Loading...
19 PICKMAN STREET - BUILDING JACKET 19 PICKMAN STREET f i UPC 10330 No. 153Lro HASTINGS, MN Citp of 6alem, jHaggarbu5ett5 f Public Prupertp Mepartment jBuilbing Zepartment One green (978)745-959-959 5 Qxt. 3R0 Leo E. Tremblay Director of Public Property Inspector of Building Zoning Enforcement Officer September 29, 1998 Joanne M. Lavoie 19 Pickman Street Salem, Mass. 01970 RE: 19 Pickman Street Dear Ms. Lavoie: According to the records on file in this office, it has been determined that 19 Pickman Street is a lawful, nonconforming four (4) family dwelling located in a R-2 zoning district. This is to determine use only and in no way is meant to confirm or deny whether said property is in compliance with all building, plumbing, gas, electric, fire or health codes. e ely,Goggin Inspector of Buildings KGG: scm Initial Construction Control Document To be submitted with the building permit application by a W Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Date: _ Property Address: Project: Check one or both as applicable: New construction xisting Construction Project description:' I - _ MA Registration Number: Expiration date: , am a registered esign prgf�ssioncd, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural [ ] Mechanical ] Fire Protection Electrical [ ] Other for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: I. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the build' I. Upon completion of the work, I shall I► official a `Final Construction Control Document'. Enter in the space to the right a"we o electronic signature and seal: Phone number: 4�1 Email: Building Official Use Only Building Oflicial Name: Permit No.: Date: