Loading...
10 PARADISE ROAD - BUILDING INSPECTION r=�yj��rb�Cl/ j i Initial Construction Control Document To be submitted with the building permit application by a A Registered Design Professional for work per the 8th edition of the ' Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Valvoline Date: 10/11/17 Property Address: 10 Paradise Road, Salem, MA Project: Check(x)one or both as applicable: X New construction Existing Construction Project description: One-story Valvoline drive-thru servicing retail store with full basement. Structural scope includes main level slab and its supporting basement walls and footings. Remainder of structural scope by others. 1, Joaquin A. Denoya, MA Registration Number: 50795 Expiration date: 06/30/18, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerningt: Architectural X Structural Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports (see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Constructior�� )ocument'. ♦ 2� AnAQU1N Enter in the space to the right a"wet"or v o A. m v electronic signature and seal: o pENOYA d 4 o STRUCTURAL w A o N0.5079 0 01 A\SSlt) i Phone number: (603)472-4488 Email:jdenoya@tfmoran.com � a 10.1117 Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised. If'other' is chosen, provide a description. Version 06 11 2013 - -7 - 24Lf CITY OF SALEM ROUTING SLIP New Construction Certificate of Occupancy LOCATION DATE ASSESSORS N d�9 DATE �{J/ 7 93 Washington St. DATE 93 Washington St. r PUBLIC SERVICES—Qa�-- DATE 120 Washington St. WATER DATE 120 Washi1ngton St. nw CROSS CONNECTION r/`1 " DATE I Y�5 z`"riA L 5 Jefferson Ave DATE 120 Washington St. CONSERVATION ATE Q 120 Washin S ELECT CAL DATE 2 )` 1 48 Lafayette St. FIRE PREVENTION l l41:��.� DATE 29 Fort Avenue �So oc S�Q DATE 120 Washington St. BUILDING INSPECTOR DATE 120 Washington St. i COP of *alem, ;fflaoarbuotto Public Propertp Department 9��,naeru� �3uilbing Department (One Oatem Oreen 745-9595 (Ext. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer December 5, 1988 Anthony Guba P.0 Box 90 27 Cherry Street Danvers, MA. 01923 RE:,_,'-10 Paradse_Road,'Sa>lem,MA. Dear Mr. Guba, Your application for 10 Paradise Road is ready for approval. Please be advised that demolition must commence prior to the issuance of the building permit according to the Board of Appeals decision. Please contact this office if I can be of further assistance. Sincerely, t� David J. Harris Assistant Building Inspector DJH/eaf toxwr�,� COP of *aiem, BaggacbUgettg T,` f•a public propertp department Nuilbing Department One inalent green 745-9595 Cxt. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer December 5, 1988 Anthony Guba P.0 Box 90 27 Cherry Street Danvers , MA. 01923 RE: 10 Paradise Road, Salem,MA. Dear Mr. Guba, Your application for 10 Paradise Road is ready for approval. Please be advised that demolition must commence prior to the issuance of the building permit according to the Board of Appeals decision. Please contact this office if I can be of further assistance. Sincerely, David J. Harris Assistant Building Inspector DJH/eaf ti _ amu 7- i �LL /� ,..f' ..x,.'r. ,rte - - . . .,.�� -�'�� .. K,. �.' � ,. . a � � .,..... �� -� � O �� ,� � '� O s+ods �iDi'''$�'Q �' �� � S d}fin ",:� ti„7�� �� ypy)lr1 4-�- SaaCY./ �m7I'o�nj[ e ' OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS HEATING EOUIPMENT • SOLAR ENERGY SYSTEMS 27 CHERRY STREET • P. O. BOX 90 • DANVERS, MASS. 019231 (617) 777-0700 November 18, 1988 Salem Building Department Attn: Mr. David Harris G ¢' Salem Green 5 Salem, MA 01970 �*+m to n mrn SUBJECT: Building Permit Application r-- Gas Station, Convenience Store ;o 100-o 10 Paradise Road, Vinnin Square N co x N pD Dear Mr. Harris: As agreed at our meeting on November 14, 1988, I am forwarding the originally submitted copies of the plans with the architect stamp on each sheet. Additionally, the following items are accepted as conditions of the permit to be incorporated into the construction or use of the new building:- 1. The portions of the exterior wall running parallel to the rear and side property lines will be constructed to one hour fire rating. This will be accomplished by using 5/8" firecode on the interior wall and a 5/8" firecode over the framing and under the clapboard. Additionally, the one opening for fresh air supply to the furnace will be fitted with a fire damper. 2. The front walk will be widened to 5 feet and concrete tire stops will be installed at those parking spaces located in front of the building. 3. There will be a partition at the top of the stairs to the attic. The attic will be used for storage only. 4. All drain piping will be cast iron. 5. Signs will be installed on the rest room doors to indicate "Employees Only. " 6. Stamped structural drawings and calculations will be forwarded when available from the manufacturer for the canopy. Thank you for your assistance, please call if there are any questions or comments. Siffcere , �nthony' G b P.E. Engine r AG/lm ® OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS HEATING EQUIPMENT . SOLAR ENERGY SYSTEMS 27 CHERRY STREET• P. O. BOX 90 • DANVERS, MASS, 019231 (617) 777-0700 November 16, 1988 Salem Building Department Attn: Mr. David Harris Salem Green � _ x Salem, MA 01970 .r T V SUBJECT: Building Permit Application r„ Gas Station, Convenience Store a 10 Paradise Road, Vinnin Square �m m raj v -o Dear Mr. Harris: n a Cn OD As agreed at our meeting on November 14, 1988, I am foG*IF, 1di'hg A the originally submitted copies of the plans with the architect stamp on each sheet. Additionally, the following items are accepted as conditions of the permit to be incorporated into the construction or use of the new building: 1. The portions of the exterior wall running parallel to the rear and side property lines will be constructed to one hour fire rating. This will be accomplished by using 5/8" firecode on the interior wall and a 5/8" firecode over the framing and under the clapboard. Additionally, the one opening for fresh air supply to the furnace will be fitted with a fire damper. 2. The front walk will be widened to 5 feet and concrete tire stops will be installed at those parking spaces located in front of the building. 3. There will be a partition at the top of the stairs to the attic. The attic will be used for storage only. 4. All drain piping will be cast iron. 5. Signs will be installed on the rest room doors to indicate "Employees Only. " 6. Stamped structural drawings and calculations will be forwarded when available from the manufacturer for the canopy. Thank you for your assistance, please call if there are any questions or comments. SWthony�,'/Gi , b , P.E. Engine AG/lm ® OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS HEATING EQUIPMENT P.O. BOX 90 • DANVERS, MASS. 01923-01901 (617)777-0700 C') L K C July 14, 1989 , crrn - cn C _o r-" Co z Mr. David Harris m< F. r") m Building Inspector rn Salem Building Department n One Salem Green H coo Salem, MA 01970 SUBJECT: Pump 'n Pantry 10 Paradise Road Salem, MA Dear Mr. Harris: As you have requested and in accordance with Section 127 of the Mass. State Building Code, I am submitting this final report for the construction control project at the subject facility. To the best of my knowledge and belief, all aspects of this project have been completed as per the plans and specifications and in compliance with applicable codes. The work has been satisfactorily completed and the building is ready for occupancy. S' Q3� ASS igiH M1Y G En � �F AG/lm ® OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS HEATING EQUIPMENT P.O. BOX 90 • DANVERS, MASS. 01923-01901 (617) 777-0700 C -a r W July 14, 1989 0 r n,A„ o 6n n co - am Mr. David Harris m � o Building Inspector T o rn Salem Building Department a -+ One Salem Green N w c� Salem, MA 01970 SUBJECT: Pump 'n Pantry 10 Paradise Road Salem, MA Dear Mr. Harris: The contaminated soil at the subject property was removed to Keene, MH for use as raw material at an asphalt batch plant. This action was conducted with the approval of the Mass. Department of Environmental Quality Engineering. Please find enclosed a copy of one of the manifests. Sin erely Antho a, P.E. Engin er AG/lm ® o OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL.GASOLINE.MOTOR OIL.INDUSTRIAL LUBRICANTS HEATING EQUIPMENT . SOLAR ENERGY SYSTEMS 27 CHERRY STREET . P. O. BOX 90 . DANVERS• MASS. 01923-0190 1 (617) 777-0700 April 14 , 1989 Mr. David Harris b Salem Building Department i One Salem Green '< z Salem, MA 01970 RE: Building Permit No. z m< tn 10 Paradise Road =o W m rn a - y Dear Mr. Harris : "' C.01 Per your request, please consider this letter as certifica- tion that the footings and foundations were installed according to the prints . Enclosed is the certification from Landmark Engineering to the effect�jtha.t the foundation is properly located. S In CTM �� V s a fyzA. r Ant h Engin e' 'iLf bh 46tg/nma Enclosure � r C July 13, 1989 o m "' c cn cs i cin G O 7A7 r5'7 Mr. David Harris Building Inspector o� Salem Building Department un One Salem Green Salem, MA 01970 Re: Pump 'N Pantry 10 Paradise Road Salem, MA 01870 Dear Mr. Harris: As you have requested, to the best of my knowledge and belief, the construction of the CSI, Ltd. responsibility portion of the Pump IN Pantry was completed as per plans and specifications and in compliance with applicable codes . Sincerely, CSI, Ltd. Steve Leonard Project Manager SL/nam 2824 cc : Tony Guba-Bursaw Oil Corp. Tom Brown-CSI, Ltd. George Dempsey-CSI, Ltd. Dave Carson-CSI, Ltd. CSI Construction Services Incorporated 300 Lafayette Road Rye, New Hampshire 03870 603 964-7373 OCT 23 8 39 Ah X87 ofs ${ �ottrb of �ppral eirY CLERK. DECISION_ON.,T.-HE PETITION OF BURSAW REALTY TRUST FOR VARIANCES AT` 10 PARADISE ROAD (B-2E3 A hearing on this petition was held September 30, 1987 with the following Board Members present: James Hacker, Chairman; Messrs. , Bencal, Fleming, Luzinski and Strout. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Law Chapter 40A. Petitioner, owner of the property, is requesting variances from density regulations, Section VII Table II to allow removal of existing building, island and tanks to allow construction of new facility, use will remain the same. Property is located in a B-2 district. The Variance which has been requested may be granted upon a finding of the Board that: a. special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structures in the same district; b. literal enforcment of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioner; c. desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent or the district or the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented and after viewing the plans, makes the following findings of fact: 1 . Plan, as presented, is an improved and better use of the land; 2. Plan as presented provides a better and less hazardous traffic pattern; 3. Uses would remain substantially the same; 4. Plan as submitted provides for more parking than what currently exists; 5• There was no opposition. On the basis of the above findings of fact, and on the evidence presented, the Board of Appeal concludes as follows: 1 . Conditions exist which especially affect the subject property, but not the district generally; 2. Literal enforcement of the Ordinance would work a substantial hardship . on the petitioner; 3. The relief requested can be granted without detriment to the public good and without nullifying or derogating from the district or the Ordinance. DECISION ON THE PETITION OF BURSAW REALTY TRUST FOR VARIANCES FOR 10 PARADISE ROAD, SALEM page two Therefore, the Zoning Board of Appeal voted unanimously; 5-0, to grant the Variances requested, subject to the following conditions: 1 . Project comply with all requirements of the Salem Fire Prevention Bureau; 2. Demolition of existing building and removal of tanks be in strict accordance with all State and Local codes; 3. A demolition permit be obtained from the Inspector of Buildings; 4. A building permit for all construction be obtained prior to commencement of work; 5. All construction be in accordance with plans submitted; _. 6. Eleven (11 ) parking spaces be maintained as shown on plan submitted; 7• A Certificate of Use and Occupancy be obtained prior to occupying the new structure. GRANTED Names B. Hacker, Chairman A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK XU+aL FROG: THIS D":ISIOI�, iF A'Y. SHALL BE MADE PURSUANT TO SECTION 17 OF THE MASS. VhERAL LAWS, CHAPTER 808, AND SHILL BE FILED R'IT;UN 20 DAYS AFTER THE DATE OF FILING ('F THIS DECISION IN THE OFFICE OF THE CITY CLERK. R::'."A%T TO ?::ASS. GENERAL LAP;'S. CHAPTER 85'8. SECTI'CN 11. TH'E VASiANCE OR SPECIAL PER'EIT �uAGIEG HEFtJi;. SHALL NOT TAKE EFFECT UNTIL A. COPY OF THE=ECIS!0%. EEAR!NS THE CERT- 1, OF THE CITY CLERK THAT 20 DAPS HAVE ELAPSED �,..D NO RP?ESL HAS BEEN F!LED CR 7n T. IF SULH AN APPEAL H=.S BEEN FILE. THAT IT HAS BEEN DIS.i'SSED OR DENIED IS ' REOP.EDED IN THE SOUTH ESSEX REGISTRY OF DEEDS AND INDEXED UNDER THE NAk:E OF THE OWNER OF RECORD OR IS RECORDED AND NOTED ON THE OWNER'S CERTIFICATE OF TITLE, BOARD OF APPEAL i i i i I i j ti ti 0 ??sem ti g2 P1100 fov�v 10Zg5 0 6g0 i i I 1 ��33 a Q I R i I L= 4L95 /7< 20,00 r i i"?t 1 i 1 PLOT PLAN /N SALEM, MASS. /CERT/FY THAT THE FOUNDATION SHOWN j HEREON CONFORMS TO A VARIANCE GRANTED FOR s BY THE ZONING BOARD OF APPEALS ON OCT, P4 1987 8URSA W OIL CORP. 44 F OND SCALE /';30' APRIL /989 10 cM.4NIJS i \ ,p No. 9234 O <<Fc GT F r LANDMARKENGINEERING 8 'E SURVEY/NG, INC L YNN, MASS. f � � c 0 rn Salem Building Department r- w+ o City of Salem f'c�^ ° M One Salem Green "4 Salem, MA 01970 SUBJECT: CONSTRUCTION CONTROL PROGRESS REPORT ---------------------------------------------------------------- Building Permit Number: 118-89 Location Address: 10 Paradise Road, Salem Owner: Bursaw Realty Trust, 27 Cherry Street, Danvers, MA Project Description: Demolition and Reconstruction of Gas Station and Convenience Store Period For This Report: July 5, 1989 - July 14, 1989 Estimated % Complete End Of This Period: 99% ---------------------------------------------------------------- Inspections This Period: Final Plumbing Electrical Health Preliminary walk for c/o with building dept. Changes In Specifications, Shop Drawings: None Problems: None ---------------------------------------------------------------- Description Of Work Completed This Period: Final finishes, closing of all trades ---------------------------------------------------------------- Based on on-site observations and to the best of my knowledge, information, and belief, the work has progres a °?i ordance with the approved drawings and specifi io k Submitted By:_ 1 L A hon b = E ,• e Y ,�_ j.3-7 � ® OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDIBTRIAL�YBRICAN% HEATING EQUIPMENT "i 2 O P.O. BOX 90 • DANVERS, MASS. 01923-01901 (617)777-07� T� CV m 1� r^, CK) O mM N n 3� N -p nc m n nc n cn r � � y June 28, 1989 Mr. David Harris Salem Building Department One Salem Green Salem, MA 01970 Dear Mr. Green= Enclosed is a copy of our permit from The Commonwealth of Massachusetts Department of Public Works for your file. Please call if you need further information. Sincerely, Anthony u .E. Engine AG/lm 5-19588 �• U�jP 0i>ZltiltIIltl ra1t4 nf tiBBtlI ll3p B r OT Cn DEPARTMENT OF PUBLIC WORKS C3 PERMTT SalemCn co Cn Subject to all of the terms, condition and restrictions printed or written below, and on the reverse si& hereof, permission is hereby granted to Anthony Guba,. Bursaw Oil Corporation, P.O. Box 90, Danvers,Massachusetts 01923 to enter upon the state highway layout in the„�City of Salem, locally known as Paradise Road or Route A_ for the purpose of4resurfacing existing commercial drives toro at # 10 Paradise Road-Bursaw Oil Corporation. Pert p Y - No equipment trucks, etc. shall occupy any part of the travelled way except between the hours of 8:00 A.M. and 4:30 P.M. from Monday through Friday. Weekend work is permitted under the terms of this permit. Also, no work shall be allowed on the day before or the day after a long weekend which involves a holiday without the permission of the District Highway Engineer. --It shall be the responsibility of the Grantee to contact the DistrictEngineer" regarding the field location of any underground traffic control devices on this project. Said drives shall be surfaced with Bituminous Concrete, Type I and shall be comprised of a 3" Class I Bituminous Concrete Base Course and two (2) 11h” courses of Class I Bituminous Concrete Pavement for a tot AI depth of 6" with a foundation of at least 6" of compacted gravel . The finished surface shall butt into and not overlap the existing highway grade at the road edge. All work shall be done in accordance with the Commonwealth of Massachusetts Department of Public Works Standard Specifications for Highways and Bridges. The drives shall be so graded that no water shall be so graded that no water shall enter the layout nor pond or collect thereon, including the roadway surface. All disturbed areas, such as sidewalks, curbing, shoulder, grass plots, shall be .restored to their original conditions. The curb corners or radii may be painted at the time of installation. Said curb shall be painted yellow only. The curb shall be placed in conjunction with or immediately following completion of the driveway surfacing — The part of the drives located within the limits of the state highway shall be maintained by the Grantee, at his own ekpense and to the satisfaction of the Engineer. (Cont'd) CseAlhSae Ralwsg Paru**1.gb as Permits fa the Lariat N Flay Co dslla eft. After env view. veedMlts,dmgo Cu four uledkMnd strMtverw ger big,a our urs.stlea Is mad• la W pandwar. W sea doll be Properly verb filled trM suitable materiel, the Wb.011wg gull be thgrwaplt "meed. and the a*rfs*$y W �d�pY�seaaerr moa, Never $hail be W% a.