Loading...
224-234 HIGHLAND AVENUE - ZONING {1ennedz� - SpE2 - dt,(AICa.uL/�v S�y, zzy - zap{ o� d r I� I�— CMDR �T �{ yr`"' `0TH ILI tJ of ~tUilnlllCa55arbuerfts w. Itzmtitt earl Aip 5-- air tl 6rrrn Q � Decision Site Plan Review t� Y Special Permit The Kennedy Development Group, Inc. 500 Broadway -- Everett, MA 02149 RE: Quikava and Best Wash Car Wash- 224 and 234 Highland Avenue On Thursday, March 21, 1996, the Planning Board of the City of Salem opened a public hearing regarding the application of the Kennedy Development Group, 500 Broadway, Everett, MA 02149, under Section 7-18, Site Plan Review of the Salem Zoning Ordinance, with respect to the construction of a 5,429 s.f. building to house a car wash and a 490 s.f. drive thru coffee kiosk at 224-234 Highland Avenue, adjacent to the previously approved Pep Boys site. The public hearing was closed on May 16, 1996. At a regularly scheduled meeting of the Planning Board held on May 16, 1996, the Board voted by a vote of six (6) in favor, two (2) opposed, to approve the application as complying with the requirements of Section 7-18, subject to the following conditions: 1. Conformance With Plan Work shall conform with set of plans entitled, "Proposed Car Wash - Salem, MA," dated November 29, 1995, revised February 3, 1996, March 5, 1996, April 4, 1996, and April 29, 1996, and May 28, 1996, containing 5 sheets labeled L-01 through L-05, prepared by CDW Consultants, Inc, 111 Speen Street, Suite 119, Framingham, MA, 01701. 2. Amendments Any amendments to the Site Plan or waiver of conditions contained within shall require the approval of the Planning Board. 3. Traffic a. The Applicant , his successors or assigns, shall receive written approval from the Massachusetts Highway Department (MHD) for the proposed curb cuts and traffic signal changes on Highland Avenue prior to the issuance of a Building Permit. The Applicant, his successors or assigns, shall assume all costs for any required traffic changes. b. The Applicant, his successors or assigns, shall receive written approval from the City Planner and City Electrician for the proposed traffic changes, including signal timing, on Highland Avenue. c. Upon issuance of a Certificate of Occupancy for the Pep Boys building, the Applicant, his successors or assigns, shall provide the City of Salem with S 10,000 to be used toward a Highland Avenue Corridor Study which shall define potential improvements to the Highland Avenue Corridor. d. The Applicant, his successors or assigns, shall provide a deceleration lane along their entire property frontage to the signalized entrance to the site on Highland Avenue. The applicant, his successors or assigns, shall provide "right turn only" striping for the deceleration lane. The deceleration lane shall be depicted on the site plan and approved in writing by MHD prior to the issuance of a Building Permit. e. The Applicant, his successors or assigns, shall provide the City and MHD, at no cost, an area of land approximately 10 feet wide as shown on the approved plan, beyond the deceleration lane, along the entire Route 107 (Highland Avenue) property frontage of the site to allow for the future widening of Highland Avenue. This area of land is not to be utilized until said area of land is determined by MHD to be necessary to accommodate future roadway improvements. The responsibility for the future improvements shall not be borne by the applicant, his successors, or assigns. Such area shall be shown on the plan, and maintained in perpetuity as a No-Build Zone. f. The Applicant shall provide the City with copies of all plans and correspondence to and from MHD on this project. 4. Conservation Commission All work shall comply with Order of Conditions #64-231 issued by the Salem Conservation Commission. 5. Utilities a. Utility installation shall be reviewed and approved by the City Engineer prior to the issuance of a Building Permit. b. Drainage shall be reviewed and approved by the City Engineer prior to the issuance of a Building Permit. 6. Site Lighting a. A lighting plan shall be submitted to the City Planner for review and written approval prior to the issuance of a Building Permit. b. All site lighting shall be installed and maintained in such a way so as to not reflect or cause glare on abutting properties, or which adversely affect safe vision of operators of vehicles moving on nearby streets. 7. Landscaping a. A detailed landscaping plan and planting schedule shall be submitted to the City Planner and approved in writing prior to the issuance of a Building Permit. b. Trees shall be a minimum of 3 1/2" caliper. c. Vertical granite curbing shall be installed along the radii at each of the two entrance driveways, as well as at all entrance radii at Quikava and the Car Wash. d. Concrete or sloped granite curbing shall be installed within the entire site. e. Applicant, his successors or assigns, shall install a 4 foot chain link fence behind the northeast corner of the Pep Boys building to prohibit debris from blowing or rolling into wetland area. Location of such fence shall be reviewed and approved by the City Planner. f. The Applicant, his successors or assigns, shall install a wooden fence ranging in height from 6-8 feet and appropriate landscaping along the entire rear property line to provide screening for abutters. The applicant, his successors or assigns, shall submit a plan depicting fence and landscaping for the City Planner's written approval prior to the issuance of a Building Permit. Construction shall include concrete footings and pipe bracing at each post. g. The Applicant shall complete the installation of the fence and landscaping along the rear property line, adjacent to abutting residences, upon completion of the fill operation and site preparation and prior to the start of actual building construction. h. The applicant, his successors or assigns, shall clearly delineate pedestrian crossing areas within the site. In addition, applicant, his successors or assigns, shall provide a handicapped curb-cut adjacent to the bus stop. Pedestrian crossing plan shall be reviewed and approved by the City Planner prior to the issuance of a Certificate of Occupancy. 8. Signage a. The approved site plan does not depict a billboard and therefore, no billboard shall be allowed to be erected at any time on the entire site. b. Proposed signage shall be reviewed and approved in writing by the City Planner. 9. Board of Health All Board of Health requirements in a letter dated April 12, 1996 shall be strictly adhered to. 10. Fire Department All work shall comply with the requirements of the Salem Fire Department. 11. Building Inspector All comments from the Building Inspector dated March 11, 1996 shall be adhered to. _ l 12. Water Test The water system shall be tested by the City of Salem Clerk of the Works for pressure and bacteria prior to the issuance of a Certificate of Occupancy. 13. Underground Utilities All utilities shall be installed underground. 14. Blasting a. All blasting to be done in accordance with 527CMR13 and City of Salem Blasting Ordinance. b. The Applicant, his successors or assigns, shall provide written notice to all abutters at least 72 hours before the start of blasting. Such notice shall include the time and duration of blasting. 15. Clerk of Works A Clerk of Works shall be provided and paid for by the applicant, his successors or assigns, as deemed necessary by the City Planner. 16. Bus Stop Relocation a. The applicant, his successors or assigns, shall work with the MBTA to relocate the bus stop on Highland Avenue at the signalized entrance to the westerly side of driveway. The relocation shall receive the written approval of the City Planner. b. The City shall make a formal request to the MBTA for the installation of a bus shelter at the bus stop. If the MBTA does not agree to pay for the bus shelter, the Applicant, his successors or assigns, shall agree to pay for the bus shelter. 17. Rooftop Screening A plan for the screening of rooftop equipment shall be submitted to the City Planner for written approval prior to the issuance of a Building Permit. 18. Rooftop and other Noise Rooftop noise and rooftop noise mitigation shall be implemented in accordance with the "Sound Level Monitoring and Modeling - Pep Boys Automotive Supply and Service Center" study conducted by Tech. Environmental, Inc., dated June, 1995 and the Tech Environmental, Inc. Study dated March 29, 1996. If noise levels taken during Summer months, the year following completion of construction after construction exceed these levels, additional mitigation measures shall be installed, as deemed necessary by the City Planner, to reduce the noise level to the preconstruction levels. The Applicant has agreed to utilize a Digital Read Out System for the Quikava Speaker System as mitigation if it is determined that noise from the speaker system is problematic to abutting residents. In addition, the Applicant has agreed to turn off outside power for vacuums and self-wash bays at the car wash after operating hours. 19. Security Gates The Applicant shall install security gates at each entrance driveway at Highland Avenue to prohibit access to the site after hours. The Applicant shall work with the City Planner, the Fire Department and the Police Department to design an acceptable gate system. 1 20. Truck Deliveries Truck deliveries shall be limited to the hours of 7:00 a.m. to 6:00 p.m. Monday-Saturday and 12:00 p.m. to 6:00 p.m. on Sunday. 21. Street Sweeping Applicant, his successors or assigns, shall provide street sweeping on Highland Avenue, Glenn and Greenlawn Avenue, as is deemed necessary during the period of construction by the City Planner in consultation with the Ward Councillor. 22. Hours of Operation Hours of operation for the Pep Boys service bays shall be limited to the hours of 9:00 a.m. - 6:00 p.m. on Sunday and as allowed by the City of Salem Code of Ordinances Monday - Saturday. 23. Exterior Elevations The Applicant shall conform with the building materials and colors as shown on the elevations for Quikava, Pep Boys and Best Wash. These elevations shall be part of the approved plans for this project. a. Pep Boys - Exterior Elevations, prepared by David N. Lummis, AIA, Ignarri - Lummis, Architects and Planners, 601 Chapel Avenue East, Cherry Hill, NJ 06034, dated April 23, 1996. b. Quikava - Elevations/Sections, C-2 Prototype, Sheet A-2, prepared by Quikava, Inc. dated 3/15/96, revised April 24, 1996. The exterior materials shall include wood trim and wood clapboards. In addition, there shall be no widows walk on the roof. C. Best Wash, Highland Avenue, Salem MA, Exterior Elevations, dated May 10, 1996. 24. Security Upon commencement of the fill operation, the Applicant shall post a bond, in an amount to be determined by the City Planner, in consultation with the City's Landscape Architect, in order to ensure sufficient funds are available to stabilize the slope along the rear property line in the event the project does not go forward. 25. Maintenance a. The applicant, his successors or assigns, shall employ an acceptable method or means for the holding and disposal of trash (rubbish) after site development with a copy of this method sent to the Planning Department and Health Department in writing for their approval. b. Refuse removal, ground maintenance and snow removal shall be the responsibility of the developer, his successors or assigns. c. There shall be no salt used as a de-icing agent. d. Winter snow in excess of the snow storage areas on the site shall be removed off site. I 26. Construction Practices All construction shall be carried out in accordance with the following conditions: a. No work shall commence before 8:00 A.M. on weekdays and Saturdays. No work shall continue beyond 5:00 P.M. There shall be no work conducted on Sundays and holidays. Inside work of a quiet nature may be permitted at other times. b. All reasonable action shall be taken to minimize the negative effects of construction on abutters. Advance notice shall be provided to all abutters in writing at least 72 hours prior to commencement of construction. Notification shall also be submitted to the Planning Department. c. Maintenance of all landscaping shall be the responsibility of the applicant, his successors or assigns. The applicant, his successors or assigns, shall replace all trees and shrubs which do not survive for greater than two (2) years. d. The Applicant shall implement a dust control program, including but not limited to, watering down of the site during the fill operation. e. All construction shall be performed in accordance with the Rules and Regulations of the Planning Board, and in accordance with any and all rules, regulations and ordinances of the City of Salem. 27. As-Built Plans As-built plans, stamped by a Registered Professional Engineer or Land Surveyor, shall be Its submitted to the Planning Department and Engineering Department prior to the issuance of a Certificate of Occupancy. 28. Violations Violations of any condition shall result in revocation of this permit by the Planning Board. unless the violation of such condition is waived by a majority vote of the Planning Board. I hereby certify that a copy of this decision and plans have been filed with the City Clerk and copies are on file with the Planning Board. The Special Permit shall not take effect until a copy of this decision bearing the certification of the City Clerk that twenty(20) days have elapsed and no appeal has been filed or that if such appeal has been filed, and it has been dismissed or denied, is recorded in the Essex South Registry of Deeds and is indexed under the name of the owner of record or is recorded on the owner's Certificate of Title. The fee for recording or registering shall be paid by the owner or applicant, his successors or assigns. Walter B. Power, III Chairman jm/bd/pepboys.dec a i a '�AroWde t w 0M $alettt (16am �i � J / y Decision Site Plan Review Wetlands and Flood Hazard District Special Permits The Kennedy Development Group, Inc. 500 Broadway Everett, MA 02149 RE: Pep Boys - 224 and 234 Highland Avenue On Thursday, May 18, 1995, the Planning Board of the City of Salem opened a public hearing regarding the application of the Kennedy Development Group,1500 Broadway, Everett, MA 02149, under Section 7-16, Wetlands and Flood Hazard District and Section 7-18, Site Plan Review of the Salem Zoning Ordinance, with respect to the construction of a +/-22,000 s.f. Pep Boys automotive parts and service facility and associated site work of 224 and 234 Highland Avenue. The public hearing was closed on July 6, 1995. At a regularly,scheduled meeting of the Planning Board held on July 6, 1995, the Board voted by a vote of eight (8) in favor, none (0) opposed, to approve the application as complying with the requirements of Section 7-16 and 7-18, subject to the following conditions: I, Conformance With Plan Work shall conform with set of plans entitled, "Pep Boys - Salem, MA," dated March 17, 1995, revised March 31, 1995, April 27, 1995, May 23, 1995, and July 12, 1995, containing 6 sheets labeled L-01 through L-05, prepared by CDW Consultants, Inc, 111 Speen Street, Suite 119, Framingham, MA, 01701. 2. Amendments Any amendments to the Site Plan or waiver of conditions contained within shall require the approval of the Planning Board. 3. Traffic a. The Applicant , his successors or assigns, shall receive written approval from the Massachusetts Highway Department (MHD) for the proposed curb cuts and traffic signal changes on Highland Avenue prior to the issuance of a Building Permit. The Applicant, his successors or assigns, shall assume all costs for any required traffic changes. b. The Applicant, his successors or assigns, shall receive written approval from the City Planner and City Electrician for the proposed traffic changes, including signal timing, on Highland Avenue. c. Upon issuance of a Certificate of Occupancy for the Pep Boys building, the Applicant, his successors or assigns, shall provide the City of Salem with $10,000 to be used toward a Highland Avenue Corridor Study which shall define potential improvements to the Highland Avenue Corridor. d. The Applicant, his successors or assigns, shall provide a deceleration lane along their entire property frontage to the signalized entrance to the site on Highland Avenue. The applicant, his successors or assigns, shall provide "right turn only" striping for the deceleration lane. The deceleration lane shall be depicted on the site plan and approved in writing by MHD prior to the issuance of a Building Permit. e. The Applicant, his successors or assigns, shall provide the City and MHD, at no cost, an area of land approximately 10 feet wide, beyond the deceleration lane, along the entire Route 107 (Highland Avenue) property frontage of the site to allow for the future widening of Highland Avenue. This area of land is not to be utilized until said area of land is determined by MHD to be necessary to accommodate future roadway improvements. The responsibility for the future improvements shall not be borne by the applicant, his successors, or assigns. Such area shall be shown on the plan, and maintained in perpetuity as a No-Build Zone. 4. Conservation Commission All work shall comply with Order of Conditions #64-231 issued by the Salem Conservation Commission. 5. Utilities a. Utility installation shall be reviewed and approved by the City Engineer prior to the issuance of a Building Permit. b. Drainage shall be reviewed and approved by the City Engineer prior to the issuance of a Building Permit. 6. Site Li tine a. A lighting plan shall be submitted to the City Planner for review and written approval prior to the issuance of a Building Permit. b. All site lighting shall be installed and maintained in such a way so as to not reflect or cause glare on abutting properties, or which adversely affect safe vision of operators of vehicles moving on nearby streets. 7. Landscaping a. A detailed landscaping plan and planting schedule shall be submitted to the City Planner and approved in writing prior to the issuance of a Building Permit. b. Trees shall be a minimum of 3 1/2" caliper. c. Vertical granite curbing shall be installed along the radii at each of the two entrance driveways. d. Concrete or sloped granite curbing shall be installed within the entire site. e. Applicant, his successors or assigns, shall install a 4 foot chain link fence behind the northeast corner of the Pep Boys building to prohibit debris from blowing or rolling into wetland area. Location of such fence shall be reviewed and approved by the City Planner. f. The applicant, his successors or assigns, shall install a wooden fence ranging in height from 6-8 feet and appropriate landscaping along the entire rear property line to provide screening for abutters. The applicant, his successors or assigns, shall submit a plan depicting fence and landscaping for the City Planner's written approval prior to the issuance of a Building Permit. Construction shall include concrete footings and pipe bracing at each post. g. The applicant, his successors or assigns, shall flag all trees along the rear property line to be removed and depict them on a site plan. The plan shall be submitted to the Planning Department for review. All trees which are being removed and are over 5" in caliper shall be approved by the City of Salem Landscape Architect. It is understood that in every instance where a tree over 5" in caliper can be saved it will be the expressed interest of the applicant, his successors or assigns, and the City of Salem to save such tree. h. The applicant, his successors or assigns, shall clearly delineate pedestrian crossing areas within the site. In addition, applicant, his successors or assigns, shall provide a handicapped curb-cut adjacent to the bus stop. Pedestrian crossing plan shall be reviewed !± and approved by the City Planner prior to the issuance of a Certificate of Occupancy. i. After all project landscaping is completed, and prior to the issuance of a Certificate of Occupancy, the applicant, his successors or assigns, shall be required to add further landscaping if such is required by the City Planner. 8. Signage Proposed signage shall be reviewed and approved in writing by the City Planner and may be less than the signage allowed in the Salem Sign Ordinance. 9. Board of Health All Board of Health requirements shall be strictly adhered to. 10. Fire Department All work shall comply with the requirements of the Salem Fire Department. 11. Water Test The water system shall be tested by the City of Salem Clerk of the Works for pressure and bacteria prior to the issuance of a Certificate of Occupancy. 12. Underground Utilities All utilities shall be installed underground. 