50 FORT AVENUE - ZONING 50 Fort Avenue
P.O. Box 989
Salem MA 01970
978-744-4550
SESD Fax:978-741-0478
e0.: F
.gip 03
January 30,2014
P
GOnAt�U .
TO: Chapter 91 Notification List(attached)
FROM: Alan F. Taubert, Jr.,P.E.
Executive Director
RE: Contract No. 13-1
Marblehead Pipeline Replacement Project
M.G.L. Chapter 91 Waterways License
Application No. W13-4008
As you may know, the South Essex Sewerage District is preparing to undertake a
construction project to replace the two parallel ductile iron pipelines that carry raw sewage from
the Town of Marblehead under Salem Harbor to the District's treatment plant in Salem. One of
the pipelines ruptured in the spring of 2013 and discharged raw sewage into Salem Harbor. That
rupture was repaired and the District immediately conducted an engineering investigation of the
condition of the remainder of the pipelines. The investigation determined that the existing
pipelines are severely corroded and in imminent danger of failure.
The engineers recommended that the existing pipelines be replaced on an emergency
basis with two 24"high density polyethylene pipelines that will not corrode. The District
immediately ordered the preparation of plans for the replacement project. Since the late summer
of 2013 we have been diligently working to obtain all of the many state and federal permits that
have been required for the project. Our goal continues to be to begin the construction of the new
pipelines as quickly as possible.
Enclosed is a copy of the public notice in connection with the District's application for a
Chapter 91 License which has been required by MassDEP for the project. Also enclosed is a set
of the plans for the project. We have been required to send these documents to everyone on the
attached Chapter 91 Notification List. There is the opportunity to submit comments during the
Chapter 91 Notification List
January 30,2014
Page 2
public comment period as described in the Public Notice,but no formal action is required of
anyone on the List.
You may direct any questions about the project to Alan F. Taubert,Jr.,P.E.,Executive
Director, 978-744-4550, extension 127.
Chapter 91 Notification List
Mayor's Office William C. Lanphear,Agent
Salem City Hall Marblehead Conservation Commission
93 Washington Street Mary Alley Building
Salem, MA 01970
7 Widger Road
Salem City Council Marblehead,MA 01583
Salem City Hall
93 Washington St Tom Devine,Agent
Salem, MA 01970 Salem Conservation Commission
93 Washington St
Selectmen's Office Salem, MA 01970
Abbott Hall
188 Washington Street Capt. Bill McHugh
Marblehead, MA 01945 Salem Harbormaster
51 Winter Island Rd
Jeffrey Chelgren Salem, MA 01970
Town Administrator
Abbott Hall F.Webb Russell
188 Washington St Marblehead Harbormaster
Marblehead, MA 01945 9 Ferry Lane
Marblehead, MA 01945
Salem Planning Board
120 Washington Street Coastal Zone Management
3rd Floor 251 Causeway Street,Suite 800
Salem, MA 01970 Boston, MA 02114
Salem Zoning Board Division of Fish and Wildlife
120 Washington St Field Headquarters
3rd Floor 100 Hartwell Street,Suite 230
Salem, MA 01970 West Boylston, MA 01583
Division of Marine Fisheries
Marblehead Zoning Board Annisquam River Marine Fisheries Field Station
William C. Lanphear 30 Emerson Street
Mary Alley Municipal Building Gloucester, MA 01930
7 Widger Road
Marblehead, MA 01945 Massachusetts Historical Commission
22 Morrissey Boulevard
Boston, MA 02125
Marblehead Planning Board
Abbott Hall
188 Washington St
Marblehead, MA 01945
Page 1 of 3
Chapter 91 Notification List
Mr. Brian Valiton Attn: Mike Johnson
Army Corps of Engineers National Marine Fisheries Service
New England Division Northeast Region
Regulatory Division 50 Great Republic Drive
696 Virginia Road Gloucester MA 01930-2276
Concord, MA 01742-2751
Abutters:
Address Municipality , Parcel ZIP Code Owner
16 Liberty Road Marblehead 156-13 01945 Earl Bethune
14 Liberty Road Marblehead 156-14 01945 Patricia Cameron-Grillo
23 Dodge Road Marblehead 155-40 01945 Peter Barada
21 Dodge Road Marblehead 155-41 01945 Nicholas Xiarhos
17 Dodge Road Marblehead 155-43 01945 Arthur Christiansen
15 Dodge Road Marblehead 155-44 01945 Simon Danforth
12 Dodge Road Marblehead 155-45 01945 Benjamin Ayer
19 Dodge Road Marblehead 155-42 01945 Kathryn Rieper
9 Dodge Road Marblehead 154-13 01945 Louise Forbes
5 Dodge Road Marblehead 154-14 01945 Joanne Friedman
1 Dodge Road Marblehead 154-15 01945 Emery Glass
328 West Shore Dr Marblehead 154-15A 01945 John Nestor
26 Stramski Way Marblehead 154-15B 01945 Town of Marblehead
1 Stramski Way Marblehead 154-17 01945 David Darby
5 Stramski Way Marblehead 154-17A 01945 Patrick Rousseau
9 Stramski Way Marblehead 155-48 01945 Darryl Smith
11 Stramski Way Marblehead 155-49 01945 Darryl Smith
18 Liberty Road Marblehead 156-39 01945 Day Robert Michael Crecelius
Page 2 of 3
DEPARTMENT OF ENVIRONMENTAL PROTECTION
WATERWAYS REGULATION PROGRAM
Notice of License Application pursuant to M. G. L. Chapter 91
Waterways License Application Number W13-4008
South Essex Sewerage District
NOTIFICATION DATE: FEBRUARY 4, 2014
Public notice is hereby given of the application by the South Essex Sewerage District to
replace and maintain the existing 20-inch and 24-inch pipelines with twin 24-inch High
Density Polyethylene (HDPE) pressure mains across Salem Harbor, between existing
Valve Structure A, Marblehead and Valve Structure B, at the District's Wastewater
Treatment Plant in Salem. The proposed use of the project is to provide for the
conveyance of wastewater across a waterway and is a water dependent project.
The Department will consider all written comments on this Waterways application received
by within 30 days subsequent to the "Notification Date". Failure of any aggrieved person or
group of ten citizens or more, must include no less than five citizens who are residents of
the municipality in which the proposed project is located,to submit written comments to the
Waterways Regulation Program by the Public Comments Deadline will result in the waiver
of any right to an adjudicatory hearing in accordance with 310 CMR 9.13(4) (c).
Additional information regarding this application may be obtained by contacting the
Waterways Regulation Program at (617) 292-5500. Project plans and documents for this
application are on file with the Waterways Regulation Program for public viewing, by
appointment only, at the address below. Written comments must be addressed to: David
Slagle, MassDEP-WRP, One Winter St., 5t'fl., Boston, MA 02108.
I`
z a s 6 7 9 s lU
CONTRACT No. 13-1
A
MARBLEHEAD PIPELINE REPLACEMENT PROJECT
SOUTH ESSEX SEWERAGE DISTRICT
50 FORT AVENUE
H SALEM, MASSACHUSETTS D
i
/ 1
in ce:cece.�.ws 3�` •*'� and // !! 1 DISTRICT BOARD MEMBERS
endM
f Sch :: Subs
i % !�� WALTER A.DEFILIPPI,P.E.,CHAIRMAN
• -�> > O v U pf}PIoed a, / MICHAEL P.COLLINS P.E.,MEMBER,BEVERLY
// / I RICHARD P.RODGERS P.E.,MEMBER,DANVERS
D 0* we_.la a� tle'B�a�agjrp !! Knapp, ROBERT J.LANGLEY P.E.,MEMBER,PEABODY D
—A P1.1 IT ATOIC
'. -(• �/ //��Q ROCK - DAVID H.KNOWLTON P.E.,MEMBER,SALEM
[^0 \ t OCk ��' 'FA r AMY MCHUGH,MEMBER,MARBLEHEAD
V
F.aQoa • rSai mTer ipal Soul
..
rf \ / O U/�
c v on.usMenva ��N'O,. ulq .-`.G4
= ..��` . .
9 �E7�ISTING�
� PI�PELjyES I- " _
INV ��. ...
i
- 8UQ S:
ste i9t o _ DISTRICT ADMINISTRATION
ALAN F.TAUSERT,JR.,P.E.,EXECUTIVE DIRECTOR
I" LIGNMENTB / DAVID MICHELSEN,DISTRICT ENGINEER
r ,
AEP CEMENT
\\'PIPELINE i
! ' 1, F
9ht 3 / % er. d
int
SA�/ @M !
�POlnt. /,L--ti 5
l
l
LOCUS MAP DRAFT
®
H
6IXITH E65E%6EWERASS DISTNICT � Oo E. Sc.l e: Drawing TIHe'. Drawing Na.
CCN gACTN 13-0 Sp FORT AVENUE p.G070g1� S�/ 1p ]< U AS NOTED COKv SHffT G—I
MAQBIEHEADPIPEUNEREP EMENTPRO£LT iy""' / /
$p1EM,MASSACHUSETTS
2 ] A 1 5 1 6 1 7 1 9 9 1p
1 2 J 4 5 fi 7 8 9 10
' A� u o' t '.',Ry s'1 u'gi�9S� yCjrC`8d' F"YfiS.°�J "P�'7.±4, A
IF
A
S � C
ti
TSM
rtYi y y�.
� 9P
n
F
FII
G G
i
DRAFT
zoo 0 200 400
Ml H SCALE IN FEET H
SOUTH ESSEX SEWERAGE DISTRICT Dole: Scale: 0—ing TILle: Drawing No.
i CONTRPCT No.13-0 50FORTAVENUE VYA ID 24 1} p5 NOTED ov[Am[w C—�
MA4S-EHEAO PIPELINE RE0. EMENT PROJECT S.M,MASSACHUSETTS
i 2 5 6 7 R 9 ID
t 2 ] 4 5 6 7 0 9 t0
A / ZL AR.11 RANX ix a A� l Al A A I!1 , `i� �1�� t A
rE "z°;'�1,
Aq
A \VM,
.. � 1 =' j' \—� =__ •\ _ l� 1' �__ "ifs J�� ),� <�.laS} ,za. \ ,�,�a`� � /
AAA1 r /� _ -�- �✓ _J,/ �a IgM f'�t -:�
, c°naeN°.
r�-mom/ ®' ca_' \___ —1 i�'�--•-- �� \ s�q v� •, v/ —aw
--z ALA, elr1t
} ,.- ,.,.� ,., v ,,AA, vlw�l
°m all. A.�f...'\ �) ` AnalSP %c � (I LAN � , ..� ..J Sf,. x / _:L�' ,•!�: ,�
axm
DoeDoewr PeRRA
U
'r— �' ____
I i yF _
@
t Al
-.l
F a
t X s a mlrc s an i ' ' $ [
33
R me
m
I
I
1. _
�n
., r
_ e -
wiaater xs
Aenite
�"CnHE ELLWATICArl D—Hi All JIN it.Ighte It.lo.
Now
I
�
'DRAFT
g I �� a �� i. y I Ti - A als w I, ,I I:
a�.ao s,.00 ,A.— A.A. ,,,.aes,,.a. on— a— ,,.,. A— all. r.— all. , ,,".. en. A-. PROFILED,. ,..A. — e,o.m A—. ,..m v,.= �.m v:.ee —A. -ao. L— I.I. i— Aw— Si..q
v,.ve N,.ee
H H
SOUTH ESSEX SENNERAGE DISTRICT OoI, scala, Drawing Title: Drawing No.
CONTRACT N°.13-1 50 FORT AVENUE Q.N--. 10/N/,3 AS NCTED PLAN exo PeOrL[ c—'2
MPABIEHEAD PIPELINE REPLACEMENT PROJECT Si MPSSACXUSETTS V
L2 3 5 6 7 a 9 10
1 2 ] 4 5 6 2 B 9 10
I �
A
EXISTING PIPE TO REMAIN IN PLACE `—
r>e
\I\41,
Ir
cwRU F'T+� 0,
PLAN .1.1an ma
waRl Funn
I l_
: jI
Lo
IF6[
T
i
—'r
J
RMc
F F
• TRI -M eum r wwelxp,s c 1
TurP M W x.
M(WOMI,wssN [errN[
m
-w- DRAFT
.•e �i
e e a
- I"
amm rw.m m..ee rn.m sm.ee »r.m ,v.w ,».ae m.m sae.ee siaee su.m sn.m snm nr.m n..w ,u.m su.ne s:um s:e.m sw.w xs.00 num rm.ee as.ee m..m ra.w n,.ee n..m no-w u,.m
H PROFILE "
S.I.ESSEX SE ERAGE OISTRICT Nole: Scale: 01,111, Tithe: @awing N.
CONTRACT No.1]-1 50 FORT AVENOE � N._.._ �0�26�Q AS NOTED e5nx axO T•POIIIE G—}
MARBLEIF—PlP LINERER EMENTFROJ CT SN M.MASSACHUSETTS y
1 2 ] d 5 6 9 8 9 0
0 9 0
I s 2
A A
r
v x
c
BLk
4 tX ty , P
S
t
r A£Q8f87 ,,
it tl.r 3M• . •
c • �"w' � a � ��� V4 c
tk
q.' a
BYPASS :S
D -" ~a� , p- a t �. av� r2, t:. 3 e ." y Sv+v o
.x ' w fi.a
SSAUM
Y-
a
. Tp9:
IT I
F
H 'APROX MHW
e = a
G .� c
F,'aj,°�:.AREE-1�,nn., eo—M,E � DRAFT
H
SOUTH ESSEX SEWERAGE DISTRICT OOIe. 9mI Umwmg TIHe: DI—Cg A,
CONTRACT No.13-0 50 FORT AVENUE '10/24/I] 'A NOTEN AREA PLAN AT SEEP VALVE STRUCTURE —Q
MA9BlEHEAp PIPELINE REPLACEMENT PROJECT SALEM,MASSACHUSETTS � -
2 ] 4 5 6 7 8 9 10 _J
1 1 1 ] a 5 6 J s B 9 10
A y t k�•� r roe A
p }'�� `,,. •r ' .�'"` of yf ru7� `5'1" ea ,},�'g._ ; #P . tv.li �#"g
480*IN9TALL `Iii
s " : EN.,PIPES IN"�`'M
7RERCH <
/ T.:U!: .1 _ R:
L
$T
F15 F OU UREAY EEAAf�II
EHE
c .p k tp�n „>" e„502v}_ 0 x '�,f 0�yo6':.d+-kt'y4 r 5fi79 c
NIX'
x
D
n
iti d¢l rt+ da .e •� +�.
NIL�V,.r,
F k 3 L'`N \tkC ^ST§ M M 4J•P E Z.
•
P / P
R+ g 4
p
N G
NAPE rwa 9[ne1WPX nwomc 'I e
.Y s wIII
AINXH�'sc s[ns n rs c t NN N l[srs¢ -UN
IS i a`dl°w
H DRAFT H
SOUTH ESSEX SEWERAGE 019TRICT UoA Smle: Drawing Title: Drawing Na
CONTRACT M.13-t RUNG L.Vi
MA4BLEHEAO PIPELINE REPLACEMENT PROJECT MFORTAVENUF rygplpppR '._..-_, - iC�]q�l} p5 NOifD nnu aury AT SEND vuK sevCNNE C—$ j
SPIEM,MA59ALNU9ETlS -
1 P ] 6 5 5 ] e 9 10
t 2 ] 4 5 fi 7 B 9 Ip
A A
surnm u:E�I uAe � � i I
J
Y nc uwu
rix swwm tmlTo _--
SECTION
VALVE STRUCTURE B (SALEM) SECTION — VALVE STRUCTURE A (MARBLEHEAD)
l—3/h- ,-° eie r-o
p p
aor w°.
11181
wL"c� 21
X16',°"m,nerc.rrusw mrt .
7.1
terjL
�let ` �rw e .5 M,e
m.Hl�tgar i
1° e rrr "
SECTION PLAN — VALVE STRUCTURE A
»•,•oie--.-o
SECTION PLAN — VALVE STRUCTURE B
G c
VALVE STRUCTURES
EXISTING CONDITION
DRAFT —
H
SOUTH ESSEX SEWMAGE OI STRICT pole'. Scale: Growing Title: 0—ing Na.
CONTRACT No.t3-1 50 FORTAVENUE pn 5*Q=r�--_ 1112413 AS NpiEp xAc�siaucnA[s[xrsnvs cwC'npu5 C—[7
MA45LEHEPDPIFELINERERACEMENTPROaECT SNEM,MASSACHUSETTS /
t 2 ] 5 b 7 8 9 0
1 2 J 4 5 6 6 - 9 10
A sox eoxmwnEN NET ueo 0o A
—HENJEENEW SEE SHED C-4
t l
I _
I it
9 / H
SutMw ExEI xw[ Iii ���.�. �HER I
I y T
I
SECTION
VALVE STRUCTURE B (SALEM) SECTION — VALVE STRUCTURE A (MARBLEHEAD)
D 0
1eSE IESI
El Ill
oxCu�R[wwwsd(MI
1. Ir1I
1. __SEES Ii
� � -� E�I j .'(E, HE.
...... r�
SEEN, `m
aa� p q oixcJ �sswE wes�m SUED
Ta oa.R.m oSH/EI EER ares PPS(:a ePECv) mPw.r wPPEni�z wm o emus"1 oa ePd.�
IS 1 21 ISPE
SECTION PLAN — VALVE STRUCTURE B SECTION PLAN — VALVE STRUCTURE A
wzwm� NINE H,'-..o
G
b
1, THE EDVATIO'S.. _
ESIL SIDES'_ o Ew.'IS.NINE.ne.nm au:1 VALVE STRUCTURES
SPEED fl�ONE ElE SD .1111
TEMPORARY CONDITION
E,SE,IN ba,.w:zmw,RTz SEEN,a.M z"RESN"m,m.
DRAFT
H H
SOUTH ESSEX SEWERAGE DISTRICT A Dole: Scale: Drovicg TRIe: Drawing No.
CONTRACT No.1J4 50FORTAVENUE =a ��= ID/34/I} q5 NOTED VALYL STRUCaURIS 1IMPORnRY COUOI'DON C—J
MOASLEHEPD PIPELINE RERACEMENT PROJECT SNEM,M455ACHUSETi4
1 2 3 9 5 6 > 6 9 10
A A
i j r
R /i 9
Eur 1.@J pE
I I —
\.._.- wai 1re1
11, Al
I
SECTION
VALVE STRUCTURE B (SALEM) .. SECTION — VALVE STRUCTURE A (MARBLEHEAD)
D D
2
aE
[_ N n¢'urrc[vmiu wISrsm(m1
..�rLi..
I
IR,E
! 1'wG l : „aoE wA
�\\
1.�DE.,n:. :ISE
\_ aRNLL—N R«o
roNr:UwE g.Eo
cmv,'a.�=,+G'resE w�a��w� _.. U,-N ar
I awc r.Gc 1.. xo n.wu _1
sE EV
' T.5 R11, io r�..�Nouow.G aow NE,<a .M,.e, 1,.01 F
SECTION PLAN — VALVE STRUCTURE B SECTION PLAN — VALVE STRUCTURE A
swr.ve=r-a m¢ orrcE.ENT
c c
1R.-r-a
'' - ourvN va B siwo�+G:GSG VALVE STRUCTURES
G Gr 1THE'953 MM,1�u�,i��—TS vA,r w CIIONAre ssiw. PERMANENT CONDITION
DRAFT
SOUTH ESSEX SEWERAGE DISTRICT Oole: Scale: prowl lKi'slFuovREs v�aumErvi[orvvrtory browing No.
COMRACT PLACE SO FORT AVENUE '- ._...... 10/M/13 AS NOTEp C—B
MMBOEHEnO PIKE HE 13-1 P0.pJECi SNE0FORT AA NSETS W
2 3 4 6 7 8 9 Ip
r t ] a 5
OR—1 SOL.—I DRATE
H III Oai_,�' It .
IT
OUT
„
::asa. —1 C.,o.:rM. — SSrba..:.sA
s OR
-yII 11 XN1* —1 HIRE 11
= C�`P0' Kip =b' SECTION
N"i,.RIort,.N l ,,aw,: :..na.
SLAWS NN m,aN TEST IN, mim,as S 1..N,a.:.veueI
Ycna:r:„+[iNI'—SENCE 1OI r ANsfl
H ONLUOW FjWC11�11
TO, END.msmuLA
. — PLAN PN Is o ml
wa
SXI1 ,IIN ,��� I �-I:Ies.:sr.w,s. .Al.r:1
S,n.s wN.Nm,rSHIG ,I NET
HNUIX Ac,taru.,ce ITEM. SIT AN 11 NERSTRELI SET.r.NN snurze'""RECUSE .11
IUNIS
111
CRECULTUREEN LINE
CATCH BASIN /DROP INLET TWE "A" TWE"B" EILEVEATpN
C WTH SEDIMENTATION CONTROL C
.,s 'CC INNESSUNDITiNE IFTsoo o�SERIES" RO ND oo S AS.A` M REMOVAL OF DEBRIS BOULDERS AND STONE BLOCKS
...e.u"USECER RE,ER cSy� r —1 HE-I.
I NAT so ;CC
HAY ORmSTRAW EROSION eCHECKS .N ws CENTS- mn.n room o n,.
. \�z'
ITS w..ms 11,M
menROSE CONESSULL.1 ' one Or v,¢m�N ao ul �rtnm
.STAN TO OIL
On
D s,wg Nm n,ceowN s�,arzN pop
D
9� .I—bs..Nen Nr DEC R,Lo« #ITOSr1RXULNL,: 4 N9:A.mPERSPECTIVE MEW m eonoNsun., D dnw¢e me:�N 1-1
%
Em
TO OR'µN
)RICH 'TIC IMSEST
-' SECTION PLAN
FOR
E NC1LE.N n.,„./17-- RE
NN,osm�Nor HAYBALE E
.� �N.oJ s..i,No,.HIT 1"A.e..m,r.o.TO"'Ar.mm,K.o,.cln a.,<I STRAW WATTLE FOR SEDIMENT CONTROL
TERS
Ao �o.,IE.IT.NEN,
Cay'
4 w. OD
WRE SEE,AND,TO
.at,ACONIC
IN TO 111HOUT,
Anr,.•v'i.N s £ a1 usexm IT¢sz,m..wom
RISC IF EGRESS
G d iic"� mi u O uu
,xIwTN
COT
MQN T svLLDO EXTENDED THINDO
D
DRAFT °''ARE°AC
ANP—TRACKING PAD
H
SWEET E55E%SEWERAGE DISTRICT Dole: Scale: DO, Tltle: Omving.4o.
CONTRACT No.13-1 50FORTAVENUE (...4'Vr..-- 10/I4/1] AS NOTED EROSION AND SEOMINT CONTaOLS SXEET I C-9
MPRBLEXEAD PIPELINE REPLACEMENT PROJECT SALEM,MASSACHUSETTSL—
1 I31 3 5 fi 7 8 9 10
I 2 ] 4 5 6 7 e 9 10
A A
9 B
e r
ew(si srtcl
C C
memu`f °T'I= xw
II
Lre_
D D
I
II
I/
%;PES,
T P
TURBIDITY CURTAIN AND COFFERDAM AT
TURBIDITY CURTAIN OFFSHORE LOCATION - SHORELINE LOCATION
O c
DRAFT
H
SOUTH ESSEX SEWERAGE DISTR ICT Oale: smle'. O.o , Tdle: Dmwin6 N.
CONTRACT No.1J-0 SOFORT AVENUE MfimOM f VJU;-._; 10/2A/1} AS NOTED EROSION ANO 40IVENT CONmo S SHEET 2 C—I D
MM6LEHEAOPIPELINERERACEMENTPRO,r£CT SALEM,MA55ACHOSETTS
2 ] 5 D 7 B 9 10
2 2 4 5 6 7 8 9 lD
A
A
SECTION IN ROCK SECTION IN SOIL_
<' TIE-DOWN STEVE
TEMP. BYPASS
24" HPDE
B B
"0 EXPANSION ANCHORS (rm)
E%ISi.
GRACE EXIST. GRADE IN SOILS
IN ROCK v
6" MIN
f . IN SOILS
A"%R"%S PRECAST
C CONCRETE SLEEPERS C
(SPACE 8' GO
TEMPORARY BYPASS
N.T.S.
D 1-06ARIEs (5'�ro 10vlE) D
HALF SECTION HALE SECTION
EXISTING SEABED IN SOIL IN ROCK
EXISTING GRADE VARIES
VARIES (4'f ro 5 rrP) w� —� r.—a4' (AepvE Mnw)
R 3�j r
BACNFlLL IAS VARIES (TRANSITION
- W/ DREDG )' CO i0 5' OC
E E AT VALVE STRUCTURE) E
BACKFILL TRENCH SHEETING MAY HAVE BEENW/ DREDGED MATERIAL 3'- "' gPLACE BY PREVIOUS CONTEZ
COMPACTED SCREENED
GRAVEL AGANST VNpST
NOT FS. MATERIAL OR SHEETING
I. REMOVE EXISTING a�. E
F 20" AND 24" DI PIPES.
COMPACTED SCREENED GRAVEL
UNDISTURBED MATEPoAL7/ AGAINST UNDISTURBED MATERIAL
REPLACEMENT PRESSURE MAN COMPACTED REPLACEMENT PRESSURE MAIN
CONCRETE SAND 24' HOPE CONCRETE 5— 24" HDPE
CROSS SECTION REPLACEMENT PRESSURE MAINS IN NOTES:
EXISTING ROCK TRENCH IN HARBOR 1. REMOVE EXISTING CROSS SECTION REPLACEMENT PRESSURE MAINS IN
STATION 502+00+ TO 504+80t AND 556+87 TO 20"AND 24- 01 PIPES. EXISTING TRENCH ON SHORE G
G 561+12t STATION 500+00 TO 501+00t
N.T.S.
T.S.
S
2 FSer OM2°0,;°w���prs;,"I'o �«U"'N: DRAFT
SOUTH ESSEX SEWERAGE DISTRICT UOU,. Scale: Omwin9 T.Ue: D...... No.
CONTRACT%.13 i 5G EORT AVENUE wILmegn 10 2d 13 AS NOTED OIINL5 sr[[i l oT x C-1 T
MARBLEHEAD PIPELINEREEIACEMIENT PROJECT - SALE.,MASSACHUSETTS / /
2 ] 5 T 7 b 9 0
2 ] 4 5 fi - ] B 9 1�
21'3
A MOUNDED EXCESS
DREDGED MATERIAL Q EXISTING SEABED
OVER ifi fNCH ,
Ss
�3'
r
B � B
0"' BACK FILL W/
DREDGED MATERIA
AT
PRO%. LIMBS OF DREDGING
C _ PRECAST CONCRETE COLLAR C
NOTES. I
I. TEMPORARILY SIDE CAST DREDGED MATERIAL.
AFTER REPLACEMENT PRESSURE MAINS ARE INSTALLED, REPLACEMENT PRESSURE MAIN
BACKFILL TRENCH W/ DREDGED MATERIAL. 9 24" HDPE
MOUND ANY EXCESS MATERIAL.OVER
TRENCH AS SHOWN,
CROSS SECTION REPLACEMENT PRESSURE MAINS IN
OFF SHORE AREAS OUTSIDE FEDERAL NAVIGATION
D - CHANNEL AND ROCK TRENCHES AT SHORELINE °
N TO
]Yx ' EX15TING SEABED
E DREDGED MATERIAL Ir E
OVER TRENCHi0 ORIGINAL. Owa
SURFFACAC E ELEVATIONS
] D.. BACK FILL W/ F
s DREDGED MATERIAL
'l APPROX LIMITS OF DREDGING
PRECAST CONCRETE COLLAR
NOTES. I
O I. TEMPORARILY SIDE CAST DREDGED MATERIAL F` ]' G
AFTER REPIACEMENT PRESSURE MI ARE INSTALLED. g, REPLACEMENT PRESSURE MAIN A.Al
BACKFILL TRENCH W/ DREDGED MATERIAL f^ 24" HOPE o IN'EP.eo.rxv Al EARIAP ewsc
RESTORE SURFACE ELEVATION TO ORIGINAL ELEVATIONS
TRENCH AS SHOWN. ' AT�oeA''j-Ell w.�EEE.Curt 1.1IAA E s �
CROSS SECTION REPLACEMENT PRESSURE MAINS IN
FEDERAL NAVIGATION CHANNEL DRAFT
Nis H
H
SOUTH ESSEX SEWERAGE DISTRICT Dote'. Scale: Drawing TAIA Drewing Na.
OONTRACT RE,13-1 50 FORT AVON LE � 'S''N_ ID/34/,S AS NO DETAILS STREET x or z (,'—jL
MMBL.PEADPIPSLINEREPLACEMENT PROJECT SALEM,MASSJEHUSETi9
1 2 ] 5 5 1 7 B 9 IF
4
e+w faw
E I
!T It
DEPARTMENT OF ENVIRONMENTAL PROTECTION
WATERWAYS REGULATION PROGRAM --- •„ °LAS„�.
a . . .._ .vDEVE_'..
