485 LAFAYETTE STREET - ZONING (2) 1 ti +J I � Cl j� OF Q • CITY OF SALEM CLERK,s OFFICE A PLANNING BOARD IOQS JUL ? Form G-Definitive Subdivision and Wetlands & Flood Hazard District Special Permit Decision July 25, 2005 Glover Estates,LLC C/o Arty. George W. Atkins Ronan, Segal&Harrington 59 Federal Street Salem, MA 01970 RE: Tides Lane--485 Lafayette Street Form C--Definitive Subdivision and Wetlands & Flood Hazard District Special Permit Decision On Thursday,June 16, 2005, the Planning Board of the City of Salem opened a Public Hearing regarding the application of Glover Estates, LLC to allow the construction of a roadway,which will end in a cul-de- sac on the parcel located at 485 Lafayette Street. The public hearing was continued to July 7, 2005, and July 21,2005. The Public Hearing was closed on July 21, 2005. At the regularly scheduled meeting of the Planning Board held on July 21, 2005, the Board voted by a vote of seven in favor (Puleo, Durand, Moustakis,Lombardini, Ready, Weiner, Sullivan),none opposed, to approve the Form C-- Definitive Subdivision and Wetlands & Flood Hazard District Special Permit subject to the following conditions: I. Conformance with the Plan Work shall conform with the plans entitled, "Definitive Plan, Tides Lane, Salem& Marblehead, Mass.,"prepared by Hayes Engineering, Inc., 603 Salem Street, Wakefield, MA, 01880, dated April 26, 2005,including pages 1-4 revised June 1, 2005; and the sheet entitled, "Roadway Improvement Plan," dated April 26, 2005 and revised June 1, 2005. 2. Amendments Any modification to the approved plans must receive the prig Board or approval of the Plannin unless deemed insignificant by the City Planner. Any waiver of conditions contained within shall require the approval of the Planning Board. 3. Subdivision Regulations 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 . TEL: 978.745.9595 FAx: 978.740.0404 ♦ WWW.SALEM.COM The Subdivision shall be constructed in accordance with the requirements of the Subdivision Rules and Regulations and any other applicable regulations. 4. Reference on the Approved Plans This decision shall be referenced on the original plans prior to the endorsement by the Planning Board. 5. Endorsement of the Plans Following the statutory 20-day appeal period, the Planning Board will sign the original subdivision plans,which shall be recorded at the Registry of Deeds. Prior to endorsement of the plans, condition number eleven (11), "Security,"must be addressed. 6. Transfer of Ownership Within five (5) days of the transfer of ownership of the subdivision, the Planning Board shall be notified in writing of the new property owner's name and address. 7. Pre-Construction Conference Prior to the start of work under the approved subdivision, a pre-construction conference shall be scheduled with the City Planner (or her designee), the City Engineer(or his designee), the Building Commissioner, the Health Agent, and any other departments that may be necessary. The developer shall submit a construction schedule at the time of the pre-construction conference. 8. Soil Erosion & Sedimentation Control Plan At the time of the pre-construction conference, the developer shall also be required to submit a soil erosion and sedimentation control plan, information on plans for the stockpiling of earth materials and/or any plans for hauling of earth materials for review and approval by the City Planner and City Engineer. 9. Chapter 91 License a. The applicant shall obtain a Chapter 91 License from the Department of Environmental Protection prior to the start of construction. b. The applicant shall adhere to all requirements as set forth by the Department of Environmental Protection and the approved Chapter 91 License. c. The applicant shall submit their Chapter 91 license application to the Department of Planning and Community Development. 10. Maintenance of the Roadway As agreed,Tides Lane will remain a private right of way and maintenance,repair and snowplowing will be the responsibility of the condominium association. The applicant shall submit condominium association documents containing this provision to the DPCD prior to the start of construction. 11. Emergency Water Connection Provided the project on the Marblehead parcel is approved, the applicant shall install an emergency water connection between Salem and Marblehead. The location and specifications shall be submitted to the Salem City Engineer and the Marblehead Town Engineer for their review and approval prior to the start of construction. 2 12. Pedestrian Signal Provided the project on the Marblehead parcel is approved,and as agreed, the applicant shall construct the pedestrian crossing signal on Lafayette Street as shown on the plans and specifications entitled, "Salem—Marblehead Branch Bike/Pedestrian Facility, Signalized Pedestrian Crossing,"prepared by C&C Consulting Engineers,LLC,214 Lincoln Street, Boston, MA 02134, dated January 2005,including drawings 1-6 prior to the start of construction. 13. Building Permit The applicant shall obtain approval of the comprehensive permit to build the proposed structures from the Town of Marblehead prior to the start of construction. 14. Curb cuts The applicant,if the property abuts a state highway, shall obtain a curb-cut permit from Mass Highway prior to the commencement of any work. 15. Drainage The applicant shall submit a revised drainage plan and detail of the proposed drainage facility to the Department of Planning& Community Development and the Office of the City Engineer for review and approval prior to the endorsement of the plans. 16. Environmental Cleanup Provided the project on the Marblehead parcel is approved, and as agreed, the applicant shall remediate the lead contaminated soils including but not limited to the site,harbor, beach, bike path, and parcels owned by the Salem Conservation Commission (Assessors map 31,Lots 235 and 236). A detailed remediation plan shall be submitted to the Planning Board prior to the start of any work 17. Lafayette Street Improvements a. Provided the project on the Marblehead parcel is approved, and as agreed, the applicant shall construct roadway improvements to Lafayette Street as shown on the sheet entified "Roadway Improvement Plan,Tides Lane,Salem&Marblehead, Mass," dated April 26, 2005 and revised June 1, 2005,prior to the start of construction. The roadway improvement plan shall be revised to show the changes below. Final plans shall be reviewed and approved by the Department of Planning&Community Development, the Office of the Salem City Engineer, and the Marblehead Town Engineer prior to the endorsement of the plans. b. The applicant shall install a crosswalk across Tides Lane. c. The applicant shall install a new concrete sidewalk along Lafayette Street from the pedestrian signal to Tides Lane and on both sides of the roadway along the entire length of Tides Lane. d. Flush scored concrete islands and striping to be installed on Lafayette Street and Tides Lane. 18. Salem Conservation Commission a. All work shall comply with the requirements of the Salem Conservation Commission. 3 b. The applicant shall receive all necessary approvals from the Salem Conservation Commission prior to commencement of any work. 19. Landscaping a. A final landscaping plan shall be submitted for review and approval to the Department of Planning& Community Development prior to the start of work. b. The applicant shall coordinate with the City of Salem Cemetery &Shade Tree Department for the selection of street trees. The selection and placement of street trees shall be reviewed and approved by the Department of Planning& Community Development prior to installation. 20. Security (Section III(B)(5) of the Subdivision Regulations) Before endorsement of the plans, the applicant shall agree to complete the required improvements specified in Section V of the Subdivision Regulations, for any lots in a subdivision. Such construction and installation is to be secured by one of the following methods ds which may from om timet Y o time be vaned by the applicant with the approval of the Planning Board: a. Endorsement of approval with bonds or surety The subdivider shall either file a performance bond or a deposit of money or negotiable securities in an amount determined by the Planning Board to be sufficient to cover the cost of all orany part of the improvements specified in Section V not covered by a covenant under `B"hereof. Such bond or security,if filed or deposited, shall be approved as to form and manner of execution by the City Solicitor and as to sureties by the City Treasurer and shall be contingent on the completion of such improvements within the term of the bond or two years,whichever is earlier,unless an extension is granted by the Planning Board. The amount of the bond shall be determined by applying the actual surveyed quantities multiplied by unit prices listed in the latest building construction cost data manual used by the Engineering and Planning Department. b. Endorsement of approval with covenant The subdivider shall file a covenant,executed and duly recorded by the owner of record, running with the land,whereby such ways and services as specified in Section V,not covered by bond or deposit under "a"hereof, shall be completed to serve any lot before such lot may be built upon or conveyed, other than by mortgage deed. 21. Certificates of Occupancy No Certificate of Occupancy will be issued prior to construction of the roadway through binder course. 22. Lighting a. The Applicant, his successors or assigns shall coordinate with Massachusetts Electric and the City Engineer on the installation of street lighting within the Subdivision. The street lighting shall be the responsibility of the applicant, his successors or assigns. b. No light shall cast a glaze onto adjacent parcels or adjacent tights of way. 4 c. A final lighting plan shall be submitted to the City Planner and the City Electrician for review and approval prior to the issuance of any building permits for the proposed dwellings. d. After installation, lighting shall be reviewed by the City Planner and the City Electrician, prior to the issuance of any Certificates of Occupancy. 23. Construction Practices All construction shall be carried out in accordance with the following conditions: a. The operation of tools or equipment used in construction or demolition work shall occur in accordance with Salem _Ordinance a ripn 2 (5) oncrruction and $acting and between the hours of 8:00 AM and 5:00 PM on weekdays and Sahudays. No work shall take place on Sundays or holidays. The Planning Board will agree to changes in the starting time, at the request of the applicant and if approved by a formal vote of the City Council, as per the ordinance. b. Any blasting,rock crushing,jack hammering,hydraulic blasting, or pile driving shall occur in accordance with Sgm Ordinance Section 22-2 (5), Con wcdon and B a tin&and be limited to Monday-Friday between the hours of 8:00 AM and 5:00 PM. There shall be no blasting, rock crushing,jack hammering, hydraulic blasting, or pile driving on Saturdays, Sundays, or holidays. c. Blasting shall be undertaken in accordance with all local and state regulations. d. All reasonable action shall be taken to minimize the negative effects of construction on abutters. Advance notice shall be provided by the applicant to all abutters in writing at least 72 hours prior to commencement of construction of the project. e. All construction vehicles and equipment shall be cleaned prior to leaving the site so that they do not leave dirt and/or debris on surrounding roadways as they exit the site. f. The applicant shall abide by any and all applicable rules,regulations and ordinances of the City of Salem. g. All construction vehicles and equipment left overnight at the site must be located completely on the site. h. No Street shall be closed without prior approval of the Department of Planning and Community Development, unless deemed an emergency by the Salem Police Department. 24. Blasting The applicant shall distribute the flyers entitled, "Facts for Massachusetts Property Owners About Blasting" to all abutters within three hundred (300) feet of the blasting area. 25. Conveyance of Easements and Utilities The applicant shall submit an acceptable form of conveyance of easements and utilities prior to the endorsement of the plans. 26. Construction Traffic & Phasing 5 a. All construction will occur on site;no construction will occur or be staged within City right of way. Any deviation from this shall be approved by the Department of Planning& Community Development prior to construction. b. A construction traffic/phasing management plan and schedule shall be submitted to the Department of Planning& Community Development for review and approval prior to the start of work. c. Any roadways, driveways, or sidewalks damaged during construction shall be restored to their original condition by the applicant. d. The applicant shall clean construction vehicles before they exit the construction site,and clean and sweep all streets affected by their construction truck traffic as necessary. 27. Clerk of the Works The services of a consultant to serve as a Clerk of the Works shall be provided by the City, at the applicant, his successors or assigns'expense, as is deemed necessary by the City Planner. 28. Office of the City Engineer The applicant, his successors or assigns shall comply with all requirements of the City Engineer 29. Board of Health (BOH) The applicant shall comply with the following conditions issued by the Board of Health: a. Soil and water, contaminated by the previous lead plant company, shall meet the residential standards of the Massachusetts Contingency Plan. b. The plan to remediate any contamination must be presented to and approved by the Salem Board of Health. c. The individual presenting the plan to the Board of Health must notify the Health Agent of the name, address, and telephone number of the project (site) manager who will be on site and directly responsible for the construction of the project. d. If a DEP tracking number is issued for this site under the Massachusetts Contingency Plan, no structure shall be constructed until the Licensed Site Professional responsible for the site certifies that soil and ground water on the entire site meets the DEP standards for the proposed use. e. The developer shall adhere to a drainage plan as approved by the City Engineer. f. The developer shall employ a licensed pesticide applicator to exterminate the area prior to construction, demolition,and/or blasting and shall send a copy of the exterminator's invoice to the Health Agent. g. The developer shall maintain the area free from rodents throughout construction. h. The developer shall submit to the Health Agent a written plan for dust control and street sweeping which will occur during construction. 6 i. The developer shall submit to the Health Agent a written plan for containment and excavation material generated during removal of debris,vegetative waste, and unacceptableg g demolition and/or construction. j. The Fire Department must approve the plan regarding access for fire fighting. k. Noise levels from the resultant establishment(s) generated by operations,including but not limited to refrigeration and heating, shall not increase the broadband sound level by more than 10 dB(A) above the ambient levels measured at the property line. L The developer shall disclose in writing to the Health Agent the origin of any fill material needed for the project. m. The developer shall notify the Health Agent when the project is complete for final inspection and confirmation that above conditions have been met. 30. Health Department All work shall comply with the requirements of the Salem Health Department. 31. Fire Department All work shall comply with the requirements of the Salem Fire Department. 32. Office of the Building Commissioner All work shall comply with the requirements of the office of the Salem Building Commissioner. 33. Utilities a. Any utility installation shall be reviewed and approved by the City Engineer prior to the issuance of a Building Permit. b. All site utilities shall be installed underground. 34. Maintenance a. Refuse removal,ground maintenance and snow removal of Tides Lane and associated sidewalks shall be the responsibility of the condominium association. The applicant shall submit condominium association documents containing this provision to the DPCD prior to the start of construction. b. Maintenance of any landscaping shall be the responsibility of the applicant, his successors or assigns. The applicant, his successors or assigns, shall guarantee all trees and shrubs. 35. As-built Plans As-built plans, stamped by a Registered Professional Engineer, shall be submitted to the Department of Planning and Community Development and Department of Public Services. The cost of the as-built plans will be included in the performance surety and the funds will not be released until satisfactory as-built plans are submitted. 36. Violations Violations of any condition shall result in revocation of this permit by the Planning Board,unless the violation of such condition is waived by a majority vote of the Planning Board. 7 I hereby certify that a copy of this decision and plans has been filed with the City Clerk and copies are on file with the Planning Board. The Decision shall not take effect until a copy of this decision bearing the certification of the City Clerk that twenty (20) days have elapsed and no appeal has been filed or that if such appeal has been filed,and it has been distressed or denied,is recorded in the Essex South Registry of Deeds and is indexed under the name of the owner of record is recorded on the owner's Certificate of Title. The owner or applicant, his successors or assigns,shall pay the fee for recording or registering. Walter B Power, III Chairman 8 i t I t t � _ I . - - - t � SALEM HARBOR t / CERTIFY THAT / HAVE CONFORMED I / TOWN OF WITH THE RULES AND REGULAT/ONS MARSLEHEAD —� OF THE REGISTERS OF DEEDS /N t ELECTR/C OEPr PREFAB/NG THIS PLAN. ASSESSORS AMP TOWN OF t 55, LOT 2 AfARBLEHEAO P & PARK ,,E 285.00 DEPT. ----------------- / t / / �..56'p0 ASSESSORS MAP HA YES ENG/NEER/NG, INC. N7 59, LOT 10 . 6,00"E o- 65 A(ARBLEHEAD WATER — N 0 40 g & SEWER COMM. DoT E MARBLEfaHEAO WATER & SEWEIR COMM. ASSESSORS MAP N 3�LOTQ234� 2'1�� '(�' 31, LOT 233 J 1 I LOT 2 14 R=967.605 CHBRG=251 2 =7756 123,27 S.F. L=252.23 CHLEN_ L_64.32 A=57.51'50" / 54LEM =110.35 R=61.74 CONSERI/AAON / / r.��W L COMM L=62.3COMMISSION � J— / ASSESSORS a �� 4� ,�O CHBRG=SO4 22 27"E MAP 31, I� •CC � � � O ,� CHLEN=59.73 _---- / LOT 235 / / O 3�6 9 �' �� A5 O / SALEMCONSERVA N \aj0 "00 hh ry / ♦ COMMISSION l/ //// // � A r ' ASSESSORS 'Al V �Gl � UT1LlSY / \ { MAP 31, t,-v rn_ LOT 236 Z `h 4� V� �� cs' 7D cE ��p"E R s �- \ ' / 7.50 N79 GI•E \ o qti 5 ,5p„E SHo --E grs v, 6Z•25 N77'38 \ NV L1=7031'44n O ~ • ,1O R=35.00 0 N 147500 'P c� oo / UN �L LOT 1 7w,4 26, 188 S.F. r TA`\`// �. ti� ��•,�� p ,�� j/ �� \ /tion 52'$3 \ �,\ . 60 1 ��`L / �� (,/ �� •h64 \ �, .05,1 1 2 to � o � • '� C1 / N 8040 84 ROBRNA ERT R/CHARD C. & TAM/ •rylb j i � ASSESSOR'S MAP ARTHUR AIDE / \��� �,\'� �ry� •� O&H REAL 7Y 7RUST \ 55, LOT !0 ASSESSORS MAP \ c \ 17 Yr /�w_c cS Q� tL� �S- \ DAWO C/OTIS, / -� TRUSTEE / 80 ROBERT ROAD ASSESSORS MAP \ / ��P 55, SOT 9A / L=49.4i I PR/Sr;VELA L. / N � DOLIRER \ / 38 AdRTHUR AVE. I , j / \ 555, LL'Or 16 MAP / Sey s, z -drST.I '0 GRI 01-D • F L W+CRf TYLER PAS$ QSTLELH4L/077S °�.E. \,,�° $l coo ` a � �oP .� 76 ROBERT ROAD R.�MAr,,o+>% I p /P o 5 tlA F Ca O� R/ChG4R0 S. ASSESSORS MAP °``• o ,, p o cY r r/ Uo �; 9Z �.� .�, ��' Fy���� �� `�• oLPAESTp,, `5 1 Q v �� F` l .�0��f �;'� BENNETT 55, 107- 9 / RD C� Osq �Qf 3 cc` �F °L P NGAf 74 ROBERT RQAO / ASSESSORS AMP ✓\c��F �( �G, - 55, LOT 8 SaF� •,,� H4RLES ��` / / NOTE. THE SIDELINE OF THE PROPOSED ROADWAY �Q - o \9 \\ ff.. �; /S TO FOLLOW THE EXISTING TOWN ZINE DIVIDING SALEM AND MARBLEHEAD '� DENOTES STONE BOUND TO SE SET SY OWNER ►� ,. ''�i , �s w�� AY'��ti `' �� UNLESS OTHERWISE NOTED. LOCUS GLOVER ESTATES LLC ' R ++ �Ro 28 ESSEX STREET eo"" g 1 / LYNN, MA 01902 ► O 20 40 80 120 us � Z o � ` LOGI SALEM ASSESSOR'S `+rn6�yc�9 Z �� .o 1 RES T R MAP 31, LOT 237 DEFINITIVE PLAN \ 5 l°Q� MARBLEHEAD ASSESSOR'S ��p�SN of r�gss4c T/ DES LANE o ,3 �ti MAP 55, LOTS 1 & 3 0 �s PETER J. ymoo NOTES: CLERK'S CERTIFICATION ON THE PLAN o OGREN LEM MARBLEHEAD MASS. ,$DO ' 'o• , 1 ' r 8J vTco Nf, t kONAN• [ 1.) TOPOGRAPHIC DATUM IS N.G.V.D. TO OBTAIN M CITY DA TC- OWNER ENGINEER oc 9? o + 7 n uN --------------------- FE5S� v DATUM ADD 4.36. .SALEM MARBLEHEAD GLOVER ESTATES LLC " ", ` <. � R ,* o w ✓o SEt HAVES ENG/NEER/NG, INC. y Q a >x 4I o �� m _ q o5� � o ;,,�, Ro. Q j 28/x{WESSEX STREET 603 SALEM STREET ;INBY RD. 4 W a J! 9 n O yq p`�G ♦�0" N • • �/. LYNN AA 01902 1 . o i NOTE: EXEMPT FROM RIVERS PROTECTION ACT BY: I CLERK OF THE TOWN OF AIARBLEHEAO ZONE R- > ZONE. SSR A WAKEFIELD, MASS. 01880 rce, , 3 ,H = , R,niR ° /� E� " I RIVERS PROTECTION ACT SECTION 18 EXEMPTING LAND NOW OR DO HEREBY CERT/FY THAT THE NOT/CE OF APPROVAL OF THIS PLAN P�1 Z�,1oa�' SCALE.' 1" = 40 DATE.' APR/L 26 2005 R� v o c,fay a n R o ° R rf ti ¢' o i- FORMERLY ASSOCIATED WITH HISTORIC MILL COMPLEXES BY THE PLANNING BOARD HAS BEEN RECE/VED AND RECORDED AT M/N1MUM SETE�4CKS. MINIMUM SETBACKS. Q 4. Tad! !¢° a h 3 �hNy 'LL,1�o z SS' a N�q m m aocK rii' , , " �a �f,haQ/\ � Q��R (+' o-`�" $�DAR7ta0ulHJ SRN R`�'�---�_ J("° THIS Of AND NO APPEAL WAS RECE/VED DUR/NG THE 7WENTY FRONT = 15 FRONT = 20 S4LEM PLANK/NG BOAR APP ,D d Q "���o �� y �� r,°.� O a Cp `1 0. �-� 310 CMR 10.58(6)(i) IF A NEW OR REVISED CHAPTER 91 DAYS NEXT AFTER SUCH RECE/PT AND RECORD/NG OF SA/D NOT/CE. S/DE = 10' D APPLICATION F/LED ------------ i$Icc SIDE 25 ` a �af j �j� LICENSE IS OBTAINED. REAR = JO' REAR = 15'IHEP ______________________ FINAL PLAN F/LED_____________ C , ] i Q ' 2 a C Q ? / o° Q O C) 6 �y oR 1 ° ' a ; o° °2 Q' P eo r o acn� ��ER Rc Z q t NOTE: PLAN INFORMATION FROM "SBE PLAN OF ND GRADING & MIN. FRONTAGE = 100 MIN.. FRONTAGE = 100' z,R DRAINAGE PLAN, GLOVER ESTATES 485 LAFAYETTE+ STREET ROUTE 114 M//V LOT AREA = 15,000 SF M/N. LOT AREA = 1t�000 S.F j k I "R" B4RB aA q SR•RO�OGfy,R / S ( _________________________ — __—____—_---_--_---_ `►�1KKE°O°//Ryo $� / IPFaZ u °�f�,z eek Q , o MARBLEHEAD, MASSACHUSETTS- BY PATROWICZ LAND DEVELOPMENT -- HEAR/NG DATE �q• r. l I ENGINEERING SCALE 1'=20, DATED SEPTEMBER Z5, 2001 TOWN CLERK LOT (.,OVERAGE 30% (MAX.) m s ---------------------- PLAN APPROVED-------------- L OCUS MAP _ �,50o SHEET 1 OF `�' ---------------------- PLAN SIGNED-----____-- ----- „' N65,90. 0 . . MARBLEHEAD WATER ;` . �.•.. ATER � w SEWER COMM. SEWER COMM. 3A.S.S OT°233�p � H�S OS�234�P *J2'1�•"w LST 2 =14 56 05 J*6.J 85 CHBRG;:;: 56 123,297 S.F. R=967.67 CHLEN=251. 4. L=77. L=252.23 g L=64.32 D=57'51'50” 61.74 s / \ Co S£R�A77ON / / �W L=110.35 L=62.35 / COMM/SS/ON � � CHBRG=5O4 2227t / 3 oRS / O g� �'� '� I O CHLEN=59.73 - 1 / LOT 235 / 3 6• �' .►�� ."� 0 � /S4LEM 3f 16.06 -� CONSERV / ASSESS 's 0� / \ / MAP 31, Q� h / LOT 23 Z C� �' 70.06 SS-J k 57 50 '79.10'10 E S11'jG - (s-R) -o 0 2+s� �-' S '50T — 5aowS�EN 62.25 N7738 ,{ N \ V A=70:31'44" O� N75. N >t * � R=35.00 =43.08 LOT 1 �h10 BUFFER FROM L.S.C.S.F. BLEHEAD CON. 'OM. 26, 188 S.F. �ti c► > �G g3 � � 2 ROBERT AND \PROPOSED a LEVEL SPREADER (� M£RNA KAL/S RICHARD C. TAMI W/CRUSH .�r \ 84 R08£RT RQ40 L. BANE 41 STONE SWALE ASSESSORS MAP ARTHUR AVE 55, LOT 10 ASSESSORS MAP op D&H REAL TY TRUST 55, LOT 17 \ \ �. �\ -��irNo, _ i' \ DA WD HAL/OT/S, \ ♦ off\ moo�,, V, �� TRUST££ \o R; S 80 ROBERT ROAD ��\ \ ASSESSORS MAP i NXA L\ �� k N o\ �� 0 �` �,P 55, LOT 9A / L 49.40 PR/SC/LLA L. r \ DOL18ER J8 ARTH41R 0 \ VE ASSESS'ORSAAMP 55, LOT 16 so ,h 0 MICHAEL AND / STELLA HALIOT/S 76 ROBERT ROAD RICHARD S. ASSESSORS MAP SENNETT 55, LOT 9 74 ROBERT ROAD / ASSESSORS MAP 55, LOT 8 / i i ' 1 CLERK'S CERT/F/CAT/ON ON THE PLAN o� oww h o o DATE. QK CLERK OF THE TOWN OF MARBLEHEAD, DO HEREBY CERT/FY THAT THE NOT/CE OF APPROVAL OF THIS PLAN SY THE PLANNING BOARD HAS BEEN RECf-MED AND RECORDED AT 1.ooz 350 00 50.58 D 3 5olt 502 368.0 4 p 1.5sz TH/S OFF/CE AND NO APPEAL WAS RECEIVED DURING THE TWENTY 20.0 K-Val 25.8 K-Val DAYS NEXT AFTER SUCH RECEIPT AND RECORD/NSG OF SAID NOT/CE. ------------------------- �'� TOWN CLERK DENOTES STONE BOUND TO BE SET BY OWNER UNLESS OTHERWISE NOTED. s EX/S NG CEA ITERLM 0' 20' 40' 80' 120' - EXISTI G RIGH S/DE ' DEFIN/TIVE- PLAN & PROF/LE OF h1gsS 57 SIDZ� - o�� PETER J. 9 G TIDES LANE p IL CIVIL .SALEM & MARBLEHEAD, MASS. o y v 9 No 27145 O n Ago`�G,S EP N OWNER ENG/NEER 4 �S, A �v GLOVER ESTATES LLC HAYES ENGINEERING, INC. 28 ESSEX STREET 603 SALEM STREET LYNN, MA 01,902 WAKEFIELD, MASS. 01880 J 7. OO/o 50 V C 50 ' V C. �• 56� �prZ'two•S SCALE- 1- = 40' (HOR) & 4' (BERT) DATE- APRIL 26, 2005 m W I^ M o�p f��' SALEM PLANNING BOARD APPLICATION FILED ------------ ^ , BASE EiEv = 0 ---------------------- FINAL PLAN FILED------------- Of00 1 Of50 1 fG70 1*50 2*00 2*50 3+00 3*50 o ---------------------- HEARING DATE --------------- N TIDES LANE ---------------------- PLAN APPROVED-------------- N_ C" O1 Q ---------------------- PLAN SIGNED------------ co SHEET 2 O - 4 ---- { I iia l 1 I I LAND SUBJECT TO COASTAL _- STORM FLOWAGE FOR SALEM HARBOR - 1 (ELEVATION 14.0) - IFEMA V-4 ZONE (MARBLEHEAD) W , � -/ per..,., ___- w• �••�/ •�•• .)t.• ,•+...:N:M,,. ••'• �� yl.. t.�:.�.�.. 111tH MM � 21.02 1 W - -` _r- -!�•�' ' •—•�� r +lam' 711 ••••••.••Y •`......'•••••••~ �••••...••••... INV-15.92 `_' RIM =21.02 SAMM HARBOR � _" ---'ate'•---'- '"��'` '' __ _ •••• rf G1R�LEHEAD 1 f ��� ,i► '.= "'`'' ..•••• •ELECTRIC DEPT. .•• ,.. / /- ter, _% �eP�� ,;'` ••••• ASSESSORS MAP '••••••• • TOWN OF 55, LOT., • • r AlARBLEHEAD LAND SUBJECT TO COASTAL CJOoocs,p ;1t . ••••• _." qGrr'•`$5- • EC PARK STORM FLOWAGE FOR SALEM HARBOR f' j/ DEPT (ELEVATION 14.0) FEMA V-3 ZONE (SAM) ASSESSORS M AP• 77.56''0 N — � - J J / i - .! l •. CAVED-IN Q-. o O ' �._. ....;..;... .. • .• •.• MANHOLE Y li-Ac-d / *6r6OA . • 0 SRAI '�TOPcc) YOF � ••• N O_ RIP .•,. 6 Cn OF A64R"HEAD NATER _ - -' --_ i r ATER '- "`- Rv I11R S AWP -_ - - - `"4"".�."` SEWER COMM aOLD �' �ovNo Y-- - . '` '' -----ASSLrS'SOR S AIA .31,1 LQT z.33/ \ . - �- - __ 1? •.3.��1 • • •% _ `CrAVEh-IN , V LOT 2 -- _ _._w- _ :.rJ6 Q MAN OLE1� - \ / - >--�-;; 1.52 ;= ► tai% _ 123,297 S.F. / �•� -,, 1 ;1 L=252..2 g L.=64� •�o - O Ll 5l' l'5 i % I` SWEM �cp _> caiNERVATXIN , f s ` 1 L=110 e of �' / / -_._._._� RIM- .31.77-- AW _ i' i � F L=62., 5 / rs RUEiBLE INV-1x.05 COA0V4ZAON 1 4 P -=504:2-2127"f1J M1 ;i OLD FOUNDATION WAILS / -�- / AS'SESWR'S �6 °� �i,� O L .. CHBR �, , / ASAP .31, !"`f ' d 9y ��C• .k� i ry P\�� CHLEN�59", 3l -- ' / LOT 2•�5 j J h6. •►�� 1 O ^) •�� - SOLEA/ �� ,yQ 1 h 1 13.95 , --�' ``` � � '� COA/A/>�/ ON � a 1 1�?,•, �,,�'h `� �-- �--• -� .�/ .3-f 16.06 ` y, 1 ,+ INv� `EM�NT '"__ -- � :_``----�: -•- , ''"_---- moo. �� �-- �__�_...._�- • ,- I 4� , 1 // �! : EAS —_ / • '--- � 000 SIT • �� _ Cb IQ / -- - -� ,Lor c� � —.i. j 1 o ti o , � �t i • I �� + 06 -_ ✓ �- tee' Ji- --"" ENCE�s-�- 1 silo / t / Qn , ' ' t�al4.ea 5 773$ s �,.r_N - l _•- -- � I , dv­ ti / Q O=70•, 1'44 (o o i r R=35.10 •t� �� ', �' f% ;' >? c� N3 NS " / L=43.044 \t o Cn3 O ,'t � + 1 LOT 1 f, ` � v I ,� / 1 ,FROIrI L.s.c.s.F. 1 , 26, 188 311E , ,r �� ' ( Coh.coM.)A. �..:. - I,k Oslo Raat N \ +O I D SUBJECT TO COASTAL / + LAND SUBJECT T COAST , E STORM FLOWAGE FOR n�Q STORM FLOWAGE ORFOREST RIPER ., y'..� \ • 1 \ I I ` THE FOREST RIVER y' ,' (MEASURED 100 FROM ELEVATION 10.0) / Cp •�5 I (ELEVATION 10.0) FEMA A-2 ZONE s'cLPY PIP RODOSE a�C, , i�'` ,-—�'• \ ROBERT AND G�� W OUTFA LEVEL/SPRE ER ♦` fir'', m- MER/IG4 KAL/S O w CRUSH RICHARD C. & TAM/ •W / STd/NE SWALE� 1 f �l F" \ 34 RMERT ROAD \ / 1 L ! ASSES'iOR S MAP L BONE 41 / •` 55, LOT 10 ` \ ARTHUR AVE / °� `'•� \1 / ,t�' • f ASSESSORS APAP �/ OdrH REALTY TRUST \ \\ �.,� ( !- r r + // / .o� ® �� 55, LOT 17 \ o\ � I .�F,r• '?`� / / / DA14D HALIOT,S C> VVVV// / TRUSTEE N 'c'• 'a o 'CIA, S �� �/ l ff 80 ROBERT ROAD ot /'i,/ ASSESSORS WAR --- '••'N i •'�r �, , ., 55, LOT 9A d l � 7\ 2 x / L 49.40 f s . � 200 FOOT Po T�, sMH��� � PR/SC/LLA L MEAsuRm FROM THE F r ram SEAWALL) 0 DOL/BER " / 10 .38 ARTHUR AVE: ' BENCHMARK ` ` /��f /^ \ \ ASSESSORS AL4P 401, MONEL RIVET i Q� 55, LOT 16 IN LEDGE i V ELEVATION - i !/j• /f / \ \ •�� 22.09 (NGVD 1929) a �t�' �('►'! /� BEAST. `G Sp _..�� J�J� l %f / 42' Will LINE M/CH4£L AND j \ , / STELLA HAL107'5 �F SUB-ECT TO �rAL / � � �'./ / /�/ /I /�J � 76 ROBERT ROAD STORM FLOWAGE FOR THE FOREST RIVER ,, ./ ASSESSORS MAP (MEASURED 100 FEET FROM ELEVATION 10.0) \ / .q�M,y �,w✓ ' /n 55, LOT 9 f 74.R0 T t � �I�.e�r �/ MAP � ,Ti8 i SMH 4 / I/ \ �pr1EMAY GARAOE PAVED DRIVEWIA Sw RW-53M / CLERKS CERT/F/C4PON ON THE PLAN QEVAiipy��OQP ! I �l � � f ,• �O�44re •_ 10E f` ° /53.3-- DATE•---------_------------ t7- - DENOTES STONE BOUND TO BE SET BY OWNER l UNLESS OTHERWISE NOTED. I CLZRK OF THE TOWN OF VARZiLEHEAD, DO HEREBY CERT/FY THAT THE h10"TICE OF APPROVAL OF THIS PLAN 0' 20' 40' 80' 120' BY THE PLANNING BOARD HAS BIEEN RECEIVED AND RECORDED AT THIS OFF/CE AND NO APPEAL WAIS RECEIVED DUR/NG THE TWENTY DAYS NEXT AFTER SUCH RECE/PIr AND RECORD/NG OF SA/D NO TICE TOPOGRAPH/C PLAN OF �95�9'. ------------------------- o= PETER L ��4 TIDES LANE TOWN CLERK o `�yL" SALEM MARRMHEAD, MASS. `> 9 No.21145 O ' A9 0c,sTE�� `'. OWNER ENGINEER �ioNAL�G�� GLOVER ESTATES LLC HAKES ENG/NEER/NG, INC" 40 E- 28 ESSEX STREET 603 SALEM STREET L YNN, MA 01902 WAKEFIELD, MASS. 01880 m Ptf`� Z'1 'Zo10r SCALE- 1" = 40' DATE, APRIL 26, 2005 Q m ' SALEM PLANNING BOARD APPUCARON FILED v m ------------ of o ---------------------- FINAL PLAN FILED-------____-- 0 N ---------------------- HEARING DATE --------------- 3 ---------------------- PLAN APPROVED SHEET 3 Of - 4 ---------------------- PLAN SIGNED----------____-- , co a MANHOLE FRAME dr COVERRN/SH RQ4D GRADE NOTE- 5 FOOT SECT/ON OF STRAIGHT H!-0 PIPE � (AS SPECIFIED) B � 8" OR GROUND SURFACE TO BE USED FOR THE FIRST SECTION OUT OF CATCH QAS/N PRIOR TO CONVERSION TO CASCADE GRATE OTHER TYPES OF PIPE, IF REOUIRED. STANDARD MANHOLE 2 COURSES OF BRICKS FRAME AND GRATE FRAME & COVER do MORTAR ARE TO BE MORTAR BED BRICK AS REQUIRED TO '� TO BE SET AN FULL ADJUST TO GRADE(8"MAX) ALL CATCH BASIN BED OF MORTAR AXUSTMEUSED FOR NI-S -YFJ11 - AL FRAMES & GRATES FR F 70 BF ET AVALARE TO BE FULL BED OF MORTAR. 4 - - - - - - -LEBARON LF248-2 WALL OF MANHOLE2 COURSES OF BRICKS (MIN) DAMETER F/LL MORTAR JOINTS INSIDE o BR/CK LINED �'r` G R A S S ,,,L � ''i"WITH HYDRAULIC CEMENT PRECAST CONC. TRANSlT/ON�� � MORTAR ARE TD BE " rO " 24"f 1 ShL4PE0 INVERT USED FOR GR40E 'CON/CAL " (NON-SHR/NK/NG MORTAR i P L 0 TDRIVEWAY " ALUUSTMENTS COI CAL `8 MORTAR ALL ✓O/NTS ) SECTIONS OR 84RREL ,� � AZSECTIONS WITH PRECAST 24 f l" TOP SLAB DES/GNED FORSO. OPENING M/NM/N O.12 SO /N. ( ) FLOW W££PHOLE 5" - - H-20 LQAD/NG M/N. '& (OPEN/NG TO BE M/N. STEEL PER - '"` '�` 8" R/SERPRECAST /A' VERTICAL FOOT, 9O MIN. ) HEIGHT OF RISER PLACED ACCORDING 0/N SI GEALANT AT ALL�O/NTS SECTIONS VARY TO A45HO :t PROVIDE `V' FROM I' TO 4' DESIGNATION M-199 PRECAST REINFORCED CONCRETE OPENINGS PIPE OPEN/NG5 SECTIONS WITH B/TUM/NAS77C A OLAMETER WATERPROOF CGdAT/NG Q TO B£ PRE-041ST ONE/3 BAR AROUND SHELFELEVATIONSAMEAS '�` �P - •/O p = - I" CLEAR DUES/DE P1 U /N RISER SECTION OPENINGS FOR CROWN OF HIGHEST PIPE Ec i D/AMEIFRPLUS _ _ __ _ _ _ _ _ _ PIPES 18" MUL T/PEES OF 1;2;3;4:5' " BR/CK SHELF NORMAL 2 CLEARANCE OUTSIDE OF 8 M/N.(VARIES) OR 6'LENGH73 -,• - .. OWE HA j " ,� OL4ME7ZrR � OI/£R - - - - - - - - - - SLOREI"F! Z LEVEL y P/PE f 2 , I' COVER WA7ER77GHT AND I_ HI-0 TEE FITT)NG CLEARANCE - -- - -- -- _ ,, \ FLEX/BLE BOOT : OR AQP VFOD SIZE[R SIZESIA� - - - OW PLAN MORTAR 125", 15", 18" OR 24" I 30, !�" i ` 90- ALL _ _ _ _ _ _ _ _ _ _ _ _ TYPE VA-4 VERTICAL JOINTS MINIMUM 0.12 50 /N. + PIPE � - - - i PRECAST CONC. 84SE SR/CK OR CONCRETE FILL 2'-O" STEEL PER VER77C4L PROVIDE 'V' � r GRAN/TE CURB FOOT, PLACED OPEN/NGS ` ACCORD/NG TO A45HTO V v v v v v v v DES/GNA770NM199 vvvvvvvvv 8"M/N. �vvvvvv vvvvvvvvv vvvvvvv vvvvvvvvv vvvvvvvv `— PRECAST \ CEMENT CONCRETE 84S£ UNIT 8 r MAN. SCREENED GRAVEL BASE PRECAST CONCRETE PRECAST CONCRETE UND/57URSED OR LEDGE SECT/ON A-A GRAN/TE BULL NOSE DETAIL CATCH SAS/N DRAIN MANHOLE TYP/CAL PRECAST SEWER MANHOLE NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE } DETECTABLE WAfRIWNGS SHALL CONSIST OF RAISED TRUNCATED DOMES WITH A DIAMETER OF NOMINAL 0.9", STORMCEPTOR COVER A HE/GHT OF NOMINAL 0.2"AND A CETNER—TO—CENTER ANDS " 4 4 SPACING OF NOWMAL 2.35"AND SHALL CONTRAST GRADE ADJUSTERS TO —32/f� I _ q THIN AGE VISUALLY WITH ADJOINING SURFACES, EITHER LIGHT ON SUIT FINISHED GRADE 5" SEE ►+ jr, (NOT�� ENDST/PS) BYAND L 1/3 DARK, OR DARK ON L/GHT. ME BIT. CONC. SIDEWALK �V A RETA/N/NG NORMAL PLANT SHAPE, 6"i OIL TR/M BRANCHES TO 6 FEET 8�� 3� f� CLFANOUfTYPE VA4 4 LOAM & SEED / ABOVE GROUVe2 6f FINISH GRADE GRAVEL vvvvvvvvvvvvvvvvv n a v vvvvvvvvvvvvvvvvv a 6" P VARIES STORMCEPTOR• v, \ � INSERT �- A t T ^n � A p -111 If = WEAR/NG COURSE � A 3-12" RUBBER HOSES. INS WEIR OUTfLE7 �8" � GUY WIRE ORIFICE _� B/NDER COURSE PLATE WRAP TREE TO ABODE RUBBER GASKET FIRST BRANCH MAINTAIN ORIGINAL SOIL 443 v v LINE WHEN FILLING PER ASiAI G , vvvI. GRAVEL B4SE — vvvva CEMENT vvv . '. 6" — v o v v v v v CONCRETE '° r NOTCHED GUY 2"DEPTH BARK MULCH 71" DROP TEE °• j III I STAKE 3 EA./TREE S%DEL/NE rein. 24'4 DROP ' v v I I— I-- 120' R40/AL 12" / //—SAUCER CAPABLE OF HOLDING U INLET PIPE OUTLET CONNECTION DETAIL =1 I 1=1 vvv — ;' SPACING / 4" OF WATER °o°a o OUTLET PIPE :III-1 I I ° J o =III -T I—_ -_ / BERM S/DEWALK 0.000°o oc.' v v v v -I I- i ooaoa000a' GRAVEL BASE 'o a ooa60Qaa.. e.. 4' TO 6' :I I i=1 I I °v v° — , I I _ a o 0"4*, OVERLAP vvvv I OPEN (OUT) BURLAP ° WHEEL CHAIR e , =III=1 =____ __=_=_I GRASS _ _ I i- -� I= :::.. FROM TDP OF ROOT BALL � PLOT 1 1-1 11=1 I (_1 11=1 .11=1 I 1=1 11=1 I I—II 1= LAYOUT „ p SMP SECTION THRU CHAMBER 6 _ / (SEE DETAIL) l=1 I 1=1 I I—I 11=I I ' I —� 1 1=I li 1- L/NE �/4 O/A. HOLE > DEEP — PLANT/NG SO/L: 1 2 LOAM, AT ACTUAL POINT OF _ III _ 1/4 SAND 1/4 PEAT MOSS COMPAC7£D 5U66R40£ SURVEY REFERENCE I _) I I ::: _ VERT/CAL DETECTABLE SURFACE TO NOTE : 6 GRANITE CURB CONFORM WITH ADA ENLARGED IN 1. THE USE OF FLEXIBLE CONNECTIONS IS RECOMMENDED / / T/ STANDARDS 4.7.7 AND TEE DROP PIPE STONE BOV ND j EXISTING SUBGR4DE AT THE INLET AND OU WHERE APPLICABLE VARIES 4 29 2 2. THE COVER SHOULD BEE POSITIONED OVER THE OUTLET TYP/CAL TREE PLANT/NG DROP PIPE AND THE OIL CLEANOUT PIPE. NOT TO SC4LE I 3 OFETHE�FOLLOWNG OR U S EA IS PATENTS:PROTECTED 48 01549&MORE GRAN/TE CURB NOT TO SCALE 15725760, #5753115, X5849181. MONUMENTS SHALL CONFORM TO THE $TANDAROS TREES TO 8E APPROVED BY THE PLANNING BOARD WHZ EL CHA/R RAMP ® CORNER NOT TO SCALE SPEC/F/CATIONS OF THE CITY ENGINEER" AND SHALL SHALL BE PLANTED ALONG THE SIDE LINES OF THE NOT TO SCALE ORMCEPTOf? SE SET ACCORDING TO SUCH SPECIFICATIONS STREET, AT LOCATION AND INTERVALS TO BE NOT TO SCALE DETERMINED SY THE BOARD. CONTRACTOR TO REVIEW.• SECTION V REQUIRED IMPROVEMENTS FOR AN APPROVED SUBDIVISION PRIOR TO CONSTRUCT/ON (SErCT/ON V) OF S4LEM MASSACHUSETTS SURD/VISION Monuments CLERKS CERTIFICATION ON THE PLAN Street and Roodway 1. A// referrals hereinafter refer to Commonwealth of Massachusetts Department of Public Works Standard Specifications Monuments shall be instal/ed at all .street intersections, at all points of change in direction or curvature of streets and at other DATE. fair Highway and Bridges 1953 Edl'Won and o// amendments to dote. The words to dote' shall be interpreted to mean points where, /n the opinion of the City Engineer, permanent monuments ore necessary. Such monuments shall conform to the --------------------- "a the time of filing of a subdivision p/on for approves/" standard specification of the City EmgOeer and shall be set according to such specifications. No permanent monuments shall be instal%d until a// construction which would destroy or disturb the monuments is completed. 01 The entire area of each street or way shall be cleared of a// stumps, brush, roots, boulders, like mcterio/ and all Utilities , CLERK OF THE TOWN OF MARSL, HEAD, 50,LAYOUT � trees not intended for preservotiom. DO HEREBY CERT/fY THAT THE NOT/CE OF APPROVAL OF THIS PLAN 1. Connections for sewer, drain, watter and electrical service from the main structure in the way to the exterior line of the way 3. A// loam and other yielding moiterio,/ shall be removed from the roadway area of each street or way ord rep/aced shall be constructed for each lot wthether or not there !s a building thereon, except that the Board mo}, waive such requirements, BY THE PLANNING BOARD HAS BEEN RECEIVED AND RECORDED AT w&b suitable material. Section V!/-F of the Zoning Ordinance of the City of Salem shall be referred to. in whole or in THIS OFFICE AND NO APPEAL WAS RECE/VED DURING THE TWENTY part, in the case of a lot to be used for a park, playground or for any other purpose for which, in the opinion 5' S' 3' 12' 12' 3' S" 5' 4.e Granite curbs and gutters shall/ be instal/ed not closer than as described in Secfi�gn IV A. herewith. Curb and gutter of the Board, such connections shall/ not be required. DAYS NEXT AFTER SUCH RECE/PT AND RECORDING OF 541D NOT/CE shall be instal/ed in conformity to, standards of the Massachusetts Deportment of Public Works, Section F-/ Commonwealth GRASS- SIDEWALK GRASS- SIDEWALK GRASS- 2. A// sewer surface water drains, water pipes and any other underground facilities, together with their appurtenances, shall be PLOT �• PLOT PLOT of Massachusetts Department of Public Works Specifications 1953 Type VA-1, installed only after the sub-grade hMcs been established- such sub-grcde and the ivsta/lotion of all uti/it.%es and the back filling LAYOUT 6r TRAVELED WAY 5. A// roadways shall be brought to a finished grade as shown on the profiles of the Definitive Plan with at /east 12" of of all the trenches shall be inspectedby the City Engineer at the expense of the contractor before any into/lotion is made. ------------------------- 1"TYPE/B/T. CONC. TOP suitable grove/ after compaction iwith a 12-ton 3-wheel roller and treated with a prime coot of asphalt MC-1 and TOWN CLERK 2"CLASS/BIT CONC. BINDER VERTICAL surfaced with two courses of type, 1-1 bituminous concrete 2 1/2" binder, 1/2" top, /n accordance with Section B-18, j GRANT£ Commonwealth of Massachusetts LOepartment of Public Works Spec/Bcotions 1953. the type of surfacing of every way shall If 1/% � 6 REVEAL be in such o way that /t will cowry the expected traffic_ for aper/od of 15 years without excessive maintenance cost. '/4'11 FT 1 14"SFr (7 P) DETAIL SHEET Sidewalks 12"GRAVEL BORROW �ZN aF Mqo 4"PLANTABLE SOIL Sidewalks shall be constructed as required by the Plorn/ng Board as follows: Sidewalks Shall have o base of 8' y��P us9 T�DES LANE CAN, F/REALARM I W1;`HSEED(!YP) of su/table grave/ and a surface of type 7-2 bitumh?ous concrete, 3" in depth /o/d in two courses, 2" b/oder and /" top. a� PETEAJ. cy /� �' ELEC. TELE. 8"GRAVEL The face of the sidewalk cga/nst the sodded edges shall be bu/It against a wooden form. The form shall be mode Z OGREN �, SALEM c�c MARRUN&W., M/'IS.J. of 1" by 3" continuous wood stropping securely fastened to 2" by 3" wood posts 18" long 2' on center. The form shall o Civic 2'Min. Cover BORROW(7YP) " No 271 A5 O I be left in place after the sidewalk is /aid. The Planning Board may require cement concrete sidewalks to confo m with ,0 9c� F,° OWNER ENGINEER w Q the sidewalks of adjacent areas. 90'� c�S��Pv��� GLOVER ESTATES LLC HAYES ENGINEER/NG, INC. ORA11V WATER S7ONA� : Grass SM;9s Q 28 ESSEX STREET 603 SALEM STREET rn 1 1,/2'7YPE/B/T. CONC. TOP '��� L YNN, MA 01902 WAKEFIELD, MASS. 01880 o Grass strips shall be provided between the curbing and s/dewa/k edge to a min/mum of five feet. The finished grade of M ONE COURSE such gross str/,os shall be a slope of 1/2%ft. toward the roadway. Where unusual physical /and character/sfics or topogroph/c ` LID? ►1 Zoo? SCALE.• 1" = 40' DATE- APRIL 26, 2005 2 >,/2"CLASS/B/T CONC. BINDER conditions exist, the Board may approve the construction of a grass step of a greater slope with the finished slope not CD ONE COURSE projecting above a plane sloped ,four hor/zonta/ to one vertical upward from the bock of the curb or below a plane sloped C) four horizontal to one vertical downward from the bock of the curb. Shade trees of o species and size to be approved by SALEM PLANNING BOARD APPLICAT/ON FILED ------------ the ___________the Planning Department shall be planted along the side lines of the streets, at the location and intervals to be determined N � by the Board. Trees shall be protected by suitable boxes, fenders, or we/!s as appropriate. The app//cont shall be responsible for the health and erectness of these trees for twenty-four (24) months after acceptance of the rood by the Board or he shall ---------------------- FINAL PLAN FILED------------- 3 be responsible for rep/acing the tree with one at /east equal /n size and comparable in type to the tree being rep/aced and oga/n guaranteed for at /east twenty-four (24) months from date of rep/opting. ---------------------- HEAR/NG DATE --------------- QJ QJ a The top six inches of grass strips shall consist of good quality loom extending to the right-of-way, screened, raked and rolled TYP�'CAL CROSS SECT/ON with at /east o 100-pound /%r to grade. The loom shall be screened with lawn gross seed applied in sufficient quantity to assure ---------------------- PLAN APPROVED -------------- F- adequate permanent coverage, satisfactory to the Planning Department, rolled when the loam is moist. Looming and seeding shall be /f /f NOT TO SCALE in accordance with Section 751 and 765 of the Standard Specifications. SHEET T OF T ---------------------- PLAN SIGNED--------------- a. — 00 a I Amended Dec:4W � 4g5 Laatpe e �4. CITY OF SALEM PLANNING BOARD Form G-Definitive Subdivision and o o Wetlands & Flood Hazard District Special Permit Amended Decision `�z s April 9,2007 Glover Estates,LLC C/o Arty. George W.Atkins Ronan,Segal&Harrington 59 Federal Street Salem,MA 01970 t RE: Tides Lane-485 Lafayette Street Form C--Definitive Subdivision and Wetlands&Flood Hazard District Special Permit Decision On Thursday,March 15,2007, the Planning Board of the City of Salem opened a Public Hearing regarding the application of Glover Estates,LLC to amend the previously issued decision dated July 25,2005 to allow for a change to the roadway entrance, addition of parking spaces and modification of conditions in the decision concerning traffic improvements on Lafayette Street,and start of construction and ownership of the roadway for the parcel located at 485 Lafayette Street The public hearing was continued to April 5, 2007.The Public Hearing was dosed on April 5,2007. At the regularly scheduled meeting of the Planning Board held on April 5,2007, the Board voted by a vote of Six (6) in favor (Power,Collins, Kavanagh,Puleo,Sullivan,Ready),three (3) opposed (Moustakis, Lornbardini, Hanscom), to approve some of the amendments requested to the Form C--Definitive Subdivision and Wetlands &Flood Hazard District Special Permit as detailed below and subject to the following conditions: 1. Conformance with the Plan Work shall conform with the plans entitled,"Definitive Plan,Tides Lane,Salem&Marblehead, Mass.,"prepared by Hayes Engineering,Inc.,603 Salem Street,Wakefield,MA,01880,dated April 26,2005,including pages 1-4 revised June 1,2005;and the sheet entitled, "Roadway Improvement Plan," dated April 26,2005 and revised June 1,2005 and revised plans dated January 10, 2007, pages 1-4. 2. Amendments 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 .TEL: 978.745.9595 FAx: 978.740.0404 ♦ WWW.SALEM.COM Any modification to the approved plans must receive the prior approval of the Planning Board unless deemed insignificant by the City Planner. Any waiver of conditions contained within shall require the approval of the Planning Board. 3. Subdivision Regulations The Subdivision shall be constructed in accordance with the requirements of the Subdivision Rules and Regulations and any other applicable regulations. 4. Reference on the Approved Plans This decision shall be referenced on the original plans prior to the endorsement by the Planning Board. 5. Endorsement of the Plans Following the statutory 20-day appeal period,the Planning Board will sign the original subdivision plans,which shall be recorded at the Registry of Deeds. Prior to endorsement of the plans, condition number eleven (11), "Security,"must be addressed. 6. Transfer of Ownership Within five (5) days of the transfer of ownership of the subdivision, the Planning Board shall be notified in writing of the new property owner's name and address. 7. Pre-Construction Conference Prior to the start of work under the approved subdivision, a pre-construction conference shall be scheduled with the City Planner(or her designee),the City Engineer (or his designee), the Building Commissioner,the Health Agent, and any other departments that may be necessary. The developer shall submit a construction schedule at the time of the pre-construction conference. 8. Soil Erosion& Sedimentation Control Plan At the time of the pre-construction conference, the developer shall also be required to submit a soil erosion and sedimentation control plan,information on plans for the stockpiling of earth materials and/or any plans for hauling of earth materials for review and approval by the City Planner and City Engineer. 9. Chapter 91 License a. The applicant shall obtain a Chapter 91 License from the Department of Environmental Protection prior to the start of construction. b. The applicant shall adhere to all requirements as set forth by the Department of Environmental Protection and the approved Chapter 91 License. c. The applicant shall submit their Chapter 91 license application to the Department of Planning and Community Development. 10. Maintenance of the Roadway Tides Lane may be accepted as a public way provided that any and all maintenance,repair, and snowplowing shall be the responsibility of the condominium association in accordance with an Agreement between the condominium association and the City of Salem which shall be submitted to the DPCD and executed prior to the start of construction. The Agreement shall also contain a hold harmless indemnity agreement protecting the City of Salem against liability in connection with 2 the way. In addition the Agreement shall be noted on the as built plan and shall be filed with the Essex South District Registry of Deed. 11. Emergency Water Connection Provided the project on the Marblehead parcel is approved,the applicant shall install an emergency water connection between Salem and Marblehead. The location and specifications shall be submitted to the Salem City Engineer and the Marblehead Town Engineer for their review and approval prior to the start of construction. 12. Pedestrian Signal Provided the project on the Marblehead parcel is approved,and as agreed, the applicant shall construct theP edestrian crossing signal on Lafayette Street as shown on the plans and specifications entitled,"Salem—Marblehead Branch Bike/Pedestrian Facility,Signalized Pedestrian Crossing,"prepared by C&C Consulting Engineers,LLC,214 Lincoln Street,Boston,MA 02134, dated January 2005,including drawings 1-6 prior to the start of construction. 13. Building Permit The Applicant shall obtain from the Town of Marblehead all required permits to build the proposed structures prior to the start of construction. 14. Curb cuts The applicant,if the property abuts a state highway,shall obtain a curb-cut permit from Mass Highway prior to the commencement of any work. 15. Drainage The applicant shall submit a revised drainage plan and detail of the proposed drainage facility to the Department of Planning&Community Development and the Office of the City Engineer for review and approval prior to the endorsement of the plans. 16. Environmental Cleanup Provided the project on the Marblehead parcel is approved,and as agreed, the applicant shall remediate the lead contaminated soils including but not limited to the site,harbor,beach, bike path, and parcels owned by the Salem Conservation Commission (Assessors map 31,Lots 235 and 236). A detailed remediation plan shall be submitted to the Planning Board prior to the start of any work. 17. Lafayette Street Improvements a. Provided the project on the Marblehead parcel is approved,and as agreed,the applicant shall construct roadway improvements to Lafayette Street as shown on the sheet entitled, "Roadway Improvement Plan,Tides Lane,Salem&Marblehead,Mass," dated April 26, 2005 and revised June 1,2005, and further revised plans dated January 10, 2007,pages 1-4, prior to the start of construction. The roadway improvement plan shall be revised to show the changes below. Final plans shall be reviewed and approved by the Department of Planning&Community Development, the Office of the Salem City Engineer, and the Marblehead Town Engineer prior to the endorsement of the plans. b. The applicant shall install a crosswalk across Tides Lane. 3 n• , c. The applicant shall install a new concrete sidewalk along Lafayette Street from the pedestrian signal to Tides Lane and on both sides of the roadway along the entire length of Tides Lane. d. Flush scored concrete islands and striping to be installed on Lafayette Street and Tides Lane. 18. Salem Conservation Commission a. All work shall comply with the requirements of the Salem Conservation Commission. b. The applicant shall receive all necessary approvals from the Salem Conservation Commission prior to commencement of any work. 19. Landscaping a. A final landscaping plan shall be submitted for review and approval to the Department of Planning&Community Development prior to the start of work. b. The applicant shall coordinate with the City of Salem Cemetery&Shade Tree Department for the selection of street trees. The selection and placement of street trees shall be reviewed and approved by the Department of Planning&Community Development prior to installation. 20. Security(Section III(B)(5) of the Subdivision Regulations) Before endorsement of the plans,the applicant shall agree to complete the required improvements specified in Section V of the Subdivision Regulations, for any lots in a subdivision. Such construction and installation is to be secured by one of the following methods which may from time to time be varied by the applicant with the approval of the Planning Board: a. Endorsement of approval with bonds or surety The subdivider shall either file a performance bond or a deposit of money or negotiable securities in an amount determined by the Planning Board to be sufficient to cover the cost of all or any part of the improvements specified in Section V not covered by a covenant under`B"hereof. Such bond or security,if filed or deposited, shall be approved as to form and manner of execution by the City Solicitor and as to sureties by the City Treasurer and shall be contingent on the completion of such improvements within the term of the bond or two years,whichever is earlier,unless an extension is granted by the Planning Board. The amount of the bond shall be determined by applying the actual surveyed quantities multiplied by unit prices listed in the latest building construction cost data manual used by the Engineering and Planning Department. b. Endorsement of approval with covenant The subdivider shall file a covenant, executed and duly recorded by the owner of record, ,tinning with the land,whereby such ways and services as specified in Section V,not covered by bond or deposit under"a" hereof, shall be completed to serve any lot before such lot may be built upon or conveyed, other than by mortgage deed. 21. Certificates of Occupancy No Certificate of Occupancy will be issued prior to construction of the roadway through binder course. 4 J. . 22. Lighting a. The Applicant,his successors or assigns shall coordinate with Massachusetts Electric and the City Engineer on the installation of street lighting within the Subdivision. The street lighting shall be the responsibility of the applicant, his successors or assigns. b. No light shall cast a glaze onto adjacent parcels or adjacent rights of way. c. A final lighting plan shall be submitted to the City Planner and the City Electrician for review and approval prior to the issuance of any building permits for the proposed dwellings. d. After installation,lighting shall be reviewed by the City Planner and the City Electrician, prior to the issuance of any Certificates of Occupancy. 23. Construction Practices All construction shall be carried out in accordance with the following conditions: a. The operation of tools or equipment used in construction or demolition work shall occur in accordance with Salem Ordinance Section 22-2 (5): Construction and Blasting and between the hours of 8:00 AM and 5:00 PM on weekdays and Saturdays. No work shall take place on Sundays or holidays. The Planning Board will agree to changes in the starting time,at the request of the applicant and if approved by a formal vote of the City Council, as per the ordinance. b. Any blasting,rock crushing,jack hammering,hydraulic blasting, or pile driving shall occur in accordance with Salem Ordinance Section 22-2 (5): Construction and BlastiMand be limited to Monday-Friday between the hours of 8:00 AM and 5:00 PM. There shall be no blasting,rock crushing,jack hammering,hydraulic blasting,or pile driving on Saturdays, Sundays,or holidays. c. Blasting shall be undertaken in accordance with all local and state regulations. d. All reasonable action shall be taken to minimize the negative effects of construction on abutters. Advance notice shall be provided by the applicant to all abutters in writing at least 72 hours prior to commencement of construction of the project. e. All construction vehicles and equipment shall be cleaned prior to leaving the site so that they do not leave dirt and/or debris on surrounding roadways as they exit the site. f. The applicant shall abide by any and all applicable rules,regulations and ordinances of the City of Salem. g. All construction vehicles and equipment left overnight at the site must be located completely on the site. h. No Street shall be closed without prior approval of the Department of Planning and Community Development,unless deemed an emergency by the Salem Police Department 24. Blasting 5 The applicant shall distribute the flyers entitled, "Facts for Massachusetts Property Owners About Blasting" to all abutters within three hundred (300) feet of the blasting area. 25. Conveyance of Easements and Utilities The applicant shall submit an acceptable form of conveyance of easements and utilities prior to the endorsement of the plans. 26. Construction Traffic &Phasing a. All construction will occur on site;no construction will occur or be staged within City right of way. Any deviation from this shall be approved by the Department of Planning& Community Development prior to construction. b. A construction traffic/phasing management plan and schedule shall be submitted to the Department of Planning&Community Development for review and approval prior to the start of work. c. Any roadways,driveways,or sidewalks damaged during construction shall be restored to their original condition by the applicant. d. The applicant shall clean construction vehicles before they exit the construction site, and clean and sweep all streets affected by their construction truck traffic as necessary. 27. Clerk of the Works The services of a consultant to serve as a Clerk of the Works shall be provided by the City, at the applicant, his successors or assigns' expense, as is deemed necessary by the City Planner. 28. Office of the City Engineer The applicant, his successors or assigns shall comply with all requirements of the City Engineer 29. Board of Health (BOH) The applicant shall comply with the following conditions issued by the Board of Health: a. Soil and water,contaminated by the previous lead plant company, shall meet the residential standards of the Massachusetts Contingency Plan. b. The plan to remediate any contamination must be presented to and approved by the Salem Board of Health. c. The individual presenting the plan to the Board of Health must notify the Health Agent of the name,address,and telephone number of the project(site) manager who will be on site and directly responsible for the construction of the project. d. If a DEP tracking number is issued for this site under the Massachusetts Contingency Plan, no structure shall be constructed until the Licensed Site Professional responsible for the site certifies that soil and ground water on the entire site meets the DEP standards for the proposed use. e. The developer shall adhere to a drainage plan as approved by the City Engineer. 6 f. The developer shall employ a licensed pesticide applicator to exterminate the area prior to construction, demolition, and/or blasting and shall send a copy of the exterminator's invoice to the Health Agent g. The developer shall maintain the area free from rodents throughout construction. h. The developer shall submit to the Health Agent a written plan for dust control and street sweeping which will occur during construction. i. The developer shall submit to the Health Agent a written plan for containment and removal of debris,vegetative waste,and unacceptable excavation material generated during demolition and/or construction. j. The Fire Department must approve the plan regarding access for fire fighting. k. Noise levels from the resultant establishment(s) generated by operations,including but not limited to refrigeration and heating,shall not increase the broadband sound level by more than 10 dB(A) above the ambient levels measured at the property line. 1. The developer shall disclose in writing to the Health Agent the origin of any fill material needed for the project. m. The developer shall notify the Health Agent when the project is complete for final inspection and confirmation that above conditions have been met 30. Health Department All work shall comply with the requirements of the Salem Health Department. 31. Fire Department All work shall comply with the requirements of the Salem Fire Department. 32. Office of the Building Commissioner All work shall comply with the requirements of the office of the Salem Building Commissioner. 33. Utilities a. Any utility installation shall be reviewed and approved by the City Engineer prior to the issuance of a Building Pemiit b. All site utilities shall be installed underground. 34. Maintenance a. Refuse removal,ground maintenance and snow removal of Tides Lane and associated sidewalks shall be the responsibility of the condominium association. The applicant shall submit condominium association documents containing this provision to the DPCD prior to the start of construction. b. Maintenance of any landscaping shall be the responsibility of the applicant,his successors or assigns. The applicant, his successors or assigns, shall guarantee all trees and shrubs. 7 35. As-built Plans As-built plans, stamped by a Registered Professional Engineer, shall be submitted to the Department of Planning and Community Development and Department of Public Services. The cost of the as-built plans will be included in the performance surety and the funds will not be released until satisfactory as-built plans are submitted. 36. Violations Violations of any condition shall result in revocation of this permit by the Planning Board,unless the violation of such condition is waived by a majority vote of the Planning Board. I hereby certify that a copy of this decision and plans has been filed with the City Clerk and copies are on file with the Planning Board. The Decision shall not take effect until a copy of this decision bearing the certification of the City Clerk that twenty (20) days have elapsed and no appeal has been filed or that if such appeal has been filed,and it has been dismissed or denied,is recorded in the Essex South Registry of Deeds and is indexed under the name of the owner of record is recorded on the owner's Certificate of Title. The owner or applicant, his successors or assigns, shall pay the fee for recording or registering. Walter B Powe III Chairman cc: Cheryl LaPointe, City Clerk 8 I � � Q i CA 5 SAID HARBOR � ' � pUB�rc / CERTIFY THAT / HAVE CONFORMED t � � TOWN OF --------., --® -- WITH THE RULES AND REGULATIONS AL4RBLEHEAO REGISTERS OF DEEDS IN ASSESSOR SSES O DEPT. OF THE PREFAB/NG THIS PLAN. �- ASSESSORS MAP TOWN OF i Y AG'C�; 55, LOT 2 A ARBLEHEAD BEC. & PARK OC / I � 01DTH I 285 00 DEPT- ---------------- i /' ` -� �' N71 55'00 59,SLOTORS AAP 10 HA YES ENG/NEER/NG, INC. pUB ACCEN1� 0 � CE ' � 0,,E o I o_ 5, 60 0 _ N6 go.� LOT 2 Y" Fool E MARBLEHE40 WATER AWRBLEHEAD WATER & SEWER COMM 123297 S.F. N & SEWER COMM. I ASSESSORS MAP ASSESSOR S APAP I —14 56'05 31, LOT 2,54 S8 '32'1 -W 31, LOT 233 0_ CH8RG= 77 56 _ l?=867.67 GLEN=251.52 L / S4LEM ` L=252.23 L=64 32 A=5751'S0" R=-6 7.74 / CONSERI/AT/ON rte L=110.35 COMM/SS/OL=62.35 N / / h / ASSESSORS ,+� \,o �� Qi Q' CHBRG=SO4 22 27'E / MAP 31, ,1a tK. ,�� I o, 0 ,� ' CHLEN=59.73 / LOT 235 �O 6 g � A� �� fJ''J_ EASEMENT '— f /SALEM ��J4 1 A p ��hh�N �- (To BE CONSERVATION COMM/SS/ON / ASSESSORS oo� I -----' LOT 36 N�h Y __ 70 w 06 0"E � cE 0% Q 4 10'1 LE R 4� / 57 50 �E N79• \ 5Ko : Gly— R �ExCE (S— w N7738 50 r _ _ s� ry�! L=70:31'44 ° N / N75'0 R=35.00 L=43.08 o IV ;� '` 10oil 5b .05 � /tion NE 252. v,*, � � 1 ,pro,• ��LOT 1 �� �'+ / i / \ ROBERT AND \ \ f G1� w lMER/YA KAL/S RICHARD C. & TAM/ \26, 188 S.F. A\ B4 ROBERT Raw � 7 \ Q ., ,� ASSESSORS MAP \ ARTHUR AVE: 55, LOT 10 ASSESSORS MAP \ / 4 D&H REALTY TRUST 55, LOT 17 DAKA9 HAL/OT/S, TRUsrEE 80 ROBERT ROAD N N \ ASSESSORS MAP 55, LOT 9A / � L=49.40 / � PR/SC/LLA L. DOL/BER i o � \ / J8 ARTHUR A�E. ASSESS'CIR S AAP 55, LOT 16 / oj5 M/CHAEL AND C � bi 3j•a' f 16t f I TU STELLA HAL/OT/S / 76 ROBERT ROAD / •0 `�' b RICHARD S. ASSESSORS Ad P BENNETT 55, LOT 9 �� n�� „ •v (_'1 �-- 2. a q �Vf 74 ROBERT ROAD ASSESSORS ANAP � •y'�+•• °. •s: � o 'mw:c s�--�. � (���5 •c � ) 55, LOT 8 NOTE. THE S/DEL/NE OF THE PROPOSED ROADWAY /S TO AND THE EX/ST/NG TOWN ZINE DIVIDING SALEM ND MARBLEHEAD -ll- — DENOTES STONE BOUND TO SE SET SY OWNER at / 1q J. LOCUS UNLESS OTHERWISE NOTED. GLOVER ESTATE'S LLC r£R `� ��a � � 28 ESSEX STREET 51� y , 0' 20' 40' 80' 120' LYNN, MA 01902 LQ�uJr � �'� SALEM ASSESSOR'S MAP 31, LOT 237 DAFF/N/TM- l®ZAN �-g e� ` aQ MARBLEHEAD ASSESSOR'S PO F M S T/29ES ZAM ° MAP 55, LOTS r & 3 �� gOti �� °'���'" °4F °� CLERKS CERTIFICATION ON THE PLAN PETER J. L �1 �c M�R�L�"HF4®, Y ,55.. w s ` ea a°, ,t s °<c h ° vt0ov�'�� NOTES: I've W000.J 00 � OGREN Y rev ' N *33604 OWNER ENGINEER e c, 4 1.) TOPOGRAPHIC DATUM IS N.G.V.D. TO OBTAIN SALEM CITY DATE. U o ��` ;, ,� `�• ^ d aoto DATUM ADD 4.36. ----------`---------- QQa o�P GLOVER ESTATES LLC HAVES ENG/NEERING INC. a 64{0. e o ° 4'4 ° �. A D 9 '�� +� �kY� ' 4 �C � m a �, �a LL�//� M.4RBLEHF40 sa �c� 28 ESSEX STREET 603 SALEM STREET' »a W ,�: "+�o o I ! LYNN, MA 01902 WAKEF/ELD, MASS. 01880 m ; ) � to ` s� faE�l o ` o pJ rtgre`t;\'*moo xf i=y m—s[^ NOTE: EXEMPT FROM RIVERS PROTECTION ACT BY: I CLERK OF THE TOWN OF MARBLEHEAD, ZONE' l�— ZONE' SSR „ "' dw s a 1, : 9 „� b - co3 o+'."� "1 W -. •>D r �v�.�of'Z,rsi et-7 SCALE. I" = 40' DATE. APRIL 26, 2005 aIp/ 4 ; LsG oy -'."' �6 51 yNo a TUM oil 4t e o c w ,n � RIVERS PROTECTION ACT SECTION 18 EXEMPTING "LAND NOW OR DO HEREBY CERT/FY THAT THE VO TICE OF APPROVAL OF THrS PLAN Q ,/ "i Y J j t w o W �� W ;:._ MINIMUM SETBACKS• MINIMUM SETBACKS.• a r •+( ��' '� FORMERLY ASSOCIATED WITH HISTORIC MILL COMPLEXES". BY THE PLANNING BOARD HAS BEEN RECEIVED AND RECORDED AT REVISIONS x .r a naKL�rd Na 31 �04M 4t r a , '+�w �! S <<.. 4 °<<a ? °'" �+rrrr, _ o a--, o� THIS OFFICE AND NO APPEAL WAS RECE/VED DURING THE TWENTY FRONT = 15 FRONT = 20 SALEM PLANNING BOARD APPLICATION F/LED Ro o + urk q — )� �'t °� _ t Cy0. �o ao• ; '~ 310 CMR 10.58(6)(i) IF A NEW OR REVISED CHAPTER 91 DAYS NEXT AFTER SUCH RECEIPT AND RECORDING OF SAID NOTICE. SIDE = 10' S/DE = 25' 06-01-05 ------------ co = 30' REAR = 15' ---------------------- ------------ °' "";a w `�r�""✓ tp per'` tie i LICENSE IS OBTAINED. x xn , tv •s / r e ! o S x o ~ v � " �� / , — 01-10_07 F/NAL PLAN F/LED_ `" NOTE: PLAN INFORMATION FROM "SITE PLAN OF LAND GRADING & MIN. FRONTAGE = 100 MIN FRONTAGE = 100 c• v v o y T e v i DRAINAGE PLAN, GLOVER ESTATES 485 LAFAYETTE STREET ROUTE 114 MIN. LOT AREA = 15,000 S.F. MIN. LOT AREA = 10,000 S.F. — — — ---------------------- H,CARING DATE --------------- L4 . r 2 I lr i3 °�Ft�a SQeMARBLEHEAD, MASSACHUSETTS" BY PATROWICZ LAND DEVELOPMENT TOWN CLERK LOT COVERAGE —30% MAX. ENGINEERING SCALE 1"=20, DATED SEPTEMBER 25, 2001 - - '------ ��" --- — — ---------------------- PLAN APPROVED LOCUS MAP -------------_ ,r SHEET OF `7` — — ---------------------- PLAN S/GNED------------ 0 1,50 Q GONG' ,BGG © wv \ -: :,. :e .' s \ -- LOT N MH R=17.52 `"—= '4 Y-^ '•*•, { � 123,297 w G. / \ -•, .,� I R 967 7 wou t• , G(0) L= 2,;Z3 s L= rwnarw ea�xr BRG=504 22 27'Er r _-. . z= ,\ro �� I of D 0 MNIKxar IVb LEN=59.73 jRAP fzus�r ro r IN, pp MGG GAS BE EasEµEN1 PROP. PR EJEG70 GE rp _ e- -= - u�un CUL DE SAC STREET t 1 .O6 E g GRABYA OrNERS) _e CjoiA - _ N DIA- 110 LIGHT 0 l (TYP) \ / { 8 — Rlw-1&5l. , i INV-10 .95 - .... >> � .10 OE IDS IS- - C \ by 0=70'31'44" � N75-uv \ _ \ /� 5.00 1 <n �y c� Ila p ��,,�� � $ ,� '��• do n '7- X52 8 \ � J:3 tK��� ,05,E E i / tA Ilk / L =49 40 sur+ / a ' � A- �s 5 � \ \ �• x 12' END I RET J 5 WALLr— o d o .4 - o o 0) o (o o rn CLERKS CERTIF/CAT/O/1I ON THE PLAN ++ � + � + - + � + � + ° DATE. z o Z Z Z Z Z --------------------- � o Qo � o ao P: pQo � o w > > >> > /,CLERK OF THE TOWN OF MARBLEHEAD, > J 5 -i > -i > -1 > J > -1 11.)�1 DO HEREBY CERTIFY THAT THE NOTICE OF APPROVAL OF THIS PLAN w w a_ w a_ w a w a w a w NxSY THE PLANNING BOARD HAS BEEN RECEIVED AND RECORDED AT - 50.00 VC 3.50 3.50 1. 50.00 VC 56 G�� 1 TH/S OFFICE AND NO APPEAL WAS RECEIVED DURING THE TWENTY 1.98% 1000.00 SD 582.36 SD x`b DAYS NEXT AFTER SUCH RECEIPT AND RECORDING OF SAID NOTICE. 33.0 K-Val 25.8 K-Val ,Aho �� x`1, o x� o O, ,�. `G `�'1, q)co��J �� �� i �� ------------------------- �� �J o ; '• ����J�� TOWN CLERK �x CLERK(: IN ROP OENTER[ E. P OSEO o \ \� �s, Oxer,�°� °�° --61-- - DENOTES STONE BOUND TO BE SET BY OWNER SO O �'� ��i `ii UNLESS OTHERWISE NOTED. .,20� x0� �j, �J. � s � O' 20' 40' 80' 120' T - ._-- — — -- � 12„ RCP — -- — - — ZX 57 G fr/GTS/DEL N£ ZX STING NTERL/ E y = — 1N OF MA DEFINIT/VE PLAN do PROFILE PETER Ssc TIDES LANE J. qy OGREN a CIVIL � S4LEM & MARRLEHE4D, MASS. E\XJ �/NG LE 5%DEL NL � ,9 No 2714 5 O9p�/s T e � a OWNER ENG/NEER SfONAI.� GLOVER ESTATES LLC HAYES ENGINEER/NG, INC. G 28 ESSEX STREET 603 S•4LEM STREET LYNN, MA 01,902 WAKEFIELD, MASS. 01880 J � , tqz�,ZOeT SCALE.' 1" = 40' (HOR) & 4' (VERT) DATE. APRIL 25, 2005 m w 50 ' V. C. 50 ' V. C. �. 56� REVr o 1' '98I° 06-011-0-0 5 sALEM PLANNING BOARD APDL/GAT/ON FILED ____________ c vN D• d tf7 ch P7 N N r O CA cD N — — 0o o -t rn ,M �- rn -t- co N cn a -t W N rn 01-10-07 ---------------------- FINAL PLAN FILED------------- oN N N M tri t!) tD CO f� f� 00 00 Oo oi — N BASE ELEV = 0 r '- - � Of 03.95 Of-50 1f00 1f50 2f00 2f50 3-f00 3-f50 ---------------------- HEARING DATE _______ — — ---------------------- PLAN APPROVED -------------- m TIDE5 LANE cc 0 SHCC T OF 4 — — — ---------------------- PLAN SIGNED---------------- 00 00w c li�P" I 1 LAND SUBJECT TO COASTAL STORM FLOWAGE FOR SALEM HARBOR ` (ELEVATION 14.0) �^1 FEMA V-4 ZONE (MARBLEHEAD) = � . —... I Q - r, ••+• SMH ---- RIM=21.02 --lN —.—.—.—.—its 15.92 fop •,/ .,,.,..:•?::' _ M .'__:.. •'•- •'• •• . W -- - ,• , r - a w / � I •1I ,- „'' _ �••��•�:-,•._,•f j ..es.r'^" •�yjt.' :,••• ,.' - IN=21.02 ................ INV-15.92 ACCESS ^— .-- ' .- .._.-',+s` •—. ...: ..�,A►,�i�a• - - ;•... •... _ _ -- ` SALEM HARBOR \ ' •� � .._-.--• - ,_ ._---.r._,-.- :��% ate,;, ::� .• .::.;_ •..:...lN� �- ' �_-) LIN / \ ' i/ —' _` '•�; J ,.•. ..� l'J OPD P '• ... BICYCLE PATH CROSSING IMPROVEMENTS AS \ s TING ENGINEERS INC. �/ f ` "••• •''' �.:�~::Y•..: ' '. , �'f•' � DESIGNED BY C&C CONSUL / = ,. � � / ` _._-� .��e�� :. �,•:•:,-•�•�. ,,�, •mss � I s7�s ro �'•.A� -�coPsi►a. •ANG .A It .ff.,� \ s WAaV LAND SUBJECT TO COASTAL STORM FLOWAGE FOR SALEM HARBOR `" '" •G I►I!; (ELEVATION 14.0) H,narrAa,uar.W it .A1f--- i,•• O o�O FEMA V-3 ZONE (SALFJ/) '• /�� 9[PATN — azwlxw 77 xr-tsc •✓' .f` v.>- •.• COACArZF 6trzo7r ANN.1.s - `� c - afmrxw / `,. (Al �� �. �7 � s .. '— +��� •a- . p�'pl•"COA�' BANK •'• • -i'� _/ t ^� 7^" MYYV . ;.• t . .. 1� r . TOP OF RIP R ,.• . WV IN TMH - 17.2 .fix. w. rL:.a.•. -•"! ALL ( :>... S .i ���' ' ?b4 c 0 V�NBENCHMARK X CUT c: -- P i- ` � ,- LOT - ijE OLD MH R=17.5 .._ !� ....- 1 ♦ ��� ` N' / R� A�o� (NGVD 1929), /-------------------- ' 123,297 \ _ . oLE QAVEb- to .� �- t? -V mom Smm / � ' 1 ••• ) ry ( " J2` �_ - "..r 8.05— RUBBLE i ate/ ! 1 1\ 1 Y>o w oLD> ON WALL _ / p / 1 1 •�• ,L � DG SAS ,SMP - / M P ExT e f / C ` uTY �� ' PROP. / PR��' \ 1 t UL DE SACT ,QEET- f f 06" S AN 6E bRA� OTHERS - �f 1 it I D/.4=11Dr LIGHT / \ � INV•10,5 1 J% l% - .- f"' "' -^-'-• -'-"'- 71 SPl..^'ES ` r / o 1 1 I ( / 0_'11 � \ � � < 1 1 i � �� �` � ` � . ;: / 1 ._, _ r � '� .---•- � _,=---I�G� gES1�E s E 5 RES C \ �'�G�, ` 1 1 Q W • /r- �� LIN SEN v �� //�� � �/�'� ` S�� WA SINGLE 4144 ? W / I , / / 1 PROM LS.C.S.FWLL . \� .Awa•Rs "••tea / \ / � 1 ,.. • � `3► `�'Lo 1 � L• ( , �,, " C�N.(`AM.) /� 915 r �; To CTT COAST�L FLOWAGE T}IE FOIEST RIVER 100 fFRROAA E ENATION 10.0) . y \ 5*CLAY PIP D SU T • �^ '-- ` OUTFA / STORM \ ` � NZSRIMER � 0(IVIP Ill A-2 ZONE \ � h /'• 1 , ��// f � .i ,,Y 'off` 1,5,6\RI-1 V 1 / \ • 5N•• . � 2ooh#�TERSN . FROM RAER SEAWALL) o � = --- • •SCO ENS/ E � r � \ �iP GRD l i o Oil � "� ._ -• �,� ; X111/� � ` �' "� � 100-FOOT BUFFER TO LINE LAND SUBJECT TO COASTAL STORM FLOWAGE FOR THE FOREST RIVER \ (MEASURED 100 FEET FROM ELEVATION 10.0 \ ,/ �� srA Amer \' 2 f/ // SCORED FLUSH CEMENT em, N s 4 �f �� / CONCRETE ISLAND owl\ 6 / FtE-set / PAVED / ! ( DRIVEWA o } 12' . T. CLERKS CERT/F/CAT/ON ON THE PLAN i- /1 r r { i'° `� f S 10l -®- - DENOTES STONE BOUND TO BE SET BY OWNER Fftr 4416 ' /333 EI F;4 ,or�3 DATE. _____________________ UNLESS OTHERIY/SE NOTED. CLERK OF THE TOWN OF MARBL£H£AD, , DO HEREBY CERT/FY THAT THE NOT/CE OF APPROVAL OF THIS PLAN O 20 40 80 120 BY THE PLANNING BOARD H45 BEEN RECE/VED AND RECORDED AT wREr uc THIS OFF/CE AND NO APPEAL WAS RECEIVED DURING THE TWENTY 04 YS NEXT AFTER SUCH RECEIPT AND RECORD/NG OF SA/D NOT/CE TOPOGRAPHIC RAN}{ OF M4S,s ' TIDESd ANf off' PETER J. V ------- z OIVIL S4LE (,Pc ilA�4R M RLE�/E:40, MASS. TOWN CLERCiViL K ,9 No.27146 "'`' G : OWNER 611049/NEER U At GLOVER ESTATES LLC HAYES ENG/NEER/NG, INC 28 ESSEX STREET 60,3 SALEM STREET 9/T OR11,4 W1-1 L YNN, AN O 1902 WAKEFIELD, AMASS. 01880 -16m•to.-toa•i SCALE- 1" = 40' DA TE APRIL 26, 2005 ILA. ao J REV/S/ONS �� D6-01-D5 V PLANNING BOARD APPL/C4T/ON FILED — — — — M44FINAL PLAN FILED------------- 01-10-07 ---------------------- ao C) �- ---------------------- HEARING DATE --------------- W DUAL CENTERLINE � RUMBLE STRIP W/ MARKER --------------- — — ------- PLAN APPROVEO______________ 3 — PLAN SIGNED 00w SHEET 3 4 i MANHOLE fAWME dr COVER 8" 8" F/N/SH R040 GR40E NOTE 5 FOOT SECTION of STRAIGHT Hl-o PIPE, (AS SPEC/F/ED) OR GROUND SURFACE TO BE USED FOR THE FIRST SECTION OUT OF C4TCH BASIN PR/OR TO CONVERSION TO CASCADE GRATE OTHER TYPES OF PIPE, /F R£QU/RED. STANDARD MANHOLE 2 COURSES OF BRICKS , FRAME AND GRATE FRAME & COVER MORTAR BED BR/CK AS REOU/RED TO TO BE SE7 IN FULL ck MORTAR ARE TO BE ,. ,� �m� JJL AGi/UST TO GRADE B MAX ( ) ALL CATCH BASIN BED OF MORTAR USED FOR ATS. - _, FR4MES & GRATES � � FRAME TO BE SET IN f --- ---- __ _1 � ARE TO BE FULL BED OF MORTAR. 4 --------- - t-� j WALL OF MANHOLE LEBARON LF248-2 2 COURSES OF BRICKS (MIN) OLgM R o i t -�''r cfc MORTAR ARE TO B£ ) ,. 24"f 1' ALL MORTAR ✓O/NT5 !NS/DE t BR/CK LIVED GRASS ,� ,n� BITUMINOUS : USED FOR GR40E 18� WIIH HYDR4UL/C CEMENT t t PREC4.ST CONC. 7R4A6T/ON SHAPED INVERT • DRIVEWAY ALt1USTMENTS NIC& \ (NON-SHRINKING MORTAR) i t SEC77ONS OR 84RREL ,,� PL O T N v 24'f 1" SECTIONS M8" MORTAR ALL 101NI`S ► i S£CTO&S W17H PRECAST SO. OPENING t O Z W£EPHOLE -______-___ I TOP SLAB DE3'lGNED FOR ', •; 6" : W 5" MIN 0.12 S0. IN. - H-20 LOADING (MIN.) ,,dr ,4 l (OPRE/CAST/N E MIN. 57EEL PER SLOW M/N. ^ � RISER SECTION) yE/GHT OF RISER PLACEVERD CCORD/NG WATERTIGHT BU7YL RUBBER , ;• V ON VAR TO HO JD/NT SEALANT AT ALL JOINTS [79o. SEC77 S Y AAS " " PROVIDE 'V' FROM f' TO 4' DES/GNAT70N M-f99 PRECAST REINFORCED CONCRETE ' e a 48 f 1 OPEN/NGS SECTIONS WITH B/TUM/MASTIC A /� ''�" ' D/AME7ER PIPE OPE11//NGS WAJL"RPROOF COA77NG �1 ; \ - _ p w " TO BE' PRE-CAS'T SHELF ELEVA770N S�(ME AS ` '" '°�` ''�` 5 . _ - 1 CLEAR OUTS/DE P/PE ONE 3 BAR AROUND /N R/SEx' SEC170N CROWN OF H/GHETT P/PE \. TEE ! OL4METER PLUS OPEJY/NGS FOR •\� O -� VCO NORMAL 2" CtiARANC£ ---------- " � • y! N WATER OU75/DE OF P/PES 18 ) OR L£NGH75 1;2;J;4:5' BR/CK SHELF PIPE + Z" --' D/AME7£R & OVER 8 M/N.