•n .Ith IN dsNgtnd Premod, If W truth b MM Is eotd trt•trr *o barn athe Material eta ve aid far hrh.dWypenc wM...a rel u. It s *im N W venetr•t. ,chime, er erne mutt N W ar4ry N W highway b dbl"ehd It sh•R be "llum i 4 r Isd roMHW a yfM q trCu dw4rhd. bnd M rive sntw4ts ate rmo1M Wr abaci eovesrond with thea •,ready Is ales, Ow the mend. Myst mr.w Plea are his gap rip bighwgr W monde" cull be made erthmtt disturbing W l4rdegd saf•ca d W shadow be dr *edge the Mdwy. err W Curve" NPm shall as carried W eve*Is• letter carried under and pips. .1. sthmwtsg C The GveaM shop s*lalels W gOrtaa of W veadww oyer Y4 •IrCu410 Sa berg N W Drrollmego mV deem asSaa*ry, aatll til *bw of On srstrCASa AW be" bm analas%& Wa/IHeaa RWH*$ Puumwb to rerape be in RrbNlorl of rely Wlrah ad Ovesbmd /1ltestewa and W C1110*$ bad Trlaeatat, *I Ttas selmgs to the e toysties of LOU H tam.gamsed other-les,vith�t In Provided. w trip la"otd within the limits N the /411 highway Shall he met MY Tldle W trove w Is SV guy loserfan with their Dnwth. The vim Sull be w!1""IN at .mit The D�rtment, 11SUaga and pd in so lat"thol ftyybbe hN1 ora lowan to "Cq velth M bl"r" W sera whor bide NO Outside W byues N W highway, Whero W Outtlat or trlamlst N two is a*Wriad by this Permit. *air twit Cecil*$ mad trimming atoll M HN a oV he delete. saw be lit ErttlaSos. Is W wastr*Nles ar'Nco plrurlMo of Fob lisp se 697 wirer toll be OrNW riveter to lit wdon N W �nm*nd than d. fo"t; pw• •led. howe.er. Oat the wOu of such Ilam mer maintain such pq wires u e to..r rl..yuga theft Ur to" fres W[rwae *nU1"rp ux AM W D*eanwnt Aon awry eves go rw"te Culd Mira er Sa ab" them 4 the .p•abs /tel s4td. to aver go�p Nat W Irga through which ave Mtm ay pea, pts wAa shall ve Irulald •gel outb War seve t*arde end be aV be almost d h the Cadger. Who" high mere Wien on "neW ueder this Permit, they Sh.tl be No %Noted Shot. *saw andltbr N maximum Seca14 u yepards p Cutting N her er maw, that rbatt be a Aron of at Iwl eight tat b"was Such Mob ltgobn .Ira end other wtsw. store fettle of The b PON owtd 1 within e taorMftent with tht Permit. rig Plaanntou so the to be of ubek. Sir IN else and Issw►film r W Departments Near tlt MLst tRe tsrstb•a he Sae► Of the Dogartmeial a Sign G*Wnl oto AddltloW C•sdlllMw Whew•ver the wad "DMrlmtst" Y wad krme It dell agree the Depurtesenl Of Publlt Work* no 11, Commonwealth N msartbCuNu. When W wad "EMiswr" b teal hemp n shell meta W District Highway Angimmr at Styr suturbd MP.,.11ve at W Dg rtseent. Wyr..ur the .ad 'Grannt" I. gr.d bertia 11 Gell aenll the rel Ou er Damon$. corperetlen tram". or municipality 4 .Fag Ob aeysA b Or their legal rgrNeeutl.a. During the arwrres of :y ...rk ell ctrwturm gad" /ro*ad had shore Small dull he P'Aweriy pewld from Oma urrl.es dell be pntsd and melnumH be may be *weeny to the Peots"fira N the traveling e*elie' lit some *ball m de Or Injury: such 'is mad the Grgnn* ANI be reeror.M* for all damages Sa roraew w popaity gee to ar rmulbof tram any work deNDdddererlethis PW el Repast a herein auaolsd, so w.esv:4s pull he made go Mail plod within the limits N to putt ► hw Post go be le4rfe t wnNrw•rlfy with the len•' wror Said word. highways 4 SOrh a eraser If Say Ofadiee N Nduws:k work dila" under this romil Intwfam$ With W drainage of lbs BullMakers, h a17 .V. etre\ aeric halt sad wUNs gull M Ounotrwtd go may ha awwVL Is W plebs *f W Ent4ar. 4 4b Pwpar cop N meld drdnega Wherever W hardened the . outlets of the es•e.V b.be push h •ere the Zealots, may vender It nwcwrryy or ad.0oble Y do we ase ear. by I .III a emigres a the .msbsea N W Deportment.th nL N tuck Ume o, the Department mer direct, sad I apse tha er Cyd be b*M A the Crista, way eriall op and and donna d W red W ma4Nsb permit", to, old Work If had trust directed 67 the t*$lacer. AR nymests a agu*rlalmen and Cu uboray. IrPes4n. Sts,. emP47nd y Iy Denotmvnt fa or on acenunl of the work betels a Implald shall h made by gold Crossett forthwith an W anlpt N we"ttsa gods, 347 nib. Or •wc►en approved by the Department,IF FLXT9 WITHIN R _ WO� CONTRARY OCTEDEAft Of THF G AND. �RP �TOCORRECTUCH WORXOR TO RRHOVR /TRUCTUALIOR MATERIAL ORDERED TO t it OV AVTFAILA COM.MA(t � PNOTICE. CORATI•T OR COPL9 SUCTIME H WnMRR� VyDEPAENT VTH CIL WIOnTR1TUR% OR [IrTAR 6MAN.RC SHALL REIMAVA/C TAR COHAONWALTMOPORA►AATREBY TIfFRJg►EgIONCUADRLDLn CORRECTING AND/OR COMPLRT• IAO THC WORK OR REMOVING THE STRUCTURES OR MATCAIAIA Or TIME DVARTMEf THE NTR OF PUBLIC XRFIX OMORW,WAND STHL CJtTIRL EI►L DE DONS LNt6RTHE THEREOr /AAIJ.ION SC SAND ORNLO/YHTALSATISFACTION GA PANTL OA Os W vemPINIOu N W work *rola a lopplaW so sabbub gel do4ylt shall be 7rmo•d and W renderer Sad rrobIS abull hit tsf1 apt ends arsmatab4 pad gotWatory a W gWow. The Department berey menu the them to Order W obsel N a Joel W removal N may Nmqun ter Nru"ara suthgrled be LILLY Dtrralt at bap Um", Wd choose it aswel 4 be made be and sl W *seance Of the Grantee of14/their sweemm w moa This Pewit a*$ be au$HSd Or ve•shad at say time be W DepuimeN wlWol madorlap gold D•roetrgoat W W Ceamepwlth N Mwashusscu liable Is bay was 7w Crasta Shan Pet W Salary. eo►plsttm mad sn"Unk Nares N*try)"Pater appo,atd by W Dep•rtmeal 4 suFrrw W Serb firms r•m4mP1a1od. All N W above endAlmu shelf be sppiba►b to W work hams asturlasd, Melvin W gom" •re lecotub4at rel W sem pal W ewe N W Pkwm11, Is whish ria W rMW Itwrlttme w pristsd w W fat N W pwall gulf *$Fly. ?u "w Pben W gthin Permit or W Mlat N wWM any b mp *ball a Utg4 so *$roimgjt y lie Gr•stw to cemSb .Ilk all N W osodill*ag shit mtrbtku priaW At wrlt4s hostile. Note: A copy of this permit must be on the job ,site at all times for inspection. Failure to have this permit available at such site will result in suspension of the rights granted, by this permit. pC=Mmuvrato of 4+3 tm �o DEPARTMENT OF PUBLIC WORK$ PENJ= Salem Subject to all of dw tw=6 conditions and ratakdor Printed or wtittea bolowo and on the esvase a& haaeafv pereisaice is hereby emoted to All work shall be done at the direction of and to the satisfaction of the District Engineer an at t e Grantee' s expense No trees shall be cut or removed under this permit. , THE GRANTEE SHALL ALSO ADHERE TO ALL STIPULATIONS AS STATED ON THE "INSERT TO ACCOMPANY PERMIT # 5-19538 All Utility Companies whose services are located within or adjacent to the proposed installation areas shall be notified in writing of the proposed installation at least 48 hours prior to the start of any excavation in said areas. This is independent of required dig safe notification. No tracked vehicles will be allowed on the highway surface without a protective mat. DIG SAFE # 8839-4962 -4. •u y (SEE OTHER SIDE FOR ADDMONAL OONDMONS) , No work shall be done under this permit until the Grantee shall have communi- cated with and received instructions from the District Kshway Engineer of the Depart. mint Of PUNIC Wort, at , P.O. Box 38, Hathorne,MA 01937 This permit shall be void unless the work herein contemplated shall have been completed befog June 14, 1990 Dated at Hathorne tA1s 14th day of Jun 1989 Department of Public V/orl By David J. W ,son District Highway Engineer NaD-60p Mtk Sher Consortium Strauss hrorotsrb r ► lo@ fon the tout of Flown. C&mdmlts, our. A four enr MN. hedelb, dMa a alba,gNMepeed otrmmm an bid, No our een.•tlea to Rude Il W heedwe,. W trBokwreH a 'how 'bell r "maker" herb filled ell\ eulmbh msl&ral. tow Yr\.d111nR shell be thoroughly nwpea, ale 1M rorfm 1 W and Rem� Wa eM'. Aske mhmll be lot' Pea "'A tY edwsnly arced. 11 W ear► k doe In amid twelve, "I Irwrke wdt thea shall a Roel ton ha Is wlwre,er the hehdes" wr(a@o Rt W row",. ryuwm, my we own of W a"taa of W Jets"er Y db1041. oam peMnwo as Dayton It W" drarbd. 694 K w materials an nAUIM cher alkali ee..a,p44 -ilk Ut Pood 1b o0va el�d► b pmOn W ae w. WYn rrcw alp. are m erre W hla►wot dn.l•Y the M Connections kellbet% _d�rielno he M .10 ed series, d t\o rud�.Wa emor the nNwa, a L ""WeNMnNawserarlM&is• tsryrr Pipe. taken eheaWMM W amiw. Th• Crm•M ole a e OM of W Mdaa Ams aha althetaBs a rent as W Dcpeeemmnt may 40w Devonian. ew1 all otaa td W B.arehm 'bete ban Lw has oualeebA C&Whi •e Strauss ►arYntsrb to Yarmpb IN as amok, of Irlr, Miry eve OheNed sirpetary W W Catty She Trinomial N Tree to U# Qpml" M Dole line. mtlw* ether rl" 1 edm pressure, he Iran (meld Wfuls W limits of the /ab ►lahwsy obell be w1 a 16810400111- No Sar Vire alkali be attached 0 teker without b apetW permit from the D•permlo"t red In so octal &hall tRar be pe otruahed Am m fftedle the tones or IR da mm7 $%wrm With their growth. The calero shelf be Am PhelotW at all Use" Sud $lam WI tMr Shen ore p®q{� via a rulure W bas tub" hot& a fBbldm W WUUea of tis highs". Who" W "lung •r Ulamtsa Of them IN oBWr1Amd y this Permrit, Only muck muttbg one trlmmlas aWI be dnhe r ma he date• same b the Melmae. \ Is lir agelrhellas a !•at.etlM of pole Ila" oto got vine&hell be &'tool Reser to as .Prot@ Of Lose rrwN them BIN font; pen. Ride. heePP. Um W when N Such Ilam wan Regulate cask rlt7 wins at a lesser slevalu than Na feat from /y around eWl $Book lir Y W Daurtn@nt shall ,fall shows b rOnrro e4 Vim Of b "em &Mae NO the Mgtba pmt Result. la Rover toaaaaapes the g 6 aChByk Which 414101 writers may pee, Amu VIM "I be insulated mod aware face tons awards awed w ma he dlesmd M /he Loeser. When huh ow"o " all" ahe mherW 0"" Shot Wallis' gYr Alkali be n revealed shat. gedro to diti," ad malmmR promotehe t"ada t otattam of "' a ens, them #hall be • "a" of at broke eight feel Mtssmn much high tenon .it" mud other orb,• mos d"s form dot of Gm feel q Bush Paha *tweed f•1 genursup" sales tthe n mit. wed Nando bee ad amokrdeeke 'A r eN I�Boob&torah an �&epart B lbw Rkslup BY the Dap*rlermt mg dlraBL General shoe Addltlwul CoNlebme WYhesor its Word "Danertmemt" to fed Ynla 11 oYry Rrm" the DsPa'Ub"t het Publlr Wke d the Commwe K Maeheere Whompea ** -Bud "Lonlpi' b woad b@rdm p •hell 0"0 the District Niel,", Somewhat P ether auth"4ed rprMmw d llthe RawDmarrewr"t. Wherrrr the word •'Groatee- I. we•d bottom 11 *hall moa the Volume a Persons. Corporptsn w municipality to ar rook this permit be From"• or their bagel n"esBtstisn. Ilezu the rrrwrrs t( ;he ssnra oh strwine% Balm &mad lid •Yoe erred *hall M preprrl b."h n 'heli Y &'elle Sud ndn0,nr9 d man be mwrosrr in she perowties of Ib trosAiwa r Pthe So from danab r IDIOCY: she\ mtyht: eN the Oramtsc Nall be rR►anwhle, for mit damson de poop ws Property due cm or r"ulond IIC 'm mayeWork udbbe P,o lyarooker