BLANEY STREET - ZONING Z 0 rv0t
( iV COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENERGY & ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
ONE WINTER STREET, BOSTON, MA 02108 017-292-5500
IF'I
DEVAL L. PATRICK R ,..�.a i?o.,., IAN A. BOWLES
Governor
OCT 1 5 LOUD Secretary
TIMOTHY P.MURRAY LAURIE BURT
Lieutenant Governor
DEPT.OF PLANNING 2S Commissioner
City of Salem
c/o Bourne Consulting Engineering
3 Bent Street
Franklin, MA 02038
Attn: Alyssa Richard
Re: PUBLIC NOTICE OF WATERWAYS LICENSE APPLICATION No. W08-2463
Salem Harbor, Salem, Essex County
Dear Applicant:
The Waterways Regulation Program (WRP) has received your application requesting
authorization to perform certain activities in state waterways pursuant to M.G.L. Chapter
91, the Public Waterfront Act and its regulations at 310 CMR 9.00 etc. The WRP has
assigned this application filing with the above-referenced Waterways License application
number. IT IS IMPERATIVE THAT YOU REFER TO THIS APPLICATION NUMBER
WHENEVER YOU SUBMIT OR REQUEST INFORMATION FOR THIS FILE Upon
review of this application, the WRP has made a determination that this project is a Water-
dependent Use Project.
Attached is the WRP's Public Notice form for this application. The Applicant is required to
publish this notice, at his/her expense, in one or more newspapers having circulation in
the area affected by the proposed activity. This notice must be published in the local
newspaper(s) for at least one day on or before Notification Date. The required public
comment period shall begin on this designated Notification Date. The Applicant is
required to submit proof of publication to the WRP by sending a copy of the newspaper
notice showing the date of publication or a copy of the newspaper notice and a letter from
the newspaper indicating the date the public notice was published.
Pursuant to 310 CMR 9.13(1)(a), the Applicant is also required to concurrently
provide this notification, along with a copy of the project site plans submitted with
the Waterways License Application, to the appropriate municipal officials,
regulatory agencies and abutters to the project for their review and comment, by
Certified mail. (see Notification mailing list attached).
This information is available in alternate format.Call Donald M:Gomes,ADA Coordinator at 617-556-1057.TDD Service-1-800-2984207.
MassDEP on the World Wide Web: hrip:/Av mass.gov/dep
C*,* Printed on Recycled Paper
For Chapter 91 purposes, an abutter is defined as the owner of land that shares a
common boundary or corner with a project site at the water's edge, as well as the owner
of land that lies within 50' across a waterbody from such site, see;,310 CMR 9.02.
The WRP will publish,the Public Notice in The Environmental Monitor, if required.
Lastly, the WRP cannot complete its review of this application until the following
information/document(s) checked below have been submitted:
® Proof of publication of the Public Notice
® Receipt of the Municipal Zoning Certification
® Receipt of the Municipal Planning Board Notification Form
®-Receipt of a valid Final Wetlands Order of Conditions
❑ Receipt of a valid DEP Water Quality Certification
❑ Completion of the MEPA review process
® Plans according to the specifications of Appendix A of the Waterways Application.
NOTE: Final Mylar Project Plans will be required upon notice from the
Department and prior to issuance of the Chapter 91 License.
❑ Other:
Should you have any questions, please contact me at (617) 654-6520. Thank you.
Sincerely,
CQ���,6 ��
David B. Slagle
Environmental Analyst
Waterways Regulation Program
DEPARTMENT OF ENVIRONMENTAL PROTECTION
WATERWAYS REGULATION PROGRAM
Notice of License Application pursuant to M. G. L. Chapter 91
Waterways License Application Number W08-2463
City of Salem
NOTIFICATION DATE: October 15, 2008
Public notice is hereby given of the application by City of Salem to construct and maintain
a multi use transportation facility which includes a water transportation terminal and pier;
and to dredge approximately 115,117 cy of sediment at 10 Blaney Street in the
municipality of Salem in and over filled and flowed tidelands of Salem Harbor Designated
Port Area. The proposed use of the project is to provide for commercial docking and
access to navigable waters, provide for adequate water depths for safe berthing and
navigation; and is a water dependent project.
The Department will consider all written comments on this Waterways
p V application
received by within 30 days subsequent to the "Notification Date" Failure of any aggrieved
person or group of ten citizens or more to submit written comments to the Waterways
Regulation Program by the Public Comments Deadline will result in the waiver of any right
to an adjudicatory hearing in accordance with 310 CMR 9.13(4)(c).
Additional information regarding this application may be obtained by contacting the
Waterways Regulation Program at (617) 292-5500. Project plans and documents for this
application are on file with the Waterways Regulation Program for public viewing, by
appointment only, at the address below. Written comments must be addressed to: David
Slagle, Environmental Analyst, MassDEP Waterways Program, One Winter St., 51' fl.,
Boston, MA 02108.
Pursuant to 310 CMR 9.13(1)(a), the Applicant is also required to concurrently provide this
notification, along with a copy of the project site plans submitted with the Waterways
License Application, to the appropriate municipal officials, regulatory agencies and
abutters to the project for their review and comment(see Notification mailing list
attached). The applicant shall send the notice of license or permit application by Certified
mail to the attached list, abutters and notify the Department when completed.
Mailing List: Notice of License Application pursuant to M. G. L. Chapter 91
Mayor and City Council, City of Salem
Salem Planning Board
Salem Conservation Commission
Salem Zoning Board
Salem Harbormaster
Coastal Zone Management
251 Causeway Street, Suite 800
Boston, MA 02114
Massachusetts Environmental Policy Act (MEPA) File# 14234
100 Cambridge Street, Suite 900
Boston, MA 02114
Division of Fish & Wildlife and Law Enforcement
Field Headquarters
1 Rabbit Hill Road
Westborough, MA 01581
Attn: Tom French
Division of Marine Fisheries
Annisquam River Marine Fisheries Field Station
30 Emerson Avenue
Gloucester, MA 01930
Massachusetts Historical Commission
220 Morrissey Blvd., Columbia Point
Boston, MA 02125
Army Corps of Engineers
New England Division
696 Virginia Road
Concord, MA 01742-2751
Abutters — For Chapter 91 purposes, an abutter is defined as the owner of land that
shares a common boundary or corner with a project site, as well as the owner of land that
lies within 50' across a waterbody from such site, see 310 CMR 9.02.
WRP Files'
_ -
"�.\
it:
SECT
SCALE: 1"=3000'-0" N
LOCUS PLAN
I I
I ` ��••• E 1 r l\ G
I _ c
C 1 r'
p I I
O O
N I
II o
p `
p AJ
z L)
p V
z
\ p E.
p '•M9W' U�-y]
\sRONALD R
\ � aouRrae ~_T
CIVIL 4i
W6321ma Q w.SA
IlaTe
dip
100 YR FLOOD +17.0
HTL 1 .0
II, F MHW +18.9
? NGVD +4.2
a i x I x MLW 0.0
F B 31DZ - •-••) �. I -
m 44 SHEET 1 OF 8
PLANS ACCOMPANYING PETITION OF
CITY OF SALEM FOR CONSTRUCTION
AND MAINTENENCE OF THE PORT
FACILITY EXPANSION AT BLANEY
STREET, SALEM, MA IN SALEM
HARBOR.
PREPARED BY
ti
PROPOSED 56'X100'
TERMINAL BUILDING
SEE SHEET B
PIER
PARKING LOT PIER SEE SHEET 4
J .
r 1 /
EWER PUMP
- - STATION ;. ,6
L
,
MLW
Il HARBORWALK
MHW & HTL UNDER
HARBORWALKI
'� MHW & HTL AGAINST BUVHEAG- - -- i! --�
SAL cnA F'ARF017
_l - -- -tel 1T(11r1�Fin
Hewlhornv
/ 4
Cove Marino
`-
I _. ..'lJ
n PROPOSED CONDITIONS
z 0 120
SCALE:1 "=120'-0"
I" CONCRETE DECK - -
IIGH BARRIER RAIL 12'
HARBORWALK 6' CONCRETE SIDEWALK
PARKING AREA
(VARIES)
TOP OF
HARBORWALK CENTER PARKING ISLAND
EL. +15-0
4'
F
MHW EL. +8.9 ±*' FILL FILL
CONC. RETAINING WALL
PROPERTY LINE
'�. EXISTING SLOPE EXISTING GRADE
MM �l-.0.00 @.`'``r.: EXISTING RIP RAP
�] TIMBER PILE 15' O.C. (TYP.)
A PROPOSED HARBORWALK AND PARKING LOT SECTION
3
15 B" CONCRETE DECK
HARBORWALK
42" HIGH BARRIER RAIL
1% SLOPE EL. +17-5 TOP OF HARBORWALK
>. . ., EL. +17.0
12"0 TIMBER PILE
HTL EL. +11.0
EXISTING RIP RAP J MHW EL. +8.9
_ 2 REINSTALL EXISTING
FILL 11 tRIPRAP EXISTING MUDLINE
MLW EL. 0:00
.' CONCRETE BULKHEAD LIMIT OF DREDGE
r>)VK
o`. Vii . ,
— ar0 EL. —11.0
PROPOSED PIER SECTION 0 16'
B
SCALE:1/16"--V—O" S(.AI F-1 /iF 1'=(1"
------------
........... ....
...........
3d
IF
IL
rj)
r
5'.1
FAC
f W WMAY
NN,
---------------
MLWI I
�MAY N
PROPOSED PIER
0 50
SCALE:1 "=50'-0"
VARIES CONCRETE CURB
(30' TO 70')
GREENHEART PILE
TOP OF PIER 12" CONCRET 7'-6" O.C. (TYP)
EL. +17.0 DECK CONCRETE CAP
MHW EL. +8.9
MLW 'EL. 0.00
12"0 PIPE PILE (TYP.)
n PROPOSED PIER SECTION
5
32' CONCRETE CURB
' TOP OF 2'0 FLOAT GUIDEPILES (TYP)
PIER EL. +17.0
STEEL SUPPORT CONCRETE PILE CAP
MHW EL. +8.9
PILES ® 5' O.C. TIMBER WAVE
1-
BARRIER
MLW EL. 0.0
. A BARGE II COMMERCIAL VESSEL BERTH
RRY BERTH I
U
12"0 PIPE PILE (TYP)
R s �'
o PROPOSED ACCESS PIER SECTION
B
SCALE:1/16"=1 '-0"
NN, N.
Ilk \
11 / , 1 'I i \, ,.I. I!, 1 ,, II-J,;,',/ ,</ '
I It I
fI
N,
�i7TJ
HTL
!'DR GE
DEPTH
,�
3+00 4+00 5 _, 6+00 7+00 1 (-2, .00)
8'+OQ +00 10+00 11+00, +`00
DREDGE DREDGE I
7
DEPTH DEPTH !I
.. .... ------ .-,(-11.00) (-16.00) '�AILEM HAIR'B(
AROOPZ
7
411,11'rfliFfil Tiff DREDGE., VOLUME=. , 1 115117 CY.
DREDGE -AREA= I 29857,0'1SQ. FT
IF, r
PROPOSED DREDGE PLAN
0 120
SCALE:1 120'-0"
L
HTL EL. +11.0
MLW EL. 0.00 . • • • • • • .. . . . . . . . . .
EL. -16.0
:TA STA STA STA STA
90 +50 +010 +100 +137
n TRANSVERSE DREDGE SECTION
SCALE:1/1 6"=l'-0"
EXISTING MUDLINE '
t EL. +11.0
.W E . 0.00 . . . . . . . .. . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
EL. -11.00 EL. -16.00
EL. -27.00
PROPOSED 3 ON 1 SLOPE
h�
Ti
LONGITUDINAL DREDGE SECTION 0 60
p s SCALE:1 "=60'-0"
CML
Nu 52'9ld
EL. +28.0
EL. +17.0
;.
-MHW ELS_' W
n PROPOSED TERMINAL SECTI MLW EL
SCALE:1"=2V-0"
I f
f
1
I(I( \
e ROP0SED TER INAL GROUND LEVEL PLAN
o e
SCALE:1"=20'-0"
SHEET 8 OF 8