Loading...
UTS Job 23418 Report 17 Soil Inspection Report 07-25-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-25-2019Soil Inspection Report Report No.17 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 70-80° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavators; Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders, and Ingersoll Rand Pro Pac 110 series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: Perimeter footing trench excavation continued within the Southern limits of proposed building #2 along column line 2 (see sketch). The trench was excavated to design elevation utilizing the Deere 450 excavator equipped with a flat cutting edge (flared teeth) to minimize sub grade disturbance. Ground improvements were recently completed in this area by installing GCC deep foundation elements. The area was over excavated 6" below design BOF elevation to provide a cushion/base of material between the elements and the footing. All GCC elements were carefully located and exposed during excavation. The sub grade soil in this area is fill and varies in consistency from organic silt with ash, wood and clay to tannin bark. A layer of mirafi 160 filter fabric was placed atop the sub grade as specified. A 6" thick layer of ¾" crushed stone was placed and graded. The surface of the stone was compacted utilizing the heavy plate compactor generally exhibiting stable/firm conditions. Installation of water utilities was performed at the south side and in between buildings 1&2. The trench was carried down to design elevation utilizing the Deere 380 excavator. The class 52 CLDI piping was installed and bedded in clean imported bedding sand. Mechanical joint fittings and boulder thrust blocks were used at all bends. The trench was backfilled using the same material generated during excavation generally consisting of F - C gravel and sand, trace silt placing. 12 - 18" thick lifts were placed and graded. Each lift was compacted employing several passes of coverage utilizing the heavy Wacker plate compactor exhibiting stable/firm conditions. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-25-2019Soil Inspection Report Report No.17 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque UTS Matt Chace UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 07-25-2019 Report No.17 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment