SRA Decision.Solar Panels Salem MM Redevelopment Authority September 11, 2014 MT. Robert T. Lutts 216 Essex Street Salem, MA 01801 Dear Mr. Lutts: Enclosed please find the SRA decision regarding the installation of solar panels at 30 Federal Street. I am copying the City's Building Inspector so that he is aware that your project has been approved by the Salem Redevelopment Authority. If you have any questions,please do not hesitate to contact me. Sincerely, —4& 1 Andrew Shapiro Economic Development Planner Enclosure (1) Cc: Thomas St. Pierre Salem .a�q Redevelopment Authority Salem Redevelopment Authority Decision September 10, 2014 30 Federal Street: Discussion and vote on installation of rooftop solar panels SRA Decision At its meeting on September 10, 2014, the SRA voted 5-0 to approve a September 3, 2014 DRB recommendation to approve the installation of solar panels atop the roof at 30 Federal Street as presented in a packet dated 8/21/14, on the condition that a 30th panel be installed in the upper left-hand corner of the roof, nearest the chimney, in addition to the original 29 that were proposed., DRB Recommendation At its meeting on September 3, 2014 the Design Review Board voted unanimously in favor of the proposed project to install 29 solar panel atop the roof at 30 Federal Street conditional upon the applicant adding one additional panel in the upper left- hand corner to make an even 30 panels. Staff Comment for SRA Meeting Oth Oth The applicant has agreed to mount a 3 panel at the request of the DRB. The 3 panel is not shown in the materials enclosed, but the applicant has agreed to install it. Proposal for September 3 DRIB Meeting The applicant proposes to install an array of 29 solar panels atop the south-facing rooftop at 30 Federal Street, which can be seen while looking toward the IVIBTA station. According to the scope of work provided starting on page 6 of the enclosed packet, the system will be flush mounted to the roof. The enclosed rendering show the panels to be a dark shade of blue. Staff Comment The plan on page 7 shows an exterior meter. I will request more information to be provided from the applicant in regard to the meter and any potential conduits that may be associated with connecting the panel system to the unit. Salem Redevelopment Authority Salem Redevelopment Authority Proposal September 10, 2014 30 Federal Street: Discussion and vote on installation of rooftop solar panels DRB Recommendation At its meeting on September 3, 2014 the Design Review Board voted unanimously in favor of the proposed project to install 29 solar panel atop the roof at 30 Federal Street conditional upon the applicant adding one additional panel in the upper left- hand corner to make an even 30 panels. Staff Comment for SRA Meeting The applicant has agreed to mount a 30th panel at the request of the DRB. The 30th panel is not shown in the materials enclosed, but the applicant has agreed to install it. Proposal for September 3 DRB Meeting The applicant proposes to install an array of 29 solar panels atop the south-facing rooftop at 30 Federal Street, which can be seen while looking toward the IVIBTA station. According to the scope of work provided starting on page 6 of the enclosed packet, the system will be flush mounted to the roof. The enclosed rendering show the panels to be a dark shade of blue. Staff Comment The plan on page 7 shows an exterior meter. I will request more information to be provided from the applicant in regard to the meter and any potential conduits that may be associated with connecting the panel system to the unit. 216 Ess�St,,t P.O.Box 150 Salem,MA 01970 m" Cabot 978-745-9233 800-888-6468 WEALTH MANAGEMENT, INC. fax:978-744,31og �.eCabotxom August 21, 2014 Dear Salem Redevelopment Authority and Design Review Board, Please place the solar panel installment project for 30 Federal Street on the agenda for the September 3 rd 2014 board meeting. The project to be reviewed is the installments of solar panels on the commercial building located at 30 Federal Street. I the applicant and the owner of property give full permission for this project to be completed. Thank you for your Consideration, 0 Robert T. Lutts Property Owner A- 4ERGY OMM a Rob Lutts 30 Federal St Incumbent Utility Mass Nat'i System Size(M) 6.56 Annual System Production(kWh) 8,566 Annual Current Consumption(kWh) 8,566 Percent Consumption Offset 100% Current Cost Available for Offset 0.171 Levelized Cost($) 0.080 Levelized C7st wI1CFu1d1Deprecinjon6(L 6.038 Panels na !an Soar CS 26 jw P!250P 6 Inverte Enphase-M215 —�26 TaxQredkS8,n5 Total System Investment $27,450 Federal Investment Tax Credit ff.ep'­b4 -$8,235 Rebates from Utility Of-ppimeb,g) -$2,000 Net System Investment $17,215 Depreciable basis $23,332 NetinveA prrt� -Estimated Federal Tax Rate 35% $17,21 f1f,gelkable) Estimated Total Value of Depreciation -$8,166 Net S ystern Investment Less Full MACRS Depreciation $9,049 3112/2014 Prepared by. Brandon nail 10122941 Prepared for: KeVn dark Rob Lutts 30 Federal St 3/12/2014 10122941 - 17 Annual Cost Earned REC/ Ann Net ITC W No Ann Net 17C with Year Avoidance(1,2) pB,(Z3)fgAWW Depreciation Full Depreciation 1 $1,523 $1,285 ($24,642) l$12,773) 2 $1,576 --�1,278 ($21,787) ($7,305) 3 $1,631 31,272 ($18,884) ($2,834) 4 $1,689 $1,266 ($15,930) $1,059 Earned MC 5 $1,746 $1,259 ($12,924) $5,004 /Pal 6 $1,807 ---�1,253 $8,537 7 $1,870 $1,247 ($6,747) $19,820 8 $1,934 $1,241 ($3,572) $22,996 9 $2,001 $1,234 ($336) $26,231 10 $2,071 $1,228 $2,963 $29,530 11 $2,142 $0 $5,105 $31,672 12 $2,216 $0 $7,321 $33,889 13 $2,293 $0 $9,614 $36,191 14 $2,372 $0 $11,985 $38,553- 15 $2,453 $0 $14,439 $41,006 16 $2,538 �2 6,976 $43,544 17 $2,625 so 1119,601 $46,169 is $2,715 $0 $22,316 $48,884 19 $2,808 $0 $25,125 $51,693 20 $2,905 $0 $28,029 $54,597 21 $3,004 $0 $31,034 $57,601 22 $3,107 Annual CoA So $34,140 $60,708 A.1d.n. 23 $3,213 $0 $37,354 $63,921 100% 24 $3,323 $0 $41, 7:, $��T 6 2;44 25 $3,436 U3 $7 Total 1 $58,999 $17564 $44,113 $70,6 u, ny .,. u�.W.I.M usu�h,nIM,In.. nnauli, 1,;=m-nm,-m=decUne In mnn an�anum $4'000 $3j5OO $3,000 $2,500 $2,000 $1,500 $1,000 $500 $0 ------ ... 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 ya., Woe oe,�afth Baia& Canah Flw OT..,Tm ftlut 1 20.00% $4,666 $1,633 2 32.00% $7,466 $2,613 3 19.20% $4,480 $1,568 4 11.50% $2,683 $939 5 11.50% $2,683 $939 6 5.80% $1,353 $474 Total $23,332 $8,166 Rob L� 30 Federal St 3/12/2014 10122941 $70,000 -------------- $60,000 —----- $50,000 ------- -------------- $40,000 $30,000 ........... -------- $20,000 -------------- —-------------...... $10,000 ------------------- --------------- .......... $0 -$10,0oo 0 1 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 -$20,0C ------ ------- -$30,000 .......... ------ --- ------ -$40,000 ------------- 71 Full Investment Payback(years): 4 25 Year IRR Without Tax Benefits: 16.36% 25 Year I RR With Tax Benefits: 23.12% Project Assumptions Utility Assumptions System Size AC 5395 Utility Company Mass Nat'l System Location Roof Utility Rate Plan General Roof or Ground Material Other Annual Usage 8566 Azimuth 173 Utility Rate Escalator 4.00% Tilt 30 Water saved (Gals) Coal not burned (Lbs) aline not consumed (Gals) F-2600.00 5366.97 525.17 0.57 Lbs. of CO2avoided Miles not driven Landfill Waste Avoided (Lbs) Trees Planted 10293.39 10713.44 3149.78 117.00 Rob Ludibi 30 Federal St 3/12/2014 1012N41 am; Year Federal Tax Utility Rebateiff Tax on Rebate Rf Depreciation 141 Annual Cash Cumulative Cash Credit 121 -PPII-N.) "14,11-hi") (if-PPA-1,10 Payment 151 Offset 161 REC or PBI 17) Other Flow $8,235_$ 2,000 $ $. 1,633.27 $ (27,450) $ 1,523 $ 1,285 $ - $ (12,773) ($12 2 _ $ 2,613.24 $ $ 1,576 $ 1,278 $ - $ 5,468 �J�7,30S) 3 - $ 1,567.94 $ $ 1,631 $ 1,272 $ - $ 4,471 $2;1 834] 4 $ 939.13 $ $ 1,688 $ 1266 $ - $ 3o893 5 $ 939.13 $ $ 1,746 $ 1,259 $ - $ 3,945 6 $ 473.65 $ $ 1,807 $ 1,253 $ - $ 3,534 ;$8 53-1 7 $ $ 1,870 $ 1,247 $ - $ 3,117 8 $ $ 1,934 $ 1,241 $ - $ 3,175 �14 k9 9 $ $ 2,001 $ 1,234 $ $ 3,236 8,065 10 $ $ 2,071 $ 1,228 $ $ 3,299 '�'1,364 $ $ 2,142 $ $ 2,142 506 12 $ $ 2,216 1 $ $ 2,216 722 13 $ $ 2p293 $ $ 1 Z8,0151 14 $ $ 2,372 $ $ 2,372 15 $ $ 2,453 $ $ 2,453 -$U;840 16 $ $ 2,538 $ - $ 2,538 $35,378 17 $ $ 2,625 $ - $ 2,625 5384OR-3 18 $ $ 2,715 $ - $ 2,715 19 $ $ 2,808 $ - $ 2,808 20 $ $ 2,905 $ - $ 2,905 21 $ $ 3rOO4 $ - $ 3,004 22 $ - $ 3,107 $ - $ 3'107 $5Z 542 23 $ - $ 3,213 $ - $ 3,213 5- 24 $ - $ 3,323 $ - $ 3,323 $59,078 25 6 $ 3,436 $62,514 ; 62,514 $62,g4 Total 8,235 $ 2,000 $ $ 8,166 (27,750)1$ 5!:9�9 12,564 $ $ 1.)Property value based on the net present value of the offset and SREC values discounted at 8%annually IRR 32.229% 2.)The Federal Government currently offers a 30%Investment Tax Credit for qualifying solar systems 3.)Rebate is shown as Income,with your ass 35% Please consult your accountant or tax Preparer to determine the specific tax treatment and benefits for your solar system. 4.)Federal MACRS depreciation schedule assuming a 35%federal marginal tax rate and excluding any available state tax beneflU.Consult your accountant or tax preparer to determine your effective tax rate 5.)Annual financing payment based on a term of: 8 years Rate Is subject to credit approvals.Assumed Interest rate Is; 6.00% Annually 6.)Offset of energy is based on current electricity rate per kWh.Escalation assumption Is: 4.00% Annually 7.)PBI/REC earned based on system production multiplied by the REC for the fixed perflad of time as defined on page 2 18.)internal Rate of Return Rob Lutts 30 Foderal St 3/12/2014 10122941 $70,000 $60,000 $50,000 $40,000 $30,000 $20,000 $10,000 $0 ($10,000) ($20,000) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 This analysis is based on estimated system production,and assumptions ra;i,mts, jegordhgf'Wrei'htillty costs performance and economic incentives.Actual performance and economic incentives may vary in amount Analysis or availability.Please consult with a tax advisor about any tax credits or deductions,including interest payments. kWh A measure of energy consumption,it Is the amount of energy consumed by a 1000-watt appliance runningfor I fullhour. MACRS Modified Accelerated Cost Recovery System- Under this system,the capitalized cast(basis)of tangible property is recovered over a specified life by annual deductionsfor depreciation. An angular measurement in a spherical coordinate system.The vectorfrom an observer(origin)to a point of ,Azimuth interest is projectedperpendicularly onto a reference plane;the angle between the projected vector and a reference vector on the reference plane is called the azimuth. IRR Internal rate of return.The discount rate that makes the net present value of all cashflowsfrom your project equal to zem. Cumulative i:ash flow Calculatedby taking intialsystem investment andsubtracting netsystem costfrom totalsystem cost,offset, depreciation and taking the absolute value and adding each year back on itself. Cumulative savings Takenfrom cashflow,summarizing annual cashfiow based on savingsfram project Solar panels come with a 25 year production warrantYfrom manufacturer and a ten year manufacturing Warranty Information warranty;-Workmanship and other components generally came with ten year warranties years;See the individual specification sheetsfor additional details. Levelized Cost Levelized cast is calculated by dividing the Net Cost by the system production on an annual basis. FOR CONSTRUCTION Grid-Tied Photovoltaic System RGS DC Rating: 7.25 kW ENERGY Lults,Rob 30 Federal St 327 ul—k Spu�AL2 SW:7 too,a can Salem,MA 01970 Pho.(860)SM-33M Rm(4231633�22U Jurisdiction: Town of Salem Sheet List GRID-TIED PHOTOVOLTAIC SYSTEM Sheet N. ShMT]Uo 7ISkW DC 0 STC Scope of Work: General Notes: Pv�offl COVER LUTrS.ROB RGS Energy shall mdall a 7.26 kW Gdd-Ved Photovoltaic('PV')System 1. System follows anylel Fire Code Setbacks par Ordinances of the PV-AOI SITE PLAN 30 FEDERAL ST tabling(29)Convallan Solar CS6P-250P Modules With(29)Enphase Energy Tom Of Before. SALEM.MA 01970 M21540-2LL-SM-0 Micro-Inverter(s).The Modules shall be flush mounted 2. All Projects will comply with the Ordinances of the Town of Salem. PV.A02 MODULE LAYOUT Prcqed#10122041 on the asphallicomp. hlngle met and interconnected We supply side hap. 3. Construction He=;7are-Binn Monday­Friclay,Sann-8pra Saturday, No time un Sunday or legal Holidays. PV�3 DETAILS DKN 4. Product Data Shoals shall be Included. PV-AG4 MATERIALS RW Equipment Specifications: 5. �oftmip penetrations shall be completed and aseed per code by a PV-E0I ELECTRICAL DIAGRAM 2014-08-12 Module:(29)Canadian Solar CS6P-250P ncensed contractor. Inverter 1:(29)Enphase Energy M215-60-2U.-S22412I 6. Ali Photovoltaic modules shall be tested and listed by a recognized PV`-E02 SYSTEM CALCS REVISIONS Raddng:UnIRao SolarMount Llamakay. Attachment Flashing:Eco-Facten Green-Fasten with 7. Certifications shall Include UL1703,IEC61646,IEG61730. PV-GOI SIGNAGE 0 By Dole Notes CP-SQ­SIoffed Bracket md!AJuminum Flashing 8. A commuous ground shall be provided for the Army and for all . ...,I a%uwc*a. Photovoltaic Equipment. 2 9. DC Wiring shall be run In metal conduit or raceways WNn enclosed spaces in a building. Roof Specifications: 10. Conduit.Win,system and Raceways shall be located as dean as R00fl: possible to ridges,hips,and outulde walls. Ah.[VG..p.Shingle 11. Conduit between Sub Amsys and to DC shall 9 (Single Layer) use guidelines,that minfirnice it*total onflount of conduit by taking the Z'x I G'Rarftem @ shortest palh. 16.D.C. 12. Space Requirements for elechical equipment shall comply with NEC Pitch:30' 1 AzTmulh:173- Article 110. Amy Slize:29 Modules 13. Equipment groundim,shall be strad In soctwdance with Table 20.11M 8 Site Specifications: 14. Con...kee that am not readly accessible and that am wed In he Occupancy.11 circults operating atorm"30VAC or DC shall require a col for Design Wind Spead:100 MPH opening and are required to be marked"Do not disconnect under Exposure Category:C loacr or'Not for current Intemptingm,pror 690.33(c)&(a). Mean Roof Height,25 it 15. All signage to be placed In accordance with local building code. Ground Snow Load:40 PSF(Reducible) 16. Signs or Directories shall be alfachad to the electrical equipment or Adj.Roof Smew Load:30.8 PSF located adjacent to the Identified equlpmenL 17. Store should be or sufficient durability to aftholand 11%environment. All Work to be In Compliance with: 18. Any plaques shal be metal or plastic with engraved or machine .1 2014 National Sectflml Ce,le(NEC) termed letters,or elocir"ating,In a red background with white 2009 International Residential Code(IRC) lettering,a minimum of 318u height and all capital letters, 2009 Intemnathmml Building Gode(IBC) 2012 international Fire Code QFC) 2012 Uniform Mechanical Code(UMC) 2012 Uniform Plumbing code(UPC) MA 780 CMR.81h Edition 4nducUng 2/4111 revisions W Tables R301,2(4)&R301.2(5) 11 NIA ASCEIANSI 7�05 Minimum Design Loavda for Buildings and Other Structures COVER Ac conceded and adopted by Town of Salem % PV-000 FORCONSTRUCTION 4L ----------- T, ------------ RGS ENERGY (E)Property Line 32 Taugwma Spu�M2 Equipment Location:Exterior Fax(41A�� (E)Ulfty Motor ORINMED Equipment Location:Interior Mechaniml Room PHOTOVOLTAIC SYSTEM (E)MMn S�.DISonnn,,ii (E)Electrical Guffer with Tops Per Unit 7.2SkW DC @ STC (r)Uffity,Mawr-Per Unit (E)Multi Family Dwe�llng LUTTS,ROB (E)Main Semic,Panel-POI 30FEDERALST it (N)FLMed PV AG Disoonned SALEM,MA01970 (N)W Production Meter/Monitor Project#IGIZ2941 (N)PV AC Combiner Panel DKN RW 2014-08-12 REVISIONS It By Debe Nows � .1.1 �aaavuwv —2 4 ----------—------ Federal St N SITE PLAN (E)Walkway F`V-A01 FORZONSTRUCTION Pit ARRAY I-MECHANICAL LOADS Amy Am. 515.7 it' Total PlucimmIto Dead Load: 3.12 Par Army Weight �-_7 Avg.Dead Load par Anchor. 17.9 the RGS Anchor Oty.: ENERGY Design Values by RoofZo E�Com" Eqde Interior 32 Taugeonk Spur,M2 Max.Lim c parx 5tvm1.WCTM78 �In.O.C. 418 In.D.C. Pro.(M)53�3370 .................... .......................... Max.UnfRan,Rall Caidgwer 16 in.*D.C. 1AIm O.C. 16 In.O.C. Adjusted Anchor Spam ........... .......................... Deseviorce Point Wad: W.8 be 307 PHOIPOVOILTAIC SYSTEM __;SA�R UpliftPokel-oad: -�79.1 be .150.1 lbs, 7261,101 DC @ STC Minimum Anchor burengue 707 be Average Safety Factor LUT7S.ROB 30 FEDERAL ST SALEM,MA 01970 30, Project#10122941 DKN RW 2014-03-12 REVISIONS 0 BY Dwis Notes �.j exuwxne. 4 z Landscape Modules Require Vertical Rate 16 4" vdth Unistrud Sub-frame U'-7' L - Total Quantity.1 Attachments=0 , Roof Zones ans deflned by dimension,a 3.0 ft. . Maximum Allomble Cantilever for UnRac Hall Is Ys Me Maximum Rail Span . Racking and Attachment UniRam SolarMount wth Ece-Fastan Green-Fastan.111,CP-SQ-Sloftd Bracket and Alurnlrurn Flashing attached with Lag Scrins,Has Head,1"SS,5/1 U's 3-1J2'Length a 3116' V-0. . All Dimensions h.n am to module edges.Including 1 in.Spadmg bethween Modules required vmon using the Top Clamp Method.The Role Extend 3 In.Beyond the module edge. . unlRac Requires one thermal expansion gap lcr�wary mr,of mil greaterthan W N MODULE LAYOUT . Amy Installed according to the UnflRaw SolarMount Code-Compliant installation Manual ver.227.3, Pub 110016-1m.June 2011 . Attachment Locations,It shmn,am approximate.Final adjustment a attachment location may be necessmy depending on field conditions.All attachments am staggered amongst the framing members. PV-A02 FOR.00NSTRUCTION G.d WEEB& ,I, Module Clamp 145� RGS Unim.Sulannount ENERGY Red w/Want G.Fasten FlashmF 32Tau,vvnkSu,� ECO-GFII-BLK-812%Nhin swowor,a Mrs C.O. Module(TyP.) ECO-CP-SQ Compression Bmacket Nv(40) am Nab Roofthup 5116N 3.5-S.S.Lag Suit GRI"ED W/2.6'Mmmurn Penehaslon PHOTOVOLTAIC SYSTEM Sealed w/Approned!Soolant ?MkWOCQSTC r*A O.q. LUTTS,ROB 30FEDERA-ST SALEM,MA 01970 Project#10122941 Attachment Profile Attachment Detail DKN �3/4 =V-0- �P=r-01 RW 2014-08L12 16'Mem Rod FmjTdng PV Module Rail Overhang lVMax REVISIONS Rall Bull. ROD Ovodbang # By nes, Notes I moss. Roof Attachment V Anchors locatudi cmalthumets f ran u framing members 9 U� tag "splice cost. Min of 2 supports -VAL—1 Mthin the each mv a modules on elffier side ofsoice 2'V. T "lit VA-.".rSpn Solse-Mount Rall evith a anan,spacing of 41r 3 Sta ered Attachment Detail (Typ.) Detail NTS NTS Gnmmd WEEB& Mask&Clamp Module Frans. SS Bull: Unbac Solummunt BoadoetwIL-Foot Nib Modulo(Typ.) (Long ads Dovan) 1-fiW Sq.UnISInd Unhac SIoUuxl CharawpI UGC-1 Rooftap Grown Fasten Flashing. ECO-GFI-BLK-812 VAII, VARIES ECO-CP-SQ Compression Bracket& Unwac Rafl 5/16-x 3.6-S.S.Lag Bull w/T Minimum Penetration DETAJLS 5 Groundin Clip & Module Sealed wlAppwW Sealant Scale;N.T.S. Vertical Rail Detail PV-A03 FOR.CONSTRUCTION �Suesteeffill of Materials S NOM.Matelfals Usled below ars subject In charW dudng final InsagloUon. ENERGY PART DESCHIPTION PAU NUMBER CITY MWIMIRd DP4((;N[DADS 321lwg�sw'= ..;..................... stunln�amm ......................................... ........ ..................................................... ptaaa(Wal 5�m ..........................I........................................................................................................... Ra(4131 ................................................ RIMMIRM mm- 111111 ........... K.A.d U.11M.0 WaRs Roofs .. . . . . . ........ GFUD-119D ............................. ;;6ihimmu PHOTOVOLTAIC SYSTIEM ........................ ............ ........................ 725kW OC @ STC ....................... .............. . ...................1 .................. ........... ........... LUTTS,ROB 3D FFDERAL ST .......... ......... .................. ...................................................... �.l I - ............. .............. ................................ ....................-......................................... ....................................................... .......... SALFM,MAOIWO .......... .................. ......................... Pradec1#10122941 ... ........................ Mw ........... DKN ..... ............. , - ..'.ii ............. ............. RW .............................. ............................................................ 2014-0�12 ................... ...........- ............ .................. ........... �ims Flat Roof ................... ..................................................... Hip Roof(7* <0 270) .........................................................................................................-................... ...................; . ;.............. By HaIn, ................................ W ........... ........... ............ 2 .......... ............................I.......................................... ........................................ ...................... .............................................-..............-.1-.1".................................................... 4 ................................................ ............ii ................. ........... ........................................................... .................ET. ..... .......................... .................................................... ............ k;"aw ..................!7:.T!n.................. ......... ........................ . ...........20MB�............................ .......... ........................ ....................... ............................ Gable Roof(0-e 70) Gable Roof(7-<0:5 45') uwii; � **** I I**** : ............ ............. ................... ..................... ........................... .......... F1 Intedor zones, E3 End Zones, comerzom ................... .............. ..................wau............................ umm................! ......................... ............... ................_J....................... S��!T............................................................................................ L, I.............. ......................................... .............................................................. Ap .................... ............ ........................ ..................... ............ .....................2........... ............... .......................................................................... .................. ............ ................... .............. .......... . ..................... ........... ci�iizo6i ................................... ......................................................... .............................. .................... .......... .................... .............. .......... ....................................... ..................ann��................... A........... .......................... M..M.RB................................ ........... VAFUES ..e ................................................... ...................... .............. ........... MATERIALS ................... ......... ..... ................... 345 n T 2 ........... .......................... ....... ............... ............. ....... PV-A04 ................................ ............... .............-.......... . ...................... .......................................................................................- ......... .... ........... FOR CONSTRUCTION Notes; VVIRIE SCHEDULE A 1. All conduit to use waller-tight expansion fitings. Tag I Div I Sim 1gle 2. All Rosillop conduit to W a minimum of I-news the red$",few. I Who TYPO I guouiid Size STYPO Conduit I-Qagth A i 2 i #12 i ENGAGECABLE #5 BARE Cu ................- ...... ....... ARG................ FREE Afft NIA 4, AJI equipment to be rated NrMA-3R undess;othewlso noted. amble) .......................... . ... 3. PV Connection Into Lead Center shall be Positioned at the opposite and from the Utility Input feeder location.(Where appil B : 6 0 i THHNVTHWN-2 #BAWGTHWN-2 RGS ........................ ..............................---- ... .................3./.4.-..E ENERGY C i 3 #8 1 THHNrrHWN-2 i G THWN 5. Lomst expected ambient temperature based on ASHRAE min.mean extreme dri,bulb harnpratwe for ASHRAE locadlon meet ............. - T. ....... .................................... ...........2 314"EMT OR ........................................................ simile,to Installation. ............................ SewCntx,cr0fi378 6. Highest continuous ambient temperature based an ASHRAE highest month 2%ch,bulb temperature for ASHRAE locabon meet ......................NA................_: 3fir ENT 10 Ft.... �.(860)53�370 shmar to installalism. WRIESMING tex fst�n M-= 7. All conclusions to be copper unless noted atherv,iss. Tag Sh. 91rC Derailed Aneapactly 8. Conductor sizing shall Imut Voltage drop In 2%DC&1.5%AC(2%for Eaphase Systems). I I (AllowableAmpe.Te-PIDersts.1511IDerme) Aap=wly GRID-TIED A #12 1 30A X 0.76 M80A PHOTOVOLTAIC SYSTEM ......... M.00 A ................................................ 40A X 0.76 X 0.8 =.X32A 35.00 A 725kW DC III STC ..............-.......... 7 ............... ......... 55A X 0.96 X I =:52.80 A W.00 A LLYTTS.ROB .............................. ..............................1. .............XL 75A X 0,90 X 1 =;72.00 A 65.00 30 FEDEFlAL ST ............................. ........................................ ........................................ SYSTEM LA13ELING SPECIFICATIONS SALEM,MA D1970 I�DCVoWe(-18'C): 42.6V Project#101�1 ............ ............................... DKN ............DC p9:1 y... AcNminadVoitage: nov Rw X)14-08w12 RIEVISIONS # By I catte I None, jamawm[ �. OR -2 I-Phaw 120124UV 4 Public Motor— (E)Man Debtor(Containing Barite Tops) (N)Enphase Envoy ENV-120 1 29 Canadian Saba CS&P-250P Modules�ith 29 Enphase 8 Energy M215-60-21-L-S22-113 Mlcr�lnvertsra age. Branch of 10 —" -4�, IN)SUBPANEL �.o, FUSED 10QA DISCONNECT w8v UnL"FEED: WA 206 v 208 V 3-Phesa WBVAC Bran.h.f10 (N) J-B. x M 100A 15A -- ------ ISA Branch of 9 D INTS A B C C (E) ELECTRICAL DIAGRAM 100A Square 1) �IS�NGGLGMH PV-E01 FOR CONSTRUCTION MODULE SPECIFICATIONS Canadian Solar CSGPI TEMPERATURES RGS 'ENERGY 01 for Voltage Calculations: 31-C 32 Tw�nk Sp,&12 Stonpm,�OT06178 -T Fr-PtRz.P---fW9qi�s;a naujj6n'ft;W SYSTEM LABELING SPECIFICATIONS GRID-TIED 11.09A PHOTOVOLTAIC SYSTEM -PC C)c OPI ...... ......... 725kW DC 0 STC LUTTS,ROB INVERTER 1 SPECIFICATIONS 30 FEDERAL ST INVERTER I CURRENTS INVERTER 1 LABELING SPECIFICATIONS SALEM.MA D1910 Enphass Energy DCM—Pwfi� MULALLEIM11.25 Proled#I(H22941 M21 *-21-L-SM-IG .............. .............I...................................... jj.:09A 206V I....... ... DION ............. DC Operating unams MODULE Imp AC Max AC Currant- 17.2 A RW ........... ........................ ................ ............. RI 8.. .� 2014-08-12 .......... .............. —C.mantlox MO LEI.I ................ INVERTER I VOLTAGES — ........... 2.2 V................. REVISIONS .............................. DCMaXV0JWg- MODULE V.x TEMP DELTA.TEMP COEF Voc x P. 16V -T-- .............. ................ Output Cumen� Z.: .[.(INVERTER I.--x I (48-c): vrRTER QTY)/1.732 x 1.25 ... .. ......... ... 0. � By N. I(I.03A x 29)/1.7321 x 1.25 MZOA DC Operating MODULE Vmp IIIIII 48V Voltap: .......................— WAV = 30.1 V 15A ...........6 . ................... NIA ELECTRICAL CALCS PV-E02 FOR CONSTRUCTION 10M, RGS ENERGY 3ZTau,s,aSM= stcrg�ff� Phon,(850)�M R.)M-=25 GRID�TIED PHOTOVOLTAIC SYSTEM 725kW DC 0 STC WA LUTTS,ROB 0111,91, 30 FEDERAL ST SALEM.MA 01970 NEC Article 60.64(B)(4) Project#10122941 NEC ArIlde 690.6(C) &705.10 DKN RW 2014-0&12 REVIBIGNS NEC Article 60.14(C)(2) Every 14Y.a=dLdIj4,oxee,& 0 By Date Notes C m0eWsy. awsxas EC PWe 690 4 NEC Article 690,M(8)(7) NEC Artois 690A7 &70SM(4) System Specifications system Spallimitlans, NEC Article 690.54 NEC Article WOM NTS SIGNAGE PV-GO1 Jill, o .�t Ott The Commonwealth of Massachusetts Department of Public Safety Massachusetts State Building Code(780 CMR) Building Permit Application to Construct,Repair,Renovate or Demolish any Building other than a One-or Two-Family Dwelling Code and Other Requirements for Building Permits The Department of Public Safety has issued these building permit application forms so that municipalities across the state can move toward use of a single permit form and consistent permit application process. The MA State Building Code specifies the requirements of building permits and the applicant is advised to review and be familiar with these requirements in order to avoid some of the common permit application problems.likewise the applicant should be aware that some municipalities require that the owner confirm, even prior to acceptance of the building permit apphcation,that no outstanding property taxes,water fees, etc.exist. Filing Instructions 1.Please contact the city or town where the work will be done to ensure that the city or town will accept this application form and if any additional information is required, and obtain the correct mailing address. After doing so, print the application, fill in completely and then submit to the local city or town where the work will be done. 2.AH applications shall be considered complete and will be reviewed if construction documents, specifications, fee, and other materials that may. be required as indicated in the Building Permit Application are included with the application. 3.Please include a check for the Building Permit fee. The fee may be calculated using the information to be supplied in section 12 of the Building Permit Application. The check is to be made payable to the local city or town where the work will be done. The Commonwealth of Massachusetts Department of Public Safety Massachusetts State Building Code(780 CMR) Building Permit Application for any Building other than a One-or Two-Family Dwelling (Mis Section For Official Use Only) Building Permit Number: Date Applied: — I Building Official: SECTION 1:LOCATION(Please indicate Block#and Lot#for locations for which a street address is not available) 30 Federal Street Salem 01970 No-and Street City/Town Zip Code Name of Building(if applicable) SECTION 2:PROPOSED WORK Edition of MA State Code used— If New Construction check here 0 or check all that apply in the two rows below E)dsting Building 0 Repair 0 1 Alteration 0 1 Addition 0 1 Demolition 0 (Please fill out and submit Appendix 1) Change of Use 0 Change of Occupancy 13 1 Other E Specify: solar Are building plans and/or construction documents being supplied as part of this permit application? Yes M No 12 Is an Independent Structural Engineering Peer Review required? Yes 0 No 13 Brief Description of Proposed work. Installation of a 7.25kW roof mounted solar array using 29 Canadian Solar CS6P-250P modules,29 Enphase M215-60-2LL-S22 micro inverters,and all associated electrical work. SECTION 3:COMPLETE TIES SECTION IF E)GSTING BUILDING UNDERGOING RENOVATION,ADD ITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Ddsting Building Investigation and Evaluation is enclosed(See 780 CMR 34) 0 E)dsting Use Group(s): O'ffce Proposed Use Group(s), nochancle SECTION 4:BUILDING HEIGHT AND AREA EMsting Proposed No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.) Total Area(sq.ft.)and Total Height(ft.) SECTION 5:USE GROUP(Check as app�clle) --j A; Assembly A-I 13 A-2 13 Nightclub 13 A-3 11 A-4 0 A-5 0 1 B. Business E: Educational 0 F: Factory F-I 0 F20 0 1 H. MHazard H-1 0 — H-2 El H-3 0 H-4 0 H-5 11 -4 L3 1 ;,. 1: Institutional 1-111 1-2 0 1-3 antile 13 R: Residential R-10 R-2 0 R-3 13 R-4 11 S: Storage S-1 0 S-20 U: Utility 0 Special Use 13 and please describe below: Special Use: SECTION 6;CONSTRUC rION TYPE(Check as applicable) IA 0 IB 0 IIA 11 HB 0 1 IILA 0 HIB 0 1 IV 0 1 VA Cl VB 0 SECTION 7.,SITE INFORMATION(refer to 780 CMR 111.0 for details on each item) Water Supply. Flood Zone Information: Sewage Disposal: Trench Permit Debris Removal: Public 0 Check if outside Flood Zone 0 Indicate municipal 13 A trench will not be Licensed Disposal Site 0 Private 0 or indentify Zone:— or on site system El required 0 or trench or specify: permit is enclosed 0 Railroad right-of-way: Hazards to Air Navigation: MA Historic Coranumon Review Process: Not Applicable El is Structure within airport approach area? Is their review completed? or Consent to Build enclosed El Yes 0 or No El Yes[] No 0 TTON 8:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code:—Use GToup(s):— Type of Construction:— Occupant Load per Floor: Does the building contain an Sprinkler System?: Special Stipulations: SECTION 9- PROPERTY OWNER AUTHORIZATION Name and Address of Property Owner Robert Lutts 216 Essex Street Salem, MA 01970 Name(Print) No.and Street City/Town zip Property Owner Contact Information: - 978 _ 745_ 9233 rob@ecabot.com Title Telephone No.(business) Telephone No. (cell) e-mail address If applicable,the property owner hereby authorizes Name Street Address City/Town State zip to act on the property owner's bebaX in all matters relative to work authorized by this building permit application. SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 2) (If building is less fl=35,000 cu.ft.of enclosed space and/or not under Construction Control then check hue 0 and skip Section 10.1) 10.1 Registered Professional Responsible for Construction Control Name(Registrant) Telephone No. e-mail address Registration Number Street Address City/Town state zip Discipline Expiration Date 10.2 General Contractor Alteris Renewables dba RGS Energy Company Name Travis Genatossio Name of Person Responsible for Construction License No. and Type if Applicable 32 Taugwonk Spur,Al2 Stonington CT 06378 Street Address City/Town State zip 8605353370 kimberly.hendel@rgsenergy.com Telephone No.(business) Telephone No.(cell) e-mail address SECTION 11:WORMRS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§25C(6)) A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit, Is a signed Affidavit submitted with this application? Yes 9 No Cl SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE item Estimated Costs:(Labor and Materials) Total Construction Cost(from Item 6) $ 1.Building $ 6,000 Building Penrdt Fee=Total Construction Cost x (Insert here 2.Electrical $ 25,000 appropriate municipal factor) 3.Plumbing $ 4.Mechanical (HVAC) $ Note:Minimum fee $ (contact municipality) 5.Mechanical (Other) $ Enclose check payable to 6.Total Cost $ 31,000 1 (contact municipality)and write dieck number here SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. 860-535 - 3370 Please print and sign name Title Telephone No. Date 32 Tauqwonk Spur,Al2 Stonington CT 06378 Street Address City/Town State zip Municipal Inspector to fill out this section upon application approvaJ: Name Date Appendix 1 For the demolition of structures the building permit applicant shall attest that utility and other service connections are properly addressed to ensure for public safety. Please fill in the information below and submit this appendix with the building permit application. The building permit applicant attests under the pains and penalties of perjury that the following is true and accurate. Property Location(Please indicate Block#and Lot#for locations for which a street address is not available) 30 Federal Street Salem 01970 No. and Street City/Town zip Name of Building(if applicable) For the above described property the following action was taken: 4 Water Shut Off? Yes 0 No 0 Provider notified and Release obtained? Yes ID No 13 Gas Shut Off? Yes 11 No 11 Provider notified and Release obtained? Yes 11 No El Electricity Shut Off? Yes 11 No 0 Provider notified and Release obtained? Yes 0 No El Yes 0 No 0 Provider notified and Release obtained? Yes D No D Other(if applicable) Yes 0 No 0 Provider notified and Release obtained? Yes 1:1 No 11 Other (if applicable) Appendix 2 Construction Documents are required for structures that must comply with 780 CMR 107.The checklist below is a compilation of the documents that may be required for this. The applicant shall fill out the checklist and provide the contact information of the registered professionals responsible for the documents. This appendix is to be submitted with the building permit application. Checklist for Construction Documents* Mark"x"where applicable No. Item Submitted Incomplete NotRequired I Architectural 2 Foundation 3 Structural 4 Fire Suppression 5 Fire Alarm(may require repeaters) 6 HVAC 71 Electrical 8 plumbing(include local connections) 9 Gas(Natural,Propane,Medical or other) 10 Surveyed Site Plan(Utilities,Wetland,etc.) 11 Specifications 12 Structural Peer Review 13 Structural Tests&Inspections Program 14 Fire Protection Narrative Report 15 Existing Building Survey/Investigation 16 Energy Cons ation Report 17 Architectural Access Review(521 CI�M) 18 Workers Compensation Insurance 19 Hazardous;Material Mitigation Documentation 20 Other(Specify) 21 Other(Specify) 22 Other(Specify) *Areas of Design or Construction for which plans are not complete at the time of application subinittal must be identified herein.Work so identified must not be comonexiced unta this application has been amended and the proposed construction document amendment has been approved by the authority having jurisdiction.Work started prior to approval may be subjected to triple the original permit fee. Registered Professional Contact Information Registration Number Name(Registrant) Telephone No. e-mail address Discipline Expiration Date Street Address City/Town State zip Name(Registrant) Telephone No. e-mail address Registration Number Discipline Expiration Date Street Address City/Town State zip Registration Number Name(Registrant) Telephone No. e-mail address Discipline Expiration Date Street Address City/Towii State 1p Official use Only Permit No. Occupancy and Fea Checked BOARD OF FIRE PREVENTION REGULATIONS [Rev. 110-11 Ceavablank) APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All Work to be perforrued in accordance with the Massachusetts Electrical Code(MEQ,527 CUR 12.00 (PL F-4&6 PRrN T fN AW OR TYPE A L L AVFOR MA TrOA Date. City or Town of- Salem To the Inspector of Wires: By this application the uudansig:r�gives notice of�hisor her intention to perform the electrical work described below. Location(Street&Number) 30 Federal Street Owner or Tenant Robert Lutts TelephoneNo. 978-745-9233 OwneesAddress 216 Essex Street,Salem, MA 01970 Is this permit in conjupetion with a building permit? Yes El No (Check Appropriate Boy) Purpose of Building Office oommercial-no change Utility Authorization No. Existing Service Amps Volts Overhead[F� UndgrdE:l No�of Meters New Servic Amps Volts Overhead F], UndgrdEj No,of Meters Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: installation of a 7.25kW roof mounted solar array using 29 Canadian Solar CS6P-250P modules,29 Enphase M215-60-2LL-S22 micro inverters,and all associated electrical work. Completion ofthe folio ' table mav b ewaivedbythe of Wires, No.of No.of Recessed Luminaires No.of Ccil.-Susp.(Paddle)Fans Transformers XVA No.of Luminaire Outlets No.of Hot Tubs Generators KV.A U - Above No-of Emergency Ligliffn—g No.ofLumivaires Swimming Pool grad. E] gr;A. 0 Battgn Units No.of RecepUcle,Outlets No.of Oil Burners FIREALARAIS lNo.of'Zories No.of Switches No.(if Gas Burners lNo.ot-Detection and Initiating Devices otal No.of Ranges No.ofAirCoud. Tons No.of Alerting Devices Heat 7m If -Contained No.of SeW No.ofWaste Disposers T ta Detection/Alerting Devices No.of Dishwashers SpacelArea Heating KW Local El Municipal 0 connection 0 No.ofDryers Heating Appliances KW Security terftW rVivices or Equivalent No.ofWater KW No.Of No.of Data—Wirbig- Heaters Signs Ballasts No.ofDevices or Epulvalent No.Hydromassage Bathtubs lNo.ofMotins; Total HP ejecommumcatious wiring, No.of Devices or Equivalent OTHER: Attack additional detail ifeletired or as required by the Impactor of Wires. Estimated Value of Electrical Work: $25,000 (When required by municipal policy.) Work to Start: Sept 2014 Inspections to be requested in accordance with MEC Rule 10,and upon completion. INSURANCE COVERAGE: Unless waived by the owner;no permit for the performance of electrical work may issue unless the licensee provides proofafliability insurance including"completed operation"coverage or its substantial equivalent. The undersigned certifies that such coverage is in force,and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE M BONDEI OTHER El (specify:) I certify,under thepains andpenaldes ofperjury,that the informad 7 this application is true and cornpIde. FIRM NAME: Alteds Renewables dba RGS Energy LIC.NO.. 14005-A Licensee: Craig T. Reekle Signature LIC.NO.: afapplicable,enter-exmpt-t the ficeme nmber Ili: in But.Tel.No.%M-0-535-3370 Address: 32 Taupwonk Sour,A-12,Stoninaton. L;I 0637B Alt.Tel.No.:781-738-7156 "Per M.G.L.c. 147,s,57-61,security work requires Department of'Public Saf6ty"S"E—Couse: Li 0.No. OWNER'S INSURANCE WAWER: I am aware that the Licensee does not have the liability insurance coverage normally requiredby law. By my signature below,I hereby-waive this requirement. I am the(check one)El owner Q owner's ag=t Owner/Agent Signature Telephone No. PERMIT FEE: 8/20/2014 Rm LN - a MEE! 8/20/2014 -3� 2 la 7 NO 2 8/14/2014 !$300=. 97�74�9233 W t ILI t, I + qm.. 8/14/2014 OFF I C 57UIT-Es 3 =� M-745-9233 AR, FjL 8/14/2014 Ao= it 8/14/2014 ------------- 77777=7 oil 216 Essex Street P.O.Box 150 Salem,NIA 01970 Cabot 978-745-9233 ULU 800-888-6468 fax:978-744-3109 WEALTH MANAGEMENT, INC. www.eCabot.com August 21, 2014 Dear Salem Redevelopment Authority and Design Review Board, Please place the solar panel installment project for 30 Federal Street on the agenda for the September 3" 2014 board meeting. The project to be reviewed is the installments of solar panels on the commercial building located at 30 Federal Street. I the applicant and the owner of property give full permission for this project to be completed. Thank you for your Consideration, 7V- My -09- Robert T. Lutts Property Owner I WE MM-li! l,L7 RGY A ri.� V w ml� 4, ��AncW Gooft Ockir Owmxm 01;ii I: Rob Lutts 30 Federal St Incumbent Utility Mass Nat'l System Size(kW) 6.50 Annual System Production(kWh) 8,566 Annual Current Consumption(kWh) 8,566 Percent Consumption Offset 100% Current Cost Available for Offset 0.171 Levelized Cost($) 0.080 Levelized Cost with Full Depreciatioon�( � 0.038 Panels Canadian Solar-CS6P-250P 1 26 nverters Enphase-M215 1 26 Tax Cr.dit$8,235 Total System Investment $27,450 -Q� Federal Investment Tax Credit -$8,235 � L ki Rebates from Utility (Ife,plicable) -$2,000 qg Net System Investment $17,215 Depreciable basis $23,332 Ef llplilabll,�l�llhe��f�oquotd�,i�9MACRS) NetInvest ent- c Estimated Federal Tax Rate 35% $17,21 fff agalicble) Estimated Total Value of Depreciation (if applicable.how much of the cost mr,ran claim at your tax rate in total) -$8,166 Net System Investment Less Full MACRS Depreciation $9,049 3/12/2014 Prepared b, Brandon Tha[I 10122941 Prepared for: KoWn Clark Rob Lutts 30 Federal St 3/12/2014 10122941 Annualcos Earned REC Ann Net ITC W No Ann Net ITC with Year Avoidance(1,2) PBl(2,3) Depreciation Full Depreciation 1 $1,523 $1,285 ($24,642) ($12,773) 2 $1,576 $1,278 ($21,787) ($7,305) 3 $1,631 $1,272 ($18,884) ($2,834) 4 $1,688 $17266---T-($15,930) $1,059 Earned REC 5 $1,746 $1,259 ($12,924) $5,004 /PSI 6 $1,807 $1,253 ($9,864) $8,537 18% 7 $1 740 $1,247 ($6,747) $19,820 $1:8 8 93 $1,241 ($3,572) $22,996 9 $2,001 $1,234 ($336) $26,231 10 $2,071 $1,228 $2,963 $29,530 11 $2,142 $0 $5,105 $31,672 12 $2,216 $0 $7,321 $33,899 13 $2,293 10 $9,614 $36,181 14 $2,372 N $11,985 $38,553 15 $2,453 $0 $14,434 $41,006 16 $2,538 $0 $16,976 $43,544 17 $2,625 0 $19,601 $46,169 18 $2, �? ---�48,984 V $22,316 19 $2,808 $0 $25,125 $51,693 20 $2,905 $0 $28,029 $54,597 21 $3, 04 $0 $31,034 $57,601 Ann..]Cost 22 $3,107 $0 $34,140 $60,708 Avoidance 23 $3,213 :00 $37,354 $63,921 24 $3,323 $40,677 $67,244 25 $3,436 $0 $44,113 $70,681 Total $58,999 $12,564 $44,113 $70,681 11 Am'unt our unrybrinceri,ced,Calcularterrommins inlivyincreme 4.d. annually 2 Asomme'u,%annual dii In yetern p,,d,Won ,,,,ewabfe Enerry over PECI or Production Beed neri(PSI),Posed on avallable market data L- $4,000 $3,500 $3,000 $2,500 $2,000 $1,500 -eel $1,000 $500 $0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 My - V.r 1 20.00% $4,666 $1,633 2 32,00% $7,466 $2,613 3 19.20% $4,480 $1,568 4 11.50% $2,683 $939 5 11.50% $2,683 $939 6 5.80% $1,353 $474 Total $23,332 $8,166 Rob L.tu 30 Federal St 3/12/2014 10122941 $70,000 $60,000 00 $40,000 --- ---— ",0,0 $30,000 $20,000 $10,000 $0 -$10'000 0 1 0?!!�:3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 -$20,()(110 -$30,000 ————---------— $40,000 Full Investment Payback(years) : 4 25 Year IRR Without Tax Benefits: 16.36% 25 Year IRR With Tax Benefits: 23.12% Project Assumptions Utility Assumptions System Size AC 5395 Utility Company at'l System Loati" Roof Utility Rate Plan General Roof or Ground Material Other Annual Usage 8566 Azimuth 173 Utility Rate Escalator 4.00% Tilt 30 Coal not burned (Lbs)- Gasoline not consumed (Gals) Homes powered 2600.00 5366.97 j 525.17 0.57 Lbs. Of CO2 avoided Miles not driven Landfill Waste Avoided (Lbs) Trees Planted 10293.39 10713.44 3149.78 117.00 Rob Lutts 30 Federal St 3/12/2014 10122941 Federal Tax Utility Rebate(if Tax on F= (if D e P r.ec,,,a I i o n[41 Annual Cash Cumulative Cash Year 121 applicable) bf ,_ Payment 151 Offset 161 REC or PBI Other Credit ���-Ppfl' b1c) (irapplicable) Flow "llElow" I ...........$8,2351 $ ......_______2,000 $ $ 1,633.27 $ (27,450) $ 1,523 1,285 $ (12,773) 3 ------------ ....... 2 ----tl 2,613.24 $ $ 1,576 $ 1,278 $ 5,468 ($�,365) --------------- --------------------------------------- - ------------------------------------------ . .... 11-.......�'v�.......-'.. 3 $ 1,567.94 $ - �$ 1,631 $ 1,272 $ $ 4,471 ($i,1334) -------------------- 4 939.13 $ - $ 1,689 $ 1,266 3,893 $1,059 ------------------------------ ----------------------- --------------------------------- ............-....... 5 $ 939.13 $ 1,746 $ 1,259 .:$5,604 ----------------------------------------------------------------------------------------------................ .. ..... 473.65 $ 1,807 $ 1,253 3,534 x$8 537 11,654 7 1,870 1,247 $ 3,117 ------------------ ---- ----------------------- --------- ------------- - 8 1,934 $ 1,241 3,175 9 1 $ 21001 1 $ 1,234 3,236 $18,065 ................. ---------------------------------------------------- --------------- ----------------------------------------------------------------------------------------f- --- -- ---------------------------------------------------- ---------------------------- n" 10 $ 2,071 $ 1,228 $ - $ 3,299 �-�2i 364 -------------------------------- ...... 11 $ 2,142_1_$------------ 2,142 $Z3;506 ---------------------- ------------- -------------- 12 2,216 $ $ 2,216 -------------11----------- 13 1 $ 2,293 Is 2,293 "4$'28,'015 ---------- -- -------- ------- 14 _____2,372 2,372 $30 A87 4�----------- .......... 15 0 I $ 2,453 2,453 16 2,53 8 2,538 8 ----------- I-------------- ............... 17 2,625 2,625 n ---------------------- ---------------------------- $ 2715 't- $ 2715 ------------------------------------------------ ------------ ------------ ------------- t 19 $ 2,- $ 2,808 20 $ 2,905 $ 2,905 431 ----------------------------- . . . ........ -------- _I- -------------- ---I.- 21 ! $ $ 3 $ 3004 �49 435 ---------- -------------- -------------- I - 22 3 107 $ 3,107 $52,542 ------------------ ....... - 23 ...... -J $ ........3�213 3,213 ------- ---------------- 3,323 $ 3,323 $59,078 24 .��5 755 ............ ------------- -------- ......................---- ........... -'o-- 11--,".r."... 25 3,436 $ - 3,436 $62,514 $ $ Total $ 8,235 2,000 8,1615 $ (27,450)1 $ 58,999 12,564 $ Property value based on the net present value of the offset and SREC values discounted at 8%annually IRRia 32�229% 2.)The Federal Government currently offers a 30%Investment Tax Credit for qualifying solar systems 3.)Rebate is shown as income,with your ass 35% Please consult your accountant or tax preparer to determine the specific tax treatment and benefits for your solar system. 4.)Federal MACRS depreciation schedule assuming a 35%federal margraltax rate and excluding any available state tax benefits.Consult your accountant or tax preparer to determine your effective taxrate 5.)Annual financing payment based on a term of: 8 years Rate is subject to credit approvals.Assumed interest rate is: 6.00% Annually 6.)Offset of energy is based on current electricity rate per kWh.Escalation assumption is: 4.00% Annually 7.)PBI/RECearned basedon system production multiplied bytheRECorthefixed perflod of time as defined on page 2 g)internal Rate of Return Rob L.M 30 Federa I St 3/12/2014 10122941 $60,000 $50,000 $40,000 $30,000 $20,000 $10,000 $0 ($10,000) ($20tOOO) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 f9 20 21 22 23 24 25 -Ionst-i— -s-- -�d,�16 i ure-wru-tvity-- This analysis i's based on estimated systm sumpr� rate reja ng costs performance and economic incentives.Actual performance and economic incentives may vary in amount Analysis or availability.Please consult with a tax advisor about any tax credits or deductions,including interest payments. A measure of energy consumption,it is the amount of energy consumed by a 1000-Watt appliance running for 1 full hour. Modified Accelerated Cost Recovery System- Under this system,the capitalized cost(basis)of tangible property MACRS is recovered over a specified life by annual deductionsfor depreciation. An angular measurement in a spherical coordinate system. The vectorfrom an observer(origin)to a point of Azimuth interest is projected perpendicularly onto a reference plane,the angle between the projected vector and a reference vector on the reference plane is called the azimuth. IRR Internal rate of return.The discount rate that makes the net present value of all cash flowsfrom your project equal to zero. Calculated by taking intial system investment and subtracting net system costfirom total system cost,offset, Cumulative cash flow depreciation and taking the absolute value and adding each year back on itself. Cumulative savings Takenfrom cashflow,summarizing annual cashflow based on savingsfrom,project Solarponels come with a 25 yearproduction warrantyfrom manufacturer and a ten year manufacturing Warranty Information warranty,Workmanship and other components generally come with ten year warranties years;See the individual specification sheetsfor additional details. Levelized Cost Levelized cost is calculated by dividing the Net Cost by the system production on an annual basis. FOR CONSTRUCTION Grid-Tied Photovoltaic System RGS DC Rating: 7.25 kW ENERGY Lutts,Rob 32'raulfwank Spur Al2 30 Federal St str"mon""01"78 Salem,MA 01970 Phone bha))535-3370 Fax(413)03 2225 Jurisdiction: Town of Salem Sheet List GRID-TIED PHOTOVOLTAIC SYSTEM Sheet No. Sheet Title 7.25kW DC @ STC Scope of Work: General Notes: PV-000 COVER LUT7S,ROB RGS Energy shall Install a 7.25 kW Gdd-ded Pholo,,oltalc(�PV�)System 1. System follows anylall Fire Code Setbaclos Per Ordinances of the PV-AO1 SITE PLAN 30 FEDERAL ST totaling(29)Canadian Solar CS6P125QP Modules with(29)Enphase Energy To.Of Salem. SALEM,MIA 01970 V!215�21_1_-S22-IG Micn,Inverter(s).The Modules shall be flush mounted 2. All pmjeds will comply with Me Ordinances of the Town of Salem. FV-A02 MODULE LAYOUT Proect If 101�941 on the asphaillcomp.shingle roof and interconnected via supply side tap. 3. Construction Hours:7am-8mn Monday-Friday,9arrh8pen Saturday, PV-A03 DETAILS DKN No time on Sunday or legal Holidays. 4. Product Data Shems shall be included. PV-AG4 MATERIALS RW Equipment Specifications: 5. Rooftop Penetrations shall be completed and smiecl Per code by a PV-EOI ELECTRICAL DIAGRAM 2014­(?8-12 Module:(29)Canadian Solar CSSP-250P licensed cormusector. rumner 1:(29)Emphase Energy M215-60�21_1_-S22-03 6. Al Photonvolatic modules shall be tested and listed by a recognized PIV-EO2 SYSTEM CALCS REVISIONS Racking;UniRac,SolarMount lahomado, # By Dow Notes Attachment Flashing;Eco-Fasten GreenIFasten with 7. Certifications shall include UL1703, EC61646,IEC61730. PV_G01 SIGNAGE CP-SO-Slofted Breast and Aluminum Flashing 8. A continuous ground shall be provided far Me Army and for all Phot000llWic Equipment. 2 9. DC Wiring shall be ron in metal conduit or raceways within encased 3 spaces in a building. 4 Roof Specifications: 10, Conduit,Wire systems and Raceways shall be located as dose as V Roof 1: possible to ridges,hips,and outside walls. Asphall/Comp.Shingle 11. Conduit between Sub Arrays and to DC CombinereftDiscannects,shall R (Single Layer) use guidelines Mat minimize the total amount of conduit by asking the T.10-Reuters @ shortest path. o 16"O.C. 12. Spam Requirements for electrical equipment shall comply with NEC Pitch:30' 1 �imutlh:173' Arbole 110. Amay Sim:29 Modules 13. Equipment grounding shall be sized in accandance with Table 250.1�. Site Specifications: 14. Connection;that am not readily accessible and Mat am used in Me Occupancy:11 armits operating at or over 30V AC or DC shall require a tool for Design Wind Speed:100 MPH opening and are required to be marked'Do not disconnect under 9 load"or'Not for current interrupting',per 690.33(c)&(a). Ei(stiSUM Campory:C Mean Roof Height:25 ft 15. Al signage to bes placed in accarxiamm with local building coce. Ground Snow Load:40 PSF(Reducible) 16. Signs or Directories shall be attached to Me electrical equipment or Adj.Roof Srhm Load:30.8 PSF located adjacent to Me identified equipment. als, 17. Signs should be ofsofficient durability to withstand the envirannneillo 0 18. Any plaques shall be metal or plastic with engraved or machine All Work to be In Compliance with: 2014 National Electrical Code(NEC) printed letters,or elec1mplating,in a red backgromnd with white effielug,a minimum of 318"height and all capital letters. 2009 International Residential Code(IRC) 2009 International Building Code(IBC) ene�p� 2012 International File Case IFC) 2012 Uniform Mechanical Code UMC) 2012 Uniform Plumbing Code(UPC) MA 780 CMR,SIM Edition -inducing�4/11 revisions to Tables R301.2(4)&RW1.2(5) 4 NIA ASCEIANSI 7.05 Minimum Design Loads for Buildings and Other Sibunctur., COVER As amended and adopted by Town of Salem A PV-000 = M = = M = = M = = M = = M M M = = M FOR CONSTRUCTION "W" 131�ffll ----------------- RGS ENERGY 32T�u,wunk Spu�Al2 (E)Property Line It so,"Inton,a 06�178 Phone(NO)535-3370 x(413)683-2225 Equipment Location:Exterior (E)Utly Meter GRID-TIED Equipment Location:Interior Mechanical Room PHOTOVOLTAIC SYSTEM (E)Main S.ryic.Disconnect E)Electrical Gutter with Taps Per Unit 7.25110N DC @ STC 1 2 Unity Meter-Per Unit (E)Multi Family Dwelling LUTTS,ROB (E)Main Sewice Panel-POI 30 FEDERAL ST (N)Fused W AC Disconnect MEM,MA 01970 I (N)PV Production Meter/Monitor Project#101 n941 (N)PV AC Combiner Panel — DKN — RW --n, 2014-08-12 REVISIONS # BY I Dats, No. J.'aarul 3 x ----------— Fd.11 St N SITE PLAN (E)Wallemy PV-AO1 FOR CONSTRUCTION PV ARRAY I MECHANICAL LOADS ��Arma,�AMO Total Photovoltaic Dead Load .1 at RGS 3 5:1 'E 51 Ym.ig g, id A Anchor'y'� 1608 1 Its Avg.Dead Load per Anchor 1 17.9 be ENERGY nchor Oty.: 90 iftirtsm'. 32T­�.k!xc�,Al2 Design VadiuU06 by l Ono Comer l Interior Storighoor,Ct M373 ives nifipl.�Riifi Span! 45 in.O.C. 48 in OC� t8 in.O.C. Phore(9.)535 3370 Fax(413)683 2225 Max.Un!R.o Rall Cantilever IS in.D.C. 1 6 In.O.C. 16 in.D.C. Adjusted Mchor Span: az in.O.C.­ h.97C. 32in.D.C. GRID-TIED Downforce,Point Load; '1073 line. 3 1 07:8 Is. 307.8 Ill PHOTOVOLTAIC SYSTEM Uplift Point Load; -179.1 loss -4T6.1 In. -150.1 line 1.2SkW DC @ STC Minimum Anchor Strengd,: 707 be LUTTS,ROB Average Safety Factor. 4.40 30 FEDERAL ST SALEM,MIA 01970 30' Project#10122941 — DKN — RW .—NiAn, 2014-08-12 REVISIMS # BY I Data Notes 3 4 V 20W Landscape Modules Require Vertical Rails 16"1. with Unistrut Sub-frame V-7 6' * Total Quantity ofAmchmertz=90 . Roof Zones am defined by dimension,a 3.0& 9 . Maximum Alowable Cantilever for UriRac Hall is Y3 the Maximum Rail Span . Racluing and Attachment UniRac,SolarMount with Ect,Fasten Gmen-Faston with CP-SQ-Slotted Bracinet and Aluminum Flashing attached with Lag Screw,Heux Head,18-11 SS,511 F x 3.1�'Length s W1 6" 1 . Ali Dimensions shown a.to module edge.,including I in.Spacing between Modules required when using the Top Clamp Method.The Rails Extend 3 in.Beyond the module edge. MODULE LAYOUT . UnII Requires one ffiernial expansion gap for every run of mil greater Man 40' . Army Installed according to Me UniRac SolarMount Code-Compliant installation Manual ver.227.3, Pub 1101616-1cc,June 2011 . Attachment Location.,If ho.,.. pprindmate.Final adjustment of attachment location may be necessary depending on field conifilions.Ali attachments am staggered amongst the framing members. PV-A02 FOR CONSTRUCTION Ground WEEB& Module Clamp RGS Undrac Solannoust ENERGY Rail /L-fth.t Green Fasten Flashing: 32T..esonkSpu,Al2 ECO-GFI-BLK-812 With rupison,U06378 hone(.60)S3S.337D Module(TYP.)) ECO-CP-SQ Compression Bracket Fox(413)683-2225 Rooftop �1 6'x 3.5-S.S.Lag Bolt GRUD-TIED .12 5"Minimum Penetration PHOTOVOLTAIC SYSTEM �ka(vxa �e� Sealed w/Approved Sealant 7.25kW OC @ STC Y, 0C. LUTTS.ROB 30 FEDERAL ST SALEM,MA 01970 Projectls 101M941 Attachment Profile Attachment Detail novan DKN �3/4--V 0- Scale:1"— RW 2014-08-12 16-Ms. 16'Max REVISIONS RoofFranning PV odule Rail Overhang Rail Splice Rail Overhang By chas No. 1 .1.14 Attachment 3 ii it Mcfenalmostad on alternate of framing members FM�,nl 2 supports N Stagger Splice I wthin dre eacft me,of modules on either side of splice 32"Max c1xir Spacm DiarMoust Rail o Will a max spacing of 4W �In Sta ered Attachment Detail (Typ.) Rail Splice Detail 3 NITS NITS X Ground WEEB& Module Clamp Module Frame Unins,Solamemlft SS Bol, Bracket V L-Foot "i, Module(TYP.) (Long Side Dovvn) I-W Sq.UniStrut Unirac Slotted Channel UGC-1 Green Fasten Flashing: Rooftop ECO-GF1-BLK-812 With VARIES ECO-CP-SO Compression Bracket& UnwacRail 5/16'.3.5'S.S.Lag Bolt DETAILS wl 2'Minimum Penetration 5 Groundin Clip & Module Sealed w/Approved Sealant Scale:N.T.S. Vertical Rail Detail Scale:1.=1'.0.. PV-A03 FOR CONSTRUCTION � es lo, E�nc Rool Zo�n losel B�ujldin s Suggested Bill of Materials RGS NOTE.Matenals baled below am subject to change dunag Final lanotaffalkin. ENERGY PART DESCRIPTION PARTNUMBER QTY 32 Tau,annk Spin,Al2 MININ01.11 nNSIGH MAPIS PinaNVOM�NIODU� 1.11'.. � I'll,....... .......... swesineon,CT 06378 --'cn.AN.cxacxN— Phone(80)$35 3370 bson. IN.a I M I iN Fax(413)683 2225 Rai Beii,hi Wind lemineurce Einelinerd 13.11dia,as Walls&Roofs - E,pN,,E—V M215 60-21�522-x Nees ww�uv6 n GRID-TIED ............... ..... PHOTOVOLTAIC SYSTEM .... ......... .......... ... ......... ..... E.O.m. 7.25kW DC @ STC e,' E N V 20& LUTTS,ROB a,a"a—eux G'ah,vie.'vm�za.-Ne.�N acraiani 1 30 FEDERAL ST zhNNe ini i�vcq oee—a,hao..wilih miji exa,...' SALEM,"01970 .............. Pmject#10122941 n,haac ii DKN ... ........— .. ... ........ nxh�Wowi 3.31 1 RW j..xid..oUKZae�.e1P&oa�ae'F Fansh �xaxac is U.I.,wwphountiwhi�iaexsn.necomiawninnh ean.� SO -Non— 201"8-12 ...... ......... �.'Nrs a wo-ti,iihanees REVISIONS unex.c nonaeo'cneon savrz�.nan a." xm� No lagioli.He.Hand,11.11, aa By Data Naboa Flat Roof Hip Roof(7* <0 2�27") Aniews anian. oca�a`�Fsexw Po �111aaio iai.-n ........ .................. 9 aneNeesaheiii,a, ..... ... ... eehvEeone'ka�um.eow,D,P.w.G-—,6,ne..a.IF... .. .......... MINN...WE............... . ..... V.11.11.ilen whas e I ENPFUJNiZN0 6 ENPH VWRHHU I Gable Roof(0!c 70) Gable Roof(7*<0:5 450) in—dieg,ee—eiiGneext 8 eaGROUNDUIP91 308=1S .... ........ End Zones ComrZories WileyElextrinecioeb,M-et G—ehNiumner P/N.16.47) I]z Wie-agkare,imue-�Narxxei ioppxr-�/wli 1-) 116 A�eel. - ......F.TC-i en 'I WH he I I I P I I P,ci ......... ........N.131..... ............. ..... ... 3ol.i. Strannoilia 1HdeV2QaxeGandParmer1,CCAPt12�) Leleentlef..'ex�10.�ln'thin &NI... R..Ronxf.�Thee. nuaeaum no ..... ...... vffixii—= I In ween"'a;v.Ix 14 B—ne,a a�P e.Tax,an coill ae.1-SODU1.2imIlliffialkiR 111:funb� 1.a.I .a I ozinnee ..i VARIES FRNR25 I Gr..d'0B,o,D4T"enanIN MATERIALS iffinivelb—one,xine. ......... ..... Unnee-100 345 tereaslienI aaa....� .2.1,xteeene a...I ........ ........ 1�A,V`Ini 1.n).�.h.xoe)io�iau—,.I.. .110N.e 1 A1111 1, PV-A04 ..... ........... ........- ------ FOR CONSTRUCTION Notes: WIRE SCHEDULE Wine Type Ground Siza&Type 1. At Conduit to use watetight expansion fittings. ty Sias Conduit ath 2. All Rooftop Conduit to be a minimum of V above the mal surface. #12 ENGAGE CABLE #6 AWG BARE Cu FREE AIR A RGS 3. PV Connection into Load Center shall be positioned at Me opposite end from give Utility Input feeder locationl(Where applicable) It 111,#10 THHl,kTHWN-2 #8 AWG THWN-2 314',EMT 50 ENERGY Peems' 4. At equipment to be rated NEMA-3R unless otherwise noted. C 3 IS THHNfTHWN-2 043 AWG THWN-2 3/4'EMT 20 F Re" 5. Lowest expected ambient temperature based on ASININE min,mean extreme Cry bulb temperature for ASHRAE location Most NA 3/4'EMT 10 Ft 321�u;�nlespa."l similar to installation. #6 THHN/THWN-2 ....... ........ Sterginton,CT 3678 6. Highest Continuous ambient temperature based on ASHRAE highest month 2%dry bulb temperature for ASHRAE location most WIRE SONG Phone(NO)SA5-3370 similar to installation. Fax(413)683.2225 7. All conductors to be copper unless noted offierwase. Tag Stes 9DPC Derated Arnapacity 75-C 8. Comiuctor slang shall limit Voltage drop to 2%DC&1.5%AC(2%for Eriphase Systems). (Allowable Amps x Tamp Derate x Fill Derater I Ampacity GRID-TIED A #12 30A X 0.76 = 22.80 A 25.00 A PHOTOVOLTAIC SYSTEM A_ B #10 40A X 0.76 X 0.8 = 24.32 A MOO 7.25kIN DC @ STC 118 55A X 6.96 X 1 =_52.60A 50.00 A LUTTS,ROB D #6 75A X 0.96 X 1 72.00 A 65.66 A 30FEDERAL ST SALEM.MA 01970 SYSTEM LABELING SPECIFICATIONS Pmj.1#101229111 Max.DC Voltage(-18'C): 42.6 V DC Max-Current, 11.09 A 66 bipsnating ViAtage. 36A V DC Opemling Current 8.30 A Nesn I.n..at-V Chugs: 208 V M 11..A.C C.uns I n I t: 17.2 A RW 1-12 RWSIONS By Dele Notes [UnKRI-OR--------------- I now .1.1. i 3 I-Phase 120P240V 4 Public Meter i M 400A (N)Enphase Envoy (E)Wire Gutter Containing Semice jTaps) ENV-120-01 t—o 29 Canadian Solar CS6P-250P Modules with 29 Eniphaso Energy 1,1215-60-21L-S�-113 Micro-Inverters Branch of 10 IN)SUBPANEL PRGWZG�P) FUSED 100A C DISCONNECT QM UTILITY FEED: 0 1)PV Meter 30A Enip ase(OEM:GE) 208 V 20V F71 RGMMTR-01 3-Phase 20ZAC Branch of 10 (N) 25A J-Box 4x4x4 M —100A 15A D NTS Branch of 9 C C 100A ELECTRICAL DIAGRAM S,...D RRIMIGEGBOrDEDTO PARTI.R.CC.I. Branclftol� i RAVVERSIBLE CRIMP PV-EO1 R..fto El.drical L-------------- P Interior Meoftanical Room Electrical i ---------------------------------------------------------------------------------------------------------------I------------------ FOR CONSTRUCTION MODULE SPECIFICATIONS TEMPERATURES RGS Canadian Sol.,CS6P-250P ENERGY Ambient Low Temperature: -18-C STC-Rating: 25OW Height: 64.5 in. Ambient High Temperature: 32-C 32raw,wonk Spur,Al2 ...... . ... PfcRating: 236W Width W.7 in. Risoiooi.hge caimirtiom 31.6 spvm.n,a OH78 -1. V-:.Igg'��V- .1 � I - Plh.n�(86M 535-3370 . ......... MP j.57 In. Temnix.Rise for Exposed Ccnduk on Roe. 22-C Fax(413)W3-222S I.: 8.3G A Area: IT3 W V oc: 37.2 V Weight: 4.1.9..I.b..a.. SYSTEM LABELING SPECIFICATIONS GRID-TIED I Sc: 8.87 A Me.x.Fuse: I i�O.0..A F m" DC Voltage(18'CL 42.6 V DC Max.Current 11:09 A PHOTOVOLTAIC SYSTEM .1 T a mp.Coeff.-V I w): -O.M 00%P 11 C DC Operating V011a9W 30.1 V Oprating.C.u 11 ment: 8.30A 7.25kW DC @ STC AC Nominal Vo Current 17.2 A UUTTS,ROB 30FEDERALST INVERTER 1 SPECIFICATIONS INVERTER I CURRENTS INVERTER I LABELING SPECIFICATIONS SALEM,MA 01970 Enphase Energy DCMax.Cumnt: MODULElscxl.25 Max.DC Voltage(-18'C); 42BV _�- DC Max.Current 1109 A Pmject#101�941 M215-60-21-L-S22-IG 837A x 1.25 11.09 A DC Operating Voltage 30.1 V DC biperaling Current B.M A - DKN N.MinaIVA.. 20BV .... ........- - 1".."AC Norn I in 11 a I 1 11 Voltage:.1 1.208 1 V M 11 a I x-1.A I CC I ument 17.2 ....... ... --- - 11 DC Operating dum.nt MOOULE Imp - RW Max.W m: 260 W 2014-08-12 M, --W x�: 215 W S.3A 8.30 A INVERTER 1 VOLTAGES -ax. ... ......... Source C.aeni.I pc. MODULE IS.x 1.25 x 1.25 REVISIONS swrtul,vollag.: �v 8.87A x 1.25 x 1.25 13.86 A DCMax.voltago MODULE Vocx TEMP DELTA xTEMP COEF Voc Ohutptdumnl�ln: f(INVE�kttikii��INVEFiT�kQtl�)11.i��j�i.�6 (-18'C): 37.2V x 43 x 0.0034 = 42S V # By I Data Notes Max.V 4B V........... .56 A bc Oporating MOLIGLE vnip M ex.V V [(1.03A x 29)/1.732] x 1.25 2 Voltage: 30.1V = 30.1 V Max.I oc: 15 A 3 Max.I 1�03 A a X N/A ELECTRICAL CALCS PV-E02 FOR CONSTRUCTION RGS ENERGY 32Tau,I Sp,Al2 Sto�,I 0 M78 PhOne(SW)535-3370 Fax(413)683-2225 GRID-TIED PHOTOVOLTAIC SYSTEM WARNING ELECTRIC SHOCK HAZARD I 7.25kW DC @ STC IF GROUND—FAULT IS RE CATED CUTTS,ROB NORMALLY GROUNDED CONDUCTORS 30FEDERN-ST SALEM,MA 01970 NEC Article 690.64(B)(4) Project#101229,11 It 705.10 NEC Article 690.5(C) — DIN! — RW --- 2014-(38-12 REVISIONS Every 1(Yon all wndult,j-boxes,& 0 BY Date Net. NEC Article 61 raceevays 1 DEC Article 690 1 NEC Article 690.6,1(8)(7) r4 NECArficlK &705.22(4) RAI E D MAX POWER ROWE R P 01 NIT CU R RE NIT 8,30 A RATED MAX POWER POINT VOLTAGE 30 1 V 8 MAXIMUM AC OPERATING CURRENT 172A MAX SYSI EM VOLTAGE 42.6 V MAXIM UM AC OPERATING VOLTAGE 208 V SHORT CIRCUIT CURRENT 11.09 A System Specifications System Spadfications NEC Article 690.54 NEC Mid.690M NTS SIGNAGE PV-GO1 ryolifl, Flo, I tit TI 016.- 114 The Commonwealth of Massachusetts Department of Public Safety Massachusetts State Building Code (780 CMR) Building Permit Application to Construct, Repair, Renovate or Demolish any Building other than a One- or Two-Family Dwelling Code and Other Requirements for Building Permits The Department of Public Safety has issued these building permit application forms so that municipalities across the state can move toward use of a single permit form and consistent permit application process. The MA State Building Code specifies the requirements of building permits and the applicant is advised to review and be familiar with these requirements in order to avoid some of the common permit application problems. Likewise the applicant should be aware that some municipalifies require that the owner confirm, even prior to acceptance of the building permit application, that no outstanding property taxes, water fees, etc. exist. Filing Instructions I.Please contact the city or town where the work will be done to ensure that the city or town will accept this application form and if any additional information is required, and obtain the correct mailing address. After doing so, print the application, fill in completely and then submit to the local city or town where the work will be done. 2.All applications shall be considered complete and will be reviewed if construction documents, specifications, fee, and other materials that may be required as indicated in the Building Permit Application are included with the application. 3.Please include a check for the Building Permit fee. The fee may be calculated using the information to be supplied in section 12 of the Building Permit Application. The check is to be made payable to the local city or town where the work will be done. The Commonwealth of Massachusetts Department of Public Safety Massachusetts State Building Code(780 CMR) Building Permit Application for any Building other than a One-or Two-Family Dwelling iii,u ... 7,(Flus Section for,,Qffic� Building Permit Number: Date�ppjied' ...]jBuiIding:CfhciA.. SECTION 1:LOCATION(Please indicateA.ocki#and Lot#'for locations forwfiich�a stre-et.addrAs is n 6-t4vailable) 30 Federal Street Salem 01970 No.mid Street City/Town Zip Code Name of Budding(if applicable) �SECT ON 2:PROPOSED WOR Edition of MA State Code used If New Construction check here 0 or check all that apply in the two rows below Existing Building 11 FRepaur El Alteration El I Addition 0 1 Demolition 0 (Please fill out and submit Appendix 1) Change of Use 0 1 Change of Occupancy 0 1 Other ZI Specify: solar Are building plans and/or construction documents being supplied as part of this permit application? Yes M No 0 Is an Independent Structural Engineering Peer Review required? Yes 0 No 0 Brief Description of Proposed Work Installation of a 7.25kW roof mounted solar array using 29 Canadian Solar CS6P-250P modules, 29 Enphase M215-60-2LL-S22 micro inverters, and all associated electrical work. SECTION 3:COMPLETE THIS SECTION IF EXISTING:BUILDINGIUNDERGOING�'REN,OVATION,;,ADDI-TION,OR-7 IN USE OR occup T'V:' CHANGE ANC Check here if arr Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) 13 Existing Use Gro up(s): Office Proposed Use Group(s): no change SECTION.4:BUILDINGHEIGHTAND AREA . No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.) Existing Proposed Total Area(sq.ft.)and Total Heig ht(ft.) e) - SECTION5;1SE GROUP(Check-as4pplicibl A: Assembly A-1 0 A-2 0 Nightclub 0 A-3 0 A-4 0 A-5 0 B: Business E: Educational 0 F: Factory F-I 0 F2 0 1* h Hazard H-1 El H-2 El H-3 0 H-4 0 H-5 0 E' L- - — FR: Residential R-10 R-2 13 R-3 0 R4 0 I: Institutional 1-10 1-2 0 1-3 0 1-4 0 M: Mantile 0 S: Storage S-1 13 S-20 U: utility El Special Use El and please describe below Special Use: S,ECTION�6:CONSTRUCTION,TYPE(Che&9 applicable) IA 0 IB 13 IIA 1:1 IIB 0 IIIA 0 IIIB 0 1 IVO JVAO VB 0 SECTION 7.SITE INFORMATION.(refer to 780 CMR111.0:for detailsion each item) Water Supply: Flood Zone Information: Sewage Disposal: Trench Permit: Debris Removal: Public 0 Check if outside Flood Zone El Indicate municipal 0 A trench will not be Licensed Disposal Site 13 Private 13 or indentify Zone:— or on site system 0 required 0 or trench or specify: permit is enclosed 0 Railroad right-of-way: Hazards to Air Navigation: MA Historic Commission[Zeview Process: Not Applicable 0 Is Structure within airport approach area? Is their review completed? or Consent to Build enclosed 3 Yes C3 or No 0 Yes 0 No 0 SECTIOM&CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code: Use Group(s):— Type of Construction: Occupant Load per Floor: Does the building contain an Sprinkler System?:—Special Stipulations: SECTION!9. PROPERTY OWNER AUTHORIZXTION Name mid Address of Property Owner Robert Lofts 216 Essex Street Salem, MA 01970 Name(Print) No.and Street City/Town Zip Property Owner Contact Information- 978 _ 745_ 9233 rob@ecabot.com Title Telephone No. (business) Telephone No. (cell) e-mail address If applicable, the property owner hereby authorizes Name Street Address City/Town State Zip to act on the property owner's behalf,in all matters relative to work authorized by this building permit application. -:SECTIONAO:;CONSTRUCTION CONTROQP,lease fill out Appendix 2)t** 7�_ (Ifbuil ing is less than 35;00�cu.ft.-of enclosed sp'ac6 and/ n6t unde'r!�C&struc*tion Controfthen check here EI and skip,Sectioii 10.1)�` 10.1 Registered Professional Responsible for ConsfnictiorcContr6I..r* Name(Registrant) Telephone No. e-mail address Registration Number Street Address City/Town State Zip Discipline Expiration Date 10.2 General-Contractor il, yi, nv J. Alteris Renewables dba RGS Energy Company Name Travis Genatossio Name of Person Responsible for Construction License No. and Type if Applicable 32 Taugwonk Spur,Al2 Storington CT 06378 Street Address City/Town State Zip 8605353370 kimberly.hendel@rgsenergy.com Telephone No.(business) Telephone No.(cell) e-mail address - SECTION 11:WORKERS'CONVENSATION INSURANCE AFFIDAVIT.(M.q:L�.152.§.Z5C(6)y A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Is a signed Affidavit submitted with this application? Yes 6 No 11 0 C SECTION12:,CONSTRUCTI N OSTS7ANb PERATEEE - Item E stimated Costs:(Labor and Materials) Total Construction Cost(from Item 6) $ 1.Budding $ 6,000 Building Permit Fee=Total Construction Cost x (insert here 2.Electrical $ 25,000 appropriate municipal factor) 3.Plumbing $ 4.Mechanical (FfVAq $ Note:Minimum fee-$_(contact municipality) 5.Mechanical (Other) $ Enclose check payable to 6.Total Cost $ 31,000 (contact municipality)and write check number here SEcti6N ii:SIG NAT'U' RE OF BUILDING PERMIT-APPLICA NT By entering my name below,I hereby attestunder the pains and penalties of perjury that all of the information contained in this application is fine and accurate to the best of my knowledge mid understanding. 860 535 - 3370 Please print and sign name Title Telephone No. Date 32 Taugwonk Spur,Al2 Stonington CT 06378 Street Address City/Town State Zip Municipal Inspector to fill out this section-upon application approvah Narne Date, Appendix 1 For the demolition of structures the building permit applicant shall attest that utility and other service connections are properly addressed to ensure for public safety. Please fill in the information below and submit this appendix with the building permit application. The building permit applicant attests under the pains and penalties of perjury that the following is true and accurate. Property Location(Please indicate Block # and Lot #for locations for which a street address is not available, 311 Federal Street Salem 01970 No. and Street City /Town Zip Name of Building (if applicable) For the above described property the following action was taken: Water Shut Off? Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0 Gas Shut Off? Yes 11 No 0 Provider notified and Release obtained? Yes 0 No 0 Electricity Shut Off? Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0 Other (if applicable) Yes 0 No 13 Provider notified and Release obtained? Yes 0 No 0 Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0 Other (if applicable) Appendix 2 Construction Documents are required for structures that must comply with 780 CMR 107. The checklist below is a compilation of the documents that may be required for this. The applicant shall fill out the checklist and provide the contact information of the registered professionals responsible for the documents. This appendix is to be submitted with the building permit application. I Checklist for Construction Documents* ark"x"where applicable No. Item Submitted Incomplete Not Required 1 Architectural 2 Foundation 3 Structural 4 Fire Suppression 5 Fire Alarm(may require repeaters) 6 HVAC 7 Electrical 8 Plumbing(include local cormections) 9 Gas(Natural,Propane,Medical or other) 10 Surveyed Site Plan(utilities,Welland,etc.) 11 Specifications 12 Structural Peer Review 13 Structural Tests&Insp ctions Program 14 Fire Protection Narrative Report 15 Existing Budding Survey/Investigation 16 Energy Conservation Report 17 Architectural Access Review(521 CMR) is Workers Compensation Insurance 19 Hazardous Material Mitigation Documentation 20 Other(Specify) FIToo,ib','r(Lssppzc:��)) *Areas of Design or Construction for which plans are not complete at the time of application submittal must be identified herein.Work so identified must not be commenced until this application has been amended and the proposed construction document amendment has been approved by the authority having jurisdiction.Work started prior to approval may be subjected to triple the or4inal permit fee. Registered Professional Contact Information Name(Registrant) Telephone No. e-mail address Registration Number Discipline Expiration Date Street Address City/Town State Zip Registration Nu Name(Registrant) Telephone No. e-mail address mber Discipline Expiration Date Street Address City/Town State 11, Name(Registrant) Telephone No. e-mail address Registration Number Discipline Expiration Date Street Address City/Town State Zip (flo.nonwea&al Majictc4�&M Official U-se Only Permit No. Occupancy and Fee Checked BOARD OF FIRE PREVENTION REGULATIONS, [Rev. 1/07] (leave blank) APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code(MEC),527 CMR 12.00 (PL FA SE PRINT IN INK OR TYPE ALL INFORMA TIOA9 Date: City or Town of- Salem To the Inspector qf Wires: By this application the undersigned gives notice of his orber intention to perform the electrical work described below. Location(Street At Number) 30 Federal Street Owner or Tenant Robert Lutts TelephoneNo. 978-745-9233 Owner's Address 216 Essex Street, Salem, MA 01970 Is this permit in conjunction with a building permit? Yes No (Check Appropriate Box) Purpose of Building Office commercial-no change Utility Authorization No. Existing Service Amps I Volts Overhead Undgrd No.of Meters New Service Amps I Volts Overhead Undgrd No.of Meters Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: Installation of a 7.25kW roof mounted solar array using 29 Canadian Solar CS6P-250P modules, 29 Enphase M215-60-2LL-S22 micro inverters, and all associated electrical work. Completion gLthe following ble inay be waived by the 12TLeclor gL fflrey. T No.at Tota No.of Recessed Luminaires No.of Ceil.-Susp.(Paddle)Fars Transformers KVA No.of Luminaire Outlets No�of Hot Tubs Generators KVA Above o In- Ei No.at Emergency Ligfiling— No.of Luminaires Swimming Pool grud. grud._- Battery Units No.of Receptacle Outlets No.of Oil Burners FIRE ALARMS IN,.of Zones No.of Switches No.of Gas Burners No.of Detection and Initiating Devices Total No.of Ranges No.of Air Cond. Tons No.of Alerting Devices No.of Waste Disposers Heat FK—W Na.of—Self-Contained Detection/Alertinit Devices Municipal E] other No.of Dishwashers Space/Area Heating KW LocalEl Connection No.of Dryers Heating Appliances KW Security Sgte,,gss� N'�of , or Equivalent No.of Water KW No.of No.of Data Wiring: Beaters Signs Ballasts No.of Devices or Eguivalent No.Hydromassage Bathtubs JNo.of Motors Total UP I elecommunications,Wiring. No.of Devices or Equivalent OTHER: Attach additional deaul if desired,or as i equired by the Inspector of Wires. Estimated Value off.lectrical Work: $25,000 (When required by municipal policy.) Work to Start: Sept2014 Inspections to be requested in accordance with MFC Rule 10,and upon completion. INSURANCE COVERAGE: Unless waived by the owner,no permit for the performance of electrical work may issue unless the licensec provides proof of liability insurance including"completed operation"coverage or its substantial equivalent. The undersigned certifies that such coverage is in force,and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE EJ BONDE3 OTHER [I (Specify:) I certify, under thepains andpenalties ofperjuty,that the informantatton this applicad n Is true and complete. FIRMNAME: Alteris Renewables dba RGS Energy 77 LIC.NO.:14005-A Z Licensee: Craig T. Reekie Signature LIC.NO.: (Ifopplicable,enter "exempt-in the license number line) Z99-- Bus.Tel.No.,860-535-3370 Address: 32Tauqwonk Spur.A-12.Stoninaton, CT06378 Alt.Tel.No,781-738-7156 *Per M.G.L.c. 147,s.57-61,security work requires Department of Public Safety"S"License: Lic. No. OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law. By my signature below,I hereby waive this requirement. I am the(check one E]owner El owner's a ent. Owner/Agent Signature Telephone No._ FEE. $ 8/20/2014 -UN- 1� a-gg� rA imp 8/20/2014 9ff mum om 2 ..............------------- U Z�41xlxl',,?�1�1�11,�, Ail, 1A 8/14/2014 3mmumma ;u—jrEs gal .$3009" 976-7115-9233 M-i 8/14/2014 Ai wl� 8/14/2014 Us all