Notice of License Application pursuant to M.G.L.Chapter 91
Waterways License Application Number W14-4273
Applicant:Algonquin Gas Transmission, LLC
Project Location: Beverly Harbor, Collins Cove,Waite St, 1 East Collins St, 51 Osgood St, 2 &31
Collins St, 50&40 Rear Webb St, 4& 17-23 Szetela Ln, 3,4,9, &24 Fort Ave,Salem, Essex County
Public Comments Deadline: November 20, 2014
NOTIFICATION DATE: October 20, 2014
Public notice is hereby given of the Waterways License Application by Algonquin Gas Transmission,
LLC for the construction and maintenance of a 1.2 mile natural gas pipeline (Salem Lateral
Project) located under the sea floor of Beverly Harbor and under filled and flowed tidelands of
Collins Cove, Salem, via horizontal directional drilling (HDD). The project also includes the
construction and maintenance of a new metering & flow regulating station located within the
Salem Harbor Designated Port Area, 24 Fort Avenue, Salem. The Salem Lateral Project will
deliver natural gas supplies for the Footprint Power Salem Harbor Station Facility. The
proposed project has been determined to be water-dependent.
The Department will consider all written comments on this Waterways Application received by
November 20, 2014 (Public Comments Deadline). Failure of any aggrieved person or group of ten
citizens or more to submit written comments to the Waterways Regulation Program by the Public
Comments Deadline will result in the waiver of any right to an adjudicatory, hearing in accordance
with 310 CMR 9.13(4)(c).
Additional information regarding this application may be obtained by contacting the Waterways
Regulation Program at(617) 292-5551. Project plans and documents for this application are on file
for public viewing, by appointment only, at the address below.
Written comments must be addressed to: Frank Taormina, Regional Planner, MassDEP Waterways
Regulation Program, One Winter Street-5th Floor, Boston, MA 02108.
i
I HEREBY VERIFY THAT THIS PLAN HAS BEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
oa•� sg,
F JOSEPH E. � -
c4
S/0lIAL Ei�'
Zg"1`1
REGIS RED PROFESSIONAL ENGINEER DATE
x _ P OPOSED
�«�� n� :IATEPPI 16' UNE 118 r
?/ k ,
HISTORIC MLN
(` IfBEV_ERLY HARBORiI 1 Jj, q tl
`l0'�s1 HISTORIC MLW
,. r �R•(tzl, '` LOCUS MAP
BEVERLY o(M �I ,MLW
r
MASSACHUSETTS m,l` g s 'y 4 v
HISTORIC
HUBUNE HOT-TAP ,+ '�I 'HISTORIC MHW
TIE-IN LOCATION J g .
•PROPOSED S M LATERAL
RBOCKS '" j,' ' '' *� MLW !` METER STATION a T.
�.
w 1 lural C M�n
r ,� '•, �.� �TISTORIHW
HUB U Ej
,x \.,v , . •F'
✓� d + es ✓ *' i _SNB (SH)y. 5 0 1.� t
.MHW
ra HISTORIC MLW;
o�E PROPOSED IE COWNS_C_OVE
UNE NO. 1-18 �j ° «,.✓"
+• .+'• \ ✓
MLW "BjHW
M • A •`' .+`')
xE AT �y4 "(+ _+[. .:"SALEM MASSACHUSETTS ?I FLOO�PWN . .
GRAPHIC SCALE
IOOo• S00' 0 10001
NOTES:
tHOfM1(gs
1. COORDINATE SYSTEM:UTM ZONE 181NAD 83,ELEVATION DATUM:NAVD 88. oaf S"p
2. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED BY OSI ON W 5 E.
11/612013 TO 11/9/2013. I+GG�nt
3. MEAN HIGH WATER(MHW)AND MEAN LOW WATER(MLW)AS SHOWN ARE No.uola
DERIVED FROM NOAH NAVIGATION CHART NUMBER 13276. g1�pE9
4. HISTORIC MHWI MLW FROM MASS GIS DEP FILES.HISTORIC MHW I MLW AL
ON FOOTPRINT PROPERTY FROM PREVIOUSLY APPROVED CHP.91
JURISDICTIONAL LINES FOR LICENSING OF THE FOOTPRINT PROJECT. $-ZB• ��
JOSEPH E.WOJNAS
DATE:AUGUST 28.2014 HATCH MOTT MACOONALO
PLANS ACCOMPANYING THE PETITION OF
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN.FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR,AND CONSTRUCTION OF A NEW
METERING AND FLOW REGULATION STATION ON
FILLED TIDELANDS,IN SALEM,MASSACHUSETTS.
OVERALL.VIEW
SHEET 1 OF 17
I HEREBY VERIFY THAT THIS PLAN HAS BEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
N OF
JOSo�
oWgI�NAR
NP ala 7
�rsTEPF� �P
-/GNAL Eta'
REGIS ED PROFESSIONAL ENGINEER DATE
®� BEVERLY HARBOR
4n r PROPOSED TEMPORARY
00� ONSTRU WORKSPACE UMITS
2.86 APPROX. 2.66 ACRES + off
ro i
wF
<< a u a
t W�
APPROXI ATE BEVERLY HARBOR
i H
COFFER D OD ENTRY/EXIT LOCATION
SEE CROSS STA. 0+00
OF DREDGINGNG AREA AREA
ON SHEET 12 OF 17 10' PERMANENT
SPECIAL EASEMENT
_' _ __ 110.25&Gj/jOR GE
HUBUNE HOT-TAP
PE-IN LOCATION 4 PROPOSED 16
UNE NO. I-18
H% N/F
COMMOMWEALTH OF
MASSACHUSETTS
STER ROCKS '��
AREA
EXISTING 30"
HUDLINE PIPELINE
MEAN LOW WATER
APPROXIMATE BEVERLY HARBOR EAN HIGH WATER EV 4.7 ELEV. -4.679
HDD ENTRY/EXIT LOCATION STA. 0+00 0 0'
PLAN AND PROFILE VIEWS F -10'
GRAPHIC SCALE w _30' SEA OOR-
100' 50' 0 100'
w _50
PROPOSED 16" UNE N0. 1-1 0+00 1+00 2+00 3+00
NOTES: BEVERLY HARBOR HDD
1. COORDINATE SYSTEM:UTM ZONE 18/NAD 83,ELEVATION STATION
DATUM:NAVD 88.
2. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED
BY OSI ON 1116/2013 TO 11/912011 F?j$N OF,1 ,
3. MEAN HIGH WATER(MHW)AND MEAN LOW WATER ?�
(MLW)AS SHOWN ARE DERIVED FROM NOAA JOSEPH E. r
NAVIGATION CHART NUMBER 13276.
4. HISTORIC MHW/MLW FROM MASS GIS DEP FILES.
HISTORIC MHW/MLW ON FOOTPRINT PROPERTY FROM rsRpV�
PREVIOUSLY APPROVED CHP.91 JURISDICTIONAL LINES
FOR LICENSING OF THE FOOTPRINT PROJECT.
S. FOR DREDGING PLAN SEE SHEET 12 OF 17.
DATE:AUGUST 28,2014 JOSEPH E.WOJNAS
PLANS ACCOMPANYING THE PETITION OF HATCH MOTT MACDONALD
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR,AND CONSTRUCTION OF A NEW
METERING AND FLOW REGULATION STATION ON
FILLED TIDELANDS,IN SALEM,MASSACHUSETTS.
BEVERLY HARBOR CROSSING BY HORIZONTAL
DIRECTIONAL DRILL
SHEET 2 OF 17
I HEREBY VERIFY THAT THIS PLAN HAS SEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
jHOFV
JOSEPH E.
WCNAS
CIVIL VIL
�No.
k7EP�E1""
REGLfAERED PROFESSIONAL ENGINEER DATE
/ BEVERLY HARBOR
® n
�
Wo� MLW x 3+ o
O Y
HISTORIC MlW N F d r
x :(
CAMOMWEALTH OF i
'^ Y ASSACH SE1
MS '^
/ 10' PERMANENT
EASEMENT
_ ——4t00_—_—5+04—— -t90—___7390_—— E+04____5t40___-jum
______________[---V______ __________--
E PROPOSED 16' UNE NO. 1-18
BEVERLY HARBOR HDD
_SPECIAL ANCHORAGE 110.25 @—110.,
-
10.1_
PLAN AND PROFILE NEWS
GRAPHIC SCALE
100' 50' _ Q 100-
30, .MEAN HIGH WATER ELEV. 4.328
z 10'
ELEV. -4679— oc
O
r-1 — —
°'-30- PROPOSED 18' UNE NO. -18
"I-50' BEVERLY HARBOR HDD U
-70'-
3+00 4+00 5+00
"+ d-- 7+00-- — 8+00 ---§F-.
STATION
NOTES:
1. COORDINATE SYSTEM:UTM ZONE 18/NAD 83,ELEVATION DATUM:NAVID Ig OF ,
88. ?
2. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED BY OSI ON JOSEPHE.�
11/6/2013 TO 11/9/2013. S NAS. H
3. MEAN HIGH WATER(MHW)AND MEAN LOW WATER(MLW)AS SHOWN f3
ARE DERIVED FROM NOAH NAVIGATION CHART NUMBER 13276. 18p
4, HISTORIC MHW/MLW FROM MASS GIS DEP FILES.HISTORIC MHW/
MLW ON FOOTPRINT PROPERTY FROM PREVIOUSLY APPROVED CHP. JONAL
91 JURISDICTIONAL LINES FOR LICENSING OF THE FOOTPRINT
PROJECT. -1%6'(LA
JOSEPH E.WOJNAS
DATE:AUGUST 28,2014 HATCH MOTT MACDONALD
PLANS ACCOMPANYING THE PETITION OF
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR,AND CONSTRUCTION OF A NEW
METERING AND FLOW REGULATION STATION ON
FILLED TIDELANDS,IN SALEM,MASSACHUSETTS.
PIPELINE ALIGNMENT AND PROFILE
SHEET 3 O 17
I HEREBY VERIFY THAT THIS PLAN HAS BEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
IN OF,1 ,
F JOSEPH E
WOJNAS
CIVIL
No.4WI3 w
g1EA-
DNAlF1�
2RdV
te-2�-
REQ&ERED PROFESSIONAL ENGINEER DATE
PROPOSED TEMPORARY
® CONSTRUCTION WORKSPACE LIMITS
4� \ N F BOSTON G45 30' PERMANENT
i / COMPANY EASEMENT�y
� O
Z /
PROPOSED 16'
MHW 10' PERMANENT LINE NO. 1-18
� EASEMENT /.
APPROXIMATE
COLUNS COVE
_1 OR---LL+nO_ _-12 ) —r isGo--- // ROD
ENTRY/EXIT
_.________ \� TION
/PROXIMATE
N/FBEVERLY HARBOR
COMMOMWEALTH OF \� HISTORIC MHW HDD ENTRY/EX
MASSACHUSETTS \ LOCATIONS(R
EXISTING S
( PIPELINE
BEVERLY
HARBOR
MHW P�
37-0063 9� .
PLAN AND PROFILE MEWS /—FORTYPICAL PIPE CROSS
GRAPHIC SCALE SECTION BETWEEN BORES
100' 50' Q 100' SEE SHEET 17 OF 17
WI NATURAL
MEAN
30' HIGH WATER ELEV. 4.328 GROUND
10'
z
<-30, R
SEA FLOO
w PRO
w-50 PROPOSED 16' LINE NO. I-18 16 UNE NO. I-1
_70BEVERLY HARBOR HDD COLLINS CQVE HDD
10+00 11+00 12+00 13+00 STATION 14+00 15+00 16+00
NOTES:
1. COORDINATE SYSTEM-UTM ZONE 18/NAD 83,ELEVATION DATUM:
NAVD 88. .fr4T�N�
2. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED BY OSI ON
11/6/2013 TO 11/9/2013. JOSEPH E, +
3. MEAN HIGH WATER(MHW)AND MEAN LOW WATER(MLW)AS
i
SHOWN ARE DERIVED FROM NOAA NAVIGATION CHART NUMBER S
13276.
4. HISTORIC MHW/MLW FROM MASS GIS DEP FILES.HISTORIC MHW/ AL
MLW ON FOOTPRINT PROPERTY FROM PREVIOUSLY APPROVED 15- M14 p
CHP.91 JURISDICTIONAL LINES FOR LICENSING OF THE FOOTPRINT V•2 14
PROJECT.
JOSEPH E.WOJNAS
DATE:AUGUST 28,2014 HATCH MOTT MACOONALO
PLANS ACCOMPANYING THE PETITION OF -
ALGONOUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR,AND CONSTRUCTION OF A NEW
METERING AND FLOW REGULATION STATION ON
FILLED TIDELANDS,IN SALEM,MASSACHUSETTS.
PIPELINE ALIGNMENT AND PROFILE
SHEET OF 17
I HEREBY VERIFY THAT THIS PLAN HAS BEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
SNOFaya�_
JOSEPH Ewom". .
p No.
wk y
U � y
7oxattl�
'1/i �-2�•ltl
REC&ERED PROFESSIONAL ENGINEER DATE
/ UCENSE NOS. 2120,
® N/F NEW ENGLAND ) 2541 & 156
POWER COMPANY
n
pW -18- \ MHW n'
o+? N/F BOSTON GAS
m� COMPANY a
<^� ® HISTORIC MHW
N/F WARD II SOCIAL
\ N
CLUB OF SALEM /
10' PERMANENT /
EASEMENT I+ /
.�9tl2._—_143 —_L20+00___.Z
36-0245 /
f PROPOSED 16- / 100-YEAR
UNE N0. 1-18 36-0244 / FLOOD OMITS
56-0245
4 PROPOSED TEMPORARY
CONSTRUCTION WORKSPACE 36-0242 /^\ / •A%
36-0241 , iY
PLAN AND PROFILE VIEWS
GRAPHIC SCALE
100' 50' . 0 100'
T I
z
o-7p
PROPOSED 16' UNE NO. -1 MURAL
w _ COWNS COVE HDD GROUND
w-50
-70-
-90,
70-90 - 17+00 18+00 19+00 20+00 21+00 22+00 23+00
NOTES: STATION
1. COORDINATE SYSTEM:UTM ZONE 18/NAD 83,ELEVATION DATUM:
NAVD 88. T"OF
/Qy�.
2. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED BY OSI
ON 11/6/2013 TO 11/912013. aa�
3. MEAN HIGH WATER(MHW)AND MEAN LOW WATER(MLW)AS o Wary�A,9'
SHOWN ARE DERIVED FROM NOAA NAVIGATION CHART NUMBER `A NCte
13276,
4. HISTORIC MHW/MLW FROM MASS GIS DEP FILES.HISTORIC MHW
/MLW ON FOOTPRINT PROPERTY FROM PREVIOUSLY APPROVED /agatET�V
CHP.91 JURISDICTIONAL LINES FOR LICENSING OF THE
FOOTPRINT PROJECT.
JOSEPH E.WOJNAS
DATE:AUGUST 28,2014 HATCH MOTT MACOONALO
PLANS ACCOMPANYING THE PETITION OF
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR,AND CONSTRUCTION OF A NEW
METERING AND FLOW REGULATION STATION ON
FILLED TIDELANDS,IN SALEM,MASSACHUSETTS.
PIPELINE ALIGNMENT AND PROFILE
SHEET 5 OF 17
I HEREBY VERIFY THAT THIS PLAN HAS BEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
�TROFN
A�
JOSEPH E.
WOJN4S
No.m13 y
ONAL
REGIS.ERED PROFESSIONAL ENGINEER DATE
N/F ^
O e u COMMOMWEALTH OF
1. J MASSACHUSEWS M+O
COLLINS COVE HISTORIC MLW '�H
-� N/F CITY OF SALEM �:..__...�-
/
10' PERMANENT
EASEMENT
$4+ 25og__ 26+00___ 27+00 __ 28+00 _L_ 9+9_._._ 70+00 _
-- ---- ---------- -- ----------
MHW —
100-YEAR E PROPOSED 16- UNE N0.
FLOOD UMTS 1-18 COLLINS COVE HDD
�l N
36-0275 N/F CRY OF SALEM
r /
/"269 . 36
ISTORII ` \ \\
36-0272 MHW - 36-0315\
PLAN AND PROFILE VIEWS
GRAPHIC SCALE
100' 50' 0 100'
MEAN HIGH WATER El-W. 4.328
10'
0-10 -
-30� TURAL SEA FL OR' - MEAMLIlF
ROUND
-� -PROPOSED 1-70 0
-90 24+00 25+00 26+OD 27+00 28+00 29+00 30+00
NOTES: STATION
1. COORDINATE SYSTEM:UTM ZONE 18/NAD 83,ELEVATION DATUM: +�TWOFA1q�.
NAVD 88. A
2. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED BY OSI ON EPH9.
11/62013 T0111912013. Nq9
3. MEAN HIGH WATER(MHW)AND MEAN LOW WATER(MLW)AS SHOWN y
ARE DERIVED FROM NOAA NAVIGATION CHART NUMBER 13276.
4, HISTORIC MHW/MLW FROM MASS GIS DEP FILES.HISTORIC MEW/
MLW ON FOOTPRINT PROPERTY FROM PREVIOUSLY APPROVED /ONAI
CHP.91 JURISDICTIONAL LINES FOR LICENSING OF THE FOOTPRINT
PROJECT. g•L$'Fy
JOSEPH E.WOJNAS
DATE:AUGUST 28,2014 HATCH MOW MACDONALD
PLANS ACCOMPANYING THE PETITION OF
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR,AND CONSTRUCTION OF A NEW
METERING AND FLOW REGULATION STATION ON
FILLED TIDELANDS,IN SALEM,MASSACHUSETTS.
PIPELINE ALIGNMENT AND PROFILE
SHEET 6 OF 17
I HEREBY VERIFY THAT THIS PLAN HAS BEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
�ySN OF,iy�,
JOSEPHE.
www'
CML
No.4W13
R7I
ALF1�
za �4
REGIS ED PROFESSIONAL ENGINEER DATE
,l
/ IT N/F CHV OF SALEM
C _ 0
1io
4]y Op
HISTORIC MLW i
40 +?i' DOWNS COVE \yy ^
n
Ni N/F CITY OF SALEM
I-18-e
E PROPOSED 167
UNE N0, I-18
10' PERMANENT COWNS COVE HDD
EASEMENT1
—?L+ �
_--3 �U+w—L_ 4+o0 — —J�+ffi_—_16�r.OD—_.——3
__________ _________
PLAN AND PROFILE VIEWS
GRAPHIC SCALE
100' W. 0 100'
MEAN HIGH WATER ELEV. 4.328
10'
z-10
0 SEAR MEAN W 4.
E-3(Y
-4.7
w-50 PROPOSED 16" LINE N0. I-18
CO NS COVE HOD.
31+00 32+00 33+00 34+00 35+00 36+00 37+00
STATION
NOTES:
1, COORDINATE SYSTEM:UTM ZONE 18/NAD 83,ELEVATION DATUM: �p�TM OF, ,
NAVD 68. 3` y
2. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED BY OSI ON J�EPi1 EYn
11/6120137011/9/2013. W VOAS
3. MEAN HIGH WATER(MHW)AND MEAN LOW WATER(MLW)AS SHOWN
ARE DERIVED FROM NOAA NAVIGATION CHART NUMBER 13276. p
4. HISTORIC MHW/MLW FROM MASS GIS DEP FILES.HISTORIC MHW
MLW ON FOOTPRINT PROPERTY FROM PREVIOUSLY APPROVED CHP,
91 JURISDICTIONAL LINES FOR LICENSING OF THE FOOTPRINT
PROJECT.
DATE:AUGUST 28,2014JOSEPH E,WOJNAS
HATCH MOTT MACDONALD
PLANS ACCOMPANYING THE PETITION OF
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR,AND CONSTRUCTION OF A NEW
METERING AND FLOW REGULATION STATION ON
FILLED TIDELANDS,IN SALEM,MASSACHUSETTS.
PIPELINE ALIGNMENT AND PROFILE
SHEET 7 OF 17
I HEREBY VERIFY THAT THIS PLAN HAS BEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
"S,SN OF A
%Fj—E. .
WONA3
GWL
N8.0.5819 y
elWAL�
�� g• 2B'�4
REGISTEUED PROFESSIONAL ENGINEER DATE
oW W 41-0242 Z#O
♦2 7a
^. S N/F CIN OF SALEM
N
COLLINS COVE
N/F CITY OF SALEM
10' PERMANENT
� —
EASEMEMl AM
—_Ewan_ _42 __ _—
E PROPOSED 18" UNE NO. r�
1-18 COLLINS COVE HOD MHW �0
?yq
4'`
°?�,
N/F CITY OF SALEM
1-18-e Of;
PLAN AND PROFILE VIEWS
GRAPHIC SCALE
100' 50' 0 100'
' MFAN HIGH WATER ELEV. 4.328 NATURAL GROUND
10'
O S FLOOR -
MEAN HIST RIC L
w ELEV. -4.769 ROPOSED IT LINE N0. I-1
-70" COWNS COVE HO
-90 38+00 39+CO 40+00 41+00 42+00 43+00 44+00
STATION
NOTES:
ySN OF
1. COORDINATE SYSTEM:UTM ZONE 18/NAD 83,ELEVATION DATUM: cct0'
NAVD 88. & JOSEM E, w
2. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED BY OSI ON OINA9 ti
1 11612 01 3 TO 1'11912011 CIVIL 9
3. MEAN HIGH WATER(MHW)AND MEAN LOW WATER(MLW)AS O
SHOWN ARE DERIVED FROM NOAA NAVIGATION CHART NUMBERFF
dFOh�E
13276.
4. HISTORIC MHW I MLW FROM MASS GIS DEP FILES.HISTORIC MHW
MLW ON FOOTPRINT PROPERTY FROM PREVIOUSLY APPROVED 'L$ )5
CHP.91 JURISDICTIONAL LINES FOR LICENSING OF THE FOOTPRINT
PROJECT. JOSEPH E.WOJNAS
DATE:AUGUST 28,2014 HATCHMOTTMACDONALD
PLANS ACCOMPANYING THE PETITION OF
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR,AND CONSTRUCTION OF A NEW
METERING AND FLOW REGULATION STATION ON
FILLED TIDELANDS,IN SALEM,MASSACHUSETTS.
PIPELINE ALIGNMENT AND PROFILE
SHEET 8 OF 17
I HEREBY VERIFY THAT THIS PLAN HAS BEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
y19 OF,1 ,
o�
JOSEPHwoJNAS
n
cnI m
No.4 3
AL
REGIJITERED PROFESSIONAL ENGINEER DATE
o
41-0242
0 W
m i HISTORIC MHW i+c
,A on
r
x
41-0259 i v
/ 100-YEAR MISTMHW
FLOOD LIMITS 1
/ 41-0237
N/F CRY OF
t6
N/F CITY OF SALEM
cl 1-3 / 4 / 10' PERMANENT
EASEMENTI
---
--
(
41-0235 ' - 41-0257 -1,
\ > 41-0255
0
PROPOSED 16' UNE
41-0245 '
)
PLAN AND PROFILE MEWS
GRAPHIC SCALE
IOD' 50' 0 100'
10'
z
9-10' ffimNATURAL
a_30GROUN
50' PROPOSED 16- UNE NO. I-1
COLLINS COVE HDO
w-]0'
-90 45+00 46+00 gRgH
47+00 48+00 49+00 50+00 51+00
STATION
NOTES:
1. COORDINATE SYSTEM:UTM ZONE 181NAD 83,ELEVATION DATUM'
NAVD 88. y�SH OF
2. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED BY OSI pg" S'fi
ON 1116/2013 TO 11/9/2013. ERNE..
3. MEAN HIGH WATER(MHW)AND MEAN LOW WATER(MLW)AS $j
SHOWN ARE DERIVED FROM NOAA NAVIGATION CHART NUMBER 46919
13276.
4. HISTORIC MHW/MLW FROM MASS GIS DEP FILES.HISTORIC MHW I �
MLW ON FOOTPRINT PROPERTY FROM PREVIOUSLY APPROVED L�
CHP.91 JURISDICTIONAL LINES FOR LICENSING OF THE -Z E,
FOOTPRINT PROJECT.
DATE:AUGUST 28,2014JOSEPH E.WOJNAS
HATCH MOTT MACDONALD
PLANS ACCOMPANYING THE PETITION OF
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR,AND CONSTRUCTION OF A NEW
METERING AND FLOW REGULATION STATION ON
FILLED TIDELANDS,IN SALEM,MASSACHUSETTS.
PIPELINE ALIGNMENT AND PROFILE
SHEET 9 OF 17
I HEREBY VERIFY THAT THIS PLAN HAS BEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
IN OF,NgJ,
oQ
JOSEPH E.
cpi OWOIVL �J
NJ.�4 13 y
GONALE
i •Z� g (4
REGIST ED PROFESSIONAL ENGINEER DATE
\\ l UCENSE NO. 3098
N/F FOOTPRINT POWER SALEM
HARBOR R®ATE, LP
Do-
FLOOD LIMITS
n / HISTORIC MHW
PROPOSED TEMPORARY e
F CONSTRUCTION.
_ •� �/ WORKSPACE LIMITS VN_
.APPROXIMATE COLUNS COVE
HDD ENTRY/EXN LOCATION
PROPOSED 10' ONE NO. I-18
30' PERMANENT'I
"IVB EASEMENT( ---- -------- HW..M
LICENSE NO.. 392, 1852, CNP. 111
---ACTS OF 1847, AND CHP. 91
i
AUTHORIZATION VIA 658 DECISION 13-1
PLAN AND PROFILE VIEWS
GRAPHIC SCALE
100' 50' 0 100'
30'
z 10'
0
-10 R SEE SHEEP it DF 7
1-30 FOR TYPICAL PIPE
-50ftROPOSEDLINE NO. 1-18 - CROSS SECTION
-70WNS COVE HDD BEYOND BORE
52+00 53+00 54+00 55+00 56+00 57+00 58+00
STATION
NOTES:
1. COORDINATE SYSTEM:UTM ZONE 18/NAD 83,ELEVATION DATUM:
NAVD 88. `STH OfA(,(y,
2. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED BY OSI ON 1�
1116/2013 TO 111912013. �� JOSEPH E.
3. MEAN HIGH WATER(MHW)AND MEAN LOW WATER(MLW)AS s
SHOWN ARE DERIVED FROM NOAA NAVIGATION CHART NUMBER
13276. pk�
4. HISTORIC MHW I MLW FROM MASS GIS DEP FILES.HISTORIC MHW/
MLW ON FOOTPRINT PROPERTY FROM PREVIOUSLY APPROVED 'WONALE
CHP.91 JURISDICTIONAL LINES FOR LICENSING OF THE FOOTPRINT •2&'(ti
PROJECT.
WOJNAS
DATE:AUGUST 28,2014 JOSEPH E.
HATCH MOTT MACDONACDONALO
PLANS ACCOMPANYING THE PETITION OF
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR,AND CONSTRUCTION OF A NEW
METERING AND FLOW REGULATION STATION ON
FILLED TIDELANDS,IN SALEM,MASSACHUSETTS.
PIPELINE ALIGNMENT AND PROFILE
SHEET 10 OF 17
I HEREBY VERIFY THAT THIS PLAN HAS BEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
,pVtH OF�
O�
zi
WOMgSE.
i �/ONA�E
REGIS RED PROFESSIONAL ENGINEER DATE
PROPOSED METERING c
® AND VALVE SITE / w'
W A
o+z \\ --- MHW
Yl` i LICENSE N0. 3098 "fy_
N/F FOOTPRINT POWER SALEM
HARBOR REAL ESTATE, LP
30' PERMANENT HISTORIC
EASEMENT / //L MLW
PROPOSED TEMPORARY
CONSTRUCTION
WORKSPACE UMRS
1
PROPOSED 16'
LINE NO. 1-18
MHW
' LICENSE.NOs. 392. 1852, CHP. 111
ACTS OF 1847 AND CHP. 91
iAUTHORIZATION VIA EMB DECISION 13-1
PLAN AND PROFILE MEWS
GRAPHIC SCALE
100' 50' 0 100'
30'
10'
O
-10' O SEE PIPE
ICALCRD THE BORE
w ION-
-30' GROUND OF PIPE BEYOND THE BORE
ON SHEET 17 OF 17
-50'
_70'
59+00 60+00 61+00 61+93
NOTES: STATION
1. COORDINATE SYSTEM:UTM ZONE 18/NAD B3,ELEVATION
DATUM:NAVY 88. QV� -7, 19
2. DATUM:NAVY SHOWN BASED ON SURVEYS PERFORMED BY OSI
ON 1116/2013 TO 11/912013.
3. MEAN HIGH WATER(MHW)AND MEAN LOW WATER(M LW)AS
SHOWN ARE DERIVED FROM NOAA NAVIGATION CHART NUMBER
13276.
4. HISTORIC MHW/MLW FROM MASS GIS DEP FILES.HISTORIC
MHW/MLW ON FOOTPRINT,PROPERTY FROM PREVIOUSLY APPROVED CHP.91 JURISDICTIONAL LINES FOR LICENSING OFTHE FOOTPRINT PROJECT.
DATE:AUGUST 28,2014JOSEPH E WOJNAS
HATCH MOTT MACDONALD
PLANS ACCOMPANYING THE PETITION OF
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR,AND CONSTRUCTION OF A NEW
METERING AND FLOW REGULATION STATION ON
FILLED TIDELANDS,IN SALEM,MASSACHUSETTS.
PIPELINE ALIGNMENT AND PROFILE
SHEET 11 OF 17
I HEREBY VERIFY THAT THIS PLAN HAS BEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
�tH OFAyp�
OEPHB.
NAS
No�CIVIL
ti
�s/7AL
REGI RED PROFESSIONAL ENGINEER DATE
'\ ,T1i T 1•p S�'�ete
BEVERLY HARBOR +' F
PROPOSED SALEM—
PROPOSED
ALEM C t"•.,
/\ PROPOSED TEMPORARY COFFER OAM (85' LATERAL 15 UNE {x
® \ LONG x 55' WIDE x 8.5' DEEP) MATERIAL- I-18 / 1.2 MI
TO BE DREDGED BELOW MHW: 4d
AREA: 0.1 ACRE
\\ VOLUME: 1.500 CUBIC YARDS
ti
TO BEVERLY LACUS MAP
HARBOR
NAVIGABLE ��-
CHANNEL SPECIAL ANCHORAGE
1�0.25�110.1
HUBUNE HOT-TAP \
TIE-IN LOCATION p
APPROXIMATE BEVERLY HARBOR
0\�0 HDD ENTRY/EXIT LOCATION STA. 0+00
\, PLAIJ VIEW GRAPHIC SCALE
EXISTING 30'
HUBLINE PIPELINE
LIMITS OF COFFER DAMMI'1 TS OF COFFERDAM
-•+moi FAN HIGH °6 MEAN HIGH
WATER ELEV. WATER EI_ V.
4.328 4.328
'kNMEAN LOW
BOTTOM OF MEAN LOW BOTTOM OF WATER ELEV.
EXCAVATION WATER ELEV' EXCAVATION -4.679
(-17 NAVD 88) -4.679 (-17 NAVD 88)
SECTION AA SECTION BB
SCALE: 1"=40' SCALE: 1"=40'
NOTES:
1. COORDINATE SYSTEM: UTM ZONE 19/NAD 83, ELEVATION DATUM:
NAVD 88.
2. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED BY OSI ON
11/6/2013 TO 11/9/2013. SN OF
3. MEAN HIGH WATER (MHW) AND MEAN LOW WATER (MLW) AS SHOWN '
ARE DERIVED FROM NOAA NAVIGATION CHART NUMBER 13276. o`�
4. HISTORIC MHW/MLW FROM MASS GIS DEP FILES. HISTORIC _E
MHW/MLW ON FOOTPRINT PROPERTY FROM PREVIOUSLY APPROVED `4
CHP 91 JURISDICTIONAL LINES FOR LICENSING OF THE FOOTPRINT X19 h
PROJECT.
S. DREDGED MATERIAL FROM THE SITE WILL BE TEMPORALILY STORED AL
AND THEN USED AS BACKFILL IN THE DREDGED AREA.
WOJNAS
DATE: AUGUST 28, 2014 JOSEPH E. ACDON
PLANS ACCOMPANYING THE PETITION OF HATCH Mon MACDONALD
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR, AND CONSTRUCTION OF A
NEW METERING AND FLOW REGULATION
STATION ON FILLED TIDELANDS, IN SALEM,
MASSACHUSETTS.
DREDGING PLAN & CROSS SECTIONS
SHEET 12 OF 17
PROPERTY OWNERS
Tract No. Contactl Cuntact2 Site Address City State Zip I Status City Parcel ID
1-18-1 Commonwealth of Directly N/A
Massachusetts Affected 1'
Boston Gas National Grid Directly -
1-10-2 I Company 40 Sylvan Road, Waite Street ISalem MA 01970 Afro-c%
3J-OOfi4
Waltham,MA 02451 1
New England Power National Grid Directly
118-3 ComPzoy 405ylvan Road, Waite Street Salem MA 019]0 Affected 360234
Waltham,MA 02451 f
1104 I Ward It
Social Club 1East Collins St �Salem l MA 01970 Affected&. 111 Directly 36-02]1
' 1 Glen A.Maynard Directly
-18-5 51 Osgood street Salem MA 01970 36-02]3
Carol A.Maynard I AHected
City Hall —� Directly—
-_-- �— -
1-18-6 City of Salem 93 Washlirl Street, 31 Collins St Salem MA 01970 36-0473
Salem,MA 01970 Affected
�— City Hall
irectly
11ga I City of Sanm 93 Washington Street, 2Collins St Salem MA 01910 D 36-0.1]4
Salem,MA 01970 Affected
?— City Hall ---_ ---� _-�—
118- Directly —42-0 �
8 j City of Salem 93 Washington Street, 50 Rear Webb Street Salem MA 01970 001
Salem,MA01970 Affected
City Hall
6189 I City of Salem 93 Washington Street Directly40 Rear Webb Street Salem MA 01970 Affected 42-0002
Salem,MA 01970
City Hall
1-18-10 ' Cityol Salem 93 Washington Street, 17-23 1J-235xe[ela lane Salem MA 01970 Affected
42-0003
` Salem,MA 01970
City Hall DirectlyAffectedL City of Salem 93 Washington Street, 45re[ela lane Salem MA 01910 AHected 41-0243
Salem,MA 01970
City Hall Directly
I ig-18 City of Salem 93 MA01WashingtonStreet, 3Forl Avenue— Salem MA 01910 414236
em,MA 01
Sal9]0 Affected
City Hall MDirectly 1-19-14.5 City of Salem 93 Washingmo Street, 9Hrt Avenue Salem MA 01970 41-0244
Salem,MA 01970 Affected I _�
-IBdS — Cayofselem 93 Washington Street, 4Fort Avenue —Directly
Ciry Hall ISalem MA 01970 Affected 41-0258
Salem,MA 01970
ower
Foci P
(' 139-19-19 Salem Harbor R 24 Fort Avenue Salem MA 019]0 Directly 41-0271
Estate LP I Affected
PLANS ACCOMPANYING THE PETITION OF DATE: AUGUST 28, 2014
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR, AND CONSTRUCTION OF A
NEW METERING AND FLOW REGULATION
STATION ON FILLED TIDELANDS, IN SALEM,
MASSACHUSETTS.
PROPERTY OWNERS LIST i '
SHEET 13 OF 17
PROPERTY OWNERS
CONTINUED
— Conbttl ( Contact2 Site Me,— City State Zip Status City Nua.l
ID
Salem Plumbing Supply COIn< no,
PO.Bax 510,BPverly.Mpl g30ritlge Street Salem MA 01110 pputter 36o23g
191
Ralph H,&Debra L Sevin_ 1,0.10,511,Be verly,MA 01915 13 PIan:ms Sim. (Salem MA 10197D gbutlerl 360239
Patricia L Ment,Trustee
Donovan Irrevocable um Eztate imst ( 20 Crms Stent 15 plan:erz Aree (Salem MA 101110 Abutter 16-0240
Daviel.Pemeault 1 21 Plan[ers5treel Salem MA 101970 Abutler 1 36L241
R 1.1"ia A.Pandy 23 Planter55Vttt Salem MA 1.191. Abney, 36-0243
�__/o mgeneo.inbol[ _ 25 Plant,Street Salem LMA 01970 Abutter 360243
Eugene D.5(Ool[Ir
__ Ira O.I.H. _ _ 2]Plant... ..r1ell... Salem MA 01970 Abutter 36-0244
Adamh&Kri-nnfnig ]9 planters Street Salem MA 01970 Abutter 1 36-0245
IosDeM1 Deter,
WaRitane 47 OsgaM Street Salem)MA 10070 Abutter' 3610269
Debora R Dawkins I 4]Osgood Street Salem)MA 1019701 Abutter 16.14
Susan BYa[es _53 Osgood St net Salem MP 101970'Ab Iter 360274
In,B Mckay SI OSI.Strret (Salem MA 101970 Abutter 3h 0275
ITmlea E.&Mary[gnigFt j 5 fa st Collins St _ Salem IMA 1019]01 A_bu[ter! 36-02]_8
___ PauIESDntlaMMdNene_--�� I__ 7East C011lns Sl ISalem�MA 1019]0 Abu_r1 36L279
lean A Demand I 9 Eant Collins Sr Salem)MA 1039]0 Abu[ter( 36 07g0
IOM1n g.Snow 1 S40sg`_otl Street Salem MA 019]DI Abutter) 36-0306
TheSosnowski Family crust 9ConnIII Road Salem l MA 1019701 Abutter 1360315
Salem CryNall —
[tyolSalem 93 Wash ngmn 5trert WeOb S[ t Salem MA IOlY]O Abutter 36-0q72
SaIPm,MA 01170
Crete,LLC 1Ll,nak'z Naneas 1—Ire.,In,1mr,I Salem)MA W191.1 Abutter 3]-0061
Angio&Iealle,Agonakli 11 Orld,Strait ISaIPm MA 019]0)Aharyer 37-W62
A.It S.PIII,grtau.f,LLC ( Pr 1
99 Rrurnmer Ill LLC 13AI Aar—al up Amercas, 1ID,i1,Ime Salem rap 1Ot970 Abutter I PCOR3
ewyoM1.nRW19
Boston Gas Company N qO SyW In Read Waltham MA ID24511 Abutter) 42-0I[0
Salem c:v Mall
City Df Salem 93 Washington Street, Fort 4yamae Salem MA I019]0 Abutter 41-0]35
Salem,MA 019]0 _ _
Rlcllard Vardalakos 9FOrt Avenue 5FortAvenue Salem MA 019]0 AbumeJr410237
Salem Xousin Allh.rl 27[Fatter""le
0 ry Salem,MA01"o part Terrace Salem MA 019]0 Abutter) 41-0242
Salem C'OnC.I.
Hall
City of5alem 93 Wa5Fingt ". Fort Avenue Salem MA 01 Abetter 41-0245
_� Szlem,MA 01970
Ieflrey Brack,
Culp&Denim AShlaw BWebb Stuart Salem MA 101970 Abutter; <10354
Steven).&Susan M.Sz[recM1Dwi¢ IDI/3 Webh Stree: (Salem MA 101970 Abutter 41-0255
Tre 1P0 Trust _ IOspb P.BoAvert,T:usteel BWebb Street Salem M_A 0)_970_ppu_[Ier _41-0_25_6
_ _ ___.. _ _.L_ 1
PLANS ACCOMPANYING THE PETITION OF DATE: AUGUST 28, 2014
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR, AND CONSTRUCTION OF A
NEW METERING AND FLOW REGULATION
STATION ON FILLED TIDELANDS, IN SALEM,
MASSACHUSETTS.
PROPERTY OWNERS LIST 2
SHEET 14 OF 17
PROPERTY OWNERS
CONTINUED
[,tall Conta22 Sile Mdrezi City State To Status City Parcel
ID
._ _ .__._._ ._.. .._..I .. . _.
Antl'ewl.CooperRMicllelle i.FratlMe 6Wehb Street 531Pm MA�019J0 Abutter I1-035]
Hall Morrisal Brooke D.Morrlisey 24 NigM1 Sheet 16 Derby Street Salem MA Ml. Abutter 4Y0359
Taps`eItl,MA 0l9B2 I
NRH Propellor 5bop lnc I 2Sxetela Lane Salem MA RiN Mutter 410274
I Inn Pierre Draauk 81 oerhy4reet Salem MA-019JO Abutter 410215
Ambard E.Sa—key I 93-95 Biro,Streit Seem I MA 101970 Mutter 410276
HDET Really Tmst 5Sian"Street Salem I MA 101970 Ahutter 4t-037]
Salem Clty Nall
Qm'.f5a1em 93 WasM1ingtan Sheet Blaney Street ylem MA 01970 Abutter 410370
Salem,MA 019)0
Salem OW Hall
Crtyof Salem I. 93 Wa5bmgton Sir., Herby 51rrm (Salem MA 701970 Abutter 410321
Salem, B.
Francisb Jr.&Cadalm M.Shute 1Settle,Way U1 Salem MA 1019]01 Abutter 2-0905-80
au
lecerne r 1.0'Oorral 2xHl.k Wa/�0192H�Abutter 42400059@
!)3Er Street ims[ M.Oelan
sseTruuen I 35e¢Iers Way Salem MP(019J0 Abutter d2A:05-003
P.O.Bmd071,VeaMLy,MA
01961
amea A.A lol,n 1.',matn at1th—uA 15alem A 101`)0 Abutter 12 bal 1.
Hill Family T-1 SSAW—Way U5 xlem MA Mrlo Al., 4lAro5 WS
4uu Arthur OraLV ( 6xttlers Way U6 Alam MA 01910 Abutter al.W B06
Cael3&IULm'.A,Hell untl 11 WaInm Sire":9)6)9 )yr:In.S Way ylem MP 01970 Abutter d22W5d9J
4reen['ova Springs,FL 32013
r Xaroll1.pemona[o&GaiIA.AAUMnot aeml—way U8 Allem MA 01970 Abutter l42-0 5 803
1
0.lxharl6.&Prtriria Marl M-1, a a--al U9 Salem MP o19JH Abutter 422971
'.mT A M arta 1.error, He terhar5 Way U 10 5a!em MA 103970i Abutter 42-rhe 0
Sam me a'aellee eMersvlay U al I za A 101970 Abulter 424atsgll
..111W.,lc&Oral qnn oareL ".btert WayU L, Sale. M4 019]0 Abutter 143A' lKl
la0rry&$uxnnneL[onley 1 "; 13 Se'do"..,il Salem MA 019tH Abutter ial-0morl
Ateb Mame 145e1uh-WayU 14 p19J0 Abutter 143060ig14
YaRn M.O'B-ien I 355e1tl iWay-IS Salem MA 019J0 Abutter 434WSBll
PIANS ACCOMPANYING THE PETITION OF DATE: AUGUST 28, 2014
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR, AND CONSTRUCTION OF A
NEW METERING AND FLOW REGULATION
STATION ON FILLED TIDELANDS, IN SALEM,
MASSACHUSETTS.
PROPERTY OWNERS LIST 2
SHEET 15 OF 17
PROPERTY OWNERS
CONTINUED
Conla[t2 Site Add— GtV $G<e zip sG... City P.-H
MarVuis&Cordula Magee&Seymo'a,Smith 16Settle.Way U 1. .'am 1IA 101970 Abutter 4340]OS816
obn S_Tangr— 1lle"I'rs lu 1J Salem MP 10,970 Abutter 42d g$17
r
$uunCavalieri 185e VIen WayV 18 Salem Mg 01970 Abutter a3N3ifl18
L-
- Mary
11",41 95enIerS WaVU 19 Salem MA 01970l Abutte, 19
Trplame58ElaineNally Lamlly Trust lames Nally 305e1tlers Way V 30 Salem MA 1019]O�Abutter 42N tg
1.1n F.&Pa Vie M.Tlemey 315enlers Way U 31 Iylem M2 019701 Abutter 422 1alt
PauIA.ft MaduVe BouelraA 22 Sailers WaV U 22 Salem MA 01970 Abutter 4NW tl
21 Sell— a,ewlry I...I eoland&Mary St Pierte, )j
Trustees SeNler[N/ayU23 Salem MA 019MAbutter 42.-B23
1 gae."N.&5uun5..... 245 niers Way V 34 Salem MA 101970 Abutter 41LLO 4
Mkbaal D.YMenko 355enle,s Way V 35 Salem MA 101970 Abutter 42A 11 4125
M1M1E.Geu,ge&IwnGlli 1 1 265enlersWVV36 Salem MA 01970 Ab Iter 62A%15826
P!i GG&NaemE 8om8eault 21 Mal u 2J 1 Salem MA 01970 Abutter 42{ 1121
Douglas S Bums laving Trutt Douglass Oum;T,ustee Sfl Senlert Way U 3g (Sal— MA 01910 Abutter 41WJ5038
1 Willa—,.&$usanP.Dion1 295¢1[1,'5 Way U 29 l salemi M A 01970 Abutter l4'.t29
Wayne W.&lillian E ea,.r,d 305enle..Way U 30 Salem MA 019]0 Abulhr 42aW5810
0one11 T.4 Patrkia M.Otte[ 131Spttkn WayU31 Salem]MA 1019]D Abutter 42-00054)1
oteob&Patrlcla eauvin 45elllers WayV33 5alpm MA 1019]0 Abutaer 43m25533
ibirty�ibre¢Sertl¢rs Way T,usl [/o Caeol G.ge... 335-1—Wa,V33 Salem MA 101970 Abutter al-.1-833
Spu16 Et5et Sewerage Dlsvia 50 Fprt Avenu= Sale= MA019]0 Abutter 82-11
POB 989 J
PLANS ACCOMPANYING THE PETITION OF DATE: AUGUST 28, 2014
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR, AND CONSTRUCTION OF A
NEW METERING AND FLOW REGULATION
STATION ON FILLED TIDELANDS, IN SALEM,
MASSACHUSETTS.
PROPERTY OWNERS LIST 2
SHEET 16 OF 17
I HEREBY VERIFY THAT THIS PLAN HAS BEEN PREPARED IN
CONFORMITY WITH THE RULES AND REGULATIONS OF THE
REGISTERS OF DEEDS OF THE COMMONWEALTH OF
MASSACHUSETTS.
(N OFA(q„_
XSEPHE'.`a
8 �� y
51EP
LONAL
2$ ly
REG6YERED PROFESSIONAL ENGINEER DATE
TYPICAL TRENCH DETAIL
2 FT.
SETBACK. II..'......'.-.C::::.':.'::.'.�
(MIND
L':. TRENCH'!:': SPOIL
GRADE "...........
...........
..........
BACKFILL
PIPE
—6 MINIMUM WHEN ROCK IS
PRESENT IN THE DITCH
6' MINIMUM IN SOIL
T MINIMUM IN ROCK OR A WATERBODY CROSSING
CROSS-SECTION VIEW OF TYPICAL TRENCH
NOTES_
1. THIS IS A TYPICAL CROSS SECTION OF TRENCH INSTALLATION IN UPLAND AREA WHERE HDD IS NOT USED.
2. ALL ORIGINAL CONTOURS WILL BE RE-ESTABUSHED UPON COMPLETION OF PIPE INSTALLATION. EXCEPT IN
WETLANDS, A CROWN MAY BE LEFT TO ACCOUNT FOR DITCH SETTLING, AS DIRECTED BY THE
ENVIRONMENTAL INSPECTOR.
3. IN COLD WATER FISHERY STREAMS, THE TOP If OF THE TRENCH WILL BE BACKFILLED WITH
CLEAN GRAVEL OR NATIVE COBBLES.
SN OF
o�
3 WSEPH E.
L y
STEPS
gONAt�'�
PLANS ACCOMPANYING THE PETITION OF DATE: AUGUST 28, 2014 JOSEPH E. WOJNAS
HATCH MOTT MACDONALD
ALGONQUIN GAS TRANSMISSION COMPANY TO
INSTALL AN UNDERGROUND NATURAL GAS
PIPELINE IN FILLED TIDELANDS AND BENEATH
BEVERLY HARBOR, AND CONSTRUCTION OF A
NEW METERING AND FLOW REGULATION
STATION ON FILLED TIDELANDS, IN SALEM,
MASSACHUSETTS.
TYPICAL BURIAL CROSS SECTIONS
SHEET 17 OF 17