10 WHITE STREET - ZONING (2) CHAPTER 91 LICENSE No. .0
Application for' License Amendment
ASSOCIATES,INC.
' Proposed
Vine Associates,Inc. 'r ,�` 4 ,.-• .
372 Merrimac St.
' Newburyport,MA 01950 I'
978-465-1428 j
978-465-2640
�n
' ar ft+s�pY
s'x
1
Submitted to:
Department of Environmental Protection
Waterways Program
One Winter Street, 6th Floor
' Boston, MA 02108
Submitted by:
Vine Associates, Inc.
372 Merrimac Street `
Newburyport, MA 01950
1
February 4,2009
Susan St,Piero,AICP
,� PPoaipal
Vi n e Tel(978)465-1428 ext,202 n
ASSOCIATES,INC. Fax(978)465-2640
Newbu ort- Cell(781)439-2461
syp Hingham q0
wateetmnt consultants ssepierre@vineassociates.net �S N
372 Merrimac Street 333
NewburypoM MA 01950
Susan St.Pierre,AICP -
Prieaipal d
Vi n e Tel(978)465-1428 ext.202
ASSOCIATES,INC. F.(979)465-2640
Newburyport-Hingham-Bourne Cell(781)439-2461
sst.piette@vineassociates.net �
Waterfront Consultants
372 Merrimac Street
Newbutyport,MA 01950
/f2G� a �f/S-Co
;.-:.
/ry1 0� �G, r� /J�r
/� .S�' -
_���� ���
�a�r�i� ����,��
1
I
1
February 4, 2009
1 Mr. David Slagle
ASSOCIATES, INC.'�
1 Waterways Program
Department of Environmental Protection
Northeast Region
1 One Winter Street Newt+uryyort
Boston, MA 02108 Massachusetts
01950
1 Re: Proposed Replacement of Marina Building
Hawthorne Cove Marina (978)465-1428
DEP Chapter 91 License No. 1590 Fax
1 Dear Mr. Slagle, (978)465-2640
1 On behalf of the Hawthorne Cove Marina and pursuant to the state Chapter 91 regulations
at 310 CMR 9.24, Vine Associates, Inc. (VAI) is requesting an amendment to the above-
1 referenced Chapter 91 license to allow the reconstruction of the marina support building
lost to fire in 2007 at the Hawthorne Cove Marina in Salem, MA.
1 As shown on the attached plans, the footprint of the proposed structure (2,160 square feet)
is smaller than the footprint of the former structure (2,280 square feet) and the building will
1 be placed in a different location closer to shoreline. Additional information is presented in
Attachment 3. We have received an Order of Conditions from the Salem Conservation
Commission which is provided in Attachment 6.
1 If you have any questions, or require additional information, please do not hesitate to
contact our office. Thank you for your consideration.
1 Sincerely,
Vine Associates, Inc.
1
Susan St. Pierre
1 Project Manager
Attachments
1 CC: Russ Vickers
1
' INDEX
ATTACHMENT 1 Transmittal Form and Fee Payment
ATTACHMENT 2 Chapter 91 License Application Form and License Drawings
' ATTACHMENT 3 Project Description
I ' ATTACHMENT 4 Abutters List
' ATTACHMENT 5 License No. 1590
ATTACHMENT 6 Order of Conditions DEP# 64-485
1
1
1
' ATTACHMENT 1
Transmittal Form and Fee Payment
Enter your transmittal number r x226055
' I Transmittal Number
Your unique Transmittal Number can be accessed online: http://mass.aov/deo/service/online/trasmfrtn shtml or call
MassDEP's Infol-ine at 617-338-2255 or 800-462-0444(from 508,781,and 978 area codes).
Massachusetts Department of Environmental Protection
' Transmittal Form for Permit Application and Payment
1. Please type or A. Permit Information
print.A separate
' Transmittal Forth BRP WW03b Waterways License Amendment
must be completed 1.Permit Code:7 or 8 character code from permit instructions 2.Name of Permit Category
for each permit
application. Construct replacmement marina building
3.Type of Project or Activity
' 2. Make your
check payable to B. Applicant Information - Firm or Individual
the Commonwealth
of Massachusetts Hawthorne Cove Marina
' and mail it with a 1.Name of Firm-Or,if a needing this a
copy of this form to: party 9 approval is an individual enter name below:
DEP,P.O.Box Vickers Russ
4062,Boston, MA 2.Last Name of Individual 3.First Name of Individual 4.MI
02211. 10 White Street
5.Street Address
3. Three copies of Salem MA 01970 978.740.9890
this forth will be 6.Cityrrown 7.State 8.Zip Code 9.Telephone# 10.Ext.#
needed.
' Russ Vickers
Copy 1 -the 11.Contact Person 12.e-mail address(optional)
original must
accompany your
permit application. C. Facility, Site or Individual Requiring Approval
' Copy 2 must
accompany your Same as Above
fee payment. 1.Name of Facility,Site Or Individual
Copy 3 should be
' retained for your 2.Street Address
records
4. Both fee-paying 3.City/Town 4.Stale 5.Zip Code 6.Telephone# 7.Ext.#
and exempt
' applicants must 8.DEP Facility Number(if Known) 9.Federal I.D.Number(if Known) 10. BWSC Tracking#(if Known)
mail a copy of this
transmittal for,to: D. Application Prepared by (if different from Section B)*
' .O.Box 4062
PVine Associates, Inc.
P.O.Bo
Boston,MA 1. Name of Finn Or Individual
02211 372 Merrimac Street
' 2.Address
Newburyport MA 01950 978.465.1428 201
•Note:
For BWSC Permits, 3.Cityrrown 4.State 5.Zip Code 6.Telephone# 7.Ext.#
enter the LSP. Susan St. Pierre
' 8.Contact Person 9.LSP Number(BWSC Permits only)
E. Permit - Project Coordination
' 1. Is this project subject to MEPA review? ❑ yes ® no
If yes, enter the project's EOEA file number-assigned when an
Environmental Notification Form is submitted to the MEPA unit:
' EOEA File Number
F. Amount Due
DEP Use Only Special Provisions:
' 1. ❑Fee Exempt(city,town or municipal housing authority)(state agency if fee is$100 or less).
Permit No: There are no fee exemptions for BWSC permits,regardless of applicant status.
2. ❑Hardship Request-payment extensions according to 310 CMR 4.04(3)(c).
Rec'd Date: 3. ❑Alternative Schedule Project(according to 310 CMR 4.05 and 4.10).
' 4. ❑Homeowner(according to 310 CMR 4.02).
Reviewer., 11656 $105.00 2/2/2009
Check Number Dollar Amount Date
' Attachment 1 Transmittal Form.doc-rev. 1/07 Page 1 of 1
VINE ASSOCIATES,INC. o4,w NEWBURYPONTFIVECENrSSVGS SK 11656
372 Merrimac Street 53-715=113
Newburyport,MA 01950
978-05.1428 2/2/2009
Fax-978-085-2840
i
ORDER OFE Commonwealth of Massachusetts $ "105.00
One Hundred Five and 00/100•""""*"'"""""'••""'"•"'""""" """"""'•"•""""""""••"""•••"'•`•'•
DOLLARS 8
Commonwealth of MA
Chapter 91
11'01 L656 1: 21 k37 L5021: 2970 238 8ii'
VINE ASSOCIATES,INC. 11656
Commonwealth of Massachusetts 2/2/2009
Chapter 91-Hawthorne Cove 105.00
i
I
I
Checking/Newburypor Chapter 91 105.00
1
1
1
1
1
' ATTACHMENT 2
Chapter 91 License Application Form and License
' Drawings
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Waterways Regulation Program 22605
'
Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No.
Water-Dependent, Nonwater-Dependent,Amendment
Important:
Whenfilling outA. Application Information (Check one)
forms on the
computer,use NOTE: For Chapter 91 Simplified License application form and information see the Self Licensing
only the tab key Package for BRP WW06.
'. ' to move your
cursor-do not Name(Complete Application Sections) Check One Fee Application#
use the return
key. WATER-DEPENDENT-
, -IQ r General (A-H) ❑ Residential with <4 units $175.00 BRP WWola
❑ Other $270.00 BRP WW01b
❑ Extended Term $2730.00 BRP WW01c
Forassistance .............................................................................................._...............................................................
' in completing this Amendment (A-H) ❑ Residential with <4 units $85.00 BRP W W03a
application,please —
see the
"Instructions". ® Other $105.00 BRP WW03b
NONWATER-DEPENDENT-
Full (A-H) ❑ Residential with <4 units $545.00 BRP WW15a
1 ❑ Other $1635.00 BRP WW1 5b
' ❑ Extended Term $2730.00 BRP WW15c
............................................................._...................................................................._.._.._.._.._.._.._.._.._.._
Partial (A-H) ❑ Residential with <4 units $545.00 BRP WW14a
' ❑ Other $1635.00 BRP WW14b
❑ Extended Term $2730.00 BRP WW14c
1
.......................................................................---.._.._..__.._.
Municipal Harbor Plan (A-H) ❑ Residential with <4 units $545.00 BRP WW16a
' ❑ Other $1635.00 BRP WW16b
❑ Extended Term $2730.00 BRP WW16c
' Joint MEPA/EIR(A-H) ❑ Residential with < 4 units $545.00 BRP WW17a
❑ Other $1635.00 BRP WW17b
' ❑ Extended Term $2730.00 BRP WW17c
Amendment(A-H) ❑ Residential with <4 units $435.00 BRP WW03c
❑ Other $815.00 BRP WW03d
' ❑ Extended Term $1090.00 BRP WW03e
1
CH91App.doc•Rev.6/06 Page t of 13
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Waterways Regulation Program 22605
'
Chapter 91 Waterways License Application -310 cMR 9.00 Transmittal No.
Water-Dependent, Nonwater-Dependent,Amendment
' B. Applicant Information Proposed Project/Use Information
1. Applicant:
' Russ Vickers l
Name E-mail Address
10 White Street
' Mailing Address
Note:Please refer
to the"Instructions" Salem Massachusetts 01970
Cityrrown State Zip Code
t 978.740.9890 11
Telephone Number Fax Number
2. Authorized Agent(if any):
' Vine Associates, Inc. s . Jerre vmeassocla s.ne
Name E-mail Address
372 Merrimac Street
' Mailing Address
Newburyport Massachusetts 01950
Cityrrown State Zip Code
' 978.465.1428 978.465.2640
Telephone Number Fax Number
C. Proposed Project/Use Information
' 1. Property Information (all information must be provided):
0
' Owner Name(if different from applicant)
Map 41, Parcels 283, 284 and 298 42 deg 31' 20" 70 deg 52'59"
Tax Assessors Map and Parcel Numbers Latitude Longitude
10 White Street, Salem Massachusetts 01970
' Street Address and Cityrrown State Zip Code
2. Registered Land ❑ Yes ® No
3. Name of the water body where the project site is located:
Salem Harbor
4. Description of the water body in which the project site is located (check all that apply):
' Type Nature Designation
❑ Nontidal river/stream ❑ Natural ❑ Area of Critical Environmental Concern
' ❑ Flowed tidelands ❑ Enlarged/dammed ❑ Designated Port Area
® Filled tidelands ❑ Uncertain ❑ Ocean Sanctuary
❑ Great Pond ❑ Uncertain
' ❑ Uncertain
CH91App.doc•Rev.6/06 Page 2 of 13
1 Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Waterways Regulation Program 22605
'
Chapter 91 Waterways License Application - 310 cMR 9.00 Transmittal No.
Water-Dependent, Nonwater-Dependent,Amendment
' C. Proposed Project/Use Information (cont.)
Select use(s)from
Project Type Table 5. Proposed Use/Activity description
' on pg.2 of the
"Instructions" Construction of a new 36 foot by 60 foot single story marina building that will replace a slightly larger
building lost to fire in 2007 and installation of associated utilities. See Attachment 3, Project
Description.
' 6. What is the estimated total cost of proposed work(including materials & labor)?
' $375,000
7. List the name &complete mailing address of each abutter(attach additional sheets, if necessary). An
' abutter is defined as the owner of land that shares a common boundary with the project site, as well
as the owner of land that lies within 50' across a waterbody from the project.
See Attachment 4
' Name Address
Name Address
' Name Address
1
D. Project Plans
' 1. I have attached plans for my project in accordance with the instructions contained in (check one):
® Appendix A(License plan) ❑ Appendix B (Permit plan)
' 2. Other State and Local Approvals/Certifications
❑ 401 Water Quality Certificate
' Date of Issuance
®Wetlands 064-485
File Number
❑ Jurisdictional Determination JD-
File Number
❑ MEPA File Number
' ❑ EOEA Secretary Certificate
Date
❑ 21E Waste Site Cleanup
' RTN Number
CH91App.doc•Rev.6/06 Page 3 of 13
1
' Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Waterways Regulation Program 226055
' Chapter 91 Waterways License Application - 310 CMR 9.00 Transmittal No.
Water-Dependent, Nonwater-Dependent,Amendment
E. Certification
All applicants, property owners and authorized agents must sign this page. All future application
correspondence may be signed by the authorized agent alone.
' "I hereby make application for a permit or license to authorize the activities I have described herein. Upon
my signature, I agree to allow the duly authorized representatives of the Massachusetts Department of
Environmental Protection and the Massachusetts Coastal Zone Management Program to enter upon the
premises of the project site at reasonable times for the purpose of inspection."
"I hereby certify that the information submitted in this application is true and accurate to the best of my
knowledge."
rValitit,
' Applicant's signature J Date
Property Owner's signature(if different than applicant) Date
Agent's signature(if applicable) Date
' CH91App.doc•Rev.6/06 Page 4 of 13
1
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Waterways Regulation Program 22605
'
Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No.
Water-Dependent, Nonwater-Dependent,Amendment
' F. Waterways Dredging Addendum
1. Provide a description of the dredging project
' ❑ Maintenance Dredging (include last dredge date R permit no.) ❑ Improvement Dredging
No Dredging Proposed
' Purpose of Dredging
2. What is the volume(cubic yards)of material to be dredged?
3. What method will be used to dredge?
❑ Hydraulic ❑ Mechanical ❑ Other
4. Describe disposal method and provide disposal location (include separate disposal site location map)
1
1
5. Provide copy of grain size analysis. If grain size is compatible for beach nourishment purposes, the
Department recommends that the dredgedmaterialbe used as beach nourishment for public
beaches. Note: In the event beach nourishment is proposed for private property, pursuant to 310
CMR 9.40(4)(a)1, public access easements below the existing high water mark shall be secured by
applicant and submitted to the Department.
1
1
� 1
CH91App.doc•Rev.6/06 Page 5 of 13
i 1
o'er
T�
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Waterways Regulation Program 22605
' Chapter 91 Waterways License Application -310 cMR 9.00 Transmittal No.
Water-Dependent, Nonwater-Dependent,Amendment
' G. Municipal Zoning Certificate
City of Salem
Name of Applicant
' Hawthorne Cove Marina Salem Harbor Salem
Project street address Waterway City/Town
1 Description of use or change in use:
Construction of a new 36 foot by 60 foot single story marina building that will replace a slightly larger
building lost to fire in 2007 and installation of associated utilities.
tTo be completed by municipal clerk or appropriate municipal official:
' "I hereby certify that the project described above and more fully detailed in the applicant's waterways
license application and plans is not in violation of local zoning ordinances and bylaws."
ll
' Thomas St. Pierre d
Prints a of Municipal Official Date
' Inspectional Services Director Salem
Signature of M icipal Official Title City/Town
1
CH91 App.doc•Rev.6/06 Page 6 of 13
1
1 Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Waterways Regulation Program 226051
' Transmittal No.
Chapter 91 Waterways License Application -310 CMR 9.00
Water-Dependent, Nonwater-Dependent,Amendment
' H. Municipal Planning Board Notification
Notice to City of Salem
Applicant: Name of Applicant
t Section H should Hawthorne Cove Marina Salem Harbor Salem
be completed and Project street address Waterway City/rown
submitted along
' with the original Description of use or change in use:
application material.
Construction of a new 36 foot by 60 foot single story marina building that will replace a slightly larger
building lost to fire in 2007 and installation of associated utilities.
1
1
To be completed by municipal clerk or appropriate municipal official:
"I hereby certify that the project described above and more fully detailed in the applicant's waterways
license application and plans have been submitted by the applicant to the municipal planning board."
' Lynn Duncan, Director Department of Planning & Development
n d Name of Municipal official Date
Salem
' Sig t re of Municipal Official Title City/Town
' Note: Any comments, including but not limited to written comments, by the general public, applicant,
municipality, and/or an interested party submitted after the close of the public comment period
pertaining to this Application shall not be considered, and shall not constitute a basis for standing in
any further appeal pursuant to 310 CMR 9.13(4)and/or 310 CMR 9.17.
1
CH91App.doc•Rev.6/06 Page 7 of 13
1
w w w w w w w w w wI w w w w w w w w w
CERTIFY THAT THIS PLAN ,
AS PREPARED , CONFORMS TO
THE RULES AND REGULATIONS
OF THE REGISTERS OF DEEDS .
T
PILINGS
O -L
�
Jo N � aW Z.u LL 4 O lr
W-1i op3p Q1a 3Q
Z m a X17 U
z � < F s
p
0 a wo o m v2 p a n Z
w o ��z 0 0 LOCUS MAP
n 3Oo
J ) L3 t,• VMV3S 31INV89 J
CONC. oG
7a o WNQ VN^ �I j %K? GRA'S
c➢
U
W,Gap jm wa y W w
QaW 3r � W � NI zit .y„ e
Ln uJ
O WJ / / OQ 0 In
Qz0
3 o Z y w (D 3 P7
KN
Z H
O w69'i WVVV
o"Q DWELLING I
2
a
U S
Jaz a3 o�z I d�� �ml bo w �
-
wz yA M 20
< <02 I11 Q J
Vpm hal °?� QOM it K ti' Nm
W A J o p Q
w a d EXIS�NG gU1lDIN
TRA1 E BLE w z
�4x go
Q3 �z. om
iz Z
_ Aab �K a3 30
a $
�g FU J o
J 'AGF 7 8"DRAIN 3
/=030
pD`'.KENGE
WO FRA $<
WHITE STREET „ OD
STORY WO
WIDTH) 11`, 2
(PUBLIC-VARIABLE 1� 2 DWELLING a Q
1 CONDOMNUM PLAN
PLAN BOOK 155.PLAN 50 Tnommmmd
SHEET 1 OF 2
PLAN ACCOMPANYING THE PETITION OF:
HAWTHORNE COVE MARINA
MARINA BUILDING REPLACEMANT
SALEM HARBOR
SALEM, MA
JANUARY 2009
VINE ASSOCIATES, INC.
CERTIFY THAT THIS PLAN ,
AS PREPARED, CONFORMS TO
THE RULES AND REGULATIONS
OF THE REGISTERS OF DEEDS .
�m
-ING
Q �
Z� (001)
P pl 01
o THIS 3:
baa iy w r
Jo f N aw o LL 2 Z
0 J
p ¢
CID 'u
Z o
�3p w K w p
MIW..Y•.. 410 ¢ 4w v=i O ¢ a •. O Z
0
u
J ° "'� � a oY (�• •VM""(3S �11Ng'?J`J �j w
r "'o _ mow ZG
"� '"� SONC. -M 3
XO O u,oggCC leI�,yy�''
_WU w _ LSH zU��r "T -
a dM o nP
G
-
Zs� am � k v W_ Otis IVII 330'<� �I oryp
� awn 0�Q3Sp �.
3 I O Z D
\I�zO
V~i N pas +"e —00
x OdQ _ - ^81I w>-
w NI
o�m0 Wc>
< DWELLING Y z
M1
• 2 I� O
QQ- K W'w w
X00^ V ..I zoo LZN
d ' ¢
g
w<r0 �a n=O O'• ZZ 1 z00wx ¢�
V'mU,' ^R:� roo�7 F9Q 1 J cis � m =0
� a1UJ}_
Z
Uw o w xw x5w
wm wm
wmWpp
�
1- r
u, �wvL� EX15 NG UILDIN _ %'is d
\V N iRA1LERs RT BlE w ww-,x o z a u
.Qf�µ z` 30
a r U i p
B"DRAIN Z0? gl 3
WO I-0.0 1 F2¢ ,
R=/3_QWw
tiv 3 OAwK WJ _ vs.T c
0¢ m
¢ti
��i h o Jzo 7 O z a�w
V" D FRA zpoS
WHITO
E STREET z+SiORY Wp
(PUBLIC-VARIABLE WIDTH) 11
111 2 DWELUNGIHAN ELS LANDING
III CONDOMINIUM IRD5!
PLAN BOON 156. PLAN 50
PLAN ACCOMPANYING THE PETITION OF:
HAWTHORNE COVE MARINA
MARINA BUILDING REPLACEMANT
SALEM HARBOR
SALEM, MA 9 aoe
JANUARY 2009 ===TM=5=mu=EW SHEET 2 OF 2
VINE ASSOCIATES, INC.
1
1
1
1
1
1
1
1
1
' ATTACHMENT 3
' Project Description
1
ATTACHMENT 3
APPLICATION FOR AMEDNDMENT TO CHAPTER 91 LICENSE No.1590
Marina Building Replacement Project
Hawthorne Cove Marina
' 10 White Street, Salem,MA
PROJECT DESCRIPTION
A. Introduction
Hawthorne Cove Marina, Inc. desires to construct a new 2,200 square foot (so, one-story wood
' frame marina support building and remove two existing portable/trailer structures from its
existing facility on White Street in Salem, MA. Also included is related utility work (water,
electric, gas,sewer) to serve the new building including a sewer pump station and outlet pipe to
' the nearby City sewer system in Turner Street. The new building will replace a building lost to
fire in 2007.
' B. Site Description and Use
' The Project site is the existing Hawthorne Cove Marina property bounded by Derby Street to
the north, White Street to the east, Turner Street to the west, and Salem Harbor to the south
containing approximately 1.83 acres. Approximately 0.34 acres (15,000 so of the site and related
' facilities are located on filled tidelands authorized under several under Chapter 91 Licenses
listed on Table 1. The entire site consists of a gravel surface. The existing stormwater drainage
' system is limited to one catch basin connected to a 24 inch storm drain line that runs through
the site.
' The site currently contains a small 1-story building used as an office, a 2-story building with
office/laundry/bathroom facilities and several small sheds used for operations and
maintenance tools and supplies. Also on the site are several temporary portable/trailer
structures providing additional workshop and maintenance space to replace the space lost
when the fire destroyed the marina support building in 2007.
' The site is utilized as a marina with the backland used for vehicle parking during the boating
season and storage of boats during the off-season. A boat lift system is utilized to move boats to
' and from the water.There is a boat wash area located just landward of the boat lift.
Hawthorne Cove Marina -Chapter 91 License Amendment Application Project Description • Page 1 of 3
Table 1
Chapter 91 Authorization
License Issuing Authority Date of Issuance Purpose
No.
3348 Harbor&Land Commissioners 1909 Construct solid
' wharf
3615 Harbor&Land Commissioners 1911 Construct seawall
and fill
1774 1921 Fill between two
solid piers and
relocated drain line
' 1792 Department of Public Works 1936 Construct Timber
Pier
' 1729 Department of Public Works 1935 Construct Timber
Pier
2774 Department of Public Works 1945 (plan only) Material Disposal
from Dredging and
piling for proposed
boat anchorage
2963 Department of Public Works 1947 Construct boat
anchorage
' 4752 Department of Public Works 1963 Place floating pier
and finger floats and
construct boat ram
' 250 Department of Environmental 1977 Construct and
Quality Engineering maintain stone dike,
fill,piers,travel lift,
ramps,floats,finger
floats,mooring piles
' and t o dredge in
Salem Harbor
1590 Department of Environmental 1986 Re-configure and
' Quality Engineering maintain pile held
float system and
dredge
1
Hawthorne Cove Marina -Chapter 91 License Amendment Application Project Description • Page 2 of 3
li
' C. Proposed Project Work
' The proposed Project includes the following elements as depicted on Sheet 2 of 2 of the Chapter
91 License Plans:
' • Construction of a new 2,200 sf 1-story wood frame building.
This new building will be utilized as office space and marina support space including
I' restroom facilities. The foundation will be a post tensioned concrete slab at grade.
• Installation of utilities to serve the new building.
' Water and electricity will be obtained from on-site connections to existing buildings. Gas will
connect to existing services in Turner Street. A new packaged sewer pump station will be
installed on site with outlet piping to the City sewer at an existing manhole in Turner Street. This
' new sewer pump station and connection to the public system will handle the sanitary waste from
the new building and adjacent existing building to replace an existing inadequate on-site septic
' system.
• Removal of existing temporary trailer structures.
' Existing portable trailer structures providing office,workshop, and storage facilities will
be removed from the site once the new building is constructed.
D. Waterways Resource Areas
The site is comprised of filled and flowed tidelands. No work is proposed in flowed tidelands.
The proposed building and utilities will be constructed in filled tidelands that are already used
for marina related purposes.
Hawthorne Cove Marina -Chapter 91 License Amendment Application Project Description 9 Page 3 of 3
1
1
1
1
1
t
ATTACHMENT 4
Abutters List
1
' ATTACHMENT 4
ABUTTERS LIST
' 41_0278_0 41_0285_801
' Dominion Energy Salem McCauley Denise M.
625 Liberty Ave 18-1 6 White St. U1
Pittsburgh,PA 15222 Salem, MA 01970
41_0294_0 41_0285_802
Haley Linda C Lawrence,Christopher P
43 Turner St 6 White St. U2
Salem, MA 01970 Salem,MA 01970
41_0285_803
41_0295_0 Whittleton Brett A
Iwanicki Anthony Jr 6 White St. U3
47 Turner St Salem,MA 01970
' Salem,MA 01970
41_0285_804
41_0296_0 Naranjo Carol
i ' Northrup Sandra J 6 White St. U4
49 Turner St Salem,MA 01970
Salem,MA 01970
' 41_0285_805
Smith George L
41_0297_801 6 White St. U5
' Weeks,Jeffrey R Salem,MA 01970
53 Turner St U1
Salem,MA 01970
41_0299_802
'
Zbyszynski John F
55 Turner St U2
Salem,MA 01970
1 41_0299_0
House of Seven Gables
' 115 Derby St.
Salem,MA 01970
1
1 Form WD 54
1 OPP (nvmmnnturatT4 of fRafiliar4wrttff
1
No. 1590
1
Darbie Landing Limited Partnership
1
Of Salem in the County of Essex and Commonwealth
1 aforesaid, has applied to the Department of Environmental Quality Engineering for license to
reconfigure and maintain an existing pile-held float system and to dredge
and has submitted plans of the same; and whereas Sue notice of said application, and of the time and
place fixed for a bearing thereon,has been given,as required by law,to the Mayor and
1 City Council of the city of Salem
1
Whin said Department, having heard all parties desiring to be heard, and having fully considered
1 said application, hereby, , authorizes and licenses the said
1 Darbie Landing Limited Partnership subject to the provisions of the ninety-firstchaptei ,
of the General Laws, and of all laws which are or may be in force applicable thereto, to
' reconfigure and maintain an existing pile-held float system and to dredge
in and over the waters of Salem Harbor and in accordance with the locations shown
and details indicated on the accompanying DEQE License Plan No. 1590
1 (5 sheets).
1 _
1
J
�I 1
1
1
1
t
ATTACHMENT 5
License No. 5490
' License:No. 1590
Page 2
The Licensee shall reconfigure and maintain an existing
p
system and dredge in and over the waters of Salem Harbor and describedfl at
follows.
An existing pile-held float system as depicted on DEQE License Plan No.
' 1590 (sheet 1 of 5), previously authorized under DEQE License No. 250 and
D.P.W. Licens Nos. 4752, 2963, and 1792, shall be reconfigured as shown on
said License Plan (sheet 2 of 5).
' Two irregularly shaped areas as shown on said License Plan (sheet 1 of 5)
shall be dredged to a typical depth of 7 feet below the mean low water datum.
Approximately 6,700 cubic yards of sediment shall be dredged with all dredge
' spoils to be disposed of at the "Foul Area. "
All work authorized hereby shall be performed in strict accordance with
the Order of Conditions issued to said Licensee by the Salem Conservation
' Commission on September 25, 1986 and the Water Quality Certification issued
by DEQE Division of Water Pollution Control on November 19, 1986.
' The structures authorized hareby shall be limited to the following use:
commercial recreational boating facilities.
All. work authorize
th the details d herein shall. be,-in the -.location shown and- in-accordance'
wiindicated on bEQE License Plan No. 1590.
1
Please see page 3 for additional conditions to this license.
1
' Dupliclte of said plan, numbered 1590 is on file in the office of said De
and original of said plan accompanies this License, and is to be referred to as a part hereof. pent
The amount of tide-water displaced by the work hereby authorized has been ascertained by said
Department,and compensation thereof has been made b the said
Partnership Y Darbie Landing Limited
' Waterways License No. 1590
Page 3
t
STANDARD LICENSE CONDITIONS
'
I. Acceptance of this Waterways License
shall
the Licensee, to conform with all terms andconditiions�statednherein.aremby
' 2. This . License is granted upon the express condition that any and all
other applicable authorizations necessitated due to the provisions hereof
1 shall be secured ELIE to the commencement of any activity authorized
pursuant to this License.
' 3. Any change in use or substantial structural alteration of any structure
or fill authorized pursuant to this License shall require the issuance by
. the Department of a new License in accordance with the provisions and
procedures established in Chapter 91 of the Massachusetts General Laws.
' Any unauthorized change in use or substantial structural alteration of any
structure or fill authorized in this License shall render the License
void. This License granted... by. the Department pursuant to this. chapter
shall be revocablefor- noncompliance -with the terms and conditions set
forth herein.
4. Nothing in this License shall be construed as authorizing encroachment
� ( in, on, or over property not owned or controlled by the Licensee, except
with the written consent of the owner or owners thereof.
' 5. This License is granted subject to all applicable Federal , State,
County, and Municipal Laws, ordinances and regulations.
6. This License is granted upon the express condition that use by boats or
' otherwise of the structure(s) and/or fill authorized hereby shall not
involve any discharge of wastewater, sewage, petroleum products., or other
Polluting matter into adjacent waters, except in strict conformance with
the requirements and authorizations of any applicable local and State
health departments and the DEQE Division of Water Pollution Control .
' This License . is granted upon the express condition that the Licensee,
its essors and assigns, shall upon request in writing by the
Department, n e the location of said
herein, lower to h depth, raise it to authorized
' entirely from . said wat suc _Ye_i`glit,or remove it
as the Department may prescribe. Said
Licensee; by accepting this Li e, shall be deemed to consent and agree
to this condition. In the case of re 1 or neglect of a request by the
' Department on the part . of the Licensee, uccessors and assigns, to
comply with this condition, the License shall wholly void and the
Commonwealth may proceed to remove or cause
said _ at the expense of said Licensee, itsremovessoal o
and assigns, as en rs
waters. unauthorized and unlawful structure and/or fill in s
'
License No. 1590
Page 4
' by paying into the treasun•of the Commonwealth Two dollars and no cents ($2.00)
for each cubic yard so displaced, being the amount hereby assessed by
( said Department (40 cubic yards)
' Nothing in this License shall be so construed as to impair the legal rights of any person.
This License shall be void unless the same and the accompanying plans are recorded within
' 60 days
xflg, xr from the date hereof,in the Registry of Deeds for the Southern
District of the County of Essex
' In 33]Llttr55 M4rrre5, said Department of Environmental Quality Engineering have hereunto
set their hands this twenty—seventh day of Jams-:,y
' nineteen hundred and eighty—se r in the year
' Commissioner
Chief Engineer
' Division birecto <3-' - ' Department of
Environmental Quality
Engineering
THE COMMONWEALTH OF MASSACHUSETTS
by the said
' of the further sum of
the amount determined by the Governor as a ju equitable charge for rights and privileges
i , hereby granted in land of the Comm a th,
BOSTON. .. . ... ........
..............
..... .. . . . ... .. ... .. .
. .. ............ ......... .
Governor
q�TRUE COPY—qT[W
CSRT F WR
WAL'n 04GUeMNG
' mveah6 of Mart
\SALEM", MA 01970
v, 3n u
NATHANIEL S ING CONDOMINIUM TRUST
WHITE STR
' SALEM, MA 01970 - _1.
ROBERT DIANE L. r �0> ,.ary.3* s ✓`v
43T BEET
L A RB u n`
w
' 1970
... i. e B.BtC:a :wnp
i
ANTHONY I WAN I CK I , JR. N.O.A.A.CHAFlT 13275
' 47 TURNER STREET _ -- • --
SALEM, MA 01970 PRIOR LICENSE DATA
BRAD ORD C. • & SANDRV). NORT P ` #250 (1977)
49 T NER STREET #4752 (1963)
MA 01970 #2963 (1947)
� JOHN L. �lERQAfJ ..0:0•-..,
�0 55 TURNER STREET. :- #2774 (1945)
' to ALEM., MA-S197 #1792 (1936)
a #1729 (1935)
' w \
� g
7 MLWS:
Z xa \ .
' W
t �
W CD
Wbi
Q O^l
41 fn O
N
Li)F=—w 1 • FLOOD
' s e.,vJ 1 3 _ EBB
LTK Or
DATUM: MLW = 0.0 FEET
50 0 50 100 :
SCALE IN FEET I SALE RBOR
' � r� 3 h
/ - `L V%
I �Ia1-CR Q ��
' PLANS ACCOMPANYING PETITION OF P . N OF, EXISTI CONDITIONS
DARBIE LANDING LIMITED PARTNERSHIP SHEET 1 OF 5 g6 lA/.
TO MAINTENANCE DREDGE, MODIFY FLOAT LICENSE PLAN NO
ARRANGEMENT, CONSTRUCT AND APGrove-d by ^e _;in eet ot -. ;:renn�, QIIy- Engineerin
MAINTAIN RAMPS, FLOATS, FINGER FLOAT ,f bf„
' AND MOORING PILES IN SALEM HARBOR CO lollI3 ICwR
CITY OF SALEM COUNTY OF ESSEX, MASS — O'VISION DIRECTOR
AUGUST 1986 - --•--- ' SFCTICti' cHiEF
vnimiuuiimroinnivamu nurini i h -e
///// // O //I'///// //////////.ii/// ///b,qp p/I fl// .f 1 iii 1 �.0 �:
01017
// l!i s/ '• .::. i/ t II e .. /rusniensii�f/ft%ff sfq//i I s 'f.iJ,'�/.//// Rill
� _ __ —_ _ _ • • • •
QUI: r�lr•.,/ � - — 1�Wii1
lNM'y<:Yr.4T�fi -k`:' !.3'2asa �n ren"Y6 rypy
aY3 �
- ggl��
�liB-
III III I III w G • ,1 •� • ��^—�_-�I a`�!I;�I:II�I;'
• ` ull � ��I�II!!III'
fit N/
, ,/ ow
%IIII II II
/I'. .II II .. I Iii III IIS
IIII
e'•�iiiiiiii v�.vi.,.i„ieiiiiiuiiiiiiiiiiiir//oo/ioiii/loll/i/ o////////�
/ %/%///////%///////////////////////////////////%%ii//////ii..._
90,
5 —3
—7"
SECTION( A —A tit°`«•
? BRULE
f 0.' G'
MATERIAL TO BE DREDGED 8 roeussoN 1�
ESTIMIS
ATED DREDGE QUANTITY = 6,700 CY `
225'
1 -7
_J1
SECTION B — B 5
10 20
DREDGE SECTIONS SCALE IN FEET
' (LOCATED ON SHEET7,3
1 _ 2X6 RAIL
2X4 P
/J 4X4 POST
x-14
1 w NFRONT ELEVATION r
� o
ti MHW=8.8
1 V I I WOOD PILE —
LU
a
cl) q
ui
1 I I z MEWS=_1 - - I - ---
SIDE ELEVATION
1 I
2 1 0 2 PLAN Approved by Department of Environmental Quality Engineering
4 Date.'�Kvoat y
grv%i C IAI Cr CT _Agx^,A,AV n. Z{,)4 97
1 EXIST. GRANITE WALL
EXIST, BLDG.
1I till CANTILEVERS OVER W, LL
3 12 15'
1 �
1 w 55
PLAN
1 WOOD RAILING
12X12 p
f _
1 TIMBER ILE
L 1 3X 10 RACE
11�
ELEVATION
1 EXIST. GRANITE WALL
MHW=8.8
1
1 MLW=0.0
1 i
1 SECTION
1 WOOD DECK DETAILS
0. >
TOB6lm A
Na M
10 5 0 2ws
s
IL
SCALE IN FEETgtcece O .
ff11., t''i Department o1 Environ�SqO
i
3s 8' 40
f
1 - 6
35' SINGLE SLIP 16 16' 40' SINGLE SLIP
4' 4'
WOOD OR CONC SURFACE DECK TIMBER OR STEEL PILE
' CORNER KNEE
35' DOUBLE SLIP co N
30'DOUBLE SLIP
4 35' 30' 3.5'
fFREEBOARD — 1WTO 22'• PLAN
� POWER POST �
MHW=8.8'
' PONTOON FLOTATION
i MLW=OA'
—7'
' ELEVATION �y+E �MME 4
0� 0 TYPICAL SLIP SETS0.
:
' SCALE IN FEET z119. 26973 Yw
LICENSE PLAN' NO. /5940
Approved I* Cepa„•hent of Environmental Quality Engineerinr�,
r
' Date:�KtAuKfj -Z-711C1187 (�ALA�Ac-e o_
1
1
i
1
I '
1
1
' ATTACHMENT 6
' Order of Conditions DEP # 64-485
CITY OF SALEM
k" CONSERVATION COMMISSION
January 29, 2009
Susan St Pierre
' Vine Associates
372 Merrimac Street
Newburyport,MA 01950
I , Re: Order of Conditions—DEP#64-485
Hawthorne Cove Marina, 10 White Street,Salem Massachusetts
Dear Ms. St. Pierre:
' Enclosed, please find the Order of Conditions for the above referenced project.
Following the 10-day appeal period (as of February 12, 2009), this document and the
attached Special Conditions must be recorded at the Essex County Registry of Deeds
' (Shetland Park 45 Congress Street, Suite 4100 Salem, Massachusetts). Once recorded,
please return a copy of Page 9 of the Order, which will indicate to the Commission that
the document has been recorded.
' As indicated in the Order,prior to any work commencing:
1. this Order must be recorded,
2. a sign shall be displayed showing DEP File#64-485 within public view, and
' 3. contact me at least 48 hours prior to any activity to schedule a pre-construction
meeting to review the Order with your hired contractor.
If you have any further questions,please feel free to contact me 978-619-5685.
Sincerely,
' Carey D ques
Conserv tion Age U Staff Planner
Enclosures
' CC: DEP Northeast Regional Office
Russ Vickers, Hawthorne Cove Marina
1
1
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands MassDEP File Number:
WPA Form 5 — Order of Conditions 64-465
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
' A. General Information
' Important: Salem
When filling 1. From: Conservation Commission
out forms on
the computer, 2. This issuance is for(check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions
' use only the
tab key to 3•To: Applicant:
move your
cursor-do not Russ Vickers
' use the return a. First Name b-.Last Name
key. Hawthorne Cove Marina
c.Organization
ID° 10 White Street
' qh d.Mailing Address
Salem MA 01970
e.City/Town I.State g.Zip Code
' 4. Property Owner(if different from applicant):
a.First Name b.Last Name
c.organization
' d.Mailing Address
e.City/Town I.Stale g.Zip Code
5. Project Location:
10 White Street Salem
a.Street Address b.City/rown
' 41 Lots 283, 284, and 298
c.Assessors Map/Plat Number d.Parcel/Lot Number
Latitude and Longitude, if known: 42 deg. 31'20" 70 deg. 52'59"
e.Latitude f.Longitude
' s. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel):
Essex 63244
I ' a.County b.Certificate Number(if registered land)
11868 86
c.Book d.Page
7. Dates:i ' November 25 2008 January 8, 2009 Janaury 29, 2009 a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance
8. Final Approved Plans and Other Documents(attach additional plan or document references as
needed):
Notice of Intent Hawthorne Cove Marina Building Construction
a.Plan Title
David B. Vine David B.Vine
b.Prepared By c.Signed and Stamped by
' November 2008 1"=40'
d.Final Revision Date e.Scale
Hawthorne Cove Marina Construction of New Marina Building and Received 1/8109
' Installation of Associated Utilities-Construction Plan g.Date
vryafwmS.Cae• rev:Mill Installation
1 of 11
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands MassDEP File Number:
WPA Form 5 — Order of Conditions 64-485
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
' B. Findings
' i. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
' work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ❑ Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
i ' d. ❑ Private Water Supply e. ❑ Fisheries f. ❑ Protection of Wildlife
Habitat
1 g. ❑ Groundwater Supply h. ® Storm Damage Prevention i. ❑ Flood Control
z. This Commission hereby finds the project,as proposed,is:(check one of the following boxes)
i ' Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance standards set
forth in the wetlands regulations.This Commission orders that all work shall be performed in
' accordance with the Notice of Intent referenced above, the following General Conditions, and any
other special conditions attached to this Order.To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent,these
' conditions shall control.
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the
t wetland regulations.Therefore,work on this project may not go forward unless and until a new Notice
of Intent is submitted which provides measures which are adequate to protect these interests, and a
final Order of Conditions is issued. A description of the performance standards which the
' proposed work cannot meet is attached to this Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site,the work, or the
effect of the work on the interests identified in the Wetlands Protection Act. Therefore,work on this
' project may not go forward unless and until a revised Notice of Intent is submitted which provides
sufficient information and includes measures which are adequate to protect the Act's interests,and a
final Order of Conditions is issued. A description of the specific information which is lacking and
why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c).
tinland Resource Area Impacts: Check all that apply below. (For Approvals Only)
3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and
' wetland boundary(if available) a.linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
' 4. ❑ Bank a.linear feetb.linear feet c.linear feet d.linear feet
5. ❑ Bordering Vegetated
Wetland a.square feet b.squarefeet c.square feet it.square feet
6. E] Land Under W aterbodies a.square feet b.square feet c.square feat d.square feet
and Waterways
' e.6y dredged f.riy dredged
wpaform5.0ac• rev.$NB Pape 2 of 11
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 64-485
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
' B. Findings (cont.)
' Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
7. [:1 Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet I.cubic feel g.cubic feet h.cubic feet
8.. ❑ Isolated Land Subject
to Flooding a.square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet I.cubic feet
' s. ❑ Riverfront area a.total sq.feet b.total sq,feet
Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feel
' Sq It between 100-200 k square feet h.square feet I.square feet
9 9 q q ],square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
' la. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
' 11. ❑ Land Under the Ocean a.square feet b.square feet
c cfy dredged d.cly dredged
i ' 12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13. ❑ Coastal Beaches a.square feet b.square feet a cry nourishmt. d.cly nourishmt
' 14. ❑ Coastal Dunes
a.square feet b.square feet a cly nourishmt. d.dy nourishmt.
15. ❑ Coastal Banks a.linear feet b.linear feet
' 16. ❑ Rocky Intertidal Shores a.squarefeet b.square feet
17. ❑ Salt Marshes
' a.square feet b.square feet c.square feet d.square feet
16. ❑ Land Under Salt Ponds a.squarefeet b.square feet
c.Gy dredged d.cly dredged
19. [1 Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
' 20. ❑ Fish Runs Indicate size under Coastal Banks,inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
My dredged b.cty dredged
21. ® Land Subject to Coastal 2,800 2,800
' Storm Flowage a.square feet b.square feet
wpafarm5.dcc• rev.Slee Page 3 Or 11
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 64-485
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
I , C. General Conditions Under Massachusetts Wetlands Protection Act
' (only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
' measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
t injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal,state,or local statutes,ordinances, bylaws, or regulations.
' 4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
' b. the time for completion has been extended to a specified date more than three years, but less
than five years,from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
' set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
' 6. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster,wire, lath, paper,cardboard,
pipe, tires,ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
' 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
' Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land,the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done.The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
' which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
' size bearing the words,
"Massachusetts Department of Environmental Protection"[or, "MassDEP"]
"File Number 64-485
1
' wPabrn6.doc• rw.5/08
Page 4 0111
Massachusetts Department of Environmental Protection
- Bureau of Resource Protection -Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 64-485
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
' 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP.
11. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of
tCompliance(WPA Form 8A)to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
' 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order,and may require the submittal of any
tdata deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the property
' subject to this Order and to any contractor or other person performing work conditioned by this Order.
16. Prior to the start of work,and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
' stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
I , stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or
water body. During construction,the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed.The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
' NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
18. The work associated with this Order(the"Project') is (1)® is not(2)❑ subject to the
Massachusetts Stormwater Standards. If the work is subject to the Stormwater Standards,
then the project is subject to the following conditions:
a) All work, including site preparation, land disturbance, construction and redevelopment, shall be
' implemented in accordance with the construction period pollution prevention and erosion and
sedimentation control plan and, if applicable,the Stormwater Pollution Prevention Plan required by the
National Pollution Discharge Elimination System Construction General Permit as required by
1 Stormwater Condition 8. Construction period erosion,sedimentation and pollution control measures
and best management practices(BMPs)shall remain in place until the site is fully stabilized.
1
,paformS doc• rev.SNB
Pages W 11
' Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands MassDEP File Number:
' WPA Form 5 - Order of Conditions 64-485
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and
until a Registered Professional Engineer provides a Certification that:
i. all construction period BMPs have been removed or will be removed by a date certain specified in
the Certification. For any construction period BMPs intended to be converted to post construction
operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the
MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or
prepared for post construction operation, including removal of all construction period sediment trapped
in inlet and outlet control structures;
Ii. as-built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
W. any illicit discharges to the stormwater management system have been removed,as per the
' requirements of Stormwater Standard 10;
iv. all post-construction stormwater BMPs are installed in accordance with the plans (including all
planting plans)approved by the issuing authority, and have been inspected to ensure that they are not
damaged and that they are in proper working condition;
' v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion.
c) The landowner is responsible for BMP maintenance until the issuing authority is notified that
another party has legally assumed responsibility for BMP maintenance. Prior to requesting a
' Certificate of Compliance, or Partial Certificate of Compliance, the responsible party(defined in
General Condition 18(e))shall execute and submit to the issuing authority an Operation and
Maintenance Compliance Statement("O&M Statement)for the Stormwater BMPs Identifying the party
' responsible for implementing the stormwater BMPsOperation and Maintenance Plan("O&M Plan")
and certifying the following:i.)the O&M Plan is complete and will be implemented upon receipt of the
Certificate of Compliance, and fl.)the future responsible parties shalt be notified in writing of their
ongoing legal responsibility to operate and maintain the stormwater management BMPs and
1 implement the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in accordance
with the long-term pollution prevention plan section of the approved Stormwater Report and, if
applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge
Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage
easement, assumes responsibility for maintaining each BMP. To overcome this presumption,the
' landowner of the property must submit to the issuing authority a legally binding agreement of record,
and acceptable to the issuing authority, evidencing that another entity has accepted responsibility for
maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for
' purposes of implementing the requirements of Conditions 18(f)through 18(k)with respect to that
BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 18(f)
through 18(k)with respect to that BMP shall be a violationof.the.Order of Conditions or Certificate of
Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding
' agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and
easement deed that grants the responsible party access to perform the required operation and
maintenance must be submitted along with the legally binding agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the
design plans,the O&M Plan,and the requirements of the Massachusetts Stormwater Handbook.
1
wparwm5 aoc• rev.5106 Page 6 of tl
' Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands MassDEP File Number:
WPA Form 5 — Order of Conditions 64-485
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
I ' C. General Condlttons Under Massachusetts Wetlands Protection Act cont.
' g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three(3)consecutive calendar years
of inspections, repairs, maintenance and/or replacement of the stormwater management
system or any part thereof,and disposal (for disposal the log shall indicate the type of material
' and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservation Commission
("Commission") upon request; and
' 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site
to evaluate and ensure that the responsible party is in compliance with the requirements for
each BMP established in the O&M Plan approved by the issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in
' accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are
prohibited.
' j) The stormwater management system approved in the Order of Conditions shall not be changed
without the prior written approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design
Credit(as defined in the MassDEP Stormwater Handbook,Volume 3, Chapter 1, Low Impact
' Development Site Design Credits)shall not be altered without the prior written approval of the issuing
authority.
1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing
constructed around stormwater BMPs shall include access gates and shall be at least six inches
above grade to allow for wildlife passage.
Special Conditions (if you need more space for additional conditions, please attach a text document):
see attached document
D. Findings Under Municipal Wetlands Bylaw or Ordinance
t. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The' Conservation Commission hereby finds (check one that applies):
a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
' 1. Municipal Ordinance or Bylaw 2.Citation
Therefore,work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards,and a final
Order of Conditions is issued.
eyarwm5.eoc•rev.Sroe
Page 7 of 11
' Massachusetts Department of Environmental Protection
1� Bureau of Resource Protection -Wetlands MassoEP File Number:
WPA Form 5 - Order of Conditions 64-485
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance (cont.)
' b. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
1.Municipal Ordinance or Bylaw 2.Citation
' 3. The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above.To the extent that the following conditions modify or
differ from the plans, specifications,or other proposals submitted with the Notice of Intent, the
' conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows (if you need more space
for additional conditions, attach a text document):
1
1
1
1
i '
w afwm5.dx- rev.WS
Page e N 11
it
' Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands MassDEP File Number:
�\ WPA Form 5 - Order of Conditions 64-485
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special Ipnu¢pv w`?
condition pursuant to General Conditions#4,from the date of issuance. 1. yte of i nce
Please indicate the number of members who will sign this form:
This Order must be signed by a majority of the Conservation Commission. 2.Number of Signers
' The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant.A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatures,
u- O
C
' Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
' On this 8 of January 2009
Day Month Year
Before me,the undersigned Notary Public, K.Cornacchio, A.Hamilton, K.Gliden, M.Blier,
personally appeared
proved to me through satisfactory evidence of identification,which was/were
' personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of Salem Conservation Commission
Cityrrovm
' CAREY R.DUO 8
�n(aowtowrr► s
Ux
kycomrtu+kn6plM � k•f/)
' t N3 s1grr6ture off otary Public
Care R. ues
Printed Name of Notary Public
Place notary seal and/or any stamp above August 16,2013
My Commission Expires(Date)
This Order is issued to the applicant as follows:
' ❑ by hand delivery on y certif ed mail,return receipt requested,on
Ott
Date Date '
vryafwmS.Eac• rev.5'08 Page 9 et 11.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 64-485
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant,the owner,any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of
Conditions. The request must be made by certified mail or hand delivery to the Department,with the
I' appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form,as provided
in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy of the
request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission
' and to the applicant, if he/she is not the appellant.Any appellants seeking to appeal the Department's
Superseding Order associated with this appeal will be required to demonstrate prior participation in the review
of this project. Previous participation in the permit proceeding means the submission of written information
to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order
' or Determination, or providing written information to the Department prior to issuance of a Superseding
Order or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
' the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act(M.G.L. c. 131, §40),and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations,the Department has no appellate jurisdiction.
' Section G,Recording Information is available on the following page.
1
' wpaforrtd.0ac• rev.Sloe Pape 10.111
' Massachusetts Department of Environmental Protection
' Bureau of Resource Protection - Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 64-485
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
' This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located,within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
' Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on
this page shall be submitted to the Conservation Commission listed below.
Salem
' Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
---------------------------------------------------------------------------------------------------- --------------------
' To:
Salem
Conservation Commission
' Please be advised that the Order of Conditions for the Project at:
10 White Street 64-485
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
' for;
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
' In accordance with the Order of Conditions issued on:
Date
i
' If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
' Signature of Applicant
vryafwmS.dOc• rev.5109
Page 11 of 11
' Attachment to Order of Conditions i/ 64-485
' Page''Tof 6
SALEM CONSERVATION COMMISSION
DEP FILE #64-485
10 White Street,Hawthorne Cove Matins
' City of Salem,Massachusetts
' ADDITIONAL FINDINGS
' Based on the Estimated Habitats or Rare Wildlife and Certified Vernal Pools Map (June 1, 2003) from Natural
Heritage & Endangered Species Program(NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any
vernal pools.
' This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L.Chapter 131,Section 40 and the City
of Salem Wetlands Protection Ordinance, Salem Code Chapter 34,Section 34-1—34-13.
1. This Order permits the construction of a 2,200 square foot, one story, wood frame building, associated
utility work(water, electric, gas, sewer), and removal of portable/trailer structures. This project is located
within land subject to coastal storm flowage and the 100 foot buffer zone extending from the shoreline.
' Adjacent resource areas include Land Under the Ocean,Coastal Bank,and Coastal Beach and no alteration
or work will occur within these resource areas. The project will not alter the grades within the site area.
The stormwater report included with the Notice of Intent dated November 25, 2008, outlines the plan to
' handle site stormwater, the construction period pollution prevention plan, erosion and sediment control
plan, and the long term operation and maintenance plan. Per DEP's comments: "MassDEP questions
whether applicant has met Standard 7 of the Stormwater regulations-to the maximum extent practicable.
Redevelopment calls for improving existing conditions for water quality-how does this project meet the
standard?" and email correspondence between the applicant's representative and the Conservation Agent
on January 27 and 28 2009(See attached),the applicant also agreed to install a new deep sump catch basin
' with a hooded outlet. The new catch basin will be installed approximately 8 feet south of and will connect
to the existing drain manhole located near the center of the site. Additionally, the applicant agreed to
remove the grate structure on the existing drain manhole and replace it with a solid cover to ensure that
storm water runoff from the site will be collected in the new catch basin rather than the drain manhole.
GENERAL CONDITIONS
' 2. This Order of Conditions must be recorded in its entirety(all 6 pages)at the Essex County Registry of
Deeds or the Land Court for the district in which the land is located, after the expiration of the 10-day
' appeal period and within 30 days of the issuance. A copy of the recording information must be
submitted to the Salem Conservation Commission before any work approved in this Order
commences.
' 3. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131,Section 40,Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands
Protection Ordinance,Salem Code Chapter 34,Section 34-1—34-13.
' 4. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones,other than that approved in this Order,
' shall occur on this property without prior approval from the Commission.
' Attachment to Order of Conditions# 64-485
' Page 2of 6
' 5. Prior to any work commencing, a sign shall be displayed showing DEP File#64485,and not placed on
a living tree.
6. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
7. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers
' to act on its behalf in administering and enforcing this Order.
8. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at
I' any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131,
Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
' 9. The term"Applicant"as used in this Order of Conditions shall refer to the owner,any successor in
interest or successor in control of the property referenced in the Notice of intent,supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
' 10. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S.Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G.L. Ch.2 1 A ss7
and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the
' septic system within 100 feet of wetlands shall be submitted to the Commission prior to
construction initiation.
(4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR
' 744.).
11. If there are conflicting conditions within this Order, the stricter condition(s)shall rule.
' 12. All work shalt be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
' 13. The Commission or its Agent shall have the discretion to modify the erosiontsiltation control methods
and boundary during construction if necessary.
14. The Commission reserves the right to impose additional conditions on portions of this project or this site
I' to mitigate any actual or potential impacts resulting from the work herein permitted.
15. The work shall conform to the following attached plans and special conditions:
' Final Approved Plans
Notice of Intent-Hawthorne Cove Marina Building Construction-Proposed Work Plan
' (Title)
' Attachment to Order of Conditions N 64-485
Page,-!of 6
November 2008
(Dated)
David B. Vine
(Signed and Stamped by)
City of Salem Conservation Commission
' (On file with)
Hawthorne Cove Marina Construction of New Marina Building and Installation of Associated
' Utilities- Construction Plan
(Title)
' Received January 8,2009
(Dated)
' (Signed and Stamped by)
City of Salem Conservation Commission
(On file with)
' 16. Any proposed changes in the approved plan(s)or any deviation in construction from the approved
plan(s) shall require the applicant to file a Notice of Proiect Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field,as to whether the
change(s)is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
' 17. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
' buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
' PRIOR TO CONSTRUCTION
18. Prior to the commencement of any activity on this site other than activities listed above,there
shall be a Pre-Construction Meeting between the project supervisor,the contractor responsible for the
work, and a member of the Conservation Commission or its Administrator to ensure that the
requirements of the Order of Conditions are understood. The staked erosion control line shall.be
' adjusted,if necessary,during the pre-construction meeting. Please contact the Conservation Commission
Agent at(978)745-9595 ext 311 at least forty-eight(48)hours prior to any activity to arrange for the
pre-construction meeting.
' 19. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Administrator shall inspect and approve such installation at the pre-construction
' meeting.
20. No clearing of vegetation,including trees,or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
t
Attachment to Order of Conditions A 64-485
' Page, of 6
21. There shall be twenty(20)hay bales and wooden stakes under cover on the site to be used only for
emergency erosion control.
' EROSION CONTROL
22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in the wetland areas and buffer zones. The erosion control
' specifications provided in the Notice of Intent and the erosion control provision in the Order will be the
minimum standards for this project;the Commission may require additional measures.
23. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland
' resource areas to prevent sediment from entering wetland resource areas.
24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
' replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
25. The area of construction shall remain in a stable condition at the close of each construction day.
' 26. Any de-watering of trenches or other excavationrequired during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through hay bale sediment traps,silt filter bags or other means approved by the Commission or its
Administrator.
' 27. Within thirty(30)days of completion of construction on any given portion of the project,all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
' vegetative cover,using sufficient top soil to assure long-term stabilization of disturbed areas.
28. If soils are to be disturbed for longer that two(2)months,a temporary cover of rye or other grass should
be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,
' exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored,to
prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
' 29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
' the approved plan(s).
31. All waste products,grubbed stumps,slash;construction materials,etc.shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
' 32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
' 33. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil
prior to seeding and final stabilization.
34. Immediately following drainage structure installation all inlets shall be protected by silt fence,haybale
barriers and/or silt bags to filter silt from stormwater before it enters the drainage system.
35. There shall be no pumping of water from wetland resource areas.
' Attachment to Order of Conditions N 64-485
' Page Sof 6
' 36. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
37. During construction,all drainage structures shall be inspected regularly and cleaned as necessary,
' 38. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including,but not limited to, civil administrative
' penalties under M.G.L Chapter 21A,section 16.
' AFTER CONSTRUCTION
39. Upon completion of construction and final soil stabilization, the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance(COC):
' (1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
(3) An"As-Built"plan signed and stamped by a Registered Professional Engineer or Land Surveyor
' showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
areas taken from the plan(s)approved in this Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances,structures and best
management designs,including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structures"include,but are not limited to,all buildings,septic system components,wells,
' utility lines,fences,retaining walls,and roads/driveways;
(d) A line delineating the limit of work-"work"includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order;
' 40. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
41. If the completed work differs from that in the original plans and conditions,the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission,may the applicant request in writing a Certificate of
' Compliance as described above.
42. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Administrator has
authorized their removal.
' ADDITIONAL CONDITIONS
43. The final grade shall be sloped away from the resource area(specifically the Coastal Bank, Land Under
the Ocean, and Coastal Beach).
Attachment to Order of Conditions k 64-485
Page'6of 6
44. Per DEP's comments: "MassDEP questions whether applicant has met Standard 7 of the Stormwater
regulations-to the maximum extent practicable. Redevelopment calls for improving existing conditions for
water quality-how does this project meet the standard?", the applicant also agreed to install a new deep
sump catch basin with a hooded outlet. The new catch basin will be installed approximately 8 feet south of
and will connect to the existing drain manhole located near the center of the site. Additionally, the
applicant agreed to remove the grate structure on the existing drain manhole and replace it with a solid
cover to ensure that storm water runoff from the site will be collected in the new catch basin rather than the
drain manhole.