at Emerge Am heroin w'tatted. •o ookeatlaa *he11. be 0640 m Rbb'b placed- wlUts U, limits of lM ate" Die►ram le fah • masher IL he Y 1•rrtere ubftwwsrity with the tsa.e.' o,er Amid sod. It aq Vmdirp or ald•wlh .orb done under leis permit tourtorw, with the drainage of the /tab blohwa to any way. o'\ Amtsre Wlhe ale wUa1a a\all M 'orutrwted u my he remember. Is W malalhe of W Lapeer. b WC pewper care of Amu drolay WYroesr W hardened *wrfm'o of the R+dssa b distarked eN the Laehea nor "",do, 11 "ways r N.lea►le ws do he 'eke elll a entered ► she urrim, R a lM rrandff rte I.F. y the GN+W, Whe by WRher ole Muw Rthe mrd tYkmuA b Mearoaerrrrr fee hold work direLit and W WMA dinned by the ha haroo Ary wens"1W Am mbrialmAm lid ws tsherero. Impacts ore., smpormd N the DepoRwAml fon nor on oaount of the web I ryob s t avl jmod e►oll M mal, y mid Gnnbm fo lowith am W em@Ipt of arlttem eders. Pay Chile.a sone►m arlroctd by the Dq&rmget. TO IF THE ORANTLr DOLL ANY WORK CONTRARY TO THE ORDERS OF THE ENGINEER. AND. AMR DDE NoTlakp PAILS PLLTLRWITHIN THE SPECIFIED TIME THE REMOVE RKSTROAUTHORIZED uRES OR Y MATERIALS PERM T. THE DL►AD To RTMLNT WAV.REMOVED OWITN OR WITHOUT NOTICE. CORR►/'T OR COMPLETE SUCH WORK IN WIIf1i.t Op iN ►ART, OR p►NOVA SUf.N pTRtlRtip►t R MATRRIAIA. AND TNR GICANT►.E SMALL RLIbInVAaE TME. COM NONWLALTM TOR ANY LE►LNaL INCUMLD W CORRECTING AND/OR COMPLR• INC THE WORK OR RLMOVING THE STRUCTURES OR MATER1A11 O► T77L DALL EPARTMENT O/F TMX WORK lUOIN.ICOWOIkXS- ANDD/TIM ENTIRE EiPENSERTNHEAi0SUPERVISION E BINIjNTO.THE HS GR6►Z`N Om W reinstating at the wrk boMa mo"bgbud all rubbish shed debris &Mil be Chwsheed *N the loodwmy mud medaldre Nall In reit •est mal prnestsble •ad aWfaUrp to W I W"w. like he book peralt •�a7 Wali. ale¢hasinggCit tgmo.&0 a be motherpt to 40 IV ei%Basten aaIgrenr of the Ou Or the n ton m r-al of ieftYlr emeor structures ean or •alplr,aorlyd y TRIP Permit man be Inoedl/ed r perNed at ea Uw by W Dswtrmt Wphewt rumderlaa au Department m W eMmw la ed Mwae TRIP IW4 If enp ay. :1e CnRts 111144 any the okra. e•LUts•s •N tnheLsd Ampemow al w7 Hnem W RPploktd y the Dersamosome b euprrw the wM heheN awbmsreW. . All Of W #ben teNllloa mired be applW►k to W Sub bomb aeaaleed, Baler W Amer are Ime"*kl*al with W s•dlerpe w W hs of W pirmm Is WAIN mom the Muhl,' Written a PrImW " W fav Bal W Permit Nall Reply.. 1 The •stover b ale pri W vogit aft, of ue Leda.of how cram" Wrmeedm mka0 rfheuhe4 Re Reres&mRl y W Greakta Y carpi# with ell et W eB r" w •node of tba Note: A copy of this permit must be on the job ,site at all times for inspection. Failure to have this permit available at such site will result in suspension of the rights granted, by this permit. /1JJ/d 4 � INSERT TO ACCOMPANY PERMIT " 5-19588 The Grantee shall be responsible for the hiring of police officers during the entire time that work is being done within the State Highway Layout or as deemed necessary by the District Highway Engineer. The Grantee shall indemnify and save harmless the Commonwealth and its Department of Public Works against all suits, claims of liability of every name and nature arising at any time out of or in consequences of the acts of the Grantee and in the performance of the work covered by this permit and/or failure to comply with the terms and conditions of this permit whether by itself or its employment of subcontractors. This permit is subject to the procurement of the necessary Town Grant. If it becomes necessary the Department shall place an Inspector on this project and said Inspector will be paid for under a reimbursable by the Grantpe Two way traffic shall be maintained at all times during this project. At any time during the operation of this project it becomes necessary for the Grantee to detour traffic it shall be his responsibility to notify the District Highway Engineer in writing seventy-two (72) hours in advance of this detour. The Grantee shall supply the District Highway Engineer with a plan showing the. intended route of this detour along with the appropriate signing and the number of Police Officers to be assigned to -this detour. The .Grantee= shall also state the length of time said detour will be in existence and he shall have concurrence from the area Police Chief regarding this detour. All said detours are subject to review and concurrence by.the. District>Traffic a Engineer. It shall be the responsibility of the Grantee to notify both this office telephone number: 774-3190, ext. 15 , and the Area Maintenance Foreman (his location is listed below) , forth-eight - (48) hours in advance of starting work on this project. The Grantee shall also notify both parties when he has completed this project. The Maintenance Foreman for this area is: David Rock Telephone Number: ���_g4p4-g4p4 The Grantee shall place signs and cones for the protection of the workers and the motoring public, in accordance with the Approved Safety Manual on Uniform Traffic Control Devices, and the Work Zone Traffic Control Standards and Guidelines - USDOT - FHWA, April, 1980 Edition. When a snow or ice condition exists during the progress of this work, the Grantee shall keep the highway well sanded to a point not less than 200 feet beyond the limits of the barriers and signs. The bound marked MHB shall not be removed or disturbed. If it becomes necessary to remove and reset any highway bounds then the Grantee shall hire a registered professional land surveyor to perform this work. It shall be the responsibility of this land surveyor to submit to this office a statement in writing and a plan containing his stamp and signature showing that said work has been performed. ® OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS HEATING EQUIPMENT P.O. BOX 90 • DANVERS, MASS. 01923-01901 (617) 777-0700 tF O °4m p ca n CID vm � C7=0 rn wv Me r I, An Cx :sn cS+ June 26, 1989 Mr_ David Harris Salem Building Department One Salem Green Salem, MA 01970 SUBJECT: Construction Control Progress Report Dear Mr. Harris: Please find the sixth progress report attached. Please feel free to call if you have any questions. S' #er An P.E. Engi AG/lm Attachment I � i Salem Building Department �p `CD City of Salem E CXD One Salem Green y,r r � Salem, MA 01970 SUBJECT: CONSTRUCTION CONTROL PROGRESS REPORT CM -------------------------------------------------------- --- - Building Permit Number; 118-89 Location Address: 10 Paradise Road, Salem Owner; Bursaw Realty Trust, 27 Cherry Street, Danvers, MA Project Description: Demolition and Reconstruction of Gas Station and Convenience Store Period For This Report; June 7 - June 21 , 1989 Estimated % Complete End Of This Period: 85% ----------------------------------------------------------------- Inspections This Period; None Received permit from state DPW for driveway paving. Changes In Specifications, Shop Drawings: None Problems; Soil coordinated to be removed June 22nd and 23rd. ----------------- Description Of Work Completed This Period: Wall laminates installed. Walk in cooler box installed, casework installed. Concrete walk poured. Telephone pole installed. Rough HVAC and electrical continued. Drywall installed, taped and finished. Exterior painted. ----------------------------------------------------------------- Based on on-site observations and to the best of my knowledge, information, and belief, the work has proaressed i accordance with the approved drawings and specif ' aVnsSubmsttedBy _ -- -------------- An bonE. Date ® OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS HEATING EQUIPMENT • SOLAR ENERGY SYSTEMS 27 CHERRY STREET P. 0. BOX 90 • DANVERS, MASS. 01923-0190 1 (617) 777-0700 June 6, 1989 C7 G I`i+ -i C_ ry r Mr. David Harris �n m Salem Building Department v m n One Salem Green m Salem, MA 01970 o — RE: Pump ' n Pantry Conversion - Rough Framing Cn CJC� 10 Paradise Road - Vinnin Square Dear Mr. Harris : As you requested, I am forwarding this letter to certify that, to the best of my belief and knowledge, the rough framing, electrical , mechanical and plumbing has been installed in accordance with the plans, local codes , the Massachusetts State Building Code , and good industry practice at the above-mentioned location. Sincerely, BURSAW OIL C RPORATION Antho y a, P.E. Engin r 58tg/nma June 9, 1989 Mr. David Harris o Building Inspector Salem Building Department One Salem Green* Salem, MA 01970 :v Re: Pump 'N Pantry a 10 Paradise Road Salem, MA 01870 LID c,® Dear Mr. Harris : As you have requested, to the best of my knowledge and belief, the rough framing, rough plumbing, rough HVAC and rough electrical have been installed as per plans and specifications, and in compliance with applicable codes . Sincerely, CSI, td. Tom Brown Vice President TB/nam 3734 cc: Tony Guba-Bursaw Oil Corp. George Dempsey-CSI, Ltd. Steve Leonard-CSI, Ltd. Dave Carson-CSI, Ltd. CSI Construction Services Incorporated 361 Hanover Street Portsmouth, New Hampshire 03801 603 436-7622 ® OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS HEATING EQUIPMENT P.O. BOX 90 • DANVERS, MASS. 01923-01901 (617)777-0700 O A ~ f May 25, 1989 c�cm o mrn 0 x rn` o rn CD CD Mr. David Harris - C n Salem Building Department m One Salem Green H cca Salem, MA 01970 SUBJECT= Contruction Control Progress Report Dear Mr. Harris: Please find the fourth progress report attached. Please feel free to call if you have any questions. Sin rely 4Antho G ba, P.E. .Engin e AG/lm Attachment Salem Building Department City of Salem One