Loading...
6 PALFREY COURT - BUILDING INSPECTION 9 r. 4SQ4 CITY OF SALEM, MASSACHUSETTS r INSPECTIONAL SERVICES DEPARTMENT THOMAS ST.PIERRE INSPECTIONAL SERVICES DIRECTOR /BUILDING COMMISSIONER KIM 3ERLEY DRISCOLL MAYOR 120 WASHINGTON STREET♦ SALEM,MAssACHusEm 01970 Txr.:978-745-9595 ♦ FAX:978-740-9846 Date: December 20, 2015 T 1z/zq/�� t rte- �pj55 To: Sharon;IC Smith CG JDSr:PN 6v�V2toA Address: 6 Palfrey CourtZf3tCC Tule City/State Salem; MA 01970 "(ott• �{�1�ttYze Re: Illegal Hoist Ms. Smith: The Building Department has received reports that you are operating an exterior hoist from the 3d floor of the Muilti-Family Building at 6 Palfrey Court. You were previously informed,by the Salem Building Commissioner, that any work to accommodate a`hoist' from the third floor of that building would require a building permit*; and that the permit would be contingent upon a load bearing calculation and detailed construction documents, satisfactory to the Building Department, from a registered structural engineer. The permit would also be contingent upon the written consent of other condo owners within the Building. None of those items have been submitted to the Building Department, and no permit has been issued. * 780 CMR Massachsetts State Buildinn Code SECTION 105 PERMITS 105.1 Required. It shall be unlawful to construct, reconstruct, alter, repair, remove or demolish a building or structure; or to change the use or occupancy of a building or structure; or to install or alter any equipment for which provision is made or the installation of which is regulated by this code without first filing an application with the building official and obtaining the required permit. ;r CITY OF SALEM, MASSACHUSETTS INSPECTIONAL SERVICES DEPARTMENT ♦ N THOMAS ST.PIERRE INSPECTIONAL SERVICES DIRECTOR /BUILDING COMMISSIONER KIMBERLEY DRISCOLL MAYOR 120 WASHINGTON STREET♦ SALEM,MASSACHUSETTS 01970 TEL:978-745-9595♦FAX:978-740-9846 All use of the hoist must cease immediately and remain stopped until the Building Department has been satisfied that proper construction permits have been applied for, and issued to appropriately licensed personnel.No work may be undertaken without written approval from the Salem Building Department. Before the hoist can be used, the completed installation must be inspected and accepted by the Building Department. You must contact the Building Department immediately upon receipt of this letter to discuss your plan of action. Failure to resolve the issues cited above will be construed as non-compliance and may result in the issue of municipal tickets and fines as well as further enforcement actions. If you feel you are aggrieved by this order, you have the right to appeal to the Massachusetts Board of Building Regulations and Standards(BBRS) at One Ashburton Place/Boston/MA. Thank-you, Ham Wagg Assistant Building Inspector 978761975643 hwagg&a.lem.com cc T. St.Pierre, Building Commissioner Page 1 of I Harry Wagg From: Harry Wagg Sent: Monday, January 04, 2016 8:55 AM To: 'Sharon Smith' Subject: RE: Hoist-illegal activity Hello Sharon, Thank you for taking the time to sort that out. I apologize for the confusion and for rearranging the cast of characters. The original letter(sent to you)was copied to Bernice Turner at 6 Palfrey Court, and to Joseph Giuffrida in Marblehead. If you can let me know the name of the third floor occupant, I will re-issue the letters and—this time- include the offender. Thank you, Harry From: Sharon Smith [mailto:smittykay@msn.com] Sent: Friday, January 01, 2016 11:40 AM To: clarecomputertutor@yahoo.com; blt6pal@yahoo.com Cc: Thomas St. Pierre; Harry Wagg Subject: Hoist- illegal activity Clare, I received a letter from the City of Salem regarding your hoist. Apparently you have been using it illegally and a neighbor has a picture of it and reported it to the City of Salem. The noise was invasive to them and thus they made the call to the City. The letter,which I have scanned and attached here, was addressed to me by mistake. I will rectify that on Monday and let them know that the letter needs to be sent to your father(as the owner) and to you(as the tenant). In good faith, Bernice and I said it would be OK to let the current hardware that you had already installed without the consent of the Palfrey Court Condominium Association or the City to remain there until a decision is made as to whether the Association agrees to its installation AND the proper permits were given from the City. You have used this hardware to put the hoist in, use it, and then take the hoist down. This is illegal. Due to your illegal use of the hoist we insist that you remove the hardware and repair the resulting damage to the building by Friday, January 8. As the City states in the letter, you are to cease all use immediately. Thank you. 1/4/2016 CITY OF SALEM, MASSACHUSETTS INSPECTIONAL SERVICES DEPARTMENT THOMAS ST.PIERRE INSPECTIONAL SERVICES DIRECTOR /BUILDING COMMISSIONER KIMBERLEY DRISCOLL MAYOR 120 WASHINGTON STREET♦ SALEM,MASSACHUSETTS 01970 TEL:978-745-9595 1 PAx:978-740-9846 Date: January 11, 2016 To: Clare Giuffrida Address: 6 Palfrey Court/Unit 3 City/State Salem, MA 01970 Re: Hoist Ms. Giuffrida, Thank you for removing the Hoist and Bracket from the 3`d floor of the Muilti-Family Building at 6 Palfrey Court. As we discussed, permission to install and use a `hoist' from the third floor of that building would require: 1. Plans produced by an architect or structural engineer,and submitted to the Salem Building Department. 2. A letter of consent from the condo association. 3. A Building Permit, issued by the Salem Building Department. 4. Installation by a Massachusetts Construction Supervisor License holder. 5. Final approval by the Salem Building Department. Thank-you, — .. ---------------------—,- Harry Wagg Assistant Building Inspector 978-619-5643 - hwagg@salem.com I cc T. St.Pierre,Building Commissioner J. Giuffrida S. Smith B. Turner ;File ' PUBLIC PROPERTY ' DEPARTMENT KIM 5ENEY DIUSCDLL MAYOR 1:6 WTSHIDH:CDN SPRM a SAUah4 MASSACH=stI'rs 01970 TEL,978-745-959S 0 FAX 97&740-9844 I APPLICATION FOR THE REPAIR.RENOVATION, CONSTRUCTION. DEMOLITION OR CHANGE OF-USE OR OCCUPANCY FOR ANY EXISTING STRUCTURE OR BUILDING r4 1.0 SITE INFORMATION _ Location Name: Building: Property Address: Property is located in a;ConserJation Area Y/N Historic Dis 2.0 OWNERSHIP INFORMATION 2.1 Owner of Land a Name: Address: . Teiephone: 3.0 COMPLETE THIS SECTION FOR WORK IN EXISTING BUILDINGS ONLY r' Addition Existing Renovation Number of Stories Renovated e Change in Use New Demolition Existing Approximate year of Area per floor (sf) Renovated construction or renovation of existing building New Baef Description of Proposed Work`: t <���\ _�C1+z.�:-�• . 1�`-->z..'�Lca`�... d.._`'a•a.J�s c� �F'[�.i..�5 Mail Permit to: What is the current use of the Building? Material of Building? \"Os If dwelling, how many units? Will the Building Conform to Law? Asbestos? Architect's Name Address and Phone ( ) Mechanic's Name �3 �F?r— , �� rc�c -h Address and Phone `� Construction Supervisors License# 04SI6 HIC Registration# Estimated Cost of Project$'7a Permit Fee Calculation Permit Fee$ _ Estimated Cost X$71$1000 Residential Estimated Cost X$11/$1000 Commercial An Additional$5.00 is added as an Administrative charge. Make sure that all fields are properly and legibly written to avoid delays In processing. The undersigned does hereby apply for a Building Permit`to�build to th'e�aab'o{v�e•stated specifications. Signed under penalty of perjury Date 01 i 5 a , " J O