Loading...
UTS Job 23418 Report 11 Compressive Strength Report - Concrete 06-25-2019 (003)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-25-2019Compressive Strength Report - Concrete Report No.11 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:4500# 3/4"No. Of Sets:3 99CUBIC YARDS: SET 1 LOCATION:GCC Pier #234 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H071 4.00 x 8.00 12.57 Good 06/25/19 07/02/19 7 45,000 3,580 2 H072 4.00 x 8.00 12.57 Good 06/25/19 07/09/19 14 56,500 4,490 2 H073 4.00 x 8.00 12.57 Good 06/25/19 07/23/19 28 71,000 5,650 1 H074 4.00 x 8.00 12.57 Good 06/25/19 07/23/19 28 67,500 5,370 2 H075 4.00 x 8.00 12.57 Good 06/25/19 07/23/19 28 66,000 5,250 1 Slump (in.)7 Air Temp. (F.)70 Conc Temp (F)72 Truck No.285 Ticket No.1297 Time 7:30 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:GCC Pier #91 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H076 4.00 x 8.00 12.57 Good 06/25/19 07/02/19 7 48,000 3,820 1 H077 4.00 x 8.00 12.57 Good 06/25/19 07/09/19 14 60,000 4,770 1 H078 4.00 x 8.00 12.57 Good 06/25/19 07/23/19 28 77,500 6,170 1 H079 4.00 x 8.00 12.57 Good 06/25/19 07/23/19 28 75,500 6,010 2 H080 4.00 x 8.00 12.57 Good 06/25/19 07/23/19 28 79,000 6,280 1 Slump (in.)5 1/2 Air Temp. (F.)70 Conc Temp (F)73 Truck No.273 Ticket No.4986 Time 9:10 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:GCC Pier #217 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type H066 4.00 x 8.00 12.57 Good 06/25/19 07/02/19 7 49,000 3,900 1 H067 4.00 x 8.00 12.57 Good 06/25/19 07/09/19 14 58,000 4,610 1 H068 4.00 x 8.00 12.57 Good 06/25/19 07/23/19 28 74,000 5,890 1 H069 4.00 x 8.00 12.57 Good 06/25/19 07/23/19 28 75,000 5,970 2 H070 4.00 x 8.00 12.57 Good 06/25/19 07/23/19 28 73,500 5,850 1 Slump (in.)7 Air Temp. (F.)70 Conc Temp (F)71 Truck No.1817 Ticket No.5002 Time 1:00 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders Received 6-27-19 Inspector Premium Travel Name Time Hours Time Mark Geraci No Max Day 1 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-25-2019Compressive Strength Report - Concrete Report No.11 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Riley Bourque UTS Matt Chace Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-25-2019Compressive Strength Report - Concrete Report No.11 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries FIELD SUMMARY REPORT Total Pour:GCC Holes; Building #1: 321, 322, 323, 324, 325, 326, 327, 328, 329, 330, 331, 332, 333, 231, 232, 234, 218, 217, 216 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)5-7 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 06-25-2019 Report No.11 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment