Loading...
UTS Job 23418 Report 15 Soil Inspection Report 07-18-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-18-2019Soil Inspection Report Report No.15 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:70-80° TIME:7;00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E excavators; Wacker DPU 6555 & 200Lb. plate compactors, CAT 980 & 950 loaders, and Ingersoll Rand pro pac 110 series - 10 ton drum roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Installation of drainage utilities was performed East and SE side of building 2. CB# 6,7,8 & 9 were installed on this date. The Excavation was performed utilizing the Deere 380 excavator. The sub grade was previously prepared using crushed stone and processed gravel structural fills. The structures were set atop the in place material and backfilled using the same material generated during excavation generally consisting of F - C gravel and sand, trace silt. De watering was performed as necessary. The structures were backfilled placing 12 - 18" thick lifts utilizing the Deere 75 excavator. Each lift was compacted employing several passes of coverage utilizing the heavy Wacker plate compactor exhibiting stable/firm conditions. A de watering sump was installed adjacent to proposed Stormceptor 4800. A deep excavation was made to an approximate depth of 5' below the structure. A perforated sleeve was installed and bedded in crushed stone. This work was performed in advance of installation of the drainage utilities to facilitate de watering. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-18-2019Soil Inspection Report Report No.15 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque UTS Matt Chace UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-18-2019 Report No.15 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment