DECISION
Site Plan Review Special Permit
PEABODY BLOCK
Autumn Realty Trust
c/o Attorney John Serafini, Sr.
63 Federal Street
Salem, MA 01970
On Thursday, April 19, 1990, the Planning Board of the City of Salem held a public
hearing regarding the application of Autumn Realty Trust, c/o John Serafini, Sr., 63
Federal Street, Salem, MA for the rehabilitation of a connector building at the Peabody
Block located at 118-128 Washington Street, 247 Essex Street and 4 Barton Square.
At a regularly scheduled meeting of the Planning Board held on May 10, 1990, the
Board voted by a vote of seven in favor, none opposed, to approve the application as
complying with the requirements of a Special Permit, subject to the following conditions:
1. Conformance with Plan
Work shall conform to plan entitled "Peabody Block Rehabilitation" prepared by
Clinton Design Associates, dated April 19, 1990, revised May 8, 1990, or as amended
by the Salem Redevelopment Authority or its Design Review Board.
Z. Amendments
Any amendments to'site plan shall require the approval of the City Planner.
3. Utilities
Utility installation shall be reviewed and approved by the Director of Public
Services.
4. Board of Health
Board of Health requirements outlined in a letter dated April 11, 1990, shall be
strictly adhered to.
5. Lighting
Exterior lighting shall be installed and maintained in such a manner so as to not
reflect or cause glare on abutting or facing residential premises, or which adversely
effects safe vision of operators of vehicles moving on nearby streets.
6. Landscaping
Landscaping shall be subject to the review and aproval of the Planning Department.
a. Mature trees shall be a minimum of 4" caliper.
b. Maintenance of landscape vegetation in a healthy and thriving condition shall be the
responsibility of the developer, his successor or assign.
7. Signage
Signange shall be reviewed and approved by the SRA, DRB, and City Planner.
8. Maintenance
a. Employ an acceptable method or means for the holding and disposal of trash (rubbish)
after site development with a copy of this method sent to the Planning Department
and Health Department in writing for their approval.
b. Refuse removal, ground maintenance and snow removal shall be the responsibility of
the developer, his successors or assigns.
9. Construction Practices
All construction shall be carried out in accordance with the following conditions:
a. No work shall commence before 8:00 a.m. on weekdays and Saturdays. No work shall
continue beyond 5:00 p.m. There shall be no work conducted on Sundays or holidays.
Inside work of a quiet nature may be permitted at other times.
b. All reasonable action shall be taken to minimize the negative effects of construction
on abutters. Advance notice shall be provided to all abutters in writing at least 72
hours prior to commencement of construction.
10. Violations
Violations of any conditions shall result in revocation of this permit by the Planning
Board.
This endorsement shall not take effect until a copy of this decision bearing certification
of the City Clerk that twenty (20) days have elapsed and no appeal has been filed, or that if
such appeal has been filed, and it has been dismissed or denied, is recorded in the Essex County
Registry of Deeds and is indexed in the grantor index under the name of the owner of record or
is recorded and noted on the owner's Certificate of Title. The fee for recording or registering
shall be paid by the owner or applicant.
I hereby certify that a copy of this decision and plans are on file with the City Clerk and a
copy is on file with the Planning Board.