Loading...
SALEM PORT EXPANSION - ZONING 1 I MEMORANDUM 372 Merrimac Street AFmburyport Massachusetts TO: Salem Port Expansion 01950 ENF Distribution List FROM: Susan St. Pierre (978)465-1428 DATE: April 15, 2008 Fax RE: Environmental Notification Form (978)465-2640 Enclosed please find a copy of a Environmental Notification Form that was filed with the state MEPA Office on April 15, 2008. If you have any questions or concerns, or need further assistance please contact my office at 978/465-1428. Thank you. MIRY "Awl �� .� i�'4 T�t °f'raa« s'.g R��`� CIATES,I � Salem Massachusetts�� � 4 �x EnvironmentalNotification�Form �� -� ;f- '•" sem.;:_, ,,,, ,«;-:��_�.® � � • • • ' � bey.,;. � y�`. ,. y' u • Enginceriwg Consultants Vine ASSOCIATES, INC. ' April 15, 2008 372 Alm iniac Sn-ee1 Nawbuiy{mn ' Secretary Ian A. Bowles Massachuseas Executive Office of Energy and Environmental Affairs Attn: MEPA Office 01950 100 Cambridge Street, Suite 900 (978)465-1428 Boston, MA 02114 Fax (978)465-2640 Re: Environmental Notification Form neQ$SOe.a e Salem Port Expansion ' Salem, MA Dear Secretary Bowles: On behalf of the City of Salem, (the 'Project Proponent'), Vine Associates, Inc. is pleased to submit the enclosed Environmental Notification Form (ENF)for the Salem Port Expansion. ' The Project proposes to construct a multi use water transportation facility on a site owned by Dominion and located in the Salem Harbor Designated Port Area in the City of Salem. The development of this facility has been planned and evaluated by the City of Salem over the past several years. The proposed development plan includes land and waterside improvements including pedestrian and vehicular access; parking; a water transportation ' terminal with passenger facilities, office and storage space; and a fixed pile supported pier and a system of gangways and floating docks/barges to accommodate a variety of vessels ' such as commercial fishing boats, small coastal cruise ships, visiting ships, water taxis, excursion vessels and a supply boat. ' The facility will require dredging of 8.3 acres of Salem Harbor to create navigable areas with sufficient depths to accommodate the vessels programmed for the site. The U.S. Army Corps has recently determined that the sediments proposed for dredging are suitable for offshore open water disposal in the Massachusetts Bay Disposal Site. The project is required to file an ENF as it will alter a coastal bank(note that the bank was ' previously altered); alter more than ''/z acre of wetland resources from the proposed dredging activities; dredge more than 10,000 cubic yards of material; and expand pile supported structures occupying flowed tidelands more than 2,000 sf in base area (301 CMR ' 11.03(3)(b)(1)(b) and (f) and (3), (4), and (6)). 1 1 The project is an important economic initiative for the City that is included in the City's 2008 Municipal Harbor Plan. This City Project has received funding from and is supported by the state Seaport Council as well as other organizations in the City. The City expects to complete the project design in the winter of 2008 and begin construction in the spring of 2009. ' Thank you for your consideration in this matter. Please do not hesitate to contact me if you have any questions at(978)465-1428. Sincerely, VINE ASSOCIATES, INC. ' fly-uus ' Susan St. Pierre Principal cc: K. Driscoll, Mayor City of Salem D. Babb-Brott, MEPA Director Enclosures 1 original signed ENF ' 1 copy of signed ENF 1 copy of first three pages of ENF including project description I '