13. Blasting a. All blasting to be done in accordance with 527CMR13 and City of Salem Blasting 1 Ordinance. b. The Applicant, his successors or assigns, shall provide written notice to all abutters at least 72 hours before the start of blasting. Such notice shall include the time and duration of blasting. 14. Clerk of Works A Clerk of Works shall be provided and paid for by the applicant, his successors or assigns, as deemed necessary by the City Planner. 15. Bus Ston Relocation a. The applicant, his successors or assigns, shall work with the MBTA to relocate the bus stop on Highland Avenue at the signalized entrance to the westerly side of driveway. The relocation shall receive the written approval of the City Planner. b. The City shall make a formal request to the MBTA for the installation of a bus shelter at the bus stop. If the MBTA does not agree to pay for the bus shelter, the Applicant, his successors or assigns, shall agree to pay for the bus shelter. ' 16. Rooftop Screening A plan for the screening of rooftop equipment shall be submitted to the City Planner for written approval prior to the issuance of a Building Permit. 17. Rooftop Noise Rooftop noise and rooftop noise mitigation shall be in accordance with the "Sound Level Monitoring and Modeling - Pep Boys Automotive Supply and Service Center" study conducted by Tech. Environmental, Inc., dated June, 1995. If noise levels taken after construction exceed these levels, additional mitigation measuresishallbe installed, as deemed necessary by the City Planner, to reduce the noise level,to the preconstruction levels. 18. Truck Deliveries Truck deliveries shall be limited to the hours of 7:00 a.m. to 6:00 p.m. Monday-Saturday and 12:00 p.m. to 6:00 p.m. in Sunday. 19. Street Sweeping Applicant, his successors or assigns, shall provide street sweeping on Highland Avenue as is deemed necessary during the period of construction by the City Planner in consultation with the Ward Councillor. 20. Hours of Operation Hours of operation for the service bays shall be limited to the hours of 9:00 a.m. - 6:00 p.m. on Sunday and as allowed by the City of Salem Code of Ordinances Monday - Saturday. 21. Maintenance a. The applicant, his successors or assigns, shall employ an acceptable method or means for the holding and disposal of trash (rubbish) after site development with a copy of this method sent to the Planning Department and Health Department in writing for their approval. b. Refuse removal, ground maintenance and snow removal shall be the responsibility of the developer, his successors or assigns. c. There shall be no saltused as a de-icing agent. d. Winter snow in excess of the snow storage areas on the site shall be removed off site. 22. Construction Practices All construction shall be carried out in accordance with the following conditions: a. No work shall commence before 8:00 A.M. on weekdays and Saturdays. No work shall continue beyond 5:00 P.M. There shall be no work conducted on Sundays and holidays. Inside work of a quiet nature may be permitted at other times. b. All reasonable action shall be taken to minimise the negative effects of construction on abutters. Advance notice shall be provided to all abutters in writing at least 72 hours prior to commencement of construction. Notification shall also be submitted to the Planning Department. c. Maintenance of all landscaping shall be the responsibility of the applicant, his successors or assigns. The applicant, his successors or assigns, shall replace all trees and shrubs which do not survive for greater than two (2) years. d. All construction shall be performed in accordance with the Rules and Regulations of the Planning Board, and in accordance with any and all rules, regulations and ordinances of the City of Salem. 23. As-Built Plans As-built plans, stamped by a Registered Professional Engineer or Land Surveyor, shall be submitted to the Planning Department and Engineering Department prior to the issuance of a Certificate of Occupancy. 24. Violations Violations of any condition shall result in revocation of this permit by the Planning Board, unless the violation of such condition is waived by a majority vote of the Planning Board. I hereby certify that a copy of this decision and plans have been filed with the City Clerk and copies are on file with the Planning Board. The Special Permit shall not take effect until a copy of this,decision bearing the certification of the City Clerk that twenty(20) days have elapsed and no appeal has been filed or that if such appeal has been filed, and it has been dismissed or denied, is recorded in the Essex South Registry of Deeds and is indexed under the name of the owner of record or is recorded on the owner's Certificate of Title. The fee for recording or registering shall be paid by the owner or applicant, his successors or assigns. Walter B. Power, III e a Chairman 'm/bd/ a bo s.ds J P P Y P i i 1` 4 i l ;4 f � �e 1 f f Sn I l ��l,r lei 1 r � n w�. !, . � . . \31 , /. xk . � . ¥ - z a\ . vy \ ¥ k \ . � r I ✓ Fn°-,`�Fww. Sl�'•i v I _�..�_ -. K 4 v11bo 1. 3 l pl lw 'fit rri ' w \\ • � V at r r......I r I /. am - _1 - \ >• _ • �-_�� • .a.moi. �Y k � F,. `v \ ( . - � • � 3 . / : < . Z5-