63 FLINT STREET - ZONING (2) Gad 6 e6
�c gyp° Mue OItlrttt (Surd
DECISION
Business Park Development
Wetlands and Flood Hazard District
Site Plan Review
Special Permits
Allied Realty Trust
63 Flint Street
Salem, MA 01970
Re: Allied Lumber
On Thursday, November 1, 1990, the Planning Board of the City of Salem held a public
hearing regarding the application of Allied Realty Trust under Section VII R, Site Plan
Review Special Permit; Section VII P Wetlands and Flood Hazard District Special Permit;
and Section VII Q, Business Park Development District Special Permit, of the Salem
Zoning Ordinance, for the construction of two buildings with a total footprint of 20,000
s.f. at 63 Flint Street.
At a regularly scheduled meeting of the Planning Board held on November 15, 1990,
the Board voted by a vote of eight in favor, none opposed, to approve the applciation as
complying with the requirements of a Special Permit, subject to the following conditions:
1. Conformance With Plan
Work shall conform with plan entitled "Allied Lumber and Supply, Salem, MA ", dated
October.16, 1990, revised November 15, 1990.
2. Signage
Signage for the project shall be review and approved by the City Planner and the
Planning Board prior to issuance of a Certificate of Occupancy.
3. Lighting
All exterior lighting shall be installed and maintained in such a manner so as not to
reflect or cause glare on abutting or facing residential premises or on-coming traffic.
4. Landscaping
Landscaping shall conform with plan entitled, "Allied Lumber and Supply, Salem, MA
Site Plan", dated October 16, 1990, revised November 15, 1990.
a. Proposed tree plantings along the canal shall be reviewed by the Planning
Department. In addition, the time for planting such trees shall be determined by
the Planning Department.
b. Shrub diameters shall be a minimum of 24".
c. After all project landscaping is completed, and prior to the issuance of a
Certificate of Occupancy, the developer will be required to add further landscaping
if such is required by the Planning Board or City Planner.
d. Maintenance of all landscaping shall be the responsibility of the owners.
5. Board of Health
Board of Health requirements set forth in a letter dated November 15, 1990, shall be
adhered to.
6. Concrete Curb Stops
Concrete curb stops shall be installed at the back of each marked space in the parking
area.
7. Utilities
All utilities shall be installed underground.
8. Conservation Commission
Work shall conform with all requirements of the Salem Conservation Commission
Order of Conditions.
9. Construction Practices
All construction shall be performed in accordance with the Rules and Regulations of
the Planning Board, and in accordance with any and all applicable City of Salem
regulations.
10. Violations
Violations of any conditions shall result in revocation of this approval by the Planning
Board.
I hereby certify that a copy of this decision and plans have been filed with the City
Clerk and copies are on file with the Planning Board. The Special Permit shall not take
effect until a copy of this decision bearing the certification of the City Clerk that twenty
(20) days have elapsed and no appeal has been filed or that if such appeal has been filed,
and it has been dismissed or denied, is recorded in the Essex County Registry of Deeds and
is indexed under the name of the owner of record or is recorded on the owner's Certificate
of Title. The fee for recording or registering shall be paid by the owner or applicant.
Walter B. Power, III �J .
Chairman
M9WP