2 PICKMAN STREET - BUILDING INSPECTION h
CITY OF SALEM
PUBLIC PROPERTY
Y �4�{{
TI�
����� DEPARTMENT
KIM FIR18Y DRISCOLL
MAYOR
120 WASFIWGfON SrREer+ $ALENf,MnssAc:fi usrrrs 07970
Ti u.:978-745-9595 ♦ FAS:978-740-9846
March 28,2007 VIOLATION NOTICE
PROPERTY LOCATION #2 Pickman Street
Jeffrey Barrow
14 Gregory Street
Marblehead ma.01945
Dear Barrow
The above listed property has been found to be in violation of the following State
Codes and/or City Ordinances: The salem Fie Marshall identified a failing wooden stair
being used as a Fire escape. I was asked to look at the stair yesterday. Repairs have been
done on the stair without a Building Permits and numerous code violations. The riser
height is too large. Ballister spacing incorrect, Railing height too low, stair width
incorrect.
The Mass State Building Code 780C.M.R sec 111 requires Building permits.
Section 1001 through 1028.3 covers the construction of means of egress stairways.
You are ordered within 30 days to begin repair or more likely replacement of this
stairway. You are further directed to secure the services of a licensed Architect or
engineer to prepare construction documents for this departments review. All work wi I I
need to be done by a Mass licensed Construction Supervisor.
Failure to comply with these orders will result in a complaint being filed in Salem
District Court. If yo feel you are aggrieved by this order your appeal is to the Board of
Buil �ngs Regulatihoyns and Standards in Boston.
'4e
Thomas J. St. Pierre
Building Commissioner/Zoning Enforcement Officer
Cc Jason Silva, Mayors Office
Fire Marshall Lt. Griffin
Salem Fire Department
AB Lafayette Street
Bales, M► 01970
violation Nation
n.,
Monday Novegber 6, 2006 ,+ /1
lq�aztments ,.
002 Pickman Street
Sales, WK 01970
An inspection of your facility on Friday August 25, 2006 revealed the violations
listed below.
ORDER To COMPLY: Since these conditions are contrary to law, you must correct
them upon receipt of this notice. An inspection to determine compliance with
this Notice will be conducted on TO BE DETERMINED. at / /
If you fail to comply with this nctice before the reinspection date listed, you
may be liable for the penalties provided for by law for such violations.
Violation Code Article Division Page Count
12.105. Emergency Escapes 0 0
Wooden Fire escape that runs down back of building is rotted and is pulling
away from the house.
All emergency exits are to be maintained in good working order, situation to be
remedied forthwith.
Cranny, Captain,Paul J
Inspector �[ OOogpant/owner
'_)
Lt. Griffin I/1
Fire Marshal
M. Building
11%06/2006 16:23 Page 1
Z0 39dd HOiMcEIC 3KJ W31VS Z0b69bLOL6 I0.0I 900V/ O/I'
s
Professional Plaques
Division of
NAUSET LAMINATING, INC.
29 CONGRESS STREET
P.O. BOX 2057
SALEM, MASSACHUSETTS 01970
(6]7) 745-5563
Building Inspecter
Salem, MA 01970
December 3, 1984
Dear Sir:
Recently I purchased an apartment house in Salem on 2 Dickman St, and
would like to establish it on the books as a legal six family. It presently
has six seperate baths, kitchens, and apartments and as far C-fbaAc bzc-k.
as I have been able to research, it was always used as a six unit building.
One tenant, Solange Doussard, told me that up until two years ago she
lived at 2 Dickman St. for at least 16 years. During that time it was
always used as a six family apartment building. She presently lives at
288 Essex St. (744-1161) in the elderly housing building. She initially
agreed to sign a letter confirming these facts but later changed her
mind. I can only attribute this to the fact that she is very old and
because of her age, I did not want to persue it further.
I-am?�Aalnew owner of this propeety and would like it to comply with all
the local and state codes. Establishing it as a legal six family residence
is one of my first priorities.
Sincerely,
' � � �ctllna:V,ID
Jeffrey Barrows
'`�,a of
�� ixblir ru ext e �rfntent
t
Richard T. McIntosh
One Salem Green December 17, 1984
745-0213
To Whom It May Concern: Re: 2 Pickman St.
R-2 Zoned
The 1955 Zoning Ordinance shows the above referenced property to
be in an apartment house district which allowed for a 6 family dwelling.
Records on file in this Department, indicate that 6 family use is
being continued.
This use may be continued under the current Zoning Ordinance in
the present R-2 Zoned district.
r
Lt
Richard T. McIntosh
Zoning Enforcement Officer
RTMCI/jc
Building Inspecter
Salem, MA 01970
December 7,198+
Dear Sir:
Concerning the property on 2 Pickman St. that I recently purchased,
further evidence of its use as a six family apartment house is
detailed below.
Voter $egistration Records 1956-1965;
19569 6 families listed(McOlure,O,Hara,blright,Collins,Cassie,Knowlton)
1957-19609 6 families listed
19659 6 families listed(Carey,Cormier,Cutter,O§Hara,Wright,Dupuis)
These records are all from room 5 at Salems City Hall. Evidence of the
property being usdd as a six family unit is also documented there right
up to the present.
William Carter,who owned the property from approximatly 1973 to 1976,
agreed to wright a letter documentingthe house as a six family during
the time he owned it. That letter will be forthcomming shortly.
Sincerely,
effrey Barrows
Box 2057
Salem, MA 01970
SALEM FIRE DEPARTMENT COMPLAINT FORM
FIRE PREVENTION BUREAU �l�1Ld13lG S C4'T DATE' ept, 22 79 0930 M.
.. .. .......................19............TIME. ...
ocotion of Complaint or Hazard ' 1'icl;marl St,
Douglas li au . 1a:�155 n 1. Cr
;omplaint_by u Address _T'iC1tlTlan M—::3
No secor Q Enf Vy . of exit f'rorn third floor tenemen s
Nature of ComplaintSfti-
and from one 2nd floor apartment
Received by Deputy Chief Crowley
Investigated by I Se1�t 22 79 0930
DATE..........I.:....'......................19............TI ME..................M.
Action Taken _ Informed owner, Air. Mark i'elt, on premises that this is a
violation and would have to be forwarded to Bldg, Insp„ This is very
obviously a landlord tenant disagrooatent . Boauchain has been ordered out
and he made the complaint in retaliation, Mr, Pelt bought the r,roperty
about a year and a half ado and s6ys he was under the impress-
Other Department Notified
ion that the provi.ous owner had nerm:i.ssion to rapt the two third floor
ar)Drtmc,nts and LL.e once on the second floor w/o the socond exit,
Form ,i5t.3
11 9 06 rum '04
NITY OF
(9
CL-AJ,=a4N
aA
1
35 West Avenue
Salem, MA 01970
December 7, 1984
Mr. Jeff Barrows
P.O. Box 2057
Salem, MA 01970
RE: 2 Pickman Street
Salem, MA 01970
Dear Jeff:
Subject to our conversation on December 6, 1984, please
be advised that I owned property located at 2 Pickman Street,
Salem, Massachusetts, from the years of 1973 to 1976. I
purchased this property as a six-unit apartment house and I
sold it as a 6-unit apartment house.
If you have any further questions, please do not
hesitate to call me.
Sincerely,
1
/ lj�A�—
Ri haarter
RPC:ls
Dec. 7, 1984
State of Massachusetts
County of Middlesex
Then personally appeared the aboved named Richard P. Cater and signed this
document as his own free act and deed.
KRISTFN B. HOi4ISY
NOTARY PUBL.Ic Notary Public
My commission Lxpires
June 1, 1990 Commission expires: June 1, 1990
PAUL G . FERMANO, ARCHITECT
CONSULTING ARCHITECTS
June 10, 2007
Mr. Thomas J. St. Pierre, Buildinej COmm1551oner
City of Salem
Public Property Department
120 Wa5hington Street
Salem, MA 01970
Re: 2 Pickman St Salem - Emergency Stairs
PGFA Project # 07-005
Subj> Feld V15it Reports
Dear Mr. 5t. Pierre:
Please find attached our f=ield Vi,it Report:, for the ,ubject project. I was, un,ure if your office
requires eopie5 for the on-going constructions in Salem, but felt it was better to err on the side of
too much information r=ather-than not enough.
Thank you for your assistance and participation during the design phase to bring this project to such
a quick and oucce&s,ful completion. it has been my plea,ure recently to find a few other Building
Officials who also recognize the benefit of being participants in developing the design Solutions. A5
we have experienced with this project; the approval is fast, the bidding and construction much
quicker, with qualified locai contractors, resulting In a solid, well constructed and Code acceptable
final build-out.
If there are any questions or other issues related to this prajeet, piea5e don't hesitate to ca11.
Very trul "A'
1E pR�y
qe 20
Ca y
a y
P
Paul aJf A ARB
Prmcipal / r j Manager
Enol: f=ield Visit Reports # 1-7, dated from 5/22 thru 6-07-07
ARCHITECTURE - DESIGN PLANNING CONSTRUCTION ADMINISTRATION
17 PRINCE STREET • MARBLEHEAD, MA • 01945-2223 Ph...: 781-631-0508 E-mail: pfexm avo®coin ces f.v et
MA L I C . # A R 5 9 1 5 • N H L I C . # 1 5 1 6 • F L L I C . # A R 0 0 1 2 9 3 4 • RI LIC . # 1 9 6 3
N C A R B C E R T I F. I C A T I O N # 32602
PAUL G. FERMANO, RA/NCARB
CONSULTING ARCHITECTS
Architects Field Report
Project: Barrows Fire Escape
Project No: 07.005 Field Report No: 1
Date: 22 May 07 Time: 0800 hrs weather: Clear Temp.Range: 45-65°F
%Completion: 15% Conformance W Schedule: n/a
Work In Progress: Present at Site:
Excavation and set forms for foundation piers. Danco Mgmt Crew
Paul Fennano, RA—PG Fermano Architects
Observations
1. Demolition was completed in a day. All reusable materials were Geared of nails and old joist hangers
and set aside for re-use.
2. All observed pier footings were 4' or greater below existing finish grade. Bells and sonotubes were
property installed and ready for concrete tomorrow. Three holes have yet to dub, but will be ready for
the pour.
3. There was no building permit on site. I contacted the Danco office and was told that the Building
Inspector's office had authorized the construction to begin and that the permit card would be issued by
the end of the week. Work is expected to last about 2 weeks.
4. The next field visit will be on Thursday 5/24.
Items to Verify,
See text above.
Information or fiction Required:
Attachments:
Copies to:
Client- Mr. Jeff Barrows
Contractor- Danco Mgmt, Inc.
Building Inspector- Mr. Thomas St. Pierre, Bldg Com 7S Tner
Report By: Paul G. Ferman, RA/NCARB
ARCHITECTURE • DESIGN • PLANNING • CONSTRUCTION ADMINISTRATION
171`n.ce Stteet Matblehead, MA 01945-2223 tel 781.631.0508 a-mail: pfermano@comcaet.net
PAUL G. FERMANO, RA/NCA"
CONSULTING ARCHITECTS
Architects Field Report
Project: Barrows Fire Escape
Project No: 07.005 Field Report No: 2
Date: 24 May 07 Time: 0800 hrs weather: Clear Temp.Range: 45-65°F
%Completion: 25% Conformance W Schedule:- Na
Work in Progress: Present at Site:
Framing on new foundation piers. Danco Mgmt Crew
Paul Fermano, RA—PG Fermano Architects
Observations
1. Concrete pour was completed in a day.
2. Repair of the wall veneer at the first floor doorsill was completed and the framing of the new deck
begun. During the day the columns for the upper decks will be stood up and deck construction
started.
3. Today's framing layout indicates that a couple of the piers are not centered, but the full bottom surface
of the columns will be supported on the galvanized column base plate. I recommended that the
framing continue.
4. Next observation visit will be Saturday morning, 5/26.
Items to Verify:
See text above.
Information or Action Required:
Attachments:
Copies to:
Client- Mr. Jeff Barrows
Contractor- Danco Mgmt, Inc.
Building Inspector- Mr. Thomas St. Pierre, Bldg Commissioner
ReportBy: Paul G. Fermano, RA/NCARB
ARCHITECTURE • DESIGN • PLANNING • CONSTRUCTION ADMINISTRATION
17 Prince Street Marblehead, MA 01945-2223 tel 781.631.0508 e-mail! pfermano@comca•t.net
PAUL G. FERMANO, RA/NCA"
CONSULTING ARCHITECTS
Architects Field Report
Project: Barrows Fire Escape
Project No: 07.005 Field Report No: 3
Date: 26 May 07 Time: 0900 hrs Weather: Sunny Temp.Range: 65-850F
%completion: 40°.% Conformance W schedule n/a
Work in Progress: Present at Site:
Framing of new decks and stairs. Dan Tremblay and Danco Mgmt Crew
Paul Fermano, RA—PG Ferman Architects
Observations
1. Framing is going very well. Mid-level deck and stair stringers are in and top deck, columns and stair
stringers will go in today. We discussed the handrail design and heights. Rails will be 2x4's. The top
rail will be capped with 5/4 composite boards for handrails.
2. 1 advised the GC to install the 1"t floor deck and stair to grade ASAP. if the new stair conflicts with the
existing hose bibb,the company's plumber is to gain access and relocate it to a location with dear
access. The GC will advise of his findings on Tuesday morning.
3. The GC will install composite decking at all stair treads, risers and platforms today and on Tuesday so
that they could be used in an emergency. Temporary rails will be installed until the final ones are
installed.
4. Next visit will be on Tuesday 5/29.
items to Verify:
See text above.
Information or Action Required:
Attachments:
copies to:
Client- Mr. Jeff Barrows
Contractor-Danco Mgmt, Inc.
Building Inspector-Mr. Thomas St. Pierre, Bldg Commissioner
Report By: Paul G. Fermano, RA/NCARB
Ai CHT-1-= ._ _
17 Prince Street Marblehead, MA 01945-2223 tel 781.631.0508 e-mail: pfermxexr,@comcaat.net
PAUL G. FERMANO, RA/NCARB
CONSULTING ARCHITECTS
Architects Field Report
Project: Barrows Fire Escape
Project No: 07.005 Field Report No: 4
Date: 29 May 07 Time: 1300 hr's weather: Partly sunny Temp.Range: 65-85°F
%Completion: 600h Conformance W Schedule Ahead
Work in Progress: Present at Site:
Framing of new decks and stairs. Dan Tremblay and Danco Mgmt Crew
Paul Fermano, RA—PG Fermano Architects
Observations
1. Framing is almost done, with work continuing at the topmost deck and the last set of risers between
the middle and top decks. The 3-riser stair from the new wood first floor poroh has not been done yet.
I advised the carpenters to layout this grade level stair to confirm that there will be no conflict with the
existing hose bibb. I asked that they call me if there is an obstruction of the bibb. They said that they
had seen the potential issue but felt that it would Gear, but they would call me if they discovered a
problem.
2. The foreman said there was quite a bit of interest by the neighbors and the residents about the new
stair, He said they were asking about color and if there were going to doors added from the units onto
the decks. I instructed them to defer the questions to the landlord and not to make any commitments
for future work.
3. The GC thought that they will be done by mid-week, next week. I asked to be kept aware of their
progress and their schedule for the final inspection.
4. Next visit will be on Friday 6/01.
Items to Verify:
See text above.
Information or Action Required:
Attachments:
Copies to:
Client-Mr. Jeff Barrows
Contractor- Danco Mgmt, Inc.
Building Inspector- Mr. Thomas St. Pierre, Bldg Commissioner
Report By: Paul G. Fermano, RA/NCARB
ARCHITECTURE • DESIGN • PLANNING • CONSTRUCTION ADMINISTRATION
17 Nc ce Stmet Marblehead, MA 01945-2223 tel 781.631.0508 a-mail: pform•vo Qcomma[.ne[
PAUL G. FERMANO, RA/NCA"
CONSULTING ARCHITECTS
Architects Field Report
Project: Barrows Fire Escape
Project No: 07.005 Field Report No: 5
Date: 01 June 07 Time: 1300 hrs weather: Partly sunny Temp.Range: 65-85°F
%Completion: 75% Conformance od-Schedule Ahead
Work in Progress: Present at Site:
Framing of new decks and stairs. Dan Tremblay and Danco Mgmt Crew
Paul Fermano, RA—PG Fermano Architects
Observations
1. Framing is almost done, with only some final components at the topmost deck to be installed. I
advised the carpenters to lay temporary plywood decking and rope rails until the final composite deck
boards are installed. This should provide a reasonable level of safe egress until work is completed.
2. The GC is anticipating the crew to start the composite decking, treads and risers tomorrow and
handrail construction Monday. All materials are on site to complete the work. We confirmed the
guardrail and handrail heights at 42" and 36", respectively.
3. The GC asked if Saturday work was allowed. I explained that I knew of no restrictions, but suggested
that an 0800 hrs start rather than the usual 0700 might be appreciated by the residents.
4. Next visit will be on Monday 6/05.
items to Verity:
See text above.
Information or Action Required:
Attachments:
Copies to:
Client-Mr. Jeff Barrows
Contractor-Danco Mgmt, Inc.
Building Inspector- Mr. Thomas St. Pierre, Bldg Commissioner
Report By: Paul G. Fermano, RA/NCARB
ARCHITECTURE • DESIGN • PLANNING • CONSTRUCTION ADMINISTRATION
17 prince Street Matblebead, MA 01945-2223 tel 781.631.0508 a-mail: pfermano®comcaetmet
PAUL G. FERMANO, RA/NCARB
CONSULTING ARCHITECTS
Architects Field Report
Project: Barrows Fire Escape
Project No: 07.005 Field Report No: 6
Date: 05 June 07 Time: 1300 hrs Weather: Partly sunny Temp. Range: 65-800F
%Completion: 90% Conformance W schedule Ahead
Work in Progress: Present at Site:
Framing of new decks and stairs. Dan Tremblay and Danco Mgmt Crew
Paul Fermano, RA—PG Fermano Architects
Observations
1. Framing is done, with only some final components of the composite decking to be installed. The
carpenters were laying out the last of the final rails at the top deck, with all the stairs and lower decks
already. I pointed out that wall mounted rails are needed at the stairs at the same mounting height.
2. The GC is anticipating the crew to be completely finished, including cleaning and re-grading around
the entire newfire escape structure. I asked that I be notified regarding the Building Inspector's
schedule for the final inspection. He agreed to let me know.
3. Next visit will be with the Building Inspector for the final inspection, yet to be scheduled.
Items to Verify:
See text above.
Information or Action Required:
Attachments:
Copies to:
Client- Mr. Jeff Barrows
Contractor- Danco Mgmt, Inc.
Building Inspector- Mr. Thomas St. Pierre, Bldg Commissioner
Report By: Paul G. Fermano, RA/NCARB
ARCHITECTURE • DESIGN • PLANNING • CONSTRUCTION ADMINISTRATION
17 Pn.vc Stmet Marblehead, MA 01945-2223- tel 781.631.0508 a-mail: pfermavo@comca•Avet
i
PAUL G. FERLvUNO, RA/NCA"
CONSULTING ARCHI T ECTS
Architects Field Report
Project: Barrows Fire Escape
Project No: 01.005 Field Report No: 7
Date: 07 June 07 Time: 4.200 h s weather: Sunny Temp.Range: 55-75°F
%Completion: 100% Cmdn ante W schedule Ahead
Work in Progress: Present at Site:
Genes al clean uP. Dann Trem".ay and Danco Mgmt Crew
Paul Feanano, RA–PG Fermano Architects
Observations
i. Stair is complete and final cleaning and re-grading Will be done in a few minutes.
2 Th 'la' Inn ti I 14. a
e u„sing ,,,ape for I las.already come and gone, approving the new stair. A copy of,,,e slgrled
permit is attached for rewl-d.
items to verify:
See text above.
Information or Action Required:
Attachments: Copy of the Building Perrrrt with the final inspection approval, initialed by uie Building Inspector and
dated EiRiO7.
Copies to:
Clion!- :"r. Jeff Ba,r—mws
Contractor- Danco Mgmt, Inc.
Building ii 13pc t()r-
IVTiiOITia3 viPierre,
. Bldg Commissioner
Report By: Paul G. Fermano, RA/NCARB
ARCHITECTURE • DESIGN PLANNING • CONSTRUCTION ADMINISTRATION
17 Nmi a Skeet Maablehead, MA 01945-2223 tel 781.631.0508 e-mail: pfermano Qcomca•tmet
0002 PICKMAN STREET 996-07
GI #: 5616 COMMONWEALTH OF MASSACHUSETTS
Map: 35
Block: CITY OF SALEM
Lot-. 0068
Category: REPAIRBEPLACE
Pganit# 996-07: BUILDING PERMIT
Project# JS-2007-001625
Est.Cost: $15,000.00
Fee Charged; $170.00
Balance Due: $.00 PERMISSION IS HEREBY GRANTED TO:
Const.Class: Contractor: License: Expires
Use Group: .; DANCO MANAGEMENT INC. STATE-043536
Lot Size(sq.ft.): 3217
Owner: BARROW JEFFREY G
Zoning: R2
Units Gained: Applicant. DANCO MANAGEMENT INC.
Units LostAT: 0002 PICKMAN STREET
Dig Safe#:
ISSUED ON: 24-May-2007 AMENDED ON: EXPIRES ON. 24-Oct-2007
TO PERFORM THE FOLLOWING WORK.
REPLACE REAR EGRESS&DECK
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Electric Gas Plumbing Building
Underground: Underground: Underground: Excavation:
Service: Meter: Footings:
Rough: Rough: Rough: Foundation:
Final: Final: Final: Rough Frame:
Fireplace/Chimney:
D.P.W. Fire Health
Insulation:
Meter: dile // n /J
Final: ��C J 1//-/
House p Smoke: w-
Treasury:
Water. Alarm:
Sewer: Sprinklers:
THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM LOS
RULES AND REGULATIONS.
Signature:
Fee Type: Receipt No: Date Paid: Check No: Amount:
Lpj0#f*
24-May-07 9134 $170.00
An inspectupon completion of waft
7454595 Ex
GeoTMS®2007 Des Lauriers Municipal Solutions,Inc.
APR-24-2007 12:25P FROM:PATROWICZ ENGINEERIN 976-745-4110 70:19787409846 P.2
y 3v�' :''� '%,
TO: Mr. Thomas St. Pierre \`,. ` ��"�"�`-C1%1TE:April 24, 2007
City Building Inspector `\
Washington Street
Sal
Salem, MA 01970 ``
RE: Permanent Slope Stabilization,1 �v 1
#6 Gallows Circle, Salem, MA,•, >\
PLOE#05-16.2
Dear Mr. St. Pierre:
Originally, you hired me for civil engineering consultation to address an"unsafe"condition as
described In the State Building Code 780 CMR Section 121. 1 performed several inspections and
prepared a report(with photographs)dated 7128/05.
Temporary construction measures were taken for safety reasons including demolition of the
existing timber wall, removal of unconsolidated/orgenic material(which existed in back of the wall),
construction of a temporary slope, and placement of some boulders at the toe of the slope. All
efforts to (a)minimize the probability of erosion, (b)minimize the amount of unconsolidated
material needed to be removed off-site, and (c)maximize the stability of the temporaryslope.
In my 7/26/05 report, I strongly recommended that permanent slope stabilization solution be
properly engineered and constructed soon, since the temporary slope that was created is
susceptible to erosion and possible slope failure(which would (could)negatively Impact down-
gradient properties). The solution for a permanent slope requires field survey, geotechnical
engineering, proper drainage controls(catching and piping stormwater runoff),erosion control
measures, and heavy machinery to construct such a permanent solution for a stable slope.
it is my understanding that funds are unavailable at this time in order to complete this permanent
slope stabilization project per my original 7/28/05 recommendation.
it is my understanding that due to the constraints listed-above, the City of Salem has asked if there
is another less expensive alternative that would better the current situation. Although I do not
recommend this On lie of a full geotechnicalty engineered design): a grass slope of 3:1 (H:1)with
appropriate terracing, crushed-stone retention swales and placed boulders(on the steep areas)
would clearly better the current temporary slope situation.
If you have any additional questions, please do not hesitate to contact me. Thank you.
Sincerely,
PATROWICZ LAND DEVELOPMENT ENGINEERING
Scott Patrowicz, P.E. ,
RPR-24-2007 12:25P FROM:PRTROWICZ ENGINEERIN 976-745-4110 TO: 197E740964E P. 1
■ A ■
LAND DEVELOPMENT ENGINEERING
FAX COVED SHEET
DATE: `f- /S'4 1-L-, -7 TIME: IZ � -2,; C��spr-, �
REGARDING:
FROM: Scott Patrowicz, P.E.
PHONE: 978-838-6400 FAX: 978-745-4110
MESSAGE:
J �
YOU SHOULD HAVE JUST RECEIVED THIS COVER SHEET AND PAGES. IF YOU
DID NOT, PLEASE CALL ME.
14 Brown Street, Salem, Massachusetts 01970
Cell: 978-836.6400 Fax:978.745.4110 Email:scott.patrowlcz@verizon.net