiderman Description of Work Proposed: Re paint house to match existing colors: Clapboards: C2 color "Portage" Doors: C2 color "Eggplant" Trim and railings: Benjamin Moore "Antique White" NO changes in calor, material, design, location or outward appearance. Non-applicable due to being in- kind replacement. Dated: April 25, 2016 SALEM HISTORICAL COMMISSION By: X�S�1 c �– �` } / F44-1 The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. Once completed,please submit a photograph(s) of the final result(maximum offour-i.e. one photograph of each affected fafade). THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. 1 \ E I�kVaFStam� t°��'; ';' 1 2,116 1 � 1 DEPT O- PL',%NR. ��... COMM UNI I Y DEVE_OPM ENT Salem Historical Commission 120 WASHINGTON STREET,SALEM.MASSACHUSETTS 01970 For Office Use Only 19781 6195685 FAX(978)7409404 APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of Non-Applicability as described below for: ❑ New Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition F,/� Painting ❑ Sign ❑ Cther District: ❑Derby Street ❑Lafayette Street ✓❑McIntire ❑Washington Squar: Address of Property: 21 1/2 Broad Street Name of Record Owner(s): Isabell Leshko and Matt Kleiderman(Note:townhouse part of condo association) Owner Mailing Address: 21 1/2 Broad Street Description of Work Proposed Please type ot-prhit rlearly. Attacli addiliolial sheets, as iieressary. Using existing color scheme, repaint front of unit 21 1/2 Broad Street(rear and side of unit was painted in 2015). The clapboards are a C2 color Portage The doors are C2 Eggplant. The trim & railings are Antique White (Benjamin Moore). Name of Applicant: Isabell Leshko QOwner❑Contractor❑Tenant❑Other: ISABELL LESHKO """ K`1,11 ° Signature: .:w�`IS1111:=°« " "°0 "" '""' Date: 4/19/16 978-590-8129 E-mail Address: isaleshko@gmail.com Certificate will be mailed to the owner unless otherwise indicated here: Certificate should be mailed to: Name Isabell Leshko Mailing address:21 1/2 Broad Street City: Salem State: 1 tZip: 01970 \ _www"k�Ill , 4 AN i ,\ ` __•�...- ..� a '� t�tA � a i����'. PC �tYBZ."i0 1�®_s_cs.a avw '�• aW_`�'s� �Ii Yil e: \ ...� fl< ,PP► • _� _ w i.a !tel 1+9!' vhvP•�" I �� � � C 4p� Salem Historical Commission 120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ✓ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire District Address of Property: 19'2 - 21'/z Broad Street Name of Record Owner: David Leach/Laurie LaChapelle. James Zissulis. Matt Kleiderman/Isa Leshko Description of Work Proposed: Replace existing fence at front and side property lines to replicate existing, including paint colors. No changes in material, design, location, color or outward appearance. Non-applicable due to being in-kind replacement. Dated: March 21, 2016 SALEM HISTORICAL COMMISSION � By: l�a �i�✓t / T The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. Once completed,please submit a photograph(s) of the final result(maximum of four-i.e. one photograph of each affected fapade). THIS IS NOT A BUILDING PERMIT. Please be sure tc obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. Date Stamp = RECEIVED MAR 0 9 2016 DEPT. OF PLANNING& Salem Historical Commission OMMUNITY OEVELOPME T 120 WASHINGTON STREET.SALEM,MASSACHUSETTS 01970 For Office Use Only f9781619.56W FA%;9781740-0404 APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of Non-Applicability as described below for: ❑ New Construction ❑ Moving ❑✓ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Sign ❑ Other District: []Derby Street ❑Lafayette Street ❑✓McIntire ❑Washingtcn Square Address of Property: 19 1/2-21 1/2 Broad Street Name of Record Owner(s): David Leach/Laurie LaChapelle,James Zissulis,Matt Kleiderman/Isa L.eshko Owner Mailing Address: 19 1/2 Broad St Salem,MA 01970 Description of Work Proposed Please type orprint clearly:Attach additional sheets, as necessary. We plan to replace the existing fence in the front of the property that stretches from 19 1/2-21 1/2 Brcad Street. The new fence will maintain the specifications of the original fence:42" high pickets, 3/4"x 2 5/8",pointed,with 1 1/4" between pickets. At the end 21 1/2 Broad street section,the fence will tarn at a 90 degree angle to the edge of the building, as it does currently. There will be gates at each property, starting at the porch railing,to al'ow entry into the front yards. Additionally,the fence which runs between 19 Broad street and 19 1/2 Broad street will be replaced. This section of the fence will maintain the specifications of the original fence: 27"high pickets, 3/4" x 2 1/2" wide,with flat top. 1 1/2" between pickets. Topped by a rail. Pickets and rails will be made of cedar, fence posts will be white cedar. All fence to be stained Benjamin Moore Antique white,to match the house trim--the same calor that the existing fence is now. Images follow this page and a painted sample is included. 1 K-W" AsL l 5fa -(fPAf i w ?tom or f ' %A Ac feJti b Gv gy p I 1 Ua w� e.V+tia� 1 T3Izi, Ito FCV-- Name of Applicant: David Leacch� QOwner❑Contractot❑Tenant❑Other: Signature: I Date: 3/9/16 Tel.#:978.741.1021 E-mail Address: scallopsalem(acomcastnet Certificate will be mailed to the owner unless otherwise indicated here: Certificate should be mailed to: Name David Leach Mailing address: 19 1/2 Broad St City:Salem State: Wip: 01970 Existing fence from 21 Broad to the end of the property at 21 %. A- 16 a 4I - 3 �S -Wow 7 i Fence it front of 19 Y2 Broad street,and small fence running between 19%and 19 Broad st. y. R ` .ti. Side fence is shorter, has a top rail,and was painted gray to match the former color of the house. 19 Broad Street is white, 19 Y2 is now pale green. e custom madepi kets r � t ti lig i Patricia Kelleher From: scallopsalem@comcast.net Sent: Monday, March 21, 2016 3:03 PM To: Patricia Kelleher Subject: Re:Application for a Certificate of Non-Applicability Categories: HDC Patti, Thanks very much. We will direct the fence guy go with the Ashland Slate. David From: "Patricia Kelleher" <Dkelleher(o)Salem.com> To: scallopsalem(aDcomcast.net Sent: Monday, March 21, 2016 2:42:13 PM Subject: RE: Application for a Certificate of Non-Applicability Thank you, David. This should be satisfactory to the Commission. I will process the Certificate of Non-Applicability and it should be ready by Wednesday. Patti ---------------------------- Patti Kelleher Community Development Planner,City of Salem Department of Planning&Community Development 120 Washington Street, 3'd Floor Salem, MA 01970 Phone: 978-619-5685/Fax: 978-740-0404 pkelleher@salem.com www.salem.com Office Hours: Mon 8-3:30, Wed 8-3:30,Thurs 8-2:30 From: scallopsalemCalcomcast.net rmailto:scallopsalem(&comcast.netl Sent: Monday, March 21, 2016 2:28 PM To: Patricia Kelleher Subject: Re: Application for a Certificate of Non-Applicability 1 v r 1 . ry I might not have time to come by the office today. Attached is a photo of the fence with the Benjamin Moor Arborcoat paint chart. It looks like Ashland Slate would be the most reasonable comparable, taking in to account over 40 years of weather exposure. I am at 978 741-1021. 1 can also bring by an 8 1/2 x 11 print of this if you need it for the files. If you need me to come over, I am available after about 3:45. thanks, David From: scallopsalem(a-)comcast.net To: 'Patricia Kelleher" <pkelleher(d_)Salem.com> Sent: Thursday, March 10, 2016 2:37:36 PM Subject: Re: Application for a Certificate of Non-Applicability Yes the design is the same but the construction is much sturdier. Sent from XFINITY Connect Mobile App ------ Original Message ------ From: Patricia Kelleher To: David Sent: March 10, 2016 at 2:31 PM Subject: RE: Application for a Certificate of Non-Applicability Does the proposed gate design replicate the design and size of the existing gates? Patti From: scaIlopsalem(o)comcast.net [mai Ito:scallopsalem(d)comcast.net] Sent: Thursday, March 10, 2016 2:20 PM To: Patricia Kelleher Subject: Re: Application for a Certificate of Non-Applicability Hi Patti, There is currently a gate for each unit and we do want to stain the side fence antique whit to match the rest of the fence, as the house is no longer gray. 3 Please let me know if I can answer any other questions. David Sent from XFINITY Connect Mobile App ------ Original Message ------ From: Patricia Kelleher To: David Sent: March 10, 2016 at 1:42 PM Subject: Application for a Certificate of Non-Applicability David, Thank you for your application for a Certificate of Non-Applicability. I had several questions—the application states that there will be gates at each property, starting at the porch railing. Do gates exist at these locations currently or are these new gates in the fence. Also, the application photograph states that the side fence was painted gray to match the former color of the house. Will this side fence be painted in a different color than what is existing, specifically the Benjamin Moore Antique White? Thank you, Patti ----------------------------- Patti Kelleher Community Development Planner, City of Salem Department of Planning& Community Development 120 Washington Street, 3"d Floor Salem, MA 01970 Phone: 978-619-5685/ Fax: 978-740-0404 4 pkelleher a salem.com www.salem.com Office Hours: Mon 8-3:30. Wed 8-3:30. Thurs 8-2:30 Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal officials are public records. FMI please refer to: hftp:/twww.sec.state.ma.us/pre/preidx.htm. Please consider the environment before printing this email. 5 �o Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving O Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property:21 %:Broad Street Name of Record Owner: Isabell Leshko & Matt Kleiderman Description of Work Proposed: Restore windows and replace existing storm window. Dated: September 24, 2015 SALEM HISTORICAL COMMISSION By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. Date Stamp S Salem Historical Commission 120 WASHINGTON STREET.SALEM.MASSACHUSETTS 01970 For Office Use Only (9781619-%65 FAX M78)7400404 APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of Non-Applicability as described below for: ❑ New Construction ❑ Moving ✓❑ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Sign ❑✓ Other District: ❑Derby Street ❑Lafayette Street ❑✓McIntire ❑Washington Square Address of Property: 21 1/2 Broad St. Name of Record Owner(s): Isabell Leshko and Matt Kleiderman(and townhouse is part of a condo association) Owner Mailing Address: 21 1/2 Broad St. Description of Work Proposed Please type or print dear/y:Attach adrbamial sheets, as rleressaiy. All windows in our townhouse will be fully restored by Old House Works (http://www.oldhouseworks.conv). For details on the restoration process see: http://www.oldhouseworks.com/window-restoration.html In addition, all existing storm windows will be replaced with more efficient storm windows that match the existing windows in color and material. The existing windows are white aluminum windows(with the exception of one window on the 2nd floor, which is very old and is just bare metal.)The new storm windows will be Point 1 Series Windows by Custom Built and they are designed for historic house applications: http://custombuiltii.com/windows/storm-windows/Point-l-series/. Name of Applicant: Isabell Leshko QOwner❑Contractor❑Tenant❑Other: Isabell Leshko Signature: Date: 9/20/15 Tel. #: 978-590-8129 E-mai- Address: isaleshko@gmail.com Certificate will be mailed to the owner unless otherwise indicated here: Certificate should be mailed to: Name Mailing address: City: State:_Zip: poiq !� S6L�Z�JZL ai Sava Zeod G� d�:fir, hY I Cuatvut cusroM am�r When thermal performance, architectural --- -- preservation and aesthetics, or budget are a - concern, Point ITM storm windows are the ideal solution. (� Architect-specified Point 1TM storm windows are designed and custom built to ensure maximum energy efficiency and enhance the appearance and value of residential as well as ----- commercial dwellings. _ _ MEN Using only the highest quality components and manufacturing techniques, Point JTp1 storm windows will provide you with a lifetime of energy savings and trouble-free service. 2S } P� Point/''`'storm svindars protect the Rose!sterid Light House in Narragansett Urn'. Point JTM storm windows are constructed of high tensile strength, J 6063 T6 aluminum (the industry standard is TS), and are ideally suited to rigorous applications, period homes, or your castle. Point 1TM storm windows protect the existing underlying window from the harmful effects of wind and weather. They reduce noise infiltration while adding value and insulation to the building envelope. See for yourself the Point I TM difference! r • 3 ;aVow, f 1 ' ` �rrrrrrrrrrrrr .%%ease%r�r��r 3 t MMIL ankOIL . I I i f r � r _ � a. f Y r -,r 41.6 A 4w'11k)P%dk-Amok x MEN AL AO r y t , p, 4 y r k' i .t Vis.°,.. .� �� �� •• `` � �^ .. k IMM A*Jyr y a t{' Fill _LL IM r. Fool* * # - - L ' i �., 7 � ' i 1 �ONCVT Salem Historical Commission 120 WASHINGTON STREET SA-EM,MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition O Painting ❑ Signage ❑x Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 19 '/2 - 21 '/z Broad Street Name of Record Owner:1_'/z -21 1/2 Broad Street Condominium Trust Description of Work Proposed: Repair/replace rotted front railings with stained fir to match the existing railings. Repair/replace rotted boards and flashing on all dormers. Repair leaky windows by repairing/replacing flashing around windows. Replace rotted floor boards and railings on back porch for unit 21 %. Repair fascia and clapboards. Repaint using existing colors. Repair roof over entrance to unit 21312. Replace/repair window boxes for unit 21 %. There will be no changes to the design, material, color or outward appearance of any of these items. Dated: July 30, 2015 SALEM HISTORICAL COMMISSION The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. 0 T a* Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction t] Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 19 '/z- 21 '/2 Broad Street Name of Record Owner: 19 %:- 21 '/2 Broad Street Condominium Trust Description of Work Proposed: Replacement of the existing 5"K-shape gutters with 6"K-shape white gutters. Three additional downspouts to be installed(one on each side as well as at the rear of the house). The downspouts will be painted to match the house. Dated: August 26, 2015 SALEM,HISTORICAL CO�M�M,ISSSION By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise_ndicated. THIS IS NOT A BUILDING PERMIT. Please be sere to obtain the appropriate pen-nits from the Inspector of Buildings(or any other necessary permits or approvals)prior to commencing work. Date Stamp ou, Salem Historical Commission For Office Use Only APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY Pursuant to the Historic Districfs Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of Non-Applicability as described below for: ❑ New Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Sign ✓❑ Other District: [-]Derby Street ❑Lafayette Street QMcIntire ❑Washington Square Address of Property: 19 1/2-20 112 Broad St. Name of Record Owner(s): 191/2-21 1/2 Broad Street Condominium Trust Owner Mailing Address: Description of Work Proposed Please type orpnut dearly. Attach ad&tiomd sheets,as net ess uy. Repair or replace rotted front railings with stained fir matching railings Repair/replace rotted boards and flashing on all dormers on both sides of house. Repair leaky windows by repairing/replacing flashing around windows throughout unit 21 1/2 Replace rotted floor boards and tailings on back porch for unit 21 1/2—keep existing design IcItIlIlepair epair and replace gutters and downspouts damaged by ice.New gutters will be increased slightly in size(by 20%) order to improve water flow and prevent further ice dams.Two additional downspouts to be added: one on the uth and one on the West(i.e.,the back of the house and the side facing Ome Square),to prevent fitrther ice ms. Additional gutters added to back,west and east wall,to be painted the appropriate color and placed as conspicuously as possible. any fascia underneath gutters that are damaged. Using the existing color scheme,paint West and South sides of the house Repair/replace any damaged clapboards to prevent further ice dam leaks in house. Repair small roof over the entrance to unit 21 1/2 Replace window box that broke and repair existing window boxes for Unit 21 1/2 Name of Applicant: Laurie LaChapelle QOwner❑Contractor❑Tenant❑Other: Signature: ha Lc p Date: -7 12 Tel.#:978741.1021 E-mail Address: lilachapelle@comcast.net Certificate will be mailed to the owner unless otherwise indicated here: Certificate should be mailed to: Name Mailing address: City: State:_Zip: ATTACHED DOCUMENTATION An application will not be consideredcomplete unless all work items are thoroughly describedand the application includes all information needed for the Commission to rake a determination. Failure to submit a complete application may result in a continuation to a future meeting.. Recommended information includes: Photos of existing conditions,taken from all public ways Site plan showing location of improvements — 1J 0--0"sP L O u u> Elevation drawings of the existing conditions and proposed improvements Drawings of details and other special conditions,including profiles Description,photographs,and/or catalog cuts of proposed materials(please bring to the meeting product samples, if appropriate) Dimensions(i.e. height of fence,size of pickets and posts, etc.) Paint color samples, if applicable(no less than 2"x2") i Location and size of all mechanic l equipment, such as transformers,HVAC equipment, electrical service and meters, and proposed screening \ 3"x4" Yx3" \ 2"x3" i LLL sfspou[ 3"x4" 3'x<' 3'x4" 5 1200 6000 2"x3" 1 600 600 6600 lal IT: y1 a `®�i^ Ati� r IAV, ; A $ ��'�' + �\lI 'J " `. r w I F fir d .Ayp�� : < FF may. ` t... � ♦, �I rl Y. ++ r Y Ic r 4 r� ti. A] }• L 1 N 'f t. !/ •ems Aw e. y r e �r, i �_ - -�,_ - �•_� �- �_ �� -� E� .�^^ z.. - .. ., E �_� �._ _��� ��� �_ :. - ! `�r.r G��-. ,. E i� J.SJ rX :WVN7 cAW ✓_____ SPAW� X :NF.RE�ucazra,v� of�x�.fay/ rsxsdy_c os fax ..jfJ'SLX C�VXn' �N-�d6'�T.1TX-�A/TTwd�1 AN. SLATE SN/11r4zS T — _ Ell CLAPBOARDS[EDE IT _ m _ ' 1 �S.TMT --S7'Ar--ET 'Z Y,47-ION a � �5 DUN 8➢gKiSSPIAN, iutecgon so¢¢m.per. ' nW. rw _cG197?/ %- /4� � /9a-24 21-% ,BROAD ST. SALEM/JA.S!. A~, AGASUReEO{ORANN By Pp`8,:y� ✓ose/�N Di Sj'Ef'AXo J,4. A�PCNiptcT A./.q. i 1 RECOROBD AT4SSE.'X REG/S rRr orbz-EDS BooK No.22B2,PA4-,EN0. boo ,BYA/'.CAN ORAWV BYCNAs.A.ME CAA/- /J)'AVL' CONrDRMED W/T TNER04E.;yC RE6U/.AJ'/ONS Oj-THERE¢ 'E'R /SJS O/r,DEXEDS O-,ESSEAl CO4Nrj'/N /04 AN. a a I�� W I II 2ffe sTt'kY U/La/NC �. BROAID ,$r. 23-23 -2.5-2.5,4 BROAD Jr I I i R4.n C 6GLS.) ALL COMMON ORtY/BL/C SPACC /S SHONNNAjt//ED. PUN BOOKU-SDLAN.7 ,no cam«uw wo�c wesr. 4 R O A D wa.N" ` rtm�.d c�J�C,G1.oZ a9 Y ' +Ih /9�e2 "r�! %.Z :CBneCa-rti-�..e..cu��.✓ /YCAL P- AN ?ia z mhn 23.Y-2-55Y2S,�4R0A D ST .5,94EA1,IVASS., /CERY/F7 THAT TNI9 PLAN SNOM37NE UN1r-0ES1FNAj10N AND r#ATj'N/SPL A N/.'OLLYA Na J T ACCURATELYOEP/CTSTNE LAYO UT OF jNE UN/TS,T/1E 40CA710N 01MENS/ONS.APPROX/MATE AREA 0/)NE ��lllVl UN/T$MMNENTRANCEANO/MM401A 7E COMMON AREATO NH1CN EACH UNITNAS ACCESTAS,BO/Lr LIYAYE CONFORME'0 W/TN ]NE RUL--St RE6U1 AT/ONS O/TNE REGISTERS OF OEE-0S FOR �ES.9EX COUNTY IN PREPARING THE PLAN. E _ I ' I i/ ��.� deo RopM ( BSD R¢oM❑ BEAD R0;7A/❑,' 1 i i CLOSdj N O CLOSE] / I I CLosET nomr I CLorEj I I �\ 5ZA ROM I BE.e� ROq,ry .B D RP04 / ONVr/9 dnq/r 2� I /�-k/4 I I I I I \ Ps / LO=9" PIAN OOOKUSVLANX 7HIRD IFL00R /0LAIV waoamn arormau oot sew wac OCA L ZA4 •/-0. y� � ..A.G.h..l. ...auarw lft-,2421% BRDAD Sr SAZZAAl1A5S, awst. /I p 0.��Q++•y MEAS UR EO O'DRAWN .BY .JOSEPH D1 .3r- 12,2 ✓R.ARCH/]ECT A./.A, O o e S 4 -122 AUBURN Jr AIEAFOAA,IVA SS., - Q,` -f BERT/fYTIIA j TNIJ pi AN JNDIY9 TN£UN/r D£SI6NA7--0N ANO JHAj jN/B PLAN fULGY AND ��J _,gCC(LRATELY DEp/CTJ.TNE LAYs:uj Of THE UNIjJ jNE LOCAT/ON,D/MENS/ONS APPROX/f/ATFAR6A 0/TN6 _7UN1JY7%ATN£N)7PANCE AND.JTCMdLIATE COMMON AREA TD 1✓NICN EACH UN/j�yAS ACC£SSAJQUIGT 7��'S'OTIf_bR1!.ED::i'JS.Y-TAF=.FFl[LIJ t RECULATION:T e/'rAE REgIJTERJ OFDEEOJ/YR t I ...BeD ROOM �o BED ROOM I ,BED ROOM cGD. BEDROO� ( BED ROOM GD BED Rim O I II - IND 0 AJ JATN TN cLD.7ET I _rzosET L^LmJ<r i � I BED Roo/Mg(I t BED R00A BED R00A . UNIT' /9tS' v HALL HALL L4 UNIT 2I - HALL •I UNIT 211E CLO. - I ua PLAN—6PPaAN�2? ,SECOND ,/"LOOR /01AN =e, • + (tcz .a. n79 -50ALX ,BROAD ST. ,SALEM,MASS, AjFA3URED d DRAWN BY JOJEpN D/STEfANO q/R. ARCNI�T/ECT A•/.A. O e / 2 4 122 AUBURN ST /�IXDfbRO,/'(AJJ.• z ICE&T/FY THAJTN/S ptBN SNLWS jN£11.P/T SES/{.'NATIQK dNG_TeY1F_THIJ'./�LAN t'ULLY ANII )SY �UdATELY-D EPICjS jNE LAYOUT Q{Th!E/!NL)'$�77YEY-lT1jTON d/dGNJ•tONS AfjpRGX/MATE-�RfA OfnVE (/N/J:1�1197N LNTRANCE ANL./KMEQIArW Cn"AN dELiL.�II.7i'Ar' ZSSA�aL/tT - =tWA vr'CAN v R.905 / .K RIIGCS�.-,Q f1LdTLQHI_ NE-RF�'1J'JCRS-�',GEEATj.T- __ i D/N/NG R/M. W77CHEN iCrTCA£N jJTiY/&1s RA• I st"/TCNEN LtJH/NG R f O 0=0" CLOSE] CLQJEJ -� VL OI CLQJET CLOJE7 •i I L/Y/Ny RN. L/Y/NG RM I L/Y/N¢ RM• HALL HALL I HALL UNIT na UN/T 2/ I 111117-21,6E J93A-�P•t'T rB9osc.FT /890 Sµ/7' i ALL COMMON OR PURL/C Sf9�E/S.si/Q NATcN R. �� _. � ((,Pd)0 - 0 L PIM BDP ru+ R5'r �LOOR PLAN t5so.+cusa`,-oefY3,w oar. .. VAL v'a-a/ /z Cep *-^u�• /9/ 2/ 2/Jf BROAD ST. SALEr�/�1ASS, AR$f. J��p WAS DREG $&RA WN BY -1OSE/?N D147E/A No ✓R. ARCH/TA-Cr,q,/,A, Oj U r a r 234 /22 AUB URN SY. /yEDFQRO,MASS., t� '. ..__ ._....- 5I717p /tc.°rt vr)gdr,�yjS(�L.iN.AVOAJ JAII UAW'.3£57�77QS'-.7�Hd=Tlld�-Td/°Pt�u fr'ct r w.ve �� Z�al �tamnataY�-- -4&E7f;11'.f7.Y2'h'TR.IHCEANL rvxFn iNp - AVIAr �€pC-ra xTx�RUt�c-$.:Yar�rtcaX ywxzl,ry - 7H pxgp ;%MF 7AE:.iarxN I � � Q Q � i �� N Aj R I XE , f/ ATR ❑ ❑ '' i ❑ ❑ I o ❑ q , I I I ❑ El 26 I i 6. /+'/3 d! % XyGOa.ai !'-0ntO�.ei..ccc`-nv 7A i t �1rmroat .cc�ev5� 1 -2I Z/0 ,BROAD ST. SALZJ,,/%ASS. I '�' ,,��77Qp A'EASUR6d f ORAWN BY X91-►�i ✓ajro# OLSYE/ANO✓R..4Rc#lrzc7A./•A O d ''. o f S g 4 122 AUBURN Gutter Sizing- Storm Master Gutters Page 1 of 2 1-888-795-6730 STORMMIA(�T info@stormmastecccm J f` Q.,1 Quality for the life of your home. 2!i Contact Contact Us About Products News Gallery Rewards Architects Gutter Tlps Contact Us Home G=tt rsivrg Gutter Sizing Fiv�tnch K-style gutters or 6-inch half-rounds,the most common residential sizes,are able to handle the rainfall on most houses inmost parts of the country.But houses with big,steep roofs or those located in climates prone to heavy downpoursmay need wider gutters and extra downspouts to keep rainwater from overflowing. - To figure out what size gutters you need first you'll need to calculate the square footage of the gutter's drainage area.For a simple gable-end roof,you would only need to make two calculations,one for Half-Round Ii-Style each slope.Hip roofs and intersecting roofs have multiple facets,and for those you'll need to add up the area(length x width)of each surface within a drainage area to get the total square footage. Adjusting for Pitch and Rainfall Once you know the total square footage of drainage for each gutter,you'll need to adjust for the following two factors: 1.Roof-pitch factor The steeper a roofs pitch,the more windblown rain it can collect.you can measure pitch with a 2-foot level and a tape measure:Hold one end of the level against the roof,level it and then measure the distance between the roof and the underside of the level at its midpoint,which gives you a 12-inch run.A 5-inch gap,for instance,is a 5-in-12 pitch.Once you know pitch,you can find your roof-pitch W factor In the table below. - IF Roof pitch/Roof-pitch factor: 12 in 12 or higher 1.3 „ 9 in 12 to 11 in 121.2 6 in 12 to 8 in 121.1 4 in 12 to 5 in 121.05 Flat to 3 In 121 2.Maximum rainfall intensity The U.S.Weather Bureau records the maximum rainfall that could possibly happen in a 5-minute period,in inches per hour,for various regions.The higher the amount,the bigger a gutter has to be to keep from being overwhelmed in a storm burst Download this handy table to find out the number for your area. Sizing the Gutters Multiply the drainage area by the roof-pitch factor and rainfall intensity to find out the adjusted square K-Style Gutters footage.Then use the chart below to see what size gutter you need.(If a roofs various drainage areas call for different size gutters,go for the biggest one.) 4 T } K-Style: S-Inch 5.520 square feet R 6-inch 7,960 square feet \ y �l Half-Round Gutters v �17` http://stormmaster.com/gutter-sizing/ 8/19/2015 Gutter Sizing - Storm Master Gutters Page 2 of 2 Half-round: I 5-inch 2,500 square feet ek eel 6-inch 3.840 square feet For example:A house In Chicago has a roof whose actual drainage area is 1,000 square feet.The 6-in-12 pitch factor(1.1)multiplied by 1,000 yields an effective area of 1.100 square feet.Multiplying that number by the local maximum rainfall Intensity(6.8 inches per hour)yields an adjusted square footage of 7,480 square feet.Therefore,this roof should be equipped with 6-inch K-style gutters. Gutter Capacity One foot of S'K-Style gutters holds 1.2 gallons of water. One foot of 6'K-Style gutters holds 2.0 gallons of water. Extra Capacity What if the runoff is off the chart for standard gutters?You have three options: 1.Get 7.or 8-inch gutters.Theyll cost more and probably require a custom order through a professional installer. 2.Increase the pitch of the gutter.The standard is about%inch per 10 feet Increasing the pitch increases a gutters handling capacity,but the gutter may look askew over a long run. 3.Add downspouts.The above recommendations assume that you have properly sized downspouts every 40 feet.As with gutters,a downspout's capacity must match or exceed the expected runoff.Use the chart below to figure out how many extra downspouts you need.Adding a 2 by 3 rectangular downspout,for instance,boosts your gutters capacity by 600 square feet of drainage area. Rectangular 2 by 3 inches-600 square feet 3 by 4 inches=1,200 square feet Round 3 inches=706 square feet 4 inches=1,255 square feet Information courtesy of the Sheet Metal and Air Conditioning Contractors National Association(SMACNA),a standards-setting organization based in Chantilly,Va. Gutter Expansion The subject of expansion is of interest to many installers.The chart below is a guide to help you see at a glance the effect of expansion on various materials. Theelpanslon of 150 ft-length of material due toanlocrease In temperature of 100 degrees F. M0tonLv Fraction Deonw Ep;; Galvanized 13W .44 h, Copper SW .625 Stainless SIS .625 Aluminum 25W .781 Yi Ia Bw 1.92 Wood "112, .5 'The au wubr B1,rn used M viryfa an appmdtrrb" Teat reads range hom .000031'(0.000037: ..V/,0d is inAerwW more by Lii moishae ratlMrtlwr heat Storm Master Guttersrp2013 I Created by:Roy Web Design http://stonnmaster.com/gutter-sizing/ 8/19/2015 �q l 12Z-, I-7-- ROOF LRdoF 3"x 4" 3"x 4" 3" t 2"x3" ' —_ 2"x3" 3"x4" sf spout 3'x4" 3"x4" 1200 600 1 6 2"x3" 1 600 600 6600 zV, � s� �2�ti��vws 1 2 3 4 5 6 7 6 9 10 11 12 13 14 15 16 17 19 30 23 pitch 460 sf east and west 529 400 20 929 30.4795 40'width-west/east 32'Vie_ I L- 19, 70'base 19' roof pitch 7 end 19 361 square ridge ends I rise 42 6 heigth 14 196 square East West south I north runj 631 9 roofedge 23.60 557 total ise to ridge 23 23 23 23 23 23 20 2.222222 square root Base 19 19 32 19 32 19 437 437 736 437 736 437 3,220 area i1 t� Q —A 1_3 wind factor t1 3,542 effective area 2 rain fall 7,084 drainage F is Salem Historical Commission 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Corr mission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act (M.G.L. Ch. 40C)and the Salem Historic Districts Ordinance. District: McIntire Address of Property- 19 �G - 21 /, Brand Street Name of Record Owner: Laurie LaChauelle, David Leach, James Zissulis, Sarah Weigel, Mike LeFebvre Description of Work Proposed: Paint colors: Body—Portage Trim—Linger Doors— Wicked—Note: It is also highly recommended that the storm doors be painted this color Shutters-Zorro Dated: June 3. 2011 SALEM STORICAL CCO�MMISSION The homeowner has the option not to commence the work (unles it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. - ...\ '. - t */ r � J t � � rr •r: rkLh!`�r �i Jr Yyxc ') f . q , r .. f . . ? � � ./, lr, r`` .ry✓ G,4,� .� A ^r�R � H, �. j � rr y .� I „I .ti Y'1 ui %�y,IK IA Iy I♦tJ+�rr, ��vY�. 3M1�`< S r}wt e. >. 'y7,1G��f .1, 1C I (.h I < 9^ : }}}}} .��>'RL{.! ^ ^ aui�n _�V > e.. . Y i' .fie• x \ _ t t c � � .tt ^Y'�Ye'ry 'I " C �...r "t�c\,;�}* rb♦;J'♦ 5C`^I, +�I 1 yrs T 6. I ♦" "ice I 3S. -.. � - -- I �" ��� �lhil�llllllll�lilll �ill IIIIIIIIIIIIIIIIIIIIIIII IIIUIfIIIIIII iI►Ila) ,iF MIilil t -- Iv lw 'Vol. um r Fl UUU N 11 7/1 SYS ?+7} 0.! �41, �' • / ,�� /+ ,.` it y ' , ,4jo IF C : r � . 2 � r w � - 1\WW 1 F, • �" .fin p y.L yr �e+u w449. 1 TF=• 1601 tl k Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)745-9595 EXT.311 FAX(978)740.0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction -;K Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic Districts Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property 19 'A Broad Street Name of Record Owner: David Leach&Laurie LaChanelle Description of Work Proposed: For the 2"d floor alcove window, option for either of the following: • Leave exterior of window as existing and block interior so that the window is no longer functional, but appears functional from the outside; or • Remove window, retaining the exterior window frame. Fill in frame with clapboards to match existing, including paint. The request to fill in the frame with glass block is NOT approved. Dated: February 8, 2007 SALEM HISTORICAL en �COMMISSION By: The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. A y ig s Y 0? f` J. I U� c t`J S Q yW -+J r � 1_ '' I,�I�Ihunu��null�n�gflltl!i�l!II�'!In�Illlt������lln�,.,, „ i b S O� ti Q'• Oi N i9 N•+ yr= `1 4'`1:I DW - _j e°► � , �� � � �: �} �M yrs �� `�� y�f9 �,�� �. r. i _._ � � � 4 rC to �'i �I A /( �g I �i s. �r J r (a �� 4 i ... � ,_ =�� �a r_ r� m. i E {y.. �U oui F W .J �� G ! \ � /� � � , �� yp �� Y�17 ,I S YYAN' �;. � , �, , , , a�-. , ; ,� � �� A r �' I i ��111411111111�I1111111111�II1117111111fr� I���IIIIIIIIIII _102162 LEACH1021 ime_1981 t+ i R �QJyi� r Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)745-9595 EXT 311 FAX(978)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction Alteration ❑ Demolition f Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District,as per the requirements set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property- 19 16 and 21 Rroad Street Name of Record Owner: David Leach&Laurie LaChanelle, Judith Zissulis Description of Work Proposed: Demolition of existing lean-to. Replace molding in kind as needed. Retain existing door. Option to remove both transoms if needed(either both remain or both be removed). Encourage installation of storm panel at 21 to match storm panel at 19 '/2. Replace concrete/brick stairs with wood porch and stair per drawing submitted,painted to match house trim. Dated: August 7, 2006 SALEM HISTO,,RICAL COMMISSION By `�IW "`RI�r ��`1-� The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. �V� - .: ,� i` �.�'•� / v da 1 ♦ � r� �=� .� � �" � e � � � l V kl-f Il' A r. i It f, . r i r ,® 1ZOTTI MHHOHI 2791-ea ® ` tip zzet p-PIf O l �G�, /' a q y P; I•t 1 A ♦ _ -- ct1 i-N � 102144 ims-1620 LAC:HAPELLE102 1 ��-'-� _- w �d� � ,. � ' � . ,� IZO13ll3dtlHJHI y79i-ew! ,�. bbT70i 2�V ry . p d¢ f ¢ .� �v A I � � - '�'"�+.y"- •�� I Pill 1 IT .J 4V i!h A �. DOVETAIL BUILDERS PROJECT, 4' X 12' DECK CUSTOMER: Lachapelle, Laurie DWG NO: REV SCALE: SHEET: OF IF- � II It: DOVETAIL BUILDERS PROJECT: 4' X 12 ' DECK CUSTOMER: Lachapelle, Laurie DWG N0: REV SCALE: SHEET: Of DOVETAIL BUILDERS PROJECT: 4' v 12 ' DECK CUSTOMER: Lachapelle, Laurie DWG NO: 005 - DTB - LL- DECK RX SCALE: 1 /16" - 1 0�� SHEET: OF ,4 01, q A e t •Jtµ •� ¢ `��M jj ��.�I �,t' . If ir4l' t � V 7 . S k f i .ice �'�} /"�" '•'ir. � �~ '' .nR •T• a� l pp �I'y i � 4 - - r t i .r_� x • Y'- .� _ y � � I1 �- �' _i n �F �° 09070 POLAR01Dtb3 ¢y t !'/ 4 � � . � i 1 �, ;�Il�ii��HNI�Nh, �.��i �- � . � ,, �� r ! _ sOIL 0 3 Salem Historical Commission 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970 (978)745-9595 EXT.311 FAX(978)740.0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving Reconstruction ❑ Alteration /❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 19 �G Broad Street Name of Record Owner: David A. teach& Laurie.i. LaChanelle Description of Work Proposed: Replacement ofgutter on side of house to replicate what was there. No changes in color, material, design or outward appearance. Non-applicable due to being in kind replacement. Dated: November 14,2003 SALEM H O AL COMMISSION By: The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. I, i � � G I a� 023 # 3 1114O'J03 CUS 01-1E HOUR f'}OT& _ 1 "deol 1 y,iAn l A �� ��4 C 023 # O"'`�I"'`t GI:! ONE HOUR F'UJTL r z O , x ^ q r • r r f:.. Ilk 'a�'.�, � �_ ¢:Y � � ��=° �y 4'1 � <. ey., .�. _� �.�%'�\ � _ ; , ��� 11 G t11�aIJ�1u3 Cli'::� UiJ " �'IU _ �. ��,, �� o �\ �— < .�\ .. ::'�� _ • r"a e. VPPF.i �1 023 if ? IINUJ0 CUS 01-IE 141JR KOTO Vil .T,CO\Vfil xF.ow• Salem Historical Commission ONE SALEM GREEN,SALEM, MASSACHUSETTS 01970 (508) 745-9595 EXT. 311 FAX (508) 740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 19 '/z - 21 %: Broad St. Name of Record Owner: 19 % - 21 '/z Broad St. Condo Trust Description of Work Proposed: Repair of concrete front steps to replicate existing. No changes in color, material, design or outward appearance. Non-applicable due to being in kind maintenance. Dated: October 14. 1997 SAL HISTORICAL COMMISSION By: 2i Qt The homeowner has the option not to commence the work unless it r tes to resolving an outstanding violation). All work commenced must be completed within az from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Insp--ctor of Buildings (or any other necessary permits or approvals)prior to commencing work. C� .l L ITITTTTTTTTTTTIT, , • . �I�l�l�l�ll�l,i����lllllll ! lillillllllllllllllllll ! LllllLlU.lr_ 5134+1-2 N- 31.-1 la p: IL r3 ` � w }Y.1 i • _max .. - ' +• 5114+1-2 N- 2L--1 t � r C � ��'' r. iy �(��� � �y ..+n �� '1'',',',,+,,,,,,,', S J . .f i '.:�����UWWWWUtI�� ��, .,...a 5134;1-2 N- X-1 i ...i n :<w. * .. •�w3. .. 5134+1-2 H- 2L-1 _ S,�gD]Vlyt Salem Historical Commission ONE SALEM GREEN,SALEM, MASSACHUSETTS 01970 (508) 745.9595 EXT. 311 FAX (508)740-0404 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving • Reconstruction ❑ Alteration ❑ Demolition zg� Painting ❑ Signage ❑ Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 19 V2- 21 %2 Broad Street Name of Record Owner: 19 '/1 - 21 '/2 Broad Street Condo Trust Description of Work Proposed: Paint colors: Body- Option of Tarrytown Green or Mill Springs Blue Sash, Doors& Shutters-Black Trim -Antique White Dated: September 18. 1997 SALEM HISTORICAL COMMISSION By:� � T-he homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indica.ed. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. ' + � >:y: �! <� 'i � , 3.�a-: ?� f.: �/�1�� f t LJ Ln W z .Z-" 2 Mot s: :s wwm m Wm '! r A c �4. [. � Y ►" �./ n -, � '� � � _, 0. �, ��� ��i i � � � %, �� � �p � �� J� i+ 1� S+ �,� :; t r_ �i I ''moi I Z � ,Fr: '� =,� _ �� _ �I , _ .I _�_SI� 4C _ Salem Historicai Commission ONE SALEM GREEN.SALEM.MASSACHUSETTS 01970 15081745-9595 EXT.311 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ® Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 1915-21' Broad St. Name of Record Owner: 191i-211g Broad Street Condominium Trust Description of Work Proposed: Replacement of existing fence in kind. No change in color, material, design or outward appearance. Non-applicable due to being an in kind replacement. Dated: 6/5/95 SALE . HISTORICAL COMMISSION t� Bv: T Cit CG1 I��i «rrY'?— The homeowner has the option not to commence the work (unless it z6ates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Ir-spector of Buildings (or any other necessary permits or approvals) prior to commencing work.