Salem Green Salem, MA 41974 SUBJECT: CONSTRUCTION CONTROL PROGRESS REPORT ----------------------------------------------------------------- Building Permit Number: 118-89 Location Address: 14 Paradise Road, Salem Owner: Bursaw Realty Trust, 27 Cherry Street, Danvers, MA Project Description: Demolition and Reconstruction of Gas Station and Convenience Store Period For This Report: May 10 - 24, 1989 Estimated % Complete End Of This Period: 60% ---------------------------------------------------------------- Inspections This Period: None Changes In Specifications, Shop Drawings: None Problems. Still working on removal of contaminated soil , awaiting DERE approval . ----------------------------------------------------------------- Description Of Work Completed This Period: Rough framing complete, HVAC roughed, rough electrical started, roof shingled, clapboard 50%, canopy installed, concrete curbs installed, aluminum storefront installed. ---------------------------------------------------------------- Based on on-site observations and to the best of my knowledge, information, and belief, the work has progressed in accordance with the approved drawings and specifications. Submitted By:-------------------------------- Anthony Guba, P. E. Date ® OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS HEATING EQUIPMENT P.O. BOX 90 • DANVERS, MASS. 01923-01901 (617)777-0700 May 11, 1989 Mr. David Harris , Salem Building Department One Salem Green Salem, MA 01970 SUBJECT: Construction Control Progress Report Dear Mr. Harris: Please find the fifth progress report attached. Please feel free to call if you have any questions. Sincerely, Anthon a, P.E. Engine AG/lm Attachment C7 CO m ? r-0 al Salem Building Department City of Salem r^m CD rn One Salem Green o Salem, INA 01970 P. w SUBJECT: CONSTRUCTION CONTROL PROGRESS REPORT (n C10 ----------------------------------------------------------------- Building Permit Number: 118-89 Location Address: 10 Paradise Road, Salem Owner: Bursaw Realty Trust, 27 Cherry Street, Danvers, MA Project Description: Demolition and Reconstruction of Gas Station and Convenience Store Period For This Report: May 24 - June 7, 1989 Estimated % Complete End Of This Period: 70% ------------------------------------------------------------------ Inspections This Period: Rough electrical , plumbing, framing. Review of driveway plan by State DPW, and signage application by Planning Department. Changes In Specifications Shop Drawings: None Problems- Still working on contaminated soil removal with DEQE. ----------------------------------------------------------------- Description Of Work Completed This Period: Outside clapboard, rough electrical and mechanical , drywall , cooler refrigeration box, interior framing and sheathing all completed or installed. ---------------------------------------------------------------- Based on on-site observations and to the best of my knowledge, information, and belief, the work has progress in accordance with the approved drawings and specif ' ati s. Submitted By:_ ---- -- - ------------------- Anthony b P.E. Date ® A OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS HEATING EQUIPMENT P.O. BOX 90 • DANVERS, MASS. 01923-01901 (617)777-0700 n ~ a C3= C m r Cn b.m Co 1 mm to 2 G7 �O IA O s m May 11, 1989 n ca Mr. David Barris Salem Building Department One Salem Green Salem, MA 01970 SUBJECT: Contruction Control Progress Report Dear Mr. Barris: Please find the third progress report attached. Please feel free to call if you have any questions. Si rel , Anthon b P.E. Engine AG/lm Attachment � c C3;0 Cr r nl O 3T'iT9 � Z Salem Building Department nm km 0 City of Salem c m One Salem Green r. Salem, MA 01970 vyi w _ c.o SUBJECT: CONSTRUCTION CONTROL PROGRESS REPORT ---------------------------------------------------------------- Building Permit Number: 118-89 Location Address: 10 Paradise Road, Salem Owner: Bursaw Realty Trust, 27 Cherry Street, Danvers, MA Project Description: Demolition and Reconstruction of Gas Station and Convenience Store Period For This Report: April 26, 1989 to May 10, 1989 Estimated 'f. Complete End Of This Period: 45'1. ---------------------------------------------------------------- Inspections This Period: None Changes In Specifications, Shop Drawings: Change 2" x 12" ridge board to micro lam Change 4" x 4" columns in attic to 6" x 6" Submitted canopy drawings Problems: ---------------------------------------------------------------- Description Of Work Completed This Period: Framed roof and sheathed entire building, including attic floor ---------------------------------------------------------------- Based on on-site observations and to the best of my knowledge, information, and belief, the work has oroQressock in accordance with the approved drawings and speci ' c i s Submitted By: _ _ _ _____ Anthony P.E. Date �i..\ � � i.ti •if f.J � __ l I DENNIS THE MENNIS PEST CONTROL WOBURN 935-DEAD LOWELL 459-2950 CAMBRIDGE 576-1038 LYNN 592-0023 PEABODY 532-3443 ,DATE,±7 z TYPE OF SERVICE `° ,,;TIME f�jc��p 9 ❑ REG4LnAR `�ONE-TIME IN_ OUT_ 'NAME 7{ / ),Al ` ADDRESS��N�,� 1 Gly CSA/ /,J`HONE ❑ Pest C6ntrol Inspection Ll Termites LlPretreatment XRodents ❑ Spraying CHEM�AIS USED �Wb OUANTITV USES :SPECIAL WSTRUCTIONS/REMARKS AMOUNT -74 ` "D `-• v I d fluTOTAL CUSTOMER SIGNATURE SERVICE REPORT BUILDING DEPT 30 PH RECEIVED tvlV Qf SALEM,-MAS,,, IFhshi®n STRUCTURAL ANALYSIS Date: Sheet 1111 of �} Project. Te.xgGo Location,: Sa�G�' � Mal Size & Description: Z¢ x 3 L 3c JCo' G)eiai Reference: FASHION, Inc. Dwgs. No. JC-4'Zo - z'o Design Criteria: 7%0 Live Load - ¢o e S <O • z.o Wind Load'- Z?r p5F Allowable stresses per A.I.S.C. & L.G.C.F.S. Manuals. 10 J'G !o> Structural. Beams - r�� 3 ks• � \N OF 4f o Structural Tubes - ley. c ¢L Jc;; NORMAN ra BERYL BRASEL N0.28561 o' 9p�FC/ST1 R� v4.Jf_( , 0 Z FSS/ONAL ENG\? 01,0 04) z(i') '" t; r �7 41Z s .Io3+=1a ,rme-llCa � cl� L1sc }Z" x 13¢a k Z4 • -hf� � .z 8G CL',o t J4.3-o ,x , 5•= l4,'3.0 (��=B,S$ /p 3 . U�c h/ 12T� /'� .ADL=�� a"LL =3.7Sdos.F �4.o ,o' P, =•BJ 4-.4'r"� y'•O/ (;,,g ✓nope ¢.A�0v.oJtS.7��(3.�> �(oo.3S,uj S=6b.357 %30.2in3N7�ia �. ' (,/� W {4- X ZZ '� L=• i$o a-3_7 f "9'.�b'�S� t �v .��-, S.s-y =>. �•s 5 S�ytsYa-6, L 1�<//ry/ d�A'�C>rim. \ �'�'�i g3L� �- . > 7s— l.�..� L Zn Z k y; @ ea. /n�:�6' �c.h-bre �'• FuIX // Lead 7iZ,0 / .�K Z 57� �Z49 1 8 1. ; )• �� + Tr / O >c Z , 30,3 ' 20 A„e,h-v i 4 Rte. : " S�ruvf ti�� S�•u-1 1'.csiy r► � b y Lynn S, Bce�l.�. � e�. .21, T/ia ''nbs� c�i�ICY/ /.va-n� JS cicxf /010( 1;7% -fu// an621a,� liLet to i /d cJ _T 4-111-113 Jd T- q 04) rJ,z3 �PLI z� 781 (k4) -3 (k4)Z- 3(4ce)2-144(x� + 77�. � aLtIL kd =4115 •• ar SSo2�" 1¢" 1) T = 9 (S.So) - 11.7 =38 z or J9.1 K/1ao/� 18" $=!8• For ld " ¢ A3(( bolts F, =,91191 (az� = Z1.3K } 19,1 K A3G Bo/-h Base Pbtt- & lc�et o� C.l• S.4 00(/,0) c,27z. ksi M4 =Ez'1zC4Xt8��(i) r�CJ.o -.zr2z4xi)(18��(s)(4� =1o�.oLl,K z - =4.S4h3 evf,e Pio ie o n t Tu (Irb CJ �usse;>!s) Part I( h-c., 1, I ' 1� 4rxJ8� J3,�o ,37 S,o�, 1.90 ,63 2,7-57zz,6g 4,c90 2 �_c 1�,So 13,31 2 9,zz Tcl- 1 ;.48 5 = 13 9 =5r'.(o91rn. 3 >�f;S�J- Ih3 OJG y Y /� � L6se ! 18"X/l,•x34„ / /lefC !w z �38"N4� gUs5.54 S QCT S*Uo- (7 ' P K Up/f�fav (-z, oo) =1.0,91 VL U = F..- a 4,0' fb f 1 n S'�4a =33.73 K =,,lv Lsl x O.44 2101 .k 2,0 k m =Z .4- > 1,S o� VV& Tiy /zSSunrG Q'jYVG Ler�C, �ort�/�,y/�S OVG/�u�,iir+7 � 1.1�lirj P = 19,87+4,a(4,o)�Q,o)(� Solt .mss - 2 � s. _ �P= � - (4,0) =x.84- ks� Use - o/ x4 -Dt �¢�-oj' s�c� w;tl, d.i✓cwa�c/ rram� S -'O�` �c � � -� r x 4-`-O flii�.�C L✓itLioc,o�" 4�/i✓�L✓3t� /'eS�"v.?�gf" ( Fashion STRUCTURAL ANALYSIS Date: Sheet I/1 of 4- Project: Ta.xdGo S�S Location: z ¢ a< J(i� GJeis� Size & Description: x &L Z C,./u ar+n Ga n e� 3 G Reference: FASHION, Inc. Dwas. No. 4 -ego!r C y,o Design Criteria: - 7=•0 Live Load - ¢c ,p 7�0 y,o Wind Load'- 2a� p5T Allowable stresses perA.LSeC. & L.G.C.F.S. Manuals. Structural. Beams - X{11.OF A Structural 'Ribes - Fy c ¢L 'k;. �E4 As$ CoA NORMAN c"yc BERYL RASEL 26501 p 041 j,(�L,O)Z !Jc X90 FG1Sr rrs 4k� AfsS�OMAL ENG\ _mom _.o41(,. 3n {,�o4JL z .103+.J7 /o USc 34, 'D -/!7� � .2.8LL tl¢.3-o ,�c � 5= /A;'3•o (��,=8,32� ,i,3 / 'DL=� r1.1s =3.7Sdos-F X4.0. ,o' P, =.BJ 4-4-for`) mop 4'.Qro0 4- S-2,7 -;-'60.3S,�J � 2,-Z, �'s S S'�sy,-e� L1�Gr,•t'/ �rr•?e>•nom. � �'�`� A3zS -f cq ,c � 2Xzk,� L'° 2d , rniaT Lv+')m Fu Wim.OZS(�g�(�.1p7) � �iL� K. ._.. � 4 � 4K.•l TGr dd p41q.g� (7� �/4-.3oK Y�7=7�If�Z-�7�=2Z,o7 �K 2 Sg -2,4-y J s4.ea Ti 73:1 U i S10K/ Oh .. Rif. : SfiuC�NIYI S�•G�-1 �.t,Sl y�'1 bl�a./ L ynn s, �,/tt�/t � t�. 2r. r,66 Vias f CII 4c:a4 /Ga"e / 5 �•Lwc �O W/7H �u// unbala�.ct..0 /I'vc lo�,l, P� = ll. 23 1 /4 = 5/,e¢Ie vo \8. zf £fig = 7T t, ��'')�9 -'r ��s/.�4Ciz)=o �Z 6«ssa 3Ck�)�-144(ke� -rye-o. � = o d� � �,, � 'e• y,t -14 4 t o ,r T kd =Viso 14-" .. 1.) T -3 =30.1i oI^ 19.1 Fo� ld" ¢ A3G bolf,5 • Use 1¢' x 2%G" /o..s A3(, Bo/ Base Plyfi` Ing =E?-,z(4x,2)A) -t&* ! w evf>e �ro ie o Tim (/� C� ufse,�) L a"x4" 9,oa z.��� 8,zS2z,69 4,c9v 2ro_� L��- "s7c) 13,31 29,zz 5 n _1_9_,_4_� S LhS9- In 3 OJL 31 C6S4 18~����K39 /, )`N�t1G u1 2 ^38�I�4AGUSSGS Utf S16�e K o31LS-,a-o (z¢,o) o,> =10.91 Vol. o 10"x• Do�avdnSt yp//f�- m Foy a 4,0' R a TZ1,77- - g-.o Z Wi>��oclf' c�iiYtlyyyr r'cS7"�^J-Yyrf' Try S,c� x 7.S x4,o f/c,_ So; SL 3 P� = //,Z3 4-5-.0 C7, =33.73 K So�1 1�ics5. = oy = P- _ 5 =,90 = 1,11 -x-,90 =2,01 2,0 )-W m� Gl�.cck S�F•�� F�Jai a yarn s?` o ye/�-u i.;,y,.� IWOT (3,75 S,Fi -Z,¢ X1.5 OlC Try/1 4,o ' )c 4.0 'x4,o' i;k. // 1 /7SSunrt diYVG LoI7G, 'or'tvwjr S OVG�T4rhi L1�0!/ 7 P = 19,8?+4, 0[¢,0)�4,0)�! =29,47 K• 2 Sci) opr<.-ss, _ �P = R = (a o� =1.84 ks� -e- z, 0 1<rot ot= T oZI x 4�-O+ x¢r- . S- p^ � 7 ` -��' " ¢/-O` tlii�.� wi>`"Lioco�" 4�ii✓.clva� /'es�'v.�:itf" ® OIL CORPORATIC>N AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS _ HEATING EQUIPMENT P.O. BOX 90 • DANVERS, MASS. 0192301901 (617)777�Y00 L3 i3 i 77 ozo y PF rn css sa+ May 1, 1989 Mr. David Harris Salem Building Department One Salem Green Salem, MA ' 0,1970 SUBJECT: Construction Control Progress Report Dear Mr. Harris: Please find second progress report attached. Please feel free to call if you have any questions. Sincerel4Enginr a, P.E. AG/lm Attachment co Salem Building Department Jnr a City of Salem CAn a One Salem Green r— n Salem, MA 01970 o m SUBJECT: CONSTRUCTION CONTROL PROGRESS REPORT v ---------------------------------- e ----------------------V+---co-- Building Permit Number: 118-89 tn C.C3 Location Address: 10 Paradise Road, Salem Owner: Bursaw Realty Trust, 27 Cherry Street, Danvers, MA Project Description: Demolition and Reconstruction of Gas Station and Convenience Store Period For This Report: April 12, 1989 - April 26, 1989 Estimated % Complete End Of This Period: 30% ---------------------------------------------------------------- Inspections This Period: Plumbing rough underground Gasoline Piping Rough underground electrical Changes In Specifications Shop Drawings: Eliminate drywell , reverse floor drain flow through backflow valve into sanitary Awaiting structural drawings for canopy Problems: Awaiting disposition of contaminated soil stockpiled on site. Modified plumbing plan per requirement of Plumbing Inspector ---------------------------------------------------------------- Description Of Work Completed This Period: Backfilled tanks, completed piping between gasoline tanks and gasoline island, poured concrete paving over tanks and around gasoline island. Installed all underground utilities, poured floor slab, rough framed first floor walls. ---------------------------------------------------------------- Based on on-site observations and to the best of my knowledge, information, and belief, the work has progress in accordance with the approved drawings and sp:;ho qyu6 s Submitted By: ____ _____, P.E. Date OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS HEATING EQUIPMENT P.O. BOX 90 • DANVERS, MASS. 01923-01901 (617)777-0700 April 13, 1989 oY w )z m Mr. David Harris m c Salem Building Departmento One Salem ,Green Salem, MA 01970 "0 H cn; ti �O SUBJECT: Construction Control Progress Report Dear Mr. Harris: Please find first progress report attached. Please feel free to call if you have any questions. Sinc rely Antho G P.E. Engin r AG/lm Attachment w `y Salem Building Department City of Salem One Salem Green Salem, MA 01970 SUBJECT: CONSTRUCTION CONTROL PROGRESS REPORT ---------------------------------------------------------------- Building Permit Number: 118-89 Location Address: 10 Paradise Road, Salem Owner: Bursaw Realty Trust, 27 Cherry Street, Danvers, MA Project Description: Demolition and Reconstruction of Gas Station and Convenience Store Period For This Report: March 29, 1989 - April 12, 1989 Estimated % Complete End Of This Period: 15% ---------------------------------------------------------------- Inspections This Period: Foundations = Building Department UG Electrical Service Conduit = Electrical Tank Removal = Fire Department Tank Installation/Piping = Fire Department Changes In Specifications, Shop Drawings: Canopy plan submitted, dimensions wrong - new plans being prepared. Problems- Contaminated soil was removed from tank excavation and is stockpiled on site. DEQE has been notified. Extra tanks not known to exist were found and removed under permit from fire department. Water line was damaged, new stop has been installed. ---------------------------------------------------------------- Description Of Work Completed This Period: Buildings and improvements were demolished. Old tanks removed. New tanks have been installed. Building foundations have been installed, underground utilities started, sewer tap into street completed. ---------------------------------------------------------------- Based on on-site observations and to the best of my knowledge, information, and belief , the work has progressed in accordance with the approved drawings and specif . t' s. O Submitted By: ___ _ _ __ Anthony u a, E. Date CONSTRUCTION CONTROL PROJECT NUMBER: PROJECT TITLE: PROJECT LOCATION: 10 Paradise Road, Salem, Mass . _+ c r NAME OF BUILDING: Pump 'n Pantry o , ^m ri cn NATURE OF PROJECT: Conversion and upgrade of existing fad1!11ities tor"= W -n I self-serve= gasoline and convenience store. = —� - (n CX3 IN ACCORDANCE WITH SECTION 127.0 OF THE MASSACHUSETTS STATE BM LDIISGP CODE, I, Anthony Guba, P. E. Registration No. 32727 BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICA- TIONS CONCERNING: ENTIRE PROJECT XX ARCHITECTURAL STRUCTURAL FIRE PROTECTION ELECTRICAL MECHANICAL OTHER (specify) FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OR MY KNOWLEDGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING C%E, ALL ACCEPTABLE ENGINEERING PRACTICES AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. FURTHER CERTIFY THAT I SHALL PERFORM THE .NECESSARY PROFESSIONAL _-ERVICES AND EE PRESENT ON. THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 127.2.2: 1 . Review of shoo drawings, swples and other submittals of the contractor as required by the ccrotruction contract documents as sutamtted for building permit, and approval for conforrmce to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction carmQ:onts requiring controlled materials or construction specified in the accepted engineering practice standards listed in Appendix B. PURSUANT TO SECTION 127.2.3, I SHALL SUBMIT PERIODICALLY, A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE STATE BUILDING INSPECTOR. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORTAS TO SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY. SA RE SUBSCRIBED�AND ^SWORN TO BEFORE ME THIS 21stDAY OF Marc 19 89 . e �oNwr Citp of batem> jHag9aCbU!5Cttg >> r Public Propertp Mcpartmeut �M;Ne �3uilbing Mcpartment One batem green 745-9595 (Ext. 380 William H. Munroe Director of Public Property . Inspector of Buildings t Zoning Enforcement Officer n ' +n r, ODfA — fA GJ in accordance with the provisions of MGL,c 40, S 54, a condition of Building Permit Number 118-89 is that the debris resulting from this work shall he disposed of in a properly licensed solid waste disposal facility as defined by MGL c 111, S 150A. The debris will be disposed of in: Robert Hiltz Disposal , Gloucester, MA - Building Materials Only. (Location of Facility) Sig tur o Permit Applicant Ant)nonN' G�bc , P.E. Date Citp of batem, Jfla9gaCbU2;ett5 + na Public Propertp Department °BGmNew �3uilbing Mepartment One batem Oreen 745-9595 (Ixt. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer AFFIDAVIT As a result of the provisions of MGL c 40, S54, I acknowledge that as a condition of Building Permit Number 11.8-89 all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. I certify that I will notify the Building Official by (Iwo months maximum) of the location of the solid waste disposal facility where the debris resulting from the said construction activity shall be disposed of, and 1 shall submit the appropriate form for attachment to the Building Permit. X", �- L 7�i Date Signature of Permit Applicant (Print or type the following information) Anthony Guba, P.E. Name of Permit Applicant Bursaw Oil Corporation Firm Name, if any 27 Cherry Street, Danvers, Massachusetts Address *� OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS HEATING EQUIPMENT • SOLAR ENERGY SYSTEMS 27 CHERRY STREET • P. 0. BOX 90 • DANVERS, MASS. 01923-0190 (617) 777-0700 March 22, 1989 _+ D Nn M N N n O I-m Mr . David Harris m•c ry n Salem Building Inspector =o rrr1 One Salem Green m = Salem, MA 01970 rNn Cz RE: Building Permit 10 Paradise Road, vinnin Square Texaco Gas Station Dear Mr. Harris: As you requested, this letter is to notify you that the general contractor for the subject permit has been changed from: Thomas Mackey & Sons to: CSI, Construction Services, Inc. 361 Hanover Street Portsmouth, NH 03801 603/436-7622 Mass . License Salem License # As this project will be construction control, I ca.n be contacted at the above as engineer for the project. Thank you for your assistance. Sin ere y Antho uba, P.E. Engi er 32tg/nma. -�� . O ! 'a L.11IV11VIUIVVVtALI 1`11 IVUiJJAI HUJt I I5 DEPARTMENT OF ENVIRONMENTAL QUALITY ENGINEERING DIVISION OF SOLID AND HAZARDOUS WASTE V� One W inter Street 1t;i / Boston, Massachusetts 02108 Please print or type.(Form designed for use on elite 02-pitch)typewriter.) UNIFORM HAZARDOUS1.Generator US EPA ID No. Manifest 2.Pagel Information in the shaded areas WASTE MANIFEST MAP 0 0 0 0 4 0 0 7 g Document NI of I is not required by Federal law. 3.Generator's Name and Mailing Address Bursaw Oil Company 'A.State Manifest Document Number 27 Cherry St. MA:,' " C683480 ' n Danvers, MA. B.state Gen.ID a.Generator's Phonal 508, 777-0700 0,Paradise Rd. Salem, MA. n 5. 'transporter 1 Company Name 6. US EPA ID Number State T. s.ID T ' D' Service Station Maintenance MAD 9 8 0 7 3 4 7 9 2 ,J$ 1_, w 7. Transporter 2 Company Name 8. - US EPA ID Number D.Transporter's ne I ma 1853-877 1 L tate rens. -..r— C3 ry ,9 D Aki 0 F��gN ame d$ate Address 10. US EPA ID Number ''1 c I 1- I^," 'I=:c4p 1 1-- 1, O� h°ran-' "'' "'f11LC01I1� l.�n$L" F;Transporter'sP o-Fal^ -1p fl 00 Lower Main Street G . aleFec9rty'a'igril ' "tRequi N Keene, N. H. N H D 9181212, 0 0paitYaFnoRr1 c a i3 ,"i.19 ' 1a. 'rn�L W. p 11.US DOT Description llncluding Proper Shipping Name,Hazard Class,and ID Number) Tot ar� r: nit vyAsta No. O Quanikt of 00 J Regulated recycled material ' 00016 As Milli U p" t`I per E Z aI E C N CL E y R c. —1 ¢ A O T j o I f O R 3 d. D m 1-i z r L r1 ` J.Additional Descriptions for Materials Listed Above lino/udephysicalstafeenahazardcods.) "". K Handling Codes for Wastes Listed Above DO r Manifested per DEQE for m > a. trackingpurposes only- c. - a. C. tW b tl .7R - b. r< x d. = T m E 15.Special Handling Instructions and Additional Information E a 16.GENERATOR'S CERTIFICATION:I hereby declare that the contents of this consignment are fully and accurately described above by N proper shipping name and are classified,packed,marked,and labeled,and are In all ospems in proper condition for transport by highway O according to applicable International and national government regulations. U If al thalargequantity the®toglcomfythatl have aprogram inplace toreduce the volume and leto me which minimizes tto rho degree havend determined threat hrew to Lobe economically practicable C and that l have selected the practmaty cable mer,I have made ent,a go dfaith,effort rist oral currently avawast generation to me which minimizes besthe w present management method that isuman voilaalth and to m,and that h N enC OR,illamasmall quantity generator,Ihave made agood faith effort to minimize my waste generation and select the best waste management method that is available to me and thatl 0 N ..afford. Date eEj n:zd?ypedNe _ r ignot Month Day Ifeatc o ziu'le-S4.1Z ZI 0a in T 1 T sporter 1 Acknowletl ement of Receipt of Materials Data N R m A Printed/rypedNams Signature Month Day Year U N C S P R 18 ansporter 2 Acknowledgement of Receipt of Materials Date T Printed?ypeadNeni Si nature Month Day Year E R 19.Discrepancy In ication Space F A C I L 20.Facility Owner or Operator:Certification of receipt of hazardous materials covered by this manifest except as noted in Item 19. T Date y PrinfedyTyped Name Signatu Month Day Year C QC I �-2 form Approved OMB No.2050-0039.Expires 9-30-91 EPA Form 8700-22(Rev.9-86)Previous editions are obsolete. COPY>3: GENERATOR-MAILED BY TSDF 11 } 18p 3 - - ±' 0- Tc . o. FACIA l 1U1- 211 } IIQI �II "IDS- 211 .II 4., 0l1 4 r. Jr' OLE FOR CONDVITAS SHOWN 'II«� ` •I1� 4. i.' 1, • .I - - - - - 2 HOLES if I : Z 2 'STD. STEEL PIPE INTERIOR DOWNSPOUT N ! I GussET t 4*x 34x Ya PLATE ` CONDUIT I I O F I N f 'I' — z - F DRAIN U m i s - I �I .. ( �'.---j • I DRAIN Z" 14' Z" - CONI\T . 1•. . .1 1 - _ BASE PLATE DETAIL I 0 I i (A5TM A 36 )" I ®_? 141i I FooTIN� ,h rs• I I " WIDTH . - 13oL--- SPACING (TYP) IO x1Olf /4- i I I • I , ANCHOR -BOLTS: VI9• XLf 6 " LONG +I I COLUMN I I r I I KLEVELING NUTS-11 _N I I I ' t WTM A30 FULL PENETRATION NON•5r' HRINHING GROvr To BE I = APPLIED ArtEFT CANOPY IS r^ti• I i I I LEVELED E .SECURED. t OUTLINE OF FACIA I -Li- I'.. .•,.;,'a: :!:� ?�• _ C>. D. .'p • o NOTE: FOOTING PLAN Demo-I-Es DIMENslorv�o '±t — ANCHOR BOLT DETAIL 00 BE FIELO VERIFIED. • > w .. NOTES : ry 3'XS'ELECTRICAL OPENING " mn ALL FOOTINGS MUST 13E DESIGNED IN ACCORDANCE CONDUIT I ,✓ITH LOCAL BVILDING CODE, - • (BY OTHERS 3'X5"ELECTRICAL OPENING RECOMMENDED FOOTING 51ZES WILL BE GIVEN �. tn -� co BASED ON 2,000 P. S. E MINIMUM SOIL BEARING CAPACITY CONOU\T II ( BY OTHERS) role OF FOOTING ELEVATIONS ARC EOL/IQL UNLESS Tuar COLUMN I OTHERWISE NOTEp., 114 ANCHOR BOLT e�Iliv M . - I ltfmRIOR DOWNSPOUT - TV8& COLUMN FASHION INC. IS NOT RESPONSIBLE FoR . FINAL. ' �•� s'o o NORMAN 5 . I I • , IWO ANCMOR BoLl1'S I FOoTING DESIGN. BRAS EL m II I Z I L NON-SHRINH GROUT I INTERIOR DOWNSPOUT FOOTIN(NS ' IF BURIED t I T RESTRAINED BY CONGRET� II 9 No 28501 C N I« _ DRIVEWAY :_4-o L✓!DTN K,�O LENGTH X 4'0 DEPTH. Po FCISTE-R'` .••I 11 II LEVELING NUTS II 2,2 NON- SNRINK(jROUY - IF NOT BURIED IN RESTRAINED BY CONCRETE - FFs'NNALESei\� O ip I II 'CENTERLINE OF Pik A6ovE ' I .II I q I LEVELING NUT tN III MlMnvr� RE1NF � II BOTTOM OF BASEPLATE MUST DRIYEUAy. 5-O" WIDTH : m LENCTHX�-Q11 DEPTH, N 14(3 Is. - lf1 II II #IN/MUM REIN; BE F1E\..O VERIFIED• Q : ` III ... III .• . . .. 4� Ie" . . iGa�m,'s'��I'°���-p `� _ FIN15MED GRADE - I INISNED GRADE VARIES (ISLAND OPTIONAL) S ,r ES t+VlC3TH 00 NO�v/f LU^�9 /A Z,S Z- !•U 'b' '•c: — :�;= ,;, _':; � R,EG75Eta-CA►voPY F i:Sr��Lb Sy NO. REVISION 6Y 047E CONSTRUCTION ;I _ G• I - JOINT. '•• P",'i• .•�."• r •. A# , •. 'l•. •o •.c .�I. � ��•� � 154 W Mob h Sb CENTERLINE OF PIPE ABOVE .'G. •..,• :�• •.•. .:'Q.•: - VARIES BOTTOM OF BASILPLaTE " 1 t ANCHOR BOLT .81 - FOOTING LAYOUT' I : , TeXACO 5/S ' MUST BC' FIELD VERIFIED. '��� ,y. •' , .' , ALTERNATE' 1`N OF D15CHAR6E - VAR1Es SID �A2AD1 5 �b (EXTENSION FROfi COLVMtV BK'OTNe.RO. 5 i \ 11 '.WITHOUT DRIVEWAY ' RESTRAINT - •' . � :� : � WITH _ i�.. DRIV�WAY.t:'' RE57RAINT .: _ F 1 . I ¢I I 24 '"x 3(� +C2)GoL. �uo�' w/�• LAM11��Tr;D Sr�rH �Acl,4 a ' }! job No. TYPICAL FOOTING ' , SECTION ' L M.xT ' CAT[ _ 1 t- 1� QQ r /• CCR DAT! OQAWING 'NO.�OF Ko5-t✓ H UI w...•..••.+.r+.w,.w....«.w+h-u..r.mew++.•w.*w e.+.".i..... .w•-•v..'---•,. ... -- .,.. i - ' 1 ,: NoTe: ,+ r • - .C14ECT PURLINS 4 ,vK L&wem FLANDi� ' OUT-LANE: OF FACIq - + HOLES' TO I NSIOE 17F CANOPY. N II I� In o N � Q LJ 1 N _ i LRT. BRACE N LII fr. G "2 x 2 x 3/r� m _1 0 Ch o ' (ryP.1 4)PLACE) m II , i PB U I 4 Q 00 LL CL-1 cLI O o �Z i(3 x 22 GA. PtgECOAT�D �jTL�C•• CNANt,4EL GUTTER ' r,' I : 1 O 0 I I �O — .- 1 Ir I w I' �I I- �e Q- e _ I W MTG CHANIUGL I -CB wo o 00 V (MC-rI\J @ 21-0l C(R.5 � cB- 12"x 134 x Z4GA. STL. Ua N u W EA. EWE) - II FLAT ROOF PANELCT"`(P� I O .. t � j j 3 _ 1 — O 0 Q - ��-z - W 12 X 14 pURLI►J (TYp) -o ���/ _ —r r 2'I+ N SLO1- 0 .RooF �• PUPLIN$ ..:t.t. ut ea- , CeC••' ...' t r. n'L .� , - - 141Pd .,: th^ {t i'.73'- FRAMING PLAN I s 3 •. 4 4" - BOTTOM FLANGE OF PURLIN CE .t jll� _ PA1.1EL CLIP W/,:4 -0 x L�Le,. BOLT :.. MULL B1-�RRACE Oar. A (r'/P)m , p 4=011 CEQTEQS 1?,"K 134 x24 CGA STEEL �wzC N 44', LAMINATED ,. FLAT Ro0F Pl' I LS SMOOTH FACIA . . . COLOR= F�ArB[AGK ,�;.• � -- ,;: L PANEL TO BEAM DETAIL If BOTTOM OFSIC c \�`� lD m � I \BOT7oM OF yc.n-rEk I I n. NOTE' ' 2'/Z" -STD. �TEE-L 6iPE I I FACIA IS 2-5/8" 5HO2T of U- I QTE� lob r owN►sPour I I I �, DOVERINU CRo55BEAMS - CTY�� I i 1 C.O L U M IU (T,(P) • I I O ' 1JCC�ACAA/OPY INIOTI-1 $I t O O T. E'. � •�2- j - j.. _ NO. REVISION BY DATE �ilL��iln ,p,��3L 15450 W 103th 'ST• t� p � \ LENEXA S. 'ko&Z1' BOTTOM OF VPgE fl"ATE _ �1 /11 y_ � � ` , I� r Iz FRAMING PLAN a ELEVATIONS D�NoTEs DIME IJ510,1.1 . D;1 REcrr arJ IOP XdG E S�JS E , ARttbi D. SIDE ELEVATION ?o F>r P19LD VE21 , Isb t SALEM, MAS, t B 24 't x 311 (2) COL. CANOPY;Wf 4411 LAMI1JaTI? 9100714 FhUA • \ •. , • .. , JOE NO. MADE DATE - D •n� CNEa_ —UMIbArE ,. 1 '.DRAWING N0. r.:OF 4 �• .UG7d J- - o. TO o. FACIA ' HOLE FOR CONDVITA5 SHOWN I I .. •j F IZ a HOLES * ! I 2 j,.STD. STEEL PIPE: l 1 INTERIOR OOWNSPOVT nJ I I III ,� I - ,,• �' 4'X 3'x 3/e _ GUSSET PLATE 44 —I. CONOVIT I I H - 1- � , , I � , I N DRAIN N o z �+ I ll - 1 �±1 DRAIN I II 1 I z" 14 2" COND\J\T I I BASE PLATE DETAIL • 0 I I I (A5Tri ' A 3(. )' +I L---- - - J L - - - - - J- i I I � FOOTING 1411 � rb � _ I I . . , f i. _ WIDTH • L30LT SPAuxc (TYp) 4 ANCHOR BOLTJ: I11' XZ=6 " LONG COLVI•'IN I I I I I I I' I ( "/LEVELING NUTS E \" I (A$TM A34) I • FULL PENETRATION \ I I NON'SHRINHING GROUT TO BE APPLIED AFTER 'CANOPY IS LEVELED f' ,5ECURED. J. OUTLINE. OF FACIA [ I ,J _ .'4 L.!: ,.: _ • :, _ J :P L .D No DENOTES -DIMEWOON'TO -FOOTING PLAN ANCHOR BOLT DETAIL BE FIELD VERIFIED. T NOTES : 3 XS•ELECTRICAL OPENING 0 ALL FOOTINGS MUST &E DESIGNED IN ACCORDANCE rn`T D .� WTH LOCAL BVILoN4 CODEoI 3"x5'ELEC 'RIALOPENING BORECOMMENDED FOOTING SIZES WILL 8E GIVEN BASEDON 2,000 PS. F MINIMUM $OIL UEgRING CAPACITYCONDUIT ' N 1 - II - OTHERI✓OE FNOTEp,ELEVAT10N5 Ig RE EOLIAL UNLESS r " �P M� I (BY OTHERS �,. \ �` � TvgE COLUMN �� F 9 14 `h ANCHOR BOLT irf.MRIOR DOWNSPOVT L Tt/a.r COLUMN :' FASHION INC. IS NOT RESPONSIOLE FOR FINAL {° NORMAN os • I • lA"GS_ ANCHOR - BOLTS - I FOOTING DESIGN. o OCRYL- II iI 21L NON-SFIRINK 'GROUT i, BRASEL O INTERIOR DOWNSPOUT �. FOOTINGS: IF BURIED IN # PESTRAINED by CONCRETE .o ,p NO. 501 O �, F-•I I. _ DRIYENAY 4-0" WIDTH X,�OP. LENGTH X 4!DII DEPTH. PO,,fSG/ST4"Grc�a � .. � L 2 N N SHRINK R V , / N EVE MG UT! 0 GOY ON i N - I L N P � IP NOT AL BURIED IN 9T ' 4! RE RAINED BY CONCRETE ' O II I CENTERLINE OF Pik. ABOVE � DRIYhJAY�_5.0° -WIDTH [ �n LENGTHX 4'!C" DEPTH, � N LEVCLING NUT In I I M 41mvm REINF , II BdTTOM OF BASEPLATE MUST s4C� 19' in II II MINIMUM REINR: BE FIELD VERIFIED. :m LL FINIgNED C"sRAO E i1, I , trrr ' FINISMED GRADE, 'b', '••1 II •i'•":•• ' VARIES (ISLAND OPTIONH,L) _ - :.- L. D I - a --VAR , 'D :b• 1 — �:' ,. '.�• E5 - m LA7n� 44ND0�YIV1oTHFOo7: SrzL CbAlUrilt'La49r/ON Z:,S REVISION 6Y 'DATE �. to•' •��... _ i ",.i. CON TRV TIO r • ,. - i• 5 G N :b a - - "o o JOINT. •.•• s'. 'D I , p'�'•;:� . Au :x: . ;�.` 154 <~.! . � .. CENTCRUNEOFPIPEA80VE ;•G� ';:, • +'a: •rj ;•Q.::, •.i%Twr,`i•i'�',,;�'0 ' -I'i ' - VARIES BOTTOM OF BRSEPLRTf� - . . . .•. i �. .� ` , NG LAYOUT ' 1 ANCHOR : BOLT ' a FOO L MUST BE FIELD VERIFIED. ALftlk E�'�t�ES 6F. 0%�tHwROE - \, T E VARIES . ' ENS\ON FROC1 COl VMN BYO H RS.