Loading...
10 BLANEY STREET - ZONING COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENERGY & ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION r Ctio rI - `� ONE WINTER STREET, BOSTON, MA 02108 017-292-5500 dC f ha; REG. 11 ` DEVAL L. PATRICK IAN A. BOWLES Governor OCT 1 6 2008 Secretary TIMOTHY P.HURRAY DEPT.OF PLANNING& LAURIE BURT Lieutenant Governor OOWOMIFI(it VRONAENT Commissioner City of Salem c/o Bourne Consulting Engineering 3 Bent Street Franklin, MA 02038 Attn: Alyssa Richard Re; PUBLIC NOTICE OF WATERWAYS LICENSE APPLICATION No. W08-2463 Salem Harbor, Salem, Essex County Dear Applicant: The Waterways Regulation Program (WRP) has received your application requesting authorization to perform certain activities in state waterways pursuant to M.G.L. Chapter 91, the Public Waterfront Act and its regulations at 310 CMR 9.00 etc. The WRP has assigned this application filing with the above-referenced Waterways License application number. IT IS IMPERATIVE THAT YOU REFER TO THIS APPLICATION NUMBER WHENEVER YOU SUBMIT OR REQUEST INFORMATION FOR THIS FILE Upon review of this application, the WRP has made a determination that this project is a Water- dependent Use Project. Attached is the WRP's Public Notice form for this application. The Applicant is required to publish this notice, at his/her expense, in one or more newspapers having circulation in the area affected by the proposed activity. This notice must be published in the local newspaper(s) for at least one day on or before Notification Date. The required public comment period shall begin on this designated Notification Date. The Applicant is required to submit proof of publication to the WRP by sending a copy of the newspaper notice showing the date of publication or a copy of the newspaper notice and a letter from the newspaper indicating the date the public notice was published. Pursuant to 310 CMR 9.13(1)(a), the Applicant is also required to concurrently provide this notification, along with a copy of the project site plans submitted with the Waterways License Application,to the appropriate municipal officials, regulatory agencies and abutters to the project for their review and comment, by Certified mail. (see Notification mailing list attached). This information is available in alternate format.Call Donald M.Gomes,ADA Coordinator at 617-556-1057.TDD Service-1-800-298-2207. MassDEP on the World Wide Web: http:lt w.mass.gov/dep 0 Printed on Recycled Paper A For Chapter 91 purposes, an abutter is defined as the owner of land that shares a common boundary or corner with a project site at the water's edge, as well as the owner of land that lies within 50' across a waterbodifrom such site, see; 310 CMR 9.02. The WRP will publish.the Public Notice in The Environmental Monitor, if required. Lastly, the WRP cannot complete its review of this application until the following information/document(s) checked below have been submitted: ® Proof of publication of the Public Notice ® Receipt of the Municipal Zoning Certification ® Receipt of the Municipal Planning Board Notification Form ® Receipt of a valid Final Wetlands Order of Conditions ❑ Receipt of a valid DEP Water Quality Certification ❑ Completion of the MEPA review process ® Plans according to the specifications of Appendix A of the Waterways Application. NOTE: Final Mylar Project Plans will be required upon notice from the Department and prior to issuance of the Chapter 91 License. ❑ Other: Should you have any questions, please contact me at (617) 654-6520. Thank you. Sincerely, David B. Slagle Environmental Analyst Waterways Regulation Program DEPARTMENT OF ENVIRONMENTAL PROTECTION WATERWAYS REGULATION PROGRAM Notice of License Application pursuant to M. G. L. Chapter 91 Waterways License Application Number W08-2463 City of Salem NOTIFICATION DATE: October 15, 2008 Public notice is hereby given of the application by City of Salem to construct and maintain a multi use transportation facility which includes a water transportation terminal and pier; and to dredge approximately 115,117 cy of sediment at 10 Blaney Street in the municipality of Salem in and over filled and flowed tidelands of Salem Harbor Designated Port Area. The proposed use of the project is to provide for commercial docking and access to navigable waters, provide for adequate water depths for safe berthing and navigation; and is a water dependent project. The Department will consider all written comments on this Waterways application received by within 30 days subsequent to the "Notification Date" Failure of any aggrieved person or group of ten citizens or more to submit written comments to the Waterways Regulation Program by the Public Comments Deadline will result in the waiver of any right to an adjudicatory hearing in accordance with 310 CMR 9.13(4)(c). Additional information regarding this application may be obtained by contacting the Waterways Regulation Program at (617) 292-5500. Project plans and documents for this application are on file with the Waterways Regulation Program for public viewing, by appointment only, at the address below. Written comments must be addressed to: David Slagle, Environmental Analyst, MassDEP Waterways Program, One Winter St., 5th fl., Boston, MA 02108. c Pursuant to 310 CMR 9.13(1)(a), the Applicant is also required to concurrently provide this notification, along with a copy of the project site plans submitted with the Waterways License Application, to the appropriate municipal officials, regulatory agencies and abutters to the project for their review and comment(see Notification mailing list attached). The applicant shall send the notice of license or permit application by Certified mail to the attached list, abutters and notify the Department when completed. Mailing List: Notice of License Application pursuant to M. G. L. Chapter 91 Mayor and City Council, City of Salem Salem Planning Board Salem Conservation Commission Salem Zoning Board Salem Harbormaster Coastal Zone Management 251 Causeway Street, Suite 800 Boston, MA 02114 Massachusetts Environmental Policy Act (MEPA) File# 14234 100 Cambridge Street, Suite 900 Boston, MA 02114 Division of Fish &Wildlife and Law Enforcement Field Headquarters 1 Rabbit Hill Road Westborough, MA 01581 Attn: Tom French Division of Marine Fisheries Annisquam River Marine Fisheries Field Station 30 Emerson Avenue Gloucester, MA 01930 Massachusetts Historical Commission 220 Morrissey Blvd., Columbia Point Boston, MA 02125 Army Corps of Engineers New England Division 696 Virginia Road Concord, MA 01742-2751 Abutters — For Chapter 91 purposes, an abutter is defined as the owner of land that shares a common boundary or corner with a project site, as well as the owner of land that lies within 50' across a waterbody from such site, see 310 CMR 9.02. WRP Files' I . -es –_—\�\ ♦ ` gl 111�// i � _ ,� PFO�ECT .a+AR0171 ,! 1SCALE: 1"=3000'—O" LOCUS PLAN F R g 0 d2 I 4 1 C O O X o c N I O IIN z II gg \ z 0 N z ' i � � ° I 1 ....M9W' U[•-]� 0 RONaL6.R ..� . BOURN: CIVIL 5`� I , K No.32610 T]� I I 'SLY- e8 100 YR FLOOD +17.0 I _ _ HTL +11 .0 MHW +8.9 NGVD +4.2 a II x I x MLW 0.0 9 3M — Q—r I SHEET 1 OF 8 PLANS ACCOMPANYING PETITION OF CITY OF SALEM FOR CONSTRUCTION AND MAINTENENCE OF THE PORT FACILITY EXPANSION AT BLANEY STREET, SALEM, MA IN SALEM HARBOR. PRPPARFII RY I'd PROPOSED 56'X100' TERMINAL BUILDING SEE SHEET 8 PIER PARKING LOT It t PIER L SHEET 4 J-j EWER PUMP STATION mx .. .............WILO.... HARBOR WALK IlII MHW & HTL UNDER it HARBORWALK MHW & HTL AGAINST I-ARSCIR LLLLIL���J�U_UIUUUI F Fin /I J-1cwthorne Cove. Morino —u EJ JAI—A—L)ILU ul Ll �rLi PROPOSED CONDITIONS 0 120 SCALE:1 120'-0" " CONCRETE DECK - IGH BARRIER RAIL 12' HARBORWALK 6' CONCRETE SIDEWALK - PARKING AREA (VARIES) TOP OF HARBORWALK CENTER PARKING ISLAND EL. +15.0 t. .� MHW EL. +8.9 FILL FILL \ CONC. RETAINING WALL PROPERTY LINE EXISTING SLOPE EXISTING GRADE M4W. �L-. 0.00 EXISTING RIP RAP �] TIMBER PILE 15' O.C. (TYP.) n PROPOSED HARBORWALK AND PARKING LOT SECTION 3 15' 8" CONCRETE DECK HARBORWALK 42" HIGH BARRIER RAIL 17 SLOPE EL. +17.5 TOP OF HARBORWALK _ . EL. +17.0 77T12"0 TIMBER PILE /J HTL EL. +11.0 EXISTING RIP RAP —M—HN EL. +8.9 2 REINSTALL EXISTING FILL - RIP RAP EXISTING MUDLINE v .... MLW EL OAO CONCRETE BULKHEAD LIMIT OF DREDGE � h,r 4a " EL. -11.0 PROPOSED PIER SECTION 0 16' a y SCALE:1/i6"=1'-O" _ SCALE:1/16"=1 '-0" jov UE 11J 0 NFID t� A SA:: Ll FAC w uxrnv z7wwmy l 1I I I- B + • MLWI IIIM 2ev "me 7t7-- , Fres EEE PROPOSED PIER 50 SCALE:1 "=50'-0" VARIES CONCRETE CURB (30' TO 70') GREENHEART PILE TOP OF PIER 12" CONCRET 7'-6" O.C. (TYP) EL. +17.0 DECK CONCRETE CAP MHW EL. +8.9 MLW EL. 0.00 12"0 PIPE PILE (TYP.) PROPOSED PIER SECTION 0 TOP OF 32' CONCRETE CURB PIER EL +17.0 2'0 FLOAT GUIDEPILES (TYP) STEEL SUPPORT PILES ® 5' O.C. CONCRETE PILE CAP MHW EL. +8.9 TIMBER WAVE BARRIER I ............... ............. .................... A BARGE II COMMERCIAL VESSEL BERTH e RRY BERTH 12"0 PIPE PILE (TYP) 0 16' s1 a PROPOSED ACCESS PIER SECTION 5 SCALE:1/1 6"=l '-0" IN HTL DREDGE DEPTH (-27.00) ;+Do 4+00 5 -,_6+00 7+00 8'+00 +00 10+00 1 1 +0 DREDGE - 0., 1�400 DREDGE 7 DEPTH DEPTH -.(-11.00) (-16.00) �ALEM HARBC [LUL ARBOR uu1i �Tr nf I if 1. DREDGE VOLUME= 115117 CY. DREDGE 28570 '%SQ. FT J( JJ _ ILU IN 40 A PROPOSED DREDGE PLAN 0 120 SCALE:1 120'-0" HTL EL. +11.0 . . E. 0.00 ` • u EL. -16.0 da I-A STA STIA STA STA 90 +50 +010 +100 +137 n TRANSVERSE DREDGE SECTION 7 SCALE:1/1 6"=l'-0" EXISTINGMUDLINE - L EL. +11.0 . . W EL. 0.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . EL. -11.00 EL. -16.00 - EL. -27.00 ti. c PROPOSED 3 ON 1 SLOPE n J LONGITUDINAL DREDGE SECTION a n 0 60 SCALE:1 "=60'-0" �yy &,,•4NE w CML Fki s�16 —� EL. +28.0 Exd G.J� w f ri EL. +17.0 -- - l'rif t HTS. +11 .6 _ ✓. MJ HW EL. i f / n PROPOSED TERMINAL SECT i MLW EL e SCALE:1'=20'=0' � I "II✓�'T I1�+- 1 3� 'I j� I I __ II 1 I e ROPOSED TER INAL GROUND LEVEL PLAN ° e SCALE:1'=20'-0' SHFFT R OF R