UTS Job 23418 Report 15 Soil Inspection Report 07-18-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-18-2019Soil Inspection Report
Report No.15
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:70-80°
TIME:7;00 AM
CONTACT:Bob Levesque of Fulcrum Associates
PURPOSE:Observe earthwork construction
EQUIPMENT:Deere 450C, 380G, 75G & 992E excavators; Wacker DPU 6555 & 200Lb. plate
compactors, CAT 980 & 950 loaders, and Ingersoll Rand pro pac 110 series -
10 ton drum roller
TEST METHOD:Sand Cone Nuclear Densometer
TITLE:Inspector Staff Engineer EngineerX
OBSERVATIONS:
This report follows a site visit to observe/test the earthwork for: Footing trench excavation.
Installation of drainage utilities was performed East and SE side of building 2. CB# 6,7,8 & 9
were installed on this date. The Excavation was performed utilizing the Deere 380 excavator. The sub
grade was previously prepared using crushed stone and processed gravel structural fills. The structures
were set atop the in place material and backfilled using the same material generated during excavation
generally consisting of F - C gravel and sand, trace silt. De watering was performed as necessary. The
structures were backfilled placing 12 - 18" thick lifts utilizing the Deere 75 excavator. Each lift was
compacted employing several passes of coverage utilizing the heavy Wacker plate compactor exhibiting
stable/firm conditions.
A de watering sump was installed adjacent to proposed Stormceptor 4800. A deep excavation was made
to an approximate depth of 5' below the structure. A perforated sleeve was installed and bedded in
crushed stone. This work was performed in advance of installation of the drainage utilities to
facilitate de watering.
Inspector Premium Travel
Name Time Hours Time
M. Chace No 8.00 1 Hr(s)
REVIEWED BY:Chuck Fraser
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-18-2019Soil Inspection Report
Report No.15
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Riley Bourque
UTS Matt Chace
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-18-2019
Report No.15
Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MAAttachment