(VA NES) .� LEVEL i --------- " WATERT7GHTANO ---- - H/-0 TEE f%T77NG CLEARANCE r \ t COVER - -f-- SLOPE 1%fT. - �"`"�-OR APPROVED EOUAL 1 r FLEX/BLE BOOT * 04S 7RAP FOR SIZES - - - . , y ' . • 'h. I MQRrAR 12, 15, 18" OR 24" I ' i FLOW PLA/V • RP I 30 UI'" I JOINTS M/N/MUM O.f2 SO. !NpIPE TYPE VA-4 VERT/CAL S1ZrEL PER V£R1TG4L PROVIDE 'V' �� �� PRE445T CONC. BASE BR/CK OR CONCRETE FILL GRANITE CURB FOOT, PLACEDOPENINGS 2'-O" ACCORDING TO AASHTO vv DESIGNAT/ONM199 vvv vvvva 8"M/N.✓vvvvvv ' --� vvrv�v'vvv vvvvvvv PRECAST vvvvvvvvv�, vvvvvvvv - CEMENT CONCRETE BASE UNIT 8"M/N. SCREE7YE7? GROVEL 84S£ UNDISTURBED EARI]y PRECAST CONCRETE' PRECAST CONCRETE OR LEDGE sEcrio/V A A GRAN/TE BULLNOSE Df TA11- CATCH SA, /N DRA/N MANHOLE TYP/CAL 'RECAST Sf WfR I��IANHOLE NOT Ta SC4LE- NOT TO SCALE NOT TO SCALE _ NOT TO SCALE " DETECTABLE WARN/NGS SH4LL CONS/ST OF R4/SED TRUNCATED DOMES WITH A 01AME7ER OF NOM/NAL 0.9-, STORMCEPTOR COVER A HEIGHT OF NOMINAL 0.2"'AND A CETNER-TO-CENTER AND GRATE r 0 " SPACING OF NOMINAL 2.35•"AND SHALL CONTR4ST GRADE ADJUSTERS TO 32" q \ VISUALLY WITH ADJOINING SURFACES; EITHER LIGHT ON SUR FINISHED GRADE 5" SEE N= /I DARK, OR DARK ON LIGHT. B/T. CONC. SIDEWALK A 1711N BRANCHES.AND FOLIAGE �� � •�� 6"d OIL (NOT ALL END ;r/PS) BY 1/,3 RETAINING NORMAL PLANT SHAPE,• 30 6*0 OI UT 1YPE VA4 4" LOAM & SEED ser TRIM BRANCHES' TO 6 FEET B F/N/SH GRADE GRAVEL vvvvvvvvvvvvvvvvv 4 ABOVE GROUND. v d 6 / vvvvvvvvvvvvvvvvv " - 111= Q 72.,E ,., •vvv I— I q P n P WEAR/ `o ••p —I I q ser w A\ PARIES STORMCEPTOR M06 OR® v E NG COURSE -7--�- - 3-12"RUBBER HOSES INLETWEIR OUTLET 18t " 16" _I- 1I- J -I I ( A III C—GUY WIRE t- BINDER COURSE 6"' V WRIAP TREE To ABOVE { v v'. •vvv ' *'. I— Qa I_ Rfi?Sr BRANCH—� A64INTA/N ORIGINAL SOIL RUBBER GASKET v v v GRAVEL Qq$E- v v N „ �L/NE WHEN F/LL/NG PER ASTM C M3 vvvvv . CEMENT vvv O I v v v v v v v CONCRETE 'v •0. 6 III I I STAKE- EA./7REE 2"DEPTH BARK MULCH _ _ .. d _ ' ' �— S/DEL/NE 71 INLET PIPE V v OUTt F7' CONNECTION DETAIL =III=1 ` v v I I- (- 120' R40L4L " i SAUCER CAPABLE of HOLDING rain. 24 0 DROP , 6' vvv SPACING 12 4'OF WATER °o°o o OUTLET PIPE 1VV:11 I=I I I v M vvv —I I I I BERM SIDE{VA °o°o°o°o°°° =1 11=1 v v v v v —) I= LK °0°0°0 8.0 v v v v GRAl2Z BAS'£ so = ' 0000°' 4' 7D 6' vvvv a OPEN (OUT) BURLAP 00 000 g DYES AP — t WH / - - EELCHA R I - 1I LAYOUT I I- .I FROM TOP OF ROOT BALL GRASS -III- 1/4" D/A. HOLE 1" DEEP — PLOT SMP SECTION THRU CHAMBER 6' PLAM MG SOIL. 1/2 LOAM, (SEE DETA/L) _ L/NE AT ACTUAL POINT OF 1/4 sANv, 1/4 PEAT MOSS coMPAC7FD svecR,AD£ SURVEY REFERENCE _ VERTICAL DETECTABLE SURFACE TO 6' GRANITE CURBCONFORM !PITH AOA NOTE 1. THE USE OF FLEXIBLE CONNECTIONS IS RECOMMENDED ENLARGED INI M/N- VARIES' �-EXISTING SUBCR40E STANDARDS 4.7.7 AND AT THE INLET AND OUTLET WHERE APPLICABLE. IEE DROP PIPE 4.29.2 2. THE COYER SHOULD BE POSITIONED OVER THE OUTLET r STD//�YE BOUND DROP PIPE AND THE OIL CLEANOUT PIPE. NOT TO SCALE TYPICAL TREE PLANT/NG 3. THE STORMCEPTOR SYSTEM IS PROTECTED BY ONE OR MORE GRAN/TE CURB Nor r0 Sc4LE /�1/ RAMP OF THE FOLLOWING U.S. PATENTS: X4985148, 15498331, MONUMENTS SHALL CONFORM TO THE STANDARDS WYHEEL CHAIR RAMP ® CORNE/�p #5725760. X5753115, 5849t8t. Nor ro scALE TREES TO BE APPROVED BY THE PLANN/NG BOARD SPECIFICAT/ONS OF THE C/TY ENGINEER AND SHALL SHALL B£ PLANTED ALONG T11£ S/DE LINES OF THE STORMCEPTOR BE T ACCORDING TO SUCH SPECIFICATIONS STREET, AT LOCATION AND INTERVALS TO BE NOT ro SCALE SE DETERMINED BY THE BOARD. Nor r0 sC4LE CONTRACTOR TO REVIEW SECTION V REWIRED IMPROVEMENTS FOR AN APPROVED SURD/VISION PR/OR TO CONSTRUCTION (SECTION V) OF SALEM MASSACHUSETTS SURDIKSION. Street and Roodwoy Monuments CLERKS CERTIFICATION ON THE PLAN 1. Al/ referrer/s hereinafter refer to Commonwealth of Massachusetts Department of Public Works Standard Specifications Monuments shall be installed at o// street intersections, at all points of change in direction or cuwature of streets and at other for Highway and Bridges 1953 Edition and a// amendments to date. The words "to date'shall be interpreted to mean points where, in the opinion of the City Engineer permanent monuments are necessary. Such monuments shall conform to the DATE.---------------------- at _ standard s ecif/cabon of the Cif g g p D -------------------- "at the time of fi/Ing of a subdivision pion for approval' P y Engineer and sho// be set according to such s ecificotions. No ermonent monuments shall be instal/ed until o// construction which would destrojy or disturb the monuments is completed. 2. The entire area of each street or way shalf be cleared of al/ stumps, brush, roots, boulders, like material and all Utilities CLERK OF THE TOWN OF MARBLEHEAD, , �^ trees not intended for preservation. � / 50 LAYOUT DO HEREBY CERT/FY THAT THE NOTICE OF APPROVAL OF THIS PLAN 3. All loom and other yielding material shall be removed from the roadway area of each street or way and replaced I. Connections for sewer, drain, water and electraca/ service from the main structure in the woy b the exterior line of the way BY THE PLANNING BOARD HAS BEEN RECEIVED AND RECORDED AT with suitable material. Section WI-F of the Zonring Ordinance of the City of Salem shall be referred to. shall be constructed for each lot whether or not' there is a building thereon, except that the Board may waive such requirements, in whole or in port, in the case of a lot to be used for a park, p/ayground or for any other purpose for which, in the opinion THIS OFF/CE AND NO APPEAL WAS RECEIVED DURING THE 7WEN7Y 5' 5' 3' 12' 12' 3' 5' 5 4. Granite curbs and gutters shall be installed not closer than as described in Section !V A. herewith. Curb and gutter of the Board, such connections shall not be required. DAYS NEXT AFTER SUCH RECEIPT AND RECORDING OF SAID NOT/CE GRASS- CONCRETE GRASS- CONCRETE 6A4SS- shall be instal/ed in conformity to standards of the Massachusetts Department of Public Works, Section F-1 Commonwealth PLOT S/DE7YALK �` PLOT SDEW" PLOT of Massachusetts Department of Public Works Specifications 1953, Type VA-1. 2. All sewer, surface water drains, water pipes and any other underground facilities, together with their appurtenances, shall be installed only after the sub-grade has been established; such sub-grode and the installation of dl utilities and the back Ailing LAYOUT do TRAVELED WAY " of o// the trenches shall be inspected by the City Engineer at the expense of the contractor before any installation is made. ------------------------- I 5. A// roadways shot/ be brought to a finished grade as shown on the profiles of the Definitive Plan with of /east 12 of suitable grovel after compaction with a 12-ton 3-wheel roller and treated wlYh a prime coot of asphalt MC-1 and TOWN CLERK VER77CAL surfaced with two courses of type 1-1 bituminous concrete 2 1/2'binder; 1/2" top, in accordance with Section 8-18, I f12' 1 GRAN/IF Commonwealth of Massachusetts Department of Public Works Specifications 1953. Me type of surfacing of every way shall //147 1/4"1 FT 1/40/,17 6"EW be in such a way that it will cony the expected trofric for a period of 15 years withoat excessive maintenance cost. ----------------- 12" GRAVEL BORROW Sidowolks DETAIL SHEET 4"PLANTABLE SO/L Sidewalks shall be constructed as required b rthe Plannin Board as follows• Sidewalks shot/ have a base of 8" P��H TE J. WITH SEED (IPP) q �' g �� PETER J. Y-)' TIM.5 LANE CATV, FIRE ALARM of suitable grave/ and a surface of type 1-2 bituminous concrete, 3'in depth /aid in two courses, 2"binder and /" top. o' � u�'w MASS/A�+� ELEC cfi TELE. O 8" GR4PEL The face of the sidewalk against the sodded edges shall be built ogainst o wooden form. The form shall be made OGREN } ' LEM YAgRBLE/7MO MI`IJJ. 2'Min. Cover BORROW (/YP) 1 of IN by 3"continuous wood strapping securely fastened to 2"by 3" wood posts 18"long 2' on center The foram shall No.2CIV7145 m O I be left !n place after the sidewalk !s /aid. The Planning Board may require cement concrete sidewalks to conform with A '9F 9 �isT EP�\�, ` OWNER ENG/NEER w the sidewalks of adjacent areas S10NAt� GLOVER ESTATES LLC HAYS ENGINEERING, INC. a DR41N WAS Grass Strips 28 ESSEX STREET 603 SALEM STREET N f f/2" TYPE/ BIT CONC. TOP LYNN, MA 01902 WAKEFIELD, MASS. 01880 � ONE COURSE Gross strips shat/ be provided between the curbing and sidewalk edge to o minimum of five feet. The finished grade of �` Z�.� cosuch grass strips shall be a slope of 1/2/ft toward the roadway. Where unusual physical /and characteristics or topographic SCALE 1" = 40' DATE APRIL 26, 2005 r 2 1/1' CLASS / SIr CONC. BINDER conditions exist, the Board may approve the construction of a gross strip of a greater slope with the finished slope not io ONE COURSE projecting above a plane sloped four horizontal to one vertical upward from the back of the curb or below a plane sloped REY/S/ONS CD four horizontal to one vertical downward from the back of the curb. Shade trees of a species and size to be approved by SALEM PLANNING BOARD ADPL/CAT/ON FILED the Planning Department shall be planted along the side lines of the streets, at the location and intervals to be determined 06-01-05 ------------ by the Board. Trees shall be protected by suitable boxes, fenders, or wells as appropriate. The applicant shall be responsible — -- — for the health and erectness of these trees for twenty-four (24) months after acceptance of the road by the Board or he shall 01-10-07 ---------------------- FINAL PLAN F/LED_____________ vbe responsible for rep/acing the tree with one at least equal in size and comparable in type to the tree being rep/aced and again — � guaranteed for at least twenty-four (24) months from date of replanting. ___________________ -- --------------- T — — - R/NG DATE ro TYP/CAL CROSS SECT/ON The top six inches of gross strips shall consist of good quo/ity loom extending to the rrglit-of-woy, screened, raked and rolled o`-° with at least a 100-pound roller to grade. The loom shall be screened with lawn grass seed applied in sufficient quantity to assure '-' — ---------------------- PLAN APPROVED________--____ adequate permanent coverage, satisfactory to the Planning Deportment, rolled when the loom is moist Looming and seeding shall be NOT TO SCALE in occordonce with Section 751 and 755 of the Standard Specifications ,J A aSHEET `t O� "T` — ---------------------- PLAN SIGNED---------------- i. I