Loading...
23 GLENDALE STREET - ZONING 23 G\,e,cN d o A lt -- mD Dew� avA s CITY OF SALEM PLANNING BOARD FILE #i Decision CITY CLERK, SALEM,MASS, Flood Hazard Overlay District Special Permit 23 Glendale Street (Map 33 Lot 646) September 15, 2015 Fred J. Dion Yacht Yard, Inc. 23 Glendale Street Salem, MA 01970 RE: Flood Hazard Overlay District Special Permit Decision On Thursday, September 3,2015, the Planning Board of the City of Salem opened a public hearing at the request of FRED J.DION YACHT YARD, INC, for a Flood Hazard Overlay District Special Permit in accordance with Section 8.1 Flood Hazard Overlay District of the Salem Zoning Ordinance, for the property located at 23 Glendale Street (Map 33 Lot 646). The applicant proposes to reconstruct and expand an existing storage shed for additional boat storage measuring 60'wide, 80'long, and 26'high. The public hearing was closed on September 3,2015. Flood Hazard Overlay Special Permit Findings: The Planning Board hereby makes the following findings pertaining to the Flood Hazard District Special Permit Application: 1. The proposed uses comply in all respect to the uses and provisions of the underlying zoning district. 2. A portion of the site is within the 100-year FEMA coastal floodplain. There are adequate convenience and safety of vehicular and pedestrian movement within the site and in relation to adjacent streets and property, particularly in the event of flooding of the lot(s) or adjacent lots(s) caused by either the overspill from water bodies or high runoff 3. All utilities including gas, electricity, fuel,water and sewage disposal will be located and constructed so as to protect against breaking, leaking, short-circuiting,grounding or igniting or any other damage due to flooding. 4. The proposed development will not be located within a coastal high hazard area (Zone VE on the FEMA Flood Insurance Rate Maps). At a regularly scheduled meeting of the Planning Board held on September 3, 2015 the Planning Board voted by nine (9) in favor (Ben Anderson (Chair), Helen Sides, Randy Clarke, Kirt Rieder, 2 Dale Yale, Bill Griset, Matthew Veno, Carole Hamilton and Noah Koretz), and none (0) opposed to a Flood Hazard Overlay District Special Permit subject to the following conditions: 1. Conformance with the Plan Work shall conform to the plans entitled"Plan of Land for the Proposed Reconstruction of a Boar Storage Building,Proposed Building"D" for Fred J, Dion Yacht Yard, Inc. 23 Glendale Street Salem, MA" dated August 7, 2015 prepared by Patrowicz Land Development Engineering and elevation plans entitled "Dion's Salem Harbor, Glendale Street, Salem,MA Proposed New Building" dated March 5, 2015 prepared by Allan Dennis,Marblehead,MA. 2. Amendments Any amendments to the site plan shall be reviewed by the City Planner and if deemed necessary by the City Planner, shall be brought to the Planning Board. Any waiver of conditions contained within shall require the approval of the Planning Board 3. Construction Practices All construction shall be carried out in accordance with the following conditions: a. All provisions in the City of Salem's Code of Ordinance, Chapter 22, Noise Control, shall be strictly adhered to. b. All reasonable action shall be taken to minimize the negative effects of construction on abutters. Advance notice shall be provided to all abutters in writing at least 72 hours prior to commencement of demolition and construction of the project. c. Drilling and blasting shall be limited to Monday-Friday between 8:00 AM until 5:00 PM. There shall be no drilling, blasting or rock hammering on Saturdays, Sundays, or holidays. Blasting shall be undertaken in accordance with all local and state regulations. d. All construction vehicles shall be cleaned prior to leaving the site so that they do not leave dirt and/or debris on surrounding roadways as they leave the site. e. All construction shall be performed in accordance with the Rules and Regulations of the Planning Board, and in accordance with any and all rules,regulations and ordinances of the City of Salem. f. All construction vehicles left overnight at the site,must be located completely on the site g. A Construction Management Plan and Construction Schedule shall be submitted by the applicant to the Building Inspector for review and approval prior to the issuance of a building permit. Included in this plan,but not limited to, shall be information regarding how the construction equipment will be stored, a 3 description of the construction staging area and its location in relation to the site, and where the construction employees will park their vehicles. 4. Clerk of the Works A Clerk of the Works shall be provided by the City, at the expense of the applicant, his successors or assigns, as is deemed necessary by the City Planner. Notwithstanding the foregoing, the parties acknowledge the Project shall be subject to controlled construction,which requires oversight by licensed engineers and architects.Accordingly,it is the understanding of the Board, the City Planner and the Applicant that the Clerk of the Works is expected to oversee and review all civil/site improvements related to the project located within the public way,including all utility connections to publicly owned infrastructure. It is also mutually understood that the expense associated with a Clerk of the Works shall be for a reasonable number of hours and at a customary rate for such service. 5. Fire Department All work shall comply with the requirements of the Salem Fire Department prior to the issuance of any building permits. 6. Building Inspector All work shall comply with the requirements of the Salem Building Inspector consistent with the current version of the State Building Code,Massachusetts Architectural Access Board regulations and Massachusetts Energy Codes. 7. Board of Health a. The individual presenting the plan to the Board of Health must notify the Health Agent of the name, address, and telephone number of the project (site) manager who will be on site and directly responsible for the construction of the project. b. A lead and asbestos inspection to be conducted prior to any demolition or construction. If lead or asbestos is found it shall be removed by contractors licensed for such removal. c. The developer shall ensure that pests do not negatively impact the neighborhood as a consequence of construction work. The developer shall submit pest control reports including a pest survey and treatment actions. d. The developer shall employ a licensed pesticide applicator to exterminate the area prior to construction, demolition, and/or blasting and shall send a copy of the exterminators invoice to the Health Agent. e. The developer shall maintain the area free from rodents throughout construction. f. The developer shall submit to the Health Agent a written plan for dust control during construction, such as negative air pressure and physical barriers between occupied areas and construction areas. f 4 g. The Fire Department must approve the plan regarding access for firefighting. h. Noise levels from the resultant establishment(s) generated by operations,including but not limited to refrigeration and heating, shall not increase the broadband sound level by more than 10 dB(A) above the ambient levels measured at the property line. i. The resultant establishment(s) shall dispose of all waste materials resulting from its operations in an environmentally sound manner as described to the Board of Health. j. The developer shall test for Radon and install Radon mitigation system prior to the issuance of an Occupancy Permit. k. The developer shall notify the Health Agent when the project is complete for final inspection and confirmation that above conditions have been met. 8. Utilities a. Utility installation shall be reviewed and approved by the City Engineer prior to the issuance of any Building Permit. The applicant shall have an engineer certify the utility plans for review by the City Engineer,prior to the issuance of any Building Permit. b. All electrical utilities for the site shall be underground. c. A plan for sidewalks shall be submitted and approved by the City Engineer prior to the issuance of any Building Permit. 9. Conservation Commission All work shall comply with the requirements of the Conservation Commission. 10. Lighting a. No light shall cast a glare onto adjacent parcels or adjacent rights of way. 11. As-Built Plans a. As-built plans, stamped by a Registered Professional Engineer, shall be submitted to the Department of Planning and Community Development and Department of Public Services prior to the issuance of any Certificate of Occupancy. b. The As-Built plans shall be submitted to the City Engineer in electronic file format suitable for the City's use and approved by the City Engineer,prior to the issuance of any Certificate of Occupancy. c. A completed tie card, a blank copy (available at the Engineering Department) and a certification signed and stamped by the design engineer, stating that the work was completed in substantial compliance with the design drawing must be submitted to the City Engineer prior to the issuance of any Certificate of Occupancy;as well as, any subsequent requirements by the City Engineer. ° 5 i To the extent that construction work has been completed sufficient for a Certificate of Occupancy to be issued for a portion of the Project or the Project in its entirety but that the As-Built plans have not yet been fully completed (for said portion of the Project or the Project in its entirety), the applicant may provide a performance bond or surety in an amount and for subject to approval of the City Planner to ensure that the As- Built Plans are completed within a reasonable timeframe. 14. Violations Violations of any condition contained herein shall result in revocation of this permit by the Planning Board,unless the violation of such condition is waived by a majority vote of the Planning Board. I hereby certify that a copy of this decision and plans has been filed with the City Clerk and copies are on file with the Planning Board. The Special Permit shall not take effect until a copy of this decision bearing the certification of the City Clerk that twenty (20) days have elapsed and no appeal has been filed or that if such appeal has been filed, and it has been dismissed or denied,is recorded in the Essex South Registry of Deeds and is indexed under the name of the owner of record is recorded on the owner's Certificate of Title. The owner or applicant,his successors or assigns, shall pay the fee for recording or registering. Ben Anderson, Chair The endorsement shall not take effect until a copy of the decisions bearing certification of the City Clerk that twenty(20)days have elapsed and no appeal has been filed, or that if such appeal has been filed that it has been dismissed or denied, is recorded in the Essex South Registry of Deeds and is indexed in the grantor index under the name of the owner of record and noted on the owner's certificate of title. The owner or applicant shallpay the fee far recording or registering. THESE DRAWINGS ARE DIAGRAMATIC AND ARE NOT TO BE SCALED FOR MEASUREMENTS. . ALL DIMENSIONS ARE TO BE VERIFIED IN THE FIELD PRIOR TO BOA'm� Q . . Q _ ALLAN n .N P.E. CONSTRUCTION AND THE ORDERING OF MATERIALS. ZON D ILIO DENNIS,oV THE CODE IS RESPONSIBLE TO COMPLY WITH COD REGULATIONS AND TO NOTIFY THE ARCHITECT OF.ANY DISCREPANCIES AND/OR FIELD CONDITIONS. 8 Wheeler Place THE ARCHITECT WILL NOT BE HELD RESPONSIBLE FOR CONSTRUCTION MEANS OR METHODS USED BY THE Marblehead NDA 01945 CONTRACTOR. i Tel.(781)990-5016 f 2x4 EXTERIOR WALL W/ 5/8" T-III SHEATHING OR CORRUGATED STEEL SIDING. 3ROOFp� MEMBRANE OVER n/ CK t L - • • • . ... BOARD ISOLATION r -ROOF (HIGH) • - - ROOF (LOW) z o LLJrn . i .....� Z • : GRADE BOAT STOfi`AGF� jBUILDING . . . co - PROPOSED I= RON .ELEVATION . ui CI� SCALE: I/8" = 1' -0" < Q_ UJ 2x4 EXTERIOR WALL ' W/ - 5/8" T-III SHEATHING O CORRUGATED STEEL; IDING ROOF SLOPE: ROOFING MEMBRANE I i/4 PER FOOT-1 OOT OVER 3/4 DECKING I. RODF (LOW) 4 SCALE: AS NOTED DATE: .03-05-15 00, En REVISIONS: GRADE DRAWING: {_ BOAT ' STORA'GB BUILDING BOAT STORAGE. ' BUILDING PROPOSED PROPOSED . RIGHT ELEVATION : FRONT 'tRIGHT SCALE: 1/8" ' I► _011 ELEVATIONS 7�, J � �� 8" swsf(VC(ai CI) ex.granti block steps - £-6"WCL \ ql • _-- NT � 1 � SCOPE OF\-,6� _ _ __ _ _ _ _ A AI PROPOSED WORK � - �'UBJECT — � \ h be � --- q� ER�ASEME_� � . v SEW_ - __ _ �� �A� __ ' N Work is within the Land Subject to Coastal Storm Flowage and shall meet applicable FLOWAGE _.�-- — ��/ - _ — (310 CMR 10.04) _� ' - i , - --COASTAL BEACH IZ / �.—A-- Building Codes): I1J FEMA AE Z0�1IE_-'- �b = / 2 ' (sandy beach) a � _.(_2B•fdfN7I1TD'88 =° / (310 CMR 10.27) b Q - -- - BFE=11.o V E V bq %gib y? 1 . Demolish and re-construct a portion of Building C 2 045±SF . Re-locate. 7-'- 1/ a q '�° p g ( ) e a 6-inch water Z f • q2 I ° Salem MEAN HIGH WATER A _ {�{ i / qb' exvgc 5° X:q I Zp (310 CMR 10.23) n L E M H A R B 0 R line and existing fire hydrant (per specifications of the Salem Fire Dept) approximate new qb " ""xb2 q (elevation-3.6) NAVD'88 approx.line " * I location for hydrant is shown on this Site Plan. No other changes to utilities (outside of the I q q q2x • y2 a Z l!7 j Salem Wetlands By-law & WPA qq 100-FOOT BUFFER ZONE - q Ln o ~t- „ 1 - 2 - i I new buildings footprint) are required. W v measured m TOCB _ - I i ( ) TOP OF COASTAL BANK (TOCB) _ b0 MassDEP Policy 92-1 Figtc.re#4 .2 I 2. Re-construct a Boat Storage Building (4,800±SF) to provide additional covered boat Z�W • — - �� q 002 1 �x.sandy beach exsandy beach Q� Z 1 � � �b (310 CMR 10.30) I ♦-W,yI A Q - i _ - �q I h�'F xy x %_ ex rip rap i storage capacity (floor to be crushed stone). ri 1 arx.rip rap I� 'A '1 ex.ri rn x p P N87"49 0699Eo — �— — - I'v A ! • I 9 ex.lawn x -0 b� 163'± 2_ 0 I. 'N 1 -/ ° v Q2 x ex.concr-a q 3 ' I20 s 3 qo �". P i'' r• " •- a �,+q;i .� • Ate. + 5 _ -0h xt ax '7/T/V q qA W 4 �,, o f 'I p b'•` tl� ' rJ.� �Y 41. ��i U 9 r �p N b 'IZ ' 1 �, N �. xb 80. ~ >b�' �'•.• hyv. c.s'.'4` p ,/ q WILLOW A? E f ��2, 1' 1 JANICE BALDW 10b I ; �LENDALE COVE COND INIUM o I ! iiiiiiii///iiiiiiiiii/i///////// / / / % x x e /%/// ////ii, ///i%iiii/ii///ii/i/i/:/iiiiii����:'�-•'• • ' • 'i� "' I ata3b MAP 33, LOT 63 ilm x F\o 1 e Io' X I� I I I I m IQ I ,, of I e)4, 1 1 ° h I v'q° I �' Waya3 1 qz . • z q" hb q ex,gan9 i 3 I° FEMA VE ZONE 'I pi, I x ,�—Salem MEAN RICH WATER I'n \ Bldg■F (2014)NAVD'88 ', �' x (310 CMR 10.23) o I m I 1 I * I 2" r` BFE=16.0. I ;-1 �I o I (coinciding with Ne of 8hee� xsea-wall) I I I ' FEMA AE ZONE r'•I I ( g fi� f p x° I � I I !1 I o (2014)NAVD'88 { I q4 BFE=11.0#22 o it � q , , . ���/,� s` 3 q0 x I n I WILLOW AVE x - N x 90 Shed-B I I , WILLOWVIEW CONDOMINIUM 3 �O qAM Shed-C MAP 33, LOT 630 O e 0>' �' 2" q o qq5 a0.b _ _ (, I - -'- - --- ----- - -'- Yater Service-._._._.--- - _._.-.-.-._._.-.-.-. ._-._._ _I-. _ qh ex.fIn loata2e #18 Ii (appros. ocMan) I q;q 0- �b I _�/ /,�� q,Lb 2� ex.crushed stone surface I y, ex.pitCwater) q,y> I'I 1 I • °b I q2 I I, x a ata2d i WILLOW AVE ex.,10 STEPHEN & JILLIAN BROOKS Shed-D MAP 33, LOT 632 l x x _ I i A' 1 q \-LAND'SUBJECT 1 I 22 - oata2c I,I! rnl „> a.� '£ I £' * q^," ex.crushed stone surface q Q' ex,F momB I d g E TO COASTAL I X,h 2 ° STORM FLOWAGE I 90 m Ft tazb j I , zl 8s�o00 QQ E (310 CMR 10.04) 02 _ r 2m ex oa i mo, FEMA AE ZONE Z i 7' 144 00 O�x (2014)NAVD'88 . I I ?I 0�b b� loata?a __ _ BFE=11.0 4qq I �Q �° exf NOTES _.� �. ` 'I I 0q t c M — ! - % m' I q�° e' r 1. LOCUS IS SHOWN ON SALEM ASSESSORS MAP 33, LOT 646. PROPERTY LINE and TOPOGRAPHY PER NORTH SHORE �+ rrn�''rTr t�� 5 -e�s� • Ili - �K S I"I -� BId .B Bldg.0 <tol" r'"' ' l 1 I qA2 q ` TOP OF COASTAL BANK (TOCB) SURVEY CORP. ON-THE-GROUND FIELD SURVEY. LOT AREA = 90,500±SF (MEASUIRED TO MHW). THE ASSESSOR LISTS .��'-rr8- ' 0 b li I I wq �ebS,�J�'� p qb1 I b2 qb°qbMassDEP Policy 92-1 Figure#4 THE AREA AS 205,732±SF (which includes the adjoining tidal flats). qy. q'1 (310 CMR 10.30) O ^ I 1 °' 2 ����' bP • �0-� b`) xl x02 q qb •1 i gBQ�'I Lggj q DEED REFERENCE (RECORDED AT THE ESSEX COUNTY REGISTRY OF DEEDS): BOOK 6618, PAGE 82. Ib co C) r ex.concrzte ro cC / / • %z° ® basin 0 ex.crushed stone surface WCUS I I d Wash q? Q track 2�Q4rJ- ex•gave •5 steed rad LOCUS EXISTS ENTIRELY WITHIN A R-1 RESIDENTIAL ZONING DISTRICT. ro-m constfucted— x 8.0 FRED J. DON 1 q h Pad q 0 x e ex.wood dekln9 (RESIDENTIAL) yt ion to re- _ rz2. THE SITE PRESENTL" INCLUDES MULTIPLE BUILDINGS, OFFICES, SHEDS, PARKING, YACHT YARD (crushed stone), BOAT O ' c m Pi y e Was q' v O 12� 2qq x22 ex°O averent 2 o — — — ' TSOCV q2 YACHT YAR1�, I�,e• qb co to �0 0� x an9WaYa xfloatal I �P µ---- x %� c q� e , e ,04 v DOOR i qLx e g STORAGE, BOAT LIFT, SEAWALL, PIERS, GANGWAYS, FLOATS AND UTILITIES. # #,23 RE-LbCATE O i qz b C3 x2 3. ELEVATIONS SHOWN ON THIS PLAN ARE BASED ON DATUM: NAVD OF 1988. 1 - - q GLENDALE ST ; T— ,2 Bld / / �" 1�'x• 9.0 ; i Oyq ex.wood deck 9■ %e, x GLENDALE ST �y i O AP 33, LOT 64 1 b222q �h Cas meter q ATKINS SALEM REALTY, LGC I ' h 4. LAND SUBJECT TO COASTAL STORM FLOWAGE CORRESPONDING TO THE FEMA LINES (white lines with blue shading on the MAP 33, LOT 645 I 1 �p x2 2,045 SF�re-constructed) + 2,755±ffF(new) = S ed-A 9 MAP 33, LOT 646 + o h° FEMA map) WERE DIGITIZED (best fit using fixed features from the aerial base) FROM FIRM MAP #25009CO419G DATED JULY 4 8fl0_SFx' ° 2� 80 I` 16, 2014, PLAN SCALE 1"= 500'. THE VE (coastal zone with velocity hazard, wave action) BASE FLOOD ELEVATION (BFE) IS o FTE 8.0 / 0q x • LISTED AS ELEVATION 16 (USING DATUM: NAVD OF 1988). THE AE 100-year FLOOD) BOUNDARY BASE FLOOD ELEVATION .2 �3 BIdg.A . b ( ) ( ) o EXISTING GRADES Z q x� j i • BFE IS LISTED AS ELEVATION 11 USING DATUM: NAVD OF 1988 . z I (to remain) p a y o Z 2'0 Ax I�A I b e ns q^G -1 FOUNDA�� 0`' �I/G x�0 - -- - - 0 x ex.wood deck -,2z � x z S�pPED - / x 5. WETLAND RESOURCE AREA: TOP OF COASTAL BANK (TOCB) WAS DETERMINED B)Y PLDE (BASED ON TOPOGRAPHY and CLD►) x LOCATION OF FEMA BFE) USING MassDEP POLICY #92-1 FIGURE #4 C0 0b lZo 1I I �nyI�QQ ex.pnveroent z0 4�g5tLF 6„ W ( 2•. ,9 t3, o°jx • ex!crushed stone surfw I T$&V ex.crushed stone surface -+ orch __ VC)'- I O ��''•, ; 1 ,� i ex.p ° °. 1 d 01• by / -1z"se7j67t bx I 6. AS PART OF CONSTRUCTION, THE SITE CONTRACTOR MAY WANT TO MAKE FIELD ADJUSTMENTS BASED ON ACTUAL FIELD O x 0 . SEWER EASEMENT _ 00 � . 1 59 ° —_ __ _ -� --- . ---- Nvo'ut=1.83 I 1 ' yq 6 ---- - I ,b 2°x I m� of ff , :#c"'•..x -- - 2 — ---'---- �- - Dratin x n 0 / �__ _ x Bfa ,- S (and/or TO RECTIFY ANY DESIGN DISCREPANCIES IN ORDER TO MIPLY WITH LOCAL/STATE BUILDING CODES, ' .....q.. — -----._ �� Mx 1 CIRCUMSTANCES ,Q1 g2 OO 00 LA _—_ - _ ___ - - - ---'"- a RIM-7.1s MHD SPECIFICATIONS AND ABOVE MENTIONED REQUIREMENTS FOR CONSTRUCTION ANY CHANGES TO THIS PLAN ARE THE � ♦ 0 2qI°2y`°. � ��qyi --�rg'� e � c�-_.�b� D►'a,. .� �� 'S '� • I )• _ RESPONSIBILITY (and the LIABILITY) OF THE CONTRACTOR. FIELD ADJUSTMENTS MACE WITHOUT PRIOR APPROVAL FROM PLDE C14 dxo °0` ° qyq �_' - 0r<-.� 00 0° _�,- ' -�- x $EMENT— " x� _ �\ ^b• �4`Ob. q exvgc qb -_ hq EA_ - I x - �—°x °' 1...... o-t. q — '`• b2 I c SEWER -a __ - b q i \ ••1 1 Oq2 =8.00 -9 — • I / I SHALL AUTOMATICALLY NULL and VOID ALL PLDE CERTIFICATIONS ON THIS PLAN (and ACCOMPANYING DOCUMENTS), r o s - Cv 2 I "�.6"VcLter THEREFORE PLDE IS NOT RESPONSIBLE (o LIABLE) FOR ANY FIELD CHANGES MADE WITHOUT PLDE PRIOR APPROVAL. PLDE v 1'. b 9 I x i IS ALSO NOT RESPONSIBLE (or LIABLE) FOR ANY CONSTRUCTION PERFORMED BY OTHERS (WITHOUT THE FIELD SUPERVISION a° 1� _ � _. q , •.•tea., I __.,7-- T �+ _� ••�• p 22 f� I i I YL BY PLDE). PLDE DOES NOT WARRANTY, GUARANTEE (OR WILL BE HELD LIABLE) FOR THE WORK PERFORMED BY OTHERS. E ��T - a 5 x a0 x 0 CCO` k; xx ," ,q , W 0 1 02 ex.pave lent n I x I x 2 :2 I I 7. STRUCTURAL ENGINEERING SHALL BE PERFORMED BY OTHERS. CONSTRUCTION SHALL ALSO BE PERFORMED BY OTHERS. s ti 1 5 x C I • ' I A _ - °./ q' ?til 5I i (ap�nx PLDE ASSUMES CONTRACTOR TO PERFORM HIGH QUALITY WORKMANSHIP and STRUCTURES (including buildings, walls and Z ' l .° exvgc moo` 2 qg2 P �x 4b ^q0 ¢tio�� x I I I^�q ( g g , w N 1 - m� b° q F x ��`� / i foundations) ARE "BUILT TO LAST". THEREFORE, PLDE IS NOT RESPONSIBLE (or LIABLE) FOR THE STRUCTURAL INTEGRITY qx �,� oy? °�' o>b _�i 0?' be c vx x �I•'. CB RIS/=7.18 �``a I I x F A G L �x I I 0 ANY EXISTING STRUCTURES (Including repairs). Cl) -__-�.� �°� .' _—b >q °2`� O\ 1 1 bqx� Nx � I IT7, � ITl N 0', �'i ex.crushed stone surface £ £ COASTAL BEACH Z J _ - - °�^ o °�0 0� o2q I q�0 1 x 2 i I I A AI (tidal ,ilatS) Mete ° PLAN J - °0 1q x a �;, ° I I `.1 >'.a0 1q %y5 Gas 2 x b I> a 2 x` DI (310 CMR 10.27) o LANDQ ° p x 1 'b L7 I W (+� ` q vd b0 3 3 I I 1 q q 1 eX.CO%Crete- ` W I, ex.�rushed stone surface I � � ;2�° SHOWING PROPOSED O P O S E D W R W W a2 WORK M 0_ , q. CB RIY=6.87 0q Z ZOW , I L> q b , Q Wa- Z 1 1 / o » b °0 „W °x N8z o0 0o E, ^h° ,2 , I T ACCOMPANY A o� Q ii.0i ����� I g Planning Board Z i • WQ 1 'tc iI i FLOOD HAZARD SPECIAL PERMIT g Z� � q�0 �rX E ¢�� I o f0-b IiJU) � Zo �2 0 o0CIIQ FEMA AE�SON� q° FEMA ZONE I q2 APPLICATION I I % for the proposed 0 30h TOP OF COASTAL BANK TOCB I V � n I MassDEP folic 92-1 Fi re 4 w ' %�'a h2 Salem Wetlands By-law & WPA ! !2a y (TOCB) RECONSTRUCTION #24 100-FOOT BUFFER ZONE I - (310 CMR 10.30) of, I GLENDALE ST (measured from TOM _ � BOAT S BUILDING Z ; 1 HARBORVIEW CONDOMINIUM ( Proposed Building "Y' — 4, 800± SF) MIAP 33, LOT 747 • mom (� +� � x Goo ` � L. I + e M ' h �o I 0` f o r tj 235�t�E WC ��� _ q X Salem MEoANMR HIGH — , FRED J. DION YACHT YARD, Inc. I x qh° �Q1D 00 x o b (elevation=3.6) NAVD'88 approx.line Datum NAVD 8 8 I o a I 1 bq�° 582-- • I 2 o i �2 (coinciding with face of sheetpile seawall) #23 Glendale St. o .' x° y GRAPHIC SCALE _ - Salem, MA LO Ul �� - - 1 h2 �^ 4- w., � I . COASTAL BEACH 10 tI o s 3o W , Candy beach) .. Prepared for: M E,� ' - I (30 CMR 10.27) Atkins Salem Realty, LLC of 13I I I ( IN FEET ) �H Mq F,S 1 I 23 Glendale St. P� ss o CJ� � LAND SUBJECT I I ;°2 1 inch = 10 ft �`� 9c o; TO COASTAL 1 �/� l %qh I 12�b o G Salem, MA 011970 = SCOTT IAN y .�{,� Date: Au ust 7, 2015 � PATROWICZ m O o STORM FLOWAGE I 8 I •�+�-4 I _ g _ o CIVIL( ) 1 #12 I f /i/ IN I II NOTE: THIS PLAN ONLY SERVES AS A GENERAL GUIDE. THE SITE CONTRACTOR MAY NEED PLDE#14 22 Scale: 1" - 2Q' Sheet 1 of 1 v ,9 No 33656 Uj 310 CMR 10.04 #10 I, 1 ��Iiil��, £ I M, #2R TO ADJUST FINAL GRADES (only with PLDE approval) AS NECESSARY BASED ON FIELD Ola o FEMA AE ZONE OCEAN AVE , OCEAN AVE I OCEAN AVE OCEAN AV �A I 11-9 A OCEAN AVE ACTUALITIES. APPROVAL (from PLDE) IS REQUIRED PRIOR TO MAKING ADJUSTMENT. PATROWI[CZ �, DENISE DELANEY m (2014)NAVD'88 I KARLAS KELLEY MARVIN JOHNS�N JEAN & DOROTHY BEA REGARD 2 2, P j FREDERICK J. ATKINS TRUST (� G N I BFE=11.0 MAP 33, LOT 660 MAP 33, LOT 661 1 MAP 33, LOT 662 I MAP 33, LOT 663 0j i a MAP 33, LOT 749 LAND DEVELOPMENT ENGINEERING s1 Al c1S "' ms+� 1 I I 1 ;;; i ZI NOTE: THIS SITE PLAN IS NOT FOR CONSTRUCTION, 14 Brown Street, Salem, MA 01970 I THIS PLAN IS FOR PERMITTING PURPOSES ONLY. (978) 836-6400 C: ly a� E U O U I,�I