�. _ 1S , , 514LEM M� . WITHOUT DRIVEWAY RESTRAINT {�+ITH t... DRIVEWAY_,. RESTRAINTS ! I - I I p ±C2 COL. CA1. N w/44 , L.AMIOAreD s=Tfl +-Acla _ -' • • : , La • I , . IIS - '. �- • TYPICAL FOOTING SECTIgN „t: l _ - ,. I, r. ,( ,. ..' 1". . .. t. .. •! ' I, I , `. i 019 40. yetw..wMeh.... .•nwwr ... . .Ywr•Yw.•-•--.. ......n- nT +.--•f,...wrsw---,a.•r-• ', ,I �OF 2_ K CX, DQAWINC 1.1O.OKtK LATE >O La i Nor OUTLINE OF FAGiq - .F_ SECT PURLIT-!b WIT.. L,owem, FL11N4L' - -, • HOLE9 To Ius1oE OF CauoF>Y. 1 . s N , tL N O 4T I ' LR-r. BRAGE �I - ' x G 2 2 jl p bt b Z x X x °` a' f t m (7yp•(4)PLACE a F PB I r m i IL L pp CL-1 CL-I O o M IZ >(3 X ?_Z GA PcgECOPTEQ C• CH4,.wEL GUTTER i OZ R II O r— 1-2 - O ,l <d G13 h - w -rb 'j ' Q � w m o TG CHANNEL �I -ca u]\l)' a °o " Z (I�C-CI\J(a7 21'D" CTR$ CB IZ'x 134 x 24GA. BTL. I Ua F 2 � w �ND I F\-PIT ROOF -PALIEL_ (T Pp) i _ p�V V W z ° 0 3 . 0 0 -- -- -- - - - — — -- — — — — _— FPB_ � II =__ ___- ___ W 12 X 14 -FU RLIiJ. (TYp) — — — — — � - _o a� ti �99 lu , 10�-o 11 a u+ �J�1' I' � IIS u,:�;; o t � .;n= lu�.;. .•,t•1. . C 2 but en ' - O O IO O. i100F r �I 411 -t• ceo, `icd the Anrr_ - 3 _ _ O,To O. (-Ac,H / d - I .. .. C.J ., ,. •If 3/i u'i ( ih �... • !.- t 1!071 , ,-. I FRAMING PLAN � . 34 34 - — — -- . 40.--. P.•5 _F BOTTOM FLAha4E ' 5 f' MULL BRACE _ = PgUEL CLIP Mw/ �"� X ►"L4.BoLT LnTr; f3RgCE fT`/P)m P 4-011 CEQTER5 -_ 61EL/N .. jz••x 134 xZ�r Ga Sr EEL—� }, 44' LAMINATED FLP,r ROOF PANELS w 'l SMOOTH FACIA V� COLOR; FcAT'B�-ACK PANEL TO BEAM DETAIL BOTTOM OF FACIA .� vNA\ (V BOTTOM I OF 4urrc-k. m 2112'' ;tG. STEEL SPE I NOTE: LL _ FACIA Is 2-5181, SHo2r of IwTEzlci; Pr�owo5Pou1r _ II coVERINU GRo55BEAM5 Y II 75: 10.x10x1/4 .. ! I I i I r •t K' I i m RE ISEO CLEA NCLx'� CANOPY WIbTH� $I I I J NO. REVISION AETE , � 15450 W 108th ST, OTT-OM OF V �y F2 ASE {FLATE `t l LENEXA KS, rlolo2l znB ^i , IF11 � . `\ 11, FRAMING PLAN & ELEVATIONS UoYE: --TEXACO s/s • _ � DE�IoT'ES DIMEIJSIQI.1 &' D�Rr=cTiay � SIO P , . l SIDE ELEVATION D. ARaiJI sE R 70 �� MELD VERI ISD C-ALI✓M, MAL 24,'t X 3�'± 60 COL. CAMOPY W/44''� LAMIMATED SMCOI 1 rA�CIA • E> • :, . - W.!"' _ r - MADE _ /)7 ^/ V QJ oo E N OO.. LL D DRAWING- NO./2 ` ,. 1 2 ��... r July 13, 1289 is 00 - r Mr: David+ Harris .. a. _ Building: Inspector, N Salem Building ,AepartmentLo .. . �n One Saiem: Green ._ .. ..... .. _ . Salem, MA :01970::.:. .. ... . Re: Pump . N Pantry 10 Paradise.:Road Salem, MA 03870 Deax. .Ms. Harriet AS' 17 1 ou . have r@ Y quested, to the best of my ' knowledge and belief, the construction - of the : .now Ltd:.:.rerponsibikity portion of the pump #N Pantry was completed as per plans" . and ''. speciEicat'ions and. . in , compliance with - :applicable; codee: Sincerely ,. CSi, Ltd. Steve teoriard Project: Manager . SL/nam Tony Cuba Btirsaw Oil Corp , Tom Brown-CSI, Ltd.. : George Dempsey-CST. Ltd ;.: Dave=earsGn-CSI-,- Ltd, YV'Stion Services Incorporated 301Lafiveite Raid. ® OIL CORPORATION AN INDEPENDENT DISTRIBUTOR OF FUEL OIL•GASOLINE•MOTOR OIL•INDUSTRIAL LUBRICANTS HEATING EQUIPMENT P.O. BOX 90 • DANVERS, MASS. 01923-01901 (617) 777-0700 � b U,n Co July 5, 1989 N Lp N Mr. David Harris Salem Building Department One Salem Green Salem, MA 01970 SUBJECT: Construction Control Progress Report Dear Mr. Harris: Please find the seventh progress report attached. We hope to obtain the Certificate of Occupancy next week. Please feel free to call if you have any questions. Sin ere , Anth n u a, P.E. Engi e AG/lgd Attachment Ch L- C1 F Salem Building Department c W City of Salemv 1W rn One Salem Green X Salem, MA 01970 q - -4 Ln C� SUBJECT: CONSTRUCTION CONTROL PROGRESS REPORT cm ---------------------------------------------------------------- Building Permit Number: 118-89 Location Address: 10 Paradise Road, Salem Owner: Bursaw Realty Trust, 27 Cherry Street, Danvers, MA Project Description: Demolition and Reconstruction of Gas Station and Convenience Store Period For This Report: June 21 , 1989 to July 5, 1989 Estimated % Complete End Of This Period: 95% ----------------------------------------------------------------- Inspections This Period: None, expect all finals during next period. UG tanks tested fine. NOTE: HOPE TO OBTAIN CERTIFICATE OF OCCUPANCY NEXT WEEK. Changes In Specifications Shop Drawings: No Changes Sign permit approved by Planning Dept. Driveway paving permit approved by State DPW. Problems: None ---------------------------------------------------------------- Description Of Work Completed This Period: Finalizing all work. finish electrical , plumbing, HVAC, mechanical . Installing new signage, exterior canopy, and approach lighting. ---------------------------------------------------------------- Based on on-site observations and to the best of my knowledge, information, and belief, the work has progresse in accordance with the approved drawings and specificati Submitted By:_ --- ------------- hany P.E. Date .:.- .r.^�.�.^v..wr.:.._v...., tom...^..-v ... .�_..�t�,. ..�5.!• =y.wrw...w.w -n'r ... ... -- _ _ -.. .. City of Salem, Mass. ELECTRICAL DEPARTMENT s 44 Lafayette Street PAUL M . TUTTLE , CITY ELECTRICIAN DATE . . . . . . . . ' -,7 . . . . . . . . To: INSPECTOR OF BUILDINGS Salem, Mass. Electrical Contractor (Signature of Applicant) ! ' fi, has signified their intention of performing the required electrical work ✓ � z�„7„vStreet ----7.< in conjunction with a wiri ng of sign by: ->ri-i:----`-----------------------------------------....- s i g n Contractor ISSUED BY J/,� -------------------------- ---------------------------- This is a requirement, preliminary to the issuance of a permit for the s t gn installation by the Inspector of Buildings. ORIGINAL-PLANNING DEPT.(ELLEN) PINK COPY-BLDG.INSP. YELLOW COPY-ELEC.FILE OCT 23 8 32 A '87 �� f1�it of �I�m, tt��tttllusetts FAL£# ? t CITY CLERK.E:Lcv.MASS. s Plarb of '�ppral DECISION ON THE PETITION OF BURSAW REALTY TRUST FOR VARIANCES AT 10 PARADISE ROAD (B-2) A hearing on this petition was held September 30, 1987 with the following Board Members present: James Hacker, Chairman; Messrs. , Bencal, Fleming, Luzinski and Strout. Notice of the hearing was sent to abutters and others and notices of the hearing_ were properly published in the Salem Evening News in accordance with Massachusetts General Law Chapter 40A. Petitioner, owner of the property, is requesting variances from density regulations, Section VII Table II to allow removal of existing building, island and tanks to allow construction of new facility, use will remain the same. Property is located in a B-2 district. The Variance which has been requested may be granted upon a finding of the Board that: a. special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structures in the same district; b. literal enforcment of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioner; c. desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent or the district or the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented and after viewing the plans, makes the following findings of fact: 1 . Plan, as presented, is an improved and better use of the land; 2. Plan as presented provides a better and less hazardous traffic pattern; 3. Uses would remain substantially the same; 4. Plan as submitted provides for more parking than what currently exists; 5. There was no opposition. On the basis of the above findings of fact, and on the evidence presented, the Board of Appeal concludes as follows: 1 . Conditions exist which especially affect the subject property, but not the district generally; 2. Literal enforcement of the Ordinance would work a substantial hardship on the petitioner; 3. The relief requested can be granted without detriment to the public good and without nullifying or derogating from the district or the Ordinance. DECISION ON THE PETITION OF BURSAw REALTY TRUST FOR VARIANCES FOR 10 PARADISE ROAD, SALEM, page two Therefore, the Zoning Board of Appeal voted unanimously; 5-0, to grant the Variances requested, subject to the following conditions: 1 . Project comply with all requirements of the Salem Fire Prevention Bureau; 2. Demolition of existing building and removal of tanks be in strict accordance with all State and Local codes; 3. A demolition permit be obtained from the Inspector of Buildings; 4. A building permit for all construction be obtained prior to commencement of work; 5. All construction be in accordance with plans submitted; 6. Eleven (11 ) parking spaces be maintained as shown on plan submitted; 7. A Certificate of Use and Occupancy be obtained prior to occupying the new structure. GRANTED CJ ames B. Hacker, Chairman A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK #lf%;A! FRDL! THIS D'E::hI^li, G A'.'Y, SHALL BE 7.ADE PURSUANT TO SECTION 17 OF THE MASS. tEAI EP.AL LAWS. CHAPTER 692, AND SHALL BE FILED WITHIN 20 DAYS AFTER THE DATE OF FILING f F THIS DECISION IN THE OFFICE OF THE CITY CLERK. qU R.'A''T TO '.:ASS. CE?FERAL LAi:'S, CHAPTER M. SECTION 11. THE VARIANCE OR SPECIAL PERMIT ..P;NTED HEREIN. SHALL I:OT TAKE EFFECT WML P. COPY OF THE B"ARINr THE CERT. OF THE CITY CLERK THAT 2U DAPS HAVE ELAPSED AI'D N0 FPPE4 HAS BEEN FILED, LF, 7k U, IF SJ"' AN APPEAL HAS BEEN FILE. THAT IT HAS BEEN DIS:.iMED OR DENIED IS RECU':D=D Hv THE SOUTH ESSEX REGISTRY OF DEEDS AND INDEXED UNDER THE NA61E OF THE OWNER OF RECORD OR IS RECORDED AND NOTED ON THE OWNER'S CERTIFICATE OF TITLE. BOARD OF APPEAL