Loading...
7 PERSHING ROAD - BUILDING INSPECTION 7 PERSHING ROAD r No. 4� 9-1?-5 City of Salem Ward o-4eL� l 9 APPLICATION FOR PERMIT TO BUILD ADDITION, MAKE ALTERATIONS OR NEW CONSTRUCTION IMPORTANT-Applicant to complete all items in sections:I, it, Ill, IV, and IX- I. AT(LOCATION) -a—v, 1vr D STRICT LOCATION IN0.) (STREET) OF BETWEENOT AND BUILDING caoss STREET) cnoss STREET) SUBDIVISION LOT BLOCK SIZE II. TYPE AND COST OF BUILDING -All applicants complete Parts A-D A. TYPE OF IMPROVEMENT D. PROPOSED USE-FOR"DEMOLITION"USE MOST RECENT USE 1 ❑ New building Residential Nonresidential , Addition(It residential,enter number of new 12 Vone family 18 ❑ Amusement,recreational housing units added,it any,in part D,13) 19 ❑ Chruch,other religious 13 El Two or more family-Enter number 30 Alteration(See 2 above) of units ...................................................... 20 ❑ Industrial 21 []'Parking garage 4 ❑ Repair replacement 14 ❑ Transient hotel,motel,or dormitory- Enter number of units ........................... 22 E] Servicestation,repair garage 5 [:] Wrecking(It muttitamily�esidendal,enter number 23 ❑ Hospital,institutional of units in building in Part D, 13) 15 ❑ Garage 24 ❑ Office,bank professional 6 E] Moving(relocation) 6 ❑ Carport 25 ❑ Public utility 7 ❑ Foundation only 26 ❑ School,library,other educational 17 ❑ Other-Specify 27 ❑ Stores,mercantile B.OWNERSHIP 28 ❑ Tanks,towers 8 VPrivate(individual,corporation,nonprofit + 29 E] Other-Specify institution,etc.) 9 ❑ Public(Federal,State,or local government C.COST (Omit cents) Nonresidential-Describe in detail proposed use of buildings,e.g.,food processing plant, machine shop,laundry building at hospital,elementary school,secondary school,college, parochial school,parking garage for department store,rental office building,office building 10. Cost of improvement ......................................................... $ at industrial plant.If use of existing building is being changed,enter proposed use. To be installed but not included in the above cost a. Electrical... ....... b. Plumbing r372r T ' c. Heating.air Conditioning............................................. d. Other(elevator.etc.)..................................................... lI a 11. TOTAL COST OF IMPROVEMENT $ V U III. SELECTED CHARACTERISTICS OF BbILDING -For new buildings and additions, complete Parts E-L;demolition, complete only Parts J&M, all others skip to IV E. PRINCIPAL TYPE OF FRAME F. PRINCIPAL TYPE OF HEATING FUEL G. TYPE OF SEWAGE DISPOSAL I. TYPE OF MECHANICAL 30 Masonry(wall bearing) 35 ❑ Gas 4Wn Public or private company Will there be central air conditioning? 31 Wood frame 36:g Oil 41 ❑ Private(septic tank etc.) 32 ❑ Structural steel 37 ❑ Electricity 44 ❑ Yes 45 ❑ No 33 ❑ Reinforced concrete 38 ❑ Coal H. TYPE OF WATER SUPPLY Will there by an elevator? 34 ❑ Other-Specify 39 ❑ Other-Specify 42 t16 Public or private company 46 ❑ Yes 47 ❑ No 43 0 Private(well,cistern) J.DIMENSIONS 48. Number of stories . .................. M. DEMOLITION OF STRUCTURES: ...........V.....�'�....�...... 49. Total square feet of floor area, all floors,based on ex�tenor Has Approval from Historical Commission been received dimensions ........................ .................. for any structure over fifty(50)years? Yes_ No_ 50. Total land area,sq.fl..........-3 6a................ Dig Safe Number K.NUMBER OF OFF-STREET PARKING SPACES Pest Control: 51. Enclosed.......... ............................... HAVE THE FOLLOWING UTILITIES BEEN DISCONNECTED? sz. Outdoors............ Yes No L RESIDENTIAL BUILDINGS ONLY Water: 53. Enclosed............................................................_.............. Electric: Gas: Full........................................... Sewer: 54. Number of bathrooms PaDOCUMENTATION FOR THE ABOVE MUST BE ATTACHED Partial..............................'...-.. BEFORE A PERMIT CAN BE ISSUED. IV. COMPLETE THE FOLLOWING: Historic District? Yes_ No (If yes, please enclose documentation from Hist. Com.) Conservation Area? Yes_ No (If yes, please enclose Order of Conditions) Has Fire Prevention approved and stamped plans or applications? Yes No_ Is property located in the S.R.A. district? Yes_ No Comply with Zoning? Yes_ No (If no,enclose Board of Appeal decision) Is lot grandfathered? Yes_ No (If yes,submit documentation/if no,submit Board of Appeal decision) If new construction, has the proper Routing Slip been enclosed? Yes Is Architectural Access Board approval required? Yes_ No (If yes, submit documentation) Massachusetts State Contractor License# Salem License# Home Improvement Contractor# Homeowners Exempt form (if applicable) Yes_ No CONSTRUCTION TO BE COMMENCED WITHIN SIX(6) MONTHS OF ISSUANCE OF BUILDING PERMIT If an extension is necessary, please submit CONSTRUCTION IS TO BE COMPLETED BY: in writing to the Inspector of Buildings. V. IDENTIFICATION • To be completed by all applicants / Name MSailing address O-Nu/mber,street city,and state ZIP Code Tel.No. CYOwneor (V Lessee �,1�117d z. Contractor Builder's License No. 3. Architect or Engineer I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his authorized agent and we agree to conform to all applicable laws of this jurisdiction. Signat of plica `� Address d Appli tion atg VI ZONING PLAN EXAMINERS NOTES DISTRICT USE FRONT YARD SIDE YARD SIDE YARD REAR YARD I NOTES SITE OR PLOT PLAN -For Applicant Use w N DO NOT WRITE BELOW THIS LINE VI. VALIDATION Building FOR DEPARTMENT USE ONLY Permit number Building Use Group Permit issued 19 Fire Grading Building Permit Fee $ Live Loading Certificate of Occupancy $ Approve Occupancy Load Drain Tile $ Plan Review Fee $ TITLE NOTES AND Data • (For department use) PERMIT TO BE MAILED TO: DATE MAILED: Construction to be started by: Completed by: APPOINTMENT FOR FINAL Salem F ih.e Department F•i to Prevention Bun.eau + APPOINTMENT FOR FIS INSPECTION MUST BE 48 La4ayette Stteet INSPECTION MUST BE MADE AT LEAST ONE WEE Salem, Ma 01970 MADE AT LEAST ONE WEEK AHEAD__..___•••- (508) 745-7777 AHEAD_.......... FIRE DEPARTMENT CERTIFICATE OF APPROVAL FOR BUILDING PERMIT In acco4da.nce w4th .the pn.ovt-6ton.6 o4 the Ma-"achu,6ett4 State Buitdtng Code and the Salem F-ivre Code, appZ•Lcation •t.6 hereby made 4o., app- oval o4 pta.n,6 'and, the t4auance o4 a ceAt,i4tcmte o4 appn.oval 4on, a bu,i.Cdi.ng permit by the SaZ:em F•vice Department. (Re4. Section 113. 3, Ma,aa. State Bldg. Code) Job- Location: Owner/Occupant: ( 1 , P 14 EZectttcal Cont cacton: �� )i F•vice Supp., e•6a.i,on Cont cacto,,: ,r / r S.ignatwre o4 AppZ.icaxtt: Phone #: Addne .6 o4 City on / Appt Lcaxtt: S Town: .a _J Approval date: 3 CeAtZ4•icate o4 appnovaC t4 hereby granted, on appaoved piano on 4ubm.ftt4v-Z. o4 project detattZ6, by the Salem Ft4e Depa, tment. AZZ ptan-6 ate approved -6otely 4o-% tdenti4.tcati,on o4 type and Zocntion o4 4vie pnotecti.on devdcea and equipment. Att pta.n,6 ace .6ubject to app.,covat o4 any oche¢ authoAity having ju4i.6dtction. Upon eomptetion, the appttcant .on tn6ta ten(•6) eha t nequ"t an tn.opeetl on and/o4 teat o4 the 4Z4e p4oteetion devl ce4 and equdpment. ( ** FOR ADDITIONAL REQUIREMENTS, SEE REVERSE SIDE ** ) 0 New conztnuction. Pnope+ity Zocatdon ha-6 no compZ•ia.nce w4th the p.,eovl aion.o o4 Chapter 148, Section 26 C/E, M.G. L. , -tela ti,ve to the tn.4taZatZon o4 apptoved 4Z&e aZa%m devtce•6. The owne�L o4 tht-6 p-,cope.,ty t4 nequticed to obtain compt.ta.nce a,6 a cond4tion o4 obta i,ni.ng a Buttdi.ng PeAmit. P.,copenty Zocati.on 44 to compti,ance with the pn.ovi 6ton-6 o4 Chaptee 148, Section 26 C/E, M.G. L. 1 Expt4ation dater ce F , 4ti Fee due: under 7, 500 Sq. Ft. V- 10. 00 $R 1 1,Po FIRE DEPARTMENT CERTIFICATE OF APPROVAL FOR BUILDING PERMIT In compliance with the provision of Section 113.5 of the Massachusetts State Building Code, and under guidelines agreed upon by the Salem Bldg. Inspector and the Salem Fire Chief, the applicant for a building permit shall obtain the Certificate of Approval (see reverse side) and stamped plan approval from the Salem Fire Prevention Bureau. Said application and approval is required before a building permit may be _J w issued. The Massachusetts State Building Code requires compliance z 3 approval of the Salem Fire Department, with reference to provisions of U_. m w Articles 4 and 12 of the Building Code, the Salem Fire Code, Massachusetts o �p j General Laws, and 527 Code of Massachusetts Regulations. � CO z The applicant shall submit this application with three (3) sets of plans, 2 p - drawn in sufficient clarity, to obtain stamped approval of the Salem Fire z Department. This applies for all new construction, substantial W w G CL alterations, change of use and/or occupancy, and any other approvals a " < 6 required by the Massachusetts General Laws, and the Salem Fire Code. a z a Exception: Plans will not be required for structural work when the proposed work to be performed under the building permit will not, in the opinion of the Building Inspector, require a plan to show the nature and character of the work to be performed. Notice: Plans are normally required for fire suppression systems, fire alarm systems, tank installations, and Fire Code requirements. Under the provisions of Article 22 of the Massachusetts State Building Code, certain proposed projects may not require submission of plans or complete compliance with new construction requirements. In these cases, provisions of Article 22, Appendix T, and Tables applicable shall apply. This section shall not, however, supersede the provisions outlined in the Salem Fire Prevention Regulations, Chapter 148, MGL, or 527 Code of Massachusetts Regulations. All permits for fire code use and/or occupancy shall apply for the entire structure; fire alarm and/or smoke detector installation shall apply to the entire structure based upon current requirements as per Laws and/or Codes, but the existing structure may comply with regulations applicable for existing structures. Notice: Sub-contractors may also be required to file individual applications for a Fire Department Certificate of Approval for the area of their work. Such sub-contractors shall file an Application to Install with the Fire prevention Bureau prior to commencing any work for those areas applicable. S FOR FWA�' , FINA EN E Form 81X (10/90) APpO1TA NTMENMUST BE gEK i 1NSpE T��EAS SONE WEEK INSPECj10N ST ONE W MADE AT �_....••-'' MADE AT 1 EA AHF 'D........ ..._..